High School Directions

Total Page:16

File Type:pdf, Size:1020Kb

High School Directions All sports are played at the site of the school unless otherwise listed. Updated 8/27/13 Belmont High School 255 Seavey Road Belmont, NH 03220 267-6525 From East: Route 128 to Route 11 in Alton, watch for junction of Route 140 to Gilmanton on left. Stay on Route 140 going across Route 107 and Route 106. At stop sign crossing Route 106 turn right onto Main Street. Watch for School Street on left. School is straight ahead. From West: Route 11 through Franklin and Tilton, at McDonald’s turn right onto Route 140, go about 5 miles to stop sign. Turn right onto Main Street then turn left onto School Street. School is straight ahead. From North: Take Exit 20 off I-93. At lights, turn left. Take next right onto Route 140. Go approx. 5 miles. At stop sign turn right onto Main Street. Watch for School Street on left. School is straight ahead. From South: See directions for North. Golf Canterbury Woods 15 West Road Exit 18 Route 93 left off exit left at fork up hill left into course drive - 1 mile from Route 93 Berlin High School 550 Willard Street, Berlin, NH 03570 752-4152 From Interstate 93 North Take Rte. 93 North to Exit 35 onto Rte. 3 and into Twin Mountain. Come to a stoplight. Go through the light, which keeps you on Rte. 3, and go approximately 2 miles. Take a right onto Rte. 115 (at the blinking amber light). Follow Rte. 115 to its end and take a right onto Rte. 2 into Gorham, NH (approximately 13 miles) At the stoplight take a left onto Rte. 16 into Berlin.(follow map below) Continue onto 16N through Downtown Turn Left onto High Street (Bowling Center on Left) Continue onto High Street, at second stop sign turn left onto Hillside Ave. Take next right onto Willard Street and follow to the end of the street and BHS is right there (550 Willard Street, Berlin, NH 03570) From Interstate 91 North Take Rte. 91 North to exit 17 at Wells River, VT onto Rte. 302 at Woodsville, NH. Take Rte. 302 to Littleton, NH passing through Littleton's Main St. Then Rte. 116 leading out of Littleton to its end in Jefferson, NH. Take a right onto Rte. 2 into Gorham, NH (Follow the same directions as above from Gorham) Bow High School 32 White Rock Hill Road Bow, NH 03304 228-2210 Route 93 to Route 89 North Take exit 1 At stop sign turn right and go right up the hill 9/10 of a mile At 4 way intersection-Turn right onto White Rock Hill Road School entry road 1/2 up on the right. Alpine ski Blackwater Ski Area - Proctor Academy, Andover, NH Golf Canterbury Woods 15 West Road Exit 18 Route 93 left off exit left at fork up hill left into course drive - 1 mile from Route 93 Hockey Everett Arena Loudon Road ,Concord Bishop Brady High School 25 Columbus Avenue Concord, NH 03301 224-7418 From I93 take 15W, go to the end of I393 and take a right at the set of lights onto Bouton St., go to 2nd set of lights and take a left onto Penacook St., go straight at the 4 way stop up the hill, at the top of the hill take a left onto Columbus Ave., school is down on the right Soccer- Boys’ and Girls’ Varsity NHTI Field #2 and Field #3 From I93 take Exit 15E onto I393, Take Exit 1, take left off Exit and follow signs to NHTI From I89 to I93 N take Exit 15E onto I393, Take Exit 1, take left off Exit and follow signs to NHTI From Rt. 4 to I393, Take Exit 1, take left off Exit and follow signs to NHTI From Rt. 28 to Rt. 4 to I393, Take Exit 1, take left off Exit and follow signs to NHTI Cross- Country NHTI- behind dining hall Follow same directions as varsity soccer Football- Varsity and JV Memorial Field From all points get to I89 take Exit 2, take a right of the ramp and follow to 2nd set of lights, take a left at the lights onto Fruit St., field is down on the left JV games are played on the back field Soccer- Boys’ and Girls’ JV State Hospital From all points get to I89 take Exit 2, take a right of the ramp and follow to 2nd set of lights, take a left at the lights onto Fruit St., field is down on the right Ice Hockey- Varsity Everett Arena From all points get to I93, take Exit 14, from I93 North take a right off exit and go over Merrimack River, arena is on your left, from I93 South, take a left off of exit Skiing Pat’s Peak From Manchester, NH and Boston, MA Take I-93 North to Concord, NH. Take