Philippine Port Authority Contracts Awarded for CY 2018 Head Office Project Contractor Amount of Project Date of NOA Date of Contract Procurement of Security Services for PPA, Port Security Cluster - National Capital Region, Central and Northern Comprising PPA Head Office, Port Management Offices (PMOs) of NCR- Lockheed Global Security and Investigation Service, Inc. 90,258,364.20 27-Nov-19 23-Dec-19 North, NCR-South, / and Northern Luzon and Terminal Management Offices (TMO's) Ports Under their Respective Jurisdiction Proposed Construction and Offshore Installation of Aids to Marine Navigation at Ports of JARZOE Builders, Inc./ DALEBO Construction and General. 328,013,357.76 27-Nov-19 06-Dec-19 Estancia, ; , Roxas City; and Dumaguit, New Washington, Merchandise/JV Proposed Construction and Offshore Installation of Aids to Marine Navigation at Ports of Lipata, Goldridge Construction & Development Corporation / JARZOE 200,000,842.41 27-Nov-19 06-Dec-19 Culasi, ; , Antique and , Builders, Inc/JV Consultancy Services for the Conduct of Feasibility Studies and Formulation of Master Plans at Science & Vision for Technology, Inc./ Syconsult, INC./JV 26,046,800.00 12-Nov-19 16-Dec-19 Selected Ports Davila Port Development Project, Port of Davila, Davila, Pasuquin, Norte RCE Global Construction, Inc. 103,511,759.47 24-Oct-19 09-Dec-19 Procurement of Security Services for PPA, Port Security Cluster - National Capital Region, Central and Northern Luzon Comprising PPA Head Office, Port Management Offices (PMOs) of NCR- Lockheed Global Security and Investigation Service, Inc. 90,258,364.20 23-Dec-19 North, NCR-South, Bataan/Aurora and Northern Luzon and Terminal Management Offices (TMO's) Ports Under their Respective Jurisdiction Rehabilitation of Existing RC Pier, Port of , A. T. TAN Construction Corporation 120,851,884.27 24-Oct-19 14-Dec-19 Port Expansion Project, , HG-III Construction and Development Corporation 326,388,788.53 24-Sep-19 06-Dec-19 Consultancy Services for the Hydrographic and Topographic Survey for the Construction of H.O. Noveloso Surveying 275,000.00 11-Oct-19 06-Dec-19 TUbajon Port, Municipality of Tubajon, Consultancy Services for the Hydrographic and Topographic Survey for the Construction of H.O. Noveloso Surveying 257,000.00 11-Oct-19 06-Dec-19 Port, Brgy. Gil Sanchez, Labason, del Norte Procurement of Administrative Support Manpower Services for PPA Port Management Offices Temps and Staffers, Inc. 89,819,445.48 27-Sep-19 19-Nov-19 ( Cluster) and Projects

Procurement of Administrative Support Manpower Services for PPA Port Management Offices LBP Service Corporation 03-Oct-19 30-Oct-19 ( Cluster) and Projects Proposed Construction and Offshore Installation of Aids to Marine Navigation at Ports of Mati, DALEBO CONSTRUCTION AND GENERAL MERCHANDISE 217,730,292.85 03-Oct-19 23-Oct-19 Oriental and Malalag, Balanacan Port Expansion Project, Port of Balanacan, J.C. Piñon Construction Inc. 113,797,204.44 24-Sep-19 28-Nov-19

Salomague Port Expansion Project, Port of Salomague, Cabugao, Goldridge Construction & Development Corporation 316,087,000.00 24-Sep-19 18-Nov-19

Procurement of Furniture & Fixtures for de Oro Passenger Terminal Building Progress Home and Office Furnishings 16,978,132.35 24-Sep-19 23-Oct-19 Procurement of Security Services for Philippine Ports Authority, Port Security Cluster-Southern Luzon Comprising Port Management Offices (PMOs) of , Marinduque, , Bicol, Lockheed Global Security and Investigation Service, Inc. 92,152,482.00 24-Sep-19 23-Dec-19 , and Palawan and Terminal Management Offices (TMOs)/ Ports Under Their Respective Jurisdiction Procurement of Security Services for Philippine Ports Authority,Port Security Cluster-Visayas Comprising Port Management Offices (PMOs) of /Guimaras; Oriental/; Lockheed Global Security and Investigation Service, Inc. 120,095,591.28 24-Sep-19 31-Oct-19 ; //Banago-Bredco; Eastern Leyte/; Western Leyte/ and Terminal Management Offices (TMOs)/ Ports Under Their Respective Jurisdiction Procurement of Administrativeee Support Manpower Services for Port Management Offices LBP Service Corporation 183,104,649.48 24-Sep-19 30-Oct-19 (Luzon Cluster) Projects Procurement of Administrativeee Support Manpower Services for PPA Head Office Responsibility LBP Service Corporation 201,288,731.28 24-Sep-19 30-Oct-19 Centers and Projects Supply, Delivery and Installation of Baggage X-Ray Machines and Walk-Through Metal Detectors Defense and Protection Systems PHils., Inc. 340,800,000.00 30-Aug-19 25-Sep-19 for Ports and Offices Diversified Infrastructure and Architectural Development Works Procurement of Technical Support Services for PPA's CoreApplication Systems 12,991,148.62 19-Jul-19 02-Sep-19 Corporation

