Air hlavigation Service

(Ar{s) Depantment of Transportation CIVIL AVIATION AUTHORITY OF THE

!tIPPINE

ACCOMPLISHMENT REPORT cY 2017

trio "li'11.," ffifirffiffin I ArR NAvTGAIToN sERVtcE ANS MANDATE

ORGANIZATIONAL $ETUP

FUNCTIONS OF EACH DEPARTMENT

PERSONNEL GOMPLEMENT AND STATUS

MAJOR ACCOMPLISHMENTS

INFRASTRUCTURE PROJECTS

Altachments

ptio n I nfrastructu re Projects Descri

Hei g ht cleara nce Description Project Acceptance, I nspection, Evaluation,

Navigational Aids Serviceability

ANS MANDATE

ANS AccomPlishment RePort 2017 The Air Navigation Service (ANS) is mandated to establish, operate, maintain and flight check air navigation system and equipment nationwide to provide safe, reliable, expeditious, and efficient service in conformance with lnternational Civil Aviation Organization (ICAO) Standards and Recommended Practices (SARps).

To be a leading provider of high quality air navigation systems and services that otfers strategic value to aviation stakeholders.

The Air Navigation Service (ANS) is envisioned to provide: 1, Effective plans, programs and design of air navigation systems and facilities nationwide. 2. Complete engineering services for the establishment and improvement of air navigation facilities. 3. Functional operation, maintenance and efficient management of air navigation systems equipment including airfield lighting systems, power plant and future technologies in conformance with ICAO Standards and Recommended Practices(SARPS). Functions The Air Navigation Service shall have the following functions: 1. Administration and implementation of operational plans, programs in conformance with ICAO Annexes and SARPs' 2. Formulation of the safety management systems, policies and procedures in conformance with ICAO Annexes and SARPs 3. Technical competency development of CNS Systems Specialist and Airfield Lighting & Power Technician personnel 4. Establishment of air navigation facilities nationwide. S. Determine the operational and developmental requirement of air navigational facilities, in coordination with the Air Traffic Service for inclusion in the ANF Maintenance and/or lnfrastructure Program of the CAAP. 6. Engineering data gathering and site survey for the improvement and establishment of air navigation facilities' prioritization 7. Develops and implements a system of projects, post evaluation and for the assessment of ANFplans and investment programs. 8. operation and maintenance of air navigation facilities. g. provision of technical and material requirements of air navigation facilities' procedures for l0.lmplementation of ANS regulations, policies, standard operational ANS l l.lnspection and evaluation of air navigation facilities. with the 12.Flight inspection and evaluation of air navigation facilities in compliance ICAO regulations and requirements'

ANS AccornPlishment RePort 2017 (nnttrrltdar C

llrvitrtksl

ANS AccorrPlishment Report 2017 The following Air Navigation Service Departments are hereby created with their correspond ing fu nctions:

1. Air Navigation Project Planning and Design Department - Responsible for the preparation of programs, plans, feasibility studies and system design of projects related to the establishment and/or improvement of air navigation facilities.

2. Air Navigation Prdect lmplementation Division Responsible for the execution of approved plans and designs as prepared by the Air Navigation Planning and Design Department for the establishment and/or improvement of air navigation facilities.

g. Air Navigation Quality Management Department Responsible for the formulation and implementation of standard procedures, regulation, evaluation and inspection of air navigation facilities. Responsible for the implementation of safety management systems policy and standards as necessary.

4. Air Navigation Operations Department - Responsible for the functional operation and maintenance of Communications, Navigations and Surveillance system components including Meteorological, Airfield Lighting and Power Systems.

S. ANS Field Offices - ANS field offices shall be established and responsible for the operation and maintenance of air navigation facilities in their respeclive (AFOC) areas. All Area Centers shall be headed by ANS Area Field Office Chief who shall be reporting direcfly to the Air Navigation ServiceAssistant Director General.

ANS AccomPlishmenl RePort 2017 ACCOMPLISFI ME[\ilT

Ai n Navigation $elvice

ANS AccolnPlishment RePorl 2O17 1. Conducted the detailed engineering and canied out the procurement activities in accordance with RA9184 for the project detailed in the attach Status Report. 2. Updated the ANF Development Plan for CY 2018-2019. 3. Submitted the proposed CY2O'IBANF Capital Outlay and lnfrastructure Proposed Budget. 4. Updated and finalized the adaptation of DPWH Revised Guidelines in the preparation of Approved Budget of Contract (ABC) for CY2017 Projects. 5. Creation of standard Air Traffic Controller (ATC) console for Flight lnformation Service (FlS) facilities. 6. Creation of standard VHF Communication System Design Air Navigation Facilities. 7. Completed 23 CY2017 Projects and turned-over to Bids and Awards Committee (BAC) for procurement(see attach Annex A). 8. Awarded (with NOA & NTn and turn-over the following projects to Project lmplementation Department (PID) for implementation: 8.1. Purchase/lnstallation of DVOR/DME at San Jose Airport. 8.2. Purchase/lnstatlation of Voice Logging System (VLS) at Airport. 8.3. Upgrading of Airfield l-ighting System and Runway Threshold ldentifications Lights at Tambler ( lnternational Airport). A.4. Purchase/lnstallation of PAPI System and Aerodrome Beacon at . g.S. Purchase/lnstallation of LED Floodlight and Solar-powered Taxiway Edge Lights (New System) at lnternationalAirport. 8.6. Purchase/tnstallation of Solar Powered Windcone and LED Apron Floodlight (Old System) at Kalibo lnternationalAirport. g.7. Rehabilitation of Circuit 1 of REL, STL, TEL and LED Apron Flood Lights and additional ccR at lnternationalAirport. 8.8. Rehabilitation of AFC Building including control Tower and other Works at Mactan- lnternational Airport. project lnset g. Requested the process of Fund Transfer to Area t in connection with the Runway LightsAdditional Taxiway Edge Lights at Laoag lnternationalAirport. l0.submitted monthly DoTr PMES Monitoring Form 1 Project status Report' CY2o17 Absorptive Capacity. 1 1. Submitted weekly ANS project status report for CAAP Report. 1 2. submitted cY201 6 Annual Accomplishment (DoTr) under l3.Attended project coordination meeting at Department of Transportation Msayas and Sector. Agencies/Office/ 14. prepared various ANS conespondences for the different

