SIX MONTHLY COMPLIANCE REPORT PERIOD: April, 2019 To September, 2019

th EC File No: 21-6/2013-IA.III dated 14 July, 2017

DEVELOPMENT OF JODHPUR PALI INDUSTRIAL AREA (JPMIA), DISTRICT PALI, SUB-REGION OF DMIC

By

DELHI INDUSTRIAL CORRIDOR DEVELOPMENT CORPORATION LIMITED (DMICDC)

Submitted By:

Delhi Mumbai Industrial Corridor Development Corporation Limited 8th Floor, Tower-1, Jeevan Bharti Building, 124, Connaught Place, -110001 Contact: +011-23317886 Web: www.dmicdc.com

CONTENTS 1. Project Background ...... 3 2. Information sheet ...... 4 3. Status oF EC Letter condition’s Compliance as on 30 th September, 2019 ...... 10 Annexures: ...... 24

2

Project Background

The Government of (GoI) has proposed the development of a Dedicated Freight Corridor (DFC) between Dadri and Jawahar Lal Nehru Port Trust (JNPT) covering a total length of 1504 km traversing via ---Phulera- through five states. To tap the development potential of the proposed freight corridor, a band spanning 150 kilometres on both sides of the freight corridor has been identified as the Influence Region and is proposed to be developed as Delhi-Mumbai Industrial Corridor (DMIC). Twenty-Four (24) industrial nodes comprising of Investment Regions (IR) and Industrial Areas (IA) have been identified along the length of this corridor. In line with this development strategy, the Delhi Mumbai Industrial Corridor Development Corporation Limited (DMICDC), a SPV formed under Ministry of Commerce and Industry (MoCI), Government of India, is undertaking the development of JPMIA in district Pali, Rajasthan in partnership with the State Government. Department of DMIC, Govt. of Rajasthan is the nodal agency responsible for coordination between the DMICDC and state government for proposed project implementation.

The Project involves development of Jodhpur Pali Marwar Industrial Area (JPMIA) in a total area of about 154.37 sq kms. The proposed Urbanisable area is about 64.25 sq. km, while rest will be planned as Peripheral Control Belt with agriculture and controlled development. This is planned to be located at the Jodhpur- border and at about 40 Kms from Jodhpur and 25 km from Pali. Manufacturing Industries with a large base of SMSE’s is identified as the major economic driver for the proposed development of the region. Total Water requirement for Potable purpose is about 60 MLD and water for industrial use is about 50 MLD. Source of fresh water identified is Indira Gandhi Nahar Pariyojna (IGNP) through Rajiv Gandhi Lift Canal (RGLC). Solid Waste generation will be about 82 MTD. Public transport will be developed at two levels, 1) Within JPM IA and 2) between JPM IA with neighboring Urban Centers of Jodhpur and Pali. This will comprise of BRTS along with dedicated Cycle and pedestrian tracks within the JPM IA. For regional connectivity, BRTS through bus fleet augmentation and development of Pali- Sojat bypass (about 21 km length) has been planned.

There is a provision for the development of Integrated Multi Modal Logistics Hub (MMLH) with an area of about 2 sq.km within the JPMIA. The components of MMLH are 1) Transportation facility and rail sidings, 2) Warehousing Facilities, 3) Supporting utilities and infrastructure and 4) Value added services such as Packaging, etc. This MMLH is expected to handle a Cargo of about 25 MT per annum in 2042. There is no Reserved or Protected forest in the identified JPM IA. There is no existence of any Wildlife Park/ Bird Sanctuary/ Notified Eco-sensitive Zone within a distance of 10 km from the periphery of JPM IA.

The project has been accorded Environmental Clearance vide F. No. 21-6/2013-IA.III dated 14th July, 2017. (Refer Annexure 1)

3

1. INFORMATION SHEET Monitoring the Implementation of Environmental Safeguards

Ministry of Environment Forest & Climate Change,

Regional Office (Central Region),

Lucknow

MONITORING REPORT PART – I DATA SHEET Sl. Particulars Details No. 1. Project type: River Valley / : Other- Industrial Area Mining / Industry / Thermal / The project falls under item 7(c) i.e Industrial Estate/ Nuclear / Others (specify) park and 8(b) i.e Township and Area development under the provisions of the Environment Impact Assessment Notification, 2006 and amendments thereto and Circulars issued thereon. 2. Name of the Project : ‘Jodhpur –Pali- Marwar Industrial Area (JPMIA)’ in District Pali, Rajasthan by M/s Delhi Mumbai Industrial Corporation (DMICDC) 3. Clearance letter (s) / OM No. and : File No.: 21-6/2013-IA.III dated 14th July, 2017 date 4. Location Pali a) District (s) : b) State (s) : Rajasthan

c) Location latitude / : The project area is bounded by Latitude longitude 25°52'42.57"N to 26°1'41.38"N and Longitude 73°0'52.86" E to 73° 1' 26.72" E.

5. Address for Correspondence : CEO & Managing Director, a) Address of the Concerned Delhi Mumbai Industrial Corridor Development Project Chief Engineer Corporation Limited, (with Pin code & 8th Floor, Tower-1, Jeevan Bharti Building, Telephone / Telex / Fax 124, Connaught Place, Numbers) New Delhi-110001 Contact: +011-23317886

4

b) Name & address of Nodal S.L.Sethi, Officer (with Phone No./Fax Senior Town Planner, Number(s)/Mobile No.s) Delhi Mumbai Industrial Corridor 3rd Floor, RFC Wing, Udyog Bhawan, , Rajasthan Phone No- 0141-222820 Mobile-9414045069 c) Name & address of the Commissioner, Concerned Project In-charge Delhi Mumbai Industrial Corridor, (with Phone No. /Fax Number(S)/ Room No-210, First Floor, Mobile No.s RFC Wing, Udyog Bhawan, Jaipur, Rajasthan Phone No- 0141-2227810 d)Present Status of the project; Project yet to be started. date of commencement of construction work along with quantum of work completed/date of operation.