Proposed Repainting of PPA H.O Building, Bonifacio Drive, South Harbor, Port Area, Cytracon Corporation 8,466,907.52 04-Jul-19 05-Aug-19 Construction of Back-Up Area and RC Wharf on Fill, POrt of , Ozamiz City, F. Gurrea Construction, Incorprated / Grace Construction 323,625,092.85 04-Jul-19 04-Sep-19 Occidental Corporation / JV Doña Helene Port Expansion Project, Port of Doña Helene, Socorro, del Norte Octagon Concrete Solutions 63,412,200.00 04-Jul-19 24-Oct-19

Procurement of Multi-Site Remote Surveillance Equipment and Ancillary Services Kit Properties.Beyondsight , Inc./ Ipointeast, Inc./JV 417,963,490.00 04-Jul-19 15-Aug-19

Re-Construction of RC Pier & Construction of RoRo Ramp, Port of Carmen, San Agustin, D.K. JOCSON Construction 43,884,988.00 14-Jun-19 19-Aug-19

MAMSAR Construction & Industrial Corporation/JFAP Construction of Back-Up Area and RoRo Ramp, Port of , Bohol 56,285,488.85 19-Jun-19 16-Aug-19 Construction/ JOINT VENTURE

Manoc Manoc Cargo Port Project and Port of Manoc Manoc, Malay, Aklan Khan Kon Chi Construction and Dev't Corp, 132,828,205.91 26-Jun-19 19-Aug-19 Renovation of Executive Lounge and Gym, PPA Corporate Building, South Harbor, Port Area, Cytracon Corporation 6,432,810.60 14-Jun-19 05-Aug-19 Manila Cobo Port Development Project, Port of Cobo, Pandan, BEMKAR Construction and Supply 49,410,742.00 16-May-19 11-Sep-19 Design, Supply and Installation of VRF-HVAC System and Generator Units for the Passenger Kalayaan Engineering Co., Inc/ Jejor's Construction 106,195,092.42 16-May-19 26-Jul-19 Terminal Building, Port of , Corporation/JV Construction of Back-Up Area and Port Operations Building, Port of Talaga, Mabini, Batangas Great Swiss Metal Builders Corporation 67,445,600.58 16-May-19 30-Aug-19 Procurement of Technical Services for the Conduct of Soil Investigation at Selected Ports R.S. Jardin & Associates 32,024,383.83 20-May-19 16-Sep-19 (Package 10) Construction of RC Pier, Platform & RoRo Ramp, Port of , Orient Star Constuction, Inc. 36,298,030.92 16-May-19 19-Aug-19

Capinpin Port Expansion Project, Port of Capinpin, Brgy. Puting Buhangin, Orion, Bataan Luck-Well Construction 240,098,568.79 16-May-19 19-Aug-19

Proposed Construction and Offshore Installation of Aids To Marine Navigation at Ports Romblon, DALEBO CONSTRUCTION AND GENERAL MERCHANDISE 200,345,208.31 16-May-19 19-Jul-19 and San Agustin, Romblon, Province Proposed Construction and Offshore Installation of Aids to Marine Navigation at Ports of Coron DALEBO CONSTRUCTION AND GENERAL MERCHANDISE/ JARZOE 248,988,345.58 16-May-19 19-Jul-19 and Cuyo, Palawan Province BUILDERS, INC/JV Mati Port Improvement Project, POrt of Mati, Mati, MAKAPA Corporation / KXBG Construction 76,384,964.03 07-Feb-19 15-Apr-19 Construction of PPA Port Police HQ, South Harbor, Port Area, Manila KRBS Construction and Trading 6,875,834.16 14-Feb-19 02-May-19 IBC International Builders Corporation/Dynamic Builders & Construction of Back-Up Area, Port of , Brgy. Sapao, Dumangas, Iloilo 237,931,283.84 14-Feb-19 21-May-19 Construction Company (Phil.), INC/JV Rehabilitation and Maintenance of the TWO(2) Existing PPA Vessel Traffic Management System Radio Company., LTD.,(JRC) Philippine Branch Office 329,827,680.00 07-Feb-19 15-Mar-19 (VTMS) at the Ports of Manila and Batangas Supply, Delivery, Installation and Commissioning of Seventy One (71) Generator Sets With Mindanao Laboratory Services 403,499,999.99 28-Feb-19 03-Apr-19 Automatic Transfer Switch (ATS) for Port Management Offices Proposed Dredging of Ports of Poctoy and Ambulong, Romblon; Port of Buyabod, Marinduque Khan Kon Chi Construction and Dev't Corp, 105,310,620.38 18-Feb-19 09-May-19 Extension of RC Pier and Construction of Back-up Area with RoRo - Ramp on Fill, Port of Sultan WTG Construction and Dev't. Corporation Mindanao Rock / JV 204,301,400.87 21-Dec-18 13-Mar-19 Naga Dimaporo, Del Norte Design, Lay-Out, Photography, Manuscript Preparation, Copyediting and Proofreading, and Mode Matrix Manila, Inc. 998,800.00 18-Feb-19 20-Mar-19 Printing of CY 2018 PPA Annual Report Upgrading of Cargo Berth, Port of Davao, Sasa, MAC Builders/Ulticon Builders, Inc/JV 883,490,000.00 21-Feb-19 20-May-19 Proposed Dredging of Iloilo Clustered Project I, ICPC, Fort San Pedro, Ports of Dumangas, Iloilo Hi-Tone Construction & Development Corporation / KXBG 97,430,211.90 07-Feb-19 09-May-19 and Jordan, Guimaras Construction & Development Corporation RT Crisman Builders and Construction Supply / JFAP Construction/ Proposed Dredging of Ubay and Ports, Bohol 150,998,453.76 18-Feb-19 09-May-19 Joint Venture Supply, Delivery, Installation and Implementation of Comprehensive Human Resource Cosmotech Philippines, Inc. 25,000.000.00 07-Feb-19 20-May-19 Information System (HRIS) - Government Edition Construction of Port Operations Building and RoRo Ramp, Port of , E. U. Jingco Construction Corporation 48,287,883.74 07-Feb-19 26-Apr-19 Lockheed Global Security and Investigation Services, Inc./ Zemog Lease and Care of k9 Narcotics Detection Dogs 36,000.000.00 13-Feb-19 24-Apr-19 K-9 Training Center, Inc. K9 Services/JV Supplemental Agreement to the Contract for the Provision of General Support Services for PPA LBP Service Corporation 12-Feb-19 Head Office for CY 2017 (Contract Extension)

