SLUM IMPROVEMENT BOARD A REGIONAL UNIT OF (MAHARASHTRA HOUSING AND AREA DEVELOPMENT AUTHORITY) Tel No.022-66405484 E-mail- [email protected]

Ref. No. EE/City/MSIB / e-tender / 25 / 2018-19

e-TENDER NOTICE

Digitally Signed & unconditional online Tender in form ``B-1'' (Percentage Rate) are invited by the Executive Engineer (City) Division Mumbai Slum Improvement Board (Unit of MHADA) Room No. 539 4th floor Griha Nirman Bhavan Bandra (East) Mumbai 400 051 from the contractors registered with PWD /MHADA /CPWD / CIDCO / MES / MJP / MIDC / Indian Railway / BPT / MCGM / in the corresponding appropriate class of contractor or any Govt. / Semi Govt. organization.

Sr. Name of Works Estimated cost E.M.D. 1% Security Registration Tender Time limit of Deposit 2% (Class) of Price for No Estimated (1% in the Contractor including completio cost form of 12% n of work FDR and GST in 1% through Rs. RA Bills)

1 Concreting Work of Road Near Building 8,58,207.00 8,582.00 17,164.00 Class– 560.00 9 Months Near Surya Building, Bhulabhai Desai VII & above (including Road, Mumbai-26 monsoon) (Malbar Hill) (MMNPSY-Sp-Fund)

2 Construction of Samaj Kendra and 8,58,207.00 8,582.00 17,164.00 Class– 560.00 9 Months Beautification Work at Sahyog Kendra, VII & above (including Bhulabhai Desai Road, Mumbai-26 monsoon) (Malbar Hill) (MMNPSY-Sp-Fund)

3 Concreting Work of Road Near Building 8,58,207.00 8,582.00 17,164.00 Class– 560.00 9 Months at Kala Niketan, Bhulabhai Desai Road, VII & above (including Mumbai-26 monsoon) (Malbar Hill) (MMNPSY-Sp-Fund)

4 Providing and Fixing Paver Block in 8,58,207.00 8,582.00 17,164.00 Class– 560.00 9 Months Open Premises at Alt Cube, Altamount VII & above (including Road, Mumbai-26 monsoon) (Malbar Hill) (MMNPSY-Sp-Fund)

5 Providing and Fixing Paver Block in 8,58,207.00 8,582.00 17,164.00 Class– 560.00 9 Months Open Premises at Sukh Shanti Pedder VII & above (including Road, Mumbai-26 monsoon) (Malbar Hill) (MMNPSY-Sp-Fund)

6 Asphalting of Road in Open Premises 8,58,207.00 8,582.00 17,164.00 Class– 560.00 9 Months Near Building at Mount Unic, Pedder VII & above (including Road, Mumbai-26 monsoon) (Malbar Hill) (MMNPSY-Sp-Fund)

7 Asphalting of Road in Open Premises 8,58,207.00 8,582.00 17,164.00 Class– 560.00 9 Months Near Building at Sunita, Pedder Road, VII & above (including Mumbai-26 monsoon) (Malbar Hill) (MMNPSY-Sp-Fund)

8 Asphalting of Road in Open Premises 8,58,207.00 8,582.00 17,164.00 Class– 560.00 9 Months Near Building at Anand Nagar, Forjet VII & above (including Street Road, Mumbai-26 monsoon) (Malbar Hill) (MMNPSY-Sp-Fund)

9 Concreting Work of Road Near Building 8,58,207.00 8,582.00 17,164.00 Class– 560.00 9 Months at Maheshwari Niketan, Pedder Road, VII & above (including Mumbai-26 monsoon) (Malbar Hill) (MMNPSY-Sp-Fund)

10 Providing and Fixing Paver Block in 8,58,207.00 8,582.00 17,164.00 Class– 560.00 9 Months Open Premises at Shashidhar, Bhulabhai VII & above (including Desai Road, Mumbai-26 monsoon) (Malbar Hill) (MMNPSY-Sp-Fund)

11 Providing and Fixing Ladikaran and 8,58,207.00 8,582.00 17,164.00 Class– 560.00 9 Months Beautification Work in Open Premises at VII & above (including Adinath Jahangir Daji Street, Grant monsoon) Road (Malbar Hill) (MMNPSY-Sp-Fund)

