No. CMRL/BD/2019/Walk-In Scheme/490/01

Total Page:16

File Type:pdf, Size:1020Kb

No. CMRL/BD/2019/Walk-In Scheme/490/01 No. CMRL/BD/2019/Walk-in Scheme/490/01 POLICY FOR LICENSING OF SEMI-NAMING RIGHTS FOR PHASE-1 STATIONS THROUGH WALK- IN BASIS SCHEME 1. Terms and Conditions for walk in basis scheme: All terms and conditions including the eligibility criteria shall be same as that of the failed auction/ tender from which the inventory has been taken. 2. Procedure for Selection/Short listing of applicants: (i) The applicant shall be required to submit the Application Form as per the approved format, separately for intended inventory to CMRL Tapal section. (ii) The selection is based on the first come first serve basis. The applicant whose application is received first in CMRL Tapal section will considered eligible for the said inventory. (iii) The applicants shall be required to submit the application cost and Earnest Money Deposit (EMD) amount in the form of demand draft or RTGS/NEFT in favour of “Chennai Metro Rail Limited.”, payable at Chennai along with application form for the intender inventory. If application received without application cost and EMD shall stand rejected/ cancelled outright. The applicant unequivocally and voluntarily agrees not to seek any claim, compensation or any other consideration in case of non-allotment on whatsoever reason. (iv) CMRL shall free to allot that inventory to other applicant who has applied subsequently for the inventory. Any decision taken by CMRL management will be final and binding on the applicants. No correspondence shall be entrained in this regard. (v) The intimation to the successful party shall be given through e-mail as well as on telephone on the contact number provided in the application. 3. Submission of Applications: The applicant shall be required to submit their application along with application fee, Bid security (EMD), GST, address proof and PAN card at the following address. Kind Attention: O/o Chief General Manager/ Planning & Business Development, Tapal Section, Chennai Metro Rail Limited, Admin Building, CMRL Depot, Ponnamalle High Road, Koyambedu, Chennai – 600 107 Tamil Nadu Any clarification on the policy can be made at the above address / a through e-mail to [email protected]. Page 1 of 3 Date- 07.11.2020 WALK-IN-Basis Scheme (Ref: tender dated 13.02.2019) Licensing of Semi-Naming Rights in phase-1 of CMRL network for commercial utilizations through walk-in-basis All terms and conditions of licensing of the semi-Naming rights shall be same as given in the open bid process for the tender dated- 13.02.2019. The document of which is available on the Chennai Metro Rail website www.chennaimetrorail.org. For any clarifications, please contact office of CGM- P&BD, Chennai Metro Rail Limited, Admin Building, CMRL Depot, Poonamalle High Road, Koyambedu, Chennai-600 107, Tamil Nadu, Tel- 044-2379 2000. The list of Semi-Naming Rights station names available on walk-in-basis as on date is as under and will updated based on availability of station. This policy is effect from date of publication on CMRL website (i.e, 31.08.2019) and shall remain valid upto 31st March 2022. SNR BD License Fee Application EMD in Statue as on Sl. Station Name Station code per Annum Fee in Rs Rs 07.11.2020 No in Rs 1 Vadapalani SVA-SNR-01 1 Crore 3,20,000 Available 2 Thirumangalam STI-SNR-01 1 Crore 3,20,000 Available 3 Ekkattuthangal SSI-SNR-01 1 Crore 3,20,000 Available 4 Guindy Metro SGU-SNR-01 1 Crore 3,20,000 Available 5 Ashok Nagar SAN-SNR-01 1 Crore 3,20,000 Available 6 LIC SLI-SNR-01 1 Crore 3,20,000 Available 7 St.Thomas Mount SMM-SNR-01 75 lakhs 2,40,000 Available 8 Nehru Park SNR-SNR-01 75 lakhs 2,40,000 Available 9 Anna Nagar Tower SAT-SNR-01 75 lakhs 2,40,000 Available SAE-SNR-01 2,40,000 Available Anna Nagar East 75 lakhs 10 SME-SNR-01 2,40,000 Available 75 lakhs 11 Meenambakkam SOT-SNR-01 2,40,000 Available Nanganallur Road 75 lakhs 12 SLM-SNR-01 2,40,000 Available 13 Little Mount 75 lakhs 14 KMC SKM-SNR-01 75 lakhs 2,40,000 Available 15 Arumbakkam SAR-SNR-01 75 lakhs 32,000 2,40,000 Available 16 Thousand Lights STL-SNR-01 68 lakhs 1,60,000 Available 17 Saidapet Metro SSA-SNR-01 50 lakhs 1,60,000 