6. Salient features : Project The JPMIA is proposed as a major a) of the Project Spectrum new industrial hub located on a greenfield site at about 25 km from Pali and 40 km from Jodhpur. The development of the JPM IA will span over three decades where it moves from a fledgling Industrial area, kick started by the DFC, MMLH and dependent on the existing urban centers of Jodhpur and Pali to evolve as a Primary Industrial city in the Marwar Region. Total Plot Area Total area delineated as an Industrial area would be approximately 154.37 sq. km. The proposed site of industrial area consists of agricultural land under both private and government ownership, land for cattle grazing, barren land, village settlements and village ponds etc. Project Resident Population projections have been Population size carried out based on the relationship of employment potential with expected industrial

5

output production. The Development Plan has been prepared for the overall resident population of 3.92 lac until the horizon year of 2042. Employment The project is generally expected to bring in positive social impacts in terms of employment for locals. In addition to employment, the infrastructure facilities in the project area and surroundings will improve significantly. However, in the absence of due care, development of the JPMIA may induce negative impacts, during the construction and operational phases. It is estimated that project will provide about 66000 jobs by the horizon year 2022 and 315,000 jobs by the horizon year 2042. Water Demand During Operation: water demand for the project is expected 14 MLD by 2022, 32 MLD by 2032, and 61 MLD by 2042. Source of Water The prime source of water will be Rajiv Gandhi Lift Canal. Water from this canal will be brought to Jodhpur. From Jodhpur water will be transmitted through an existing pipeline after its rehabilitation. Waste Water Wastewater generated in the generation JPMIA will be treated in phases at sewage treatment plants (STPs) for this a STP of 41 MLD capacity has been planned. For industrial waste water treatment, common effluent treatment plant (CETPs) of 10 MLD for Phase (up to horizon year 2022) and 35 MLD for the year 2042. Sewage Approx. 41 MLD STP Treatment Plant MBR technology (STP) Effluent Individual industries to treat Treatment Plant effluent up to secondary (ETP) treatment.

6

Common For industrial waste water Effluent treatment, common effluent Treatment treatment plant (CETPs) of 10 MLD Plant (CETP) for Phase (up to horizon year 2022) and 35 MLD for the year 2042. Municipal Solid The solid waste generated during Waste construction works and from generation labour camps shall be disposed off in authorized landfill through the vendor. The sewage generated from labour camp shall be disposed off in soak pits and septic tanks.

During the operational phase, an integrated approach will be adopted in the JPMIA to efficiently manage the solid waste generated in the region. The waste that will be generated in the JPMIA can be broadly categorized as municipal waste and industrial waste.

An area of about 100 ha has been identified for the Integrated Waste Management Facility (IWMF) to be provided in the JPMIA to deal with all wastes. Power Total power requirement during requirement for construction phase will be about 2 MIP MVA and will be met through installation of DG sets at construction sites. During operation phase power demand has been estimated as 91, 294 and 755 MVA in the horizon year 2022, 2032 and 2042 respectively. This power demand will be met from 132/220 Grid Substations available in project region. Suitable electric supply network will be developed in the JPMIA. Cost of the Infrastructure Development Cost - Project Approx. INR 10,000 Crore b) of the Environmental Management Plans

7. Breakup of the Project Area : There is no diversion of Forest Land involved.

7

a) Submergence area: forest & non-forest b) Others Total Area: 15,437 ha.

8. Breakup of the project affected : The propose site for Industrial area would be population with the enumeration approximately of about 154.37 sq km. Out of this of those losing Houses / Dwelling urbanisable area would be 58.99 sq km. units only, Agricultural Land & Existing land use primarily consists of agricultural land Landless Laborers / Artisans: under both private and government ownership, land a) SC, ST / Adivasi for cattle grazing, village settlements and village b) Others ponds. (please indicate whether these There will be permanent change in land use as per figures are based on any scientific provisions of master plan. The topography of the site is and systematic survey carried out plain. or only provisional figures, if a Different set of activities like industrial, residential, survey is carried out give details and basic facilities required in a city have been & year of survey) proposed in the master plan of JPM IA. 9 a) Financial Details: Project cost as : Infrastructure Development Cost -Approx. INR 10,000 originally planned and Crores. subsequent revised estimates and the year of price reference b) Allocation made for : NA environmental management Project yet to be started plans with item wise and year wise breakup

8

c) Benefit cost ratio/Internal rate of : NA Return and the year of Project yet to be started assessment d) Whether includes the cost of : NA environmental management as Project yet to be started shown in the above e) Actual expenditure incurred on : NIL the project so far Project yet to be started f) Actual expenditure incurred on : None the environmental management Project yet to be started plans so far 10 Forest Land Requirement There is no diversion of Forest Land under this project. a) The status of approval for : NA diversion of forest land for non- forestry use b) The status of clearing felling : NA c) The status of compensatory : NA afforestation, if any d) Comments on the viability & : NA sustainability of compensatory afforestation program in the light of actual field experience so far 11 The status of clear felling in non- : NA forest areas (such as submergence area or reservoir, approach roads.), if any with quantitative information required. 12 Status of construction (Actual & : Construction work is not commenced yet /or planned) a) Date of commencement (Actual : Construction work is not commenced yet & / or planned) b) Date of completion (Actual &/or : Construction work is not commenced yet planned) 13 Reasons for the delay if the : Construction work is not commenced yet project is yet to start 14 Dates of Site Visits a) The dates on which the project : NA was monitored by the Regional Office on previous occasions, if any b) Date of site visits for this : NA monitoring report

9

Compliance of conditions of Environmental Clearance (F.No. 21-6/2013-IA.III dated 14.7.2017) for October, 2018 to March, 2019. .

PART A: SPECIFIC CONDITIONS I. Construction Phase Sl. No. Conditions Compliance Status (i.) “Consent for Establishment" shall be Noted. obtained from State Pollution Control Consent to Establish would be obtained from Board under Air (Prevention and State Pollution Control Board. Control of Pollution) Act, 1981 and Water (Prevention and Control of Pollution) Act, 1974. (ii.) To achieve the Zero Liquid Discharge, Noted & will be complied. waste water generated from different industrial operations should be properly collected, treated to the prescribed standards and then recycled or discharged for the identified uses. (iii.) Necessary authorization required Noted & will be complied. under the Hazardous and Other Wastes (Management and Trans- Boundary Movement) Rules, 2016, Solid Waste Management Rules, 2016 shall be obtained and the provisions contained in the Rules shall be strictly adhered to. (iv.) During construction phase, air Noted & will be complied. pollution and the solid waste management aspects need to be properly addressed ensuring compliance of the Construction and Demolition Waste Management Rules, 2016. (v.) As per the provisions of the Noted & will be complied. Notification dated 9th December, 2016 amending the Principal EIA Notification, 2006, all the building

and construction projects (built up 10

area 5000 sqm - 150000 sqm) in the industrial area, shall require clearances for their building plans from the State/local bodies or the concerned regulating authority, as applicable. In case of project sizes having built up areas more than 150000 sqm, environmental clearances shall continue to be required from the concerned regulatory authorities. (vi.) For all the individual Noted. units/infrastructure requirements, environmental clearances, as applicable, shall be obtained from the respective regulatory authorities. (vii.) A site-specific biodiversity Noted and will be complied. conservation plan including mitigation measures to be developed from competent nationally/internationally recognized institute with appropriate financial allocation for its implementation. (viii.) Green belt shall be developed using Noted and will be complied. local tree and shrub species. No exotic species to be used for green belt development. (ix.) There shall be a continuous green Noted and will be complied. belt along the plant premises, except at the designated entry and exit points. (x.) The quantity of fresh water usage, Noted & will be complied. water recycling and rainwater harvesting shall be measured and recorded to monitor the water balance as projected by the project proponent. The record shall be submitted to the Regional Office,