I-89 North. Take Exit 5 (a left hand exit). Follow Route 202/9 West. Take the Henniker Exit. Follow Route 114 South. Go straight through the center of town for approximately 2 miles and look for the Pats Peak sign on your right. Take the right and follow the road to the Pats Peak entrance Baseball and Softball Rollins Park From all points take I93 to Exit 12N, From I93 North take 3rd left off Exit onto Broadway, 1st left would be back onto I93. From I93 South take 2nd left onto Broadway, for softball follow until you see field on the left, parking is on the street, for baseball take 6th left off of Broadway onto Broad Ave., go to the end and take a right onto Bow St., parking entrance is next right Tennis Memorial Field From all points get to I89 take Exit 2, take a right of the ramp and follow to 2nd set of lights, take a left at the lights onto Fruit St., field is down on the left Campbell High School 1 Highlander Court Litchfield NH, 03052 546-0300 From the North and East: Follow Interstate 93 South to 293 South From the South and West: Follow Interstate 3/Everett Turnpike to 293 South Then from 293 South (all directions): Take the Brown Avenue, Exit #2. At the bottom of the exit ramp, make a right turn. Continue on Brown Avenue until the 3rd traffic light. (Manchester Airport). Make a right turn at this light. Continue on this road (also called Brown Avenue, Hazelton Avenue, Charles Bancroft Highway and Route 3A) for approximately 3 miles. Turn left onto Albuquerque Avenue (you'll see the Hidden Creek Golf Course). Follow for approximately 3.5 miles. You will pass through 2 stop signs (the first is about 2.2 miles after turning onto Albuquerque, the second is 1.3 miles from there). About 1.3 miles after the second stop sign you will see CHS on your left. Golf Passaconaway Golf Course Proceed to the high school except, do not turn onto Albuquerque Avenue, but continue south on 3A for another 2 miles. Turn right onto Midway Avenue following into the Golf Course. Cross Country Town Forest The directions are the same as going to the high School except that after passing through the first stop sign you will turn left into the Litchfield Police Station and park in the parking area. There are always personnel to greet the teams and provide final instructions to bus drivers and coaches. Conant High School 3 Conant Way Jaffrey, NH 03402 532-8131 Cross-Country and Basketball Conant High School FROM THE NORTH: Take 89 North from Concord to Route 202 West to Peterborough through Hillsborough, Antrim, etc. Staying on Route 202 West, you will go around the village of Peterborough and come to the intersection of Routes 101 and 202 (four way intersection with lights). Take a left (Route 202 West). Continue into Jaffrey. At traffic lights, take the diagonal left onto Stratton Road. The school is less than ¼ mile on your left. The High School is in back of the Middle School. FROM THE SOUTH: Take Route 202 East to Jaffrey. At the first set of lights, take a right. At the second set of lights, bear right onto Stratton Road. The school is less than ¼ mile on the left. FROM THE WEST: From Keene, take Route 101 East to Marlboro. After going through Marlboro, take a right onto Route 124 East to Jaffrey. Go straight at the first set of lights. Bear right at the second set of lights onto Stratton Road. The school is less than ¼ mile on your left. FROM THE EAST: Take Route 101 West to Peterborough and the four-way intersection with traffic lights (Routes 101 and 202). Take a left onto Route 202 West. Continue into Jaffrey. At traffic lights, take the diagonal left onto Stratton Road. The school is less than ¼ mile on your left. The High School is in back of the Middle School. SWIMMING Clark Memorial 155 Central St., Winchendon, MA 01475 Follow above directions to four-way intersection in Rindge (Routes 119 and 202). Take Route 202 West into Winchendon, MA. At fork in road, bear right. You will come to a “T”; take left and go halfway down street to large municipal building on left. BASEBALL Humiston Field 31 Howard Hill Road, Jaffrey, NH 03452 Continue past the High School on Stratton Road for less than ¼ mile.Bear right at fork. Field on left. Golf Shattuck Golf Course 53 Dublin Rd. Jaffrey, NH 03452 FROM THE NORTH AND EAST: Follow directions to Jaffrey.
