DANIEL WEBSTER HIGHWAY, MERRIMACK Congestion

Total Page:16

File Type:pdf, Size:1020Kb

DANIEL WEBSTER HIGHWAY, MERRIMACK Congestion Congestion Management Report DANIEL WEBSTER HIGHWAY, MERRIMACK Segment Length: 9.9 miles Number of Traffic Signals: 14 Daily Traffic Volumes: 13,000-21,000 Number of travel lanes: 2-4 Analysis Period: July – August 2015 Roadway Class: I (Statewide Corridor—Other, Minor Arterial) and IV (Local Road, Minor Arterial) Serving as a major north-south corridor for Merrimack, this remainder of the Daniel Webster Highway within Merrimack segment of the Daniel Webster Highway overlaps with U.S. is designated as a Class I road, which is maintained by the Route 3. The route runs from the southeastern to the State of New Hampshire. northeastern portion of the town, paralleling the F.E. Everett Turnpike and the Merrimack River. Since this segment parallels the F.E. Everett Turnpike, it is an alternative commuting route for those working within In Merrimack, the Daniel Webster Highway includes a southern New Hampshire and the metropolitan Boston area. number of industrial, commercial, and residential uses. As It is also a vital road for freight transportation and local this road passes through the neighborhoods of Reeds Ferry attractions, including the Merrimack Premium Outlets and and Merrimack Village, there is some level of pedestrian and Anheuser-Busch Brewery. Due to its role as a commuting cycling activity along the route. However, the sidewalk corridor and its mixture of uses, the Daniel Webster Highway network throughout the corridor in Merrimack is sporadic. is expected to have some degree of congestion during peak travel times. From Greeley Street (which connects to Exit 11 on the Turnpike) to Bedford Road (which connects to Exit 12 on the Future projects on the F.E. Everett Turnpike may help to Turnpike), the Daniel Webster Highway is designated as a alleviate traffic congestion on the Daniel Webster in Class IV Road, as this portion of Merrimack is considered an Merrimack, since the Highway tends to collect spillover urban compact area. Due to this designation, this section of traffic during peak travel hours. the Highway is maintained by the Town of Merrimack. The Report, travel time runs and data analysis conducted by 2017 AM Peak Period Actual & Expected Travel Times Corridor Extents: Daniel Webster Highway, Bedford Town Line to Nashua City Line Expected Travel Time during the Morning Commute 16 minutes and 51 seconds, traveling in northerly direction based upon posted speeds and free flowing traffic 16 minutes and 35 seconds, traveling in southerly direction based upon posted speeds and free flowing traffic Actual Travel Time during the Morning Commute:* Northbound Southbound 17 minutes and 48 seconds 16 minutes and 44 seconds 57 seconds (6%) longer than expected 11 seconds (1%) longer than expected *The actual travel time is based upon a single travel run that was similar in duration and congestion to the average observed travel time. PM Peak Period Actual & Expected Travel Times Corridor Extents: Daniel Webster Highway, Bedford Town Line to Nashua City Line Expected Travel Time during the Evening Commute 16 minutes and 51 seconds, traveling in northerly direction based upon posted speeds and free flowing traffic 16 minutes and 35 seconds, traveling in southerly direction based upon posted speeds and free flowing traffic Actual Travel Time during the Evening Commute:* Northbound Southbound 21 minutes and 00 seconds 18 minutes and 00 seconds 4 minutes and 9 seconds (25%) longer than expected 1 minute and 25 seconds (9%) less than expected *The actual travel time is based upon a single travel run that was similar in duration and congestion to the average observed travel time. AM Travel Time Ratios (7:00am—9:00am) Corridor Extents: Daniel Webster Highway, Bedford Town Line to Nashua City Line Travel Time Ratio A travel time ratio (TTR) compares the actual (measured) & expected (non- congested) travel times along a corridor. It is assumed that in non-congested conditions, motorists can travel at the posted speed limit. The actual time is the average of several travel time runs. The ratio between the actual time and the expected time would equal 1 for a non- congested segment. Southbound Congestion does not occur during the morning peak period in the southbound direction along the entire length of the corridor, as indicated by ratios of 1.06 or less. On average, travel along the corridor in the southbound direction during the morning commute takes approximately 28 seconds (3%) shorter as compared to free-flow conditions. Northbound Congestion does not occur during the morning peak period in the northbound direction along the entire length of the corridor, as shown in the figure on the left with ratios of 1.08 or less. On average, travel along the corridor in the northbound direction during the morning commute takes approximately 2 seconds (0.2%) shorter as compared to free-flow