Blasting & Painting

Total Page:16

File Type:pdf, Size:1020Kb

Blasting & Painting .0 KSS MARINE (group of KSS ENTERPRISES) 664, T.H Road, Gajalakshmi Complex (Nearby Bank of Baroda) thiruvottiyur, Chennai-600019 Cell No:+91-9952249181 / +91-7010481051 office :044-48585698 Mail id : [email protected] www.kssmarine.in INTRODUCTION: We are a very well recognized company working in INDIA at various locations. We are expert in application of protective coating, marine coating and tank linings, and oil & gas industries, Infrastructures, Chemicals Plant, Process Industries and Offshore, providing entire fabrication and erection facilities for wind mill towers, structural fabrication, piping fabrication and erection. With expert team. The Jobs we are handling are blasting and painting at world class quality. Additionally we are efficient of handling any various types of other coating related applications. Quality audit of our job done. We submit our QC report to client for their satisfaction. We are committed to provide state of art services to our clients. We also provide services for blasting & painting, fabrication of wind mill towers alone with internal fitting like ladder and cable trench fittings etc…. Here are some pictures for your and quality’s standard as per the work procedure give by the clients. We are efficient to deliver quality at its best and according to IMO PSPC regulations by SOLAS. The teams we are developed are very well skilled, experienced and efficient to achieve stipulated goals and schedules. we are also providing advanced equipments and machineries for blasting and painting to achieve high end qualities in a stipulated time. `We are regularly providing technical training sessions and new innovative ideas in coating and surface preparation to our team. We have appointed a good team of skilled supervisors to guide and motivate our front working team. We also insure to quality of ongoing jobs through our quality inspector in at no cost as addition a value in our services. Additionally we are also providing consultancy regarding coating and surface preparation, fabrication and erection in all sort of area as wind mill towers, boilers, marine equipments and other industries. Clients etc... SERVICES: Blasting & Painting Wind mill internal Fitting Civil painting BLASTING & PAINTING: At KSS MARINE, we provide various types of Blasting and painting services to the Oil and Gas industry, Shipyard, structural industry, incilude UHP (Ultra High pressure) hydro blasting, and more traditional grit and copper slag blasting, etc... we understand that surface prepartation is essential for satisfactory performance of any paint system. The most expensive and advanced painting systems will fail if surface preparation is inadequate either in cleanliness or profile. Our highly skilled Blaster and painter are committed to provide the best solution, best methods, best quality and best value. This enables us to work in difficult to reach locations for repair work or where there are time restraints in completing a project. Rope Access is a means to complete your projects safely, on- time and within budget. All our coating systems are applied in accordance with the respective paint manufactures specification. This process in closely monitored throughout the coating application. BLASTING AND PAINTING SERVICES: Ship Building Blasting and Painting OFF SHORE Project Structural Blasting And Painting Pipe Blasting And Painting Wind tower Blasting And Painting Metro Rail Project Fireproofing application Cured oil Tank (Mother Tank) Airport Project STRUCTURAL BLASTING AND PAINTING: The integrity of structural steel depends in part on how