Inforvial 27

Total Page:16

File Type:pdf, Size:1020Kb

Inforvial 27 INFORVIAL 27 CARRERA 80 · EconoMÍA CircULAR · RUTA DE LA PLATA ProYECTOS EN LONDRES · HEAThroW SOSTENIBLE · WEARABLES CARRERA 80 ROUTE · CircULAR EconoMY · RUTA DE LA PLATA ProJECTS IN LONDON ·SUSTAINABLE HEAThroW · WEARABLES R15 SUMME RANO/ E V www.ferrovial.com 26 INFORVIAL < Enfoque > El valor de las infraestructuras The value of infrastructures El valor de un proyecto de infraestructuras va más allá The value of an infrastructure project goes beyond the de la inversión que ha movilizado o de los desafíos técni- investment raised or the technical challenges overcome. tu desarrollo las distancias cos que ha superado. Hay que tener en cuenta también su One should also take into account its contribution to the contribución al desarrollo económico y social de la comu- economic and social development of the community in nidad en que se ubica. which it is located. En la ciudad colombiana de Medellín, Ferrovial Agroman In the Colombian city of Medellin, Ferrovial Agroman ha ejecutado el proyecto de ampliación de la Carrera 80, has carried out the Carrera 80 highway extension que ha propiciado la regeneración de la quebrada de La project, which has encouraged the regeneration of La Iguaná, una de las áreas más deprimidas del municipio. La Iguaná, one of the must deprived neighbourhoods in the comunicación con las juntas de acción comunal fue cons- town. Communication with community action boards tante y permitió reducir el impacto de las obras en el día a was constant, and made it possible to reduce the impact día de los vecinos. Además el proyecto creó más de 1.250 that building work had on the daily life of local residents. empleos, lo que dinamizó la economía de la zona. Furthermore, the project created more than 1,250 jobs, El desarrollo de comunidades vulnerables a través de la which provided a boost to the economy of the area. mejora y creación de sistemas de agua y saneamiento es la The development of vulnerable communities meta que persigue el programa Infraestructuras Sociales. through the improvement to, and creation of, water and A una nueva forma de aprender Solo en Colombia más de 9.000 personas se benefician ya sewerage systems is the goal being pursued by the Social de los proyectos ejecutados en el marco de este progra- Infrastructures programme. In Colombia alone more ma, a los que hay que sumar los 2.000 beneficiarios del than 9,000 people have already benefitted from the proyecto que se desarrollará este año en la localidad de projects that have been completed within the framework El Salado. of this programme, to which we should add a further Estos dos casos ilustran perfectamente el impulso social 2,000 from the project being undertaken this year in the y económico que traen consigo los proyectos de infraes- municipality of El Salado. tructuras. Pero, ojo, ese impulso no se produce solo en These two cases perfectly illustrate the social and comunidades vulnerables. Es algo intrínseco a todos los economic boost that infrastructure projects bring with Bienvenido al proyectos de este tipo. them. But, make no mistake, this boost doesn’t just occur Por citar un ejemplo, en Londres se están desarrollando in vulnerable communities. It is intrinsic to all projects of tres grandes proyectos de infraestructuras para responder this nature. a las necesidades de la creciente población de la urbe: la To quote one example, in London three large-scale SELF-LEARNING ampliación de la Northern Line del metro, un nuevo siste- infrastructure projects are underway as a response to the ma de alcantarillado, que tiene su eje central en el Tha- needs of the growing urban population: the extension of mes Tideway Tunnel, y Crossrail. En todos ellos participa the Northern Line of the Tube, a new system of drainage, Ferrovial Agroman. with its central axis in the Thames Tideway Tunnel, and de Ferrovial La preocupación por la comunidad y su entorno ha im- Crossrail. Ferrovial Agroman is involved in all three. pulsado al Aeropuerto de Heathrow a lanzar la estrategia Concern for the community and for its surroundings has Sustainable Heathrow 2020, que reducirá en un 34% sus led Heathrow Airport to launch its Sustainable Heathrow emisiones hasta 2020. El aeropuerto, además, está lle- 2020 strategy, which will reduce its emissions by 34% vando a cabo acciones para disminuir su consumo