conditions. PM Travel Time Ratios (4:00pm—6:00pm) Corridor Extents: Daniel Webster Highway, Bedford Town Line to Nashua City Line Travel Time Ratio A travel time ratio (TTR) compares the actual (measured) & expected (non- congested) travel times along a corridor. It is assumed that in non- congested conditions, motorists can travel at the posted speed limit. The actual time is the average of several travel time runs. The ratio between the actual time and the expected time would equal 1 for a non-congested segment. Southbound Congestion does not occur during the evening peak period in the southbound direction along the entire length of the corridor. On average, travel along the corridor in the southbound direction during the evening commute takes approximately 1:59 minutes (12%) longer as compared to free-flow conditions. Northbound Congestion occurs during the evening peak period in the northbound direction between Industrial Boulevard and Baboosic Lake Road with ratios of 1.96 and 2.01, respectively. On average, travel along the corridor in the northbound direction during the evening commute takes approximately 5:42 minutes (33%) longer as compared to free-flow conditions. A Commercial Corridor The form of the Daniel Webster Highway through Merrimack reflects the suburban character of the Town. While there are segments of the corridor which have infrastructure for pedestrian and bicycling movement, the Highway primarily services automobile transportation. No on-street parking exists along the Daniel Webster Highway in Merrimack, but there is a plentiful supply of off-street parking. This contributes to the ease of motor vehicle travel along the corridor. There is a definitive change in the character of the corridor depending on whether it is within the urban compact area (a Class IV road). The southern portion of the road, outside the urban compact area has more industrial uses. When the Daniel Webster Highway becomes a Class IV road, there is a an increase in the number of curbs cuts and a decrease in the speed limit. This reflects the many commercial uses that exist along this segment, including retail, restaurant and office establishments. Within the urban compact area, there are also many single family and multi-family dwellings. These residences, which are in close proximity to the commercial uses, contribute to the “village-like” feel along this segment of the Highway. The Daniel Webster Highway through Merrimack generally operates as it should because it is reasonable to expect traffic along the corridor to be “congested” given the mix of uses. The fact that there is some motor vehicle congestion means the corridor is a desirable location. Whereas motorists may find it frustrating that it takes longer to travel the corridor, retail business owners surely welcome the vibrant environment that may attract customers. Project Highlight F.E. Everett Turnpike Widening As part of the 2017 - 2020 Transportation Improvement Program, the two lane sections of the F.E. Everett Turnpike from Exit 8 in Nashua to the I-293 interchange in Bedford will be widened. This will make the Turnpike consistently three lanes from the Massachusetts border to I-293. This project is one of the strategies outlined in Nashua Regional Planning Commission Congestion Management Process. It is considered a traditional way to deal with congestion. The expected benefits of this improvement project are that it will increase the capacity of the road, which may reduce congestion, and improve safety and air quality. Although the widening of the Turnpike is not a project that is on the Daniel Webster Highway, it is expected to have significant effects on the Merrimack segment. F.E. Everett Turnpike Interchange 11 is one major point of congestion because the on- ramp lane merges onto the Turnpike right at the point where the number of travels lanes drops from three to two. When there is a larger amount of congestion of the Turnpike at this bottleneck point, drivers will get off the Turnpike and use the Daniel Webster Highway in Merrimack to avoid the increased traffic (as evidenced in the PM Travel Time Ratios). This has effects on the local traffic that uses the Daniel Webster Highway during peak driving times. The Nashua Regional Planning Commission plans to complete an additional congestion analysis of the Daniel Webster Highway in Merrimack after the impacts of the improvements on the F. E. Everett Turnpike Probe Travel Time Data are fully in effect. Probe Data analysis was not included in this report, as in other Congestion Management reports. This is due to limited availability of probe data for this segment of the Daniel Webster Highway and for the time period when this study was done. Projects There are several infrastructure projects along and near the Daniel Webster Highway that could impact the corridor. Previously completed projects focused on improving the ease of access to the Daniel Webster Highway, such as the removal of the Exit 12 tolls.