12 Providing and Fixing Ladikaran and 8,58,207.00 8,582.00 17,164.00 Class– 560.00 9 Months Beautification Work in Open Premises at VII & above (including New Ideol, Pandit Madanmohan monsoon) Malviya Road, Tardeo (Malbar Hill) (MMNPSY-Sp-Fund)

13 Providing and Fixing Paver Block in 8,58,207.00 8,582.00 17,164.00 Class– 560.00 9 Months Open Premises at Sonawala 3A to 6D, VII & above (including Naushir Barucha Marg, Grant Road monsoon) (Malbar Hill) (MMNPSY-Sp-Fund)

14 Providing and Laying New Drainage 8,58,207.00 8,582.00 17,164.00 Class– 560.00 9 Months Line and Providing and Fixing VII & above (including Ladikaran at Navyug Mansion, Naushir monsoon) Barucha Marg, Grant Road (W) (Malbar Hill) (MMNPSY-Sp-Fund)

15 Providing and Fixing Ladikaran in Open 8,58,207.00 8,582.00 17,164.00 Class– 560.00 9 Months Premises at Ratan Abad, Tukaram Javji VII & above (including Marg, Grant Road (W) monsoon) (Malbar Hill) (MMNPSY-Sp-Fund)

16 Providing and Fixing Ladikaran and 8,58,207.00 8,582.00 17,164.00 Class– 560.00 9 Months Beautification Work in Open Premises at VII & above (including Roja Mishtika, Sitram Ghadigaonkar monsoon) Marg, Tardeo (Malbar Hill) (MMNPSY-Sp-Fund)

17 Providing and Fixing Ladikaran and 8,58,207.00 8,582.00 17,164.00 Class– 560.00 9 Months Beautification Work in Open Premises at VII & above (including Ganesh Prasad, Naushir Barucha Marg, monsoon) Grant Road (Malbar Hill) (MMNPSY-Sp-Fund)

18 Asphalting of Road in Open Premises 8,58,207.00 8,582.00 17,164.00 Class– 560.00 9 Months Near Building at Zerostriyan Colony VII & above (including (Parsi Wada) Jagangir Daji Street, Grant monsoon) Road (Malbar Hill) (MMNPSY-Sp-Fund)

19 Asphalting of Road in Open Premises 8,58,207.00 8,582.00 17,164.00 Class– 560.00 9 Months Near Building at Vinus, Navroji Vakil VII & above (including Street, Grant Road (W) monsoon) (Malbar Hill) (MMNPSY-Sp-Fund)

20 Providing and Fixing Paver Block in 8,58,207.00 8,582.00 17,164.00 Class– 560.00 9 Months Open Premises at Sonawala 8A to 8D, VII & above (including Naushir Barucha Marg, Grant Road monsoon) (Malbar Hill) (MMNPSY-Sp-Fund)

21 Providing and Laying New Drainage 8,58,207.00 8,582.00 17,164.00 Class– 560.00 9 Months Line and Providing and Fixing VII & above (including Ladikaran at Bhagyalaxmi, Opera House monsoon) (Malbar Hill) (MMNPSY-Sp-Fund)

22 Concreting Work of Road Near Building 8,58,207.00 8,582.00 17,164.00 Class– 560.00 9 Months at Jitekar Wadi, Babasaheb Jaykar Marg VII & above (including (Malbar Hill) (MMNPSY-Sp-Fund) monsoon)

23 Providing and Fixing Ladikaran and 8,58,207.00 8,582.00 17,164.00 Class– 560.00 9 Months Beautification Work in Open Premises at VII & above (including Aditya Tower, V. P. Road monsoon) (Malbar Hill) (MMNPSY-Sp-Fund)

24 Asphalting of Road in Open Premises 8,58,207.00 8,582.00 17,164.00 Class– 560.00 9 Months Near Building at Gaiwadi, J. S. S. Road VII & above (including (Malbar Hill) (MMNPSY-Sp-Fund) monsoon)

25 Asphalting of Road in Open Premises 8,58,207.00 8,582.00 17,164.00 Class– 560.00 9 Months Near Building at Malbar View, Morbi VII & above (including Lane monsoon) (Malbar Hill) (MMNPSY-Sp-Fund)

