Content Brief Summary of Jetty and Related Infrastructures ………………………………………………………2 Integrated Project at a Glance
Total Page:16
File Type:pdf, Size:1020Kb
Executive Summary for Jetty and components of Integrated Unit , Lakhpat Cement Works , ACL CONTENT BRIEF SUMMARY OF JETTY AND RELATED INFRASTRUCTURES ………………………………………………………2 INTEGRATED PROJECT AT A GLANCE .............................................................................................. 3 BRIEF SUMMARY ............................................................................................................................ 5 1. INTRODUCTION ...................................................................................................................... 7 1.1 Project Concept.......................................................................................................... 7 1.2 Promoter’s Background ............................................................................................ 8 1.3 Need for the Project and its Importance to the Country and Region .............. 8 2. SITE ANALYSIS ........................................................................................................................ 9 2.1 Site Selection .............................................................................................................. 9 2.2 Location ..................................................................................................................... 10 3. PROJECT DESCRIPTION ......................................................................................................... 13 3.1 Mining ........................................................................................................................ 13 3.2 Cement Plant ............................................................................................................ 13 3.3 Conveyor Corridor Berthing Jetty ......................................................................... 15 4. PROPOSED INFRASTRUCTURE ............................................................................................... 19 4.1 Land Area ................................................................................................................... 19 4.2 Greenbelt Development .......................................................................................... 19 4.3 Water Requirement.................................................................................................. 19 4.6 Employment Generation ......................................................................................... 19 4.7 Power Requirement ................................................................................................. 19 4.8 .......................................................................................................................................... 20 Land Compensation ............................................................................................................ 20 5. ENVIRONMENTAL ................................................................................................................. 21 6.1 Gaseous Emissions and Control ............................................................................ 21 6.2 Noise Emissions ........................................................................................................ 21 6.3 Sewage and Effluent Treatment ........................................................................... 21 6.4 Site Drainage ............................................................................................................ 21 6.5 Roads .......................................................................................................................... 21 6. PROJECT SCHEDULE & COST ESTIMATION ............................................................................. 22 7. ANALYSIS OF PROPOSAL ....................................................................................................... 25 1 Executive Summary for Jetty and components of Integrated Unit , Lakhpat Cement Works , ACL BRIEF SUMMARY OF JETTY AND RELATED INFRASTRUCTURES Adani Cementation Limited (ACL) is planning of setting up Cement Plant in Lakhpat Taluka, District Kutch in Gujarat. The proposed Cement plant will have potential to produce up to 12 Million Tonnes of Cement & Clinker. In order to serve the requirement of raw materials and product transportation ACL is planning to develop captive jetty as there are No ports in near vicinity. ACL plans to develop a dry bulk terminal along with ancillary infrastructure facilities and desalination plant (30000 m3/Day intake which will generate 9000 m3/Day product) to cater the water requirement of the integrated project of Cement Plant, Captive Power Plant, Mines and Jetty. Desalination plant with intake and outfall will be provided within the backup area. Berthing Jetty is proposed in Kori Creek with anchorage in Gulf of Kutch of Arabian Sea, the taluka headquarter. The draft available at selected Jetty location is approximately 6m. Location details of the Jetty and the Backup area are given in the table below: Location Dimension Capacity Latitude Longitude Jetty Length: 23°44'50.99"N, 68°34'41.81"E 820m approx. Water Front 23°44'36.93"N, 68°34'50.69"E 15 MMTPA (Jetty) 23°44'53.27"N, 68°35'21.23"E Jetty Width: 23°45'07.33"N, 68°35'12.35"E 28m approx. Location Area Latitude Longitude 4.05 Ha approx. 