Audit and Assurance Committee Date: 7 June 2018 Item: Annual Report 2017/18 This Paper Will Be Considered in Public 1 Summary

Total Page:16

File Type:pdf, Size:1020Kb

Audit and Assurance Committee Date: 7 June 2018 Item: Annual Report 2017/18 This Paper Will Be Considered in Public 1 Summary Audit and Assurance Committee Date: 7 June 2018 Item: Annual Report 2017/18 This paper will be considered in public 1 Summary 1.1 The purpose of this paper is to present the Annual Report to the Audit and Assurance Committee. 2 Recommendation 2.1 The Committee is asked to note the Annual Report, comment on its contents, and note the delegation to the Managing Director, Customers, Communication and Technology the task of making any adjustments prior to submission to the Board. 3 Background 3.1 The Annual Report is one of TfL's key publications and a statutory requirement under the Greater London Authority Act 1999 (as amended). Following discussion by the Committee, the report will be submitted to the meeting of the Board on 25 July 2018. 3.2 The Statement of Accounts and the Annual Governance Statement are being considered elsewhere on the agenda. Following approval, the documents will be combined to form the Annual Report and Statement of Accounts 2017/18. List of appendices to this paper: Appendix 1 - Annual Report List of Background papers: None Contact Officer: Vernon Everitt, Managing Director, Customers, Communication and Technology Number: 020 3054 7167 Email: [email protected] Appendix 1 Annual Report and Statement of Accounts 2017/18 Draft 30 May 2018 Draft Draft About Transport for London (TfL) Contents Part of the Greater London Authority We are moving ahead with many of family led by Mayor of London Sadiq London’s most significant infrastructure Khan, we are the integrated transport projects, using transport to unlock authority responsible for delivering the growth. We are working with partners Mayor’s aims for transport. on major projects like Crossrail 2 and the Bakerloo line extension that will deliver We have a key role in shaping what the new homes and jobs London and 4 Message from the Mayor 92 Remuneration Report life is like in London, helping to realise the UK need. We are in the final phases the Mayor’s vision for a ‘City for All of completing the Elizabeth line which, Londoners’. We are committed to creating when it opens, will add 10 per cent to 6 Commissioner’s foreword XX Statement of Accounts – to be a fairer, greener, healthier and more London’s rail capacity. provided at a later date prosperous city. The Mayor’s Transport 8 Year at a glance Strategy sets a target for 80 per cent of Supporting the delivery of high-density, XX Annual Governance Statement all journeys to be made on foot, by cycle mixed-use developments that are – to be provided at a later date or using public transport by 2041. To planned around active and sustainable 10 The strategy and vision make this a reality, we prioritise health travel will ensure that London’s growth and the quality of people’s experience is good growth. We also use our own XX Executive Committee 12 Operational performance in everything we do. land to provide thousands of new affordable homes and our own supply XX Members of TfL We manage the city’s red route strategic chain creates tens of thousands of jobs 16 Safety and security roads and, through collaboration with and apprenticeships across the country. the London boroughs, can help shape XX Directors of Crossrail Ltd 30 Healthy Streets and healthy people the character of all London’s streets. We are committed to being an employer These are the places where Londoners that is fully representative of the XX Membership of TfL committees travel, work, shop and socialise. community we serve, where everyone 46 A good public transport experience and panels Making them places for people to walk, can realise their potential. Our aim is to cycle and spend time will reduce car be a fully inclusive employer, valuing and 74 New homes and jobs dependency and improve air quality, celebrating the diversity of our workforce XX TfL Members’ meeting attendance revitalise town centres, boost businesses to improve services for all Londoners. and connect communities. 