26 Beautification Work and Bagicha at 8,58,207.00 8,582.00 17,164.00 Class– 560.00 9 Months M.N.P Garden, Dubhash Lane VII & above (including (Malbar Hill) (MMNPSY-Sp-Fund) monsoon)

27 Concreting Work of Road Near Building 8,58,207.00 8,582.00 17,164.00 Class– 560.00 9 Months at Tarabaug F and G, R. R. Road VII & above (including (Malbar Hill) (MMNPSY-Sp-Fund) monsoon)

28 Beautification Work and Bagicha at 8,58,207.00 8,582.00 17,164.00 Class– 560.00 9 Months Chandanbala, R. R. Thakkar Marg VII & above (including (Malbar Hill) (MMNPSY-Sp-Fund) monsoon)

29 Concreting Work of Road Near Building 8,58,207.00 8,582.00 17,164.00 Class– 560.00 9 Months at Godrej Baug Near Ambewadi, VII & above (including Nepean Sea Road monsoon) (Malbar Hill) (MMNPSY-Sp-Fund)

30 Construction of Toilet for Ladies and 8,58,207.00 8,582.00 17,164.00 Class– 560.00 9 Months Gents at Sagar Nagar (Mutton Gully), VII & above (including Banganga Road monsoon) (Malbar Hill) (MMNPSY-Sp-Fund)

31 Concreting Work of Road Near Building 8,58,207.00 8,582.00 17,164.00 Class– 560.00 9 Months at Prakash and Amar Jyoti, Reej Road VII & above (including (Malbar Hill) (MMNPSY-Sp-Fund) monsoon)

32 Concreting Work of Road Near Building 8,58,207.00 8,582.00 17,164.00 Class– 560.00 9 Months at Shanti Nagar, Nepean Sea Road VII & above (including (Malbar Hill) (MMNPSY-Sp-Fund) monsoon)

33 Beautification Work and Bagicha at 8,58,207.00 8,582.00 17,164.00 Class– 560.00 9 Months Sagar Teer, Nepean Sea Road VII & above (including (Malbar Hill) (MMNPSY-Sp-Fund) monsoon)

34 Beautification Work and Bagicha at Nav 8,58,207.00 8,582.00 17,164.00 Class– 560.00 9 Months Darya Mahal, Nepean Sea Road VII & above (including (Malbar Hill) (MMNPSY-Sp-Fund) monsoon)

35 Providing and Laying Drainage Line, 8,58,207.00 8,582.00 17,164.00 Class– 560.00 9 Months Providing and Fixing Ladikaran and VII & above (including Beautification Work in Premises at Prem monsoon) Milan, Nepean Sea Road (Malbar Hill) (MMNPSY-Sp-Fund)

36 Construction of Toilet for Ladies and 8,58,207.00 8,582.00 17,164.00 Class– 560.00 9 Months Gents at Sagar Nagar Behind Naresh VII & above (including Gupta House, Banganga Road monsoon) (Malbar Hill) (MMNPSY-Sp-Fund)

37 Beautification Work and Providing and 8,58,207.00 8,582.00 17,164.00 Class– 560.00 9 Months Fixing Chequred Tiles in Open Premises VII & above (including at Shripal Nagar, Nepean Sea Road monsoon) (Malbar Hill) (MMNPSY-Sp-Fund)

38 Beautification Work and Bagicha at Jal 8,58,207.00 8,582.00 17,164.00 Class– 560.00 9 Months Darshan, Nepean Sea Road VII & above (including (Malbar Hill) (MMNPSY-Sp-Fund) monsoon)

39 Beautification Work and Bagicha at 8,58,207.00 8,582.00 17,164.00 Class– 560.00 9 Months Samrat Ashok, R. R. Thakkar Marg VII & above (including (Malbar Hill) (MMNPSY-Sp-Fund) monsoon)

40 Providing and Fixing Paver Block in 8,58,207.00 8,582.00 17,164.00 Class– 560.00 9 Months Open Premises at Vardhaman, 135 A, VII & above (including August Kranti Marg, Cams Corner monsoon) (Malbar Hill) (MMNPSY-Sp-Fund)

