Ukraine: Follow-Up to the Declaration of Commitment on HIV/AIDS

Total Page:16

File Type:pdf, Size:1020Kb

Ukraine: Follow-Up to the Declaration of Commitment on HIV/AIDS UNGASS Indicators: National Return Form NPBI-6 Injecting drug users Data source: name Researches of Ukrainian In Data source: type Behavioural researches am Data collection period (day/month/year) 26 July 2002 PART I: Males Data requirements <25 25+ NUMERATOR Instructions: i) Line 1: enter the number of respondents who stated that t ii) Line 2: enter the number of injecting drug users (line 1) wh iii) Line 3a: enter the number of all injecting drug users (line iv) Line 3b: enter the number of injecting drug users who nev they had had a sexual partner in the last month v) Line 4a: enter the number of all injecting drug users (line on the most recent occasion they had sex vi) Line 4b: enter the number of injecting drug users who nev to the question in line 3 who reported using condoms on t 1. Injected drugs sometime in the last m 414 600 2. Injecting drug users in the last month 158 191 158 191 sharing injecting equipment in the las 3a. Injecting drug users in the last month 285 369 had sexual intercourse in the last mon 3b. Injecting drug users in the last month 185 246 avoided sharing injecting equipment b sexual intercourse in the last month 4a. Injecting drug users in the last month 154 159 condoms during the most recent sexu (in the last month) 4b. Injecting drug users in the last month 110 112 never shared injecting equipment and condoms during the most recent sexual intercourse (in the last month) 5. Avoided sharing injecting drug eq 110 112 and used condoms during most re sexual intercourse in the last month (line 4b) 6. Avoided sharing injecting drug equip 331 543 either avoided having sex or used con most recent sexual intercourse (all in the last month) (line 2 - line 3b + line 4b) DENOMINATOR 7. Numbers of respondents who repo 158 191 having injected drugs in the last m and having had sex in the last month PART II: Indicator computation INDICATOR SCORES BY SEX & AGE-GROUP 8. Divide the number of respondents who 69.62 58.64 having avoided shared injecting drug e and avoided having unprotected sex in the last month (line 5) by the total number who reported having injected drugs and having had sex in the last month (line 7) and multiply the result by 100 * This information can be used to calculate the proportion of all recent injecting drug users (i.e., includ transmission within the last month. In calculating this proportion, line 1 (rather than line 7) must be us Country: Ukraine s: safe injecting and sexual practices Institute of Social Researches in the boundaries of the project: Episurveillance of mong IDUs in seven cities of Ukraine: Donetsk, Odessa, Poltava, Simferopol, Nik to 28 September 2002 Females All ages <25 25+ All ages they had injected drugs in the last month who stated that they had never shared drug injecting equipment in the last month 1) who stated that they had had a sexual partner in the last month ver shared injecting equipment in the last month (line 2) who stated that 1) who answered "yes" to the question in line 3 and who reported using condom ver shared injecting equipment in the last month (line 2) and answered "yes" the most recent occasion they had sex 175 218 61 52 61 52 117 118 76 90 52 52 38 40 222 38 40 78 874 152 216 368 349 61 52 113 63.61 62.3 76.923077 69.03 ding those who did not have sex in the last month) who avoided all forms of behaviour associated with risk of H used as the denominator. f the second generation kolaev, Lutsk, Kharkiv Both sexes <25 25+ All ages 589 818 219 243 219 243 402 487 261 336 206 211 148 152 148 152 300 483 759 1242 219 243 462 67.58 62.55 64.94 HIV.