82 Operating our business We are constantly working to improve the We run most of London’s public city for everyone. This means freezing TfL transport services, including the fares so everyone can afford to use public London Underground, London Buses, transport, using data and technology to the Docklands Light Railway, London make services intuitive and easy to use, Overground, TfL Rail, London Trams, and doing all we can to make streets and London River Services, London Dial-a- transport services accessible to all. We Ride, Victoria Coach Station, Santander reinvest every penny of our income to Cycles and the Emirates Air Line. The continually improve transport networks quality and accessibility of these services for the people who use them every day. is fundamental to Londoners’ quality of life. By improving and expanding None of this would be possible without public transport, we can make people’s the support of boroughs, communities lives easier and increase the appeal of and other partners who we work with sustainable travel over private car use. to improve our services. We all need to pull together to deliver the Mayor’s Transport Strategy; by doing so we can create a better city as London grows. Transport for London Annual Report and Statement of Accounts 2017/18 3 Draft Draft Message from the Mayor Working towards my Transport Strategy, we are committed to making transport in London safer, cleaner and more affordable. From the streets we live on to the bus I have continued to keep TfL fares frozen, and Tube services we use, transport protected TfL’s travel concessions, shapes our daily lives and creates brought in the unlimited Hopper fare new opportunities. and got night services up and running on London Overground following its In March, I published my Transport huge success on the Tube. Strategy. This demonstrates my commitment to prioritising people’s TfL also has a vital role to play in the health and changing London’s transport growth of the city and delivering new so the city works better for everyone. housing. As well as taking forward new infrastructure schemes, TfL is developing My strategy sets out a bold vision for its own land and this year brought to making London healthier, safer and more market sites that will deliver more than welcoming, with the goal that 80 per 3,800 homes. Under my leadership, cent of journeys will be made by walking, half of these homes will be affordable. cycling or public transport by 2041. By working closely with unions and bus operators, I am helping to improve Improving London’s air quality is key working conditions. In 2017, I introduced to this work and we have made huge the Licence for London, a deal to progress over the past year. For the help drivers fairly move between bus first time since records began 10 years companies, and I secured a new £23,000 ago, London entered the third week of minimum wage for London’s 25,000 January without having breached legal bus drivers. limits for toxic nitrogen dioxide (NO2 ) air pollution. It normally exceeds these It’s only through working with others that targets by 6 January. Image 1: Mayor of London, Sadiq Khan we can truly make a difference to this great city. Our partners, our contractors, This progress could not have been our people and their unions all make a achieved without fresh thinking on vital contribution and I am grateful for London’s roads. In October 2017, I I am also helping taxi drivers to buy stage of Cycle Superhighway 6 in Camden everything they do. introduced the T-Charge to start cleaning zero emission capable (ZEC) vehicles by and Islington. up our toxic air ahead of the start of the providing funding to replace the oldest central London Ultra Low Emission Zone taxis and speeding up the installation of As well as being clean and pleasant, in 2019. new rapid charging points across the city. transport has to be safe, reliable, accessible and affordable. Over the past I launched the first two Low Emission We need streets to be welcoming year, I have been working hard to provide Bus Zones in Putney and Brixton, and environments for people to walk Londoners with the high-quality services Sadiq Khan pollution levels have fallen drastically and cycle in, and I am pleased that they deserve and to create transport links Mayor of London as a result. construction has now begun on the next that work for everyone. 4 Message from the Mayor Transport for London Annual Report and Statement of Accounts 2017/18 5 Draft Draft Commissioner’s foreword We have made good progress towards delivering our Business Plan with the safety of our customers, staff, contractors and suppliers as our top priority. Safety must always come first. In we expanded our record-breaking November, we marked the first Santander Cycles scheme to Brixton, anniversary of the tragedy at Sandilands, introducing another seven docking where a tram overturned and left the stations and 200 bikes. More Cycle rails. Dane Chinnery, Donald Collett, Superhighways, Quietway routes, and Robert Huxley, Philip Logan, Philip Seary, plans for a new walking and cycling Mark Smith and Dorota Rynkiewicz lost crossing linking Rotherhithe and Canary their lives and a further 62 people were Wharf will help to encourage Londoners injured. Our thoughts remain with their to swap their cars for more sustainable families and loved ones, and we continue and active ways of travelling. to do everything we can to support them. Our work to support London’s growth The Rail Accident Investigation Branch and create new homes has continued published its report in December 2017, apace.