ANS AccomPlishment RePort 2017 15. Conducted Site Acceptance Testing at for VLS lnstallation Project. l6.Conducted Site Acceptance Testing at Laoag lnternational Airport Rehabilitaion of Air Field Lighting System Ckt 1 . lT.Participated in the testing on completion of CNS ATM electromechanical & auxiliary works. lS.Conducted site inspection of ongoing DVOR/DME installation Project at San Jose Airport. 19. Conducted final inspection of Mactan Control Tower Rehabilitation Project and list down punch list items for rectification. 20.Attended meetings at DOTr Head Office regarding proposed Development Project at various airport such as , Kalibo, Siargao, Laoag and Airports. 21. Participated in the training /seminar regarding SMS training at CATC. 22. Conducted Final lnspection for the newly completed KALIBO lntemational Airport Air Field Lighting System Projects. 23.Conducted site Acceptance Test for at , , DUMAGUETE and Airport Voice Communication System and VLS Projects. 24.Conducted site inspection in General Santos lntemational Airpo( for Power House Rehab and upgrading of Power System. --25.Continuously monitor status of ongoing implementation of ANPPDD INFRA Projecls for various iirports for CY 2016 / 2017 through FIC's and persons in charge and update Project status list.

Below is the List of projects being implemented and completed:

No. P ect Details Status Apron Completed 1 Purchase and lnstallation of LED Flood Lights , Solar Powered TEL & Solar Pbwered Lighted Wind Cone at KALIBO lnternational Ai rt Completed 2 Purchase and installation of Voice Logging System (VLS) Tuguegarao Ai rt Purchase and installation of Voice Completed Communication and Voice Logging tem for Butuan Ai rt Voice Completed 4 Purchase and installation of Communication and Voice Logging tem for Di Ai rt. Voice Completed 5 Purchase and installation of Communication and Voice Logging s m for Duma uete Ai

ANS Accomplishme t Report 2017 6 Purchase and installation of Voice Completed Communication and Voice Logging em (VLS) for

7 Rehab of circuitl of REL,STL, TEL and Completed LED Apron Flood Light, Additional CCR (LAOAGAi r Field Lighting System)

I Rehab of AFC Building lncluding Control Completed Tower at MACTAN lntemational Airport

Some Projects for CY 2017 APP are still ongoing implementation.

No. ON GOING Projects Status

1 Purchase/lnstallation of PAPI System & Suspended Aerodrome Beacon Light at Cauayan due to Airport ongoing DOTr Prolect

2 Purchase and lnstallation of DVOF/DME Site equipment for San Jose Airport- lnstallation in progress

J UpGrading of Airfield lighting System and mobilization lnstallation of Runway Threshold stage ldentification Lights at Gen. Santos lnternational Ai

26.Evaluation of Two Thousand Five Hundred Eighty Two (2,582) Height clearance Permits (Approved Applications), One Hundred Seven (107) Height Limitatjon, Twenty Nine (29) Temporary Structure and One Hundred Seventy Eight. (178) Denied. 27. INSPECTION / EVALUATION /TESTING 27.j. Surge Protection Devices for Meteorological lnstruments at - AirPort. 27.2. Two (2) units Portable LED ProjectorforANS 27.3. Batteries for UMART UPS at Tower/Navaids Facility 27.4. Batteries for ATS at Manila Tower/Navaids Power Plant Facility 27.5.Three(3)unitsofSix(6)DoorsSteelLockerCabinetsforANFM Division 2T.6.loWVHFAMAirBandTransceiversforANSTechnicalCenter 2T.T.2500PadsofCarbonlessDailyMaintenanceLogSheetsforANF Nationwide 27.8. Batteries for DVOR/DME and UPS at Tower cab at Laoag lnt'|. Airport

ANS Accomplishmenl RePort 2017 27.9. Portable Fire Extinguishers for NCR area ANS Facitities

27.10. Three (3) Units 125W HF Transceivers for ANS Technical Center 27.11. Batteries for 30 K/A UPS of Tower Cab, Control Station & Navaids Station of Davao lnt'|. Airport

27.12. Parts and Accessories for Airfield Lighting System at New Bacolod Silay Airport 27.13. Batteries for Diesel Engine Generator Set (DEGS) & Batteries for Supply of Control Relays at Airport 27.14. Spare parts Modules for Park Air Electronics (PAE) VHF Communication Equipment at Mactan AFC

27.15. Printer Head for Thermal Printer IER 512C and IER 4OOB2 at Manila Radar Facility 27.16. Barcode-based lnventory Control System for Air Navigation Service 27.17. Parts and Accessories for Runway Edge Lights and Taxiway Edge Lights at Airport 27.18. Alignment Tool for ADB Precession Approach Path lndicator (PAPI) for ANS. 27.19. 5W VHF AM Air Band Handheld Radio for ANS Technical Center 27.20. Digital Ground Earth Tester for various ANF 27.21. Timer Board for Runway Threshold ldentification Light (RTIL) at Dumaguete & Kalibo Airport.

27.22. Desktop Computer with Voice Recording System Software for various Airport. 27.23. Spare Parts for SAF Digltal Microwave Radio (DMR) of Manila AFC.

27.24. Automatic Voltage Regulator (AVR) for Perkins Diesel Engine Generator Set at Sanga-Sanga Airport.

27.25 SparePartsModulesforVaisalaAWOSMeteorologicallnstrumentat Bacolod I SilaY AirPort. 27.26. Parts & Accessories for Airfield Lightning System at Pto Princesa Airport.

27.27. BatteriesforDieselEngineGeneratorSet(DEGS)forANSTechnical Center. & 27.28. Parts & Accessories for Airfield Lighting System at Laguindingan Kalibo Airports. Airport' 27.29 Parts & Accessories for Airfield Lighting System at

ANS Accomptshment RePort 2017 27.30. Bulbs & Accessories for Airfield Lighting System at Airport. 27.31. ACU Compressor for S-ton Air Conditioning Unit for the Radar Equipment Room & Radar Facility. 27.32. Air Traffic Light Gun for ANS Technical Center. 27.33. Coaxial Detector for lt4anila Radar & Tagaytay Radar Facilities. 27.34. Five (5) units Outdoor Motor Driven Vertical Siren for ANS. 27.35. Radar Facility under CNS ATM Project at Apari ANF 27.36. Status of CNS MET at Tuguegarao ANF 27 .37 . Ten (10) Units 10W VHF AM Transceivers for ANS Technical Center. 27.38. DC-DC & AC-DC Converter Modules for Tagaytay Radar, lloilo & Davao

28. Follow-up lnspection & Evaluation of CNS Equipments & lts Ancillaries in the following Airports. 28.1. Kalibo 28.2. Mrac 28.3. Cauayan 28.4. Bacolod 28.5. Naga 28.6. Tagbilaran 28.7. Butuan 28.8. Basco 28.9. Laoag 28.10. Davao 28.11. Pto. Princesa 28.12. San Fernando 28.13. Dumaguete 28.14. Laguindingan 28.15. Tuguegarao 28.16. LegazPi 28.17. Tacloban 28.18. Gen. Santos 28.19. Roxas

ANS Accomplishment RePort 2017 28.20. Busuanga 28.21. Dipotog 28.22. Surigao 29. Final review of Facility Operations Manual 2s.1. Mt. Majic RCAG 29.2. Subic 30.Approved Facility Operations Manual 30.1. Sanga-sanga 30.2. 30.3. Mactan AFC/Transmitter 30.4. Laguindingan 30.5.

