Sarawak to Electrify Sabah from End-2023

Total Page:16

File Type:pdf, Size:1020Kb

Sarawak to Electrify Sabah from End-2023 Headline Sarawak to electrify Sabah from end-2023 MediaTitle The Star Date 09 Aug 2021 Language English Circulation 175,986 Readership 527,958 Section StarBiz Page No 3 ArticleSize 460 cm² Journalist By JACK WONG PR Value RM 69,717 ENERGY By JACK WONG Sarawak to electrify KUCHING: Sarawak is set to export an initial 30 megawatt (MW) of electricity to Sabah for 15 years, from end-2023. The power export will be via a 31km 275kV Sabah from end-2023 double circuit transmission line which will run from Lawas in northern Sarawak to Mengalong in Sabah. Sabah Electricity Sdn Bhd (SESB) and Syarikat SESCO Bhd, a subsidiary of Sarawak Power-export deal is set for 15 years Energy Bhd, had signed a power exchange agreement and an interconnection agree- wmmmmmammmmimmmm^m 944MW Murum dam and a smaller Batang Ai ment via a virtual ceremony last Friday. dam. This marked a historical milestone in the It is now constructing the 1,285MW Baleh journey towards materialising the Borneo "This project is hydro dam. All the dams are located in the Grid and the wider Asean Power Grid. upper reaches of the Rejang River in Kapit SESCO has been exporting electricity to a/so expected to division. west Kalimantan in Indonesia for several Tenaga Nasional Bhd chairman Datuk Seri years. facilitate economic Mahdzir Khalid said the agreements signed The signatories for the agreements were was paramount in line with SESB SESB CEO Datuk Abdul Nasser Abdul Wahid collaboration Sustainability Plan and the aspiration of and Sarawak Energy group CEO Datuk BIMP-EAGA and the Heads of Asean Power Sharbini Suhaili. between the Utilities/Authorities. Sarawak Chief Minister Datuk Patinggi two states." Johari said the SESB-Sarawak Energy col- Abang Johari Tun Openg and his Sabah coun- laboration would bring Sabah and Sarawak terpart Datuk Seri Panglima Hajiji Noor were Datuk Amar Abdul Hamed Sepawi closer to a sustainable energy future, further among those who witnessed the event. contributing to the reduction of carbon emis- The interconnection is expected to com- sions in the region. mence by end-2023 once the grid expansion It will also ensure energy supply security under the Sarawak Energy's Northern Agenda and bilaterally optimised operation costs has connected Miri to the northern towns of while attracting investments for economic Limbang and Lawas in Sarawak, according to he pointed out. Sarawak and provide power for its growth. transformation in the Borneo region. a SESB-Sarawak Energy joint statement. Abdul Hamed said the Sarawak-Sabah These resources, according to the utility Building upon the proven success of its Sarawak Energy chairman Datuk Amar partnership will be one step closer to materi- body, have enabled it to offer reliable and renewable energy development strategy, he Abdul Hamed Sepawi said this interconnec- alising the Borneo Grid agenda and could act competitively-priced electricity to its domes- said, Sarawak Energy is spearheading the tion project is expected to diversify the gener- as a catalyst for the wider Asean Power Grid. tic, commercial and industrial and export green energy agenda to promote a low car- ation mix for Sabah and Sarawak while In 2016, Sarawak began export electricity customers. bon economy and transformation through enhancing system reliability and security by to west Kalimantan through a 120km 275kV Sarawak Energy's electricity supply is pre- the development of cleaner energy alterna- sharing generation resources for both double circuit transmission line stretching dominantly renewable, following Sarawak's tives such as hydrogen and solar. Sarawak Energy and Sabah Electricity. from Mambong in southern Sarawak to pivot to renewable energy resources under According to Sarawak Energy, Sarawak has 'This project is also expected to facilitate Bengkayang in west Kalimantan. the Sarawak Corridor of Renewable Energy recorded a reduction in carbon intensity for economic collaboration between the two Sarawak Energy is Malaysia's largest strategic initiative. power generation by 76.5% from 2009 to states, accelerating energy transformation renewable energy provider, harnessing its Sarawak Energy owns and operates the 2020, contributing to global climate action and supporting economic growth in Borneo," abundant natural resources to light up 2,400MW Bakun hydro electric dam and efforts. .
