company profile

company profile

i PT Berkat Manunggal Energi

ii company profile

Table of Contents

Introductions 3 Experiences 5

Overview Warehouse Millennium 29 Overview Techno Panel 30 Overview BMGS Series 31 Overview MGS Series 32 Overview KU Series 33 After Sales Suport Service 34 The Organization Chart 35 Reference List 36 The Official Supporting Document 51

The Reference Letter 52

1 PT Berkat Manunggal Energi

PT Berkat Manunggal Energi

2 company profile

Introduction

PT Berkat Manunggal Energi (PT BME) was estabilished in the beginning of year 2000 with the line of business is in the power generation supplies plus full project planning, instalation work, testing commisioning and operation maintenance services.

We are focusing to enhance the generating set market with our own Mitsubishi Diesel Generator Set for all sectors such as: Building Services, Industries, Petroleum, Mining, Agriculture, Fishery, Power Plant and Teleco munication sectors.

3 PT Berkat Manunggal Energi

Building Services Industries

Petroleum Mining

Agriculture Fishery

Power Plant Telecommunication 4 company profile

Experiences

We have significant experiences of managing the Electrical Power Project especially for supplying and installing the Diesel Generating Set in . This Experience is made available to you to through our project management teams. Our Project engineers and manager will work alongside with your team to specify and select the most suitable and reliable capacity of power generator set you needs. At every each phase of the project, we will work closely with you to ensure the succesfulland timely completion of the project.

5 PT Berkat Manunggal Energi

Experiences

Bakrie Tower Rasuna Epicentrum Central Park Mall & Soho - Podomoro City 9 X 1920 KVA 2 X 1800 KVA, 2 X 1125 KVA, 7 X 2000 KVA

6 company profile

Experiences

Menara Prima - Mega Kuningan Menara Palma - Rasuna Said 3 X 1300 KVA 2 X 2000 KVA

7 PT Berkat Manunggal Energi

Experiences

Grand Indonesia The Energy Building 6 X 2000 KVA 4 X 2000 KVA

8 company profile

Experiences

Ciputra World Gudang Garam Tower 14 X 2030 KVA, 2 X 1362 KVA 2 x 2030 KVA, 1 x 1800 KVA

9 PT Berkat Manunggal Energi

Experiences

Kuningan city - 6 x 1800 KVA, 6 x 2030 KVA, 1 x 680 KVA

Green Bay Pluit Tahap II Mall, Hotel & Condominium 5 X 2000 KVA, 1 X 1125 KVA, 3 X 1600 KVA

10 company profile

Experiences

Allianz Tower - Kuningan Bursa Efek Indonesia - Sudirman 3 X 1125 KVA 2 X 2020 KVA

11 PT Berkat Manunggal Energi

Experiences

Tempo Scan Tower Residence 8 @ Senopati 3 X 2030 KVA 3 X 2030 KVA

12 company profile

Experiences

Hotel JS Luwansa - 2 X 1250 KVA

13 PT Berkat Manunggal Energi

Experiences

Dipo Business Center 2 X 1362.5 KVA

14 company profile

Experiences

The Pakubuwono Signature - 3 X 1362.5 KVA The Pakubuwono House - 2 X 1450 KVA

15 PT Berkat Manunggal Energi

Experiences

Bintaro Lifestyle Center 4 x 2030 KVA

Sepinggan International Airport - Balikpapan 5 X 2030 KVA

16 company profile

Experiences

Sultan Hasanuddin International Airport - 2 X 2000 KVa, 1 X 680 KVA

Juanda International Airport - 5 x 1740 KVA, 4 x 2030 KVA

17 PT Berkat Manunggal Energi

Experiences

PLTD Pare-Pare Sulawesi Selatan 10 X 1740 KVA

18 company profile

Experiences

South Quarter 1 x MGS 1000 B, 2 x MGS 1400 B, 3 x MGS 2000 B

19 PT Berkat Manunggal Energi

Experiences

Sudirman Office 7.8, Podomoro City Deli, 3 x 2015 KVA 2 x 885 KVA, 7 x 1450 KVA, 12 x 2015 KVA

The Elements Apartment Lot 16 - Kuningan, Jakarta 2 x 2015 KVA 20 company profile

Experiences

Sopo Del Office Tower + Lifestyle & Hotel, Jakarta 3 x 1450 KVA, 4 x 2015 KVA

Pantai Indah Kapuk Mall & Hotel, Jakarta 3 x 1125 KVA, 4 x 1600 KVA Pantai Indah Kapuk Office, Jakarta 21 4 x 2015 KVA PT Berkat Manunggal Energi

Experiences

Marvell City Surabaya 2 x 1362,5 KVA, 2 x 1450 KVA, 3 x 1800 KVA

Sampoerna Strategic Square, Jakarta 4 x 2000 KVA

22 company profile

Experiences

SOHO @ Podomoro City, Jakarta Gama Tower, Jakarta 3 x 1800 KVA, 7 x 2030 KVA 6 x 2015 KVA

Nipah Mall, Makassar 23 5 x 2015 KVA PT Berkat Manunggal Energi

Experiences

BAKRIE TOWER - 5 x 1920 KVA

EMPORIUM PLUIT MALL - 2 x 2030 KVA

GRAND INDONESIA (I) - 1 x 1920 KVA + 3 x 2020 KVA

24 company profile

Experiences

LIFESTYLE - 3 x 1920 KVA

TANGerang CITY - 1 x 375 KVA + 4 x 2030 KVA

TEMPO SCAN TOWER - 3 x 2030 KVA

25 PT Berkat Manunggal Energi

Experiences

BTPN TOWER - 5 x 2015 KVA

PALMA TOWER - 2 x 2015 KVA

GAMA TOWER - 6 x 2015 KVA

26 company profile

Experiences

Distric-8 @ SCBD Senopati, Jakarta 9 x 2015 KVA, 5 x 2250 KVA

27 PT Berkat Manunggal Energi

Experiences

Kimia Farma, 2 x 2000 KVA

Jumeirah Resort, Bali 3 x 1362,5 KVA

Menteng Park - Cikini, Jakarta 2 x 2015 KVA 28 company profile

Overview Warehouse Millennium

29 PT Berkat Manunggal Energi

Overview Techno Panel

Proses Produksi Workshop

Simulasi Test System and Setting Module Control

Torsi Busbar Line

Panel AM/ATS Kapasitas 1000 KVA

Koneksi Busbar Line

Panel Synchron Base Load PLN Generator Control Panel Synchron with Kapasitas 1 X 1740 KVA PLN Kapasitas 3 X 2000 KVA 30 company profile

Overview BMGS Series

BMGS-55 Open Type (S4K-T) BMGS- 30 Silent Type (S4K) Cap: 55kVA Prime (50Hz-1500 rpm) Cap: 30 KVA Prime (50Hz-1500rpm)

Diesel Pump Mobile Genset - Small Capacity

BMGS-770 Open Type (S6R2-PTAA) BMGS-1740 Open Type (S16R2-PTA) Cap: 770 KVA Prime (50Hz-1500rpm) Cap: 1740 KVA Prime/1560 KVA Continous (50Hz-1500rpm)