31. Conducted Safety Management System (SIrtlS ) Audit in the following Airports 31.1 . Davao 31.2. Laoag 31.3. lloilo 31.4. Kalibo 32. Conducted Training Plans and Programs Seminar in all Area Centers 33.Attended Meeting with CNS SG at Bangkok, Thailand 34.Attended Meeting CANSO at Hanoi, Metman 35.Attended Meeting with LGU regarding OLS at Mactan-Cebu lnternational Airport 36. Attended Telecommunication Summit sponsored by Department of lnformation & Communications Technology 37. Checked DVOR bearing Misalignment at Airport 3S.Coordination meeting with Presidential Management staff regarding CAVITEX infrastructure 39.Attended Frequency spectrum Management Panel Meetlng at Bangkok, Thailand 40.Attended the 3'd Meeting of Common Aeronautical Virtual Private Network Operations Group at Bangkok Thailand 41. Monitoring of Safety Management System 42. Technical Competency Certificate (TCC) Planning & lmplementation 43.Continuously monitored the operational status of CNS/Met, Power and Airfield Lighting System and equipment of ANF nationwide thru Daily Personnel and Operations Report (DPOR), lncident and Monthly Reports.

ANS Accomplishmenl RePort 2017 44' Followed-up the flight check of navigational aids facilities that were due for calibration. 57'27o/o of Radio Navaids and 47.9-5% ot PAPi hrre .rrrent flight check status. scheduled flight The calibration of both the Radio Navaids and pApt ,1" on-going. 45' Prepared Programs 9f (PoW for the purchase.and delivery of various parts CNS/Met, -w-ork for Power and Airfield Lightihg- .v Equipment and Fixtures foi th. ,pproval Director General. -r-'r of the 46' Prepared the documents for the transfer of funds of the approved programs of work to ANF's Area Cluster. 47. Repaired equipment parts and/or of equipment at the Air Navigation Technical Center and facilitated their transfer from the Airports/ANF's to the Ceitrai bmo ioili. ,"p":, at the AN Technical Center and its delivery and installation to the orijinafinf Airports/ANF's after its restoration. 48. Provided materials, technical and personnel assistance to Air Navigation Facilities for the repair and restoration of CNS/MET, Power and Airfield Liglting System ant equipment including installation of new cNs/MET equipment. 49. Purchased and provided the Airports/ANFs with equipment parts, components and other devices and materials for the continuous and reliable operation of these facilities. 50. Prepared AIPAFs for the issuance of NOTAM of various CNS/MET, Power and Airfield Lighting System that had encountered equipmenusystem trouble including those facilities that needed to be shutdown during preventive maintenance procedures. Sl.Validated the received Operational Hazard Reports, facilitated the execution of conective measures and submitted reports to the ANQMD for the preparation of reply letter to concerned airlines or other CAAP services. 52. Prepared coordination letters to airport managers and other government agencies including other communications to equipment suppliers and service providers. 53. Coordinated with other CAAP services/offices, other govemment agencies and stakeholders for the immediate solution to problems including other issues and concerns that may directly or indirectly affect the operation of alrports/facilities nationwide.

BALUCATING Acting Chief, Air Navigation Service

ANS Report 2017 ATTACHIVIHNT

1. Air Navigation Project Planning and Design Departmentprojects. a. PPDD Project Management Report b. CY2017 Turnover of Projects for lmplementation c. Five Year ANF Development Plan 2. Au Navigation Operations Department a. Radio Navaids Equipment b. PAPWASI c. On-Site Technical Assistance Provided to Air Navigation Facitities for cY2017

ANS Accomplishmerrt RePort 2017 Air Navigation Operations Department

1 February 2018

Explry Date of AlrporU Date of Last Equipment Brand/Model Frequency Channel Status Flight Check Faclllty Fllght Check Remarks

CLARK

DAVAO

SANTOS) TAMBLER

KALIBO 113,0 tvlhz operational 29-DecJ6 29-Dec-l7 Due for llight check.

29-Dec-16 29-Deo17 Due fu flight check.

LAOAG Air Navigation Operations Department

I February2018

.,f

Explry Date of AlrporU Date of Last Equlpment Brand/Model Frequency Channel Status Fllght Check Remarks Facility Fllght Check

MACTAN

MANILA

PUERTO PRINCESA

SUBIC BAY

Due for flight cfieck. FSD45 Operational 02-Sep-16 02€ep17

L- Air Navigation Operations Department

1February2018 ,t

Alrport/ Explry Date of Brand/Model Dde of Last Facility Frequency Channel Status Fllght Check Flight Check Remarks

BACOLOD. 4329 115.3 MHz Operational SILAY 29-Dec-16 N-Dec-17 Due lor flight check.

100x Operational 29-Deo16 20-Deo17 Due for flight check.

75lliltz Operational 9Jan-17 9Jul-'17 Due tun flight check.

BUTUAN

NEC NNG-5708 0perational 21-Apr-15 21-Apr-16 Due for flight check, DE

COTABATO WLCOX 5858 113.7 t./d:'2 Operational 2-Dec-,l5 2-Dec-16 Due for flight chect.

1119 Operational 21-Apr-15 2'l-Apr-16 Due lor flight check.

DUMAGUETE 114.1Mh2 0perational 1tl-Nov-18 1tl-Nov-17 Due for flight c*reck,

rLotLo DVOR 116.3lrfrrz Operational 20-Dec-16 29-Da*17 Due for flight chock.

1lox Operational 29-Dec-,l6 2*Dec-17 Due lor flight check,

NAGA

29-Dec-17 m single syslem.( def Md Slg Gen) ROXAS 112.9 Mttz 0perational 29Dec-16

76X 0peratlonal 29-Dec-16 29-Dac-17 Due for Flight Checd.