41 Construction of Toilet Block at 17,16,414.00 17,164.00 34,328.00 Class– 560.00 12 Shivshankar Nagar, Salt Pan Road, V-A & Months Antop Hill, Wadala, Sion Koliwada above (including (Sion Koliwada) (MMNPSY-Sp-Fund) monsoon)

42 Construction of Toilet Block Near 18,88,055.00 18,881.00 37,762.00 Class– 560.00 12 Saibaba Mandir, Shiv Shankar Nagar, V-A & Months Antop Hill, Sion Koliwada above (including (Sion Koliwada) (MMNPSY-Sp-Fund) monsoon)

43 Construction of Toilet Block at Shastri 17,16,414.00 17,164.00 34,328.00 Class– 560.00 12 Nagar, Pratiksha Nagar, Sion Koliwada V-A & Months (Sion Koliwada) (MMNPSY-Sp-Fund) above (including monsoon) 44 Construction of Toilet Block at Shanti 21,45,518.00 21,455.00 42,910.00 Class– 560.00 12 Nagar, Azad Mohalla, Antop Hill, V-A & Months Wadala, Sion Koliwada above (including (Sion Koliwada) (MMNPSY-Sp-Fund) monsoon)

45 Construction of Toilet Block at Sanjay 12,87,311.00 12,873.00 25,746.00 Class– 560.00 9 Months Gandhi Nagar, Sion Koliwada VI & (including (Sion Koliwada) (MMNPSY-Sp-Fund) above monsoon)

46 Beautification Work at Roshan Baug, 10,29,848.00 10,298.00 20,596.00 Class– 560.00 9 Months Flac Road, Sion Koliwada, Mumbai VI & (including (Sion Koliwada) (MMNPSY-Sp-Fund) above monsoon)

47 Beautification Work Near Municipal 10,29,848.00 10,298.00 20,596.00 Class– 560.00 9 Months Building No.C-2, Sion Koliwada, VI & (including Mumbai above monsoon) (Sion Koliwada) (MMNPSY-Sp-Fund)

48 Beautification Work at Pratiksha Nagar, 10,29,848.00 10,298.00 20,596.00 Class– 560.00 9 Months Sion Koliwada, Mumbai VI & (including (Sion Koliwada) (MMNPSY-Sp-Fund) above monsoon)

49 Beautification Work at Indira Nagar, 10,29,848.00 10,298.00 20,596.00 Class– 560.00 9 Months Sion Koliwada, Mumbai VI & (including (Sion Koliwada) (MMNPSY-Sp-Fund) above monsoon)

50 Beautification Work at K. D. Gaikwad 10,29,848.00 10,298.00 20,596.00 Class– 560.00 9 Months Nagar, Sion Koliwada, Mumbai VI & (including (Sion Koliwada) (MMNPSY-Sp-Fund) above monsoon)

51 Construction of Vyayamshala at Shanti 17,16,414.00 17,164.00 34,328.00 Class– 560.00 12 Nagar, Salt Pan Road, Wadala, Sion V-A & Months Koliwada, Mumbai above (including (Sion Koliwada) (MMNPSY-Sp-Fund) monsoon)

52 Construction of Vyayamshala at 17,16,414.00 17,164.00 34,328.00 Class– 560.00 12 Pratiksha Nagar, Sion Koliwada, V-A & Months Mumbai above (including (Sion Koliwada) (MMNPSY-Sp-Fund) monsoon)

53 Construction of Samaj Mandir Near 17,16,414.00 17,164.00 34,328.00 Class– 560.00 12 Maa. Ashtabhuja Mandir, Shanti Nagar, V-A & Months Azad Mohalla, Wadala, Sion Koliwada above (including (Sion Koliwada) (MMNPSY-Sp-Fund) monsoon)

54 Construction of Vyayamshala at Motilal 12,87,311.00 12,873.00 25,746.00 Class– 560.00 9 Months Nehru Nagar, Kokri Agar, Antop Hill, VI & (including Sion Koliwada above monsoon) (Sion Koliwada) (MMNPSY-Sp-Fund)

55 Construction of Samajik Sabhagruha at 8,58,207.00 8,582.00 17,164.00 Class– 560.00 9 Months Kamraj Nagar, Kokri Agar, Antop Hill, VII & above (including Sion Koliwada, Mumbai monsoon) (Sion Koliwada) (MMNPSY-Sp-Fund)