BMGS-6U2 Open Type (S6U2-PTK) BMGS-16U Open Type (S16U-PTK) Cap: 1500 kVA Continous (50Hz- Cap: 4100 kVA Prime (50Hz-1000rpm) 31 1000rpm) PT Berkat Manunggal Energi

Overview MGS Series

MGS-1000-B (S12H-PTA-S) MGS-1200 B (S12R-PTA-S) Cap: 1250 KVA Standby (50Hz-1500rpm) Cap: 1500 KVA Standby (50Hz-1500rpm)

MGS-1500-B (S16R-PTA-S) MGS-2000 B/C (S16R-PTA2-S) Cap: 2000 KVA Standby (50Hz-1500rpm) Cap: 2030 KVA Prime (50Hz-1500rpm)

MGS-2500-B/C (S16R-PTAA2-S) MOG-Series Cap: 2035 KVA Prime (50Hz-1500rpm) For Oil & Gas Aplication

32 company profile

Overview KU Series

18 MACH II- SI - Gas Engine 5750 kW. 50Hz, 750 rpm

33 PT Berkat Manunggal Energi

After Sales Support Services

Our centralized qualified

engineers and technicians

provide the comprehensive

technical advice and

assistance to our field

mechanics for operation and maintenance works.

34 company profile

The Organization Chart

PT Berkat Manunggal Energi

Board of Director

Secretary

Finance & Accounting Engineering Manager Sales Manager technical manager

Project & technical Sales EngineErs Engineering

Accounting Finance Administration

35 PT Berkat Manunggal Energi

Reference List

NO PROJECT NAME / END USER CAPACITY PROJECT STATUS 1 PT. Pupuk Sriwijaya - Palembang 1 x 2000 KVA Finished 1999 2 PCI - 1 x 500 KVA Finished 1999 3 Jomblang Mall - Semarang 4 x 1000 KVA Finished 2000 4 PT. Jarum Kudus - Kudus 2 x 1500 KVA Finished 2000 5 PT. Indomiwon Citra Inti Lampung 2 x 2000 KVA Finished 2000 1 x 600 KVA Finished 2000 6 Mustika Agro Sari - Jakarta 1 x 400 KVA Finished 2000 7 Trans TV - Jakarta 2 x 1000 KVA Finished 2000 8 PT. Sinar Sosro - Bekasi 2 x 600 KVA Finished 2000 9 Puri Agung - Jakarta 2 x 500 KVA Finished 2001 PT. (PERSERO) Angkasa Pura I 10 1 x 1000 KVA Finished 2001 (Lombok Airport) - Lombok 11 Arcadia Tower - Jakarta 1 x 500 KVA Finished 2001 12 PT. Siemens Indonesia - Bandung 1 x 500 KVA Finished 2001 13 PLN Wilayah Bali - Kupang Area 9 x 1000 KVA Finished 2001 14 PLN Wilayah Bali - Sumbawa Area 6 x 2000 KVA Finished 2001 15 PLN Wilayah Bali - Lombok Area 5 x 1500 KVA Finished 2001 16 Kantor Walikota Batam 1 x 500 KVA Finished 2001 17 PLN Wilayah Kalbar 2 x 1000 KVA Finished 2001 18 PT. Bella Prima - Jakarta 2 x 1000 KVA Finished 2001 19 Davinci Tower 2 x 1500 KVA Finished 2002 20 PT. Starmas - Jakarta 9 x 1000 KVA Finished 2002 21 PT. Lautan Luas - Tangerang 1 x 1000 KVA Finished 2002 22 Pemda Balikpapan - Batakan 8 x 2000 KVA Finished 2002 23 Club Store Medan 1 x 800 KVA Finished 2002 24 Pemda Kutai 9 x 2000 KVA Finished 2002 2 x 2000 KVA Finished 2003 25 Kelapa Gading Trade Center 2 x 1000 KVA Finished 2003 2 x 300 KVA Finished 2003 26 Pemda Kutai Kertanegara 9 x 2000 KVA Finished 2003 27 Conrad Bali Resort - Bali 3 x 1000 KVA Finished 2003 28 PT. Pupuk Sriwijaya - Palembang 1 x 1000 KVA Finished 2003 29 Cihampelas Walk - Bandung 2 x 1000 KVA Finished 2004 30 Metro Tanah Abang - Jakarta 3 x 1735 KVA Finished 2004 31 Graha Auto Centre - Jakarta 1 x 1500 KVA Finished 2004 32 Medan Fair - Medan 5 x 2000 KVA Finished 2004 33 PT. Growth Asia - Medan 2 x 1735 KVA Finished 2004 34 Hon Lin Co - Taiwan 2 x 1920 KVA Finished 2004

36 company profile

Reference List

NO PROJECT NAME / END USER CAPACITY PROJECT STATUS 35 Hop Sing Pty. Ltd - Hongkong 1 x 2000 KVA Finished 2004 2 x 2000 KVA Finished 2004 36 Aska International - China 4 x 1735 KVA Finished 2004 37 RS. Gading Pluit 2 x 1000 KVA Finished 2004 38 Hop Sing Pty. Ltd - Hongkong 2 x 2000 KVA Finished 2004 39 PT. Timah Tbk (Pulau Kundur) 1 x 1735 KVA Finished 2004 40 Puri Karnos 1 x 375 KVA Finished 2004 41 Telkom - Bandung 1 x 1500 KVA Finished 2004 42 PLN Papua 7 x 1735 KVA Finished 2004 43 Batam Expo 2 x 1300 KVA Finished 2005 44 Darmo Trade Centre - Surabaya 2 x 1735 KVA Finished 2005 45 Belagio Apartment 2 x 2000 KVA Finished 2005 2 x 1280 KVA Finished 2005 46 Solo Grand Mall - Solo 1 x 1000 KVA Finished 2005 47 Dhanarmas Textile - Bandung 2 x 1735 KVA Finished 2005 48 Pamanukan Mall - Cirebon 1 x 1250 KVA Finished 2005 49 Gedung MPR/DPR 1 x 2000 KVA Finished 2005 50 Batam City Square 3 x 1735 KVA Finished 2005 51 Pasar Tanah Abang Blok A 6 x 2000 KVA Finished 2005 52 RS. Cahya Kawaluyan - Bandung 2 x 1000 KVA Finished 2005 53 Senayan Residence 2 x 2000 KVA Finished 2005 54 Poins Square 3 x 1735 KVA Finished 2005 2 x 1280 KVA Finished 2005 55 Panakkukang Square - Makassar 2 x 1735 KVA Finished 2005 56 Mega Glodok Kemayoran 4 x 2000 KVA Finished 2005 57 Ambarukmo Mall 4 x 2000 KVA Finished 2005 58 ITC Depok 2 x 2000 KVA Finished 2005 59 PT. Timah Tbk (Pulau Bangka) 2 x 1500 KVA Finished 2005 60 PT. Indonesia Nippon Seiki 2 x 770 KVA Finished 2005 61 Restaurant Angke 2 x 500 KVA Finished 2005 62 Senayan Annex 1 x 1000 KVA Finished 2005 63 Bvlgary Resort 2 x 770 KVA Finished 2005 64 Plaza Cibubur 2 x 770 KVA Finished 2005 65 Boulevard Square - Manado 2 x 2000 KVA Finished 2006 66 Telehouse Engineering 40 x 10 KVA Finished 2006 67 Palembang Indah Mall 3 x 1250 KVA Finished 2006 2 x 1735 KVA Finished 2006 68 Sentra Grosir Cikarang 1 x 1000 KVA Finished 2006 69 DIKTI - Sudirman 1 x 2100 KVA Finished 2006