Due for Flight Check. SAN JOSE 117.1t{frr2 0perational 1-Sep-16 1-Sep17

't18X Operational 1-Sep-16 1-Sep-17 Due for Flight Check. Air Navlgation Operations Department

I February 2018

Explry Date of AlrporU Dete of Lad Brand/Model Frequency Channel Status Flight Check Remarks Faclllty Flight Check

TACLOBAN

TUGUEGARAO 0perational 24.Jan-14 2tUan.15 Due for flight check.'

BAGUIO 272Rhz Operational 24,Jan-14 244an-|5 Due for Flight Check.

BASCO

PW3OOL 278Khz 3GAug-16 30-Aug-17 Due lor Flight Check.

CATICLAN

JOLO

MASBATE NEC NNG-9708 104X 0perational 11.lun-14 11-lun-15 Due for Flight Cheok.

SURIGAO ND-500il 415 Khz Operational 28-Apr-15 28-Apr-18 on tlng/e system.

CAUAYAN

I befe'dlve Mod, Sl0. 6cr. t/odule JOMALIG :it r'. .. :. Operational from 05Ct0 - 2100 only. Due t14X Operational 5Jun-12 SJun-13 DME NEC NNG.1797 tu flioht chec*.

Due for Flight Check. LUBANG VOR ASI 1150 117.5 Khz 0perational &Mar-15 &Ma-16

Due for Flight Chec,k. ASr 1119 122X 0perational 4-Mar-15 &Mar-16

AH'tvAyroArti ,' :

BACNOTAN VOR::,,;,,:1;,, '112.,71th2 CABANATUAN DVOR fPfl:ril" --rJ--5i-;!.-. DIiiIE 74X bporational,

D!0 tb fi ulfii'udrnfi errlEl pov#'sjrlcnr , LIPA

SUMMARY:

110 Total Number of Radio Navaids Equlpment 57.270/" Flight Check Sfstrs 63 Number of Operational Radio Navaids Equipment witr Cunent check stafus t5 Number of operational Radio Navaids Equipment witr Due For Flight 5 Number of On-Test Radio Navaids Equipment 27 Number of Non-Operational Radio Navaids Equipment Air Navlgatlon Operafl ons Department

Last Year Equlpment Currency Facility EQPT BRAND of Fllght Expiry of Flight Flight Remerks lnghlled Status Check Check Valldity

PAPI O2R 284pr-15 Due for Flight Ched<. 28-Apr-16

PAPI 20L 2&Apr-15 Due for Flight Ched<, 2&Apr-'16

1', Pilot & PAPI 05 2000 6"Jun-,l6 Due for Flight Check. 2-Jun-17 DAVAO

GEN, SANTOS 1996 9-Sep"16 Due for Flight Check. 9-Sep17 ITAMBLER) 1996 9"Sep-16 Due for Fllght Cheok. 9-Sep-17

KALIBO

PAPI 04 2&Sep13 Due for Flight Cheok, 26-Sep-14 MACTAN 26-Sep-13 Due for Flight Chec*. 26-Sep-'14

NAIA PAPI 13 lSNov-l5 Due for Flight Chedr. $Nov-16

PAPI 31 14Jul-14 Due for Flight Ched<, 14Jul-15

PUERTO PRINCESA

Due for Fllght Cheok, 9-Nov-16 SUBIC PAPI 25 Oct'10 Due for Fllght Chec{i.

BACOLOD.SILAY

BUTUAN

cl*ed due lo the openhtg 25.Sep12 Due tor Flight Check. 25€ep-13 CAGAYAN DE Aendnne cleed iln lo lha oPenlng Due for Flight Chec*. 25-Sep-13 oRo PAPI 19 1994 25-Sep-12

COTABATO

DIPOLOG Air Navlgatlon Operations Department

Last Year Equlpment Cunency of Flight Explry Facilig EQPT BRAND Fllght of Fllght lnshlled Slrtus Check Check Validity Remarks

DUMAGUETE

lLolLo

PAPI 09 YOTJYANG 2013 15-Sep-14 Due for FllghtCheck, f 5€ep-15 Pllot slde onty. LAGUINDINGAN PAPI27 2013 '15-Sep-'14 Due for Fllght Check. 1S-Sep-15

't994 PAPI 24 20-Oct-16 Due for Fllght Checlt. 2&Oct-17

NAGA

3,0 t0

ROXAS

JOSE

TACLOBAN

TAGBILARAN

Cc'Plld Slde Ohly, Unlled dslbilfty at Lef, PAP!27 2W2 Due for Fllght Ched<. 26-Oct-'13 sedw dwbobvwtatlot,

BUSUANGA

TARMAN

TICLAN

Umlted vlslbilry d left sector wlh,asfilctlon. pdh 1993 7-Feb-13 7-Feb-14 af e44ltuach duetoobstrucllng v@dtion. Alr Navlgatlon Operafl ons Department

13 Decembet 20'17

Date Last Year Equlpment Currency Facility EQPT BRAND of Fllght Explry of Fllght Fllght Remarks lnshlled Shtue Check Check Validity Checked

SURIGAO

VIRAC

PAPI 03 THORN OP 13JanJ6 Due for Flight Check, 12-Jan-17 OZAMIS PAPI 21 THORN 13Jan-16 Due for Flight Check, 12-Jan-17

SAN FERNANDO

SUMMAFY:

Total Number of Visual Landing Aids: 73 Number of Operational Visual Landing Aids Due for Flight Check: 20

Number of Operational Visual Landing Aids with Flight Chec{< Cunent: 35 47.95o/o Number of Non-Operational Visual Landing Alds: I Number of Visual Landing Aids with 0n-Test Status: 8 Tobl Number of Vlsual Landing Alds due for fllght check for 2017: 23

Submifted By:

FELIPE D. LABADO

Department Manager lll, ANOD AUrHoRrry pHrrpprN's ;yUlUgl"* oF rHE @ Alr Navigatlon Operallons Departmer{