effectively it can be protected from rust. The standard way to achieve this is to cover the steel in a protective coating. However, it is crucial that the coating is applied on steel that is clean otherwise corrosion may occur below the surface of the coating – creating bubbles over weakened parts of the metal The surface to be covered should be free of not only mill scale, but any dirt, grease or oil, and it should be perfectly dry. The aim is to remove anything that may hamper the adhesion of the coating to the metal and to create some roughness on the surface to improve adhesion. A protective coating works only as long as it sticks to the metal surface and its own surface remains unbroken. Structural Many more project during KSSMARINE. Below the mention the company name 1. L&T EWL, Kanchipuram, 2. The KCP Heavy engineering plant Chennai, 3. L&T Shipbuilding Kattupalli, 4. Chennai Metro Rail CMRL/CCCL, 5. L &T ECC Division Chennai, etc… STRUCTURAL BLASTING (Beam) (L&T EWL, Kanchipuram) STRUCTURAL PRIMER AND FINAL COAT (BEAM) MACHINERY EQUIPEMET ( the KCP heavy engineering unit, Chennai) AIR RECEIVER TANK (L&T EWL, Kanchipuram) PIPE BLASTING AND PAINTING: KOC PROJECT – L&T MFFK, KATTUPALI IOCL PROJECT- KSS PETRON, CHENNAI SASOL PROJECT-L&T MFFK, KATTUPALI CURED OIL TANK (MOTHER TANK) AT CPCL: Tank front View Aluminum coating Tank Top view PU Aluminum coating TANK INSIDE BLASTING AND SPECIAL COATING SPECIAL COATING IN TANK BOTTOM SIDE ADANI SITE, KATTUPALLI –STORAGE TANK WELDING AREA BLASTING AFTER APPLY FOR PAINT Final Coat tank Top view Welding Area Touch up FINAL COAT APPLY FOR TANK TOP SIDE ANDAMAN (Port Blair) AIRPORT PROJECT: AFTER POWER TOOL CLEANING FIRST STRIPE COATING VIEW FINAL VIEW OF CEMENT TANK 1. SHIP BUILDING BLASTING AND PAINTING: In the shipbuilding and ship repair industry, abrasive blasting is the most common surface preparation technique used to remove old paint and other surface materials such as rust, mill scale, dirt, and salts. Abrasive blasting might be conducted during vessel fabrication (e.g., on piping, steel plates and steel members used in structural assemblies, and other miscellaneous materials) and during maintenance and repair operations that include blasting and painting the ship's hull, and interior tanks and spaces. Surface preparation techniques, such as abrasive blasting, are also one of the most significant sources of shipyard wastes and pollution. BLAST CLEANING OF OUTER HULL (L&T Shipbuliding, Kattupali) PAINTING APPLICATION OF SHIP OUT SIDE VACUUMED CLEANING BEFORE APPLY COATING QUALITY BLASTING CLEANING OF SHIP INSIDER BLOCK STRIP COAT DURING APPLICATION FINAL VIEW OF BLOCK QUALITY AUDIT AFTER FINAL COAT IN SHIP BLOCK ALUMINUM SHIPS FINAL VIEW OF ALUMINUM SHIPS OFF SHORE PROJECT: Offshore projects Barge and rig (L&T Shipbuliding, Kattupali) CHENNAI METRO RAIL PROJECT-CCCL STENCIL (Stencil in SASOL project-L&T MFFK, Kattupalli) FIREPROOFING APPLICATION We are export in Fireproofing application. Last 10 year apply for fire proof application. Fireproof application service to Delhi airport and Chennai airport and etc…. Paint supplier: Akzonobel paint Paint product name: Interchar CHENNAI AIRPORT PROJECTS WINDMILL TUBULAR TOWER BEFORE SURFACE PREPARATION (L&T EWL, KANCHIPURAM) WINDMILL TUBULAR TOWER AFTER SURFACE PREPARATION. PAINT APPLICATION FINSH FOR WIND MILL TOWER WIND MILL INTERNAL FITTING FINAL VIEW OF WIND MILL TOWER-GAMESA TOWER KSS MARINE (group of KSS ENTERPRISES) 664, T.H Road, Gajalakshmi Complex (Opp: Bharat Petrol Bunk) thiruvottiyur, Chennai-600019 Cell No:+91-9952249181 / +91-7010481051 office :044-48585698 Mail id : [email protected] , [email protected] www.kssmarine.in .
