Central London Development Pipeline Q2 2017

Total Page:16

File Type:pdf, Size:1020Kb

Central London Development Pipeline Q2 2017 Central London Development Pipeline Q2 2017 Development Completions - As at Q2 2017, there is 9.45m sq ft of available space under construction across Central London. 1.32 million sq ft of office space completed in Q2 2017, adding 710,000 sq ft of available office space to the market. - For future 2017 development completions, 49% of the space is prelet, rising to 55% for 2018. - 10% of space has been prelet for 2019 completions, the low figure being largely the result of the commencement of 22 Bishopsgate adding 1.275m sq ft of availability to the market. - Total take-up by prelets in Q2 2017 equalled 520,000 sq ft, 17 % of total take-up in the quarter. The largest prelet of the quarter was to WeWork at Two Southbank Place, taking 280,000 sq ft. In the third largest letting of the quarter, NEX took 120,000 sq ft at London Fruit & Wool Exchange. Development Pipeline - Completion Year Oversite developments 7,000,000 at Crossrail stations are 6,000,000 projected to begin 5,000,000 construction following 4,000,000 ticket office completion. Sq Ft 3,000,000 The oversite 2,000,000 developments are 1,000,000 projected to complete in 0 2020. 2017 2018 2019 2020 Available Office Sq Ft (NIA) Let Office Sq Ft (NIA) - The most active market is City Core with 7.98m sq ft of proposed office space under construction. City Fringe, Midtown and West End have 1.74m, 2.47m, & 1.70m sq ft of space under construction respectively. - The market with the highest percentage of prelets is Southbank with only 19% of under construction space still available. This can be partly attributed to the prelet of the entirety of Two Southbank Place. The market with the largest amount of prelet space is City Core with 3.11 million sq ft. Development Pipeline - Submarket 9,000,000 8,000,000 The most active West 7,000,000 End submarket is Paddington, with 6,000,000 404,893 sq ft of total 5,000,000 space under Sq Ft 4,000,000 construction. 3,000,000 2,000,000 1,000,000 0 City Core City Fringe Docklands Midtown Southern Fringe West End Available Office Sq Ft (NIA) Let Office Sq Ft (NIA) Under Construction Pipeline (Top 10 developments by available sq ft) Address Market Completion Completion Available Sq Ft Landlord Quarter Year (Total Sq Ft) 22 Bishopsgate City Core Q4 2019 1,275,000 Temasek/AXA/PSP (1,275,000) Invsestments/BCI M 100 Liverpool Street City Core Q4 2019 520,000 British Land/GIC (520,000) 1 Bank Street Docklands Q1 2019 420,000 Canary Wharf (420,000) Group 70 St Mary Axe City Core Q4 2018 310,000 TH Real Estate (310,000) 1 Finsbury Avenue City Core Q1 2019 280,000 British Land/GIC (280,000) The Scalpel, 52 Lime City Core Q4 2017 260,000 WR Berkley Street (390,000) 100 Bishopsgate City Core Q4 2018 250,000 Brookfield (870,000) Brunel Building, West End Q1 2019 240,000 Derwent London North Wharf Road (240,000) Eighty Fenchurch City Core Q3 2019 240,000 Exemplar/Partners (240,000) Group 3 Minster Court City Core Q4 2017 220,000 Ivanhoe (220,000) Cambridge/FREO/ Greycoat Contact us Fiona Don London Office Analyst [email protected] Tel: +44 (0)20 7318 4786 Copyright Strutt & Parker, 2017. All rights reserved. No part of this publication may be reproduced or transmitted in any form without prior written consent by Strutt & Parker. The information contained herein is general in nature and is not intended, and should not be construed, as professional advice or opinion provided to the user, nor as a recommendation of any particular approach. It is based on material that we believe to be reliable. Whilst every effort has been made to ensure its accuracy, we cannot offer any warranty that it contains no factual errors. .