11

MoEF&CC along with six monthly Monitoring reports. (xi.) Special purpose vehicle shall be Noted & will be complied. established for implementation, monitoring and compliance of the environmental safeguards. (xii.) All the recommendation of the EMP Noted & will be complied. shall be complied with letter and spirit. All the mitigation measures submitted in the EIA report shall be prepared in a matrix format and the compliance for each mitigation plan shall be submitted to RO, MoEF&CC along with half yearly compliance report. (xiii.) The member units shall provide Noted & will be complied. storage tanks for storage of effluent for monitoring the characteristics of effluent and to treat the same to meet the prescribed inlet norms before taking into the CETP for further treatment. (xiv.) Proper meters with recording Noted & will be complied. facilities shall be provided to monitor the effluent quality and quantity from member industries to CETP and from CETP to the final disposal/re-use on a continuous basis. (xv.) The project proponent shall establish Noted & will be complied. an environmental monitoring cell with all the potential polluting units as members to review the environmental monitoring data and suggest for improvements. (xvi.) Internal Road widths within the Noted & will be complied. industrial estate shall be minimum 24 m ROW. (xvii.) Common facilities such as repair Noted & will be complied.

12

shops, rest rooms for drivers and attendants shall be provided. (xviii.) All required sanitary and hygienic Noted & will be complied. measures should be in place before starting construction activities and to be maintained throughout the construction phase. (xix.) Soil and ground water samples will be Noted & will be complied. tested to ascertain that there is no threat to ground water quality by leaching of heavy metals and other toxic contaminants. (xx.) Construction spoils, including Noted & will be complied. bituminous material and other hazardous materials, must not be allowed to contaminate watercourses and the dump sites for such material must be secured so that they should not leach into the ground water. (xxi.) Parking space to accommodate Noted & will be complied. trucks, cars, two wheelers and bicycles shall be provided as per the norms. (xxii.) Any hazardous waste generated Noted & will be complied. during development/ construction phase, should be disposed off as per applicable rules and norms with necessary approvals of the State Pollution Control Board. (xxiii.) The diesel generator sets to be used Noted & will be complied. during development/ construction phase should be low sulphur diesel type and should conform to Environment (Protection) Rules prescribed for air and noise emission standards (xxiv.) The diesel required for operating DG Noted & will be complied. sets shall be stored in underground

13

tanks and if required, clearance from Chief Controller of Explosives shall be taken. (xxv.) Vehicles hired for bringing Noted & will be complied. construction material to the site should be in good condition and should have a pollution check certificate and should conform to applicable air and noise emission standards and should be operated only during non-peak hours. (xxvi.) Ambient noise levels should conform Noted & will be complied. to residential standards both during day and night. Incremental pollution loads on the ambient air and noise quality should be closely monitored during development/ construction phase. Adequate measures should be made to reduce ambient air and noise level during construction phase, so as to conform to the stipulated standards by CPCB/SPCB. (xxvii.) Fly ash should be used as building Noted & will be complied. material in the construction as per the provisions of Fly Ash Notification of September, 1999 and amended as on 2th August, 2003. (xxviii.) Ready mixed concrete must be used Noted & will be complied. in site development and building construction. (xxix.) Storm water control and its re-use as Noted & will be complied. per CGWB and BIS standards for various applications (xxx.) Water demand during Noted and will be complied. development/construction should be reduced by use of premixed concrete, curing agents and other best practices referred. (xxxi.) Permission to draw ground water, if Noted and will be complied. any, shall be obtained from the 14

competent Authority prior to construction/operation of the project. (xxxii.) Separation of grey and black water Noted and will be complied. should be done by the use of dual plumbing line for separation of grey and black water. (xxxiii.) Fixtures for showers, toilet flushing Noted and will be complied. and drinking should be of low flow either by use of aerators or pressure reducing devices or sensor-based control. (xxxiv.) Use of glass may be reduced by upto Noted and will be complied. 40% to reduce the electricity consumption and load on air- conditioning. If necessary, use high quality low E value glass. (xxxv.) Roof should meet prescriptive Noted and will be complied. requirement as per Energy Conservation Building Code by using appropriate thermal insulation material to fulfil requirement. (xxxvi.) Opaque wall should meet Noted and will be complied. prescriptive requirement as per Energy Conservation Building Code which is proposed to be mandatory for all airconditioned spaces while it is aspirational for non-airconditioned spaces by use of appropriate thermal insulation material to fulfil requirement. (xxxvii.) The approval of the competent Noted and will be complied. authority shall be obtained for structural safety of the buildings due to earthquake, adequacy of firefighting equipment’s, etc. as per National Building Code including protection measures from lightening etc. (xxxviii.) Regular supervision of the above and Noted and will be complied. other measures for monitoring should be in place all through the development/ construction phase, so as to avoid disturbance to the surroundings. 15

(xxxix.) The responses/commitments made Noted to the issues raised during public Annexure 2: Public hearing minutes and hearing shall be complied with in responses. letter and spirit, and action taken shall be submitted to the Ministry. (xl.) For Corporate Environment NA Responsibility activities, 2% of the project cost shall be earmarked. The CSR funds shall be allocated for vocational training programme, development of infrastructure like construction of public toilets etc. and also to allot additional land for Lord 'Sri Ranganatha Swamy' as per the requirement. (xli.) All member industries shall be Noted and will be complied. instructed to comply with the consent conditions given by PCB/MoEF&CC strictly to maintain ambient air quality within the stipulated standards of CPCB. (xlii.) Existing State/Central Government Noted norms shall be followed for providing employment, preference will be given to local educated and unemployed people based on their educational qualification. Vocational training shall be conducted to improve the skills of local people so that they can get employment/self- employment. (xliii.) Compensation will be paid as per the Noted land acquisition act of State. (xliv.) Corporate Environment Noted and will be complied Responsibility: a) The Company shall have a well laid down Environment Policy approved by the Board of Directors b) The Environment Policy shall prescribe for standard operating process/ procedures to bring into focus any infringements/ deviation/ violation of the environmental or

forest norms/ conditions 16

c) The hierarchical system or Administrative Order of the company to deal with environmental issues and for ensuring compliance with the environmental clearance conditions shall be furnished d) To have proper checks and balances, the company shall have a

well laid down system of reporting of non-compliances/ violations of environmental norms to the Board of Directors of the company and/ or shareholders or stakeholders at large