Supplemental Agreement to the Contract for the Provision of Technical and Administrative Support Manpower Services for PPA Head Office Responsibility Centers and Projects for CY 2017 LBP Service Corporation 12-Feb-19 (Contract Extension) Proposed Dredging of Ports of Brooke's Point, Balabac and Cuyo, Palawan BCT Trading and Construction 97,740,896.08 07-Feb-19 05-Apr-19 Proposed Dredging of Iloilo Clustered Project II, Ports of San Jose de Buenavista, Antique and BEMKAR Construction 78,568,861.60 07-Feb-19 18-Mar-19 Culasi Ports Khan Kon Chi Construction and Dev't Corp,/ Great Swiss Metal Construction of Coastal Access Road, Port of , Calapan City, Oriental Mindoro 140,810,163.43 21-Dec-18 11-Mar-19 Builders Corporation / JV Construction of Back-Up Area, Port of , Oriental Mindoro Orient Star Constuction, Inc. 36,031,225.36 21-Jan-19 05-Apr-19

Construction of Back-Up Area, Port of Esperanza, Esperanza, Masbate MGB Construction and Trading 140,195,806.36 21-Dec-18 16-Apr-19

Construction of RC Pier and Continuous RoRo Ramp, POrt of Benoni, , JEJOR'S Construction Corporation 88,305,110.00 21-Dec-18 26-Feb-19