Recommended publications
  • 22 Bishopsgate London EC2N 4BQ Construction of A
    Committee: Date: Planning and Transportation 28 February 2017 Subject: Public 22 Bishopsgate London EC2N 4BQ Construction of a building arranged on three basement floors, ground and 58 upper floors plus mezzanines and plant comprising floorspace for use within Classes A and B1 of the Use Classes Order and a publicly accessible viewing gallery and facilities (sui generis); hard and soft landscaping works; the provision of ancillary servicing and other works incidental to the development. (201,449sq.m. GEA) Ward: Lime Street For Decision Registered No: 16/01150/FULEIA Registered on: 24 November 2016 Conservation Area: St Helen's Place Listed Building: No Summary The planning application relates to the site of the 62 storey tower (294.94m AOD) granted planning permission in June 2016 and which is presently being constructed. The current scheme is for a tower comprising 59 storeys at ground and above (272.32m AOD) with an amended design to the top. The tapering of the upper storeys previously approved has been omitted and replaced by a flat topped lower tower. In other respects the design of the elevations remains as before. The applicants advise that the lowering of the tower in the new proposal is in response to construction management constraints in relation to aviation safeguarding issues. The planning application also incorporates amendments to the base of the building, the public realm and to cycle space provision which were proposed in a S73 amendment application and which your Committee resolved to grant on 28 November 2016, subject to a legal agreement but not yet issued. The building would provide offices, retail at ground level, a viewing gallery with free public access at levels 55 and 56 and a public restaurant and bar at levels 57 and 58.
    [Show full text]
  • Title: the Future of Workplace in Vertical Cities: Hanging Gardens, Roof Terraces and Vertical Plazas Author: Stephan Reinke, Di
    ctbuh.org/papers Title: The Future of Workplace in Vertical Cities: Hanging Gardens, Roof Terraces and Vertical Plazas Author: Stephan Reinke, Director, Stephan Reinke Architects Limited Subjects: Occupancy/Lifestyle/User Experience Social Issues Vertical Transportation Keywords: Green Walls Public Space Sky Garden Vertical Urbanism Workplace Publication Date: 2020 Original Publication: International Journal of High-Rise Buildings Volume 9 Number 1 Paper Type: 1. Book chapter/Part chapter 2. Journal paper 3. Conference proceeding 4. Unpublished conference paper 5. Magazine article 6. Unpublished © Council on Tall Buildings and Urban Habitat / Stephan Reinke International Journal of High-Rise Buildings International Journal of March 2020, Vol 9, No 1, 71-79 High-Rise Buildings https://doi.org/10.21022/IJHRB.2020.9.1.71 www.ctbuh-korea.org/ijhrb/index.php The Future of Workplace in Vertical Cities: Hanging Gardens, Roof Terraces and Vertical Plazas Stephan C. Reinke FAIA RIBA Director, Stephan Reinke Architects Level 02, 28 Margaret Street, London W1W 8RZ Abstract As the workplace evolves in our vertical cities, the need for “think spaces” and the public realm to meet, create and innovate will become integral to tall buildings. These people places are designed to address the social challenges and enhance the co- working environments which are emerging in the dense urban context of our future cities. The design of sky terraces and the “spaces between” offer a greener, more humane and smarter work environment for the future. The public realm should no longer be held down, fixed to the ground plane, but rather become part and parcel of the upper levels of our workplace centers.
    [Show full text]
  • Unconventional & Pioneering A.K.A. London
    UNCONVENTIONAL & PIONEERING A.K.A. LONDON Much like Ziggy Stardust ( A.K.A. D av i d Bowie) this ground breaking London landmark has many alter egos... From an iconic part of the City skyline to one of the most future focused addresses in which to locate a forward thinking business. IT’S TIME TO LOOK AT 30 ST. MARY AXE FROM A WHOLE NEW ANGLE. With options ranging from approx. 5,162 to 41,828 sq ft of world class, office space across 3 spectacular floors, this is also known as your next move. 007 A.K.A. James bond A NATIONAL TREASURE WITH STYLE AND MAGNITUDE The available office floors in this suave building offer dramatic Grade A specification workspaces that make a real statement. A.K.A. THE Gherkin 22 BISHOPSGATE THE LEADENHALL BUILDING SALESFORCE TOWER A.K.A. THE GHERKIN 52 Lime Street 100 BISHOPSGATE The Willis Building 70 St Mary Axe AN ICONIC PART OF THE LONDON CITY SKYLINE A.K.A. THE ULTIMATE COMPANY Imagine positioning your business as part of the London Skyline at an address that everybody knows. 30 St. Mary Axe is your opportunity to join a thriving and diverse community of game changers. Unrivalled WORKSPACE INSPIRING VIEWS AND ALL THE ON-SITE AMENITIES YOU CAN DREAM OF. AS SOME MIGHT SAY, A MORE ENERGISED AND PRODUCTIVE WORKFORCE. Reception CGI double height space Reception CGI available office floor Rum & Coke A.K.A. C u b a L i b r e A new twist on an old favourite Historically known as the Insurance District, the immediate area has since become a magnet for a more eclectic range of sectors, from technology to education and media to finance.