Recommended publications
  • NRPC White Paper on the Nashua-Hudson Circumferential
    NASHUA REGIONAL PLANNING COMMISSION CIRCUMFERENTIAL HIGHWAY “WHITE PAPER” September 17, 2003 NASHUA REGIONAL PLANNING COMMISSION CIRCUMFERENTIAL HIGHWAY “WHITE PAPER” September 17, 2003 INTRODUCTION The Nashua Regional Planning Commission is currently evaluating the proposed Hudson-Nashua Circumferential Highway project. Due to a number of factors, NRPC feels that it is prudent for the affected municipalities (Hudson, Litchfield, Merrimack and Nashua) and the general public to take a step back and reassess to this project. 1) The project has been moved out of the first ten years of the State’s Ten Year Transportation Improvement Plan (“Ten Year Plan”) due to state transportation funding constraints. 2) The most expensive part of the project is the portion that connects Route 3/DW Highway in Merrimack with the Everett Turnpike (which is within the Pennichuck Watershed). 3) Political support for the project is unclear. 4) The permitting process has been long and ongoing, and is not resulting in closure on this controversial project. 5) The project as proposed is likely to hit stiff opposition from environmental groups and from communities within the Pennichuck Brook Watershed, as a portion of the highway will be built within that watershed. 6) Central Hudson and downtown Nashua continue to experience significant traffic congestion, and a viable relief is needed. 7) There have been major changes to the region’s transportation plans since the project was originally conceived. 8) The NHDOT has acquired right-of-way for the partial build, and Hudson, Litchfield and Merrimack have included the alignment in their master plans. Development proposals are required to accommodate the right-of-way.
    [Show full text]
  • 2013 Master Plan Update, Merrimack NH
    Merrimack, NH | 2013 Master Plan Update 9. Transportation 9.1 Introduction The Master Plan Update 2002 identified several critical areas of concern relative to existing congestion, transportation deficiencies, and the lack of connectivity within the Town. In addi- tion, the need to create a long-term transportation plan that accommodates mobility within the community for its residents, businesses and visitors and promotes development consis- tent with the Town’s vision was also identified. Key recommended actions from the 2002 report are summarized below with an update on the progress completed to date. Continue to work with the state and regional officials toward implementation of the Manchester Airport Access Road (MAAR) to improve access to the Manchester Airport for Merrimack residents and businesses while also improving access to northern Merrimack’s commercial and industrial areas to the F.E. Everett Turnpike. The MAAR, now formally named Raymond Wieczorek Drive, was completed and opened for public travel in the fall of 2011. The new interchange provides full north and south access between the F.E. Everett Turnpike and US Route 3 in Bedford, just north of the Merrimack town line. This interchange partially filled a gap in the regional transportation system for northern Merrimack residents and businesses where the existing F.E. Everett Turnpike Exit 12 configuration only provides ramps to/from the south. Previously motorists in the northern portion of the Town wishing to travel to/from the Turnpike north would have to travel via US Route 3 to the I-293/NH Route 101 interchange in Bedford to complete this trip or travel south to the Exit 11 interchange.
    [Show full text]
  • Preliminary Design Report
    Prepared For: F.E. Everett Turnpike Widening Project Nashua, Merrimack and Bedford, NH DRAFT Environmental Study Prepared By: State Project No. 13761 53 Regional Drive Concord, NH 03301 August 2018 Nashua-Merrimack-Bedford 13761 Environmental Study Contents 1 Introduction ...................................................................................................................................... 1-1 1.1 Project Background .................................................................................................................. 1-1 1.2 Lead Federal Agency ................................................................................................................. 1-1 1.3 Purpose and Need Statement .................................................................................................. 1-2 2 Alternatives ....................................................................................................................................... 2-1 2.1 Mainline Turnpike ..................................................................................................................... 2-1 2.2 Pennichuck Brook ..................................................................................................................... 2-3 2.3 F.E.E.T. over Greeley Street ...................................................................................................... 2-9 2.4 Naticook Brook ....................................................................................................................... 2-10 2.5
    [Show full text]
  • 2013 Master Plan Update, Merrimack NH
    Merrimack, NH | 2013 Master Plan Update 2. Land Use and Community Design 2.1 Introduction An understanding of the Merrimack’s historic and existing land use patterns, regulations, growth trends, natural resources, and infrastructure is useful in identifying opportunities and constraints to future development potential of the Town. Land use within a community is represented by the historic pattern of residential, commercial, industrial, municipal and insti- tutional development, interspersed with what is generally considered as open space, such as forests and natural features, undeveloped land, agriculture and parks and recreational areas. The evolution of land use within a community is the product of local economic conditions and community preferences; growth and development is based on such factors as access to jobs, employment, and the availability of affordable land for new housing or commercial development. Community preferences, expressed as land use plans and regulations, dictate the use, form, location, and sometimes the pace, of new development. Land use forms the basis for master planning and determines, to a large extent, a Town’s need to provide public facilities and infrastructure, transportation networks and services, and protection of environ- mental resources. As communities plan for their future, determining how and where growth and development should occur will provide the basis for planning where investments for municipal services will be needed, as well as determining what controls will be necessary to protect areas of the Town from unwanted development. Communities have the ability to control land use and development patterns through a variety of mechanisms, including zoning and subdivision regulations, provision of public utilities and infrastructure, and protection of open space lands through direct purchase and the acquisition or acceptance of conservation restrictions/easements.