Application received 18 Shenoy Nagar SSN-SNR-01 50 lakhs 1,60,000 Available Pachaiyappa’s SPC-SNR-01 1,60,000 Available 19 50 lakhs College 20 Washermanpet SWA-SNR-01 50 lakhs 1,60,000 Available 21 Mannadi SMA-SNR-01 50 lakhs 1,60,000 Available 22 High Court SHC-SNR-01 50 lakhs 1,60,000 Available 23 Government Estate SGE-SNR-01 50 lakhs 1,60,000 Available Note: Prospective applicants are requested to see for the station available status on CMRL website. However, please note applications will be considered on first come first served basis; based on time & date of receipt of same at CMRL Tapal section only. 2 of 3 (On Official letterhead of the Bidder) Annexure-A Date of submission: ……/……/………….. Application form for Licensing of Semi-Naming rights in CMRL Metro Stations through walk-in basis scheme 1) Name of Applicant : …………………………………………………………………… 2) Father’s/Husband’s Name : …………………………………………………………………... 3) Company : …………………………………………………………………... 4) Address : …………………………………………………………………… 5) Phone/Mobile No. : …………………………………………………………………… 6) E-mail : …………………………………………………………………… 7) SNR BD Station code No. : …………………………………………………………………… 8) Metro Station(s) : …………………………………………………………………… 9) Details of DD / Online payment : …………………………………………………………………. 10) GST and Pan No. :…………………………………………………………………. Undertaking I, ........................................................................ , certify that the details on this application are correct and I agree with the terms and conditions of Bid/ License Agreement. CMRL shall have the absolute right to reject my / our application or terminate the license agreement after issue of Letter of Acceptance, without any prejudice to take any other action as specified for material breach of conditions of Bid/ License Agreement. In witness thereof, I/ We submit this application under and in accordance with the terms of the Bid document. I/ We submit a copy of the tender document duly signed and sealed on all pages as a token of unconditional acceptance of all terms and conditions contained therein. (Signature, name and designation of the Authorised Signatory) Name and seal of Applicant/Lead Member Date: ......................................... Place: ......................................... .
Recommended publications
  • Pallavaram – Addressing Connectivity Issues Planning Last Mile Connectivity Index ◦ Chennai Metropolitan Area
    PALLAVARAM – ADDRESSING CONNECTIVITY ISSUES PLANNING LAST MILE CONNECTIVITY INDEX ◦ CHENNAI METROPOLITAN AREA ◦ STUDY AREA DELIENATION – REASONS ◦ METHODOLOGY ◦ OBJECTIVE OF THE STUDY ◦ STUDY AREA - TRANSPORT CHARACTERISTICS ◦ STUDY AREA - TRANSPORT ISSUES – ◦ ANALYSIS ◦ RECOMMENDATION AND PROPOSALS CHENNAI METROPOLITAN AREA 1. Chennai metropolitan Area 1189 sqkm 2. Population (2011) 86.54 lakhs 3. Growth rate 2.08 (decadal) 4. Major corridors (radially 1. NH5 – towards red hills – Vijaywada spread) 2. NH 205 – towards Avadi – Arakonam 3. NH4 – towards Sriperumbudur – Banglore 4. NH45 – towards Tambaram – Tiruchy 5. Major radial ring roads 1. Inner Ring Road 2. Outer Ring Road 3. Chennai By pass road 6. Existing Public transport system Bus, sub urban rail system, Metro Rail system 7. Vehicular Registration (as on 55.7 lakhs 2018) 8. Public trabsport Modal Share 28.2% (Bus + Rail) 9. Average Trip length 9.9km 10 Length of Roads 6010 km(5623 km – Interior roads and 387.35km Bus Route Roads) STUDY AREA – PALLAVARAM S.NoS.No ParametersParameters ValuesValues 1.1. PopulationPopulation (2011)(2011) 2.682.68 lakhslakhs (2026)(2026) 3.983.98 lakhslakhs 2.2. AdminsitrationAdminsitration PallavaramPallavaram MunicipalityMunicipality (42wards)(42wards) 3.3. LengthLength ofof roadsroads 252252 kmkm PALLAVARAM 4.4. TransitTransit modesmodes 1.1. SubSub urbanurban railwayrailway 2.2. BusBus 5.5. BusBus terminusterminus KilkattalaiKilkattalai • Located in the southern neighborhood on the GST HasthinapuramHasthinapuram Road (@ 25km from CBD) 6.6. BusBus SheltersShelters SixSix • Spread over an area of 18 sqkm 7.7. MajorMajor CorridorsCorridors 1.1. MMRDMMRD schemescheme 200200 • Proximity to Chennai International Airport (3.3kms) feetfeet roadroad 2.2. GSTGST RoadRoad • Existing Landuse – Mixed Residential, Residential, 8.8.