    [Show full text]
  • Experts in Central London Planning & Development
    EXPERTS IN CENTRAL LONDON PLANNING & DEVELOPMENT PLANNING & DEVELOPMENT Gerald Eve’s planning and development advisory business is one of the most respected in the UK. Consisting of over 100 professionals, we are one of the only fully integrated planning and development teams in our industry. The vast majority of the team are based in central London, working on some of the capital’s largest and most complex projects. Active in all London Acted for Advised all major central boroughs and the London developers and City of London REITS, including British Land, Derwent London, 50% Great Portland Estates, of London First's property Landsec and Stanhope and housing members We act for all the major London million estates, including The Bedford 15 sq ft £12.5 billion Estates, Capital & Counties Covent Garden, The Church of commercial gross development Commissioners, City of London, floorspace approved value The Crown Estate, Grosvenor Britain & Ireland, The Howard de Walden Estate, The Portman Estate, and Soho Estates 2 EXPERTS IN CENTRAL LONDON PLANNING & DEVELOPMENT OUR CENTRAL LONDON CLIENTS OUR CENTRAL LONDON CLIENTS 3 YOUR INTELLIGENT ADVISOR Gerald Eve is recognised among the UK’s leading experts in planning and development. Our clients look to us to help them realise or improve asset value. One of the largest fully integrated planning and development teams in the sector Deep understanding of the entire planning system Harnessing imaginative strategies and a tenacious approach to optimise outcomes Agile, flexible and adaptable to changing
    [Show full text]
  • Bishopsgate UKPN Focus August 2017
    FOCUS ON BISHOPSGATE DEVELOPMENTS Roadworks Patrol – 15TH August 2017 Authors: Michael Barratt TfL Francis Bernstein Southwark Living Streets Attendees Michael Barratt (MB) TfL Jon Baughan (JB) TfL(Roadwork Inspections) Francis Bernstein (FB) Southwark Cyclists Andy Osborne (AO) Met Police (Cycle Safety) Russel Green (RG) RTEO Enforcement Simon Munk (SM) LCC Officers Kate Bartlett (KB) LCC Ryan McGee (RM) McGee Demo Contractor Roger Stocker (RS) Lewisham Cyclists Timothy Burr (TB) Skanska (HS2) Jeff Collins (JC) St Georges (Developer) Dave Warner (DW) UKPN Apologies: Stuart Ford City of London Police Introduction The partnership is made up of TfL, cycle and pedestrian and other stakeholder groups. The objectives of the exercise is to; on a regular basis, cycle and walk through TfL and major development schemes during build and ensure where possible that the traffic management and construction management implemented does not negatively impact on vulnerable road users. pa Traffic Management Proposal UKPN planned works to connect power cables to 100 Bishopsgate. To facilitate works, a southbound diversion is to be implemented. TfL have met with UKPN to discuss all options which included maintaining a thoroughfare for southbound cyclists adjacent to the works. Due to the proposed excavation area covering the entire southbound carriageway, it is proposed that cyclists are diverted with all other traffic. The cycle patrol has been set up to actively experience the diversion routes from the cyclists’ perspective and to highlight any concerns or potential mitigation measures to improve safety. TfL and UKPN are still investigating all avenues for mitigating the need for the diversion during the latter phases of the programme.
