Reference List from Year 2000
Total Page:16
File Type:pdf, Size:1020Kb
REFERENCE LIST FROM YEAR 2000 Boiler Item No. of Pressure Temper. Year of Year of PROJECT COUNTRY SCOPE OF SUPPLY & SERVICES Typ of boiler capacity No. boiler fabrication installation S...(t/h); Bar ºC HW...(MW) 14-year operations & maintenance 1 A & A BIOENERGY VIRO CROATIA (O&M) contract of the CHP biomass Biomass boiler 1 17 t/h 60 480°C 2019 2019 plant Turnkey biomass cogeneration plant 2 A & A BIOENERGY VIRO CROATIA Biomass boiler 1 17 t/h 60 480°C 2019 2019 (CHP), 3 MWe, 8,8 MWth Engineering & manufacturing of CYMIC 260t/h 3 MAREN TURKEY Biomass boiler 1 146 450°C 2019 2019/2020 Boiler (CFB) 55MW 4 NAVIGATOR FIGUEIRA PORTUGAL Detail engineering & boiler fabrication BFB Boiler 1 112 505°C 2019 2019 BIOMASS TO ENERGY Turnkey biomass cogeneration plant 5 CROATIA Biomass boiler 1 23,4 t/h 72 485°C 2018 2019 ZUPANJA (CHP), 5,7 MWe, 8 MWth Biomass 6 VILNIUS LITHUANIA Detail engineering & boiler fabrication 1 86,1 t/h 58 274°C 2017 2018 incineration Manufacturing of pressure parts of 7 ASV6BIO DENMARK Biomass boiler 1 140MW 100 540 2017/2018 2018/2019 HYBEX boiler Engineering, material procurement, 8 AVONMOUTH UK manufacturing and delivery on site of Waste incineration 2 20,61t/h 85 bar(g) 440°C 2017 2018 waste incineration boiler Sulfite Recovery 9 SAPPI VULINDLELA SOUTH AFRICA Detail engineering & boiler fabrication 1 270 t/h 85 bar(g) 490°C 2018 2019 boiler 14-year operations & maintenance 10 ENERGY 9 CROATIA (O&M) contract of the CHP biomass Biomass boiler 1 23,4 t/h 72 485°C 2017 2018 plant Turnkey biomass cogeneration plant 11 ENERGY 9 CROATIA Biomass boiler 1 23,4 t/h 72 485°C 2017 2018 (CHP), 5,7 MWe, 6,1 MWth Engineering, material procurement, 12 PARC ADFER UK manufacturing and delivery on site of Waste incineration 1 17 MW 60,5 410 2017/2018 2018 wastw incineration boiler Engineering & manufacturing of CYMIC 13 HOFOR DENMARK CFB Boiler 458,7 MW 172 445 2017 2017/2018 Boiler (CFB) Detail engineering, material 14 DUNBAR UK procurement, manufacturing, delivery External pipelines 2 lines 2017 2017/2018 and erection Detail engineering, material 53 MWth 15 DUNBAR UK procurement, manufacturing, delivery Waste incineration 2 95 442 2015/2016 2017 66 t/h and erection 2 / 12 REFERENCE LIST FROM YEAR 2000 Boiler Item No. of Pressure Temper. Year of Year of PROJECT COUNTRY SCOPE OF SUPPLY & SERVICES Typ of boiler capacity No. boiler fabrication installation S...(t/h); Bar ºC HW...(MW) Engineering & boiler manufacturing, 16 FERRYBRIDGE 2 UK Waste incineration 2 145,1 t/h 73 430 2016 2017/2018 transportation Turnkey biomass cogeneration plant 17 HRAST ĐAKOVO CROATIA Biomass boiler 1 23 t/h 51 455 2016 2017 (CHP), 3,6 Mwe Turnkey biomass cogeneration plant 18 BE-TO GLINA, Drvni centar CROATIA Biomass boiler 1 28,5 t/h 72 480 2016 2016/2017 (CHP), 5,1 MWe, 10 MWth Engineering & boiler manufacturing, 19 DUBLIN IRELAND transportation, erection and Waste incineration 2 125 t/h 62 443 2015 2016/2017 commissioning BOSNIA AND Deatil engineering,and manufactuand Chemical alkaline 20 NATRON MAGLAJ 1 86t/h 61 460 2016 2016/17 HERZEGOVINA recostruction of black liquer boiler boiler Engineering & manufacturing of