Extension of RC Wharf and Construction of Back-Up Area, Port of Cawit, Boac Marinduque MARRA Builders, Inc. 124,555,007.01 21-Dec-18 13-Feb-19 Construction of Causeway, Back-up Area and RC Wharf with RoRo Ramps, Port of San HG-III Construction & Development Corporation 191,388,787.57 21-Jan-19 20-Mar-19 Sanfernando El Nido, Palawan Repair and Re-Painting of Seven (7) Pontoon Barges, Installation of Floating Barriers, Sanding and PIER 44 Shipyard and Development Corporation 16,509,870.32 21-Dec-18 13-Feb-19 Painting of Boat House and Coast Guard Station (CGS) Boat Landing at Malacañang, Manila Supply, Delivery, Installation, Testing and Commissioning of a Storage Solution Infostorage Corporation 8,978,858.00 21-Dec-18 08-Feb-19 Construction and Offshore Installation of Aids to Marine Navigation at Ports of Iloilo and DALEBO CONSTRUCTION AND GENERAL MERCHANDISE/ JARZOE 232,404,691.57 21-Dec-18 20-Feb-19 Dumangas, Iloilo Province BUILDERS, INC/JV Construction of Back-Up Area and Port Operations Building, Port of Mauban, RT Crisman Builders and Construction Supply 135,606,952.10 07-Dec-18 19-Mar-19 Viga Port Development Project, Brgy. Tambongan, Viga, Catanduanes 3CA Builders 8,824,094.48 16-Oct-18 21-Feb-19 Proposed Codon Port Development Project, Port of Codon, San Andres, Catanduanes EDTAHA Builders, Inc. 17,880,943.24 25-Oct-18 08-Feb-19 Proposed Constrution and Offshore Installation of Aids to Marine Navigation at Ports of Ozamiz, DALEBO CONSTRUCTION AND GENERAL MERCHANDISE/ JARZOE 280,934,523.65 07-Dec-18 07-Jan-19 Jimenez and Plaridel, BUILDERS, INCJJV Expansion of Back-up Area and RC Wharf, Port of Cagayan de Oro, Cagayan de Oro City UKC Builders, Inc. 521,898,767.92 19-Nov-18 08-Feb-19 JFAP CONSTRUCTION/RT CRISMAN BUILDERS AND Construction of RC Pier, Port of Ubay, Bohol 95,897,552.51 19-Nov-18 19-Feb-19 CONSTRUCTION/JV Brgy. U-Og Port Development Project, Brgy. U-Og, , Bohol Khan Kon Chi Construction and Dev't Corp, 44,578,616.78 19-Nov-18 15-Jul-19 Construction of Back-up Area for Motorpool, Office Storage and Ticketing Office, Port of JFAP Construction 25,250,792.17 25-Oct-18 16-Jan-19 , Bohol MAMSAR Construction & Industrial Corporation / Silver Dragon Proposed Banago Port Expansion Project, Port of Banago, Bacolod City, Negros Occidental 362,698,606.45 16-Oct-18 22-Jan-19 Construction and Lumber and Glass Supply, Inc. / JV Extension of RC Pier, Port of , Vicente T. Lao Construction 66,378,098.05 04-Oct-18 07-Jan-19 Widening of Access Trestle and Construction of RoRo Ramp with Platform, Port of Estancia, Iloilo J.S. Layson & Co. Inc 35,900,947.00 04-Oct-18 19-Feb-19 Construction of Back-up Area & Port Operations Building, Port of Coron, Palawan BCT Trading and Construction 267,817,495.21 04-Oct-18 18-Jan-19 Installation of Additional Reservoir at Trestle-2 Port of , MAMSAR Construction & Industrial Corporation 9,987,027.00 19-Sep-18 17-Jan-19 PMO Project Contractor Amount of Project Date of NOA Date of Contract Conversion of Primary Line From Single Phase to There Phase at Masao Port, City, PMO ZET Construction 3,133,641.52 14-Nov-19 28-Nov-19 Agusan Repair of Port Lighting System at Butuan Port, Butuan City, PMO Agusan Triple Z Merchandising & Electrical Services 5,874,846.98 14-Nov-19 28-Nov-19 Repair of Passenger Terminal Building at the Port of PMO Agusan, Philippine Ports ABADA Construction and Supply 12,633,190.59 14-Nov-19 28-Nov-19 Authority Repair of RC Wharf and Concrete Pavement at TMO Butuan, PMO Agusan B3 & R Construction Corp. 21,482.195.60 30-Aug-19 03-Sep-19 PMO Batangas Project Contractor Amount of Project Date of NOA Date of Contract MAINTENANCE/UPKEEPING OF OPEN CANAL & RIVER DIVERSION, PORT OF BATANGAS Sta. Cruz Construction and General Services 4,389,095.10 08-Jan-19 15-Jan-19 PMO Bicol Project Contractor Amount of Project Date of NOA Date of Contract Emergency Improvement and Maintenance of Collection Booth at Baseport Masbate, Masbate BAM Construction 993,540.59 17-Sep-19 18-Sep-19 City Maintenance of Port Facilities, Port of Legazpi City 3CA Builders 3,231,103.91 23-Jul-19 23-Jul-19 PMO Bohol Project Contractor Amount of Project Date of NOA Date of Contract Repainting of Administration and Passenger Terminal Buildings at the Ports of Tagbilaran and CLAVITE Construction and Supply 3,415,921.30 16-Sep-19 11-Oct-19 Repair of Concrete Pavement at Back-up Area to include Replacement of Electrical System, Port JRY Construction 17,696,450.78 23-Aug-19 17-Sep-19 of Tubigon, Bohol: PMO Davao Project Contractor Amount of Project Date of NOA Date of Contract Provision of Electrical Pole and Distribution Transformer at Babak Port, Babak, Igacos, Davao del Triple Z Merchandising & Electrical Services 892,000.00 10-Dec-19 13-Dec-19 Norte. Proposed Hydrographic, Topographic and Port Zone Delineation of Sta. Ana Port, Davao City PORROCHA Surveying and Engineering Services 290,000.00 12-Dec-19 18-Dec-19 Proposed Removal of RC Curb at Roro Ramp and Installation of Mooring T-Head, Tagpopongan WCCervantes Builders, Inc. 452,128.56 24-Oct-19 04-Nov-19 Port Disposal by Sale of Three (3) Warehouse on a As-is, Where-is Basis Terminal Facilities and Serivices Corp. (TEFASCO) 7,500,000.00 18-Oct-19 21-Oct-19 Maintenance Repair of Sasa Port Container Yard Installed with Paving, Blocks (Phase-1), Sasa RR & B Finest Contruction & Development Corp. / Dan Mariano 26,788,197.54 16-Oct-19 25-Nov-19 Wharf, Davao City Maldia (DCC Coro. Repainting of Road Signs and Markers Consisting of Road Line, Pedestrian Lane, Concrete Gutters, Concrete Curbs, Berth Markings Including Line Markings To Delineate Restricted and KXBG Construction & Development Corporation 5,244,782.07 20-Sep-19 01-Oct-19 Controlled Areas at the Port of Davao Repair of Sasa Port Perimeter Fence Including Provision of Razor Wire for Additional Security ZET Construction 10,035,285.61 20-Sep-19 01-Oct-19 Measures at Sasa Port, Davao City Repair / Replacement of Dilapidated Roofing. Gutter, Fascia and Sidings Including Repainting and ZET Construction 12,799,034.73 20-Sep-19 01-Oct-19 Electrical System of Transit Shed at Sasa Port, Davao City Conduct Services for the Preparation of Initial Environment Examination (IEE) Report for the Berkman System, Inc. 492,799.99 22-May-19 03-Jun-19 Issuance of Environmetal Compliance Certificate for Proposed Mati Port Improvement Project