56 Beautification Work at Almeda 8,58,207.00 8,582.00 17,164.00 Class– 560.00 9 Months Compound, Pratiksha Nagar, Sion VII & above (including Koliwada, Mumbai monsoon) (Sion Koliwada) (MMNPSY-Sp-Fund)

57 Construction of Drain, Passage and 8,58,207.00 8,582.00 17,164.00 Class– 560.00 9 Months Providing and Laying Water Supply VII & above (including Pipe Line at Indira Nagar, Flac Road, monsoon) Sion Koliwada, Mumbai (Sion Koliwada) (MMNPSY-Sp-Fund)

58 Construction of Vachnalay at Motilal 8,58,207.00 8,582.00 17,164.00 Class– 560.00 9 Months Nehru Nagar, Kokri Agar, Antop Hill, VII & above (including Sion Koliwada monsoon) (Sion Koliwada) (MMNPSY-Sp-Fund)

59 Construction of Cultural Centre at 6,86,566.00 6,866.00 13,732.00 Class– 560.00 9 Months B. M. C. Colony Near Building No.3, VII & (including Sion Koliwada above monsoon) (Sion Koliwada) (MMNPSY-Sp-Fund)

60 Construction of Vachnalay at Vallabh 6,86,566.00 6,866.00 13,732.00 Class– 560.00 9 Months Bhai Patel Nagar, Kokri Agar, Antop VII & (including Hill, Kokri Agar, Antop Hill, Sion above monsoon) Koliwada, Mumbai (Sion Koliwada) (MMNPSY-Sp-Fund)

61 Construction of New Road at Shanti 17,16,414.00 17,164.00 34,328.00 Class– 560.00 12 Nagar Chwoky to Azad Mohalla Bharni, V-A & Months Antop Hill, Sion Koliwada, Mumbai above (including (Sion Koliwada) (MMNPSY-Sp-Fund) monsoon)

62 Construction of Cultural Centre at Shanti 17,16,414.00 17,164.00 34,328.00 Class– 560.00 12 Nagar Chwoky to Azad Mohalla Bharni, V-A & Months Antop Hill, Sion Koliwada, Mumbai above (including (Sion Koliwada) (MMNPSY-Sp-Fund) monsoon)

63 Providing and Fixing Paver Block and 12,87,311.00 12,873.00 25,746.00 Class– 560.00 9 Months Concreting Work at Bal Mitra Seva VI & (including Mandal, Shri. Sunder Kamla Nagar, above monsoon) Sion Koliwada (Sion Koliwada) (MMNPSY-Sp-Fund)

64 Construction of Budh Vihar at 12,01,490.00 12,015.00 24,030.00 Class– 560.00 9 Months Dr. Babasaheb Ambedkar Nagar, Sion VI & (including Koliwada, Mumbai above monsoon) (Sion Koliwada) (MMNPSY-Sp-Fund)

65 Providing and Fixing Ladikaran, 8,58,207.00 8,582.00 17,164.00 Class– 560.00 9 Months Construction of Drain and Passage and VII & above (including Beautification Work at Kamgar Vasahat monsoon) Near Sion Hospital, Sion (Shri. Rahul Shewale) (Beautification)

66 Construction of Drain, Passage, Red Soil 17,16,414.00 17,164.00 34,328.00 Class– 560.00 12 and Beautification Work at Mahul V-A & Months Gaon, Vashi Naka above (including (Shri. Rahul Shewale) (Beautification) monsoon)

67 Construction of Drain, Passage, Red Soil 17,16,414.00 17,164.00 34,328.00 Class– 560.00 12 and Beautification Work Near Shahid V-A & Months Smruti Maidan, Siddharth Colony, above (including Chembur monsoon) (Shri. Rahul Shewale) (Beautification)

68 Concreting Work, Construction of Drain 12,87,311.00 12,873.00 25,746.00 Class– 560.00 9 Months and Passage Near Siddheshwar Mandir, VI & (including Telecom Factory Deonar above monsoon) (Shri. Rahul Shewale) (Beautification)