II. Operation Phase i.) All the topsoil excavated during Noted & will be complied. development/ construction activities should be stored for use in horticulture/ landscape development within the project site. ii.) Disposal of muck during development Noted & will be complied. / construction phase should not create any adverse effect on the neighbouring communities and be disposed taking the necessary precautions for general safety and health aspects of people, only in approved sites with the approval of competent authority. iii.) The solid waste generated should be Noted & will be complied. properly collected and segregated. Wet garbage should be composted and dry/inert solid waste should be disposed off to the approved sites for land filling after recovering recyclable material. iv.) Diesel power generating sets Noted & will be complied. proposed as source of back-up power

17

for elevators and common area illumination during operation phase should be of enclosed type and conform to rules made under the Environment (Protection) Act, 1986. The height of stack of DG sets shall be equal to the height needed for the combined capacity of all proposed DG sets. The location of the DG sets may be decided with in consultation with State Pollution Control Board. v.) Noise shall be controlled to ensure Noted & will be complied. that it does not exceed the prescribed standards. During night time the noise levels measured at the boundary of the building shall be restricted to the permissible levels to comply with the prevalent regulations. vi.) The green belt of the adequate width Noted & will be complied. and density preferably with local species along the periphery of the plot shall be raised so as to provide protection against particulates and noise. vii.) Weep holes in the compound walls Noted & will be complied shall be provided to ensure natural drainage of rain water in the catchment area during the monsoon period. viii.) Rain water harvesting for roof run-off Noted & will be complied and surface run- off, as plan submitted shall be implemented. Before recharging the surface run off, pre-treatment must be done to remove suspended matter, oil and grease. The borewell for rainwater recharging shall be kept at least 4 m.

18

above the highest ground water table. ix.) The ground water level and its quality Noted & will be complied shall be monitored regularly in consultation with Central Ground Water Authority. x.) Traffic congestion near the entry and Noted. Traffic movement will be controlled as exit points from the roads adjoining per traffic management plan delineated in EIA the proposed project site must be report. avoided. Parking, loading and unloading shall be fully internalized and no public space shall be utilized. xi.) A Report on the energy conservation Noted & will be complied after initiation of measures confirming to energy project development activities. conservation norms finalise by Bureau of Energy Efficiency shall be prepared incorporating details about building materials & technology, R & U Factors etc. and submit to the Ministry in three months. xii.) Energy conservation measures like Noted and efforts should be taken to conserve installation of CFLs/ TFLs for the the energy. lighting the areas outside the building shall be integral part of the project design and shall be in place before project commissioning. Use CFLs and TFLs shall be properly collected and disposed of/ sent for recycling as per the prevailing guidelines/ rules of the regulatory authority to avoid mercury contamination. Use of solar panels may be done to the extent possible. xiii.) The building should have adequate Noted and will be compiled. distance between them to allow movement of fresh air and passage of natural light, air and ventilation.

PART-B-GENERAL CONDITIONS

i.) The environmental safeguards Noted & will be complied. 19

contained in the EIA Report should be implemented in letter and spirit. ii.) Provision should be made for supply Noted & will be complied. of kerosene or cooking gas and pressure cooker to the labourers during construction phase iii.) Six monthly monitoring reports Complied. Six monthly Compliance report for should be submitted to the Ministry August-September, 2017, October, 2017 to and its Regional Office, . March, 2018 , April-September, 2018 & October, 2018- March, 2019 has been submitted on 01.12.2017, 21.05.2018 , 30.11.2018 & 28.05.2019 respectively. iv.) A copy of the environmental Pertains to State Pollution Control Board. The clearance letter shall also be EC letter has been circulated to District displayed on the website of the Authorities to be displayed at their respective Offices. concerned State Pollution Control Board. The EC letter shall also be displayed at the Regional Office, District Industries centre and Collector's Office/ Tehsildar's office for 30 days. v.) The project proponent shall set up a Complied. separate environmental management Manger, Environment & Public Health cell for effective implementation of Engineering has been appointed at DMICDC Corporate office, New Delhi in Technical & the stipulated environmental Projects Division. safeguards under the supervision of a Senior Executive vi.) The funds earmarked for Noted. environment management plan shall be included in the budget and this shall not be diverted for any other purpose 5. The above stipulations would be Noted. enforced among others under the provisions of Water (Prevention and Control of Pollution) Act, 1974, the Air (Prevention and control of Pollution) act 1981, the Environment (Protection) Act, 1986, the Public

20

Liability (Insurance) Act, 1991 and EIA Notification, 2006. 6. Officials from the Regional Office of Full cooperation would be extended to officials MoEF&CC at Lucknow who would be from MoEF&CC, Regional Office, Lucknow for monitoring the implementation of undertaking site inspection.

environmental safeguards should be given full cooperation, facilities and documents/data by the project proponents during their inspection. A complete set of all the documents submitted to MoEF&CC should be forwarded to the APCCF, Regional Office of MoEF&CC at Lucknow. 7. The Ministry reserves the right to add Noted. additional safeguard measures subsequently, if found necessary, and to take action including revoking of the environment clearance under the provisions of the Environmental (Protection) Act, 1986, to ensure effective implementation of the suggested safeguard measures in a time bound and satisfactory manner. 8. All other statutory clearances such as Noted. the approvals for storage of diesel from Chief Controller of Explosives, Fire Department, Civil Aviation Department, Forest Conservation Act, 1980 and Wildlife (Protection) Act, 1972 etc. shall be obtained, as applicable by project proponents from the respective competent authorities. 9. The project proponent should Complied. advertise in at least two local The Environmental Clearance issued to Newspapers widely circulated in the ‘Jodhpur Pali Marwar Industrial Area’ project has been advertised in ( region, one of which shall be in the daily), Jaipur edition on 14.09.2017 & 21

vernacular language informing that (Hindi daily), Jaipur edition the project has been accorded on 14.09.2017. Environmental Clearance and copies A copy of the advertisement is enclosed as Annexure 3 for ready reference. of clearance letters are available with the State Pollution Control Board and may also be seen on the website of the Ministry of Environment, Forest & Climate Change at http://www.envfor.nic.in. The advertisement should be made within Seven days from the date of receipt of the Clearance letter and a copy of the same should be forwarded to the Regional office of this Ministry at Lucknow. 10. This clearance is subject to final order NA of the Hon'ble Supreme Court of