Conduct Services for the Preparation of Initial Environment Examination (IEE) Report for the Issuance of Environmetal Compliance Certificate for Proposed Upgrading of General Cargo Berth Berkman System, Inc. 462,559.99 22-May-19 03-Jun-19 Project at Port of Davao PMO Eastern Leyte / Samar Project Contractor Amount of Project Date of NOA Date of Contract Repair of Damaged Ro-Ro Ramp No.1 Port of Manguino-o, Brgy. Manguino-o, City, R.V. Construction 146,980.00 04-Nov-19 12-Nov-19 Samar Repair od Depressed Damage Concrete Paving Blocks at Berth No. 3, Port of , Tacloban JFAP Construction 15,804,988.40 22-Oct-19 13-Nov-19 City Repair of Various Port Facilities, Port of , Borongan City, JUNCYNTH Construction and General Services 14,162,579.42 12-Sep-19 25-Sep-19 Repair of Damaged Concrete Pavement and Port Lighting System, Port of Calbayog, Calbayog 14,518,966.43 12-Sep-19 25-Sep-19 City, Samar Repair of Security Fence, Port Lighting System, Drainage System and Demolition of Transit Shed LAJ Trucking and Builders, Inc. 10,917,374.00 12-Sep-19 30-Sep-19 #1, Port of , Catbalogan City, Samar Repair of Old Portion of RC Pier #1, Port of Catbalogan, Catbalogan City, Samar ZET Construction 30,018,346.36 12-Sep-19 30-Sep-19 Removal of Damaged Steel Pile Fender, Ferry Terminal Port of Southern Leyte Big J Steel Construction Corp. 646,848.00 29-Jul-19 13-Aug-19 Provision of Safety Security Signages, Port of Tacloban, and Terminal Ports R.V. Construction 582,134.00 24-May-19 09-Jul-19 Provision of Stainless Framed & LED Lighted Panaflex Signboards, Port of Tacloban and Terminal R.V. Construction 593,760.00 24-May-19 09-Jul-19 Ports Repair of Damaged Concrete Pavement, Liloan Ferry Terminal, Liloan Southern Leyte R.V. Construction 840,649.00 24-May-19 09-Jul-19 PMO Lanao Del Norte / Iligan Project Contractor Amount of Project Date of NOA Date of Contract Upkeeping and Maintenance of Port Physical Facilities for a Period of Twelve (12) Months, Port of Brima Construction and Enterprises 2,595,000.00 04-Jul-19 15-Jul-19 Iligan, Iligan City

Repair of TMO and Passenger Terminal Buildings, Port of Tubod, LND Brima Construction and Enterprises 9,341,693.61 12-Dec-19 16-Dec-19 Repair of RC Slab, RC Curb and RC Beam at RC Pier, Port of , LND MRBII Construction Corporation 29,592,517.06 11-Nov-19 25-Nov-19 Repair of Perimeter Fence Along Alternate Access Road, Port of Iligan, Iligan City LAJ Trucking and Builders, Inc. 29,748,574.24 11-Nov-19 20-Nov-19 Repair of Mooring Fixtures at RC Wharf, Port of Iligan, Iligan City J.C. Dela Vega Construction and Supply 11,024,260.80 11-Dec-19 27-Nov-19 Repair of Observation Tower, Port of Iligan, Iligan City R. De Mesa Construction 8,343,285.00 12-Dec-19 16-Dec-19 Repair of Fendering System and Mooring System, Port of Kolambugan, LND Khan Kon Chi Construction and Dev't Corp, 16,033,575.66 11-Nov-19 25-Nov-19

Repair of Administration Building, Port of Iligan, Iligan City R. De Mesa Construction 17,242,195.45 12-Dec-19 16-Dec-19 PMO Misamis Oriental / Cagayan De Oro Project Contractor Amount of Project Date of NOA Date of Contract Repair of Water System, Port of Benoni, Camiguin Jejor's Construction Corp. 761,166.61 25-Nov-19 27-Nov-19