energé- between now and 2020. The airport, moreover, is working tico o potenciar el uso del transporte público o la bicicleta to reduce its energy consumption and maximise the use of para llegar a sus instalaciones. public transport or bicycles to reach its facilities. Asimismo, Ferrovial Servicios está apostando por desa- Furthermore, Ferrovial Services is committed to rrollar soluciones de economía circular, que generan valor developing circular economy solutions, which generate a partir de residuos. De hecho, este concepto defiende que value by recovering waste materials. In fact, this concept un producto nunca es residuo, sino una fuente de energía argues that a product is never waste, but actually a o una materia prima. Proyectos como la planta de Milton source of energy or a raw material. Projects such as the Keynes o el contrato de gestión de tratamiento de la Isla de Milton Keynes plant or the waste treatment management Wight siguen este modelo. contract on the Isle of Wight subscribe to this model. En definitiva, el valor de una infraestructura no sólo es In short, the value of an infrastructure is not just the la inversión que supone construirla, sino el crecimiento investment involved in its construction, but the economic económico y el desarrollo social que potencia. growth and social development that it drives. [email protected] 06 Ampliación de la Carrera 80: El valor de la comunidad Extension of the Carrera 80 Route: The value of community 04. OPINIÓN A FONDO/IN DEPTH PROFESIONES DIFERENTES/DIFFERENT PROFESSIONS TALENTO/TALENT OPINION 24. Economía Circular 42. Ministerio de Defensa de Reino Unido 52. eAcademy Circular Economy UK Ministry of Defense GRAN ANGULAR/WIDE ANGLE LENS 54. International Graduates Programme 28. Ruta de la Plata 44. BIZNEWS 06. Ampliación de la Carrera 80: Ruta de la Plata El valor de la comunidad 56. CIFRAS/BY NUMBERS Extension of the Carrera 80 Route: 32. Nuevas infraestructuras en Londres CÓMO SE HACE/HOW IT’S MADE New infrastructures in London The value of community 50. Wearables 36. Heathrow sostenible COMPROMISO/COMMITMENT Sustainable Heathrow 14. Infraestructuras Sociales en Colombia <Staff> Social Infrastructures in Colombia Edita/Published by: Dirección de Comunicación y Responsabilidad Corporativa. Jefe de Edición/Chief Editor: José Luis Cobas ([email protected]). Coordinador/Coordinator: Francisco José Campollo ([email protected]). Consejo Editorial/ PERFILES/PROFILES Editorial Team: José Luis Cobas (Corporación), María Cristina Casero (Aeropuertos), Iván González (Cintra), Silvia Lázaro (Corporación), Leonor Victoria Pablos (Construcción), Carlos Cerezo (Servicios) y Juan Ramón García (Corporación). Redacción/Edited by: Irene Cuéllar. Diseño/Design by: Thinko Studio ([email protected]). Impresión/Printed by: Grupo Impresa Distribución/Distributed by: Publidist S.A. Depósito Legal/Legal Deposit: M-4127-2008. Colaboran en este número/Contributions to this edition: Gonzalo Sales (Corporación), José Javier Sastre (Corporación), María Charcos (Corporación), Ángela Muñoz (Corporación), Alicia Herrera (Corporación), Gabriel Cuervo (Corporación), Lydia Alonso 40. Mario Móstoles, Director General Ferrovial (Corporación), Jaime Fagoaga (Servicios), Emma Watkins (Amey), Belén Sasiambarrena (Cintra), Marisol Lorenzo (Construcción), Cecilia Miravalles (Aeropuertos), Diana Barriga (Aeropuertos), Ana Rosa Victoria (CI3), y Pablo Hyam (CI3). VIVIR Y TRABAJAR/LIVING AND WORKING Inforvial no se identifica necesariamente con las opiniones expresadas en la revista. Queda prohibida la reproducción. Todos los derechos reservados. / Inforvial. Príncipe de Vergara 135. 28002. Madrid. E-mail: [email protected] Agroman Reino Unido e Irlanda Inforvial does not necessarily share the views expressed in this journal. Reproduction prohibited. All rights reserved. 