    [Show full text]
  • Fe Everett Turnpike
    Congestion Management Report F.E. EVERETT TURNPIKE (SOUTH), NASHUA Segment Length: 6.7 miles Number of Traffic Signals: 0 Daily Traffic Volumes: 60, 000-69,000 Number of travel lanes: 6-8 Analysis Period: June 2015 Roadway Class: I (Principal Arterial — Other Freeways and Expressways) The F.E. Everett Turnpike serves as one of the primary north- attractions, including the Pheasant Lane Mall, downtown south thoroughfares in southern New Hampshire for Nashua, and the commercial corridors along NH 101A and vehicular traffic by connecting the state’s three largest the Daniel Webster Highway. cities: Manchester, Nashua and Concord. Since the Turnpike runs 44 miles from the Massachusetts border to Concord, Due to its role as a commuting corridor, the F.E. Everett the portion within the Nashua Region was divided into 3 Turnpike is expected to have some degree of congestion segments (North from Exit 13 to 10, Middle from Exit 10 to during peak travel times. In addition to the high volume of 7, and South from Exit 7 to the Massachusetts State line) in cars at certain peak travel times, contributors to this order to comprehensively study congestion during peak congestion are segments where travel lanes vary from two to periods. three lanes in either direction, and toll plazas, which require drivers to slow their speed. The Southern segment is located entirely within Nashua and extends from Interchange 7 (NH 101A/Amherst St) to the The Turnpike is operated by the New Hampshire Department Massachusetts state border. This segment of the Everett of Transportation’s Bureau of Turnpikes.
    [Show full text]
  • ±5.48 Acre Retail Redevelopment Site 105 Daniel Webster Highway :: Merrimack, Nh
    FOR SALE OR LEASE ±5.48 ACRE RETAIL REDEVELOPMENT SITE 105 DANIEL WEBSTER HIGhwAY :: MERRIMACK, NH OVERVIEW CBRE/New England is pleased to present the sale or lease of the former DCU location at 105 Daniel Webster Highway, Merrimack, NH. Ideal for retail redevelopment, the property offers great visibility and a terrific opportunity to own or lease space on busy DW Highway. The property consists of ±5.48 acres with 307' of frontage and currently has a ±2,586 SF retail/commercial building onsite. 105 Daniel Webster Highway offers easy highway access; located approximately a mile from the F.E. Everett Turnpike, less than ten miles to the Manchester-Boston Regional Airport and less than 15 minutes to the Massachusetts border. FEATURES • Retail redevelopment opportunity* • ±2,586 SF building with drive-thru • ±5.48 acres • Great visibility & signage with 307' of frontage • Zoned Commercial/Industrial-1 • Minutes to highway and Massachusetts border *Must be re-zoned for retail FOR MORE Roger Dieker Mike Tamposi Chris Healey INFORMATION Vice President Senior Associate Associate 603.540.8315 603.315.4348 603.475.1235 [email protected] [email protected] [email protected] www.cbre.com/manchester 2 Wall Street • Manchester, New Hampshire 03101 603.626.0036 • Fax 603.626.0249 © 2013 CBRE, Inc. This information has been obtained from sources believed reliable. We have not verified it and make no guarantee, warranty or representation about it. Any projections, opinions, assumptions or estimates used are for example only and do not represent the current or future performance of the property.
    [Show full text]
  • Service Development Plan – November 2014 Table of Contents 1 Project Purpose and Need Summary
    New Hampshire Capitol Corridor Rail & Transit Alternatives Analysis (Parts A & B) Task 9: Service Development Plan – November 2014 Table of Contents 1 Project Purpose and Need Summary .................................................................................................... 1 2 Task Objectives ..................................................................................................................................... 1 3 SDP Report Organization....................................................................................................................... 2 4 Rationale, Goals, and Objectives .......................................................................................................... 3 4.1 Public Concern/Project Need ........................................................................................................ 3 4.1.1 Study Corridor Dynamics ...................................................................................................... 4 4.1.2 Project History and Planning Context................................................................................... 4 4.1.3 Population and Employment ................................................................................................ 6 4.1.4 Existing and Future Land Use ............................................................................................... 8 4.1.5 Economic Development and Land Use ................................................................................. 9 4.1.6 Project Need Summary ......................................................................................................