Recommended publications
  • Pallavaram – Addressing Connectivity Issues Planning Last Mile Connectivity Index ◦ Chennai Metropolitan Area
    PALLAVARAM – ADDRESSING CONNECTIVITY ISSUES PLANNING LAST MILE CONNECTIVITY INDEX ◦ CHENNAI METROPOLITAN AREA ◦ STUDY AREA DELIENATION – REASONS ◦ METHODOLOGY ◦ OBJECTIVE OF THE STUDY ◦ STUDY AREA - TRANSPORT CHARACTERISTICS ◦ STUDY AREA - TRANSPORT ISSUES – ◦ ANALYSIS ◦ RECOMMENDATION AND PROPOSALS CHENNAI METROPOLITAN AREA 1. Chennai metropolitan Area 1189 sqkm 2. Population (2011) 86.54 lakhs 3. Growth rate 2.08 (decadal) 4. Major corridors (radially 1. NH5 – towards red hills – Vijaywada spread) 2. NH 205 – towards Avadi – Arakonam 3. NH4 – towards Sriperumbudur – Banglore 4. NH45 – towards Tambaram – Tiruchy 5. Major radial ring roads 1. Inner Ring Road 2. Outer Ring Road 3. Chennai By pass road 6. Existing Public transport system Bus, sub urban rail system, Metro Rail system 7. Vehicular Registration (as on 55.7 lakhs 2018) 8. Public trabsport Modal Share 28.2% (Bus + Rail) 9. Average Trip length 9.9km 10 Length of Roads 6010 km(5623 km – Interior roads and 387.35km Bus Route Roads) STUDY AREA – PALLAVARAM S.NoS.No ParametersParameters ValuesValues 1.1. PopulationPopulation (2011)(2011) 2.682.68 lakhslakhs (2026)(2026) 3.983.98 lakhslakhs 2.2. AdminsitrationAdminsitration PallavaramPallavaram MunicipalityMunicipality (42wards)(42wards) 3.3. LengthLength ofof roadsroads 252252 kmkm PALLAVARAM 4.4. TransitTransit modesmodes 1.1. SubSub urbanurban railwayrailway 2.2. BusBus 5.5. BusBus terminusterminus KilkattalaiKilkattalai • Located in the southern neighborhood on the GST HasthinapuramHasthinapuram Road (@ 25km from CBD) 6.6. BusBus SheltersShelters SixSix • Spread over an area of 18 sqkm 7.7. MajorMajor CorridorsCorridors 1.1. MMRDMMRD schemescheme 200200 • Proximity to Chennai International Airport (3.3kms) feetfeet roadroad 2.2. GSTGST RoadRoad • Existing Landuse – Mixed Residential, Residential, 8.8.
    [Show full text]
  • No. CMRL/BD/2019/Walk-In Scheme/490/01
    No. CMRL/BD/2019/Walk-in Scheme/490/01 POLICY FOR LICENSING OF SEMI-NAMING RIGHTS FOR PHASE-1 STATIONS THROUGH WALK- IN BASIS SCHEME 1. Terms and Conditions for walk in basis scheme: All terms and conditions including the eligibility criteria shall be same as that of the failed auction/ tender from which the inventory has been taken. 2. Procedure for Selection/Short listing of applicants: (i) The applicant shall be required to submit the Application Form as per the approved format, separately for intended inventory to CMRL Tapal section. (ii) The selection is based on the first come first serve basis. The applicant whose application is received first in CMRL Tapal section will considered eligible for the said inventory. (iii) The applicants shall be required to submit the application cost and Earnest Money Deposit (EMD) amount in the form of demand draft or RTGS/NEFT in favour of “Chennai Metro Rail Limited.”, payable at Chennai along with application form for the intender inventory. If application received without application cost and EMD shall stand rejected/ cancelled outright. The applicant unequivocally and voluntarily agrees not to seek any claim, compensation or any other consideration in case of non-allotment on whatsoever reason. (iv) CMRL shall free to allot that inventory to other applicant who has applied subsequently for the inventory. Any decision taken by CMRL management will be final and binding on the applicants. No correspondence shall be entrained in this regard. (v) The intimation to the successful party shall be given through e-mail as well as on telephone on the contact number provided in the application.
    [Show full text]
  • 21-11-2020 Salient Features of Phase II of Chennai Metro Rail Project
    21-11-2020 Salient Features of Phase II of Chennai Metro Rail Project CMRL’s Phase-I project covering two corridors for 45 kms from Washermanpet to Airport in the Blue Line and from Puratchi Thalaivar Dr MG Ramachandran Central Metro to St. Thomas Mount in the Green Line with a total of 32 Metro Stations has been successfully completed and is in operation being the first Metro Rail System in India to connect the city’s Railway Terminal, Bus Terminals and Airport in the first phase itself. The Phase-I Extension of the project from Washermanpet to Thiruvottiyur (Wimco Nagar) covering 9.051 kms with 8 Metro Stations (2 Underground and 6 Elevated Metro Stations) will connect the northern part of the city to the Central Business District Area and is targeted to be opened for traffic in the end of January 2021. Considering the demand for fast, safe, efficient and sustainable public transport system, CMRL’s Phase-II project is being planned for 118.9 kms in three corridors viz. Corridors-3, 4 and 5 at an estimated cost of Rs. 61,843 Cr supported by Government of India, Government of Tamil Nadu, JICA, ADB, AIIB and NDB. Corridor-3: Madhavaram to SIPCOT covering 45.8 Km is a North South Corridor connecting the prime locations like IT Corridor, Adayar, Mylapore and Purasaiwalkam with 50 Metro Stations comprising of 20 Elevated Metro stations and 30 Underground Metro Stations. Corridor-4: Lighthouse to Poonamallee Bypass covering 26.1 Km is the East West Corridor covering the commercial hubs of city viz.