Recommended publications
  • December 2020 Contract Pipeline
    OFFICIAL USE No Country DTM Project title and Portfolio Contract title Type of contract Procurement method Year Number 1 2021 Albania 48466 Albanian Railways SupervisionRehabilitation Contract of Tirana-Durres for Rehabilitation line and ofconstruction the Durres of- Tirana a new Railwaylink to TIA Line and construction of a New Railway Line to Tirana International Works Open 2 Albania 48466 Albanian Railways Airport Consultancy Competitive Selection 2021 3 Albania 48466 Albanian Railways Asset Management Plan and Track Access Charges Consultancy Competitive Selection 2021 4 Albania 49351 Albania Infrastructure and tourism enabling Albania: Tourism-led Model For Local Economic Development Consultancy Competitive Selection 2021 5 Albania 49351 Albania Infrastructure and tourism enabling Infrastructure and Tourism Enabling Programme: Gender and Economic Inclusion Programme Manager Consultancy Competitive Selection 2021 6 Albania 50123 Regional and Local Roads Connectivity Rehabilitation of Vlore - Orikum Road (10.6 km) Works Open 2022 7 Albania 50123 Regional and Local Roads Connectivity Upgrade of Zgosth - Ura e Cerenecit road Section (47.1km) Works Open 2022 8 Albania 50123 Regional and Local Roads Connectivity Works supervision Consultancy Competitive Selection 2021 9 Albania 50123 Regional and Local Roads Connectivity PIU support Consultancy Competitive Selection 2021 10 Albania 51908 Kesh Floating PV Project Design, build and operation of the floating photovoltaic plant located on Vau i Dejës HPP Lake Works Open 2021 11 Albania 51908
    [Show full text]
  • Transport and Transportation Заочне Навчання
    View metadata, citation and similar papers at core.ac.uk brought to you by CORE МІНІСТЕРСТВО ОСВІТИ І НАУКИ УКРАЇНИ ХАРКІВСЬКА НАЦІОНАЛЬНА АКАДЕМІЯ МІСЬКОГО ГОСПОДАРСТВА Н. І. Видашенко А. В. Сміт TRANSPORT AND TRANSPORTATION Збірник текстів і завдань з дисципліни ‘Іноземна мова ( за професійним спрямуванням ) ( англійська мова)’ (для організації самостійної роботи студентів 1 курсу заочної форми навчання напряму ‘Електромеханіка ’ спеціальностей 6.050702 – ‘Електричний транспорт ’, ‘Електричні системи комплекси транспортних засобів ’, ‘Електромеханічні системи автоматизації та електропривод ’) Харків – ХНАМГ – 2009 TRANSPORT AND TRANSPORTATION. Збірник текстів і завдань з дисципліни ‘Іноземна мова ( за професійним спрямуванням ) ( англійська мова )’ (для організації самостійної роботи студентів 1 курсу заочної форми навчання напряму ‘Електромеханіка ’ спеціальностей 6.050702 – ‘Електричний транспорт ’, ‘Електричні системи комплекси транспортних засобів ’, ‘Електромеханічні системи автоматизації та електропривод ’) /Н. І. Видашенко , А. В. Сміт ; Харк . нац . акад . міськ . госп -ва . – Х.: ХНАМГ , 2009. – 60 с. Автори : Н. І. Видашенко , А. В. Cміт Збірник текстів і завдань побудовано за вимогами кредитно -модульної системи організації навчального процесу ( КМСОНП ). Рекомендовано для студентів електромеханічних спеціальностей . Рецензент : доцент кафедри іноземних мов , к. філол . н. Ільєнко О. Л. Затверджено на засіданні кафедри іноземних мов , протокол № 1 від 31 серпня 2009 року © Видашенко Н. І. © Сміт А. В. © ХНАМГ , 2009 2 CONTENTS ВСТУП 4 UNIT ONE. ENGLISH IN OUR LIFE 5 UNIT TWO. HIGHER EDUCATION 17 UNIT THREE. MEANS OF TRANSPORTATION 21 UNIT FOUR. CITY TRAFFIC 40 UNIT FIVE. TYPES OF PAYMENT IN CITY TRAFFIC 47 UNIT SIX. DOUBLED TRANSPORT 52 UNIT SEVEN. BUSES IN LONDON 54 SOURCES 59 3 ВСТУП Даний збірник текстів призначений для студентів 1 курсу заочної форми навчання напряму ‘Електромеханіка ’, що вивчають англійську мову .
