4 7 Cauayan Airport Development Project C.Y. 2015
Total Page:16
File Type:pdf, Size:1020Kb
EL. 25.00 EL. 25.00 EL. 24.00 EL. 24.00 EL. 23.00 EL. 23.00 EL. 22.00 EL. 22.00 EL. 21.00 EL. 21.00 EL. 20.00 EL. 20.00 EL. 19.00 EL. 19.00 EL. 18.00 EL. 18.00 DESIGN DESIGN ELEVATION ELEVATION 23.01 22.73 22.43 22.43 22.79 22.58 22.37 22.22 22.79 22.94 22.22 22.37 22.52 23.00 NAT. GROUND NAT. GROUND ELEVATION ELEVATION 22.61 22.41 23.01 22.72 22.43 22.43 22.52 22.79 22.38 23.00 23.00 23.00 22.36 22.40 ACCUMULATED ACCUMULATED DISTANCE DISTANCE 0.00 0.00 18.00 22.50 30.00 18.00 22.50 30.00 -30.00 -22.50 -18.00 -30.00 -22.50 -18.00 STATION 0+400 STATION 0+500 EL. 25.00 EL. 25.00 EL. 24.00 EL. 24.00 EL. 23.00 EL. 23.00 EL. 22.00 EL. 22.00 EL. 21.00 EL. 21.00 EL. 20.00 EL. 20.00 EL. 19.00 EL. 19.00 EL. 18.00 EL. 18.00 DESIGN DESIGN ELEVATION ELEVATION 23.11 23.15 23.34 23.19 22.97 22.82 23.19 23.34 22.96 23.03 23.17 23.40 23.40 23.40 NAT. GROUND NAT. GROUND ELEVATION ELEVATION 22.95 23.15 23.03 23.00 23.40 23.40 23.40 23.40 23.40 23.40 23.40 23.18 23.17 23.17 ACCUMULATED ACCUMULATED DISTANCE DISTANCE 0.00 0.00 18.00 22.50 30.00 18.00 22.50 30.00 -30.00 -22.50 -18.00 -30.00 -22.50 -18.00 STATION 0+600 STATION 0+700 EL. 25.00 EL. 25.00 EL. 24.00 EL. 24.00 EL. 23.00 EL. 23.00 EL. 22.00 EL. 22.00 EL. 21.00 EL. 21.00 EL. 20.00 EL. 20.00 EL. 19.00 EL. 19.00 EL. 18.00 EL. 18.00 DESIGN DESIGN ELEVATION ELEVATION 23.51 23.63 24.05 24.03 23.84 23.78 24.09 23.57 23.36 23.88 23.59 23.74 23.80 23.76 NAT. GROUND NAT. GROUND ELEVATION ELEVATION 23.71 23.81 23.79 24.05 23.53 23.45 24.12 24.09 23.76 23.83 24.10 23.84 23.57 23.80 ACCUMULATED ACCUMULATED DISTANCE DISTANCE 0.00 0.00 18.00 22.50 30.00 18.00 22.50 30.00 -30.00 -22.50 -18.00 -30.00 -22.50 -18.00 STATION 0+800 STATION 0+900 Prepared by: Reviewed by: Checked by: PROJECT NAME : Sheet Content: DRAWN BY: JMG Revisions: Sheet No.: REPUBLIC OF THE PHILIPPINES DEPARTMENT OF TRANSPORTATION AND ATTY. JAIME FORTUNATO A. CARINGAL CAUAYAN AIRPORT DEVELOPMENT PROJECT C.Y. 2015 CHECKED BY: JR CW-4 COMMUNICATIONS OIC, Assistant Secretary for Project Development DATE DRAWN: 2015 PROJECT SCOPE: A S S H O W N PROJECT DEVELOPMENT SERVICE - Approved by: 4 7 Widening of runway Widening of taxiway DATE PRINTED: 2015 Total Sheet No.: UNIT 83, THE COLUMBIA TOWER, BRGY. WACK WACK, RENE K. LIMCAOCO ORTIGAS AVENUE, MANDALUYONG CITY 1555 2015 4 / 7 LOCATION : Cauayan, Isabela SCALE : AS SHOWN DATE APPROVED: The copyright of this drawing remains the property of the Department of Transportation and