37 PT Berkat Manunggal Energi

Reference List

NO PROJECT NAME / END USER CAPACITY PROJECT STATUS 70 Lemigas Cileduk 1 x 500 KVA Finished 2006 71 Lemigas Cileduk 1 x 770 KVA Finished 2007 72 Permata Kuningan 2 x 1500 KVA Finished 2007 73 Menara Prima 3 x 1300 KVA Finished 2007 74 Matahari Cito Waru 2 x 770 KVA Finished 2007 75 Rekayasa Industri 1 x 1250 KVA Finished 2007 1 x 500 KVA Finished 2007 76 Excedy Pulo Gadung 1 x 420 KVA Finished 2007 77 PT. Mitra Hutama Mandiri 1 x 260 KVA Finished 2007 78 RS. Omni Alam Sutera - Serpong 3 x 1050 KVA Finished 2007 79 Angkasapura I - Makassar 2 x 2000 KVA Finished 2008 80 Matahari Binjai - Medan 2 x 770 KVA Finished 2008 2 x 750 KVA Finished 2008 81 Hampton’s Park Apartment 1 x 420 KVA Finished 2008 82 Bakrie Tower Rasuna Epicentrum 5 x 1920 KVA Finished 2008 83 Bakrie Lifestyle Rasuna Epicetrum 3 x 1920 KVA Finished 2008 84 Excel Metal Industry 1 x 2000 KVA Finished 2008 85 Arcadia Office Park 2 x 1450 KVA Finished 2008 86 Graha Energi 4 x 2000 KVA Finished 2008 87 RS. Dr. Soetomo 1 x 1500 KVA Finished 2008 88 Bandar Udara Hang Nadim 2 x 770 KVA Finished 2008 89 New Kuta Condotel 1 x 1125 KVA Finished 2008 90 RS. Yadika 4 x 600 KVA Finished 2008 91 Hotel Formule - 1 Cikini 1 x 1125 KVA Finished 2008 92 Giant Taman Yasmin Bogor 2 x 770 KVA Finished 2008 93 PT. Margonda Jaya Raya 1 x 500 KVA Finished 2008 94 Menara Palma 2 x 2000 KVA Finished 2009 2 x 1300 KVA Finished 2009 95 Plaza Balikpapan 2 x 1000 KVA Finished 2009 96 Hypermart Mall Bali Galeria 2 x 600 KVA Finished 2009 97 Bvlgary Residences 2 x 500 KVA Finished 2009 98 Bidakara 3 x 1500 KVA Finished 2009 99 PT. Ratu Sayang International 3 x 1050 KVA Finished 2009 100 Singa Gas Project - IKPT 1 x 1250 KVA Finished 2009 101 PT. Toyota Motor Manufacturing Indonesia 1 x 1362,5 KVA Finished 2009 102 Bursa Efek Jakarta 2 x 2020 KVA Finished 2009 103 Shell Project - Gresik 1 x 680 KVA Finished 2009 104 Union Sampoerna 1 x 460 KVA Finished 2009 105 Carrefour Serang 1 x 770 KVA Finished 2009 106 Carrefour Medan 1 x 770 KVA Finished 2009

38 company profile

Reference List

NO PROJECT NAME / END USER CAPACITY PROJECT STATUS 107 Carrefour Karawang 1 x 460 KVA Finished 2009 108 Meiji Indonesia 1 x 1055 KVA Finished 2009 109 RS. Siloam Jakarta 2 x 2000 KVA Finished 2009 110 TVRI - Jakarta 1 x 680 KVA Finished 2009 111 Gem’s Center - Jakarta 1 x 1055 KVA Finished 2009 1 x 1920 KVA Finished 2009 112 Grand Indonesia 3 x 2020 KVA Finished 2009 113 Paris Van Java 2 x 2000 KVA Finished 2009 114 PT. Nipsea Paint & Chemicals 2 x 1050 KVA Finished 2010 3 x 2000 KVA Finished 2010 115 The Groove - Bakrie 1 x 1920 KVA Finished 2010 1 x 1740KVA Finished 2010 116 RS. Tropis Unair 2 x 1450 KVA Finished 2010 117 Banyan Tree Resort 2 x 1250 KVA Finished 2010 Cibaliung Sumber Daya - PT. Cemara 118 3 x 1390 KVA Finished 2010 Siko Engineering 119 Fakultas Kedokteran UIN - Ciputat 1 x 500 KVA Finished 2010 1 x 1000 KVA Finished 2010 120 Bandar Udara Int’l Lombok 2 x 2000 KVA Finished 2010 121 Juanda Airport - Surabaya 1 x 1740KVA Finished 2010 122 Gedung Satu Atap Mahkamah Agung RI 2 x 1300 KVA Finished 2010 123 PT. Antar Mitra Sembada 1 x 600 KVA Finished 2010 124 PLTD Selat Panjang 4 x 1740 KVA Finished 2010 1 x 1740 KVA Finished 2010 125 PLTD Tembilahan 3 x 1735 KVA Finished 2010 2 x 1740 KVA Finished 2010 126 PLTD Rengat 4 x 1735 KVA Finished 2010 1 x 1050 KVA Finished 2010 127 Museum Bank Indonesia 1 x 500 KVA Finished 2010 128 Industri Perikanan Sukadana 3 x 300 KVA Finished 2011 129 Harco Mangga Dua 1 x 1740 KVA Finished 2011 130 Prudential Tower 1 x 680 KVA Finished 2011 131 PT. Adhimix Precast Indonesia 9 x 250 KVA Finished 2011 132 PT. Prakarsa Alam Segar - Wings Group 1 x 1740 KVA Finished 2011 133 Budha Tzu Chi 3 x 1450 KVA Finished 2011 134 Cigading Int’l Bulk Terminal 2 x 1300 KVA Finished 2011 135 Dharmawangsa Residence 1 x 2030 KVA Finished 2011 136 Cibaliung SumberDaya - PT. Mesindo Tekninesia 1 x 1740 KVA Finished 2011 137 Politeknik Ilmu Pelayaran Semarang 1 x 680 KVA Finished 2011 138 PT. Citra Sarana Sejahtera 2 x 680 KVA Finished 2011