CYMIC 21 PORVOO, Kilpilahti FINLAND CFB Boiler 1 150 MW 96 309 2016/2017 2017/2018 Boiler (CFB) Engineering & boiler manufacturing, 22 TEESSIDE UK Biomass boiler 1 160 t/h 110 410 2015 2016 transportation, erection Engineering & boiler manufacturing, 23 TEMPLEBOROUGH UK Biomass boiler 1 160 t/h 110 410 2015 2016 transportation, erection Engineering & boiler manufacturing, 24 MARGAM UK Biomass boiler 1 160 t/h 110 410 2015 2016 transportation, erection Manfuacturing of pressure parts,SH1-2 25 LISBJERG DENMARK and air preheater of the Biomass boiler 1 41 t/h 110 540 2015/16 2016 boiler,transportation Engineering & boiler manufacturing, 26 BENESSE_MAREMNE FRANCUSKA transportation, erection and Waste incineration 1 44 t/h 50 400 2015 2016 commissioning Engineering & boiler manufacturing, 27 AMAGER DENMARK Waste incineration 2 139,5t/h 96,5 461 2014 2016 transportation, erection Manfuacturing of pressure parts,SH1- 28 RIIKINVOIMA FINLAND Biomass boiler 1 64 t/h 114 500 2015/16 2016 SH4 ECO 1-6 of the boiler,transportation Manufacturing of the pressure parts of 29 CORDEMAIS FRANCE Coal fired boiler 1 600 MW 214 542 2014 2015 the boiler 3 / 12 REFERENCE LIST FROM YEAR 2000 Boiler Item No. of Pressure Temper. Year of Year of PROJECT COUNTRY SCOPE OF SUPPLY & SERVICES Typ of boiler capacity No. boiler fabrication installation S...(t/h); Bar ºC HW...(MW) Manufacturing of the pressure parts of Recovery (liquor) 30 SAPPI GRATKORN AUSTRIA 1 40 t/h 137 335 2014 2015 the boiler boiler Deatil engineering and manufacturing of 31 NAANTALI FINLAND Biomass boiler 1 390 MW 164 555 2015/16 2016 CYMIC boiler Deatil engineering and manufacturing of 32 AMEO CZECH REPUBLIC Biomass boiler 1 248 MW 118 540 2014/15 2015 CYMIC boiler Engineering, boiler manufacturing & 33 WILTON UK Waste incineration 1 41 MW 60 410 2013/2014 2014/2015 transportation Manfuacturing of pressure parts of the 34 BRIGG UK Biomass boiler 1 40 MW 146 391 2014 2015 boiler Engineering & boiler manufacturing, 35 SEVERNSIDE UK transportation, erection and Waste incineration 2 77,6 t/h 62 422 2014 2015 commissioning Detail engineering and fabrication of 36 VÄRTAVERKET KVV8 SWEDEN CFB boiler 1 467 t/h 140 560 2013/14 2014/15 pressure parts of 1 CFB boiler Turnkey biomass cogeneration plant 37 SLAVONIJA DI CROATIA Biomass boiler 1 33/26,4 60 460 2014 2015 (CHP), 4,6 MWe, 8 MWth Engineering & boiler manufacturing, 141,1 t/h 38 FERRYBRIDGE UK transportation, erection and Waste incineration 2 71,5 430 2013 2014 31,3 MW commissioning 39 DUNAUHAM HUNGARY Furnace walls Biomass boiler 1 223,2 t/h 113 520 2014 2014 Manufacturing of pressure parts of 40 BABINA GREDA CROATIA Biomass boiler 1 38,2 t/h 94 505 2014 2014 HYBEX boiler Manfuacturing of Furnace upper section, 41 VÄXJÖ, SANDVIK 3 SWEDEN grid, second pass with convective Biomass boiler 1 155 t/h 157 556 2013 2014 evaporator, SH 1, 2 & 3 Basic / detail engineering, procurement, 42 RIDHAM DOCK UK Biomass boiler 1 20.5 t/h 75 460 2013 2014 manufacturing, transportation Furnace, MW - 2 pass and superheater 43 KARLSTAD SWEDEN Biomass boiler 1 19,08 158 562 2013 2014 manufacturing BOSNIA & 44 EP BiH TE Tuzla Eco package Boiler 6 Coal fired boiler 1 215 MW 165 370 2013 2013 HERZEGOVINA Engineering & boiler manufacturing, 45 LUZERN SWITZERLAND transportation, erection and Waste incineration 1 57,5 t/h 41 410 2013 2014/2015 commissioning 4 / 12 REFERENCE LIST FROM YEAR 2000 Boiler Item No. of Pressure Temper. Year of Year of PROJECT COUNTRY SCOPE OF SUPPLY & SERVICES Typ of boiler capacity No. boiler fabrication installation S...