Communications whose permission must be obtained before any use of it can be made. EL. 25.00 EL. 25.00 EL. 24.00 EL. 24.00 EL. 23.00 EL. 23.00 EL. 22.00 EL. 22.00 EL. 21.00 EL. 21.00 EL. 20.00 EL. 20.00 EL. 19.00 EL. 19.00 EL. 18.00 EL. 18.00 DESIGN DESIGN ELEVATION ELEVATION 24.21 24.05 24.34 24.19 24.36 24.42 24.07 24.22 24.26 24.38 24.28 24.24 24.40 24.20 NAT. GROUND NAT. GROUND ELEVATION ELEVATION 24.45 24.43 24.42 24.40 24.40 24.40 24.26 24.26 24.26 24.38 24.29 24.29 24.28 24.24 ACCUMULATED ACCUMULATED DISTANCE DISTANCE 0.00 0.00 18.00 22.50 30.00 18.00 22.50 30.00 -30.00 -22.50 -18.00 -30.00 -22.50 -18.00 STATION 1+000 STATION 1+100 EL. 25.00 EL. 25.00 EL. 24.00 EL. 24.00 EL. 23.00 EL. 23.00 EL. 22.00 EL. 22.00 EL. 21.00 EL. 21.00 EL. 20.00 EL. 20.00 EL. 19.00 EL. 19.00 EL. 18.00 EL. 18.00 DESIGN DESIGN ELEVATION ELEVATION 24.35 24.52 24.37 24.33 24.39 24.54 24.54 24.56 24.56 24.52 24.58 24.48 24.60 24.50 NAT. GROUND NAT. GROUND ELEVATION ELEVATION 24.61 24.63 24.52 24.58 24.58 24.58 24.54 24.54 24.60 24.56 24.59 24.57 24.54 24.56 ACCUMULATED ACCUMULATED DISTANCE DISTANCE 0.00 0.00 18.00 22.50 30.00 18.00 22.50 30.00 -30.00 -22.50 -18.00 -30.00 -22.50 -18.00 STATION 1+200 STATION 1+228 C L 7.50 45.00 7.50 SHOULDER GRADE SHOULDER GRADE 4.50 36.00 4.50 PROPOSED WIDENING EXISTING RUNWAY PROPOSED WIDENING 1.33 % 2.0 % 1.33 % 2.0 % NGL P.C.C.P. t=250mm CRUSHED AGGREGATE BASE COURSE t=250mm RUNWAY WIDENING 1 TYPICAL CROSS SECTION DETAIL CW-5 SCALE HORIZONTAL = 1 : 200 MTS VERTICAL = 1 : 100 MTS Prepared by: Reviewed by: Checked by: PROJECT NAME : Sheet Content: DRAWN BY: JMG Revisions: Sheet No.: REPUBLIC OF THE PHILIPPINES DEPARTMENT OF TRANSPORTATION AND ATTY. JAIME FORTUNATO A. CARINGAL CAUAYAN AIRPORT DEVELOPMENT PROJECT C.Y. 2015 CHECKED BY: JR CW-5 COMMUNICATIONS OIC, Assistant Secretary for Project Development DATE DRAWN: 2015 PROJECT SCOPE: A S S H O W N PROJECT DEVELOPMENT SERVICE - Approved by: 5 7 Widening of runway Widening of taxiway DATE PRINTED: 2015 Total Sheet No.: UNIT 83, THE COLUMBIA TOWER, BRGY. WACK WACK, RENE K. LIMCAOCO ORTIGAS AVENUE, MANDALUYONG CITY 1555 2015 5 / 7 LOCATION : Cauayan, Isabela SCALE : AS SHOWN DATE APPROVED: The copyright of this drawing remains the property of the Department of Transportation and Communications whose permission must be obtained before any use of it can be made. 5.00 23.00 5.00 SHOULDER SHOULDER 23.05 23.06 GRADE 2.50 18.00 2.50 GRADE PROPOSED PROPOSED 23.05 WIDENING WIDENING 0.00 9.00 -9.00 2.0 % 1.33 % 1.33 % 2.0 % 0 + 50 NGL TAXIWAY WIDENING