Repainting of Pre-mix Reflectorized Paints on Pedestrian Lanes along Berth 1-3 and Passenger JMT Construction 878,969.90 25-Nov-19 09-Dec-19 Terminal Complex, Port of Cagayan de Oro Repair of Port Amenities, Port of , Camigun Province Jejor's Construction Corp. 977,811.28 25-Nov-19 27-Nov-19 Repair of Male Comfort Room, Port of Benoni, Camiguin Province Jejor's Construction Corp. 409,999.21 25-Nov-19 27-Nov-19 Cleaning /Clearing & Disposal of Silts & Unsuitable materials along Gate 5, Port of Cagayan de AMA Construction 36,890.00 25-Nov-19 09-Dec-19 Oro Repair of Movable Security Steel Barriers at the Passenger Terminal Building, Port of Cagayan de AMA Construction 594,869.80 25-Nov-19 09-Dec-19 Oro Repair of Damaged 128 l.m. RC Deck and 2 units RoRo Berth Along Berth 3-5, Port of Cagayan de ZET Construction 21,521,484.76 03-Dec-19 06-Dec-19 Oro Repair/Replacement of Security Lights along North-East Perimeter Fence & CCTV at Operational Khan Kon Chi Construction and Dev't Corp, 9,833,919.54 03-Dec-19 16-Dec-19 Areas, Port of Cagayan de Oro Rewiring of Shore Based Power Supply Port of Benoni, Camiguin Lions Covergence Construction and Development 2,812,106.27 03-Dec-19 09-Dec-19 Repair, Repainting & Replacement of Port Security Lighting Facilities, Port of Balbagon, Camiguin Lions Covergence Construction and Development 2,105,584.07 03-Dec-19 09-Dec-19 Repalcement of Delapidated V-Type and M-Type Ribber Dock Fender at Berth 8-10, Port of Khan Kon Chi Construction and Dev't Corp, 23,090,898.88 03-Dec-19 16-Dec-19 Cagayan de Oro Emergency Repair of Damaged RORO Ramp 3 & 4, Port of , Balingoan, Misamis Oriental ZET Construction 16,221,879.94 08-Oct-19 19-Oct-19 Repair of Passenger terminal Building and Port Facilities, Port of Balbagon, Camiguin Jejor's Construction Corp. 8,486,619.42 08-Oct-19 18-Oct-19 Repair/Replacement of Mast Towers Flood Lighting Luminaires, Port of Cagayan de Oro Khan Kon Chi Construction and Dev't Corp, 25,103,242.32 08-Oct-19 25-Oct-19 Repair of Existing Passenger Terminal Building Comfort Rooms and Amenities, Port of Balingoan, MLS JC Construction Services 991,440.61 02-Sep-19 18-Sep-19 Balingoan, Misamis Oriental Supply, Delivery, Installation/Structured Cabling, Testing and Commissioning of LED Flat Screen Television Sets with Wires and Accessories for the Baseport Cagayan de Oro, Port Management ACE Logic Computer Solutions 2,391,704.00 16-Sep-19 09-Oct-19 Office of Misamis Oriental/Cagayan de Oro Supply and Delivery of Global Positioning System (GPS) Surveying Instrument, Port Management Rainbowgeo Scientific Corp. 1,110,000.00 07-Aug-19 11-Sep-19 Office of Misamis Oriental/Cagayan de Oro Repair/Retrofit a Donated Container Van to become a Temporary Office for the Terminal MLS JC Construction Services 392,658.90 01-Jul-19 17-Jul-19 Management Office, Port of Repair and Repainting of Passenger Holding Area Amenities, Port of Cagayan de Oro Jejor's Construction Corp. 990,777.25 01-Jul-19 17-Jul-19 Repair of Security Fence at the Passenger Terminal Complex, Port of Cagayan de Oro Jejor's Construction Corp. 966,480.00 27-Jun-19 28-Jun-19 PMO NCR North Project Contractor Amount of Project Date of NOA Date of Contract Replacement of Dilapidated Windows, at the VTSD Control Center JAY-DEL Construction 1,796,062.79 17-Dec-19 26-Dec-19 Various Repair Works at Radar Station 2-Corregidor Island, JAY-DEL Construction 1,030,358.00 07-Jan-19 16-Jan-19 PMO NCR South Project Contractor Amount of Project Date of NOA Date of Contract Asphalt overlaying and declogging at 2nd St., South Harbor, Port Area, Manila RCE Global Construction Inc. 3,264,004.26 05-Nov-19 18-Dec-19 Asphalt overlaying at 11th, 13th, 25th and Railroad Sts., South Harbor, Port Area, Manila FEL-GENE Construction 11,501,083.22 28-Dec-18 30-Apr-19 Repair/Improvement of roadway pavement and drainage system at 22nd and 23rd Sts., South R.M. Pajima Builders 14,306,155.61 04-Nov-19 06-Dec-19 Harbor, Port Area Provision of Septic tank for 3rd to 5th floor use of PMO-NCR South, Marsman Bldg. premises RCE Global Construction, Inc. 416,238.37 21-Nov-19 28-Nov-19 Asphalt overlaying at 11th, 13th, 25th and Railroad Sts. South Harbor, Port Area, Manila FEL-GENE Construction 11,501,083.22 28-Dec-18 30-Apr-19 PMO Negros Occidental / Bacolod / Banago Bredco Project Contractor Amount of Project Date of NOA Date of Contract Repair of Secondary Ga, Port of Banago, Bacolod City RJL Construction 417,699 31-Oct-19 08-Nov-19 PMO Northern Luzon Project Conractor Amount of Project Date of NOA Date of Contract

Various Repair Works of Port Facilties Damaged by Typhoon Domeng, Port of Basco, MRBII Construction Corporation 9,450,840.01 10-Dec-19 18-Dec-19