    [Show full text]
  • Ross Bennett @Golder.Com
    DES Waste Management Division 29 Hazen Drive; PO Box 95 Concord, NH 03302-0095 Work Plan for 2018 Stormwater and Surface Water Investigation Saint-Gobain Performance Plastics 701 Daniel Webster Highway Merrimack, New Hampshire 03054 NHDES Site No.: 199712055 Project Number: 36430 Prepared For: Saint-Gobain Performance Plastics Corp. 14 McCaffrey Street Hoosick Falls, New York 12090 Phone Number (518) 686-6268 RP Contact Name: Chris Angier RP Contact Email: [email protected] Prepared By: Golder Associates Inc. 670 North Commercial Street Manchester, New Hampshire 03101 Phone Number: (603) 688-0880 Contact Name: Ross Bennett Contact Email: [email protected] Date of Report: March 30, 2018 Cover Sheet for Reports Template - Revised January 2011 WORK PLAN FOR 2018 STORMWATER AND SURFACE WATER INVESTIGATION SAINT-GOBAIN PERFORMANCE PLASTICS MERRIMACK, NEW HAMPSHIRE Submitted To: New Hampshire Department of Environmental Services Hazardous Waste Remediation Bureau 29 Hazen Drive, PO Box 95 Concord, New Hampshire 03302 Submitted By: Saint-Gobain Performance Plastics Corp. 14 McCaffrey Street Hoosick Falls, New York 12090 WORK PLAN WORK Prepared By: Golder Associates Inc. 670 North Commercial Street, Suite 103 Manchester, NH 03101 USA March 30, 2018 Project No.: 166-8623 A world of capabilities delivered locally Golder, Golder Associates and the GA globe design are trademarks of Golder Associates Corporation March 2018 i Project No.: 166-8623 Table of Contents 1.0 INTRODUCTION .............................................................................................................................
    [Show full text]
  • Roadway Infrastructure Master Planning Study Merrimack, New Hampshire
    Roadway Infrastructure Master Planning Study Merrimack, New Hampshire Prepared For: Town of Merrimack, New Hampshire Community Development Department Prepared By: Nashua Regional Planning Commission (NRPC) Fay, Spofford & Thorndike April 2010 Acknowledgements Fay, Spofford & Thorndike Nashua Regional Planning Commission (NRPC) Acknowledgements The completion of this study would not have been possible without the direct active involvement of many individuals. Town of Merrimack, New Hampshire Walter Warren, Community Development Director Rick Seymour, Jr., Director Department of Public Works David Lent, Deputy Director, Department of Public Works Kyle Fox, PE, Operations Manager, Department of Public Works Nancy Larson, Planning and Zoning Administrator New Hampshire Department of Transportation, William Lambert, NHDOT Traffic Engineer/Administrator Subramanian Sharma, NHDOT Traffic Engineer Nashua Regional Planning Commission Ryan Friedmann, GIS Planner, Transportation Stephen Williams, former Director NRPC Fay, Spofford & Thorndike Peter. Howe, PE, Principal-in-Charge Gary Hebert, PE, PTOE, Project Manager David P. McNamara, PE, Project Civil Engineer Heather N. Ostertog, PE, Traffic Engineer Kevin Gagne, Senior Civil Engineer I-2 Fay, Spofford & Thorndike Nashua Regional Planning Commission (NRPC) TABLE OF CONTENTS EXECUTIVE SUMMARY .....................................................................................................................................................................................ES-1 I. INTRODUCTION The
    [Show full text]
  • DANIEL WEBSTER HIGHWAY, MERRIMACK Congestion
    Congestion Management Report DANIEL WEBSTER HIGHWAY, MERRIMACK Segment Length: 9.9 miles Number of Traffic Signals: 14 Daily Traffic Volumes: 13,000-21,000 Number of travel lanes: 2-4 Analysis Period: July – August 2015 Roadway Class: I (Statewide Corridor—Other, Minor Arterial) and IV (Local Road, Minor Arterial) Serving as a major north-south corridor for Merrimack, this remainder of the Daniel Webster Highway within Merrimack segment of the Daniel Webster Highway overlaps with U.S. is designated as a Class I road, which is maintained by the Route 3. The route runs from the southeastern to the State of New Hampshire. northeastern portion of the town, paralleling the F.E. Everett Turnpike and the Merrimack River. Since this segment parallels the F.E. Everett Turnpike, it is an alternative commuting route for those working within In Merrimack, the Daniel Webster Highway includes a southern New Hampshire and the metropolitan Boston area. number of industrial, commercial, and residential uses. As It is also a vital road for freight transportation and local this road passes through the neighborhoods of Reeds Ferry attractions, including the Merrimack Premium Outlets and and Merrimack Village, there is some level of pedestrian and Anheuser-Busch Brewery. Due to its role as a commuting cycling activity along the route. However, the sidewalk corridor and its mixture of uses, the Daniel Webster Highway network throughout the corridor in Merrimack is sporadic. is expected to have some degree of congestion during peak travel times. From Greeley Street (which connects to Exit 11 on the Turnpike) to Bedford Road (which connects to Exit 12 on the Future projects on the F.E.