Recommended publications
  • Chapter 20 Route Window SE1 Blackwall Way and Limmo Peninsula Shafts
    Chapter 20 Route Window SE1 Blackwall Way and Limmo Peninsula shafts Transport for London BLACKWALL WAY AND LIMMO PENINSULA SHAFTS Baseline conditions 20 Route Window SE1 Blackwall Way and Limmo Peninsula shafts Blackwall Way shaft 20.6 The site lies in the London Borough of Tower Hamlets, alongside the Reuters car park behind the Virginia Quay Developments on Blackwall Way, a short distance from the East India DLR station. The area around the worksite is undergoing major commercial and residential development. The Reuter’s Building car park, for example, is the site of the proposed Blackwall Yard residential development. Some of the residential development may come forward before the Crossrail works start. The Crossrail works must therefore be assessed with this potential Transport residential context in mind. for London 20.7 The site is linked to the A1261 Aspen Way/A1020 Lower Lea Crossing junction by Blackwall Way, a section of which (west of Newport Avenue) is at present closed to traffic. Blackwall Way is a quiet two-way road. Parking is not restricted, and vehicles may be seen parked on both sides of the road as far as the entrance to the Reuters car park. Blackwall Way is an unadopted road, but proposals are in hand for its adoption by the London Borough of Tower Hamlets in the near future. Limmo Peninsula shaft Introduction 20.8 The Limmo Peninsula shaft site lies in the London Borough of Newham, towards the southwest 20.1 The principal works in this route window will be the construction of: corner of a large triangular area of semi-derelict land bounded by the River Lea to the west and south, and by the DLR and the Jubilee line to the east.
    [Show full text]
  • London Assembly MQT – 2 July 2014 22Nd Mayor’S Report to the Assembly
    London Assembly MQT – 2 July 2014 22nd Mayor’s Report to the Assembly This is my twenty-second report to the Assembly, fulfilling my duty under Section 45 of the Greater London Authority Act 1999. It covers the period 29 May to 18 June. Executive Summary London housing zones to create 50,000 new homes On 13 June, alongside the Chancellor of the Exchequer, the Rt Hon George Osborne MP, I announced that twenty new housing zones will be created in London, delivering 50,000 new homes. Housing zones are a new approach to get new homes built quickly. Local authorities identify and package together brownfield land which could be used for development into a housing zone, remove all unnecessary planning restrictions across it and partner with a developer to build new homes. The absence of planning constraints in these zones will significantly accelerate construction. Last November, my draft Housing Strategy set out plans for ten potential housing zones, but this announcement now doubles that number as central government and the GLA each offer £200 million for twenty zones. Commonwealth Games Queen's Baton Relay On 6 June, I was joined by Olympic, World and Commonwealth Champion, Christine Ohuruogu MBE and local schoolchildren to welcome the Commonwealth Games Queen's Baton Relay to the capital, part of the England leg of a journey that will see it travel 190,000 kilometres over 288 days. On 8 June, the Queen’s Baton made its way through Queen Elizabeth Olympic Park as part of the run up to Games. Approval of Westfield expansion On 30 May, I approved plans to extend the Westfield Shopping Centre in Shepherds Bush and build more than 1,300 homes.