Various Repair and Repainting Works at Visitor's Center Poro, City San Fernando, FPF Construction 4,782,018.85 18-Dec-19 26-Dec-19 Repair of Scoured Portion of Retaining Wall and Various Repair Works of Training Center Facilties, BJED PURA BUILDERS, INC 7,233,525.74 18-Dec-19 26-Dec-19 Poro, San Fernando City, La Union Construction of Infinity Pool and Additional Rooms of Visitors Center Bldg. at PPATC Compound, JVC Construction and Trading 11,088,273.21 10-Dec-19 20-Dec-19 Poro, San Fernando City, La Union Repair of Waterline, Drainage System & Installation of Canopy Railings at TMO Bldg., Masinloc, J.A. Olivar Engineering Design, Contruction and Supplies 7,484,351.09 21-Oct-19 31-Oct-19 Repair of Port Police Barracks at PPATC Compound, Poro, San Fernando City, La Union BJED PURA BUILDERS, INC 996,564.52 11-Jun-19 20-Jun-19 PMO Palawan Project Contractor Amount of Project Date of NOA Date of Contract Consultancy Services for the Environmental Impact Assessment And/Or Preparation of Environmental Performance Report and Management Plan (EPRMP) requirment for Green Bridge Environmental Consultancy 240,000.00 03-Dec-19 13-Dec-19 Environmental Compliance Certificate (ECC) Applicatiion for the Proposed Puerto Princesa Port Expansion PRoject, Puerto Princesa, Palawan Busuanga Port Development Project, Port of Busuanga, Busuanga, Palawan RCDG Construction Corporation 19,455,603.38 08-Oct-19 14-Oct-19 Various Maintenance of Port Physical Facilities, Port of Cuyo, Cuyo, Palawan Orient Star Constuction, Inc. 6,644,829.15 02-Oct-19 08-Oct-19 Repair of Damaged Pavement, Drainage Cover, R.C. Wharf and Platform Deck/Slab and Jacketing J.C. Piñon Construction Inc. 24,188,427.81 02-Oct-19 08-Oct-19 of Dilapidated Pile Caps, Port of Puerto Princesa, Palawan Procurement of Furniture, Fixtures and Equipment under Annual Equipment Procurement EMCOR Inc. 2,122,780.00 19-Sep-19 26-Sep-19 Program 2019 Consultancy for ECC Application for the Proposed Construction of Causeway, back-up Area and Alterra Geomatics & Construction 199,000.00 14-Jun-19 21-Jun-19 R.C. Wharf with RoRo Ramps, Port of San Fernando, El Nido, Palawan Consultancy for ECC Application for the Proposed Construction of Borac Port Development Alterra Geomatics & Construction 199,000.00 14-Jun-19 21-Jun-19 Project, Port of Borac, Coron, Palawan - Awarded to Alterra Geomatics & Construction

Provision of Modular Passenger Shed, Port of Coron, Coron, Palawan Four M Builders 5,535,666.28 14-Jun-19 21-Jun-19 Proposed Hydrographic and Topographic Survey of Coron Port, Coron, Palawan GE / Consultant 195,000.03 01-Jul-19 01-Jul-19 Proposed Hydrographic and Topographic Survey of El Nido Port, El Nido, Palawan GE / Consultant 194,999.96 14-Jun-19 21-Jun-19 Proposed Hydrographic and Topographic Survey of Port, Culion, Palawan GE / Consultant 195,000.14 14-Jun-19 21-Jun-19 Construction of Causeway, Back-Up Area and RC Wharf with Roro Ramps, Port of San Fernando, Alterra Geomatics & Construction 199,000.00 14-Jun-19 21-Jun-19 El Nido, Palawan Various Maintenance of Port Physical Facilities, Port of El Nido, El Nido, Palawan Orient Star Constuction, Inc. 3,760,995.50 14-Jun-19 21-Jun-19 PMO Panay / Guimaras Project Contractor Amount of Project Date of NOA Date of Contract Supply and Delivery of Freshwater for Baseport-ICPC, Iloilo Fastcraft Terminal, Fort San Pedro and HUC Merchandising 3,292,020.00 14-Feb-19 27-Feb-19 Port of Dumangas for CY 2019 Garbage Collection and Disposal at Baseport, CY 2019 J.S. Layson & Co., Inc. 2,229,560.00 29-Jul-19 30-Jul-19 PMO Socsksargen Project Contractor Amount of Project Date of NOA Date of Contract Retrofitting of Reinforced Piles, Slab and Beams of Bent 1-26, Including Piles of the 11 units EC Structural Composites, Inc. 19,856,593.97 28-Nov-19 26-Dec-19 Breasting, Dolphins, Port of Kalamanisig, Kalamansig, Proposed Repair of Gate Including Guardhouse & Parking Area, Port of Kalamansig, Sultan WCCervantes Builders, Inc. 3,240,145.37 05-Dec-19 Kudarat Re-Blocking of Acces Road Between Berth #9 and Container Yard 4 Including Repair of Electrical WCCervantes Builders, Inc. 5,033,133.20 17-Oct-19 20-Nov-19 Manhole Cover, Port of , Makar Wharf, General Santos City Installation of New Cylindrical Rubber Dock Fender and Accessories at CAL. 000-030 and CAL. 255- 290; and Installation of 18 Units New 50T Mooring Bollard, Port of General Santos, Makar Wharf, A.I. Yu Builders 18,362,529.26 30-Sep-19 16-Nov-19 General Santos City Repair of Damaged Paving Blocks at Container Yard 2 Phase 2, Port of General Santos, Makar WCCervantes Builders, Inc. 27,454,692.37 30-Sep-19 22-Oct-19 Wharf, General Santos City CONSOLIDATED REPAIR AND MAINTENANCE OF PORT PHYSICAL FACILITIES-2019: 1) REPAINTING OF MAIN AND NORTH GATE, REEFER RACKS, WALKWAYSHED INCLUDING GUARDRAILS, ROAD LANE MARKINGS, AND CONCRETE CURBS; 2) REPAIR OF HARBOR OFFICE ; 3) FABRICATION AND INSTALLATION OF GUARDHOUSE NEAR RORO RAMP AND RENOVATION OF OLD SCALEHOUSE; 4) REPAIR OF COMFORT ROOMS AT HARBOR OFFICE; (5) REPAINTING OF FENDER CHAINS AND A.I. Yu Builders 7,615,491.36 15-Aug-19 10-Sep-19 ACCESSORIES AND REPLACEMENT OF SHACKLES; (6) FABRICATION OF MOVABLE FENCE; (7) REPAINTING OF PERIMETER FENCE, BARBED WIRE AND ARM EXTENSION; (8) LANDSCAPING OF OLD HARBOR OFFICE GROUNDS, PORT OF GENERAL SANTOS, MAKAR WHARF, GENERAL SANTOS CITY Proposed Construction of Parking Area, Covered Court, PM's Quarter and Drainage System at ZET Construction 35,128,135.96 07-Jun-19 28-Jun-19 Port Operations Building, Port of General Santos, Makar Wharf, General Santos City