    [Show full text]
  • Rolling Stock Orders: Who
    THE INTERNATIONAL LIGHT RAIL MAGAZINE HEADLINES l Toronto’s streetcar advocates fight back l UK’s Midland Metro expansion approved l Democrats propose more US light rail ROLLING STOCK ORDERS: WHO... WHAT... HOW MUCH? Ukrainian tramways under the microscope US streetcar trends: Mixed fleets: How technology Lessons from is helping change over a century 75 America’s attitude of experience to urban rail in Budapest APRIL 2012 No. 892 1937–2012 WWW. LRTA . ORG l WWW. TRAMNEWS . NET £3.80 TAUT_April12_Cover.indd 1 28/2/12 09:20:59 TAUT_April12_UITPad.indd 1 28/2/12 12:38:16 Contents The official journal of the Light Rail Transit Association 128 News 132 APRIL 2012 Vol. 75 No. 892 Toronto light rail supporters fight back; Final approval for www.tramnews.net Midland Metro expansion; Obama’s budget detailed. EDITORIAL Editor: Simon Johnston 132 Rolling stock orders: Boom before bust? Tel: +44 (0)1832 281131 E-mail: [email protected] With packed order books for the big manufacturers over Eaglethorpe Barns, Warmington, Peterborough PE8 6TJ, UK. the next five years, smaller players are increasing their Associate Editor: Tony Streeter market share. Michael Taplin reports. E-mail: [email protected] 135 Ukraine’s road to Euro 2012 Worldwide Editor: Michael Taplin Flat 1, 10 Hope Road, Shanklin, Isle of Wight PO37 6EA, UK. Mike Russell reports on tramway developments and 135 E-mail: [email protected] operations in this former Soviet country. News Editor: John Symons 140 The new environment for streetcars 17 Whitmore Avenue, Werrington, Stoke-on-Trent, Staffs ST9 0LW, UK.
    [Show full text]
  • DLA Piper. Details of the Member Entities of DLA Piper Are Available on the Website
    EUROPEAN PPP REPORT 2009 ACKNOWLEDGEMENTS This Report has been published with particular thanks to: The EPEC Executive and in particular, Livia Dumitrescu, Goetz von Thadden, Mathieu Nemoz and Laura Potten. Those EPEC Members and EIB staff who commented on the country reports. Each of the contributors of a ‘View from a Country’. Line Markert and Mikkel Fritsch from Horten for assistance with the report on Denmark. Andrei Aganimov from Borenius & Kemppinen for assistance with the report on Finland. Maura Capoulas Santos and Alberto Galhardo Simões from Miranda Correia Amendoeira & Associados for assistance with the report on Portugal. Gustaf Reuterskiöld and Malin Cope from DLA Nordic for assistance with the report on Sweden. Infra-News for assistance generally and in particular with the project lists. All those members of DLA Piper who assisted with the preparation of the country reports and finally, Rosemary Bointon, Editor of the Report. Production of Report and Copyright This European PPP Report 2009 ( “Report”) has been produced and edited by DLA Piper*. DLA Piper acknowledges the contribution of the European PPP Expertise Centre (EPEC)** in the preparation of the Report. DLA Piper retains editorial responsibility for the Report. In contributing to the Report neither the European Investment Bank, EPEC, EPEC’s Members, nor any Contributor*** indicates or implies agreement with, or endorsement of, any part of the Report. This document is the copyright of DLA Piper and the Contributors. This document is confidential and personal to you. It is provided to you on the understanding that it is not to be re-used in any way, duplicated or distributed without the written consent of DLA Piper or the relevant Contributor.