    [Show full text]
  • City Office Market Watch
    UK Commercial – May 2020 MARKET IN City Office MINUTES Savills Research Market Watch Inevitable drop in take-up for April, although still a significant amount is under offer in the City Despite being in ‘lockdown’ for the entirety of the month, We have started to see a slight uptick in tenant supply, take-up for April reached 165,653 sq ft across 6 deals, rising from a 25% share in March (1.79m sq ft) to a 27% bringing the total for the year to date to 1.5m sq ft, which is share at the end of April (1.95m sq ft), which is still below slightly down on this point last year by 4% and 16% down on the long-term average of 29%. While this is by no means the 10-year average for this part of the year. The 12-month enough tenant supply to begin to affect rents negatively, rolling take-up is now at 6.6m sq ft, which is 3% up on the it is proving our expectations to be correct, and the more 165,553 sq ft 10-year average. Please note that this piece is not intended tenant controlled space we see arrive to the market in the of take-up in April was as an analysis of COVID-19 on the office market, rather a next 6 months could result in a negative effect on rents. the lowest amount of factual analysis of the market metrics. monthly take-up since Some of the notable tenant supply that has come to the February 2009 The largest deal to complete last month saw Covington market since lockdown began in mid-March includes 65,000 & Burling LLP acquire levels 51 - 54 (85,768 sq ft) at sq ft at the Blue Fin, SE1 building from HSBC, 20,300 sq ft TwentyTwo Bishopsgate, EC2.
    [Show full text]
  • CTBUH Research Paper Title: Towards Post-Crisis Tall Buildings
    CTBUH Research Paper ctbuh.org/papers Title: Towards Post-Crisis Tall Buildings and Cities Authors: Daniel Safarik, Editor-in-Chief, CTBUH Will Miranda, Research Coordinator, CTBUH Subjects: COVID MEP Social Issues Vertical Transportation Keywords: Commercial COVID-19 MEP Occupancy Vertical Transportation Workplace Publication Date: 2020 Original Publication: CTBUH Journal 2020 Issue IV Paper Type: 1. Book chapter/Part chapter 2. Journal paper 3. Conference proceeding 4. Unpublished conference paper 5. Magazine article 6. Unpublished © Council on Tall Buildings and Urban Habitat / Daniel Safarik; Will Miranda CTBUH Special Report Towards Post-Crisis Tall Buildings and Cities Abstract The COVID-19 pandemic has caused a massive and sudden rethink of how tall office buildings, and cities as a whole, should operate. With national and local government responses varying widely across the globe, and much about the virus still unknown, it is impossible to generate a single safe operational model for the immediate near term. However, the aggregate knowledge of the building industry Daniel Safarik William Miranda can be activated by creating an indicative, general assessment of how today’s tall buildings and their cities could be modified. This report collates the advice of the Authors Council on Tall Buildings and Urban Habitat’s Expert Peer Review Committee and Daniel Safarik, Editor-in-Chief William Miranda, Research Coordinator its database of the global tall building industry, as well as the consultancies and Council on Tall Buildings and Urban Habitat The Monroe Building professional organizations in the wider CTBUH orbit, forming a hypothetical model 104 South Michigan Avenue, Suite 620 Chicago, Illinois of the potential changes coming to the existing stock of tall office buildings and USA 60603 the cities where they are located, and speculates on the urban implications of t: +1 312 283 5599 e: [email protected] extrapolating these changes.