    [Show full text]
  • Chennai's New Metro
    Speeding toward the future: ...INDIA Chennai’s new metro India, with six of the Traffic congestion in Chennai, the capital city of the Indian fifty largest cities in State of Tamil Nadu, disrupts the lives of over 7 million the world, is a rapidly people who live and work in the area. To ensure sustainabil- developing market for ity in this rapidly urbanizing city, the Tamil Nadu govern- MRT projects. Because ment, along with the government of India, is constructing projects of this size ($3 billion+) require a 45 km metro rail system. When completed in 2015, the a blended approach, Chennai Metro is expected to significantly reduce travel time MRT PPPs have been and vehicular pollution. The cost of the Chennai Metro is developed or are about $4 billion, funded jointly by the government of India under development and the state of Tamil Nadu with a 60 percent loan from for the Delhi Airport the Japan International Cooperation Agency. IFC is transac- Line, Mumbai Metro, tion advisor to the Chennai Metro for the design and tender- Hyderabad Metro, and ing of an operations and maintenance (O&M) contract. Chennai Metro (a PPP K. Rajaraman, Managing Director of Chennai Metro Rail for O&M services). Limited (CMRL), spoke to Handshake about CMRL’s approach to contracting for such a large-scale MRT project. What was the impetus for the Chennai Metro? Shorter travel times and comfortable transportation throughout the city will directly impact economic produc- tivity and improve living standards. The metro will serve the two busiest corridors in Chennai and is expected to carry 700,000 passengers every day, beginning in 2015.
    [Show full text]
  • CHENNAI METRO RAIL LIMITED (A Joint Venture of Govt
    CHENNAI METRO RAIL LIMITED (A Joint Venture of Govt. of India & Govt. of Tamil Nadu) Admin Building, CMRL Depot, Poonamallee High Road, Koyambedu, Chennai – 600 107. Phone: 044 2379 2000 EMPLOYMENT NOTIFICATION No.CMRL/HR/09/2020 Chennai Metro Rail Limited, entrusted with the implementation of Chennai Metro Rail Project, invites applications for the post of Chief General Manager (S & T) / General Manager (S & T) on deputation basis. 1. Name of the post - Chief General Manager (Signalling & Telecom)/ General Manager (Signalling & Telecom) 2. Number of post - 01 3. Pay & Allowances - (i) The deputationist shall be entitled to draw pay being drawn in the parent organization. Additionally, deputation allowance and project allowance at 10% of Basic Pay each will be paid. (ii) Option to draw pay and allowances as per the parent organization or to draw equivalent cadre pay scale in CMRL with IDA, HRA and Cafeteria Allowances of 20% of Basic pay. 4. Method of Recruitment - On Deputation 5. Qualification and Experience - (i) Bachelor Degree in Electronics or Communication Engineering or a combination of any of these disciplines. (ii) IRSSE Officers (in Group A) presently in SAG and above level with minimum 23 years of experience in implementing design, installation, testing, commissioning & operation of AFTC based automatic signaling of a big yard (preferably for gauge conversion). Experience in tendering and contract management, implementation of design, installation, commissioning of backbone OFC, copper or other cable, SDH & UHF equipments, commissioning of LAN/VAN server, digital/IP exchanges, PA System, Surveillance System will be an added advantage. 6. Age - Age not exceeding 55 years as on date of notification i.e on 29-06-2020.