    [Show full text]
  • Rapid Transit in Toronto Levyrapidtransit.Ca TABLE of CONTENTS
    The Neptis Foundation has collaborated with Edward J. Levy to publish this history of rapid transit proposals for the City of Toronto. Given Neptis’s focus on regional issues, we have supported Levy’s work because it demon- strates clearly that regional rapid transit cannot function eff ectively without a well-designed network at the core of the region. Toronto does not yet have such a network, as you will discover through the maps and historical photographs in this interactive web-book. We hope the material will contribute to ongoing debates on the need to create such a network. This web-book would not been produced without the vital eff orts of Philippa Campsie and Brent Gilliard, who have worked with Mr. Levy over two years to organize, edit, and present the volumes of text and illustrations. 1 Rapid Transit in Toronto levyrapidtransit.ca TABLE OF CONTENTS 6 INTRODUCTION 7 About this Book 9 Edward J. Levy 11 A Note from the Neptis Foundation 13 Author’s Note 16 Author’s Guiding Principle: The Need for a Network 18 Executive Summary 24 PART ONE: EARLY PLANNING FOR RAPID TRANSIT 1909 – 1945 CHAPTER 1: THE BEGINNING OF RAPID TRANSIT PLANNING IN TORONTO 25 1.0 Summary 26 1.1 The Story Begins 29 1.2 The First Subway Proposal 32 1.3 The Jacobs & Davies Report: Prescient but Premature 34 1.4 Putting the Proposal in Context CHAPTER 2: “The Rapid Transit System of the Future” and a Look Ahead, 1911 – 1913 36 2.0 Summary 37 2.1 The Evolving Vision, 1911 40 2.2 The Arnold Report: The Subway Alternative, 1912 44 2.3 Crossing the Valley CHAPTER 3: R.C.
    [Show full text]
  • Ukraine Handbook
    KIEV, UKRAINE HANDBOOK Military Family Services Europe / MFS(E) Riga-Remote Team [email protected] www.cafconnection.ca / www.connexionfac.ca Date published: 20 June 2017 Date revised: 17 Feb 2020 TABLE OF CONTENTS GREETINGS FROM YOUR MFS(E) RIGA-REMOTE TEAM 1 EUROPEAN ADVISORY COMMITTEE ............................ 3 USING THIS GUIDE .................................................... 4 SOME HELPFUL RESOURCES ....................................... 1 OVERVIEW OF KIEV ................................................... 2 Maps ............................................................................................................. 2 Geography/Politics .......................................................................................... 4 Climate ......................................................................................................... 4 Languages ..................................................................................................... 4 Religion ......................................................................................................... 5 Cost of Living ................................................................................................. 5 Canadian/Expat Community ............................................................................. 6 Cultural Nuances, Etiquette and Traditions ......................................................... 6 Public Holidays ............................................................................................... 9 News ..........................................................................................................
    [Show full text]
  • For Free Distribution
    #9 (91) September 2015 Why Moscow is swapping The upcoming The chronicles of Ukraine's separatist leaders new wave of privatization separation from the Soviet Union WWW.UKRAINIANWEEK.COM Featuring selected content from The Economist FOR FREE DISTRIBUTION coNteNTS | 3 BRIEFING SOCIETY 5 The DNR Game: 28 Archetypes of the Donbas War: Opportunists 2, Idealists 0 How the locals see themselves How self-declared republics after more than a year of the conflict are preparing to return to Ukraine 29 Aliens Versus Predator: 7 Grenade Out of Nowhere? Kateryna Barabash on the verdict Yuriy Makarov on what caused to Oleh Sentsov as evidence the August 31 violence of atrophied social intelligence POLITICS NEIGHBOURS 8 Send in the Clones: 30 Sprechen Sie Power? In the run-up to nationwide What makes German hip again local elections this fall, 33 Leonidas Donskis on political the President’s team leadership of our time is working to counter 34 Philippe de Lara on the nature competing parties with of Soviet and Russian colonialism political clones HISTORY ECONOMICS 36 The Independence Imperative: 10 Ambiguous Debt Restructuring: The chronicles of Ukraine’s How good the deal separation from the Soviet Union with Ukraine’s private 42 Tymur Bobrovsky: creditors is "We had a chance to present what 12 Big Sale Coming Up: has been preserved in Chersonese as Reform of public property unique heritage of the world scale" management and plans Ukraine’s top archeologist on of massive privatization mechanisms to protect cultural and FOCUS historical heritage in