Recommended publications
  • NRPC White Paper on the Nashua-Hudson Circumferential
    NASHUA REGIONAL PLANNING COMMISSION CIRCUMFERENTIAL HIGHWAY “WHITE PAPER” September 17, 2003 NASHUA REGIONAL PLANNING COMMISSION CIRCUMFERENTIAL HIGHWAY “WHITE PAPER” September 17, 2003 INTRODUCTION The Nashua Regional Planning Commission is currently evaluating the proposed Hudson-Nashua Circumferential Highway project. Due to a number of factors, NRPC feels that it is prudent for the affected municipalities (Hudson, Litchfield, Merrimack and Nashua) and the general public to take a step back and reassess to this project. 1) The project has been moved out of the first ten years of the State’s Ten Year Transportation Improvement Plan (“Ten Year Plan”) due to state transportation funding constraints. 2) The most expensive part of the project is the portion that connects Route 3/DW Highway in Merrimack with the Everett Turnpike (which is within the Pennichuck Watershed). 3) Political support for the project is unclear. 4) The permitting process has been long and ongoing, and is not resulting in closure on this controversial project. 5) The project as proposed is likely to hit stiff opposition from environmental groups and from communities within the Pennichuck Brook Watershed, as a portion of the highway will be built within that watershed. 6) Central Hudson and downtown Nashua continue to experience significant traffic congestion, and a viable relief is needed. 7) There have been major changes to the region’s transportation plans since the project was originally conceived. 8) The NHDOT has acquired right-of-way for the partial build, and Hudson, Litchfield and Merrimack have included the alignment in their master plans. Development proposals are required to accommodate the right-of-way.
    [Show full text]
  • High School Directions
    All sports are played at the site of the school unless otherwise listed. Updated 8/27/13 Belmont High School 255 Seavey Road Belmont, NH 03220 267-6525 From East: Route 128 to Route 11 in Alton, watch for junction of Route 140 to Gilmanton on left. Stay on Route 140 going across Route 107 and Route 106. At stop sign crossing Route 106 turn right onto Main Street. Watch for School Street on left. School is straight ahead. From West: Route 11 through Franklin and Tilton, at McDonald’s turn right onto Route 140, go about 5 miles to stop sign. Turn right onto Main Street then turn left onto School Street. School is straight ahead. From North: Take Exit 20 off I-93. At lights, turn left. Take next right onto Route 140. Go approx. 5 miles. At stop sign turn right onto Main Street. Watch for School Street on left. School is straight ahead. From South: See directions for North. Golf Canterbury Woods 15 West Road Exit 18 Route 93 left off exit left at fork up hill left into course drive - 1 mile from Route 93 Berlin High School 550 Willard Street, Berlin, NH 03570 752-4152 From Interstate 93 North Take Rte. 93 North to Exit 35 onto Rte. 3 and into Twin Mountain. Come to a stoplight. Go through the light, which keeps you on Rte. 3, and go approximately 2 miles. Take a right onto Rte. 115 (at the blinking amber light). Follow Rte. 115 to its end and take a right onto Rte.
    [Show full text]
  • 2013 Master Plan Update, Merrimack NH
    Merrimack, NH | 2013 Master Plan Update 9. Transportation 9.1 Introduction The Master Plan Update 2002 identified several critical areas of concern relative to existing congestion, transportation deficiencies, and the lack of connectivity within the Town. In addi- tion, the need to create a long-term transportation plan that accommodates mobility within the community for its residents, businesses and visitors and promotes development consis- tent with the Town’s vision was also identified. Key recommended actions from the 2002 report are summarized below with an update on the progress completed to date. Continue to work with the state and regional officials toward implementation of the Manchester Airport Access Road (MAAR) to improve access to the Manchester Airport for Merrimack residents and businesses while also improving access to northern Merrimack’s commercial and industrial areas to the F.E. Everett Turnpike. The MAAR, now formally named Raymond Wieczorek Drive, was completed and opened for public travel in the fall of 2011. The new interchange provides full north and south access between the F.E. Everett Turnpike and US Route 3 in Bedford, just north of the Merrimack town line. This interchange partially filled a gap in the regional transportation system for northern Merrimack residents and businesses where the existing F.E. Everett Turnpike Exit 12 configuration only provides ramps to/from the south. Previously motorists in the northern portion of the Town wishing to travel to/from the Turnpike north would have to travel via US Route 3 to the I-293/NH Route 101 interchange in Bedford to complete this trip or travel south to the Exit 11 interchange.