    [Show full text]
  • 21-11-2020 Salient Features of Phase II of Chennai Metro Rail Project
    21-11-2020 Salient Features of Phase II of Chennai Metro Rail Project CMRL’s Phase-I project covering two corridors for 45 kms from Washermanpet to Airport in the Blue Line and from Puratchi Thalaivar Dr MG Ramachandran Central Metro to St. Thomas Mount in the Green Line with a total of 32 Metro Stations has been successfully completed and is in operation being the first Metro Rail System in India to connect the city’s Railway Terminal, Bus Terminals and Airport in the first phase itself. The Phase-I Extension of the project from Washermanpet to Thiruvottiyur (Wimco Nagar) covering 9.051 kms with 8 Metro Stations (2 Underground and 6 Elevated Metro Stations) will connect the northern part of the city to the Central Business District Area and is targeted to be opened for traffic in the end of January 2021. Considering the demand for fast, safe, efficient and sustainable public transport system, CMRL’s Phase-II project is being planned for 118.9 kms in three corridors viz. Corridors-3, 4 and 5 at an estimated cost of Rs. 61,843 Cr supported by Government of India, Government of Tamil Nadu, JICA, ADB, AIIB and NDB. Corridor-3: Madhavaram to SIPCOT covering 45.8 Km is a North South Corridor connecting the prime locations like IT Corridor, Adayar, Mylapore and Purasaiwalkam with 50 Metro Stations comprising of 20 Elevated Metro stations and 30 Underground Metro Stations. Corridor-4: Lighthouse to Poonamallee Bypass covering 26.1 Km is the East West Corridor covering the commercial hubs of city viz.
    [Show full text]
  • Chennai's New Metro
    Speeding toward the future: ...INDIA Chennai’s new metro India, with six of the Traffic congestion in Chennai, the capital city of the Indian fifty largest cities in State of Tamil Nadu, disrupts the lives of over 7 million the world, is a rapidly people who live and work in the area. To ensure sustainabil- developing market for ity in this rapidly urbanizing city, the Tamil Nadu govern- MRT projects. Because ment, along with the government of India, is constructing projects of this size ($3 billion+) require a 45 km metro rail system. When completed in 2015, the a blended approach, Chennai Metro is expected to significantly reduce travel time MRT PPPs have been and vehicular pollution. The cost of the Chennai Metro is developed or are about $4 billion, funded jointly by the government of India under development and the state of Tamil Nadu with a 60 percent loan from for the Delhi Airport the Japan International Cooperation Agency. IFC is transac- Line, Mumbai Metro, tion advisor to the Chennai Metro for the design and tender- Hyderabad Metro, and ing of an operations and maintenance (O&M) contract. Chennai Metro (a PPP K. Rajaraman, Managing Director of Chennai Metro Rail for O&M services). Limited (CMRL), spoke to Handshake about CMRL’s approach to contracting for such a large-scale MRT project. What was the impetus for the Chennai Metro? Shorter travel times and comfortable transportation throughout the city will directly impact economic produc- tivity and improve living standards. The metro will serve the two busiest corridors in Chennai and is expected to carry 700,000 passengers every day, beginning in 2015.