Recommended publications
  • Buying Renewable Energy in Malaysia
    MAY 2021 Buying Renewable Energy in Malaysia Corporate Renewable Energy and Low Carbon Supply Chain Series Malaysia’s electricity market provides corporate buyers of Population Average Electricity Price (Est.) renewable energy with multiple procurement pathways, Malaysia 32,644,524 $.09 - .10/kWh including corporate power purchase agreements (PPAs) and a variety of other bundled and unbundled options. at a Glance Current Renewable Energy Mix Projected PPA Cost (Est.) The volume of corporate transactions has thus far been (Incl. Large Hydro) $0.07 - .09/kWh limited, but attractive osite PPA opportunities are 23% emerging and will be a private sector demand driver in the coming years. With prices that are increasingly cost Renewable Energy Goal Estimated Unbundled EAC Price (Incl. Large Hydro) $1 - 2/MWh competitive and an ability to create significant carbon 31% by 2025 benefits due to the country’s heavy reliance on coal and natural gas, Malaysia is well positioned to facilitate the Grid Emissions Factor Bundled EAC Price growing appetite for renewable energy by multinational 0.64 kgCO2/kWh $19/MWh and local companies alike. Renewable Energy Procurement Options RE100/CDP Procurement Option Availability Key Considerations Eligibility Process Supportive Policies, Contact Local Solar Onsite Renewables Limited Generation Providers TNB Is Single Retail Subscribe To myGreen+ Retail Renewable Energy Provider Oering From TNB Both I-RECs and TIGRs Procure Using mGATS Platform Unbundled EACs Available. I-RECs Associated or Directly From Projects
    [Show full text]
  • Marine Renewable Energy Legal Framework in Malaysia: a Way Forward
    Journal of Sustainability Science and Management eISSN: 2672-7226 Volume 15 Number 3, April 2020: 101-112 © Penerbit UMT MARINE RENEWABLE ENERGY LEGAL FRAMEWORK IN MALAYSIA: A WAY FORWARD FARAHDILAH GHAZALI*1 AND MAIZATUN MUSTAFA2 1Institute of Oceanagraphy and Environment, Universiti Malaysia Terengganu, 21030 Kuala Nerus, Terengganu, Malaysia. 2Ahmad Ibrahim Kulliyyah of Laws, International Islamic University Malaysia, Jalan Gombak, 53100 Selangor, Malaysia. *Corresponding author: [email protected] Abstract: Being a nation that is surrounded by seas, Malaysia is seen to have the potential to harness energy from the sea. At present, renewable energy is already considered to be an important focus within the country’s low emissions strategy particularly through the enforcement of the Renewable Energy Act 2011. However, the scope of this Act is inadequate to include energy from the sea as it is confined only to eligible renewable energy sources under the feed-in tariff scheme. The objective of this paper is to highlight the legal and regulatory requirements governing marine renewable energy development in Malaysia particularly in sustainably capturing tidal and wave potential. As an alternative, this paper explores the viability of ocean energy as another source of renewable energy. The paper adopts a doctrinal approach and suggests some measures within the law and policy which when considered would help towards the development of marine renewable energy. The authors recommend for Malaysia to adopt the Nova Scotia’s legal framework. This model could well be applied provided that there is a strong political will and policy drivers to achieve the national objectives in accelerating renewable energy sector, particularly from marine sources.
    [Show full text]
  • SURVIVAL – the Future of Our National Electricity Industry
    (AWER) Malaysia Research Energy and Water of Association of 2011 © Published by: Association of Water and Ener Copyright Passion . Resourceful . Professional . Sustainable . Continuous Improvement gy Research Malaysia (AWER) SURVIVAL – the future of our national electricity industry CONTENT (AWER) Part Item PageMalaysia 1 Background Information 2 2 Electricity Industry In Malaysia 8 3 Sustainable Electricity Industry with Equitable Tariff 12 4 CASE STUDY 1: Power Purchase Agreement (PPA)Research 18 Renegotiation 5 CASE STUDY 2: Sarawak To Be Regulated under 22 Energy Energy Commission CASE STUDY 3: Liberalisation of Electricity industry 23 6 and – Is It A Holistic Solution for Malaysia? 7 The Way Forward 26 Water This report is published by Persatuanof Penyelidikan Air dan Tenaga Malaysia (AWER). This report is copyright of AWER. Persatuan Penyelidikan Air dan Tenaga Malaysia (AWER) Email: [email protected] Website: www.awer.org.my Copyright © 2011 by Persatuan Penyelidikan Air dan Tenaga Malaysia (AWER). Association All rights reserved.of No part of this publication may be reproduced or distributed in any form or by any means, or stored in a database or retrieval system, without prior written permission of the publisher. 2011 ISBN 978 -967-10394-1-0 © 1 | Page Copyright SURVIVAL – the future of our national electricity industry Part 1: (AWER) Background Information 1.1 Electricity Industry Model Malaysia The electricity industry works in a simple model of converting energy resources into electricity. The structure, operation and financial implications form a NATURAL MONOPOLY in the electricity market all over the world. Diagram 1 shows the simple flow of electricity industry model in Malaysia.
