Arsenal ,

Metal ceiling systems and architectural metalwork from SAS International chosen for new

Premiership football club Arsenal’s new Emirates also supplied. Stadium is a landmark building in north London. Durability as well as aesthetic appeal were both It forms part of a larger urban regeneration important considerations. SAS metal ceilings project in the area. With seating for 60,000, have an expected lifespan in excess of 25 years, the recently completed football stadium is they do not do not require re‑decoration and England’s third largest facility. SAS International are incredibly easy to clean. The polyester was delighted to have been chosen to provide powder coating ensures durability as it is metal ceiling solutions for the project, which not susceptible to paint chipping, accidental was designed by architects HOK Sport. damage, and has a high level of scratch resistance. The concealed grid (System 150) suspended metal ceiling from SAS International was used Charles Cooke of HOK Sport, explained we Project Name Arsenal Emirates Stadium in the main hospitality circulation areas, above “used System 330 to create strips of service retail outlets, as well as above the management access within the large plasterboard ceilings Client Arsenal Football Club suites, offices, press workrooms, and changing in the restaurants and collected together all rooms. A linear grid ceiling system (System 330) the ceiling mounted services on these strips Architect was used in all the hospitality bars, restaurants to maximise the amount of uninterrupted HOK Sport and private boxes, with the SAS Tubeline ceiling plasterboard ceiling we would be left with. We Main Contractor system used in the general admission toilet choose Tubeline in the GA toilets as it provided Sir Robert McAlpine facilities. us with a fully demountable ceiling system that Sub-Contractor dealt well with the radial shape of the rooms. MPG Contracts Ltd Tubeline is an aluminium, linear tube system The ‘bespoke’ metal bulkhead was achieved System ideal for creating feature ceilings and provides a by utilising components from within the SAS SAS System 150, System 330 & Tubeline clean, modern look. product range this proved cost effective, quick Special Requirements to install and looked great.” Service access, cost efficient bulkheads In addition, SAS International created bespoke Area m² architectural metalwork including a large sloping The overall construction was carried out under 2,300 metal bulkhead incorporating flat screen TVs a design-and-build contract by Sir Robert and concession signage running at high level McAlpine, with MPG Contracts as the ceiling Location London continuously around the concourse areas. installer. The stadium opened as planned in Matching metal casings for the waste bin units, July 2006 in time for the start of the 2006–07 Completion Date 2006 in Arsenal’s distinctive team colour red were football season. metal ceilings | partitioning | doors | room comfort | architectural metalwork Head Office SAS International SAS International SAS International Unit 252, Block A Level 2 31 Suttons Business Park Blanchardstown Corporate Park 2 93 Bathurst Street London Road Dublin 15 Sydney, NSW 2000 Reading RG6 1AZ Ireland Australia Tel: +44 (0)118 929 0900 Tel: +353 (0)1 899 1134 Tel: +61 (02) 8823 0000 E: [email protected] E: [email protected] E: [email protected] www.sasint.co.uk www.sasint.ie www.sasint.com.au All information and details in this leaflet are correct at the time of printing. E&OE. Published by SAS International. Copyright © 2014.