India in the matter of Goa Foundation Vs Union of India in Writ Petition (Civil) No.460 of 2004 as may be applicable to this project. 11. Any appeal against this clearance No appeal has been made against this shall lie with the National Green Environment Clearance as on date. Tribunal, if preferred, within a period of 30 days as prescribed under Section 16 of the National Green Tribunal Act, 2010. 12. A copy of the clearance letter shall be Complied. EC letter has been uploaded on sent by the proponent to concerned DMICDC’s website at link as below: Panchayat, Zila Parishad/Municipal http://dmicdc.com/downloads/environmental- clearance Corporation, Urban Local Body and the Local NGO, if any, from whom suggestions/ representations, if any, were received while processing the proposal. The clearance letter shall

also be put on the website permanently of the company by the proponent.

22

13. The proponent shall upload the Complied. Six Monthly Compliance report of status of compliance of the stipulated EC conditions for August-September, 2017, EC conditions, October, 2017 to March, 2018 , April- September, 2018 & October, 2018 – March, Including results of monitored data 2019 has been uploaded on DMICDC’s website on their website and shall update the at link below: same periodically. It shall http://dmicdc.com/downloads/environmental- simultaneously be sent to the clearance

Regional Office of MoEF&CC, the respective Zonal Office of CPCB and the SPCB. The criteria pollutant levels namely; SPM, RSPM, S02, NOx (ambient levels as well as stack emissions) or critical sectoral parameters, indicated for the project shall be monitored and displayed at a convenient location near the main gate of the company in the public domain. 14. The environmental statement for As on date project work is not commenced yet. each financial year ending 31st March in Form-V as is mandated to be submitted by the project proponent to the concerned State Pollution Control Board as prescribed under the Environment (Protection) Rules, 1986, as amended subsequently, shall also be put on the website of the company along with the status of compliance of EC conditions and shall also be sent to the respective Regional Offices of MoEF&CC by e-mail. Annexure:

Annexure 1: EC Letter

Annexure 2: Public hearing minutes and responses.

Annexure 3: EC advertisement.

23

uJ wだ 爾繭

漏 衡諭―藤 赫謙 節漏調呻 書f赫 輸 う鏑飾ゎ諭 柳輛 躙ほ ― ― 竜 輛…赫n命 飲飾 15032017奇 椰楡同赫耐 前 可_,回 | Ч :― ヽЧgυ `輸載無 R補 ・ 哺的) 飾 :15032017

● :腑 :11論 "●

赫 ミ:― ― ― 辮 鳥帯 蓼 簿 珊 鑑 臨 鼎 臨 鶏庸 輛

臨 騰'眈 謂∫締鴇 3雪 編赫哺|…繭 蝠節f甲綴織l木髯黒Tは・ 。W I,一 で頭面 1 Чヽ`Hは 輛Ⅲ■動赫ご 繹 魃 霜器瀑

2 ● 口|● ね "ヽ cMq-{r A ftri frffi fi q-on +t Tfr sir erfi rrur*ern 濶鶉 wron SInさ 1論 d cdqn fiM d rro 阿命赫 _諭 fu-qr qtt.fl rrd e* u6" 赫 蒻 可破 赫 箭TII姉 wro w oft-qr+ wrO aff cr+rff I irr Errq gtr qrq 6i

vorcr vfud *.rr r

1 フ Wrdr n frqrd oi a+r 可 翻ね Scmw ― ffi.n ? q-c o.r Aflqc vr$q. ―ヽヽЧ奇う命斜町 Sc-qrg "Ч `lql酬 sqrqn qi i Bqr Q.Ir qr< A rFE t 爾n_ま 市可葺。.ヾ TO 論択|¶ \ffi ;gfr dsw "ff ilq srd ila 口命論、1弱 、 A- -fr c

`:● 11R田諭爺 湖輛 さ| ゛せ命 ・ ・劇 奇可南nl 喩赫T゛ 動 。 … "l.哺 鶉ITま ミ 編 論命。1、 Ч赫諭赫可゛ 。●。 w奇 n赫 さ| Ⅲ面 命舗 纂赫 対ヽφIマ 諭 赫鴨 … 誦浦→。.。 ∩ 翻w輸 | 尋爛寓聴 靭熟 qゃ T息鸞電器 躙―ЧI● 、、 哺¨ 市■(BuFFER 翼晰 ミξ ZONE)ao・ .|さ 爾qや マ 駕『電肥響ξ襦 諭 前q電 "ね m.く 、 、.、 ′

蝙 鐵 。

軒謡評翼聰 ヽ幕 撮Tl理翼雲| Ψ 録π`|.さ らィⅢ書椒 Mやヽ口Ч輸 需蒋珈 さ命。・[|口 I vrr WttP 哺調蒔命赫 椰 ― 蒻所おさ赫 Чu Ч。論諭蓼 s、 向捕さ| W納 : 奇呻卿論可鋪m 1鼻 i甲 器 紹 轟 哺哺/― i哺 3ヽョ Ч[、・111 …

赫 詢詢録T。 マ゛て赫n 赫赫・ 鋪 轟新稀争碍命令輸 鞣禦輛 “赫 翁― 命聴 韓‖W篇黙“甲 計 ЧI.命 「1輛 請,囀 → 餞赫| “ ・ ― 口甲65町 卿 爺ホ莉 Y{.gq.6s d inr +{ d wqq 6 命10命 13て gernvor .rqr マ 、輸 ぅ $+u d fuc 6-6r en 赫四鍮 繭 q-rS rd aru rfi ft-qrrqr n諭 薇 ヽ 6r er5qrd{ r},n eqr w ri*r 、 ン 書膊聯,:耳筒1_ υ赫 薇南鴨 "s、 ●くo、 輸 刺 o¬ _ →億Ⅵ 0■ Gぺ I瞭 イ トご「ヽ1)| “ 中'ホ '日可厳中河命奇輌 輸師 鰤 tud赫 哺飯町ЧI、 MF哺 `ll

