Power Week Asia Energy Planning and Development in ,

Dato Ir. Alice Jawan Empaling Permanent Secretary Ministry of Utilities Sarawak Sarawak, Malaysia About Sarawak, Malaysia

❑ 12.4million hectars ❑ Highly diverse ❑ English as the main language of commerce ❑ - state capital About the Ministry of Utilities Sarawak

❑ Supporting Sarawak Government’s Post COVID-19 Economic Recovery Strategy 2030 ❑Our Role ❑Our Vision ❑ Implementing Agency for Power Supply and Energy Development is Sarawak Energy Berhad About the Ministry of Utilities Sarawak

Sarawak Economic Action Plan About the Ministry of Utilities Sarawak

Rural Electrification Development ✓Rural Power Supply Scheme (RPSS) ✓Rural Electrification Scheme (RES) ✓Stand-alone Hybrid System ✓Sarawak Alternative Electrification Supply (SARES) ✓Additonal or Late Applicant Fund (ALAF) Holistic View of Energy Development Holistic Energy Development Benefits

Digital Economy

Accelerated Enhanced Infrastructure Standard of Development Living Increased Jobs, & Average RM 0.285cents (USD0.062 cents) Business Opportunities Improved Amenities Holistic Energy Development A Balanced Generation Mix 4% 0.5% 0.8% 0.8% 12.0% 1.1% 0.2% 21.1% 15.6% 10.2% 3.1% 0.5% 67.9% 8.0% 12.6% 11.2% 66.1%

73.4% 2030f 35.6% 44.2% 2020 7,437MW 2015 5,222MW 2010 4,705MW Generation Type 1,346MW Hydro Gas

Alternative Large Scale Off Grid 2020 –Installed Capacity by end of 2020 (excluding standby generators) 2030f – Forecasted Installed Capacity by end of 2030 (consist of non-committed generations) Energy Solar Diesel Holistic Energy Development Advancing Renewable Hydropower

Batang Ai Bakun Murum

108 MW Installed Capacity 2,400MW Installed Capacity 944 MW Installed Capacity Commissioning Date: 1985 Commissioning Date: 2011 Commissioning Date: 2014

Our HEPs are developed according to International Commission on Large Dams (ICOLD) standards and guidelines to ensure they are built and operated safely, efficiently, economically and are environmentally and socially equitable. Holistic Energy Development Advancing Renewable Hydropower

Baleh 1285MW Installed Capacity Expected Commissioning Date: 2026

Our HEPs are developed according to International Commission on Large Dams (ICOLD) standards and guidelines to ensure they are built and operated safely, efficiently, economically and are environmentally and socially equitable. Holistic Energy Development Indigenous Thermal Resources for Energy Security GAS

Tg. Kidurong CCGT Power Plant

Bintulu (Gas) Tanjung Kidurong CCGT

317MW CC Installed Capacity 842MW CC Installed Capacity Commercial Operations: 1999 Commissioning Date: 2021 Malaysia’s First Clean Development Mechanism (CDM) Plant Holistic Energy Development Indigenous Thermal Resources for Energy Security COAL

Sejingkat (Coal) (Coal) Coal-Fired Power Plant

624MW Installed Capacity 210MW Installed Capacity 270MW Installed Capacity Commissioning Date: 2019 Commercial Operations: Commercial Operations: Phase 1 -1998, Phase 2- 2009 2005 Holistic Energy Development A More Modern Power System

BUNUT 500/275kVS/S SAMALAJU NEW TANJUNG KIDURONG CCGT P/S 400MW Hydroelectric Plant TANJUNG KIDURONG CCGT P/S 400MW SARAWAK POWER GENERATION P/S 317MW SIMILAJAU 500/275kV S/S Diesel Power Plant TANJUNG KIDURONG 132/33/11kV S/S MUKAH POWER GENERATION P/S 270MW Gas PowerPlant

Coal Power Plant

BALINGIAN P/S 622MW MURUM HEP944MW Existing 275kV Substation Existing 132kV Substation BAKUN HEP2,400MW Future 500/275/132kV Substation Existing 275kV Transmission Line TANJUNG MANIS Existing 132kV Transmission Line MAPAI 500/275kV S/S 500kV Transmission Line Energized at 275kV Future 275kV Transmission Line Future 132kV Transmission Line SEJINGKAT POWER CORPORATION P/S 210MW BALEH HEP 1,285MW Future 500kV Transmission Line KUCHING

TONDONG 500/275kV S/S MAMBONG SERIAN BATANG AI HEP 108MW

BADAU Electrifying Sarawak & Beyond

Power to Grow Towards Full Electrification by 2025

Utilising renewable and clean energy to light up communities Sarawak Corridor of Renewable Energy (SCORE) Hydro- Industralisation Samalaju Industrial Park Towards a Renewable Energy Power House Progress within Borneo to unlock the ASEAN Grid

Perusahaan Listrik Negara (PLN) ▪ Exporting average 190MW via power exchange agreement Building A More Sustainable Energy Future Building A Sustainable Energy Future Greening the Transport System

▪ Sarawak Energy has first electric corporate fleet in Sarawak- cars & scooters

▪ Sarawak Energy has also procured 2 units of H2 car as part of their corporate fleet

▪ EV Charging Stations in ▪ First electric bus town and in Kuching Sarawak Energy corporate office Building A Sustainable Energy Future Hydrogen Production Plant & Refueling Station

▪ First integrated hydrogen production plant and refueling station in Southeast Asia. ▪ Research into greening the transportation sector through low carbon fuels for Kuching. Building A Sustainable Energy Future Sarawak’s First Renewable Energy Certificate THANK YOU YBhg. Dato Ir. Alice Jawan Empaling Permanent Secretary Ministry of Utilities Sarawak [email protected] / 082-551101