    [Show full text]
  • C261 LIM XRW10 Instone Wharf Non Listed Built Heritage Assessment Report.Pdf
    Instone Wharf NLBH Walkover Assessment Contents 1 Introduction ...............................................................................................................4 2 Objectives and scope of this report ........................................................................4 3 Method of work..........................................................................................................5 4 A brief summary of structures .................................................................................6 5 Documentary research ...........................................................................................10 6 Conclusions.............................................................................................................16 6.1 Original research aims and archiving .................................................................... 16 6.2 Publication................................................................................................................ 16 6.3 Acknowledgements ................................................................................................. 16 7 Bibliography ............................................................................................................17 Page 2 of 17 Document uncontrolled once printed. All controlled documents are saved on the CRL Document System © Crossrail Limited RESTRICTED Instone Wharf NLBH Walkover Assessment Figures Fig 1 View of the mooring posts, looking south 6 Fig 2 Detail of a mooring post, looking south-west 7 Fig 3 Detail
    [Show full text]
  • C123 LIM Limmo Peninsula Shaft Written
    Limmo Peninsula Shaft Site Specific Written Scheme of Investigation C123-JUL-T1-TPL-CR0144_SH011_Z-00001, Rev. 9.1 Document History Continued: Revision Date: Prepared By: Checked by: Approved by: Reason for Issue: 1.0 30/01/08 Issue for CLRL Approval (MoLAS) (MDC4) CLRL comments 2.0 01/05/08 (MoLAS) (MDC4) incorporated (MoLAS) Issue for CLRL Scheme 3.0 05/09/08 (MDC4) (MDC4) Design 3 (MDC4) Update for Grip 4 to 4.0 30/01/09 (MDC4) (MDC4) incorporate the NLBH and Street Furniture Surveys 5.0 24/11/09 (PDP) (PDP) (PDP) For inclusion with ITT Updated by 6.0 26/02/10 (PDP) For inclusion with ITT for PDP) (PDP) For Approval by PDP: 7.0 18/05/10 Revised for watching brief on gas diversion 8.0 22/07/10 For PDP Acceptance 9.0 10/03/11 For Issue Page 2 of 66 Document uncontrolled once printed. All controlled documents are saved on the CRL Document System © Crossrail Limited RESTRICTED Limmo Peninsula Shaft Site Specific Written Scheme of Investigation C123-JUL-T1-TPL-CR0144_SH011_Z-00001, Rev. 9.1 This document has been prepared for the exclusive use of the Client and unless otherwise agreed in writing by Jacobs, no other party may use, make use of or rely on the contents of this document. Should the Client wish to release this document to a third party, Jacobs may, at its discretion, agree to such release provided that (a) Jacobs’ written agreement is obtained prior to such release; and (b) by release of the document to the third party, that third party does not acquire any rights, contractual or otherwise, whatsoever against Jacobs and Jacobs, accordingly, assume no duties, liabilities or obligations to that third party; and (c) Jacobs accepts no responsibility for any loss or damage incurred by the Client or for any conflict of Jacobs’ interests arising out of the Client's release of this document to the third party.
    [Show full text]
  • Leamouth Peninsula North
    planning report PDU/1097c/01 4 November 2010 Leamouth Peninsula North London Thames Gateway Development Corporation (in the London Borough of Tower Hamlets and Newham) planning application no. PA/10/01864 Strategic planning application stage 1 referral (new powers) Town & Country Planning Act 1990 (as amended); Greater London Authority Acts 1999 and 2007; Town & Country Planning (Mayor of London) Order 2008 The proposal Part detailed part outline application for a mixed-use development comprising 1,706 residential units, 7, 848 sq.m. business floorspace, 1,852 sq.m. of retail floorspace, 1, 801 sq.m. of leisure floorspace, 2,049 sq.m. of arts and cultural floorspace, 4,800 sq.m. of education floorspace, 1,296 sq.m. of community use floorspace. The applicant The applicant is Clearstorm Properties Ltd, a full subsidiary of the Ballymore group of companies. The architect is Capita Lovejoy. Strategic issues The principle of a high-density mixed-use residential led redevelopment of the site is in the interest of good strategic planning in London. The application is broadly consistent with London Plan policy; however, further information is required on affordable housing, child play space, energy and transport to ensure compliance with the London Plan. Recommendation That Tower Hamlets and Newham Council, on behalf of the London Thames Gateway Development Corporation, be advised that the application does not comply with the London Plan, for the reasons set out in paragraph 106 of this report; but that the possible remedies set out in paragraph 108 of this report could address these deficiencies. The application does not need to be referred back to the Mayor if the Corporation resolve to refuse permission, but it must be referred back if the Corporation resolve to grant permission.