ON.SME TECHIVICAL ASSISTANCE PROITDED TO AIR NAVIGATION FACILIIMS FOR CY 2017

T.O. No s FACILITY MISSION DT.IRATION . To assess the damage to the Non-Direcfional Beacon (NDB) antenna systan including guy support structures caused by 007-17 Virac NINA. January 4 - 6, . 2017 To determine the scope of works ilcluding the materials needed to restore the NDB to normal Operational testing of repated modules of Toshib a TW2280 828-17 Naga Apm 3 DVOR atN Air Navi on Facili - 7,2017 lnstallation and testing of radio conununications system(s) for t104-17 & VHF airto-ground radio communications at Legazpi and if Legazpi & May l0 22, 1354- necessary, Virac Aerodrome, to improve/extend the radio - Virac 2017 17@xt) coverage of Legazpi Tower/Approach Conhol for a reliable radio commulications in JUBAL and TORNE Installation of antenna system(s) for \rHF air-to-ground radio communications at Legazpi and if necessary, Virac Aerodrome, |05-17 &. Legazpi & May 10 to improve/extend dre radio coverage oflegazpi -22, 1355-17 Virac 2017 Tower/Approach Control for a reliable radio commrmications in JUBALaldTORNE Dsmantling of two (2) six!-foot high Trylonru antenna tower 1749-17 Taga\4ry Jnly 5 -15, 2017 masts at Radar F Accompany and proyide assistance to Toshiba Japanese 21.21-17 Plaridel Engineers in the evaluation and testing of communications August 4, 2017 console modules at Plaridel Provide on-site technical assistance to restore the Toshiba August 2l 25, 2139-1.7 Cauavan TW2280 DVOR at Cauayan Air Navigation Facility to dual - 2017 olrs. ANS-2017- . Transport One (l) Unil 7.5 KVA Portable Diesel Generator Set. 025 & ANS- October 4-11, Rornblon . lnstruct and Assist On-Site ANS Personnol in its InstallatiorL 2017-033 2017 Operation and Mainten ance. Provide on-site technical assistance in the retuning ofJohon ANS-2017- October 10-13, Dumaguete (Unit 3) VHF AM Transmitter and Receiver System fiom 122.0 029 2017 MHz to 121.5 MHz. . Provide on-site technical assistance in the restoration of MET ANS-2017- lnstruments. November 13-16, Busuanga 064 . Installation ofnew ATC Light Gun. 2017 . Installation ofPC-based Voice Lo . Provide on-site technical assistance in the restoration of the ANS-2017- November 20-25, Za;r:,.boanga DVOR equipment to dual system operations. 2017 063 , Reliabili of Toshiba DVOR modules. ANS-2017- Provide on-site technical assistance in the restoration of the 119.3 Novernber 24-29, Laoag 074 MHz en-route aeronautical communications to normal 2017 Provide on-site technical assistance in the replacement of the ANS-2017- November 27-30, Legazpi \rHF Antenna used for extended approach control which was 069 2017 Submitted by:

FELII) D. LABADO ent Manager III, ANOD

Attachment to ANOD Accomplishtuenl Repo/t 2017 CAAP compound, MIA Rd., City'1300 r el No. 94+2192 I A799 255 $1.--- u t- '( Republic of the philipprrrrs CNIIL A\'IATION AT.ITH O RTTI' OF THE PHILIPPINES

MEMORANDUM

FOR : EDGARDO M. FELISTLDA Deparfment Manager, ANPID

FROM : Department Manager, ANPPDD

SUBJECT : TURNOVER Or PROIECTS FOR IMPTEMENTATI0N

DATE :3 November?OtT

The ANPPDD have completed its task of planning detailed engineering and design, preparation of Program of work (POvv], preparation of Bidding Documents, and providing support during the procurement of the Project mentioned below.

In this regard, said Project is herebyturned over to ANPID for execution/implementation;

Name of Proiect Airport/ANF CY Contract Contract Amount Time fCDl 1) Upgrading of Airfield Lighting Gen. San 2077 180 days PhP39,9BB,55B,OB System and Runway Threshold Airport ldentification Lights

2l Purchase/lnstallation of PAPI Cauayan z0t7 120 days PhP14,388,880.81 System and Aerodrome Beacon Airport ICarried Over)

Attached is approved copy of the POWs, Notice of Award [NOA], Contract Agreement/Purchase Order and Notice to Proceed (NTPJ of the aforementioned Projects. Copy of the Contractor's Technical and Financial Bid may be requested from the BAC for your Department's reference.

It should he noted that the ANPPDD, as part of its function, will be implementing a post project impiementation review after the completion of these Projects,

It is requested that the ANPPDD be provided with a copy of the following documents after Proiect completion:

a, Site Acceptance Test Report;

{$,- lrT.IPPDD Form AD-3-2015

b. Certificate of Project Completion/ Final Acceptance c, Soft Copy ofTechnical Manuals; d. As- Built Drawings (soft copy, if available); e. Commissioning Flight Test Report (as applicable)

For appropriate action,

CECILIO M,

Noted by:

Acting Chiefl, ANS 'fi\ /gq Republieof the philippi. , CTVILAVIATTON AUTHORITY OT T"HE PHILIPPINES

MEMORANDUM

FOR ; EDGARDO M. FEIISIIDA Depaitment Manager, ANPI D

FROM Department Manager, ANPPDD

SUBIECT : TURNOVER OF PROJECTS FOR IMPLEMENTATION

DATE :20fune2017

The ANPPDD have completed its task of planning, detailed engineering and design, preparation of Program of Work (P0VD, preparation of Bidding Documents, and providing support during the procurement of the Project mentioned below.

In this regard, said Project is hereby turned over to ANPID for execution/implementation:

Name of Proiect Airport/ANF CY Contract ContractAhount Time(6D) 1) Purchase,/lnstallation of LED Kalibo Airport 20'16 60 days AFL and Solar Powered TEL- (r." 1 2J Purthase/lnstallation of .Solar 60 days PhP22, 208,888.29 Powered Windcone and LED AFL ' "' o1' '; '.';', pn I

Attached is approved copy of the POWs, Notice of Award (NOA), Contract Agreement/Purchase 0rder and Notice to Proceed [NTP) of the aforementioned Projects, Copy of the Contractor's Technical and Financial Bid may be requested from the BAC for your Department's reference.

It should be noted that the ANPPDD, as part of its function, will be implementing a post proiect implementation review afterthe completion of these Proiects.

It is requested that the ANPPDD be provided with a copy of the following documents after Project completion:

a, Site Acceptance Test RePort; b. Certificate of Project Completion/ Final Acceptance c, Soft Copy ofTechnical Manuals;

! -... Lr,,:,, o rd o '' '- '( ' i 't ( -'' "r i,{ DD Form AD-3-2015

d. As- Built Drawings [soft copy, if available); e. Commissioning Flight Test Report (as applicable)

For appropriate action.

CJt. CECILIO M.