39 PT Berkat Manunggal Energi

Reference List

NO PROJECT NAME / END USER CAPACITY PROJECT STATUS 139 Sports Center Bekasi 1 x 195 KVA Finished 2011 140 RS. Udayana Bali 1 x 680 KVA Finished 2011 141 PD Pasar Djaya Koja 1 x 195 KVA Finished 2011 142 Inoac Project - Shimizu Corp. 2 x 1050 KVA Finished 2011 143 Sari Ater Hot Spring Resorts 1 x 260 KVA Finished 2011 144 PT. Excel Metal Industry 1 x 2020 KVA Finished 2011 145 PT. Yamatogawa Indonesia 1 x 680 KVA Finished 2011 146 PT. Tempo Nagadi 1 x 500 KVA Finished 2011 147 Muara Tawar - Jakarta 1 x 680 KVA Finished 2011 148 Meratus Jaya Iron & Steel 1 x 1500 KVA Finished 2011 149 PT. Imora Honda Motor 1 x 1050 KVA Finished 2011 150 Carrefour Pasuruan 1 x 500 KVA Finished 2011 151 PLTD Pare - Pare 10 x 1740 KVA Finished 2011 152 PLTD Loepana 22 x 1740 KVA Finished 2011 153 PT. Adhimix Precast Indonesia 3 x 250 KVA Finished 2011 154 Atrium Senen Jakarta 1 x 1920 KVA Finished 2011 155 Multi Jaya Supermarket - Jayapura 1 x 1550 KVA Finished 2011 156 PLTD Kahayan 22 x 1740 KVA Finished 2011 157 PLTD Ampenan 11 x 1740 KVA Finished 2011 158 Allianz Tower 3 x 1125 KVA Finished 2011 159 Coal Boiler Plant - IKPT 1 x 1500 KVA Finished 2011 4 x 2030 KVA Finished 2011 160 Tangerang City Mall 1 x 375 KVA Finished 2011 161 Tempo Scan Tower 3 x 2030 KVA Finished 2012 162 Hotel Harris Batam 2 x 500 KVA Finished 2012 163 Kampus UMN Serpong 1 x 1450 KVA Finished 2012 164 Central Park 1 x 1800 KVA Finished 2012 6 x 1800 KVA Finished 2012 165 6 x 2030 KVA Finished 2012 1 x 680 KVA Finished 2012 166 Hotel Mercure - TB. Simatupang, Jakarta 1 x 1450 KVA Finished 2012 167 MMC Tower - Jakarta 3 x 1500 KVA Finished 2012 2 x 1450 KVA Finished 2012 168 Solo Paragon Mall 1 x 1125 KVA Finished 2012 169 Central Park Apartement 1 x 1800 KVA Finished 2012 170 Central Park Hotel 2 x 1125 KVA Finished 2012 171 Emporium Pluit Mall 2 x 2030 KVA Finished 2012 1 x 600 KVA Finished 2012 172 Kejaksaan Republik Indonesia 3 x 1362,5 KVA Finished 2012 173 PT. Indocement Tunggal Prakarsa, Tbk 1 x 1250 KVA Finished 2012

40 company profile

Reference List

NO PROJECT NAME / END USER CAPACITY PROJECT STATUS 174 Apartement Nagoya Mansion Batam 2 x 680 KVA Finished 2012 175 Residence 8 @ Senopati 3 x 2030 KVA Finished 2012 176 Montigo Resorts Batam 2 x 1300 KVA Finished 2012 177 Cipinang Indah Mall 2 x 1450 KVA Finished 2012 178 BAKORSUTANAL - PT. Focustama Sentralindo 1 x 500 KVA Finished 2012

Cibaliung Sumber Daya - PT. Smara 1 x 1735 KVA Finished 2012 179 Reditan Indonesia Finished 2012 180 Hotel Emersia Lampung 1 x 770 KVA Finished 2012 Cibaliung Sumber Daya - PT. Cibaliung 181 1 x 1735 KVA Finished 2012 Sumber Daya 182 Bvlgari Residence - Bali 2 x 500 KVA Finished 2012 183 Plaza Cibubur 3 1 x 1300 KVA Finished 2012 184 Matahari MDS Cimanggis 1 x 680 KVA Finished 2012 185 PT. Lestari Alam Segar (Wings Group) 1 x 1050 KVA Finished 2012 186 Matahari MDS Kendari 1 x 1050 KVA Finished 2012 187 Matahari MDS Gresik 1 x 680 KVA Finished 2012 188 PT. Pakoakuina 3 x 1750 KVA Finished 2012 189 PT. Tirta Alam Segar (Wings Group) 1 x 1050 KVA Finished 2012 190 PLTD Tanjung Batu - Mahakam 10 x 1735 KVA Finished 2012 191 Bandar Udara Adi Sucipto - Jogja 1 x 2030 KVA Finished 2012 192 PT. Excel Metal Industry 2 x 2020 KVA Finished 2013 193 Bandar Udara Sam Ratulangi - Manado 1 x 2030 KVA Finished 2013 194 Bandar Udara Syamsudin Noor - Banjarmasin 1 x 2030 KVA Finished 2013 195 Bandar Udara Sepinggan Balikpapan 5 x 2030 KVA Finished 2013 2 x 2030 KVA 196 Gudang Garam Tower Finished 2013 1 x 1800 KVA 197 Hotel J.S. Luwansa 2 x 1250 KVA Finished 2013 198 Kelapa Gading Mixed Square - MOI 3 x 2020 KVA Finished 2013 1 x 1050 KVA 199 Menara Prima 2 Finished 2013 2 x 1300 KVA

200 PT. Karunia Alam Segar (Wings Group) 3 x 1050 KVA Finished 2013 Hartomo Mall Solo - PT. Delta Merlin Dunia 201 3 x 2030 KVA Finished 2013 Propertindo 202 PT. Prima Plastic Internusa 1 x 770 KVA Finished 2013 203 PT. Yamasoji Indonesia 1 x 500 KVA Finished 2013 204 PT. Cometacan 1 x 680 KVA Finished 2013 205 Grand Indonesia 2 x 2020 KVA Finished 2013 206 Apartment Tower IA & IB - 4 x 1000 KVA Finished 2013 207 Ciputra Dipo Business Center 2 x 1362,5 KVA Finished 2013 208 Ritz Carlton Sawangan Resorts Bali 4 x 1740 KVA Finished 2013