    [Show full text]
  • Dam Operation Under Changing Climate: Analysing Water Availability and Hydropower Production from Murum Dam in Sarawak
    K. W. Yusof, et al., Int. J. Sus. Dev. Plann. Vol. 14, No. 3 (2019) 237–244 DAM OPERATION UNDER CHANGING CLIMATE: ANALYSING WATER AVAILABILITY AND HYDRopowER PRODUCTION FROM MURUM DAM IN SARAWAK KHAMARUZAMAN WAN YUSOF1, MUBASHER HUSSAIN2 & MUHAMMAD RAZA UL MUSTAFA1 1 Department of Civil and Environmental Engineering, Universiti Teknologi PETRONAS, Sri Iskandar, Malaysia. 2 Hydro Department, Sarawak Energy Berhad, Kuching, Malaysia. ABSTRACT In this study, we assessed the climate change impact on water resources availability and hydropower energy yield from the Murum Dam in Sarawak state of Malaysia. Precipitation ensembles of three general circulation models from Coupled Model Intercomparison Project Phase 5 (CMIP5) were used to simulate daily inflows at Murum Dam for the historical period of 1976–2015 and for the future period of 2011–2100 under two future scenarios (RCP4.5 and RCP8.5). A rainfall-runoff model was developed using Australian Water Balance Model approach to simulate river inflows atM urum Dam. Reservoir operation model was developed using HEC-ResSim to simulate the operation for Murum Reservoir under the historical and future projected inflows. It is noted that the mean river inflow at Murum Dam would increase by 4% and 11% during 2080s under RCP4.5 and RCP8.5, respectively. Similar results are noted while simulating the Murum reservoir operation; it is noted that the average annual energy from Murum Hydroelectric Plant would increase by 5% and 12% during 2080s under RCP4.5 and RCP8.5, respectively. Keywords: climate change, hydropower, reservoir operation, Sarawak, water resources. 1 INTRODUCTION Hydropower is the major source of global renewable energy production as it is the most eco- nomical source of renewable energy.
    [Show full text]
  • Rights, Rivers and Renewables Lessons from Hydropower Conflict In
    Utilities Policy 55 (2018) 189–199 Contents lists available at ScienceDirect Utilities Policy journal homepage: www.elsevier.com/locate/jup Rights, rivers and renewables: Lessons from hydropower conflict in Borneo T on the role of cultural politics in energy planning for Small Island Developing States ∗ Rebekah G. Shirleya, , Jettie Wordb a Renewable and Appropriate Energy Laboratory, University of California, Berkeley, USA b The Borneo Project, Berkeley, CA, USA 1. Introduction accepted ideals turn in to practice. There has generally been a failure to meaningfully engage with customary law and the implementation of 1.1. The intersection between indigenous rights and Small Island Developing culturally inclusive planning policy (Techera, 2010). Given the growing States (SIDS) number of large-scale energy projects being developed in SIDS, the magnitude of their potential impacts, and how directly cultural dy- The special role of Small Island Developing States (SIDS) in global namics can affect decision-making processes in such spaces, it is critical environmental protection and the universal importance of their fragile to advance discussion of the role of cultural politics in energy planning ecosystems was solidified in the Declaration of Barbados andthe for SIDS. Barbados Program of Action (BPOA, 1994). Indigenous peoples have In this paper we deconstruct the case of an energy mega-project in also obtained a greater voice at the international level in the past two Borneo - an island in the Pacific shared by three sovereign countries, decades, with the Decade of the World's Indigenous People from 1995 and home to some of the last remaining primary forest of Southeast and the United Nations Declaration on the Rights of Indigenous Peoples Asia.