    [Show full text]
  • Uber Prime Inner-London Last Mile Industrial Investment Opportunity Investment Summary
    CANNING TOWN, LONDON, E16 4ES UBER PRIME INNER-LONDON LAST MILE INDUSTRIAL INVESTMENT OPPORTUNITY INVESTMENT SUMMARY » A unique opportunity to acquire an extremely rare, multi-let industrial estate in Central London, offering highly reversionary income and underpinned by long-term residual value. » Electra is one of the UK’s premier urban logistics parks. » Situated in the heart of East London, the property is in a key location for London centric occupiers, owing to its proximity to Central London, Canary Wharf and The City. » Electra comprises 10 highly specified industrial units totalling 228,137 sq ft GIA (237,325 sq ft GEA), with unit sizes ranging from 11,060 sq ft to 53,403 sq ft GIA. » The Property is let to 9 tenants, providing a topped-up headline income of £3,725,373 pa. » This reflects a low average rent of £16.33 psf (GIA), offering excellent future income growth prospects. The latest on estate letting reflects £20.77 psf. » There is one void at Electra, Unit 8 which totals 17,010 sq ft (GIA). The vendor will provide a 6 month rent, rates and service charge guarantee. » Key occupiers include, CCF Limited, HSBC Bank Plc, Swiss Post Solutions Limited and Cubic Transportations Limited, with 81% of the income secured against covenants rated ‘Minimum Risk’ or ‘Lower than Average Risk’ by Dun & Bradstreet. » The urban logistics park provides an attractive and diverse income profile with an AWULT of 6.4 years to lease expiries and 4.3 years to break options, which will increase on completion of two lease renewals.
    [Show full text]
  • Initial East Area Information
    5393_E01.R3.1_GtEastLine 1/2/05 2:20 PM Page 1 E1.R3.1 Great Eastern Line Service Improvements ■ New and more frequent trains ■ Faster journeys to parts of the City, West End and west London with no need to change trains ■ Improved links to Heathrow Airport, Docklands and south-east London ■ Additional capacity and reduced crowding Crossrail will generally operate as an “all stations” service with up to 12 trains per hour during peak periods and up to eight at other times. Most of the existing “Metro” services will be replaced, although some will continue Liverpool Street Station at present to operate between Gidea Park and Liverpool Street. Services from further afield such as Ipswich, Chelmsford and Southend will be able to continue to operate as they do today. The Crossrail timetable and service pattern will be set by the relevant railway bodies in consultation with the train operating company responsible for operating Crossrail services. Other major benefits of Crossrail include reduced crowding on the Central and District lines and the release of platform capacity at Liverpool Street station which will facilitate additional train services from Possible Crossrail Train places such as Stansted Airport. Crossing the Capital Helpdesk 0845 602 3813 Email: [email protected] Connecting the UK 24 hours a day, 7 days a week www.crossrail.co.uk 5393_E02.R3.1_PuddingMill 1/2/05 2:23 PM Page 1 E2.R3.1 Pudding Mill Lane (1) Tunnel Portal A portal for the Crossrail tunnels will be constructed at Pudding Mill Lane. The tunnel portal will be used as the entrance/exit for Crossrail trains to operate between the Great Eastern Line and two new tunnels through central London.