    [Show full text]
  • Of the Public Purchasing Announcernº3(77) January 17, 2012
    Bulletin ISSN: 2078–5178 of the public purchasing AnnouncerNº3(77) January 17, 2012 Announcements of conducting procurement procedures . 2 Announcements of procurement procedures results . 66 Urgently for publication . 103 Bulletin No.3(77) January 17, 2012 Annoucements of conducting 01230 Municipal Enterprise “Shostka State Plant “Impuls” procurement procedures of Sumy Oblast 41 Kuibysheva St., 41101 Shostka, Sumy Oblast Website of the Authorized agency which contains information on procurement: 01097 SOE “Snizhneantratsyt” www.tender.me.gov.ua 32 Lenina St.,86500 Snizhne, Donetsk Oblast Procurement subject: code 11.10.1 – natural gas – 4570 thousand cubic Antonova Olena Mykhailivna meters, 2 lots: lot 1 – natural gas for production of heat energy for the tel.: (06256) 5–24–34; needs of institutions and organizations which are financed from state tel./fax: (06256)5–55–65; and local budget and other economic entities – 570 thousand cubic e–mail: [email protected] meters; lot 2 – natural gas for the own needs – 4000 thousand cubic Website of the Authorized agency which contains information on procurement: meters www.tender.me.gov.ua Supply/execution: at the customer’s address; January – December 2012 Procurement subject: code 29.52.1 machines and equipment for Procurement procedure: procurement from the sole participant mining industry, 10 lots: lot 1 cutter–loader УКД 200.250 in a set or Name, location and contact phone number of the participant: PJSC equivalent – 1 unit; lot 2 – offset feed control system OFCS in a set or “PJSC “Naftogaz
    [Show full text]
  • For Free Distribution
    AUTHORITIES HUSH UP INDEPENDENT PAGE TALKS ON THE VISA REGIME AND FTA PAGE LIFE AFTER EURO 2012: PAGE MEDIA BEFORE THE ELECTION PUTS DO NOT SIGNAL THE END OF HOW EUROPEANS UKRAINE IN THE SPOTLIGHT 10 ISOLATION FOR MR. YANUKOVYCH 13 CHANGED UKRAINE 28 № 12 (35) JULY 2012 WWW.UKRAINIANWEEK.COM FOR FREE DISTRIBUTION Featuring selected content from The Economist |CONTENTS BRIEFING FOCUS A No-Win Situation: A Pinpoint Strike: Lytvyn’s Choice: As Vladimir Putin comes four hours Recent developments show The position of the Verkhovna late for his meeting with Viktor that the government opens Rada’s Speaker on the Yanukovych in Yalta, he shows that criminal cases against language law, regardless of the West is not the only one turning protesters and activists his motivation, will determine its back on the Ukrainian President to discourage others to his political future and his 4 continue or join the struggle 5 place in Ukrainian history 6 POLITICS Endurance Test: Yuri Makarov Another Carrot: The government is testing on how Russian A simplified visa regime and the how the Ukrainian mass methods of initialing of the economic part media and society are pressure are of the Ukraine-EU Free Trade prepared to protect tested on Agreement does not mean that freedom of speech Ukrainian mass the international isolation of Mr. 10 media 12 Yanukovych’s regime has ended 13 SECURITY Preventing Poverty: Uzbekistan’s Demarche: John Lucas on the rule of law Tashkent’s decision to withdraw as a guide to eliminating from the CSTO could lead to yet corruption and
    [Show full text]
  • Progress Report (2016–2018) of the MDB Working Group On
    Progress Report (2016-2018) of the MDB Working Group on Sustainable Transport September 2019 Table of Contents 1 INTRODUCTION ................................................................................................................ 3 2 MDB ACTION ON SUSTAINABLE TRANSPORT: 2016 to 2018....................................... 4 3 SPECIAL FEATURE: MDB ENGAGEMENT IN ROAD SAFETY IMPROVEMENTS .......... 8 ANNEX: LENDING PROJECTS APPROVED BY EACH MDB ................................................11 African Development Bank ................................................................................................11 Asian Development Bank ...................................................................................................13 CAF – Development Bank of Latin America .......................................................................17 European Bank for Reconstruction and Development ........................................................19 European Investment Bank ................................................................................................22 Inter-American Development Bank ....................................................................................26 Islamic Development Bank ................................................................................................28 World Bank ........................................................................................................................29 Note: This is a joint document authored by members of the Multilateral Development