■面調喩面命飲■諭 紺翻用冨孵 Ч■爺マ赫 調捐,輸 諭 ●qlさ ●l゛ |

やw令 命ず餘ぅR栞書o命 甲3籠ぎマ ,雨前f河 さ′書― n釧嘔n ttm l

ゴ浦雨■結吉赫 て甫

諭 劇!ゅ 謙 ― `ぃ 赫 赫 命輸前¨ 諭 赫 ヽЧヽЧCu t

|・

諭、¬q"さ | 0 ゛ホ南命珊翔゛輛奇 苛奇う衡昭,゛ 命 葺赫ψ諭叩マ 需 “ 5 赫 Ⅲ 誡 … ・ |・ 赫 薇捕。前 ― 鷲鳳 ヽφ×命・R輛 ・ ― "く ‖夢 ЧIヽ `|1弱 腋 赫 、 w "令赫 "Ч ° n国 赫 | 哺れtさ 可・ 命輸円哺゛蒻きさ命

鳥 | 譜 … _J■ ■両爺 爺| | 繭 tHl、 計涯 ・ 罫鶏W獅黒1'満 署獅馴翻響 鋪瀾命令輌司鶯鮨 fヤolR常 。 討| 前赫・ 電―輸 q刺 赫 諭軸 鏃鶏盟 可姉 諭飾 赫aさ | 喩ホ面命爾輌書 n

コ3鷹 製卜さ1 7 ― ・ ■1ヽ 1010 訥 "口 爺 向硫に、師綸油, 心蝕m・ “ま日 赫 中町可 器鑑霧訃 … 躙田さ| 繭 認 糞町雷師 命ЧΦヽ諭."Ч l in赫 喩ホ司3 m ttnHゃ 、 赫 可寸、 コ呵輸 咆 諭゛命マg轟 劇、ゃ、箭― 爺…甫命

3 わ ヽ qi qrirff | vfl grl-q iF qr.r d var* sfuo d.n o rwrfta cmfir i Rrrftq . t3rdr + cy{nff 3ri qr$ fi-6 d m ffi oi tYqqn d er+sr i-s,rn fr sfuo qqen dt rd ft-&,i r d.ff.\'q.3n{.c d fu6Ri qffiq-qr t ot{ sncfu rfi tr i # or !+{rd Fc-o.rg ff d.n rons-crs d +, t Tf-i qlmrq oi fi ffi.n r 赫 軸 赫 軸葺 驀面針3可輛 vffiqq1 6 frri frffi rft c-drR 誦wh論 奇赫哺さ1取 iff 1fr eih erd; v-wem qron si {+qn +M d ざ譲ヽ1% dfiI fu-qr oK.rI E.€-d ifrq 諭w浦 奇赫奇赫 sfua sqq w cfuqs-fl qfi sff qr+rn r as grq rs qar o\ varcr gfod 6t n 赫 q o sfua1qr ,i-qq Tfr oik frrm … 鶉 雉 臨 3rar ctER ol qff 61 3r+r 爺取鋪マさ蒻針m― rtlnatn w{6R +1 {*qTr 書9口 ,暉Πさ| ffftqt d n-Fd fu'qr qKrrt Es-d fuq vfud qqq qI qfr-Eq-fl vtt d qr*,ff | c-Frfua sndFro f, d orm-qrq qw qti(BUFFER ZON E)Elsr :rqr i afl qw +r(BUFFER ZONE) or

elara ss.sa Ef ft.ff.t r 繭 tl■ 苗 減 ・ ° ご詰鷺窯辮脚網押 調雪ざ鳳襦可 薇蒻口面箭硼 赫 瓢岬臨 辮 | 11 市爺→訳 ● 瞳日f漸 俸て繭命論薇 ● マ飩満可命捕゛輌青 ■劇肺ヾu赫 可油命 …6■ oF新専赫きに0謙 輸 翼雲恥墾WI赫 哺捕輔命捕赫 薇爺 喩取可缶m静 町 れ olo 0ヨ 繭畷捕 さらきていママヒ m― ヽ。R命 ・ ]弔 ・ 謙 命奇麟鋼はで可輛可赫 辮呵、、●ヽ命T齢 命飾 ― 命 言缶ITお m¨ 酬゛ 器聯濯1畷 哺“円釘引奇n薇 弱命

舗 創漏¬ 話 針爾論 |

, | ‖ fヨ FTTて ,. 0 ●て舅Ⅵ●喩ホ同゛椰乖狛 ■0さ 0資 ●●●l fttRttЧ ポφN→ 匈ヽTR赫 ―薇 赫 命ЧマЧ ・ Io ・Ч r qffiqqr fu'qr€-r + ftt … …飾m tt… m.“ I Ч qЧ ●さ鎌希 qrd trtirn sitc trq{arrr 赫m嚇 赫| rrron d am q6 \'s ff ff (Special purpose vehicle) 6r rTdr +fl nc'{-qr( {rserrn sr?DI{ \ro et+q fu6r€ crtu6-{,r (REGIONAL DEVELOPMENT AUTHORITY) orrc+ otff r qa +ffq h-orff 4 η レ crE-fiYvr drrrl ol Rror*fr or ftFnur 6tr[ |

. rrwt srnrq d s-ffir n 6tsra 赫 哺賊 命命令衛)― ff6rs \d qffergr furq 儲 鋪裔 赫| erq\fua qr$,i "1可 ftri r

¬ Ч キ寺減 ●嚇おう6700■ Fpa面 綸繭 赫 簿 画 1 "0[ua平 ― ・ ・ 1面 鋪画n調 画 ゛3rORT ■針■3● oЧ !雨 T,さ 1 さ| 輛取命鋪ぃ雨図お■ “

赫萌 さ| 糀 繋 「

qlЧ ヽ|」 繭 . ctJqrfio) d ffi Eqr azrten fu ・ 彙漏m含 跡碕含奇命輛 qrt ff r Ч爛平 編 ぃ油 歯 `口 | "ゃ さ1弱金Чも¶。.寺 調n ● I爺 諭硼薗囀さ| "Ч Wtt u」 ●円 "蒻 |

+*qqffi, orFd.ftrdro-n€r lTq. c-{Yq ftaqq qrs6, crfr t{q) crfr fiM) τ

. . ¨

¨

‐ &嘉 fl`21′ 一 ′ フ . =| ‐|=11:, ' ぎ ;` 11ヽ 1 )i 一 J― ち ′ ;'r li.r =f:'a;rX$.a . r', a..-\ T [tr.'\\ TiT.41 _

遷 「 一

一 一 一

一 一 .