    [Show full text]
  • Parking Tariff for Cmrl Metro Stations
    PARKING TARIFF FOR CMRL METRO STATIONS Applicable Stations: Egmore, Nehru park, Arumbakkam, Vadapanlai,Ekkattuthangal,Alandur,Washermanpet, High court, LIC, Thousand light, Teynampet, Nandanam, Saidapet,Little mount Parking Time 4 wheeler 2 wheeler 0-6hrs. 20 10 6-12hrs. 30 15 More then 12hrs. 40 20 Beyond service hours. (24:00 hrs to 04:00 hrs) 100 50 Monthly parking pass for day 500 250 Monthly parking pass for 24hrs 2000 1000 Parking Tariff for Government estate Parking Time 4 wheeler 2 wheeler 0-6hrs. 20 10 6-12hrs. 30 15 More then 12hrs. 40 20 Beyond service hours. (24:00 hrs to 04:00 hrs) 100 50 Monthly parking pass for day 500 250 Monthly parking pass for 24hrs 2500 1000 Applicable Stations: Anna Nagar East, Thirumangalam, Ashok Nagar, Guindy Parking Time 4 wheeler 2 wheeler 0-6hrs. 20 10 6-12hrs. 30 15 More then 12hrs. 40 20 Beyond service hours. (24:00 hrs to 04:00 hrs) 100 50 Monthly parking pass for day 1000 500 Monthly parking pass for 24hrs 3000 1500 Parking Tariff for St.Thomas mount Parking Time 4 wheeler 2 wheeler 0-6hrs. 20 10 6-12hrs. 30 More then 12hrs. 40 20 Beyond service hours. (24:00 hrs to 04:00 hrs) 100 50 Monthly parking pass for day 500 250 Monthly parking pass for 24hrs 2000 PARKING TARIFF FOR CMRL METRO STATIONS Parking Tariff for St.Thomas mount (Subway Parking) Parking Time 4 wheeler 2 wheeler 0-6hrs. 10 5 6-12hrs. 15 More then 12hrs. 20 10 Beyond service hours. (24:00 hrs to 04:00 hrs) 50 25 Monthly vehicle parking pass 250 125 Monthly parking pass for 24hrs 1000 250 Parking Tariff for Mannadi Parking Time 4 wheeler 2 wheeler 0-6hrs.
    [Show full text]
  • City's First Train to Arrive in June Four Cars Shipped from Brazil; Trial Run to Be on Koyambedu Line
    City's first train to arrive in June Four cars shipped from Brazil; trial run to be on Koyambedu line Serena Josephine. M The fo ur~car train will have a total seating and standing CHENNAI: The city is all set to capacity of 1,276. "On an aver ~ receive its first Metro Rail age, each car will have 44 train from Brazil, in the first seats including dedicated week of J une. seats for persons with disabil­ Four cars of the train have ities and senior citize ns," a been shipped from Brazil and CMRL official said. are en~rou te to Chennai Port. He added: "Work on laying Officials of Chennai Metro the track and electrical work Rail Limited (CMRL) said the will soon be completed for the train was shipped from Brazil test run, which will be con­ during the last week of Apri l. ducted on the elevated "It will reach Chennai by Koyambedu-St. Thomas the end of May or first week of Mount line as and when each June. From the port, the cars portion is completed." will be transported via a trail­ FANCY RIDE The train will feature automatic sliding The Research Designs and er to the depot in Koyambe­ doors, 44 seats in each car and route maps in Standards Organisation will du," an official said. English and Tamil - PHOTO: SPECIAL ARRANGEMENT also certify the trains before The four cars will then be they are commissioned. The assembled and a four-month being manufactured in Brazil, Transport, the four~car s t a in ~ government had announced long testing process will be­ while the other 33 trains will less steel train fea tures elec~ in the State assembly that the gin.
