The World Bank Report No: ISR12756

Implementation Status & Results Eco-Farming Project (P096556)

Operation Name: Eco-Farming Project (P096556) Project Stage: Implementation Seq.No: 7 Status: ARCHIVED Archive Date: 22-Dec-2013 Country: China Approval FY: 2009

Public Disclosure Authorized Product Line:IBRD/IDA Region: EAST ASIA AND PACIFIC Lending Instrument: Specific Investment Loan Implementing Agency(ies): Key Dates Board Approval Date 02-Dec-2008 Original Closing Date 30-Jun-2014 Planned Mid Term Review Date 17-May-2011 Last Archived ISR Date 15-May-2013 Public Disclosure Copy Effectiveness Date 27-May-2009 Revised Closing Date 30-Jun-2014 Actual Mid Term Review Date 22-Apr-2013

Project Development Objectives Eco-Farming Project (P096556) Project Development Objective (from Project Appraisal Document) To deliver direct environmental and economic benefits from the integration of biogas in farming and cooking in rural households. In addition, the project aims to reduce greenhouse gas emissions through methane combustion and reduced burning of coal and firewood in the project areas. Has the Project Development Objective been changed since Board Approval of the Program?

Public Disclosure Authorized Yes No

Component(s)

Component Name Component Cost Integrated Eco-Farming Systems. 382.07 Local Technical Extension and Biogas Service Systems. 15.23 Project Management, Monitoring and Evaluation. 23.85

Overall Ratings Previous Rating Current Rating Progress towards achievement of PDO Moderately Satisfactory Satisfactory

Public Disclosure Authorized Overall Implementation Progress (IP) Moderately Satisfactory Satisfactory Overall Risk Rating Moderate Moderate

Implementation Status Overview This ISR reports the implementation progress after the Ninth supervision mission. The next supervision mission is scheduled for mid December in 2013. Public Disclosure Copy The project overall implementation progress is going well, after the level II restructuring, with completion of 90% against the overall PAD investment cost. The disbursement rate up till

Page 1 of 8 Public Disclosure Authorized The World Bank Report No: ISR12756

now is 71% for IBRD76040, at 17% increase since last ISR, and 91% for IBRD76050, a 16% increase since last ISR. The overall implementation quality of works continues to be satisfactory. It's expecting that the project targets could be achieved physically and financially by June 30, 2014. Locations Country First Administrative Division Location Planned Actual China Sheng Yixian Linchang

China Shi Zhongzhou

China Chongqing Shi Yunyang Xian

China Hunan Youxian Chengguanzhen

Public Disclosure Copy Not Entered Not Entered Not Entered

China Hunan Yizhang Xian

China Anhui Sheng Yi Xian

China Guangxi Zhuangzu Zizhiqu Xing'an Xian

China Hunan Xiangyin Xian

China Hunan Xiangtan Xian

China Hubei Xianfeng Xian

China Chongqing Shi Wulong Xian

China Hunan Wugang Shi

China Chongqing Shi Wanzhou Qu

China Hunan Wangcheng Xian

China Anhui Sheng Huangshan

China Anhui Sheng Xian

China Anhui Sheng Tianchang Shi

China Anhui Sheng Taihu Xian

China Anhui Sheng Shouchun

China Anhui Sheng Quanjiao Xian

Public Disclosure Copy China Anhui Sheng Qingyang Xian

China Guangxi Zhuangzu Zizhiqu Pingle Xian

Page 2 of 8 The World Bank Report No: ISR12756

Country First Administrative Division Location Planned Actual China Hunan Ningxiang Xian