二 一泰 一 ・ 一 θ4

L 当 0 一 呻 )。ど百d “ ・ 一 一

一 ・

ハ締姻 ん1品 1″

?Hイ)て むミ Ro″ rr‐ ■

$tr.rn

〕i41V シミンヽl簡 ヽぃ、、■ “ t瀧‐轟 ?lot',1 d I り 夕ο

c,く ,― aql●

~フ ЧJ

,Od′

_1∠け ρpttf 二_ ― ρ ら ・ 2d纂 名 ″ へ ε ′ ― 耐 ゅノ /マ

ぜ≦ゴ:こ =:」6______

harkhand i Chlt Soarh -17 OJttk Bhaskar cPapor Ralashm l anabl Hayar● l Madhya pradosh l」 J

(Fcrwrl;t qFilI g(nfot f+ria"l qu.GGf Tfl-q-6, {Eqr fu Sldfrrfi st , qrfr mqfol{rcfrc / *.q ffi 7 srql-233 7 R'{i.n:- fi/oz/2017 Ⅲ衡れ命わ竃 命m鋼 円¬国 1.覇 …劇‖ドЧ載つてf満 uloIさ・稀青網R尋 ―■覆蓼嘲円。 椰謙 GⅨ :締琴寺R瓢 晰奇青繭麟油爾舗瀾鮨町ul■ | 爾蔽1き 頭隷¬耐臨耐千硼¬赫 面響油奇Ⅲ金ヾ ∩齢阿 ¶ 爾 戸だれ Ч輛:q― 日く:W ЧttЧ w蒻 籐1可 … 2や 輛・曲I棗 雲即柵町」鼎輌甲鰤 su哺ヤも輛赫 諭 "υ ― 辮 鷺1謂閻 ゝ鷲顆鯰 黒. 襦駅

葺獅汗Pl~lTさ | 聴 “「 8聰層:塩鳩凛斌論Ⅶ命

8M鰊 爛畑、刊、.爺 口m晰 彎、 ゛ 耐 ③ Ч5` Ⅵ鰤 Husu_4-Tl.」 町fヤ5油 瓢 l翼 篭 ぎ ■ 輌蒻輛 ,。爾蒻 鋼襴 甲 171輔 ― ― `拳 `撤

18),l‖ ЧЧ:qq誦 ,豪ヾ日誦 `師 可命 31e:―“ 可 奇 晰 “誨 命 耶 調 ゛ wttNI可 ヽ T司爾 き鮨 き 瀾'烈 織姻輔 (".)'面 漏 電凛 齢 満 /ゴ猥諫ゎan耳 /、事lq yヽlq市マ珀暉きさ1民田繭 青f謝竜同釧哺阿/tョ lq

口 」1命 H● :マ ‖ 諭 孵階 金30簿調 命 3TR鮮油 くlu劇 IJくIW 軍 押 ― uも ‖,Ч R幸河‖ 。′可命請命en ttTマ国轟き| Mq qM vr.s.fi.q.. qrdl

gal;t 1!t.ryl<%- rclzll'-l

http://@apr.btEskar.csn/detaiUl 14O82O/210461020&Omadtabs- 1/m- 1 G m1714017 hma€,al 一 卜 工 E 一 ● 一 ■ J 〇 ● 〓 U N E 二