    [Show full text]
  • Preliminary Design Report
    Prepared For: F.E. Everett Turnpike Widening Project Nashua, Merrimack and Bedford, NH DRAFT Environmental Study Prepared By: State Project No. 13761 53 Regional Drive Concord, NH 03301 August 2018 Nashua-Merrimack-Bedford 13761 Environmental Study Contents 1 Introduction ...................................................................................................................................... 1-1 1.1 Project Background .................................................................................................................. 1-1 1.2 Lead Federal Agency ................................................................................................................. 1-1 1.3 Purpose and Need Statement .................................................................................................. 1-2 2 Alternatives ....................................................................................................................................... 2-1 2.1 Mainline Turnpike ..................................................................................................................... 2-1 2.2 Pennichuck Brook ..................................................................................................................... 2-3 2.3 F.E.E.T. over Greeley Street ...................................................................................................... 2-9 2.4 Naticook Brook ....................................................................................................................... 2-10 2.5
    [Show full text]
  • 2013 Master Plan Update, Merrimack NH
    Merrimack, NH | 2013 Master Plan Update 2. Land Use and Community Design 2.1 Introduction An understanding of the Merrimack’s historic and existing land use patterns, regulations, growth trends, natural resources, and infrastructure is useful in identifying opportunities and constraints to future development potential of the Town. Land use within a community is represented by the historic pattern of residential, commercial, industrial, municipal and insti- tutional development, interspersed with what is generally considered as open space, such as forests and natural features, undeveloped land, agriculture and parks and recreational areas. The evolution of land use within a community is the product of local economic conditions and community preferences; growth and development is based on such factors as access to jobs, employment, and the availability of affordable land for new housing or commercial development. Community preferences, expressed as land use plans and regulations, dictate the use, form, location, and sometimes the pace, of new development. Land use forms the basis for master planning and determines, to a large extent, a Town’s need to provide public facilities and infrastructure, transportation networks and services, and protection of environ- mental resources. As communities plan for their future, determining how and where growth and development should occur will provide the basis for planning where investments for municipal services will be needed, as well as determining what controls will be necessary to protect areas of the Town from unwanted development. Communities have the ability to control land use and development patterns through a variety of mechanisms, including zoning and subdivision regulations, provision of public utilities and infrastructure, and protection of open space lands through direct purchase and the acquisition or acceptance of conservation restrictions/easements.
    [Show full text]
  • Fe Everett Turnpike
    Congestion Management Report F.E. EVERETT TURNPIKE (SOUTH), NASHUA Segment Length: 6.7 miles Number of Traffic Signals: 0 Daily Traffic Volumes: 60, 000-69,000 Number of travel lanes: 6-8 Analysis Period: June 2015 Roadway Class: I (Principal Arterial — Other Freeways and Expressways) The F.E. Everett Turnpike serves as one of the primary north- attractions, including the Pheasant Lane Mall, downtown south thoroughfares in southern New Hampshire for Nashua, and the commercial corridors along NH 101A and vehicular traffic by connecting the state’s three largest the Daniel Webster Highway. cities: Manchester, Nashua and Concord. Since the Turnpike runs 44 miles from the Massachusetts border to Concord, Due to its role as a commuting corridor, the F.E. Everett the portion within the Nashua Region was divided into 3 Turnpike is expected to have some degree of congestion segments (North from Exit 13 to 10, Middle from Exit 10 to during peak travel times. In addition to the high volume of 7, and South from Exit 7 to the Massachusetts State line) in cars at certain peak travel times, contributors to this order to comprehensively study congestion during peak congestion are segments where travel lanes vary from two to periods. three lanes in either direction, and toll plazas, which require drivers to slow their speed. The Southern segment is located entirely within Nashua and extends from Interchange 7 (NH 101A/Amherst St) to the The Turnpike is operated by the New Hampshire Department Massachusetts state border. This segment of the Everett of Transportation’s Bureau of Turnpikes.