Noted by: TING Acting Chief, ANS ..*\

Republic of the Philippines CruILA\TIATION AIITHORITY OF TIIE PHILTPPINES

MEMORANDUM

FOR EDGARDO M. FETISILDA Department Manager, ANPID

FROM Department Manager, ANPPDD

SUBIECT : TURNOVER OF PROJECTS FOR IMPLEMENTATION

DATE : 05 luly 2017

The ANPPDD have completed its task of planning, detailed engineering and design, preparation of Program of Work (POVVJ, preparation of Bidding Documents, and providing support during the procurement of the Proiect mentioned below. ln this regard, said Project is hereby turned over to ANPID for execution/implementation:

Name of Proiect Airport/ANF CY CoEtract Contract Amount Time [CD] 1) Purchase/lnstallation of VLS Tuguegarao 2077 180 days PhP1,900,000.00 Airport

2) Rehabilitatlon ofCitcuits"l of Laoag Alrport ZOTT 150 days PhP24,988,810,39 REL, STL, TEL aNd LED APTON (Canied Flood Llghts, Additlonal rcR _ , OverJ 3) Rehabilitation of AFC Builcling Mactan Airport 2077 120 days PhP10,6B3 109,99 includlng Control Tower and ICarried Ot}er Works 0verJ

Attached is approved copy of the P0Ws, Notice of Award (N0AJ, Contract Agreement/Purchase Order ancl Notice to Proceed [NTPJ of the aforementioned Projects. Cop1, of the Contractor's Technical and Financial Bid may be requested from the BAC for your Department's reference.

It should be noted that the ANPPDD, as part of ils function, will be implementing a post proiect implementatiou review after the completion of these Pi'oje*s,

It is :.equested that the ANPPDD be prorridecl rvith ai copy of the foilowing docurnents after Project cornnletion:

tl.,;.r,r".J tr, r,v !tr{.

: !.. . . . t ,t,) ,r,rr. i.r-\f,tf1 ANPPDD Form AD.3-2015

a. Site Acceptance Test Report; b. Certificate proiect of Completion/ Final Acceptance c. Soft Copy ofTechnical Manuals; d. As- Built Drawings (soft copy, ifauailableJ; e. Commissioning FIight Test Reporr (as applicablel

For appropriate action.

CECILIO

Noted byr DR. CATING Acting Chieg ANS Republic of the philirrpirrr- CTVIL AVTATION AUTHORITY OiiTNb PHILIPPINES

MEMORANDUM

FOR : EDGARDO M.ITELISILDA

Department Manaiger, A N p I I)

FROM Department Manager, ANppDD

SUBIECT : TURNOVER OF pROlEcTs FoR TMPLEMENTATTON

DATE : A6fintZ0tZ

The ANPPDD have completed lts task of planning, detailed engineering and design, preparation of Program of work (pow), preparation ot Bidding Doiumenrs, ;d providing support during the procurement of the proJect menHonecl below, ln this rcgard, said Project is he retry turnecl ovcr to ANPID for execution/implementation:

Name of Proicct Alrport/ANF CY Contract Contract Amount Time (CDl 1) Purchase/lnsellation of San Jose 2AL7 365 PhP58,297,267.27 DV0R/DME Airport (Cany- over)

Anached is approved copy of the Pow, Norice of Award (NoA), conracr AgreementlPurchase 0rder and Notice to Proceed (N'tP) ol'the a['rrrementioned Projects. Copy of the Contractor's Technical and Financi,al Bid may be requested frorn the BAC for your Deparrment's reference.

It should be noted that the ANPPDD, as part of its ftrnction, will bc implementing a post project implemcntation review after the completion of the se Projects.

It is requested that the AN PPDD be provided with a copy of rhe followlrrg docr.rments after Project completion:

a. Site Acceptance Test Roporq b. Certificate of Project Completion/ [tin{ Acceptance c, .Soft Copy of Technical Manuals; d. As- Built Drawings (soft copy, ilavailable); & r N. /N/6 "'2tF A \*-, DD Form AD-3-2015

e, Conrrnissioning Flight Test Report (as applicablc)

For appropriate action.

..1 { li \ \', ',1 \ I .'' . ,'-l Y CECILIO M. ORTiZ 1 1.t / "t4'

Notecl by: R. UCATING Acting Chief, ANS AND C rearANr uevetopmentrlan zvtl

,.2017. , . 20L9,. 2A20, .. REGION / AIRPORT / FACILITY :, ' a- TOTAL PROJECTS PER YEAR 35 30 19 6 16 915,058,000 813,300,000 745,500,000 453,000,000 339-800,0OO ,CR )00 MANILA AFC Rehabilitation of HF Transmitter of Aeronautical Mobile Service 150,000,000 1 I (AMS) 2 Relocation of TOP SKY 100,000,000 MANILA CENTRAL OFFICE L Rehabilitation/lmprovement of ANS Office 14,500,000

2 Establishment of ADS-B Ground Station (Pagasa lsland Station) 132,000,000 I 3 Establishment of ADS-B Ground Station ( Station) 4 Establishment of ADS-B Ground Station (lba Station)

I 5 Establishment of ADS-B Ground Station (Jomalig Station) 41,000,000 MANILA TECHNICAT CENTER 1 Purchase of Spare parts for CNS/MET Equipments 100,000,000 Purchase of Spare parts for Electro-Mechanical and Airfield lighting 2 Equipments 100,000,000 00 :", 137p-A,A - LAOAG L Purchase/lnstallation of ILS 75,000,000 Rehabilitation of Airfield Lighting System, REL CKT1, TWY CKT1 and 2 ccR 25,633,000 Purchase/lnstallation of PAPI System RNWY 01 & RNWY 19 Pilot f & co-Pilot side. 50,000,000 4 Purchase/lnstallation of PALS RNWY 01 62,000,000 5 Purchase/lnstallation of ABN. 1,000,000 5 UPS 3-Phase 20KVA 1,000,000 7 Construction of CHB Perimeter Fence at RWY01 (SALS Area) 10,000,000 L Purchase/lnstallation of FSS equipment 0 00 2 Construction of FSS Building 20,000,000 1 Construction of FSS Facility including Powerhouse 20,000,000 Tion O2:;,,:,:: ,r', 60,000,000 ,- , 135,600,00G ::: 1O00O00Q CAUAYAN 1 Purchase/lnstallation of Aerodrome Beacon 15,200,000 2 Purchase/lnstallation of PAPI Purchase/lnstallation of AFL (REL, FL, TEL, WDIL, RTIL, THL/END & 3 ABN including CCR) 60,000,000 4 Replacement of MET lnstruments 10,000,000