18. Colombia: más allá de tópicos Mario Móstoles, Managing Director Ferrovial Traducción: Ábaco Multimedia. / Translation: Ábaco Multimedia. Colombia: Beyond the clichés Agroman UK and Ireland Foto de portada: Ampliación de la Carrera 80, Medellín, Colombia. / Cover photo: Extension of the Carrera 80 Route, Medellin, Colombia. [email protected] 04-05 INFORVIAL OPINIÓN ANTONIO Living Lab Guadalajara: ROMÁN JASANADA I+D+i a pie de calle Alcalde de Guadalajara LIVING LAB GUADALAJARA: RDI at STREET LEVEL Mayor of Guadalajara Desde el Ayuntamiento de Guadalajara apostamos por el de- nos mediante un panel electrónico y una aplicación web. sarrollo sostenible e integrado de nuestra ciudad, implementan- Por último, hemos abierto un nuevo canal de comunicación con do nuevas tecnologías y facilitando la I+D+i en entornos reales. los ciudadanos a través de Living Lab tuciudapp. Hemos instalado Una muestra de este compromiso es Living Lab Guadalajara, etiquetas con códigos QR en los postes de las luminarias. Leyéndo- un espacio para experimentar nuevas soluciones tecnológicas las con sus teléfonos móviles o tabletas, nuestros vecinos podrán verificando su funcionamiento a través de la interacción real con notificar incidencias y enviarnos sus sugerencias y consultas. Ade- el ciudadano. Este entorno nace dentro del marco de colabora- más, los turistas
Recommended publications
  • BAA Airport Wide Hydrogen Feasibility Study Stationary & Portable Fuel
    BAA Airport Wide Hydrogen Feasibility Study Stationary & portable fuel cells Final Report 10/03/11 [email protected] [email protected] Element Energy Limited 1 • Introduction & Executive Summary • Back-up and prime power applications • Hydrogen supply options • Building CHP and trigeneration applications • Biogas-fuelled systems • Portable power and UPS • Conclusions 2 Introduction: drivers for fuel cells This study is an assessment of opportunities for deployment of stationary and portable fuel cells at Heathrow Airport. The document complements a separate analysis of the opportunities for hydrogen transport applications. There are a number of drivers for consideration of fuel cells in stationary power applications at Heathrow. Key drivers include: • Reduction of CO2 emissions – Fuel cells offer the potential to reduce Heathrow’s CO2 emissions through more efficient heat and power generation. • Air Quality improvement – Use of fuel cells produces fewer NOx and particulate emissions, compared to incumbent systems. • Reliability and availability – Fuel cells can outperform batteries and gensets in certain critical back-up applications. • Low noise – Noise pollution is a significant issue at Heathrow. Fuel cells offer very quiet operation compared to incumbent gensets. • Integration with waste processing – Fuel cells could deliver benefits as part of an integrated waste management system at Heathrow • Synergy with transport applications – Adoption of hydrogen in both stationary and transport applications could be mutually beneficial 3 Introduction: Potential applications There are a range of potential applications around Heathrow where fuel cells could play a role: Prime and back-up power – diesel gensets are currently employed in a number of back-up power applications and there is interest in use of on-site generation in a peak-shaving mode (i.e.
    [Show full text]
  • Applicant's Responses to Written Representations
    Riverside Energy Park Applicant's responses to Written Representations VOLUME NUMBER: PLANNING INSPECTORATE REFERENCE NUMBER: EN010093 DOCUMENT REFERENCE: 08 8.02.14 June 2019 Revision 0 (Deadline 3) APFP Regulation 5(2)(q) Planning Act 2008 | Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009 Riverside Energy Park Applicant’s Response to Written Representations Contents 1 Introduction.................................................................................................................................... 1 2 Local Authority .............................................................................................................................. 2 2.1 Greater London Authority .............................................................................................. 2 2.2 Kent County Council .................................................................................................... 63 2.3 London Borough of Bexley .......................................................................................... 68 2.4 London Borough of Tower Hamlets ............................................................................ 97 3 Statutory Organisations ............................................................................................................... 99 3.1 East London Waste Authority ...................................................................................... 99 3.2 Environment Agency ................................................................................................