    [Show full text]
  • Employment Notification No.CMRL-HR-CON-08-2021 Dated
    CHENNAI METRO RAIL LIMITED A Joint Venture of Govt. of India & Govt. of Tamil Nadu) Admin Building, CMRL Depot, Poonamallee High Road, Koyambedu, Chennai - 600 107. Phone -044 2379 2000 EMPLOYMENT NOTIFICATION No: CMRL/HR/CON/08/2021 dated : 18.08.2021 Chennai Metro Rail Limited (CMRL), a Joint Venture of Government of India and Government of Tamil Nadu, is a special purpose vehicle (SPV) entrusted with the responsibility of implementing the Metro Rail Project in the city of Chennai. CMRL invites applications from qualified and experienced personnel for the appointment of following posts on contract basis:- No. Min. Max. Post Consolidated Pay Name of the Post of Exp. Age Limit Code (Per Month) Post (Yrs.) (Yrs.) Rs. 90,000/- 1 DGM / JGM / AGM (Finance & Accounts) 02 - 13 - 17 47 Rs.1,20,000/- 2 DGM (BIM) 01 Rs. 90,000/- 13 40 3 Manager (Lifts & Escalator) 01 Rs. 80,000/- 07 38 4 Manager (MEP) 02 Rs.80,000/- 07 38 5 Manager (Power Systems & SCADA) 01 Rs.80,000/- 07 38 6 Manager (Electrical Traction) 01 Rs.80,000/- 07 38 7 Deputy Manager (Traction) 01 Rs.70,000/- 04 35 8 Deputy Manager (Power System) 01 Rs.70,000/- 04 35 9 Assistant Manager (Bills) 01 Rs.60,000/- 02 30 Note:- (i) Age, qualification & experience stipulated above should be as on 18.08.2021. Age will be relaxed for deserving and experienced candidates. (ii) Higher remuneration / Higher post shall be considered based on the past experience, performance in the interview, higher qualification, exceptional credentials and expertise in the relevant field.
    [Show full text]
  • Parking-Tariff-For-All-Station.Pdf
    PARKING TARIFF Parking Monthly pass - Tariff Parking Time Car Bike 6 Wheeler Monthly parking pass for day 500 250 - Monthly parking pass for 24hrs 2000 1000 - Monthly parking pass for 2000 6:00HRS. TO 18:00HRS. - - Monthly parking pass for 3000 18:00HRS. TO NEXT DAY 06:00HRS - - 5000 Monthly parking pass for 24hrs - - Note : Above Traiff not applicable for Airport, St.Thomas mount, Vadapalani, Thirumangalam,Guindy,Meenambakkam,Ashok Nagar, Mannadi,Anna Nagar East, Nanganallore road) Parking Monthly pass - Tariff only appicable for (Thirumangalam,Guindy,Meenambakkam, Ashok Nagar, Mannadi,Anna Nagar East, Nanganallore road) Parking Time Car Bike 6 Wheeler Monthly parking pass for day 1000 500 5000 Monthly parking pass for 24hrs 3000 1500 10000 Parking Tariff for All stations Parking Time Car Bike 0-6hrs. 20 10 6-12hrs. 30 15 More then 12hrs. 40 20 Beyond service hours. (24:00 hrs to 05:30 hrs)100 50 Note : Above Traiff not applicable for Airport, St.Thomas mount, Vadapalani, Shenoy nagar, Pachaiyappas) Parking traiff for Airport station Parking Time Car Bike 10min-2hrs 75 15 Rs.75 + Rs.10 Rs.15 + Rs.10 per 2hrs – 7hrs per hour hour Beyond 7 hrs-24hrs Rs.350 Rs.100 Beyond 24 hrs Rs.700 Rs.200 Monthly parking pass for day Rs.3500 Rs.1000 Parking Tariff for Shenoy nagar, Pachaiyapas Parking Time Car Bike 0-6hrs. 20 10 6-12hrs. 30 More then 12hrs. 40 20 Beyond service hours. (24:00 hrs to 05:30 hrs) 100 50 Parking Tariff for St.Thomas mount Parking Time Car Bike 0-6hrs.