69 Concreting Work, Construction of Drain 12,87,311.00 12,873.00 25,746.00 Class– 560.00 9 Months and Passage at Sharad Wadi, Vadwali, VI & (including Chembur above monsoon) (Shri. Rahul Shewale) (Beautification)

70 Concreting Work, Construction of Drain 12,87,311.00 12,873.00 25,746.00 Class– 560.00 9 Months and Passage at Shivaji Nagar, Vashi VI & (including Naka, Chembur above monsoon) (Shri. Rahul Shewale) (Beautification)

71 Providing and Fixing Ladikaran, 12,87,311.00 12,873.00 25,746.00 Class– 560.00 9 Months Construction of Drain and Passage Near VI & (including Bramhadev Mandal, Gatla Gaon, above monsoon) Chembur (Shri. Rahul Shewale) (Beautification)

72 Providing and Fixing Ladikaran, 12,87,311.00 12,873.00 25,746.00 Class– 560.00 9 Months Construction of Drain and Passage at VI & (including Azad Nagar, Matunga above monsoon) (Shri. Rahul Shewale) (MMNPSY)

73 Providing and Fixing Ladikaran, 10,29,848.00 10,298.00 20,596.00 Class– 560.00 9 Months Construction of Drain and Passage at VI & (including Kokari Agar, Wadala above monsoon) (Shri. Rahul Shewale) (MMNPSY)

74 Providing and Fixing Ladikaran, 12,87,311.00 12,873.00 25,746.00 Class– 560.00 9 Months Construction of Drain and Passage VI & (including Behind Samrat Ashok Mandal, Matunga above monsoon) Labour Camp (Shri. Rahul Shewale) (SIP)

75 Construction of Open Sabhagruha, Drain 12,87,311.00 12,873.00 25,746.00 Class– 560.00 9 Months and Passage and Providing and Fixing VI & (including Tiles Near Prahtamesh Society, Mumbai above monsoon) Granthalay Marg, Dadar (Shri. Ramdas Kadam) (MLC-LAD)

76 Providing and Laying Water Supply 5,14,924.00 5,149.00 10,298.00 Class– 560.00 9 Months Line and Fixing Pump at Vinayak VII & (including Apartment, Gokhale Road above monsoon) () (MMNPSY)

77 Reconstruction of Vidhi Hall for 42,91,035.00 42,910.00 85,820.00 Class– 560.00 12 Citizen's at Bhagoji Keer V & above Months Smashanbhumi, Jambekar Maharaj Path, (including Shivaji Park (Mahim) (SBVY) monsoon)

78 Construction of Open Sabhagruha, Drain 12,87,311.00 12,873.00 25,746.00 Class– 560.00 9 Months and Passage Near Panchakhate Chawl, VI & (including Bapurao Jagtap Marg, Byculla above monsoon) (Shri. Arvind Sawant) (MMNPSY)

79 Construction of Open Sabhagruha, Drain 14,28,571.00 14,286.00 28,572.00 Class– 560.00 9 Months and Passage Near Sankalp Siddhi VI & (including Society, Grant Road, Mumbai above monsoon) (Shri. Arvind Sawant) (MP-LAD)

80 Providing and Fixing Ladikaran, 5,35,714.00 5,357.00 10,714.00 Class– 560.00 9 Months Construction of Drain and Passage Near VII & above (including Panchaganga Building, N. M. Joshi monsoon) Marg, Lower Parel (Shri. Arvind Sawant) (MP-LAD)

81 Construction of Drain, Passage and 13,39,286.00 13,393.00 26,786.00 Class– 560.00 9 Months Providing and Fixing Ladikaran Near VI & (including R. B. Chandorkar Marg, Agripada, above monsoon) Mumbai (Shri. Arvind Sawant) (MP-LAD)

82 Construction of Drain, Passage and 13,39,286.00 13,393.00 26,786.00 Class– 560.00 9 Months Providing and Fixing Ladikaran Near VI & (including B. I. T. Chawl, Kai. Madhavrao Gangan above monsoon) Marg, Agripada, Mumbai (Shri. Arvind Sawant) (MP-LAD)