1 AlrD o rearANr ueveloPmentFlan zvtt

,,i

TUGUEGARAO 1 Purchase/lnstallation of VLS 2,800,000 2 Site Acquisition for the lnstallation of DVOR 2,000,000 3 Purchase/lnstallation of DVOR/DME 65,000,000 4 Construction of 6-Storey Control Tower Building 35,000,000 5 Purchase/lnstallation of Communication Equipment including VCS 25,600,000 6 of MET lnstruments 10,000,000

RADAR 1 Purchase/lnstallation of RADAR System 200,000,000 LIPA 7 65,000,000 - . ::--- E ":: .,, 6q,000,000 . :.: r-_ ., ZOO,OO-O,OOG PUERTO PRINCESA 1 lnstallation Terminal Of Radar and lntegration to ATMC 200,000,000 BUSUANGA 1 Pu Co 0 2 Purchase/lnstallation of VL5 2,800,000 -

3 Upgrading of Commercial Power Line from Single Phase to 3 phase 6,000,000 SAN JOSE 1 Replacement of DVOR/DME 60,000,000 2 Purchase/lnstallation of Communication Equipment 12,000,000

sAN VICENTE 1 Purchase/lnstallation of Communications Equipment 7,000.000 2 Purchase/lnstallation of MET lnstruments 5,000,000 3 Purchase/lnstallation of Airfield Lighting System 12,000,000

2 AND C rearANr UeveppmentFlan zvt I

i;r.',,,. .:.:., 46,900,000. ,';.:,:' 29i500,00G. 41,300,00O, .l.' ,:.','. ., r,,:15;000,000, TEGASPI f':,,t.'..r:'r, 1 Purchase/lnstallation of Communications Equipment 8,000,000 I 2 Purchase/lnstallation of PAPI System 15,000,000 I 3 Replacement of Console and Voice Communication Switch 15,000,000

I 4 Airfield Lighting Remote Control Panel 2,000,000 5 300kVA Generator Set includig Power Transmissin Lines 2,900,000 MASBATE

1 I Construction of New 3-storey FSS Building including Powerhouse 20,000,000

I 2 Replacement of FSS equipment. 5,000,000 NAGA 1 Purchase/lnstallation of VLS 2,800,000

2 Purchase/lnstallation of Apron Floodlight and Lighted Windcone 12,500,000 VIRAC

7 Purchase/lnstallation of Runway Threshold ldentification Lights, Wind Direction lndicator Lights, and Apron Flood Lights 23,500,000

2 Construction of New 4-storey FSS Building with Powerhouse 20,000,000 3 Establishment of RCAG 4,000,000 t 4 Replacement of Communications Equipment 2,000,000 i...,,'., ,.... ?qinryQG::' 40,525,00O ri4o00,ooo, ,, 6,5ii0,00O ':',, 1 Establishment of RCAG 4,000,000 KATIBO 1 Replacement of ILS 75,000,000 2 Purchase/lnstallation of PAPI at Runway 23 8,000,000 Purchase/lnstallation of Lighted Windcone and Apron Flood Light 3 (for old Apron) 22,725,000 4 Purchase/lnstallation of Apron Floodlight (for new Apron) 5 lnstallation of New Elevator at Control Tower 6,500,000 ROXAS 1 Purchase/lnstallation of Communications Equipment 12,000,000 2 Purchase/lnstallation of VLS 2,800,000 3 Purchase/lnstallation of VCS 15,000,000 4 Construction of New s-Storey Control Tower Building 15,000,000 lLotto 1 Purchase/lnstallation of VLS 2,800,000 2 Purchase/lnstallation of Communications Equipment 12,000,000

3 AND C YearANF Uevetopmentt-lan zvtt

MACTANTOWER t Purchase/lnstallation of Communication Equipment including VCS 35,000,000 MACTAN AFC 1 Rehabilitation of AFC Building including Control Tower 15,000,000 MT. MAJIC 1 lmprovement of Water Supply System 3,000,000

1 Upgrade of Power System 1,500,000 TAGBILARAN '). Upgrading of Power System 4,000,000 2 Purchase/lnstallation of VLS 2,800,000

3 Purchase/lnstallation of 300KVA DEGS for entire including Rehabilitation of Powerhouse 5,000,000 4 Rehabilitation of Taxiway Lights 8,000,000 I 5 lmprovement of MET lnstrument 5,000,000 : 20,00q.000..

I 1 Construction of FSS Building including Powerhouse 20,000,000 TACLOBAN 1 Replacement of DVOR/DME 65,000,000 Rt DIPOLOG

L Purchase/lnstallation of PAPI System 12,000,000 2 Establishment of RCAG 4,000,000 1 Purchase/lnstallation of Communications Equipment 28,000,000 2 Purchase/l nstallation of VLS 2,800,000 3 Purchase lnstallation of AFL 60,000,000

4 Construction of New Powerhouse Building for 1-20KVA Generator 6,000,000 5 Replacement of MET lnstruments 10,000,000

4 Arro c rearANr ueveroPmenf i-lan zvll

1 Construction of New Control Tower Building 40,000,000 2 Replacement of ILS 75,000,000 3 Purchase/lnstallation of Aerodrome Beacon Light 1,500,000 4 Purchase/lnstallation of PAPI System 25,000,000 5 Purchase/lnstallation of Airfi eld ng system 6s,000,000 40,000,000 6 Purchase/lnstallation of Apron Flood Lights 10,000,000 7 Purchase/lnstallation of Simple Approach Light System 15,000,000

CAMIGUIN 1 Purchase/lnstallation of FSS equipment 2,000,000 ozAMls Construction of S-Storey Control Tower Builing including 1 I Powerhouse 35,000,000 2 Purchase/lnstallation of Communications Equipment 2,000,000 Purchase/lnstallation of Communications Equipment including VCS 3 and Lightgun 28,000,000

I 4 Purchase/lnstallation of VLS 2,800,000 I Total perYeor>> . i:_

DAVAO 1 Purchase/lnstallation of Communications Equipment including VCS 35,000,000 2 Edge Lights 12,000,000 ILS (both I 3 Purchase/lnstallation of runway) 150,000,000 4 Construction of New Davao FSS Building 5,000,000 ,. ,:106,000;0qq R, :,i'i,,: 56,000-000 I ;:, 28,000,000 ,, 116;000,000 COTABATO 1 Replacement of MET lnstruments 10,000,000 2 Replacement of DvOR/DME 65,000,000 3 Upgrading of AFL System (PAPI, Threshold Lights & others) 8,000,000