    [Show full text]
  • CHENNAI METRO RAIL LIMITED (A Joint Venture of Govt
    CHENNAI METRO RAIL LIMITED (A Joint Venture of Govt. of India & Govt. of Tamil Nadu) Admin Building, CMRL Depot, Poonamallee High Road, Koyambedu, Chennai – 600 107. Phone: 044 2379 2000 EMPLOYMENT NOTIFICATION No.CMRL/HR/09/2020 Chennai Metro Rail Limited, entrusted with the implementation of Chennai Metro Rail Project, invites applications for the post of Chief General Manager (S & T) / General Manager (S & T) on deputation basis. 1. Name of the post - Chief General Manager (Signalling & Telecom)/ General Manager (Signalling & Telecom) 2. Number of post - 01 3. Pay & Allowances - (i) The deputationist shall be entitled to draw pay being drawn in the parent organization. Additionally, deputation allowance and project allowance at 10% of Basic Pay each will be paid. (ii) Option to draw pay and allowances as per the parent organization or to draw equivalent cadre pay scale in CMRL with IDA, HRA and Cafeteria Allowances of 20% of Basic pay. 4. Method of Recruitment - On Deputation 5. Qualification and Experience - (i) Bachelor Degree in Electronics or Communication Engineering or a combination of any of these disciplines. (ii) IRSSE Officers (in Group A) presently in SAG and above level with minimum 23 years of experience in implementing design, installation, testing, commissioning & operation of AFTC based automatic signaling of a big yard (preferably for gauge conversion). Experience in tendering and contract management, implementation of design, installation, commissioning of backbone OFC, copper or other cable, SDH & UHF equipments, commissioning of LAN/VAN server, digital/IP exchanges, PA System, Surveillance System will be an added advantage. 6. Age - Age not exceeding 55 years as on date of notification i.e on 29-06-2020.
    [Show full text]
  • Parking Tariff for Cmrl Metro Stations
    PARKING TARIFF FOR CMRL METRO STATIONS Applicable Stations: Egmore, Nehru park, Arumbakkam, Vadapanlai,Ekkattuthangal,Alandur,Washermanpet, High court, LIC, Thousand light, Teynampet, Nandanam, Saidapet,Little mount Parking Time 4 wheeler 2 wheeler 0-6hrs. 20 10 6-12hrs. 30 15 More then 12hrs. 40 20 Beyond service hours. (24:00 hrs to 04:00 hrs) 100 50 Monthly parking pass for day 500 250 Monthly parking pass for 24hrs 2000 1000 Parking Tariff for Government estate Parking Time 4 wheeler 2 wheeler 0-6hrs. 20 10 6-12hrs. 30 15 More then 12hrs. 40 20 Beyond service hours. (24:00 hrs to 04:00 hrs) 100 50 Monthly parking pass for day 500 250 Monthly parking pass for 24hrs 2500 1000 Applicable Stations: Anna Nagar East, Thirumangalam, Ashok Nagar, Guindy Parking Time 4 wheeler 2 wheeler 0-6hrs. 20 10 6-12hrs. 30 15 More then 12hrs. 40 20 Beyond service hours. (24:00 hrs to 04:00 hrs) 100 50 Monthly parking pass for day 1000 500 Monthly parking pass for 24hrs 3000 1500 Parking Tariff for St.Thomas mount Parking Time 4 wheeler 2 wheeler 0-6hrs. 20 10 6-12hrs. 30 More then 12hrs. 40 20 Beyond service hours. (24:00 hrs to 04:00 hrs) 100 50 Monthly parking pass for day 500 250 Monthly parking pass for 24hrs 2000 PARKING TARIFF FOR CMRL METRO STATIONS Parking Tariff for St.Thomas mount (Subway Parking) Parking Time 4 wheeler 2 wheeler 0-6hrs. 10 5 6-12hrs. 15 More then 12hrs. 20 10 Beyond service hours. (24:00 hrs to 04:00 hrs) 50 25 Monthly vehicle parking pass 250 125 Monthly parking pass for 24hrs 1000 250 Parking Tariff for Mannadi Parking Time 4 wheeler 2 wheeler 0-6hrs.