41 PT Berkat Manunggal Energi

Reference List

NO PROJECT NAME / END USER CAPACITY PROJECT STATUS 2 x 500 KVA 209 PT. Wisma Nusantara International Finished 2013 1 x 2030 KVA 210 Pasar Metro Atom - Jakarta 2 x 770 KVA Finished 2013 211 Kawasaki Factory Cibitung 1 x 375 KVA Finished 2013 212 The Pakubuwono Signature 3 x 1362,5 KVA Finished 2013 213 The Pakubuwono House 2 x 1450 KVA Finished 2013 214 Antam Office Park 2 x 1450 KVA Finished 2013 215 Bintaro Lifestyle Center 4 x 2030 KVA Finished 2013 1 x 1125 KVA 216 Green Bay Pluit Tahap II - Mall Finished 2013 5 x 2030 KVA 217 Bandar Udara Mahmud Badarudin II - Palembang 1 x 1000 KVA Finished 2013 218 The Mansion@Dukuh Golf Kemayoran 3 x 1800 KVA Finished 2013 219 Kantor Pusat Angkasa Pura I 1 x 1000 KVA Finished 2013 220 PT. Hamson Indonesia 1 x 1400 KVA Finished 2013 221 HPPM CVT BELT Factory - JO. Shimizu -BCK 1 x 1800 KVA Finished 2013 222 Bandar Udara Internasional Juanda Tahap II 4 x 2030 KVA Finished 2014 223 PT. Denki Engineering (Morimo Apartement) 1 x 800 KVA Finished 2014 224 Pelindo Banjarmasin - PT. Borneo Maju Jaya 2 x 2020 KVA Finished 2014 225 Bandar Udara Samarinda Baru 2 x 2015 KVA Finished 2014 14 x 2030 KVA 226 Ciputra World - Jakarta Finished 2014 2 x 1362,5 KVA 227 Gedung TBS Ferrari 1 x 2015 KVA Finished 2014 228 Green Bay Pluit Tahap II - Hotel 1 x 1600 KVA Finished 2014 229 Green Bay Pluit Tahap II - Condominium 2 x 1600 KVA Finished 2014 230 Office Mabua Harley Davidson 2 x 450 KVA Finished 2014 231 Rumah Susun Cengkareng 2 x 885 KVA Finished 2014 232 The Convergence Indonesia 3 x 1740 KVA Finished 2014 Pompa Banjir Pluit - PT. Torishima Guna 233 1 x 1740 KVA Finished 2014 Engineering 234 Palma Tower 2 x 2015 KVA Finished 2014 235 The Providence Park Apartment 2 x 1362,5 KVA Finished 2014 236 PT. Mitsuba Indonesia 1 x 2500 KVA Finished 2014 237 Cipinang Indah Mall Extension 1 x 1500 KVA Finished 2014 238 Pertamina Makassar 1 x 800 KVA Finished 2014 239 Kempinski Hotel Nusa Dua Bali 3 x 2000 KVA Finished 2014 240 Cinere Bellevue Suites 3 x 1800 KVA Finished 2014 241 PT. Tirta Alam Segar (Wings Group) 2 x 1050 KVA Finished 2014 242 PT. Karya Indah Alam Sejahtera (Wings Group) 1 x 1800 KVA Finished 2014 243 Plaza Balikpapan 1 x 1130 KVA Finished 2014 244 PLTG Tanjung Uncang Batam 1 x 1125 KVA Finished 2014 245 PT. Cibaliung Sumberdaya 1 x 1550 KVA Finished 2014 42 company profile

Reference List

NO PROJECT NAME / END USER CAPACITY PROJECT STATUS 246 PT. Envitech Perkasa 1 x 1500 KVA Finished 2014 247 Dewi Air Restaurant 1 x 885 KVA Finished 2014 248 PT. Asama Indonesia 1 x 770 KVA Finished 2014 249 HPPM CVT BELT Factory Phase 2 1 x 1450 KVA Finished 2014 250 PT. Kingsland International 1 x 680 KVA Finished 2014 251 Menara Selaras Semanggi 4 x 2030 KVA Finished 2014 252 Telkom Landmark Tower 5 x 2030 KVA Finished 2014 253 Sky Garden Apartment 3 x 1125 KVA Finished 2014 254 Jakarta Box Tower 3 x 1450 KVA Finished 2014 1 x 800 KVA 255 Paragon Square Tangerang Finished 2014 2 x 1450 KVA 256 Indika Energy Headquarters - Jakarta 3 x 1800 KVA Finished 2014 257 Ballroom Hotel Tentrem - Yogyakarta 1 x 1000 KVA Finished 2014 258 PT. Asahi Indofood Beverage Makmur - Pepsi 1 x 1735 KVA Finished 2014 259 PT. Adyabuana Persada 2 x 1050 KVA Finished 2014 260 PT. Polari Limunusa Inti 1 x 1450 KVA Finished 2014 261 PT. Evonik Sumi Asih 1 x 680 KVA Finished 2014 262 Panakkukang Mall - Makassar 1 x 2020 KVA Finished 2014 263 Menara Danamon Jakarta 2 x 1500 KVA Finished 2014 264 PT. Wahana Idea Cipta 2 x 1740 KVA Finished 2014 265 Sami Jepara New Factory 2 x 800 KVA Finished 2014 266 RS. Sanbe Prakasa Husada 2 x 2030 KVA Finished 2014 267 New Greenfield Brewery Ungaran - Orang Tua 2 x 2015 KVA Finished 2014 268 PT. QL Agro Food 1 x 1450 KVA Finished 2014 1 x 680 KVA 269 PT. Taikisha Indonesia Engineering Finished 2015 1 x 1450 KVA 1 x 1125 KVA 270 South Quarter 2 x 1450 KVA Finished 2015 3 x 2015 KVA 271 Gama Tower Jakarta (Rasuna Tower) 6 x 2015 KVA Finished 2015 272 International Financial Centre Tower II 4 x 2015 KVA Finished 2015 273 Puncak Bukit Golf Surabaya 1 x 1050 KVA Finished 2015 1 x 800 KVA 274 Mayora Head Office Jakarta Finished 2015 2 x 1800 KVA 3 x 1050 KVA 275 Ciputra World 2 Jakarta - Phase 1 Finished 2015 3 x 1300 KVA 276 Pusri II B - PT. Rekayasa Industri 1 x 2000 KVA Finished 2015 277 Lumina Jaya Lestari Factory 1 x 1500 KVA Finished 2015 278 CV. Riotech Mandiri 3 x 1300 KVA Finished 2015

43 PT Berkat Manunggal Energi

Reference List

NO PROJECT NAME / END USER CAPACITY PROJECT STATUS 279 PT. Delta Pasific Indotuna 1 x 1050 KVA Finished 2015 280 PT. Cocotama Makmur Abadi - Pontianak 1 x 1050 KVA Finished 2015 3 x 1800 KVA 281 SOHO @ Podomoro City Finished 2015 7 x 2030 KVA 282 Izzara - GTU Simatupang Mixed Use 3 x 1450 KVA Finished 2015 1 x 600 KVA 283 MNC News Centre Kebon Sirih Finished 2015 3 x 1810 KVA 1 x 1362,5 KVA 284 G3TV Kebon Jeruk Finished 2015 5 x 2250 KVA 285 Pancoran Riverside Apartment 1 x 1450 KVA Finished 2015 286 Ciputra World 2 Jakarta - Phase 2 Office 3 x 2015 KVA Finished 2015 1 x 30 KVA 287 University Hospital UI Finished 2015 3 x 2000 KVA 288 Mangga Dua Square 2 x 2030 KVA Finished 2015 289 Gedung Arsip Data Elektronik Mandiri Rempoa 3 x 1500 KVA Finished 2015 290 STG & Boiler Batubara - PT. Rekayasa Industri 1 x 2000 KVA Finished 2015 291 Non Crucible ESF IV Antam Pomalaa - Sulteng 1 x 1875 KVA Finished 2015 292 Pertamina Donggi Gas Production Facilities 1 x 1287,5 KVA Finished 2015 293 Mercure Hotel Mega Glodok Kemayoran 2 x 2015 KVA Finished 2015 2 x 1287,5 KVA 294 Gedung Diklat BCA Sentul Finished 2015 2 x 1362,5 KVA 295 RS. Telogorejo Semarang 1 x 1500 KVA Finished 2015 1 x 260 KVA 296 PT. Banua Pandiang Andiko Finished 2015 1 x 600 KVA 297 Panakukkang Mall - Makassar 1 x 2020 KVA Finished 2015 2 x 680 KVA 298 Intermark Serpong Finished 2015 2 x 1125 KVA 1 x 600 KVA 299 Tempo Pavilion Finished 2015 1 x 1125 KVA