(t/h); Bar ºC HW...(MW) Engineering & boiler horizontal part 46 CARDIFF WALLES Waste incineration 2 30 MW 60 400 2012/2013 2013 manufacturing, transportation 47 MONDI FRANTSCHACH AUSTRIA Furnace, Boiler bank modules Biomass boiler 1 2,4 95 490 2012 2013 Engineering & boiler manufacturing, 48 VANTAA FINLAND transportation, erection and Waste incineration 2 83 t/h 91 400 2012 2013 commissioning Membrane walls, Economizer 1&2, Sulfite Recovery 49 TEMISCAMING CANADA Superheater 1, superheater 2 and 1 214 99,6 301 2012 2013 boiler superheater 3 50 VK-6 EL-TO CROATIA Replacing of existing boiler, EPC Hot water boiler 1 116 MWt 25 160 2012 2013 Detailed engineering & boiler pressure 51 BLACKBURN MEDOWS UK Biomass boiler 1 119 t/h 84 490 2012 2013 parts manufacturing Engineering & boiler manufacturing, 52 STAFFORDSHIRE UK Waste incineration 2 64.5 60 400 2012 2013 transportation and commissioning Engineering & boiler horizontal part 53 LINCOLNSHIRE UK Waste incineration 1 63.7 60 400 2012 2012 manufacturing, transportation Heat recovery 129,5/29,9/ 559,6/ 54 MELLACH AUSTRIA Module manufacturing 2 40,5 t/h 2011 2012 steam boiler 4,3 560/226 55 VK-5 EL-TO CROATIA Replacing of existing boiler, EPC Hot water boiler 1 116 MWt 25 160 2011 2012 Detail engineering and fabrication of 56 YUNUS EMRE TURKEY CFB 2 145 MW 168 404 2011 2013 pressure parts of 2 CFB boilers Furnace, MW - 2 pass and superheater 57 IGGESUND UK Biomass boiler 1 32 124 327,8 2011 2012 manufacturing Engineering, manufactoring and erection Oil - gas fired 58 HEP TE RIJEKA CROATIA 1 320 MW 170 570 2011 2011 of SH2 & RH2 boiler Engineering & manufacturing, Gas and oil fired 405 59 ATAKA UNIT 1 & 2 EGYPT transportation on site, suprevision of 2 148,1 540 2011 2011 Boiler 150 erection and commissioning 5 / 12 REFERENCE LIST FROM YEAR 2000 Boiler Item No. of Pressure Temper. Year of Year of PROJECT COUNTRY SCOPE OF SUPPLY & SERVICES Typ of boiler capacity No. boiler fabrication installation S...(t/h); Bar ºC HW...(MW) Engineering & boiler manufacturing, 60 VAASA FINLAND transportation, erection and Waste incineration 1 77 41,5 402 2010 2011 commissioning Heat recovery 78,1/90,13/ 540/540/1 61 AMBARLI TURKEY Module manufacturing 2 115/29/4 2010 2011 steam boiler 8,0 kg/s 95 62 VK-4 EL-TO CROATIA Construction of new boiler, EPC Hot water boiler 1 116 MWt 25 160 2010 2011 Biomass 63 EISENHÜTTENSTADT GERMANY Detailed engineering & boiler fabrication 1 176 95 470 2009 2010 incineration Engineering & boiler manufacturing, 64 OSLO NORWAY transportation to the site and Waste incineration 1 86,2 41,5 402 2009 2010 commissioning Engineering & boiler manufacturing, 65 NEWHAVEN UK transportation to the site, erection and Waste incineration 1 46 50 400 2009 2010 commissioning Biomass 66 MAXAU GERMANY Detailed engineering & boiler fabrication 1 198 96 520 2009 2009 incineration Engineering