    [Show full text]
  • ±5.48 Acre Retail Redevelopment Site 105 Daniel Webster Highway :: Merrimack, Nh
    FOR SALE OR LEASE ±5.48 ACRE RETAIL REDEVELOPMENT SITE 105 DANIEL WEBSTER HIGhwAY :: MERRIMACK, NH OVERVIEW CBRE/New England is pleased to present the sale or lease of the former DCU location at 105 Daniel Webster Highway, Merrimack, NH. Ideal for retail redevelopment, the property offers great visibility and a terrific opportunity to own or lease space on busy DW Highway. The property consists of ±5.48 acres with 307' of frontage and currently has a ±2,586 SF retail/commercial building onsite. 105 Daniel Webster Highway offers easy highway access; located approximately a mile from the F.E. Everett Turnpike, less than ten miles to the Manchester-Boston Regional Airport and less than 15 minutes to the Massachusetts border. FEATURES • Retail redevelopment opportunity* • ±2,586 SF building with drive-thru • ±5.48 acres • Great visibility & signage with 307' of frontage • Zoned Commercial/Industrial-1 • Minutes to highway and Massachusetts border *Must be re-zoned for retail FOR MORE Roger Dieker Mike Tamposi Chris Healey INFORMATION Vice President Senior Associate Associate 603.540.8315 603.315.4348 603.475.1235 [email protected] [email protected] [email protected] www.cbre.com/manchester 2 Wall Street • Manchester, New Hampshire 03101 603.626.0036 • Fax 603.626.0249 © 2013 CBRE, Inc. This information has been obtained from sources believed reliable. We have not verified it and make no guarantee, warranty or representation about it. Any projections, opinions, assumptions or estimates used are for example only and do not represent the current or future performance of the property.
    [Show full text]
  • Service Development Plan – November 2014 Table of Contents 1 Project Purpose and Need Summary
    New Hampshire Capitol Corridor Rail & Transit Alternatives Analysis (Parts A & B) Task 9: Service Development Plan – November 2014 Table of Contents 1 Project Purpose and Need Summary .................................................................................................... 1 2 Task Objectives ..................................................................................................................................... 1 3 SDP Report Organization....................................................................................................................... 2 4 Rationale, Goals, and Objectives .......................................................................................................... 3 4.1 Public Concern/Project Need ........................................................................................................ 3 4.1.1 Study Corridor Dynamics ...................................................................................................... 4 4.1.2 Project History and Planning Context................................................................................... 4 4.1.3 Population and Employment ................................................................................................ 6 4.1.4 Existing and Future Land Use ............................................................................................... 8 4.1.5 Economic Development and Land Use ................................................................................. 9 4.1.6 Project Need Summary ......................................................................................................
    [Show full text]
  • Ross Bennett @Golder.Com
    DES Waste Management Division 29 Hazen Drive; PO Box 95 Concord, NH 03302-0095 Work Plan for 2018 Stormwater and Surface Water Investigation Saint-Gobain Performance Plastics 701 Daniel Webster Highway Merrimack, New Hampshire 03054 NHDES Site No.: 199712055 Project Number: 36430 Prepared For: Saint-Gobain Performance Plastics Corp. 14 McCaffrey Street Hoosick Falls, New York 12090 Phone Number (518) 686-6268 RP Contact Name: Chris Angier RP Contact Email: [email protected] Prepared By: Golder Associates Inc. 670 North Commercial Street Manchester, New Hampshire 03101 Phone Number: (603) 688-0880 Contact Name: Ross Bennett Contact Email: [email protected] Date of Report: March 30, 2018 Cover Sheet for Reports Template - Revised January 2011 WORK PLAN FOR 2018 STORMWATER AND SURFACE WATER INVESTIGATION SAINT-GOBAIN PERFORMANCE PLASTICS MERRIMACK, NEW HAMPSHIRE Submitted To: New Hampshire Department of Environmental Services Hazardous Waste Remediation Bureau 29 Hazen Drive, PO Box 95 Concord, New Hampshire 03302 Submitted By: Saint-Gobain Performance Plastics Corp. 14 McCaffrey Street Hoosick Falls, New York 12090 WORK PLAN WORK Prepared By: Golder Associates Inc. 670 North Commercial Street, Suite 103 Manchester, NH 03101 USA March 30, 2018 Project No.: 166-8623 A world of capabilities delivered locally Golder, Golder Associates and the GA globe design are trademarks of Golder Associates Corporation March 2018 i Project No.: 166-8623 Table of Contents 1.0 INTRODUCTION .............................................................................................................................