    [Show full text]
  • Parking Facilities Available @ Station
    PARKING FACILITIES AVAILABLE @ STATION PARKING SPACE AVAILABILITY PARKING PASS AVAILABILITY LINE STATIONS 2 WHEELERS 4WHEELERS 2 WHEELERS 4WHEELERS Day pass 24hrs. Pass Day pass 24hrs. Pass CHENNAI CENTRAL Available Available NA NA NA NA EGMORE Available Available NA NA NA NA NEHRU PARK Available Available Available Available Available NA KILPAUK No parking facility No parking facility No parking facility No parking facility No parking facility No parking facility PACHAIAPPA S COLLEGE Available Available Available Available Available Available SHENOY NAGAR Available Available NA NA NA NA ANNA NAGAR EAST Available Available NA NA NA NA ANNA NAGAR TOWER Available No parking facility NA NA No parking facility No parking facility THIRUMANGALAM Available Available NA NA NA NA KOYAMBEDU Available Available Available Available Available Available LINE 02 CHENNAI MOFUSSIL BUS TERMINAL No parking facility No parking facility No parking facility No parking facility No parking facility No parking facility ARUMBAKKAM Available Available Available Available Available Available VADAPALANI Available No parking facility Available Available No parking facility No parking facility ASHOK NAGAR Available Available Available Available Available Available EKKATTUTHANGAL Available Available Available Available Available Available ALANDUR Available Available Available Available Available Available St. THOMAS MOUNT Available Available Available NA NA NA St. THOMAS MOUNT SUBWAY Available Available Available Available Available Available PARKING WASHERMENPET Available
    [Show full text]
  • N.Saravanan and Vijaya Basker CHENNAI METRO RAIL
    N.Saravanan and Vijaya Basker CHENNAI METRO RAIL LTD Over view of Kathipara Junction Sponsored By Consultant M/s Chennai Metro Rail Limited, Division of Transportation Engineering Chennai Anna University, Chennai Clover Leaf Interchange with exclusive entry and exit for Mount Ponamallee approach Kathipara junction is an important road junction at Alandur/ Chennai It is a cloverleaf intersection constructed in 2008 to ease severe traffic congestion. This junction serves as an important transfer point for the passengers from Central , western and southern part of Tamilnadu. A metro rail station connecting two corridors , one from Airport to Washermenpet and another from St. Thomos mount to Chennai Central The purpose and need of the project is to develop the area beneath the intersection and pull commuters to the Alandur Metro Station. Long distance travellers prefer MTC busses , para transport facilities to reach their destination from the location and vice-versa Alandur metro station located in the southern part of intersection with two corridors meeting at this point Alandur metro connects important destinations like Chennai central, Egmore, and Koyambedu intercity bus terminus Vehicles from southern part of the city enters Koyambedu side through the third level of the clover leaf intersection directly. Vehicles from southern part of the city enters Porur side through the third level of the clover leaf intersection directly. Vehicles from Southern side to Anna salai pickup the clover leaf at third level and makes a circular
    [Show full text]
  • Annual Review
    Annual Review 2015 Mr. A. M. Naik, Group Executive Chairman, was conferred the Order of the Dannebrog as Knight First Class by Her Majesty, Queen Margrethe of Denmark. The knighthood is royal acknowledgement of Mr. Naik’s role in fostering Indo-Danish ties in the fields of business, commerce and culture. Contents Company Profile 2 Balance Sheet and Profit & Loss Account 3 Network of Offices & Facilities 4 L&T Construction 6 Buildings & Factories 8 Transportation Infrastructure 14 Heavy Civil Infrastructure 18 Water, Smart World & Communication 24 Power Transmission & Distribution 30 Heavy Engineering 36 Shipbuilding 46 Power 48 Metallurgical & Material Handling 52 Electrical & Automation 56 L&T Hydrocarbon Engineering 60 Construction & Mining Machinery 70 L&T Valves 72 L&T Infotech 74 Technology Services 76 Corporate Social Responsibility 78 Larsen & Toubro is a USD 15 billion technology, engineering, BALANCE SHEET AS AT MARCH 31, 2015 construction, projects, manufacturing and financial services conglomerate, with global operations. ` MILLION The company is engaged in core, high-impact sectors – As at As at infrastructure, construction, defence, hydrocarbon, heavy 31-3-2015 31-3-2014 engineering, power, aerospace, shipbuilding, electrical & EQUITY AND LIABILITIES: automation, mining and metallurgy. Its integrated capabilities Shareholders' funds 370846 336618 span the entire spectrum of ‘design-to-deliver’, and it offers Non-current liabilities 93417 62813 turnkey EPC solutions in its major business lines. Its track record Current liabilities 404775 383615 covers products, projects and processes executed to international benchmarks. TOTAL 869038 783046 Every aspect of L&T’s businesses is characterized by professionalism and high standards of corporate governance. ASSETS: Sustainability is embedded into its long-term strategy for growth.
    [Show full text]