    [Show full text]
  • City's First Train to Arrive in June Four Cars Shipped from Brazil; Trial Run to Be on Koyambedu Line
    City's first train to arrive in June Four cars shipped from Brazil; trial run to be on Koyambedu line Serena Josephine. M The fo ur~car train will have a total seating and standing CHENNAI: The city is all set to capacity of 1,276. "On an aver ~ receive its first Metro Rail age, each car will have 44 train from Brazil, in the first seats including dedicated week of J une. seats for persons with disabil­ Four cars of the train have ities and senior citize ns," a been shipped from Brazil and CMRL official said. are en~rou te to Chennai Port. He added: "Work on laying Officials of Chennai Metro the track and electrical work Rail Limited (CMRL) said the will soon be completed for the train was shipped from Brazil test run, which will be con­ during the last week of Apri l. ducted on the elevated "It will reach Chennai by Koyambedu-St. Thomas the end of May or first week of Mount line as and when each June. From the port, the cars portion is completed." will be transported via a trail­ FANCY RIDE The train will feature automatic sliding The Research Designs and er to the depot in Koyambe­ doors, 44 seats in each car and route maps in Standards Organisation will du," an official said. English and Tamil - PHOTO: SPECIAL ARRANGEMENT also certify the trains before The four cars will then be they are commissioned. The assembled and a four-month being manufactured in Brazil, Transport, the four~car s t a in ~ government had announced long testing process will be­ while the other 33 trains will less steel train fea tures elec~ in the State assembly that the gin.
    [Show full text]
  • Employment Notification No.CMRL-HR-CON-08-2021 Dated
    CHENNAI METRO RAIL LIMITED A Joint Venture of Govt. of India & Govt. of Tamil Nadu) Admin Building, CMRL Depot, Poonamallee High Road, Koyambedu, Chennai - 600 107. Phone -044 2379 2000 EMPLOYMENT NOTIFICATION No: CMRL/HR/CON/08/2021 dated : 18.08.2021 Chennai Metro Rail Limited (CMRL), a Joint Venture of Government of India and Government of Tamil Nadu, is a special purpose vehicle (SPV) entrusted with the responsibility of implementing the Metro Rail Project in the city of Chennai. CMRL invites applications from qualified and experienced personnel for the appointment of following posts on contract basis:- No. Min. Max. Post Consolidated Pay Name of the Post of Exp. Age Limit Code (Per Month) Post (Yrs.) (Yrs.) Rs. 90,000/- 1 DGM / JGM / AGM (Finance & Accounts) 02 - 13 - 17 47 Rs.1,20,000/- 2 DGM (BIM) 01 Rs. 90,000/- 13 40 3 Manager (Lifts & Escalator) 01 Rs. 80,000/- 07 38 4 Manager (MEP) 02 Rs.80,000/- 07 38 5 Manager (Power Systems & SCADA) 01 Rs.80,000/- 07 38 6 Manager (Electrical Traction) 01 Rs.80,000/- 07 38 7 Deputy Manager (Traction) 01 Rs.70,000/- 04 35 8 Deputy Manager (Power System) 01 Rs.70,000/- 04 35 9 Assistant Manager (Bills) 01 Rs.60,000/- 02 30 Note:- (i) Age, qualification & experience stipulated above should be as on 18.08.2021. Age will be relaxed for deserving and experienced candidates. (ii) Higher remuneration / Higher post shall be considered based on the past experience, performance in the interview, higher qualification, exceptional credentials and expertise in the relevant field.