300 Menara Dang Merdu Bank Riau 2 x 1130 KVA Finished 2015 Gedung Serbaguna Universitas Maranatha - 301 2 x 770 KVA Finished 2015 Bandung 302 PT. AIA Financial 1 x 260 KVA Finished 2015 303 CV. Budi Mulyo Tehnik 3 x 260 KVA Finished 2015 304 CV. Adem Ayem 1 x 260 KVA Finished 2015 305 PT. Karya Indah Alam Sejahtera (Wings Group) 1 x 1735 KVA Finished 2016 306 Panarub Industry Factory 1 x 1450 KVA Finished 2016 307 Harris Hotel & Yello Hotel @ Hayam Wuruk 2 x 1810 KVA Finished 2016 308 Pantai Indah Kapuk Mall & Hotel 3 x 1125 KVA Finished 2016

44 company profile

Reference List

NO PROJECT NAME / END USER CAPACITY PROJECT STATUS 4 x 1600 KVA 309 Sampoerna Strategic Square Jakarta Finished 2016 4 x 2000 KVA 310 PT. Lapi Laboratories 2 x 2015 KVA Finished 2016 311 1 Park Avenue Jakarta 3 x 1300 KVA Finished 2016 1 x 375 KVA 312 Borneo Mall Kapuas Finished 2016 2 x 680 KVA 313 PT. CitraKarya ReksaGuna - Bekasi 1 x 1450 KVA Finished 2016 314 RSUD Margono Soekarjo - Purwokerto 1 x 1125 KVA Finished 2016 315 Bahana Office Tower / BTPN Tower 5 x 2015 KVA Finished 2016 2 x 1362,5 KVA 316 Surabaya 2 x 1450 KVA Finished 2016 3 x 1800 KVA 317 Puri Matahari Tower 3 x 1800 KVA Finished 2016 The Mansion@Dukuh Golf Kemayoran - Block 318 3 x 2015 KVA Finished 2016 Bougenville 319 Menara Palma II 3 x 2015 KVA Finished 2016 320 Wika Tower Jakarta 2 x 1500 KVA Finished 2016 321 Dinas Teknis Kuningan - Jakarta 1 x 1050 KVA Finished 2016 322 Bvlgari Hotels & Resorts - Bali 1 x 1050 KVA Finished 2016 323 RS. Universitas Andalas - Padang 2 x 770 KVA Finished 2016 1 x 680 KVA 324 PT. Karsa Utama Lestari Finished 2016 1 x 1125 KVA 325 Unissula Semarang 1 x 1740 KVA Finished 2016 326 Kementerian Komunikasi & Informatika RI 1 x 1000 KVA Finished 2016 327 Bekasi Square Mall 1 x 1735 KVA Finished 2016 328 Oleos Plaza - Jakarta 1 x 480 KVA Finished 2016 329 Lahendong Unit 5&6 Geothermal Power - Manado 1 x 770 KVA Finished 2016 330 Pertamina Sangatta Field 1 x 1875 KVA Finished 2016 331 Graha BNPB Pramuka 1 x 1300 KVA Finished 2016 332 PT. Tirta Alam Segar (Wings Group) 2 x 1050 KVA Finished 2016 2 x 680 KVA 333 Gren Horison Degreen Pasteur Finished 2016 4 x 1300 KVA 334 Bandung International Convention Centre 3 x 2030 KVA Finished 2016 1 x 30 KVA Pertamina Ulubelu & Geothermal Power - 335 1 x 130 KVA Finished 2016 Lampung 1 x 680 KVA 336 Kantor Pusat KPK - Jakarta 2 x 2015 KVA Finished 2016 337 Gallery 7 x 1810 KVA Finished 2016 338 Menteng Park Cikini 2 x 2015 KVA Finished 2016

45 PT Berkat Manunggal Energi

Reference List

NO PROJECT NAME / END USER CAPACITY PROJECT STATUS 1 x 1125 KVA 339 Aeropolis Utility Residences Finished 2016 1 x 1810 KVA 340 Menara Pertiwi - Jakarta 2 x 2015 KVA Finished 2016 1 x 130 KVA 341 Alfa HQ Office Tower, Alam Sutera 1 x 1050 KVA Finished 2016 2 x 2015 KVA 9 x 2015 KVA 342 Distric-8 @ SCBD Senopati Jakarta Finished 2016 5 x 2250 KVA 343 RS. Dr. Oen Surakarta 2 x 1362,5 KVA Finished 2016 344 RSPI Bintaro Jaya 2 x 1450 KVA Finished 2016 345 Gedung Prima Sejahtera Alam Sutera 3 x 2015 KVA Finished 2016 346 Meira Factory Karawang 1 x 885 KVA Finished 2016 347 PLBN (Pos Lintas Batas Negara) Wini - Kupang 1 x 260 KVA Finished 2016 348 PT. Wiratadaya Bangun Persada 1 x 680 KVA Finished 2016 349 PT. Bayer Indonesia 1 x 2015 KVA Finished 2016 350 Pertamina RU V Balikpapan 1 x 1810 KVA Finished 2016 351 PT. Mega Dharma Properti Warehouse 1 x 480 KVA Finished 2016 352 PDAM Moya Bekasi 1 x 1735 KVA Finished 2016 1 x 1030 KVA 353 Gedung Pusdiklat Kementerian ATR/BPN Finished 2016 1 x 1500 KVA 354 Harco Glodok Jakarta 3 x 2030 KVA Finished 2017 355 GCNM - Casa Domaine Apartment, Jakarta 3 x 1810 KVA Finished 2017 356 World Capital Tower Jakarta 4 x 2015 KVA Finished 2017 2 x 680 KVA 357 Signature Park Grande Tahap 1A & 1B Finished 2017 2 x 1125 KVA 358 PT. Cargill Indonesia 2 x 1290 KVA Finished 2017 Sub Station 07 Dermaga International PT. Terminal 359 2 x 1500 KVA Finished 2017 Petikemas Surabaya Sopo Del Office Tower + Lifestyle & Hotel - 3 x 1450 KVA 360 Finished 2017 Jakarta 4 x 2015 KVA 361 PT. Karet Batin Delapan - Jambi 2 x 1362,5 KVA Finished 2017 362 Sahid Eminence Ciloto 2 x 1125 KVA Finished 2017 363 PT. Penata Karya Keluarga Utama 1 x 375 KVA Finished 2017 364 PT. Tech Pack Asia - Demak 1 x 260 KVA Finished 2017 365 PT. Zebra Asaba Industries - Jakarta 1 x 1810 KVA Finished 2017 366 Kampus UMN Tower 3 Serpong 1 x 1450 KVA Finished 2017 2 x 1810 KVA 367 Puri Mansion Apartment Jakarta Finished 2017 1 x 2015 KVA 368 Kimia Farma Bandung 2 x 2000 KVA Finished 2017