EL. 25.00 1 TYPICAL CROSS SECTION DETAIL CW-6 SCALE HORIZONTAL = 1 : 200 MTS EL. 24.00 VERTICAL = 1 : 100 MTS EL. 23.00 EL. 22.00 EL. 21.00 EL. 20.00 EL. 19.00 EL. 18.00 DESIGN ELEVATION NAT. GROUND ELEVATION ACCUMULATED DISTANCE STATION Prepared by: Reviewed by: Checked by: PROJECT NAME : Sheet Content: DRAWN BY: JMG Revisions: Sheet No.: REPUBLIC OF THE PHILIPPINES DEPARTMENT OF TRANSPORTATION AND ATTY. JAIME FORTUNATO A. CARINGAL CAUAYAN AIRPORT DEVELOPMENT PROJECT C.Y. 2015 CHECKED BY: JR CW-6 COMMUNICATIONS OIC, Assistant Secretary for Project Development DATE DRAWN: 2015 PROJECT SCOPE: A S S H O W N PROJECT DEVELOPMENT SERVICE - Approved by: 6 7 Widening of runway Widening of taxiway DATE PRINTED: 2015 Total Sheet No.: UNIT 83, THE COLUMBIA TOWER, BRGY. WACK WACK, ORTIGAS AVENUE, MANDALUYONG CITY 1555 RENE K. LIMCAOCO 6 / 7 LOCATION : Cauayan, Isabela SCALE : AS SHOWN DATE APPROVED: 2015 The copyright of this drawing remains the property of the Department of Transportation and Communications whose permission must be obtained before any use of it can be made. 2.25 2.25 36.00 2.25 2.25 3.00 3.00 2.372.37 2.70 2.70 3.00 R20.00 R20.00 3.00 3.00 1.50 1.50 1 CW-7 SCALE 1 : 400 MTS 1 cm 1 cm 1 cm 0.1T T/4 TO T/6 T/4 TO T/6 T/2 T/2 2cm +/- 3mm T T T T 0.2T 2T HINGED CONSTRUCTION (J-4) DUMMY CONTRACTION (J-7) DOWELED BUTT CONSTRUCTION (J-8) (WHEN NEEDED) THICKENED END JOINT (J-9) T 1.50 NOT TO SCALE Prepared by: Reviewed by: Checked by: PROJECT NAME : Sheet Content: DRAWN BY: JMG Revisions: Sheet No.: REPUBLIC OF THE PHILIPPINES DEPARTMENT OF TRANSPORTATION AND ATTY. JAIME FORTUNATO A. CARINGAL CAUAYAN AIRPORT DEVELOPMENT PROJECT C.Y. 2015 CHECKED BY: JR CW-7 COMMUNICATIONS OIC, Assistant Secretary for Project Development DATE DRAWN: 2015 PROJECT SCOPE: A S S H O W N PROJECT DEVELOPMENT SERVICE - Approved by: 7 7 Widening of runway Widening of taxiway DATE PRINTED: 2015 Total Sheet No.: UNIT 83, THE COLUMBIA TOWER, BRGY. WACK WACK, RENE K. LIMCAOCO ORTIGAS AVENUE, MANDALUYONG CITY 1555 2015 7 / 7 LOCATION : Cauayan, Isabela SCALE : AS SHOWN DATE APPROVED: The copyright of this drawing remains the property of the Department of Transportation and Communications whose permission must be obtained before any use of it can be made. Section VIII. Bill of Quantities 130 BID ANNEX 5 PROPOSAL SCHEDULE PROJECT TITLE : Cauayan Airport Widening of Runway and Taxiway LOCATION : Cauayan, Cagayan Valley (14.1) (14.2) (14.3) (14.4) (14.5) (14.6) ITEM ITEM OF WORK UNIT QUANTITY UNIT BID AMOUNT NO. COST 102 Excavation cu.m.