83 Repairs to Drainage Line and Asphalting 12,87,311.00 12,873.00 25,746.00 Class– 560.00 9 Months of Open Premises for Compound Wall at VI & (including Naigaon Between Kohinoor Compound above monsoon) (Dr.Mahisha Kayande) (MLC-LAD)

84 Concreting Work and Providing and 8,58,207.00 8,582.00 17,164.00 Class– 560.00 9 Months Fixing Ladi at Adarsha Nagar, VII & above (including Nirmala Co-op Hsg, Society, Building monsoon) No.19, Adarsha Nagar (Dr.Mahisha Kayande) (MLC-LAD)

85 Asphalting and Construction of Concrete 10,29,848.00 10,298.00 20,596.00 Class– 560.00 9 Months Passage at Janta Nagar, Tardeo VI & (including (Dr.Mahisha Kayande) (MLC-LAD) above monsoon)

86 Repairs to Drainage Line at Krushna 171641.00 1716.00 3432.00 Class– 224.00 6 Months Mohan Building, 71, Banganga Road, VIII & (including Mumbai (Malbar Hill) (MLA-LAD) above monsoon)

87 Providing and Laying New Water 85821.00 858.00 1716.00 Class– 224.00 6 Months Supply Pipe Line at Asha Nagar VIII & (including Rahiwashi Sangh Near Dr. Vikram above monsoon) Sarabhai Bridge 51 Nepean Sea Road, Mumbai (Malbar Hill) (MLA-LAD)

88 Repairs to Drainage Line and Providing 85821.00 858.00 1716.00 Class– 224.00 6 Months and Fixing Ladi Between House Gully at VIII & (including 47/B, Khotachi Wadi, Girgaon, Mumbai above monsoon) (Malbar Hill) (MLA-LAD)

Sr. Stage Desc. Date of Time period No 1 Publishing Date 16.02.2019, 10.00 2 Document sale start 16.02.2019, 10.05 3 Document sale end 22.02.2019, 17.35 4 Bid Submission start 16.02.2019, 10.05 5 Bid Submission end 22.02.2019, 17.35 6 Technical Bid Opening 25.02.2019, 17.35 onward 7 Price Bid Opening 26.02.2019, 17.35 onward

1. The Complete bidding process will be online (e-Tendering) in two bid system. All the notifications and detailed terms and conditions regarding this tender notice hereafter will be published on line on website https://mahatenders.gov.in MHADA Website –https://mhada.maharashtra.gov.in

2. Bidding documents can be loaded on the website https://mahatenders.gov.in from

Date 16.02.2019 at 10.05 to Date 22.02.2019 up to 17.35

3. The payment for Tender Form Fee and Earnest Money Deposit (EMD) must be made online

4. Technical Bids will be opened on dt.25.02.2019 from 17.35 p.m. onwards & Price bids will be opened on dt.26.02.2019 from 17.35 pm. onwards at the office of the Executive Engineer (City) / M S I B Room no. 539 4th Floor MHADA Kalanagar Bandra (East) Mumbai – 400 051 on web site http://mahatenders.gov.in

5. e-Tenderers should submit original documents (those were uploaded during bid preparation) for verification at the time of Technical Bid opening.

6. e-Tenderer should submit information and scanned copies in pdf format in Technical Envelope as mentioned in Technical Offer.

7. e-Tenderer should have valid class II/ III Digital Signature certificate (DSC) obtained from any certifying authority.

8. The Executive Engineer (City) / M.S.I. Board MHADA Kalanagar Bandra (East) Mumbai – 51 reserves the right to accept or reject any or all tenders without assigning any reason.

9. e-Tenderer shall refer detailed tender notice regarding Performance Security & other documents to be submitted.

10. Intending Bidders shall have to comply with the contents of G.R.No.Ôãã膛ãè-01/2015/¹ãÆ.‰ãŠ.20/ƒ½ãã.2 Dt.24/04/2015

11. Guidelines to download the tender docume nts and online submission of bids can be downloaded from website http://mahatenders.gov.in Help support:1800-233-7315 E-Mail – [email protected]

12. The Bidder should submit Envelop "C'' physically in the tender box with necessary enclosure in Office of Executive Engineer / City Div. M.S.I.B on or before 26/02/2019 upto 13.00 hrs.

Sd/- (D.N. Suryawanshi) Executive Engineer (City) M. S I B Board