    [Show full text]
  • Parking-Tariff-For-All-Station.Pdf
    PARKING TARIFF Parking Monthly pass - Tariff Parking Time Car Bike 6 Wheeler Monthly parking pass for day 500 250 - Monthly parking pass for 24hrs 2000 1000 - Monthly parking pass for 2000 6:00HRS. TO 18:00HRS. - - Monthly parking pass for 3000 18:00HRS. TO NEXT DAY 06:00HRS - - 5000 Monthly parking pass for 24hrs - - Note : Above Traiff not applicable for Airport, St.Thomas mount, Vadapalani, Thirumangalam,Guindy,Meenambakkam,Ashok Nagar, Mannadi,Anna Nagar East, Nanganallore road) Parking Monthly pass - Tariff only appicable for (Thirumangalam,Guindy,Meenambakkam, Ashok Nagar, Mannadi,Anna Nagar East, Nanganallore road) Parking Time Car Bike 6 Wheeler Monthly parking pass for day 1000 500 5000 Monthly parking pass for 24hrs 3000 1500 10000 Parking Tariff for All stations Parking Time Car Bike 0-6hrs. 20 10 6-12hrs. 30 15 More then 12hrs. 40 20 Beyond service hours. (24:00 hrs to 05:30 hrs)100 50 Note : Above Traiff not applicable for Airport, St.Thomas mount, Vadapalani, Shenoy nagar, Pachaiyappas) Parking traiff for Airport station Parking Time Car Bike 10min-2hrs 75 15 Rs.75 + Rs.10 Rs.15 + Rs.10 per 2hrs – 7hrs per hour hour Beyond 7 hrs-24hrs Rs.350 Rs.100 Beyond 24 hrs Rs.700 Rs.200 Monthly parking pass for day Rs.3500 Rs.1000 Parking Tariff for Shenoy nagar, Pachaiyapas Parking Time Car Bike 0-6hrs. 20 10 6-12hrs. 30 More then 12hrs. 40 20 Beyond service hours. (24:00 hrs to 05:30 hrs) 100 50 Parking Tariff for St.Thomas mount Parking Time Car Bike 0-6hrs.
    [Show full text]
  • Parking Facilities Available @ Station
    PARKING FACILITIES AVAILABLE @ STATION PARKING SPACE AVAILABILITY PARKING PASS AVAILABILITY LINE STATIONS 2 WHEELERS 4WHEELERS 2 WHEELERS 4WHEELERS Day pass 24hrs. Pass Day pass 24hrs. Pass CHENNAI CENTRAL Available Available NA NA NA NA EGMORE Available Available NA NA NA NA NEHRU PARK Available Available Available Available Available NA KILPAUK No parking facility No parking facility No parking facility No parking facility No parking facility No parking facility PACHAIAPPA S COLLEGE Available Available Available Available Available Available SHENOY NAGAR Available Available NA NA NA NA ANNA NAGAR EAST Available Available NA NA NA NA ANNA NAGAR TOWER Available No parking facility NA NA No parking facility No parking facility THIRUMANGALAM Available Available NA NA NA NA KOYAMBEDU Available Available Available Available Available Available LINE 02 CHENNAI MOFUSSIL BUS TERMINAL No parking facility No parking facility No parking facility No parking facility No parking facility No parking facility ARUMBAKKAM Available Available Available Available Available Available VADAPALANI Available No parking facility Available Available No parking facility No parking facility ASHOK NAGAR Available Available Available Available Available Available EKKATTUTHANGAL Available Available Available Available Available Available ALANDUR Available Available Available Available Available Available St. THOMAS MOUNT Available Available Available NA NA NA St. THOMAS MOUNT SUBWAY Available Available Available Available Available Available PARKING WASHERMENPET Available
    [Show full text]
  • N.Saravanan and Vijaya Basker CHENNAI METRO RAIL
    N.Saravanan and Vijaya Basker CHENNAI METRO RAIL LTD Over view of Kathipara Junction Sponsored By Consultant M/s Chennai Metro Rail Limited, Division of Transportation Engineering Chennai Anna University, Chennai Clover Leaf Interchange with exclusive entry and exit for Mount Ponamallee approach Kathipara junction is an important road junction at Alandur/ Chennai It is a cloverleaf intersection constructed in 2008 to ease severe traffic congestion. This junction serves as an important transfer point for the passengers from Central , western and southern part of Tamilnadu. A metro rail station connecting two corridors , one from Airport to Washermenpet and another from St. Thomos mount to Chennai Central The purpose and need of the project is to develop the area beneath the intersection and pull commuters to the Alandur Metro Station. Long