    [Show full text]
  • Outlook and Benefits of an Efficient U.S. Coal Fleet Final Report January 2019
    woodmac.com Outlook and Benefits of An Efficient U.S. Coal Fleet Final Report January 2019 Trusted Intelligence woodmac.com INTRODUCTION woodmac.com Outlook of US HELE Plants Objectives of this study (1) Benchmark the installed capacity of US HELE plants against other jurisdictions o Benchmarking of the US installed capacity of HELE plants o Lessons learned from other jurisdictions on what it takes to foster the development of HELE plants o Realistic scenarios for the pace of development of HELE plants in the US, in light of the experience of countries ahead of the curve (2) Estimate the positive impact of HELE plants not monetized by private investors o Estimate other benefits not monetized, not properly captured by private investors o Social valuation of HELE plants, encompassing benefits currently not monetized by investors (3) Drive implications for policies and regulations o Findings to foster the development of HELE plants in the US o Potential implications for coal policies and regulations 2 OUTLOOK AND BENEFITS OF AN EFFICIENT U.S. COAL FLEET woodmac.com Coal-fired power plants capacity has grown 62% globally since 2000, exceeding 2,000 GW in 2018 Coal still is and will continue to be a predominant fuel in the global energy matrix Global Coal-Fired Power Plants Installed Capacity GW 2,500 CAGR 2000-2018 2,013 2,000 +1.4% +2.7% -4.6% +62% 1,500 1,243 -0.8% +3.1% 1,000 998 +7.8% 500 440 +4.7% 282 238 -0.9% 0 2011 2004 2005 2006 2000 2001 2002 2003 2007 2008 2009 2010 2012 2013 2014 2015 2016 2017 2018 United States China India JKT1 Germany Western Europe2 Rest of World Note: 1.
    [Show full text]
  • Zero Carbon Haringey Stage 1 Technical Report
    Haringey Borough Council Zero Carbon Haringey Stage 1 Technical Report Issue 2 | 18 March 2018 This report takes into account the particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no responsibility is undertaken to any third party. Job number 258282-00 Ove Arup & Partners Ltd 13 Fitzroy Street London W1T 4BQ www.arup.com Document Verification Job title Zero Carbon Haringey Job number 258282-00 Document title Stage 1 Technical Report File reference 4-07 Document ref Revision Date Filename ZC_Haringey_Stage -1-Report_Draft-1_2018-01-29.docx Draft 1 29 Jan Description First draft 2018 Prepared by Checked by Approved by Name Stephanie Robson Anne Gilpin Stephen Cook Signature Issue 26 Feb Filename ZC_Haringey_Stage -1-Report_Issue_2018-02-26.docx 2018 Description Issue to client Prepared by Checked by Approved by Name Stephanie Robson Anne Gilpin Stephen Cook Signature Issue 2 18 Mar Filename ZC_Haringey_Stage -1-Report_Issue 2_2018-03-18c.docx 2018 Description Update following client comments Prepared by Checked by Approved by Name Stephanie Robson Anne Gilpin Stephen Cook Signature SR AG Filename Description Prepared by Checked by Approved by Name Signature Issue Document Verification with Document | Issue 2 | 18 March 2018 ZC_HARINGEY_STAGE-1-REPORT_ISSUE 2_2018-03-18.DOCX ZC_HARINGEY_STAGE-1-REPORT_ISSUE 2_2018-03-18.DOCX Haringey Borough Council Zero Carbon Haringey Stage 1 Technical Report Contents Page 1 Introduction 6 2 International, national and regional
    [Show full text]
  • New Model Terminal 2
    BUILDING AND LONDON, CONSTRUCTION UNITED KINGDOM NEW MODEL TERMINAL 2 Heathrow Airport www.heathrow.com THE T2 ENERGY CENTRE HEATHROW’S NEW TERMINAL 2 IS DESIGNED WITH SUCH ENVIRONMENTALLY SYMPATHETIC IS ONE OF THE UK’S INGENUITY THAT IT HAS BEEN USED AS A MODEL FOR THE WORLD’S FIRST BESPOKE ENERGY LARGEST BIOMASS EFFICIENCY ASSESSMENT CRITERIA FOR AIRPORT TERMINALS BY THE UK’S BUILDING INITIATIVES AND AT RESEARCH ESTABLISHMENT. FULL LOAD SAVES , 13 000 TONNES OF T2 has been Heathrow’s largest airside construction project, taking two and a half years to CO2 PER YEAR. complete and seeing its first flight on 4 June 2014. It was built with sustainability as a guiding principle and its detailed planning, innovation and collaboration with contractors saw T2 HEATHROW AWARDED completed on time, under budget with no impact on operations. A 15 YEAR CONTRACT TO BIOMASS ENERGY Terminal 2 is Heathrow’s most sustainable terminal