    [Show full text]
  • Exit 36 Study Area Existing and Future Conditions
    Exit 36 Study Area Existing and Future Conditions August 2014 A joint project of the Nashua Regional Planning Commission and the Northern Middlesex Council of Governments i Table of Contents I. EXECUTIVE SUMMARY ................................................................................................................................ 1 A. IMPROVE THE OPERATION OF THE MAJOR ROADS IN THE VICINITY OF THE PROPOSED EXIT 36 SOUTHBOUND RAMP .................................................................................................................................................. 2 B. ADDRESS ALL MODES OF TRANSPORTATION .............................................................................................. 2 C. IMPROVE ACCESSIBILITY TO LOCAL AND REGIONAL JOB CENTERS ................................................................... 4 D. GENERATE OPPORTUNITIES FOR SUSTAINABLE GROWTH AND ECONOMIC DEVELOPMENT.................................. 4 E. INITIATE NEW OPPORTUNITIES FOR INNOVATIVE FINANCING AND PUBLIC/PRIVATE PARTNERSHIPS ..................... 5 F. DEMONSTRATE REDUCTION IN TRAFFIC CONGESTION AND GREENHOUSE GAS EMISSIONS ASSOCIATED WITH THE TRANSPORTATION SECTOR. ..................................................................................................................... 5 II. EXISTING CONDITIONS ................................................................................................................................ 8 A. DEMOGRAPHIC PROFILE ........................................................................................................................
    [Show full text]
  • Hudson Logistics Center Site Plan Application #04-20 Conditional Use Permit Application #02-20 Staff Report #8 Supplement to 10/21 Packet
    Hudson, NH Planning Board: November 18, 2020 HUDSON LOGISTICS CENTER SITE PLAN APPLICATION #04-20 CONDITIONAL USE PERMIT APPLICATION #02-20 STAFF REPORT #8 SUPPLEMENT TO 10/21 PACKET SITE: 43 Steele Road; Map 234 Lots 5, 34 & 35 and Map 239 Lot 1 ZONING: General – 1 (G-1) and Business (B) PURPOSE OF PLANS: Proposed commercial development consisting of three (3) new distribution and logistics buildings with associated access ways, parking, stormwater/drainage infrastructure and other site improvements. ATTACHMENTS A. Cover letter and supplemental traffic responses to public comment, trip generation analysis and TEPP memorandum, received November 4, 2020. B. Cover letter from BCM Law and Traffic Memorandum from TEPP received October 21, 2020. C. Supplemental response from Langan Engineering to Attachment B particular to site plan regulation requirements, received November 9, 2020. D. Two (2) items of correspondence from BCM Environmental & Land Law. E. Public Comment received October 15 to November 10, 2020. F. Revised Air Quality Impact Analysis, Epsilon Associates, received October 28, 2020. SUMMARY OF CONTENT Attachment A contains the Applicant’s responses to comments received through public input, including that of BCM Environmental & Land Law and its consultant, Transportation Engineering, Planning and Policy (TEPP, LLC). Attachment B is BCM’s cover letter for, and includes, TEPP’s analysis. The cover letter also provides comment on site plan regulation related to traffic issues. Attachment C is a supplemental response by the Applicant to these site plan comments. Attachment D are items of correspondence from BCM regarding the October 21, 2020 Planning Board meeting. A recommendation with respect to these letters is in the next section.
    [Show full text]