    [Show full text]
  • Places for People Capital Markets Plc Places for People Homes Limited Places for People Treasury Plc
    OFFERING CIRCULAR PLACES FOR PEOPLE CAPITAL MARKETS PLC (incorporated in England as a public limited company under the Companies Act 2006 with registered number 7623063) and PLACES FOR PEOPLE HOMES LIMITED (incorporated in England as a registered society with limited liability under the Co-operative and Community Benefit Societies Act 2014 with registration number 19447R and registered with the Regulator of Social Housing under the Housing and Regeneration Act 2008 (as amended), with number L0659) and PLACES FOR PEOPLE TREASURY PLC (incorporated in England as a public limited company under the Companies Act 2006 with registered number 9272235) £2,000,000,000 Euro Medium Term Note Programme Under this £2,000,000,000 Euro Medium Term Note Programme (the Programme), Places for People Capital Markets plc, Places for People Homes Limited and Places for People Treasury plc (the Issuers and each an Issuer and references to the relevant Issuer being to the Issuer of the relevant Notes) may from time to time issue notes (the Notes) denominated in any currency agreed between the relevant Issuer and the relevant Dealer (as defined below). The payment of all amounts due in respect of Notes issued by Places for People Capital Markets plc and Places for People Treasury plc will be jointly and severally guaranteed by Places for People Homes Limited, Places for People Living+ Limited, Castle Rock Edinvar Housing Association Limited, Cotman Housing Association Limited and Derwent Housing Association Limited (each a Guarantor and, together, the Capital Markets/Treasury Guarantors). The payment of all amounts due in respect of Notes issued by Places for People Homes Limited will be jointly and severally guaranteed by Places for People Living+ Limited, Castle Rock Edinvar Housing Association Limited, Cotman Housing Association Limited and Derwent Housing Association Limited (each a Guarantor and, together, the Homes Guarantors).
    [Show full text]
  • 7390 the London Gazette, 14 November, 1933
    7390 THE LONDON GAZETTE, 14 NOVEMBER, 1933 and is hereby appointed liquidator for the pur- Meeting was resumed at 4 p.m., when the follow- pose of such winding-tip." ing Extraordinary Resolution was submitted and At a subsequent Meeting of creditors of the passed unanimously: — above named Company, duly convened, and held " That it has been proved to the satisfaction on the same day at 27, Portland Terrace, of this Meeting that the Company cannot, by Southampton, the creditors confirmed the appoint- reason of its liabilities continue its business, and ment of Mr. Edward Beal as Liquidator of the that it is advisable to wind up the same, and Company in the voluntary winding-up.—Dated accordingly that tihe Company be wound up the 8th day of November, 1933. voluntarily; and that Mr. Harry William Buck- (072) ERNEST T. SPENCE, Chairman. ingham and Mr. Alfred Charles Surrey, be and are hereby appointed Joint Liquidators for the purpose of such winding-up." (105) K. F. BRUMFIT, Chairman, LONDON PETROL CO. Ltd. T an Extraordinary General Meeting of the A Members of the above named Company, duly convened, and held at 39, Victoria Street, J. W. ROBINSON Limited. London, S.W.I, on Tuesday, the 7th November, The Companies Act, 1929. 1933, the following Extraordinary Resolution was T an Extraordinary General Meeting of the duly passed: — A Members of the above named Company, duly " That the Company cannot, by reason of its convened, and held at the offices of J. H. Milner liabilities, continue its business, and that it is & Son, Solicitors, Albion Walk Chambers, Leeds, advisable to wind up the same, and that the in the county of York, on the 8th day of Novem- Company be wound up voluntarily; and that Mr.
    [Show full text]
  • Projects Already Fully Funded and Outside the Scope of the Proposed Review