China Anhui Sheng Shi

China Guangxi Zhuangzu Zizhiqu Luchuan Xian

China Hunan Longhui Xian

China Hunan Liyang

China Hunan Linwu Chengguanzhen

Public Disclosure Copy China Hunan Linli Xian

China Hubei Lichuan Shi

China Chongqing Shi Liangping Xian

China Hunan Lengshuitan Qu

China Chongqing Shi Kai Xian

China Anhui Sheng Jixi Xian

China Anhui Sheng Jingchuan

China Hubei Jianshi Xian

China Chongqing Shi Jiangjin Shi

China Anhui Sheng Huoshan Xian

China Anhui Sheng Huoqiu Xian

China Hunan Huayuan

China Anhui Sheng Huaining Xian

China Hunan Hengnan Xian

China Hubei Hefeng Xian

China Chongqing Shi Hechuan Shi

China Anhui Sheng Guichi Qu

Public Disclosure Copy China Anhui Sheng Xian

China Guangxi Zhuangzu Zizhiqu Gongcheng Xian

Page 3 of 8 The World Bank Report No: ISR12756

China Chongqing Shi Fuling

China Guangxi Zhuangzu Zizhiqu Fuchuan Yaozu Zizhixian

China Anhui Sheng Feidong Xian

China Guangxi Zhuangzu Zizhiqu Fangcheng Gezu Zizhixian

China Hubei Enshi Shi

China Chongqing Shi Dianjiang Xian

China Hunan Cili Xian Public Disclosure Copy China Chongqing Shi Changshou Qu

China Hunan Changning Shi

China Guangxi Zhuangzu Zizhiqu Cangwu Xian

China Guangxi Zhuangzu Zizhiqu Bobai Xian

China Chongqing Shi Bishan Xian

China Hubei Badong Xian

China Hunan Yongding Qu

China Anhui Sheng Yixiu Qu

China Hubei Xuan'en Xian

China Hubei Laifeng Xian

Results

Project Development Objective Indicators Indicator Name Core Unit of Measure Baseline Current End Target Improved quality of life in rural households as Text Value Living conditions are quite Living conditions in project In each project village and for kitchens, farmyards, and surrounding dirty, especially in summer villages and households project households, living environments are cleaner and healthier. due to manure management. continue improving through conditions are significantly There is a lot of smoke in the operating biogas stoves and better. Manure management kitchens while cooking. better manure management. has improved so that surroundings are much better.

Public Disclosure Copy Date 25-Mar-2009 08-Dec-2013 30-Jun-2014 Comments

Page 4 of 8 The World Bank Report No: ISR12756

Raised hh disposable income as fuel costs, Text Value Households buy abt. 1,500kg The cost for coal decreased Per project hh, cost for coal gathering time, and cooking time are reduced coal/year. Spend about 15% by 30 percent, cooking time will decrease by 30-50%, and as biogas slurry replaces synthetic fertilizer of cash revenues for chemical by 1.0 hrs/day, time for cooking time by 1-1.5 hrs/day, and pesticides. fertilizer and pesticides. firewood collection by 2.1hrs/ time for firewood collection by Spend 1-3 hrs/dayon day 2 hrs/day. Part of chemical collecting firewood and 3-4 fertilizer+pesticides is hrs/day for cooking. replaced by biogas slurry. Date 25-Mar-2009 08-Dec-2013 30-Jun-2014 Comments Reduction in greenhouse gas emissions as Text Value Currently households emit 790,000 ton CO2 equivalent Accumulative. Year 3: CH4 is extracted from wastes and converted to about 4 ton CO2 equivalent/ per year 600,000 ton CO2 equivalent

Public Disclosure Copy CO2 as it is burnt as fuel. household/year. per year; Year 5: 800,000-1,000,000 ton CO2 equivalent per year. Date 25-Mar-2009 08-Dec-2013 30-Jun-2014 Comments

Intermediate Results Indicators Indicator Name Core Unit of Measure Baseline Current End Target Number of households who have implemented Text Value 0 395,552 440,000 hh packages. Date 25-Mar-2009 08-Dec-2013 30-Jun-2014 Comments Greenhouse gas emissions (CO2 equivalent) Text Value 4 ton CO2 equivalent per 790000 880,000 from project households' cooking. household per year. Date 25-Mar-2009 08-Dec-2013 30-Jun-2014 Comments Chemical fertilizers and pesticides used by Text Value 500-1,500 kg/hh/year. 530 kg/hh/year Decrease by 20-30% per project households. target household and year. Date 25-Mar-2009 08-Dec-2013 30-Jun-2014 Comments Percent of project hh expressing improved Text Value 0 85% 90% of target households. quality of life due to biogas. Date 25-Mar-2009 08-Dec-2013 30-Jun-2014 Comments Changes in project hh cash expenditures on Text Value RMB 500-1,00/hh/year. RMB 900/hh/year Decrease by about RMB fuel. 200-400/hh/year. Date 25-Mar-2009 08-Dec-2013 30-Jun-2014