46 company profile

Reference List

NO PROJECT NAME / END USER CAPACITY PROJECT STATUS 2 x 1810 KVA 369 Gold Coast Mixed Use Development Jakarta Finished 2017 2 x 2015 KVA 370 Pantai Indah Kapuk Office 4 x 2015 KVA Finished 2017 371 The Elements Apartment Lot 16 - Kuningan 2 x 2015 KVA Finished 2017 372 The Pakubuwono Spring - Jakarta 3 x 1362,5 KVA Finished 2017 4 x 1050 KVA 373 Ciputra International Phase-1 Puri - Jakarta Finished 2017 3 x 1362,5 KVA 1 x 300 KVA Finished 2017 374 Jakarta Mass Rapid Transport (JMRT) 6 x 1000 KVA Finished 2017 375 Mangkuluhur City Jakarta 4 x 1450 KVA Finished 2017 376 Midtown Point & Ibis Style Hotel Jakarta 2 x 1362,5 KVA Finished 2017 1 x 1735 KVA Finished 2017 377 UTC Aerospace Systems - Bandung 1 x 2125 KVA Finished 2017 5 x 2015 KVA Finished 2017 378 Nipah Mall Makassar

1 x 800 KVA 379 The Branz - BSD City Finished 2017 2 x 1125 KVA 380 Sun Plaza Medan 2 x 2000 KVA Finished 2017 Tokyuland Apartment - The Branz Simatupang 381 2 x 1810 KVA Finished 2017 Jakarta 382 Roseville Apartment Soho & Suite BSD 2 x 1450 KVA Finished 2017 383 Grand Madison Apartment Jakarta 2 x 800 KVA Finished 2017 384 Lazada Warehouse - PT. Mega Dharma Properti 1 x 1362,5 KVA Finished 2017

385 Galleria Mall Vivo Sentul 4 x 1810 KVA Finished 2017

1 x 600 KVA 386 Mall Ambon Finished 2017 1 x 750 KVA 387 Australia International School Bali (AIS - Bali) 1 x 1030 KVA Finished 2017 388 Lapi Laboratories - PT. Taikisha Indonesia 1 x 1000 KVA Finished 2017 389 TCLZ Sentul 2 x 2500 KVA Finished 2017 390 Sima - Izzar Office Tower - Jakarta 2 x 2015 KVA Finished 2018 391 Depo BBM Pertamina Makassar 2 x 680 KVA Finished 2018 392 Hotel Aloft Seminyak Bali 2 x 375 KVA Finished 2018 393 Grand Indonesia 3 x 2015 KVA Finished 2018 394 Hotel Artama Jakarta - PT. Karsa Utama Lestari 1 x 800 KVA Finished 2018 395 The Sima Office Tower - Jakarta 1 x 2015 KVA Finished 2018 396 Millennium Centennial Center - Jakarta 5 x 1925 KVA Finished 2018 397 Jumeirah Resort Bali 3 x 1362,5 KVA Finished 2018 1 x 260 KVA 398 Wisma 81 - TOTO Office Building Jakarta Finished 2018 1 x 2015 KVA 399 Kino Office Tower Alam Sutera 2 x 1362,5 KVA Finished 2018

47 PT Berkat Manunggal Energi

Reference List

NO PROJECT NAME / END USER CAPACITY PROJECT STATUS 400 Sudirman Office 7.8 3 x 2015 KVA Finished 2018 401 The Entrance - Arcadia Office Tower Blok A 1 x 1000 KVA Finished 2018 402 The Regatta Phase II - Jakarta 2 x 1000 KVA Finished 2018 403 Hotel & Apartment Tentrem - Semarang 3 x 1500 KVA Finished 2018 404 Arcade Office Pantai Indah Kapuk 2 x 1030 KVA Finished 2018 405 Arcadia Office Tower Blok G 3 x 1810 KVA Finished 2018 1 x 530 KVA 406 PT. Cakra Inti Artha Finished 2018 1 x 800 KVA 407 - Jakarta 1 x 1450 KVA Finished 2018 408 PT. Pelayaran Tahta Bahtera 1 x 680 KVA Finished 2018 409 - Surabaya 5 x 2015 KVA Finished 2018 410 Cilegon Center Mall 2 x 2015 KVA Finished 2018 411 EPPC PG Assembagoes Situbondo 2 x 1500 KVA Finished 2018 412 South Hills Apartment Kuningan - Jakarta 3 x 1500 KVA Finished 2018 1 x 1450 KVA 413 PT. Asahimas Chemical - Cilegon Finished 2018 1 x 1810 KVA 414 PT. Bara Alam Utama (Baucoal) 2 x 750 KVA Finished 2018 415 T Tower - Jakarta 1 x 2015 KVA Finished 2018 416 Verde II Condominiums - Jakarta 3 x 1000 KVA Finished 2018 417 Permata Hijau Suites - Jakarta 2 x 800 KVA Finished 2018 418 RAPP Riau - PT. Indokarya Bangun Bersama 1 x 2500 KVA Finished 2018 1 x 375 KVA 419 Pabrik Feronikel Halmahera Timur (P3FH) - Antam Finished 2018 1 x 2500 KVA 1 x 1500 KVA 420 Terminal LPG Tanjung Sekong - Merak, Banten Finished 2018 2 x 2500 KVA Pembangunan Tangki Timbun Depot LPG Pulau 421 1 x 250 KVA Finished 2018 Layang - Palembang 422 Yakult Factory - Surabaya 1 x 1920 KVA Finished 2018 423 Fujita Kanko Apartment - Cikarang 1 x 1000 KVA Finished 2018 424 Palembang Trade Center Extension 1 x 2015 KVA Finished 2018 425 Cibis Tower Nine - Jakarta 1 x 2015 KVA Finished 2018 426 Green Sedayu Taman Palem Apartment - Jakarta 2 x 2015 KVA Finished 2018 427 Departemen Perhubungan Head Office - Jakarta 1 x 1450 KVA Finished 2018 Water Treatment Kawasan Industri Suryacipta - 428 1 x 260 KVA Finished 2018 Karawang 429 Pertamina RU V Balikpapan - Phase II 1 x 1810 KVA Finished 2018 430 Depo Pertamina BBM Balongan - Cirebon 1 x 1000 KVA Finished 2018 NEX Logistics Indonesia (Nippon Express) - 431 1 x 900 KVA Finished 2018 Cikarang 432 PLTD Kundur - PT. Timah, Tbk 1 x 1740 KVA Finished 2018 433 CV. Hasya Pratama - Samarinda 1 x 1250 KVA Finished 2018