    Appendix One: Projects already fully funded and outside the scope of the proposed review Table A: Projects fully funded by s278 agreement Project Name Completion (FY) Cost 1 Frederick’s Place (11567) Q2 – 2018/2019 £543K 2 New Ludgate (10716) Q3 – 2018/2019 £800K 3 150 Bishopsgate (10717) 2021 £810K 4 60-70 St Mary Axe Enhancement (11545) Q1 – 2018/2019 £1.15M 5 Sugar Quay (11951) Q3- 2018/2019 £240K 6 1 Crown Place (11902) 2021 £350K 7 52-54 Lime Street (11552) Q3- 2018/2019 £250K 8 Vine St S278 (11998) 2021 £750K 9 100 Bishopsgate (11610) Q4 – 2018/2019 £840K 10 10 Fenchurch Avenue (11553) Q4 – 2018/2019 £545K 11 30-32 Lombard St (11981) Q4 – 2018/2019 £225K 12 60 London Wall 2021 £250K 13 Alderman’s House (11496) Completed to be closed £275k 14 London Wall Place (11376) Q3 – 2019/2020 £3.1M 15 55 Moorgate (12028) Q1- 2019/2020 £150K 16 20 Farringdon St (11980) Q4-2018/2019 £150K 17 100 Minories Phase 1 (11695) Q2- 2018/2019 £450K Total Estimated cost of current S278 projects £10,978,000 Table B: Projects given authority to commence works at Gateway 5 and fully funded Project Name Completion (FY) Cost 1 St Pauls Area Enhancements (9669) Q1 – 2018/2019 £2.05M 2 2-6 Cannon Street Offsite (11004) Q3 – 2019/2020 £1.2M 3 Crossrail Liverpool St (Urban Integration) (11375) Q2 – 2019/2020 £2.7M 4 Crossrail Moorgate (Urban integration) (11381) Q3- 2019/2020 £2.8M 5 Bloomberg Development Highway Works (10744) Q3- 2018/2019 £4.8M 6 Crossrail Farringdon East (Station Access) (10993) 2020 £2.5M 7 Leadenhall Crossing (St Mary’s Axe) (11552) Q1- 2019/2020
    [Show full text]
  • [Jll] Version 01: 25 11 2020 a Guide to the Art
    22 ART GUIDE [JLL] VERSION 01: 25 11 2020 A GUIDE TO THE ART We have consciously designed 22 Bishopsgate to bring culture and colour into the everyday, working alongside The Contemporary Art Society, Maison Parisienne and a few other renowned creatives, to bring our space to life. These artists sat down to tell us a little more us about what’s on display, and their inspiration for each commission. 22 BISHOPSGATE — Culture Guide 2 OUR ART FOLIAGE INSTALLATIONS KARINE LAVAL https://www.instagram.com/ karinelaval/?hl=en Thanks to Karine’s artwork, much of the Lobby is transformed into an indoor garden. Three storeys tall and filled with imagery of plants, flowers and foliage, the pieces create an immersive ‘organic’ installation in the heart of the City. It was important to her that each installation evoked a sense of light and shadow, creating shifting ‘colourscapes’ as the light changed and played across the walls. The works were made to create a space that brought the outside in, allowing ABOVE: visitors and occupiers to reconnect Karine Laval, with nature, recharge and reflect. Heterotopia 2020 22 BISHOPSGATE — Culture Guide 3 OUR ART LOBBY TAPESTRIES RYAN MOSLEY https://www.instagram.com/ ryanmosley01/?hl=en Ryan has developed a series of 10 artworks for the Lobby. Part wall hangings, part collaged tapestries, the works address 22 Bishopsgate as a place of sanctuary. The artist’s starting point is the blanket. Each blanket features a human figure and is to be viewed like a stage curtain with a changing ‘cast‘ entering around it. Ryan is internationally regarded as a painter, so this commission is a new direction in his practice, as he begins working with textiles.
    [Show full text]
  • Central London Office Market Update Q1 2018
    CENTRAL LONDON OFFICE MARKET UPDATE Q1 2018 RESEARCH Real Estate for a changing world CENTRAL LONDON OFFICE MARKET UPDATE CONTACTS Brexit & the economy (which acquired record levels of Investment With further clarity emerging on a Central London office space in 2017) Q1 2018 Central London investment Daniel Bayley Head of City Agency Brexit transition deal, agreement on got off to a muted start with just volumes reached £2.35bn, down on daniel.bayley@realestate. citizens rights and the UK’s financial 150,000 sq ft of take-up recorded in the long term average quarterly figure bnpparibas STATS AT A GLANCE settlement, the result has been a Q1 2018. of £2.95bn. However, we do estimate a +44 (0)20 7338 4444 boost to business confidence. The pick-up in activity in Q2 with £4.30bn latest Deloitte CFO Survey reported Despite high levels of development currently under offer. SImon Knights an increase in optimism and positive completions both last year and this Head of West End Agency simon.knights@realestate. sentiment about the long-term effects year, large volumes of pre-letting A lack of large trophy asset sales, bnpparibas £2.35BN £4.30BN of Brexit. This has translated into an activity has kept the vacancy rate which bolstered 2017 volumes, can +44 (0)20 7318 5041 increase in demand for Central London below the long term average at 5.60%, be attributed to lower levels seen Q1 2018 office investment Currently under offer in volumes Central London offices. Indeed, levels are nearly 50% down from 6.15% in Q4 2017.
    [Show full text]