Repair of Concrete Electrical Duct, Curb & Gutter, Re-wiring of Electrical Line, Port of Kalamansig, MICAH Construction and Supply 2,569,836.88 23-Jan-19 23-Feb-19 Sultan Kudarat PMO Surigao Project Contractor Amount of Project Date of NOA Date of Contract

Repair of Dilapidated Roofing and Ceiling at Administrative Building, Port of Surigao, LVRO Construction & Supply 3,519,206.20 30-Oct-19 08-Nov-19

Repair of TMO Building, Gate, Guardhouse & Perimeter Fence, Port of , B3 & R Construction Corp. 14,463,512.68 30-Oct-19 08-Nov-19 Repair of Damaged Back-Up Area, Port of Lawigan, , Surigao del Sur B3 & R Construction Corp. 27,586,255.96 30-Oct-19 08-Nov-19 Repair of Gate No. 5 Along P. Reyes Street, Port of Surigao, Surigao City B3 & R Construction Corp. 7,814,612.47 18-Sep-19 02-Oct-19 Repair of Back-up Area at New Expansion Project, Port of Surigao, Surigao City ALGAMON Construction 26,514,804.31 18-Sep-19 01-Oct-19 PMO Zamboanga Project Contractor Amount of Project Date of NOA Date of Contract Repair/Replacement of Roofing System at Equipment Shed Building including Repainting Works, ZET Construction 3,946,986.19 20-Dec-19 26-Dec-19 , Repair of Damaged Riprap, Stair Landing & Concrete Reblocking Port of Ipil, TMO Zamboanga ZET Construction 9,295,549.42 20-Dec-19 26-Dec-19 Sibugay Repair/Replacement of Damaged R.C. Curb and Curtain Wall Including Fendering and Mooring MCLL Highway, Corner C. Ferrer Drive 27,529,393.67 16-Dec-19 20-Dec-19 System, Port of , TMO- One (1) Lot Supply and Delivery of Twenty Five (25) Units, Air Conditioning Unita (ACUs), Window REC Cooling Services 1,575 07-Oct-19 15-Nov-19 Type with Inverter and Remote Control for PPA, PMO-Zamboanga, Zamboanga Repair of Damaged Paving Blocks Pavement at Container Marshalling Yard (CMY) and Concrete RR & B Finest Contruction & Development Corp. 28,347,873.43 22-Oct-19 28-Oct-19 Box Culvert, Port of Zamboanga, Zamboanga City One (1) Lot Supply and Delivery of Purified Drinking Water for PPA, PMO-Zamboanga from April 1 Oceanah Waters Refilling Station 120,900.00 15-Mar-19 23-Apr-19 to December 31, 2019 One (1) Lot Supply of Labor and Materials for the Provision of various services such as photocopy, blue, white and colored print, binding, duplo, auto cad printing/cad plotting, Copier Solutions Specialist 311,175.00 13-Mar-19 23-Apr-19 tarpaulin and stickers printing and lamination of signages for PPA, PMO-Zamboanga from April 1 to December 31, 2019 Repair and Improvement of Steel Matting and Steel Barriers, Port of Zamboanga, Zamboanga ZET Construction 8,120,453.51 03-Jan-19 10-Jan-19 City PMO Zamboanga Del Norte Project Contractor Amount of Project Date of NOA Date of Contract Supply, Delivery and Installation of Seventeen (17) ACU and Six (6) Air Curtain Units at the Port of Lovely Bazar 1,643,350.00 13-Sep-19 13-Sep-19 and Port of Sindangan.