23°44'10.41"N 68°36'48.04"E In CRZ area near the village Back Up 23°44'17.86"N 68°36'49.96"E Kapurashi StorageArea 23°44'8.83"N 68°36'53.95"E 23°44'15.96"N 68°36'55.80"E Cargo Volumes of raw material and finished products are given below: Quantity Sr No Commodity (MMTPA) 1 Clinker 8 2 Cement 3 3 Limestone 1 4 Coal/Pet Coke 3 5 Total 15 ACL will provide supporting mechanized handling facilities at the proposed location to handle raw material as well as finished products in phased manner. Jetty and Back up Area will be connected through conveyor corridor. 2 Executive Summary for Jetty and components of Integrated Unit , Lakhpat Cement Works , ACL INTEGRATED PROJECT AT A GLANCE Company Adani Cementation Limited (ACL) ACL proposed to setup Lakhpat Cement Works for integrated project including Limestone Mine, Cement Plant, Conveyor Corridor and Berthing Project Concept Jetty in Kori Creek with anchorage in Gulf of Kutch in Tehsil Lakhpat, District Kutch (Gujarat) Part of Project Area (Ha) Commodity Capacity Unit Limestone Mine 251.9 Limestone 12 MMTPA 4.05 Clinker 8 MMTPA Captive Jetty (Backup Cement 3 MMTPA (820m x 28m) Storage Project/Production Limestone 1 MMTPA Area) Capacity Coal/ Petcoke 3 MMTPA Clinker 10 MMTPA Cement Plant + 198.32 Conveyor Corridor Cement 3 MMTPA Captive Power Within Plant (TPP & Cement Power 99 MW WHRS) Plant Location Latitude Longitude Mudhvay Limestone Mine: 23°43'59.93" N 68°41'51.66" E Village: Mudhvay, 23°44'04.90" N 68°42'08.92" E Tehsil Lakhpat, 23°42'52.44" N 68°42'40.94" E District Kutch (Gujarat) 23°42'43.64" N 68°41'53.25" E 23°43'42.76"N 68°40'26.67"E Cement Plant: 23°43'54.26"N 68°39'46.54"E Village: Koriyani, 23°44'35.90"N 68°39'42.44"E Tehsil Lakhpat, 23°44'45.52"N 68°40'11.01"E District Kutch (Gujarat) 23°44'28.97"N 68°40'44.72"E Conveyor Corridor: 23°44'5.63"N 68°41'33.34"E Plant Location and Village: Maldo, Mudhvay, 23°44'20.04"N 68°38'46.29"E Geographical Koriyani and Kapurasi, Coordinate Tehsil Lakhpat, 23°44'15.09"N 68°36'56.19"E District Kutch (Gujarat) Water Front (Jetty) 23°44'50.99"N, 68°34'41.81"E Berthing Jetty in Kori Creek 23°44'36.93"N, 68°34'50.69"E with anchorage in Gulf of 23°44'53.27"N, 68°35'21.23"E Kutch and Backup Storage 23°45'07.33"N, 68°35'12.35"E Area near village Kapurasi of Backup Storage Area Tehsil Lakhpat, District Kutch 23°44'10.41"N 68°36'48.04"E (Gujarat) 23°44'17.86"N 68°36'49.96"E 23°44'8.83"N 68°36'53.95"E 23°44'15.96"N 68°36'55.80"E Toposheet No. : 41A/10 - 1(a) Limestone Mine S. No. in the Schedule - 3(b) Cement Plant (Category as per EIA : Notification 2016) - 1(d) CPP - 7(e) Berthing Jetty with anchorage in Gulf of Kutch Land Area : Activity Area (in Ha.) Limestone Mine 251.90 Cement Plant 190.23 Conveyor Corridor 8.09 3 Executive Summary for Jetty and components of Integrated Unit , Lakhpat Cement Works , ACL Backup Storage near Jetty 4.05 Total 454.27 Distance in Mode of Material Source Km Transport Clinker From Plant to Jetty ~ 8km By Conveyor i. Coal: Imported ~ 8km (Jetty to Plant) i. By Conveyor Fuel ii. Lignite: Domestic ii. By Road ~ 20km (GMDC Mine) From Mundra to Silica Sand ~210km By Road Material Plant Transportation, i. Imported: From : i. ~ 8km Sources and Jetty to Plant i. By Conveyor Gypsum Distances ii. Domestic: From ii. By Road ii. ~160km village Ler to Plant i. From Mine to Limestone - Plant i. ~2km By Conveyor High Grade ii. From Mine to ii. ~ 12km Jetty Limestone - From GMDC Mine to ~20km By Road Low Grade Plant Cement From Plant to Jetty ~ 8km By Conveyor 125 MVA (Sourced from GVUNL/ Solar Power Plant/ WHRS/ Coal Power Requirement : based CPP) Water Requirement : 9000 m3/day (Sourced from Sea – Desalinated Water) Man Power Construction : ~630 (Direct ~30 + Indirect ~600) : Requirement Operation : ~600 (Direct ~150 + Indirect ~450) Nearest Rly. Stn. / Bhuj Railway Station : ~130 km : Airport Rudra Mata Domestic Airport at Bhuj : ~130 km Nearest town/city/DH : Bhuj (130 km) The climate of the district of Kutch is arid and moderate humidity. Climate : The coldest month is January and the hottest is May. Project Main Machinery Ordering Phase : 6 Month Implementation : Construction Phase : 30 Months period Total : 36 Months Cost of the Project : Rs. 5330/- Crore (Approx.) for all 3 phases 4 Executive Summary for Jetty and components