and the first BREEAM (Building Research COMPANY LC Establishment’s environmental assessment methodology) certified airport terminal. It has set ENERGY, CREATING A the standard for environmental efficiency both in new developments at Heathrow and in airport SUSTAINABLE END-TO- terminals worldwide. This dynamic approach to sustainability, led to collaboration with BRE to END SUPPLY CHAIN. create its first bespoke assessment criteria for airport terminals, using T2 as a model. THE SPECIALLY- Examples of construction innovation include: 99% of construction waste being diverted from COMMISSIONED landfill; LED lighting for site boundaries reducing energy consumption by 50%; design layout CONSTRUCTION ACADEMY reduces aircraft taxi times and CO2 emissions; windows designed to maximise natural light HAS PROVIDED PRE- and reduce the need for artificial lighting; water efficiency measures projected to reduce water EMPLOYMENT TRAINING consumption by 30%.
    [Show full text]
  • Increasing the Efficiency of Existing Coal-Fired Power Plants
    Increasing the Efficiency of Existing Coal- Fired Power Plants Richard J. Campbell Specialist in Energy Policy December 20, 2013 Congressional Research Service 7-5700 www.crs.gov R43343 Increasing the Efficiency of Existing Coal-Fired Power Plants Summary Coal has long been the major fossil fuel used to produce electricity. However, coal-fired electric power plants are one of the largest sources of air pollution in the United States, with greenhouse gas (GHG) emissions from burning of fossil fuels believed to be the major contributor to global climate change. Regulations under development at the Environmental Protection Agency (EPA) would impose new requirements on fossil-fueled (mostly coal-fired) power plants (CFPPs) to control GHG emissions. The first of these requirements was issued in September 2013 with proposed standards for the control of carbon dioxide (CO2) emissions from new electric generating units burning fossil fuels. EPA’s proposals for control of GHG emissions from existing power plants are expected by June 2014, with many options under consideration. EPA may target emissions on a state or plant-by-plant basis, with companies likely given choices for compliance. Within such a system, efficiency improvements can be an important contributor. The overall efficiency of a power plant encompasses the efficiency of the various components of a generating unit. Minimizing heat losses is the greatest factor affecting the loss of CFPP efficiency, and there are many areas of potential heat losses in a power plant. Efficiency of older CFPPs becomes degraded over time, and lower power plant efficiency results in more CO2 being emitted per unit of electricity generated.
    [Show full text]
  • ASX Statement
    AGL Energy Limited Level 22, 101 Miller St Locked Bag 1837 T: 02 9921 2999 ABN: 74 115 061 375 North Sydney NSW 2060 St Leonards NSW 2065 F: 02 9921 2552 www.agl.com.au ASX statement 17 September 2012 Annual Report 2012 AGL Energy Limited is about to commence dispatch of its Annual Report 2012. A copy is attached. Paul McWilliams Company Secretary 1 AGL Energy Limited ABN: 74 115 061 375 All Registry communications to: Link Market Services Limited T 1800 824 513 E [email protected] Locked Bag A14 From outside Australia: www.agl.com.au Sydney South NSW 1235 T +61 2 8280 7115 ASX Code: AGK Australia F +61 2 9287 0303 Dear Shareholder, I am pleased to invite you to attend the 2012 Annual General Meeting of Shareholders (AGM), which has been scheduled as follows: Date: Tuesday 23 October 2012 Time: 10.30am (Sydney time) Venue: City Recital Hall, Angel Place, Sydney The business to be dealt with at the AGM is provided in the enclosed Notice of Meeting. If you are able to attend the AGM, please bring the enclosed Shareholder Voting Form with you to facilitate registration at the AGM. If you do not plan on attending the AGM, you are encouraged to appoint a proxy to attend and vote on your behalf by lodging your proxy appointment online at www.linkmarketservices.com.au or by completing the enclosed Shareholder Voting Form and returning it in the envelope provided. Instructions on how to appoint a proxy are detailed on the back of the Shareholder Voting Form.