    [Show full text]
  • 10 Pascal Street
    ADDRESS: 10 Pascal Street, London, Lambeth, SW8 4SH Application Number: 20/02331/FUL Case Officer: Magda Kotyza Ward: Oval Date Received: 13/07/2020 Proposal: Full 'slot-in' planning application for phased residential led mixed-use development above and surrounding Nine Elms Station, comprising three new residential buildings of 21 storeys, 16 storeys and 17 storeys providing a total of 479 homes (Use Class C3), plus small scale commercial floorspace of 108m2 (Expanded Use Classes A1-A4 and D1), works within the Nine Elms Station 'boxes', a new public square, and associated works. Applicant: Connected Living London (Nine Agent: Avison Young Elms) Limited RECOMMENDATION 1. Resolve to grant conditional planning permission subject to the completion of an agreement under Section 106 of the Town and Country Planning Act 1990 (as amended) containing the planning obligations listed in this report and any direction as may be received following further referral to the Mayor of London. 2. Agree to delegate authority to the Director of Planning, Transport and Sustainability to: a. Finalise the recommended conditions as set out in this report, addendums and/or PAC minutes; and b. Negotiate, agree and finalise the planning obligations as set out in this report, addendums and/or PAC minutes pursuant to Section 106 of the Town and Country Planning Act 1990 (as amended). 3. In the event that the committee resolves to refuse planning permission and there is a subsequent appeal, delegated authority is given to the Director of Planning, Transport and Sustainability, having regard to the heads of terms set out in this report, addendums and/or PAC minutes, to negotiate and complete a document containing obligations pursuant to Section 106 of the Town and Country Planning Act 1990 (as amended) in order to meet the requirement of the Planning Inspector.
    [Show full text]
  • C261 LIM XRW 10 Limmo Peninsula
    Crossrail Limmo Peninsula WB and Evaluation Fieldwork Report, Doc No. C261-XRL-X-XCS-CR140-50010, Revision 3.0 Non technical summary This report presents the results of three archaeological watching briefs and a field evaluation carried out by the Museum of London Archaeology (MOLA) on the site of Limmo Peninsula, London E16, in the London Borough of Newham. This report was commissioned from MOLA by Crossrail Ltd. This work is being undertaken as part of a wider programme of assessment to quantify the archaeological implications of railway development proposals along the Crossrail route. The worksite at Limmo Peninsula shaft site (in the C261 Early East archaeology zone of the Crossrail Project) consists of two main areas, a storage/treatment compound for excavated material from tunnelling removed from the Limmo Peninsula shaft, and a conveyor for excavated material leading south to a barge loading facility at Instone Wharf at the mouth of the Lea. The results of three watching briefs and two evaluation trenches broadly confirm anticipated findings. Window samples from the evaluation trenches identified possible Allerod (late Upper Palaeolithic) deposits over Pleistocene gravels. Overlaying this was prehistoric and historic alluvium beneath 19th-century consolidation dumps of industrial waste material. Overlaying this, excavation has demonstrated that remains of the Thames Ironworks (1846 to 1912) survive beneath modern 20th-century overburden/made ground. The main industrial structure including brick flues and firebricks was probably for metal working in the shipyard. Features within the evaluation trenches correspond to buildings of Thames Ironworks identified on the historic OS maps. Early 19th-century consolidation, and the subsequent construction of the Thames Ironworks, either truncate or directly overlay the historic alluvium, and have most likely destroyed any earlier archaeological remains within their footprints.