    [Show full text]
  • Sarawak Report Taib Corruption
    Sarawak Report Taib Corruption Double-edged and repellant Jerrold stores his heat slices mutualizes connaturally. Gleetiest Ira never compute drizzly,so subject but orwelcome garagings Lukas any browbeating unavoidableness cynically obdurately. or disillusionises Sometimes irresolutely. darkening Erastus evinces her swap The interview with which begins the sarawak report APs, to spot few businessmen, some stun them said to be suspend to Rafidah. Najib had determined quick efficient order but Domestic Trade, Cooperatives and Consumerism Ministry to halt the allegation towards Suaram for its links to currency speculator George Soros. The crooks of BN Sarawak, now passing under your different company, sit allied to the government benches in the Assembly protected by PH and pale from enquiry and prosecution. London lawyers who landed on haircut and ward should buy, we need always free press. Onn Mahmud controls shipping permits. The ministers, as elected representatives, were also answerable to the Dewan Rakyat or lower bone of Parliament, Aziz added. Kadir Jasin said today. Given a remote location, children unless these communities do not reflect access to schools. Jamilah Taib Murray, the climax of Taib. The lecture slides were hastily removed from the official SEB Web site after environmental groups discovered and downloaded it. Others have all pretty exotic. However, they thought had then admit that SAKTO when relief was founded was several Taib family members. The problem note that the affluent and size of buddy the proposed HEP dams are huge. Malaysian sovereign last month, warned BNP Paribas. The exact total shape of public funds expended for the completion of initial project, but, remains unknown.
    [Show full text]
  • Sarawak Energy Berhad Tender for Bakun Dam
    Request for Tender Notice SARAWAK ENERGY BERHAD TENDER FOR BAKUN DAM UNDERWATER INSPECTION USING REMOTE OPERATING VEHICLE (ROV) TENDER NOTICE Suitably qualified tenderer is invited to quote for the above caption. The tender must be submitted using the original tender document purchased from Sarawak Energy head office. Tender Title Eligibility Reference No. Bonafide Tenderer and Tender for Bakun Dam Underwater Have successfully completed at CAI/HQ- Inspection using least (3) THREE underwater BAKUN/2017/01 Remote Operating Vehicle (ROV) inspection works using Remote Operating Vehicle (ROV) in the last five (5) years. The Tender Documents are available to the public for viewing and purchase at Level 1 (North Wing), Corporate Procurement Division, Sarawak Energy Berhad, Menara Sarawak Energy, No. 1, The Isthmus, 93050 Kuching, Sarawak between 16th October 2017 until 17th November 2017 on the following times: Monday to Thursday: 8:00 am to 12:00 pm Friday: 8:00 am to 10:30 am One set of Tender Documents will be issued upon payment of a non-refundable document fee of RM212.00 (inclusive of 6% GST), in either bank draft or crossed cheque from a bank incorporated in Malaysia, made in favour of Syarikat SESCO Berhad by no later than 17th November 2017. Tenders shall be submitted as specified in the Tender Documents, not later than 3:00PM on 22nd November 2017 to: Officer-In-Charge Sarawak Energy Berhad Tender Box, Level 1 (North Wing) Menara Sarawak Energy No. 1 The Isthmus 93050, Kuching Sarawak, Malaysia Sarawak Energy is not liable for the costs incurred by the tenderers in preparing the tenders.