    [Show full text]
  • On Energy Demand by Wolf Hafele
    SCIENTIFIC AFTERNOON LECTURE AT THE 21st GENERAL CONFERENCE OF THE INTERNATIONAL ATOMIC ENERGY AGENCY VIENNA, SEPTEMBER 1977 On Energy Demand by Wolf Hafele Introduction Since the energy crisis, a number of energy plans have been proposed, and almost all of these envisage some kind of energy demand adaptations or conservation measures, hoping thus to escape the anticipated problems of energy supply. However, there seems to be no clear explanation of the basis on which our foreseeable future energy problems could be eased. And in fact, a first attempt at a more exact definition of energy demand and its interaction with other objectives, such as economic ones, shows that it is a highly complex concept which we still hardly understand. So it may be appropriate to explain in some detail why it is so difficult to understand energy demand. Energy Flow Schemes Figure I shows the flow of energy through the economy of the Federal Republic of Germany in 1975 in millions of tons of coal equivalent, or gigawatt years. By far the largest share of the primary energy undergoes a conversion into forms of energy that are more convenient and more easily handled, which are called secondary energy. Electricity and gasoline, the most prominent examples, are transported to the consumer. The largest consumer sector is households and commercial activities, consuming 45% of all secondary energy; industry follows with 36%, and transportation with 14%. The use of secondary energy also leads to conversion losses, which are as high as 56%. Besides these principal lines of energy flow in Figure 1, there are numerous other thinner lines and sidelines that cannot simply be overlooked in a discussion of energy demand and its future evolution.
    [Show full text]
  • Flood Risk Assessment
    NORTH LONDON WASTE AUTHORITY NORTH LONDON HEAT AND POWER PROJECT FLOOD RISK ASSESSMENT The Planning Act 2008 The Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009 Regulation 5 (2) (e) AD05.14 Amec Foster Wheeler Revision 0 October 2015 Any disclosure of this report to a third party is subject to this disclaimer. The report was prepared by Amec Foster Wheeler at the instruction of, and for use by our client, and takes into account the instructions and requirements of our client. It does not in any way constitute advice to any third party who is able to access it by any means. Amec Foster Wheeler excludes to the fullest extent lawfully permitted all liability whatsoever for any loss or damage howsoever arising from reliance on the contents of this report by any third party. We do not however exclude our liability (if any) for personal injury or death resulting from our negligence, for fraud or any other matter in relation to which we cannot legally exclude liability. North London Waste Authority North London Heat and Power Project Flood Risk Assessment Contents Page Executive summary 1 1 Introduction 4 1.1 Introduction 4 1.2 Purpose of this document 4 1.3 Document structure 5 1.4 The Applicant 5 1.5 The Application Site 6 1.6 Surrounding area 7 1.7 The Project 8 1.8 Stages of development 12 2 The existing Application Site 19 2.1 Application Site description 19 2.2 Topography 19 2.3 Hydrology 22 2.4 Existing drainage 24 2.5 Geology, hydrogeology and soils 24 3 Proposed ground cover 28 4 Planning context
    [Show full text]
  • Coal-Power Plants Rejuvenated with Biomass: an Economic, Social, and Environmentally Sustainable Transition to Clean Power
    United States Department of Agriculture Office of the Chief Economist Office of Energy Policy and New Uses Coal-Power Plants Rejuvenated With Biomass: An Economic, Social, and Environmentally Sustainable Transition to Clean Power August 2017 i Coal-Power Plants Rejuvenated With Biomass: An Economic, Social, and Environmentally Sustainable Transition to Clean Power Authors Sarah Stutzman* Brandon Weiland Juan Sesmero Paul Preckel Michael Wetzstein James Duffield Sarah Stutzman is an economist in the U.S. Bureau of Economic Analysis. Brandon Weiland is a graduate research assistant in the Department of Agricultural Economics, Purdue University. Juan Sesmero is an assistant professor, and Paul Preckel and Michael Wetzstein are professors in the Department of Agricultural Economics, Purdue University. James Duffield is an agricultural economist, Office of Energy Policy and New Uses, USDA. *This paper was prepared while Sarah Stutzman was a graduate student at Purdue University. The opinions expressed in this paper are the authors’ own and do not reflect the views of the Bureau of Economic Analysis, the U.S. Department of Commerce, the U.S. Department of Agriculture or the United States Government. ii In accordance with Federal civil rights law and U.S. Department of Agriculture (USDA) civil rights regulations and policies, the USDA, its Agencies, offices, and employees, and institutions participating in or administering USDA programs are prohibited from discriminating based on race, color, national origin, religion, sex, gender identity (including gender expression), sexual orientation, disability, age, marital status, family/parental status, income derived from a public assistance program, political beliefs, or reprisal or retaliation for prior civil rights activity, in any program or activity conducted or funded by USDA (not all bases apply to all programs).