4 Construction of Tower Multi-Function Building including furnishings 3,000,000

5 AND C rearANr Ueveppmenlrlan zvtt

TAMBLER L Establishment of ADS-B 41,000,000 2 Replacement of lnstrument Landing System (lLS) @ RWY 17 75,000,000

3 Rehabilitation of Airfield Lighting System (REL fWY, THL) and lnstallation of Additional Runway Threshold ldentification Lights 41,000,000 4 Replacement of MET lnstruments 10,000,000

5 Purchase/lnstallation of PAPI System and solar Lighted Windcone 15,000,000 6 Purchase/lnstallation of PALS at RNWY 17 41,000,000 ; ,'r'102,00O000 ::a'l::. : li: :.:1 . -l BUTUAN -:-: 1 Site Acquisition of SALS 2,000,000 Construction of 7-Storey Control Tower Builing including 35,000,000 2 I Powerhouse 3 Purchase/lnstallation of DVOR/DME including access road 65,000,000

.,- r::. 1O,00C00c' :: . 35,000,00O JOtO 1 Purchase/lnstallation of PAPI 15,000,000 2 Purchase/lnstallation of MET Instruments 5,000,000 3 Construction of 4 Storey FSS Building and Powerhouse 20,000,000 SANGA-sANGA 1 Purchase/lnstallation of MET lnstruments 5,000,000

Total Number of Pro.iects Per Year>> 35 30 19 6 76

Note: Above proposed projects are based on current operational requirements. Amounts are approximate (ballpark figure)

Recom mendi n g AP P rovo I :

cEclLloM. oRTlz EDGARDO M. FELISITDA MARIOT. MENDOZA FETIPE D. LABADO Department Manoger Deportment Manoger Deportment Monager Department Monager AN2-PPDD AN3.PID AN4.QMD ANS.ANOD

Approved:

ARNOLD R. BATUCATING Date Approved (ANS): Ading Chief Air Navigation Service

6 Air Navigation Sewice PPDD Ptoiect Management Report ANNEXA-CY2O17 PROIECISIURNED{VER-TO BAC FOR PROCUREMENT Printed: February 2, 2018

APP Proiect Cost Currenl Proiect Package l-oration Adiyities/Actlon Taken Remarks / Planned Activities/ SAC Acrivities

JOFET TAMBLER 137,000,000 8id evaluation by 8AC TWG ofl'going. 1 nstallationotN nalAids VER & JOJO NAGA D.P29 30,000,000 8id Evaluation undertaken by BAC. 2 Airfleld 2S,000,000 D.P3O POW preparation on-going. l Pur.hase/lnstallationof PAPlSYstemand LightedWindcone vER &JOIO TAMBLER

HF Svstems 20,500,000 Project re-earmarked last 15lafluary 2018. AwaitinS forthe schedule of BAC for pre- Purchase/lnstallation of Communications CENTRAI. OFFICE D.P29 4 .JOFET MANILA Manila aMs 19,200,000 Proiect .e-earmarked last 15lanlary 2018. Awaiting for the schedu le ofprocurement IOFET MANILA CENTRALOFFICE 5 tstablishrnent of ADs-B G round stetion {Pagasa) BAC. t- 14,500,000 FINTAND MANILA CENTRAT OFFICT E,P5O 8AC resolutionto re-bid the project forsiBnaturc 5 Rehabilitation/lm provem ent of aNS Offices

Apron Flood tigh! Solar Powered 12,000,000 Purchase/lnstallation of vER D.P3O Bid evaluation by BAC TWG on-going- 7 &loJo Ed hts NAGA D,P29 10,000,000 gornt 8 JUN & GE8ALD .POW VER ZAI\IEOANGA D,P29 10,000,000 a pp roval on-soins. 9 JOEET&]UN IACLOBAN D.PZ9 9,750,000 ect for Award to the winni bidder. 10 ofDvo ROSE & BUTUAN D,P3O 9,750,000 Post Qualifi cation evaluation undertak€n BACTWG. 11 ment ofDVOR/DME GERALD of Airfleld tighting SYstem (REr-TEl- 9,750,000 iurchase/lnstallation vER ZAMBOANGA D,P3O POW approva I on-going. 12 &toJo solarWD ABN & PAPI of Communications Eq 5,250,000 Project re-earmarked last 15lanuary 2018. Awaiting fortheschedute ofBACforpre. Purchase/lnstallation ROSE & GERALD N,4ACIAN AFC D.P3O 13 in.lu vcs Project re-earmarked last 15 January 2018. AwaitinS Purchase/lnstallation of Communications Equipment for the schedule of BAC for pre- t4 JUN & GERALD DAVAO D,P30 s,250,000 includi vcs JUN &GERALD ROXAs D,P29 2,800,000 ofPost Qualiflcations Evaluation Result to BAC. 15 Building including other constluction of New 3-storev FSS FINLAND MASEATE E,P5O 2,250,000 POWapproved last 31Janlary 2018. Preparation ofgidding Documents 16 on-going.

4storey FSS 8u ildins including Power construction of New TINLAND E.P51 2,250,000 POWapproved last 3l lanuary 2018. Preparation ofBidding Docu ments on-going.

2,250,000 VER &JOIO ZAMBOANGA D-P3O POW preparation on-going. 18 P!rchase/tnstallation of 5imple Approach LiSht Systern flOS€ &GERALD VIGAN o.P29 2,000,000 re-earma.ked last 15 Ja 2018. 19 SU & Del of t55 Communication ]UN & GERALD VIRAC D.P29 2,000,000 Project re-earmarked last 15 January 2018. Prol€€t forre-bid. 20 5u &De & G€RALO o.P30 2,000,000 Project re-earmarked last 15lanuary 2018. Project forre-bid. 2t & Delive of t55 Communications Eq ]UN ROSE & GERAI-D ozAMtz D.P3O 2,000,000 Project re-earmarked last 15lanuary 2018. Project for r+bid. 22 & of Communications E LAOAG D-P29 1,000,000 POW prepalation on-going- 21 lation of Aerodrome Beacon vER & loro 335,500 000

D:\PPDD\ANPPDDREPORTSUnnualAccomplLhmentReport\CY2017\20lSPPDDProjectManagementReport PPDD Project Management Report

I Detailed Engineering tr POW under Approval il For Bidding On-Going Bidding