    [Show full text]
  • Roadway Infrastructure Master Planning Study Merrimack, New Hampshire
    Roadway Infrastructure Master Planning Study Merrimack, New Hampshire Prepared For: Town of Merrimack, New Hampshire Community Development Department Prepared By: Nashua Regional Planning Commission (NRPC) Fay, Spofford & Thorndike April 2010 Acknowledgements Fay, Spofford & Thorndike Nashua Regional Planning Commission (NRPC) Acknowledgements The completion of this study would not have been possible without the direct active involvement of many individuals. Town of Merrimack, New Hampshire Walter Warren, Community Development Director Rick Seymour, Jr., Director Department of Public Works David Lent, Deputy Director, Department of Public Works Kyle Fox, PE, Operations Manager, Department of Public Works Nancy Larson, Planning and Zoning Administrator New Hampshire Department of Transportation, William Lambert, NHDOT Traffic Engineer/Administrator Subramanian Sharma, NHDOT Traffic Engineer Nashua Regional Planning Commission Ryan Friedmann, GIS Planner, Transportation Stephen Williams, former Director NRPC Fay, Spofford & Thorndike Peter. Howe, PE, Principal-in-Charge Gary Hebert, PE, PTOE, Project Manager David P. McNamara, PE, Project Civil Engineer Heather N. Ostertog, PE, Traffic Engineer Kevin Gagne, Senior Civil Engineer I-2 Fay, Spofford & Thorndike Nashua Regional Planning Commission (NRPC) TABLE OF CONTENTS EXECUTIVE SUMMARY .....................................................................................................................................................................................ES-1 I. INTRODUCTION The
    [Show full text]
  • Exit 36 Study Area Existing and Future Conditions
    Exit 36 Study Area Existing and Future Conditions August 2014 A joint project of the Nashua Regional Planning Commission and the Northern Middlesex Council of Governments i Table of Contents I. EXECUTIVE SUMMARY ................................................................................................................................ 1 A. IMPROVE THE OPERATION OF THE MAJOR ROADS IN THE VICINITY OF THE PROPOSED EXIT 36 SOUTHBOUND RAMP .................................................................................................................................................. 2 B. ADDRESS ALL MODES OF TRANSPORTATION .............................................................................................. 2 C. IMPROVE ACCESSIBILITY TO LOCAL AND REGIONAL JOB CENTERS ................................................................... 4 D. GENERATE OPPORTUNITIES FOR SUSTAINABLE GROWTH AND ECONOMIC DEVELOPMENT.................................. 4 E. INITIATE NEW OPPORTUNITIES FOR INNOVATIVE FINANCING AND PUBLIC/PRIVATE PARTNERSHIPS ..................... 5 F. DEMONSTRATE REDUCTION IN TRAFFIC CONGESTION AND GREENHOUSE GAS EMISSIONS ASSOCIATED WITH THE TRANSPORTATION SECTOR. ..................................................................................................................... 5 II. EXISTING CONDITIONS ................................................................................................................................ 8 A. DEMOGRAPHIC PROFILE ........................................................................................................................
    [Show full text]
  • Hudson Logistics Center Site Plan Application #04-20 Conditional Use Permit Application #02-20 Staff Report #8 Supplement to 10/21 Packet
    Hudson, NH Planning Board: November 18, 2020 HUDSON LOGISTICS CENTER SITE PLAN APPLICATION #04-20 CONDITIONAL USE PERMIT APPLICATION #02-20 STAFF REPORT #8 SUPPLEMENT TO 10/21 PACKET SITE: 43 Steele Road; Map 234 Lots 5, 34 & 35 and Map 239 Lot 1 ZONING: General – 1 (G-1) and Business (B) PURPOSE OF PLANS: Proposed commercial development consisting of three (3) new distribution and logistics buildings with associated access ways, parking, stormwater/drainage infrastructure and other site improvements. ATTACHMENTS A. Cover letter and supplemental traffic responses to public comment, trip generation analysis and TEPP memorandum, received November 4, 2020. B. Cover letter from BCM Law and Traffic Memorandum from TEPP received October 21, 2020. C. Supplemental response from Langan Engineering to Attachment B particular to site plan regulation requirements, received November 9, 2020. D. Two (2) items of correspondence from BCM Environmental & Land Law. E. Public Comment received October 15 to November 10, 2020. F. Revised Air Quality Impact Analysis, Epsilon Associates, received October 28, 2020. SUMMARY OF CONTENT Attachment A contains the Applicant’s responses to comments received through public input, including that of BCM Environmental & Land Law and its consultant, Transportation Engineering, Planning and Policy (TEPP, LLC). Attachment B is BCM’s cover letter for, and includes, TEPP’s analysis. The cover letter also provides comment on site plan regulation related to traffic issues. Attachment C is a supplemental response by the Applicant to these site plan comments. Attachment D are items of correspondence from BCM regarding the October 21, 2020 Planning Board meeting. A recommendation with respect to these letters is in the next section.