    [Show full text]
  • Extreme Weather
    THE INTERNATIONAL LIGHT RAIL MAGAZINE www.lrta.org www.tautonline.com MAY 2017 NO. 953 KEEPING RUNNING IN EXTREME WEATHER Los Angeles: Measure M funding boosts LRT expansion Terror targets the St Petersburg Metro US draft budget freezes out transit 14 hurt as Hong Kong tram overturns UK tram-train Chaos theory 05> £4.40 Under scrutiny yet Making sense of the looking to 2018 Charleroi Metro 9 771460 832050 Phil Long “A great event, really well organised and the dinner, reception and exhibition space made for great networking time.” Andy Byford – CEO, Toronto Transit Commission MANCHESTER “I really enjoyed the conference and made some helpful contacts. Thanks for bringing such a professional event together.” 18-19 July 2017 Will Marshall – Siemens Mobility USA Topics and themes for 2017 include: > Rewriting the business case for light rail investment > Cyber security – Responsibilities and safeguards > Models for procurement and resourcing strategies > Safety and security: Anti-vandalism measures > Putting light rail at the heart of the community > Digitisation and real-time monitoring > Street-running safety challenges > Managing obsolescence > Next-generation driver aids > Wire-free solutions > Are we delivering the best passenger environments? > Composite and materials technologies > From smartcard to smartphone ticketing > Rail and trackform innovation > Traction energy optimisation and efficiency > Major project updates Confirmed speakers include: > Paolo Carbone – Head of Public Transport Capital Programmes, Transport Infrastructure Ireland > Geoff Inskip – Chairman, UKTram > Jane Cole – Managing Director, Blackpool Transport > Allan Alaküla – Head of Tallinn EU Office, City of Tallinn > Andres Muñoz de Dios – Director General, MetroTenerife > Tobyn Hughes – Managing Director (Transport Operations), North East Combined Authority > Alejandro Moreno – Alliance Director, Midland Metro Alliance > Ana M.
    [Show full text]
  • Georesources and Environment Geological Hazards During
    International Journal of IJGE 2018 4(4): 187-200 Georesources and Environment http://ijge.camdemia.ca, [email protected] Available at http://ojs.library.dal.ca/ijge Geotechnical Engineering and Construction Geological Hazards During Construction and Operation of Shallow Subway Stations and Tunnels by the Example of the Kharkiv Metro (1968–2018) Viacheslav Iegupov*, Genadiy Strizhelchik, Anna Kupreychyk, Artem Ubiyvovk Department of Geotechnics and Underground Structures, Kharkiv National University of Civil Engineering and Architecture, 40 Sumska Street, Kharkiv, Ukraine Abstract: Scientific, technical and practical problems have been considered in relation to geological hazards during construction and operation of metro objects such as shallow subway stations and tunnels. Analysis of five decades of the experience of construction and subsequent operation of the Kharkiv metro in rough engineering and geological conditions by construction of tunnels at shallow depths under the existing urban development allowed detecting and systematizing a set of the most essential adverse conditions, processes and phenomena. The main geological hazards are related to the expansion of quicksands, possibility of “flotation” of the underground structures, barrage effect, subsidence of the soil body by long-term dewatering, undermining of the built-in territories and difficulties by tunneling in technogenic fill-up grounds when crossing ravines and gullies. Most problems occur in the territories with a high groundwater level: geological risks in these areas increase, and serious incidents occur by sudden adverse changes of hydrodynamic conditions. Zones of high, medium and low geological hazards have been identified. Geological hazards have been defined at the section planned for extension of the metro line, for which calculations of the affluent value were made based on the barrage effect of tunnels on the groundwater flow.
    [Show full text]