Public Disclosure Copy Comments

Page 5 of 8 The World Bank Report No: ISR12756

Changes in project hh cash expenditures on Text Value RMB 1,000-2,000/hh/year. RMB 780/hh/year Decrease by about RMB fertilizers and pesticides. 100-400/hh/year. Date 25-Mar-2009 08-Dec-2013 30-Jun-2014 Comments Project hh time spent on collecting and Text Value 1-3 hours/day. 2.1 hours/day 1-2 hours/day. preparing fuel. Date 25-Mar-2009 08-Dec-2013 30-Jun-2014 Comments Project hh time spent on cooking. Text Value 3-4 hours/day 1.8 hours/day 2-3 hours/day. Date 25-Mar-2009 08-Dec-2013 30-Jun-2014 Comments Public Disclosure Copy Project hh time spent on cleaning biogas Text Value 0 120 hours/hh/year. system. Date 25-Mar-2009 30-Sep-2011 30-Jun-2014 Comments Number of new households connected to Text Value 0 122,721 154,800 village water supply systems. Date 25-Mar-2009 08-Dec-2013 30-Jun-2014 Comments Length of new roads connecting households to Text Value 0 1501 1400 each other. Date 25-Mar-2009 08-Dec-2013 30-Jun-2014 Comments Length of new roads connecting households to Text Value 0 75 78 farm fields. Date 25-Mar-2009 08-Dec-2013 30-Jun-2014 Comments Length of new village roads connecting to each Text Value 0 305 km 320 other. Date 25-Mar-2009 08-Dec-2013 30-Jun-2014 Comments Number of farmers trained in biogas operation Text Value 0 1,327,323 1,500,000 and management, and in new farm production Date 25-Mar-2009 08-Dec-2013 30-Jun-2014 practices (person times). Comments Clients who have adopted an improved agr. Number Value 0.00 260500.00 330000.00 Technology promoted by the project Date 25-Mar-2009 08-Dec-2013 30-Jun-2014 Comments Clients who have adopted an improved agr. Number Value 0.00 240500.00 280000.00 Technology promoted by the project- female Sub Type Public Disclosure Copy Supplemental

Page 6 of 8 The World Bank Report No: ISR12756

Targeted clients satisfied with agricultural Percentage Value 0.00 72.00 75.00 services Date 25-Mar-2009 08-Dec-2013 30-Jun-2014 Comments Targeted clients- female Number Value 0.00 275000.00 369600.00 Sub Type Supplemental Targeted clients- male Number Value 94000.00 158400.00 Sub Type Supplemental Value

Public Disclosure Copy Targeted clients satisfied with agricultural Number 0.00 272000.00 277000.00 services- female Sub Type Supplemental Targeted clients satisfied with agricultural Number Value 0.00 108000.00 119000.00 services- male Sub Type Supplemental Number of project staff trained. Text Value 0 17545 18,500 Date 25-Mar-2009 08-Dec-2013 30-Jun-2014 Comments Number of workshops conducted. Text Value 0 45 55 Date 25-Mar-2009 08-Dec-2013 30-Jun-2014 Comments Number of study tours conducted. Text Value 0 30 40 Date 25-Mar-2009 08-Dec-2013 30-Jun-2014 Comments Project progress and impact monitoring carried Text Value MIS and M&E established. MIS and established and Reports generated by MIS out with an MIS and M&E system agreed upon operating and M&E and submitted to with the Bank. the Bank in a timely manner. Date 25-Mar-2009 08-Dec-2013 30-Jun-2014 Comments

Data on Financial Performance (as of 21-Nov-2013)

Financial Agreement(s) Key Dates Project Ln/Cr/Tf Status Approval Date Signing Date Effectiveness Date Original Closing Date Revised Closing Date Public Disclosure Copy P096556 IBRD-76040 Effective 02-Dec-2008 27-Feb-2009 27-May-2009 30-Jun-2014 30-Jun-2014

Page 7 of 8 The World Bank Report No: ISR12756

Project Ln/Cr/Tf Status Approval Date Signing Date Effectiveness Date Original Closing Date Revised Closing Date P096556 IBRD-76050 Effective 02-Dec-2008 27-Feb-2009 27-May-2009 30-Jun-2014 30-Jun-2014 P105046 TF-91779 Effective 25-Apr-2008 25-Apr-2008 25-Apr-2008 30-Dec-2017 30-Dec-2017

Disbursements (in Millions) Project Ln/Cr/Tf Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P096556 IBRD-76040 Effective USD 96.00 96.00 0.00 68.57 27.43 71.00 P096556 IBRD-76050 Effective USD 24.00 24.00 0.00 21.84 2.16 91.00 P105046 TF-91779 Effective USD 24.00 5.18 0.00 2.12 3.06 41.00

Public Disclosure Copy Disbursement Graph

Key Decisions Regarding Implementation The level 2 restructuring of the project to increase the amount of reimbursement for household package unit costs has been completed and effective on April 22, 2013.

Restructuring History There has been no restructuring to date.

Related Projects

Public Disclosure Copy P105020-Hubei Eco-Farming Biogas Project, P105046-Hubei Eco-Farming Biogas Project

Page 8 of 8