    [Show full text]
  • 2016 Annual Report
    Power to Grow SUSTAINABLE ENERGY FOR SARAWAK AND BEYOND ANNUAL REPORT 2016 SUSTAINABLE ENERGY FOR SARAWAK AND BEYOND “Sustainable energy for Sarawak and beyond” captures our ambition to provide clean and reliable power for the growth and prosperity of the region. This year, we officially opened the Murum Hydroelectric Plant, enabling us to deliver an additional 944MW of energy to Sarawak; began to export power to West Kalimantan in Indonesia; signed a letter of intent with the Northern Province of Kalimantan and continued our plans to work with Brunei and Sabah to advance the Borneo Grid. As we develop our indigenous natural resources in pursuit of economic and social progress, renewable, reliable and affordable energy will play an increasingly vital role in accelerating sustainable development for Sarawak and the region. Murum HEP is located on the Murum River in the upper Rajang River basin, 200km from Bintulu. It is designed to produce 711MW (constant) and 944MW (peak) from a 2,750sq km catchment area feeding a 270sq km reservoir. Construction began in 2008 and by mid-2015 the station was fully operational, delivering its specified power into the State Grid. INSIDE THIS REPORT About this Report 03 Chairman’s Message 20 2016 Key Highlights 06 Group CEO’s Message 24 About Sarawak Energy 08 Management Discussion & Analysis 28 Corporate Information 09 Developing Our People, Leadership Vision, Mission & Living Our Values 11 and Teamwork 31 OVERVIEW Five-Year Group Financial Highlights 12 Health, Safety and Environment 35 OF SARAWAK ENERGY
    [Show full text]
  • 2017 Annual Report
    Sustaining VALUE & Continuous growth A N N U A L R E P O R T 2 0 Our 2,400MW Bakun Hydroelectric Plant 1 7 The year 2017 will be remembered for the acquisition of Sarawak Hidro from the Ministry of Finance through a RM2.5 billion share sale agreement, enabling Sarawak Energy to assume control of Sarawak Hidro. As owner and operator of the 2,400MW Bakun Hydroelectric Plant (HEP), the largest hydropower plant in the country, Sarawak Energy can integrate operations of Bakun HEP into the Group, resulting in better reliability of power supply and efficiency in resource allocation. Sarawak Energy can also have greater flexibility to maximise and operate electricity supply in Sarawak and power sustainable growth and prosperity in the state. Sustaining VALUE & Continuous growth Sarawak Energy Excellence 2020 FUTURE PRESENT (2020 and beyond) PAST (2017 to 2019) (2010 to 2016) VALUE GROWTH & REGIONAL EXPANSION SUSTAINING VALUE & CONTINUOUS GROWTH • Strengthening equity of Sarawak SIGNIFICANT Energy Group for further growth GROWTH & VALUE CREATION • Sustainability of value for realisation • State’s growth and development in the next stage • Revenue increase – 3 times • Borneo Grid • Consolidate and protect value created • Generation capacity increase A over past years > 3,000MW • Continuing the growth agenda N • More than 2,500 manpower recruited N U A L R E P O R T 2 0 1 7 Sustaining Value & Continuous Growth As Sarawak Energy marches towards achieving its ambition of becoming a regional powerhouse, we aim to uphold the high standards and operational momentum that our internal and external partners and industry players throughout the region have come to expect.
    [Show full text]
  • 01 02 03 04 05
    INVESTOR PRESENTATION 01 INTRODUCTION TO TENAGA 02 REGULATORY TABLE OF CONTENT 03 BUSINESS STRATEGY & DIRECTION 04 CAPITAL MANAGEMENT 05 FINANCIAL & TECHNICAL HIGHLIGHTS INTRODUCTION TO TENAGA Sabah Electricity Sdn Bhd (SESB) (83% owned by TNB) Dependable Capacity: 1,257MW MALAYSIA Tenaga Nasional Bhd (TNB) Sarawak Energy Bhd (SEB) Holds ‘Golden’ PRIME MINISTER / CABINET Share Ministry of Finance/ Policy Maker Khazanah Nasional Berhad MINISTRY of ENERGY, TECHNOLOGY, SCIENCE, CLIMATE CHANGE AND i. EPF ENVIRONMENT (MESTECC) ii. PNB iii. Other Govt. Agencies Implementor Other Corp. & ENERGY COMMISSION (Regulator) Public - Promote competition - Protect interests of consumers Foreign - Issue licenses - Tariff regulation Shareholders Market participant Tenaga Nasional Berhad IPPs Regulatory & Shareholding Structure & Shareholding Regulatory Consumers 33 INTRODUCTION TO TENAGA Distribution Network & Generation Grid/Transmission Customer Service Non-Regulated Business Regulated Business TNB Generation Mix: Installed Capacity: Distribution Network Length: 25,196MW Transmission Network Length: 660,038KM Oil & Distillate 0.01% TNB: 14,038MW @ 55.7% IPP: 11,158MW @ 44.3% 23,082KM Solar 0.2% Distribution Substations: Generation Market Share: Hydro 5.1% 81,327 51.2% Transmission Substations: Core Core Business 443 SAIDI: Gas & LNG 37.8% Equivalent Availability Factor 39.2mins (EAF): Transmission System Minutes: 87.7% Customer Satisfaction Index (CSI): Coal 56.9% 0.27 mins Note: TNB installed capacity & Market Share 8.1 are based on gross capacity Source: TNB Data / Info as at September 2019 Main Subsidiaries Non-Regulated Business Operation &Maintenance (O&M) Renewables, Energy Efficiency & Other Services Education & Research • TNB Repair & Maintenance Sdn. Bhd. (REMACO) • TNB Renewables Sdn. Bhd. • TNB Integrated Learning Solution Sdn. Bhd. • GSPARX Sdn. Bhd.