    [Show full text]
  • Power Generation from Coal Using Supercritical CO2 Cycle
    Power generation from coal using supercritical CO2 cycle Qian Zhu CCC/280 December 2017 © IEA Clean Coal Centre Power generation from coal using supercritical CO2 cycle Author: Qian Zhu IEACCC Ref: CCC/280 ISBN: 978–92–9029–603-4 Copyright: © IEA Clean Coal Centre Published Date: December 2017 IEA Clean Coal Centre Apsley House Third Floor 176 Upper Richmond Road London SW15 2SH United Kingdom Telephone: +44(0)20 3095 3870 www.iea-coal.org 2 IEA Clean Coal Centre – Power generation from coal using supercritical CO2 Preface This report has been produced by IEA Clean Coal Centre and is based on a survey and analysis of published literature, and on information gathered in discussions with interested organisations and individuals. Their assistance is gratefully acknowledged. It should be understood that the views expressed in this report are our own, and are not necessarily shared by those who supplied the information, nor by our member countries. IEA Clean Coal Centre is an organisation set up under the auspices of the International Energy Agency (IEA) which was itself founded in 1974 by member countries of the Organisation for Economic Co-operation and Development (OECD). The purpose of the IEA is to explore means by which countries interested in minimising their dependence on imported oil can co-operate. In the field of Research, Development and Demonstration over fifty individual projects have been established in partnership between member countries of the IEA. IEA Clean Coal Centre began in 1975 and has contracting parties and sponsors from: Australia, China, the European Commission, Germany, India, Italy, Japan, Poland, Russia, South Africa, Thailand, the UAE, the UK and the USA.
    [Show full text]
  • 2019 Load & Capacity Data
    2019 Load & Capacity Data A report by The New York Independent System Operator, Inc. Gold Book 2019 Load & Capacity Data Report Caution and Disclaimer The contents of these materials are for information purposes and are provided “as is” without representation or warranty of any kind, including without limitation, accuracy, completeness or fitness for any particular purpose. The New York Independent System Operator, Inc. assumes no responsibility to the reader or any other party for the consequences of any errors or omissions. Released April 2019 2019 Load & Capacity Data Report NEW YORK INDEPENDENT SYSTEM OPERATOR 2019 LOAD & CAPACITY DATA TABLE OF CONTENTS OVERVIEW ............................................................................................................................. 1 SECTION I: ANNUAL ENERGY & PEAK DEMAND – HISTORICAL & FORECAST ................ 7 SECTION I ................................................................................................................................................................ 9 TABLE I-1A: NYCA BASELINE ENERGY AND DEMAND FORECASTS ............................................................................. 11 TABLE I-1B: SUMMARY OF NYCA ANNUAL ENERGY FORECASTS – GWH .................................................................... 12 TABLE I-1C: SUMMARY OF NYCA SUMMER COINCIDENT PEAK DEMAND FORECASTS - MW ........................................ 13 TABLE I-1D: SUMMARY OF NYCA WINTER COINCIDENT PEAK DEMAND FORECASTS - MW .......................................... 14 TABLE
    [Show full text]