distance travellers prefer MTC busses , para transport facilities to reach their destination from the location and vice-versa Alandur metro station located in the southern part of intersection with two corridors meeting at this point Alandur metro connects important destinations like Chennai central, Egmore, and Koyambedu intercity bus terminus Vehicles from southern part of the city enters Koyambedu side through the third level of the clover leaf intersection directly. Vehicles from southern part of the city enters Porur side through the third level of the clover leaf intersection directly. Vehicles from Southern side to Anna salai pickup the clover leaf at third level and makes a circular
    [Show full text]
  • Annual Review
    Annual Review 2015 Mr. A. M. Naik, Group Executive Chairman, was conferred the Order of the Dannebrog as Knight First Class by Her Majesty, Queen Margrethe of Denmark. The knighthood is royal acknowledgement of Mr. Naik’s role in fostering Indo-Danish ties in the fields of business, commerce and culture. Contents Company Profile 2 Balance Sheet and Profit & Loss Account 3 Network of Offices & Facilities 4 L&T Construction 6 Buildings & Factories 8 Transportation Infrastructure 14 Heavy Civil Infrastructure 18 Water, Smart World & Communication 24 Power Transmission & Distribution 30 Heavy Engineering 36 Shipbuilding 46 Power 48 Metallurgical & Material Handling 52 Electrical & Automation 56 L&T Hydrocarbon Engineering 60 Construction & Mining Machinery 70 L&T Valves 72 L&T Infotech 74 Technology Services 76 Corporate Social Responsibility 78 Larsen & Toubro is a USD 15 billion technology, engineering, BALANCE SHEET AS AT MARCH 31, 2015 construction, projects, manufacturing and financial services conglomerate, with global operations. ` MILLION The company is engaged in core, high-impact sectors – As at As at infrastructure, construction, defence, hydrocarbon, heavy 31-3-2015 31-3-2014 engineering, power, aerospace, shipbuilding, electrical & EQUITY AND LIABILITIES: automation, mining and metallurgy. Its integrated capabilities Shareholders' funds 370846 336618 span the entire spectrum of ‘design-to-deliver’, and it offers Non-current liabilities 93417 62813 turnkey EPC solutions in its major business lines. Its track record Current liabilities 404775 383615 covers products, projects and processes executed to international benchmarks. TOTAL 869038 783046 Every aspect of L&T’s businesses is characterized by professionalism and high standards of corporate governance. ASSETS: Sustainability is embedded into its long-term strategy for growth.
    [Show full text]
  • Underground Sections & Tunneling Work
    Underground Sections & Tunneling Work Progress Tunnelling Completed Percentage Package TBM From To length in mtr in mtr completed UAA 01 TBM 1 Washermenpet Metro Egmore Metro 4445 4445 100 TBM 2 Washermenpet Metro Egmore Metro 4445 4445 100 TBM 3 May Day Park Central Metro 2080 2080 100 UAA 02 TBM 1 May Day Park AG-DMS 3616 3595 99.4 TBM 2 May Day Park AG-DMS 3616 3473 96.05 UAA 03 Saidapet Metro AG-DMS 5736 5736 100 UAA 04 Egmore Metro Shenoy Nagar 6776 6776 100 UAA 05 Shenoy Nagar Thirumangalam 5594 5594 100 UAA 08 TBM 1 Washermenpet Korukkupet 2000 2000 100 TBM 2 Washermanpet Korrukupet 2000 2000 100 Total 40308 40144 99.59 Smart Infrastructure Innovation Award 2017 CMRL has provided real-time information of VOLUME - 09 train services on CMRL mobile app so that Oct & Nov 2017 commuters can plan their travel at ease. The CHAIRMAN app has been updated with information about the train schedule, Route Information, Station Thiru Durga Shanker Mishra, I.A.S., I n f o r m a t i o n , F e e d e r S e r v i c e s a n d SECRETARY MINISTRY OF URBAN AFFAIRS interconnections etc on regular basis. This will GOVT. OF INDIA make it very convenient for first-time travelers. Chennai Metro Rail has train services every 10 minutes during peak hours and every Thiru Pankaj Kumar Bansal, I.A.S., 15 minutes during lean hours, the information is captured in CMRL Mobile MANAGING DIRECTOR CHENNAI METRO RAIL LIMITED Application.
    [Show full text]