    [Show full text]
  • Sivertown Tunnel Tunnel Engineering
    TRANSPORT FOR LONDON RIVER CROSSINGS: SILVERTOWN TUNNEL SUPPORTING TECHNICAL DOCUMENTATION This report is part of a wider FURTHER DEVELOPMENT suite of documents which OF TUNNEL ENGINEERING outline our approach to traffic, environmental, optioneering Mott MacDonald and engineering disciplines, July 2013 amongst others. We would like to know if you have any This report builds upon previous studies comments on our approach to to develop the bored tunnel concept and this work. To give us your addresses design development of key views, please respond to our areas. consultation at www.tfl.gov.uk/silvertown- tunnel Please note that consultation on the Silvertown Tunnel is running from October – December 2014. Silvertown Tunnel Further development of Tunnel Engineering 298348/MNC/TUN/002 July 2013 Transport for London Silvertown298348 MNC TunnelTUN 002 A Document3 15 April 2013 Further development of Tunnel Engineering 298348/MNC/TUN/002 July 2013 Transport for London Mott MacDonald, Mott MacDonald House, 8-10 Sydenham Road, Croydon CR0 2EE, United Kingdom t +44 (0)20 8774 2000 f +44 (0)20 8681 5706, W www.mottmac.com Silvertown Tunnel Content Chapter Title Page Executive Summary i 1. Introduction 1 1.1 Background ________________________________________________________________________ 1 1.2 Scope of this report __________________________________________________________________ 1 1.3 Report structure ____________________________________________________________________ 1 1.4 Contributors _______________________________________________________________________
    [Show full text]
  • Sensitive Commercial 24 June 2019 Simon
    Official ~ Sensitive Commercial c /o Crossrail Ltd 5 Endeavour Square, 8th Floor London, E20 1JN Our Ref: B2111500/1.2/JGH/166 24 June 2019 Simon Adams Head of Crossrail Joint Sponsor Team Transport for London 4th Floor, 55 Broadway London SW1H 0BD Dear Simon Crossrail PRep Project Status Report 125 – Period 2 Attached for your consideration is a copy of our Project Status Report 125, Period 2 FY 2019/20. As highlighted in previous reports, optimism bias is still being exhibited by CRL, without the full root-cause of the underlying issue being fully understood; the IM’s integration plan continues to be developed; and the mitigation plans for limiting the increasing AFCDC are still to be finalised. I would also like to take this opportunity to highlight the key issues from the Period Report that we consider require further action or explanation to Sponsors by the CRL Leadership Team: a) The actions taken to underpin the DCS and the associated AFCDC should result in a robust and predictable output. However, the buy-in of the Tier 1 contractors is still to be confirmed and this How does CRL plan to develop an aligned supply-chain that is fully bought- into the opening dates? b) The risk management approach which was reinstated in January 2019 is still considered to be immature for a programme of this, type at this stage of the delivery lifecycle. What is CRL’s assessment of the current state of development of the approach being adopted, and what are the timescales to address the remaining issues? Please let me know if you have any questions or concerns.
    [Show full text]
  • Crossrail SUSTAINABILITY REPORT 2014 Route Map BRENTWOOD
    CROSSRAIL SUSTAINABILITY REPORT 2014 Route Map BRENTWOOD Showing rail and air connections Shenfield Brentwood Surface line Tunnel Harold Wood Portal (tunnel entrance and exit) National Rail connection REDBRIDGE Romford Airport connection Chadwell Gidea Seven Heath Park Airports not on the Crossrail route - to travel to these Kings airports passengers will need to travel on other Ilford Goodmayes connecting rail services. Step-free travel is possible but SOUTH BUCKS Forest assistance will be required to get on and o some trains. HILLINGDON ISLINGTON Gate Maryland HAVERING Travel from Luton Airport Parkway Station to CAMDEN Circle Luton Airport is via an accessible bus. Metropolitan Manor Park Hammersmith & City Hammersmith & City Stratford BARKING & Central Luton District TOWER Central EALING District Central Taplow Gatwick Overground HAMLETS Jubilee DAGENHAM Burnham Jubilee DLR WESTMINSTER Whitechapel Ealing Bond Farringdon Overground West Broadway KENSINGTON & Street NEWHAM HAMMERSMITH & Drayton Hanwell CITY OF Maidenhead Langley Iver CHELSEA Hayes & Southall LONDON Liverpool SLOUGH Harlington Acton Tottenham Slough West FULHAM Street Main Line Paddington Court Road Ealing Circle Circle Custom Northern Canary Hammersmith Metropolitan House & City Central Hammersmith Wharf DLR Bakerloo & City Jubilee District Northern DLR Abbey Wood Central Twyford Woolwich Stansted DLR WINDSOR & MAIDENHEAD Southend T1,2,3 Heathrow GREENWICH T4 BEXLEY Reading Piccadilly WOKINGHAM Heathrow READING CONTENTS MOVING LONDON FORWARD 2 VISION AND VALUES 4 FOREWORD
    [Show full text]