    [Show full text]
  • Rural Electrification in East Malaysia - Achieving Optimal Power Generation System and Sustainability of Rural Electrification Projects
    Rural Electrification in East Malaysia - Achieving optimal power generation system and sustainability of rural electrification projects Tian Shen Liang Master of Science Thesis KTH School of Industrial Engineering and Management Energy Technology EGI-2016-069 SE-100 44 STOCKHOLM Master of Science Thesis EGI-2016-069 Rural Electrification in East Malaysia - Achieving optimal power generation system and sustainability of rural electrification projects Tian Shen Liang Approved Examiner Supervisor 26/1/2016 Viktoria Martin Viktoria Martin Commissioner Contact person Tian Shen Liang 1 Abstrakt Syftet med detta projekt är att föreslå förbättringar till en icke-statlig organisation i Malaysia, Lightup Borneo, för utformning av ett optimalt elproduktionssystem som kontinuerligt kan leverera el. Dessutom diskuteras hur hållbarhet kan uppnås i elektrifieringsprojekt på landsbyggden. Projektet har sträckt sig över sex månader, och inkluderar resultat från faktainsamling, fältarbete, samt en datorsstödd fallstudieanalys med hjälp av mjukvaran Homer. Statliga program för elektrifiering har undersökts, och verkar som referenser för genomförande av projektets mål. Kampung Mantapok valdes som föremål för fallstudien. Det system som för närvarande är installerat i denna by består endast av en 10 kW mikrovattenkraftverk med en enkel kontrollmodul. Byns totala elbehov är 53.72 kWh/d, med dagliga toppbelastningar kl 11 samt 17. Ett antal systemkonfigurationer, baserade på faktorförsök har utvärderas med HOMER. En systemkonfiguration bestående av en 10 kW mikrogenerator för vattenkraft, en 3 kW inverter samt två 280 Ah batterier valdes. I denna utformning erhölls det lägsta COE och NPC – RM 0.181 (US$ 0.045) respektive RM 46,230 (US$ 11,558). Denna konfiguration tillgodoser 100% av elbehovet på årsbasis.
    [Show full text]
  • Downloaded It
    Economic Development via Dam Building: The Role of the State Government in the Sarawak Corridor of Renewable Energy and the Impact on Environment and Local Communities Andrew Aeria* Since 1970, as a consequence of Malaysia’s New Economic Policy (NEP) and its integration into the global economy, the development achievements and per capita GDP growth of the resource-rich state of Sarawak have been impressive—although not without problems. Since timber and petroleum resources are exhaustible, and there is a concern with finding new sources of growth and revenue, the federal and state governments advocated industrial diversification in 2008 via the development of a multibillion-ringgit regional development corridor called the Sarawak Corridor of Renewable Energy (SCORE). Central to the success of the huge developmental corridor was cheap hydroelectric power (HEP). For the Sarawak government, SCORE’s launch and eventual success were based on the availability of abundant water resources and suitable hydropower dam sites in the state. Yet, SCORE is likely to contribute to further environmental degradation and impact negatively upon the livelihoods and welfare of local communities. This paper examines this recent development trend and its consequences. Specifically, it examines the role of the Sarawak state government in advocating the construction of numerous HEP dams, the role of foreign and local investment in SCORE, and their collective impact upon the environment and local communities. What this paper reveals is the nexus of close relationships that binds key politicians in the state administration with crony businesses associated with foreign-linked contracts that has proven to be destruc- tive socially and environmentally.
    [Show full text]