48 company profile

Reference List

NO PROJECT NAME / END USER CAPACITY PROJECT STATUS

Makassar New Port & Kendari New Port - Pelindo 2 x 600 KVA 434 Finished 2018 IV 4 x 2500 KVA 435 Terminal Petikemas Semarang - Pelindo III 2 x 2500 KVA Finished 2019 436 Grand Indonesia 2 x 2015 KVA Finished 2019 437 Hotel Grand Mercure - Lampung 4 x 2015 KVA Finished 2019 438 PT. Softex Indonesia 2 x 1362,5 KVA Finished 2019 439 Sedayu City @ Kelapa Gading Apartment 2 x 1450 KVA Finished 2019 440 Saka Farma Factory - Cikarang 2 x 2015 KVA Finished 2019 441 Bintang Toedjoe Factory - Cikarang 1 x 2015 KVA Finished 2019 442 DPPU Bandara Kertajati - Majalengka 2 x 800 KVA Finished 2019 443 Dawuan Factory Cikampek - PT. Alexindo 1 x 2015 KVA Finished 2019 PT. Indofood CBP Sukses Makmur Tbk - Factory 444 1 x 2015 KVA Finished 2019 Palembang Pocari Kejayaan Factory Malang - PT. Amerta 445 2 x 2015 KVA Finished 2019 Indah Otsuka 446 LPG Pertamina Cilacap 1 x 450 KVA Finished 2019 447 Hotel Ibis & Mercure Samarinda 2 x 1000 KVA Finished 2019 1 x 625 KVA 2 x 1000 KVA 448 Southgate Phase 1, Tanjung Barat - Jakarta Finished 2019 1 x 1362,5 KVA 4 x 2015 KVA 2 x 1450 KVA 449 Borneo Bay Balikpapan Finished 2019 5 x 2015 KVA 450 Ciputra World 2 Phase 3, Jakarta - The Newton 2 x 1450 KVA Finished 2019 451 Bandar Udara Sam Ratulangi Manado - Phase II 1 x 2030 KVA Finished 2019 452 Renaissance Nusa Dua - Bali 2 x 2015 KVA Finished 2019 453 Suzuki Indomobil Plant Bekasi 1 x 1500 KVA Finished 2019 Anugrah Pharmindo Lestari, Cikarang - PT. 454 1 x 1250 KVA Finished 2019 Taikisha Indonesia Engineering 455 Arandra Residence - Jakarta 1 x 2250 KVA Finished 2019 Menara Aria Office Building @ Harbour Bay - 456 1 x 1030 KVA Finished 2019 Batam 457 PT. Excel Metal Industry 1 x 2020 KVA Finished 2019 458 Function Hall @ Mall Alam Sutera 1 x 1250 KVA Finished 2019 2 x 885 KVA 459 Podomoro City Deli Medan 7 x 1450 KVA Finished 2020 12 x 2015 KVA 460 Daswin Office Tower - Jakarta 3 x 2250 KVA Finished 2020 461 AKR - Grand Kawanua City Walk Manado 1 x 1740 KVA Finished 2020 5 x 1030 KVA 462 Chadstone Cikarang Finished 2020 3 x 2000 KVA Southgate Phase 2 - Apartment 1 & 2, Tanjung 463 2 x 1362,5 KVA Finished 2020 Barat - Jakarta

49 PT Berkat Manunggal Energi

Reference List

NO PROJECT NAME / END USER CAPACITY PROJECT STATUS 2 x 700 KVA 464 Rajawali Place ST. Regis - Jakarta 2 x 1450 KVA Finished 2020 2 x 2015 KVA 1 x 1550 KVA 465 Wisma Barito Pasific II - Jakarta Finished 2020 2 x 2015 KVA Ciputra International Phase-1 Puri - Tower 2, 466 2 x 1362,5 KVA Finished 2020 Jakarta 467 Taman Permata Buana Apartment 3 x 1500 KVA Finished 2020 468 Grand Indonesia 2 x 2015 KVA Finished 2020 469 PT. Emerald Seaweed Indonesia - Pasuruan 1 x 800 KVA Finished 2020 470 Citra Raya - Tangerang 3 x 1250 KVA Finished 2020 471 Mall & Apartment - Batam 4 x 1810 KVA Finished 2020 472 Logos Warehousing - Bekasi 2 x 1125 KVA Finished 2020 473 RCTI Kebon Jeruk - Jakarta 1 x 2250 KVA Finished 2020 474 The Park Mall Sawangan 4 x 1500 KVA Finished 2020 475 The Smith Alam Sutera 2 x 1500 KVA Finished 2020 476 Mayapada Hospital Kuningan 2 x 1030 KVA Finished 2020 2 x 1125 KVA 2 x 1362,5 KVA 477 The Stature Kebon Sirih Mix Use - Jakarta Finished 2020 2 x 1450 KVA 2 x 2015 KVA 478 Discovery - Bali 1 x 2015 KVA Finished 2020 479 BCA KCU Matraman - Jakarta 1 x 1250 KVA Finished 2020 480 3 & Office Towers - Jakarta 7 x 2500 KVA Finished 2020 481 Buddha Tzu Chi Hospital - Jakarta 4 x 2000 KVA Finished 2020 LRT Gateway Park Jaticempaka Apartment - 482 1 x 1000 KVA Finished 2020 Bekasi 483 Galaxy Mall Surabaya - Condominium Area 6 x 2015 KVA Finished 2020 484 PT. PemukaSakti ManisIndah - Lampung 1 x 2015 KVA Finished 2020 485 Gold Coast Office Tower 8 - Jakarta 1 x 2015 KVA Finished 2020 Universitas Islam Internasional Indonesia (UIII) - 486 1 x 2000 KVA Finished 2020 Depok 487 The Pakubuwono Menteng - Jakarta 2 x 1450 KVA Finished 2020 Gedung Syariah Tower Universitas Airlangga - 488 1 x 2500 KVA Finished 2020 Surabaya 489 BRI Tower @ Gatot Subroto - Jakarta 3 x 2015 KVA Finished 2020 490 Citimall Cianjur 2 x 600 KVA Finished 2020 491 Control Building @ SCBD - Jakarta 2 x 1000 KVA Finished 2020 492 Central Park Mall - Jakarta 2 x 2030 KVA Finished 2020 493 Stadion GOR Jatidiri Semarang 1 x 1740 KVA Finished 2020

50 PT Berkat Manunggal Energi

The Official Suporting Document

51 company profile

The Reference Letter

52 PT Berkat Manunggal Energi

The Reference Letter

53 company profile

The Reference Letter

54 PT Berkat Manunggal Energi

Warehouse Millennium

Warehouse BME Millennium, Tigaraksa - Banten

55 company profile

Workshop

Workshop Jakarta Area, Taman Techno Office Park, Serpong

56 PT Berkat Manunggal Energi www.bmepower.com

Office : BME Building 5th & 6th Floor, Jl. Warung Jati Barat No. 22 B Ragunan – Pasar Minggu, Jakarta Selatan 12550 Ph. (62-21) 78848930 (Hunting), 79198360, Fax (62-21) 78848928

Warehouse BME Millennium : Workshop : Kawasan Industri Millennium Blok Q No. 1B, Tigaraksa - Banten Taman Tekno BSD Blok A-1 No. 47, Sektor XI - Tangerang 58 Email : [email protected]