O ●, じ ” ■ 1 ■ ・ 賣 一 ・ , 一 奎 〓 ・ ● 8 諄 ■ , ・ ε > ● ・ u に F ,8 ● 可 ´ 晨 ― 1 ■ ・ z く 3 ● ・ F E 雲 ■ 増 重 つ 一 ・む 目 羹 ヽ じ c ヨ く の C , f し 〓 ロ さ■ r ● , ■ ¨ヽ 6 L , ヨ z “ お ■ r F L 目 r 獨 宮 S ロ ● ■ヽ “ Z > 一 〓 ・ “ :員 t ‥ く く こ こ i , 卜 0 ¨ さ ● 0 ″ ― , 0 ● 0 饉 , 〓 ■ の ご u こ E つ 目 ■ ¨こ ヽ 2 D く ヨ 奎 ヽ O ● P 冒 卜 , 一 ■ 5 ‘ ‥ 、 甕 た一 ● 『 ● Z く o ¨ B E 多 ヽ 0 螢 ■ ヽc ■ ■ 〓 属 な E ● , 手 ‥ 0 , t ■ 上 一 当 ● ゴ 〓 V F ● 〓 〓 I, f モ ミ , ● 0 a ´ 工 ´¨ モ g ヽE ピ ● 〓 工 自 ∝ 】 僣 0 ´ E … I■ ■ ‘ , 一 富 ■ う 膵 ビ 壺 〓 ● I 〓 ■ ● 菫 ´ う E R 4 〓 ヌ ● ,, ¨ ち 還 ヽ l , ヽ 「 一 一 ●, 風 〇 ¨ 露 C 0 , こ r 一 こ ミ 0 ● ● ヨ 1 , , , 一 】 工 ^ 8 ” 一 一 三, ● ■ ・^ S a C “ ^ ) 五 ^ ● ) , こ o ≧ 「 ) 2 “ , 〓 曽 一 , ― 肇 ● o モ ‥ 〓 ― ‥ ■ I ■ ヽ 0 息 , f 一 , と 属 , ぽ ゛ 日 ― , 、 を ー 【 ョ 一 t 一 υ お 言 P “ 二 B ■ ヨ 晨〓 ● a 0 ■ ー 8 磐 皇 台 ● 卜 Ъ l ど 日 0 ● ‥ ‘ 0 0 妻 1 う 遷 電 , ”〓 E 彎 こ 〓 さ ‘一 つ ● E 富 H ョ卜 ‥ O ¨ “ 〓 ‘ 0 X 暉 1 う 菫 ー ■ 〓 〓 E 晏 L ご 0 ξ 0 “ い 〓 の ちt ● 3 〓 ● ● ‥ シ ■ 8 ‘ Ь 0 ‘ O 』 ス ミ 〓 8 2 二 ”´ I 〓 ● C ・ o■ 誤 ■ 3 ● 〓 2 ∽ ) ● 〓 ■ ● さ C , 二 0 』 場 8 ■ 一 S ● 「 ” 〓 こ ‘ O O “ ● 〓 ■い F o e F 〓 1 日 ■ X E 卜 C 螢 0 一 諸 箋 ” 〓 8 1 8 ● 「 , ( ● Ч 0 ● α .ぉ ■ ヨ ヨ 霧 1 一 ) ■ ヌ 一 ● ‥ 歯 F ■ κ E , ) E 8 ● 薔 B 一 p 8 マ 0 〓 甍 嗜 一 p 三 C ■ 2 ヨ 綺 奎 , 薔 彗 2 ● ● L 二 ● さ o の 0 0 壱 一 8 o 壼 晏 “ 3 0 ● I 一 ● C ■ 轟 1 , 重 ‘ ち 「 i t 1 ● 〓 L ● 3 c, ¨ 』 』 ¨ O こ 6 ■ ご 〓 ち ¨0 〓 0 〓 日 1 〓 E ■ ■ ● ョ ■ 0 卜 羮 尋 む Oε 壼 つ ¨ ● 一 一 一 ■ 竜 5 n ヨ‘ 〓 ● 1 ● ● ‥ 8 , ― 一 5 ● t 〓 〓 〓 ε 8 0 ● 〓 6 目 O 彗 ヨ ■ 豆, ■ く e … 一 O ■ 9 目 り ロ蘇 E コ E メ ■ ヨ 3 “ ■ , お 8 , 〕 C く F 一 〓 目 ● 1 ξ P 一 3 2一 , 〓 〓 一 o 6 〓 , ■ 西 F E “ ■ e 3 二 6 口 ● C 0 ぉ 0 0 0 o 轟 ち 』 一 一 〓 , o 一 ● ” S 〓 O 0 ● 2 H a ■ 〓 8 8 8 L ● 8 , 貢 ● ● B ● ご 0 0 ‘ ” 一 “ ”, 月 〓 L ” F ¨ ¨ 0ヽ ) X 諄 興 c 1 一 啜 o . ” 〓 ヽ 0 E ・ 0 螢 一 , 一 ● ド こ 一 、 輝 ‘ L 2 〓 6 要 コ 8 0 ‥ も “ 卜 こ ● 一 2 ピ ● こ ● 聖 . l ‘ コ 卜 コ ● ト 〓 “ 一 一 C ≦ Ш ● ● 0 彗 ● 3 場 , d “ ● 2 C 一 ゞ 2 ● ヨ ヒ 1 o 0 〓 ≧ ” 8 一 っ ∫ メ , 月 ■ コ ● 一 画 ¨ ■ 8^ 0 〓 0 ヽ 塵 0 薔 コ υ 贅 一 一 一 〓 〓 c ・ ∞ 匡 0 菫 一 一 コ C 面 0 E ■ 菫 り い o ‘ Φ ● 0 e 一 面 一 O 〓 ■ 1 R 2 E ■ し ■ ‘ C t ● 5 a 一 ≧ 〓 ● 藝 3 コ 0 ●一 ら C 〓 ■ 〓 ) ち ‥ 〓 一 ε 0 Q 〓 ● 0 C 卜 薔 ¥ ‘ 9 0 S ● C ■ 曽 卜 〇 0 e R ト ● 3 8 薔 F 只 菫 一” ■ o 』 3 0 浮 F 胃 ど S 9 コ お 菫 l ぢ 8 ● さ 0 コ 瀾 コ I ニ 8 督 ■一 ‐ あ 颯 生 一 ● 一 ≡ ‐ 員 ヨ ヨ 8 ヨ 〓 ヨ E ‥ ご ● 0 ● 〇 〓 , a N ‘ ≒ 3 0 〓 g 0 8 0 ● N 0 〓 ● 0 う 為 一 負 ) 3 B ● ヽ ■ コ 卜 t 8 0 つ ● こ ド , ● ξ , 一 , 〓 一 ‥ さ ■ 謹 ヽ l 姜 ヽ 手 ■ 、 1 0 ご E ¨ 2 口 彗 ● 〓 :: ‥ F ■ ” P R 日 O 8 き の 尋 コ 0 ■ ・ ■ 0 一 E 〓 〓 〕 ■ 曽 ヽ 3 』 虫 0 ョ 書 1 0 一 2 B ∝ 〕 日 蜃 ∞ こ 目 マ に 1 1 ρ X , ス ョ 3 , 一 こ こ 〓 7 0 綱 F お ロ ‥ 0 P ミ 一 g , 8 こ 季 * ヨ ‘ ● ヽ 〓 ( 〓 1 ■ 0 3 ● ヨ 1 H 雇 さ ● ■ 薔 と 一 ニ 贄 ≧ ヨ モ f ^ 0 ― τ と ミ ー 〓 p , 憂 ロ こ 二 ■ 6 ” つ F o じ ” 「 ■ E コ 一 ヽ ‥ ● 8 B E ● o ヨ り ● 贅 〕 一 ■ ● 日 ● 8 ■ , ヽ ● ⊇ 一 〓 一 ヨ 四 ● 督 毬 X o ‘ セ ● ヽ o I 饉 〓 8 け う ■ 塩 「 し F 〓 ヨ ― い 6 う お ● P 8 8 0 0 F ● ヽ F ョ 一 一 ⊆ セ 【 熙 o R 】 モ 】 〓 2 ● a 2 l 〓 壺 E 〓 建 1 菫 O , 〓 R o を で o ご ロ F ■ 〓 ら こ 下 】 , , ● 1 . ¨ 菫 o ■ ■ 菫 〓 さ 3 ■ i 5 摯 8 〓 嘗 1 3 魚 ‘ ■ 8 も 2 8 ① 1 〓 一 菫 ● 0 う 一お 墨 弓 1 卜 晏 〓 こ 1 一 壼 ■ 1 , ゞ 一 ヽ ■ ● 〇 ユ ´ 〓 弓 1 ■ ≧ 0 こ ■ ● 〓 疇 3 ● 一 γ 1 う 1 , 」 0 J ■ に コ R } ´ ‘ 〓 8 B ■ む O , 日 1 1 0 I ■ 8 ① ■ 0 L こ b 2、 ュ だ P 奎 ● , O ギ I 1 1 の ト L R ‘ ヨ ■ こ 倉 あ 浮 蜃 、 , O ■ 一 あ ● c こ 』 ¨″ デ ご O コ , 『 8 ● 8 ■ ‥ ¨ 〓 ■一 電 B >Q JF ‘ 〓 翌 だ, E ● 燿 8 る ■ 饉C8 ■, ) X 〓 ■ 『 E 3 ■ 8 ⊆ 一 3 日 子 0 F 〓 書 凛 こ 8 ε ^ 0 1 も う O 壺 ¨● ジ δ ,0 一E■ 0」 E O ニ 』 メ E , ● 一 8 興 〓 ,寮 ● 一 1 ヽ ■ 層 p も 1 の ョ ■ ョ s r 醸 ● 8 〓 エ ■ ■ ヽ E , 富 e ■ b ● , ” F 〓 a ● ● ● 〓 ● 鋼 〓 6 E 〓 O ■ 〓 I ヽ 卜 0 ● ● ● ■ E 一 目 I ■ b ヨ B ■ ● I Я ● ■ F 1 層 夏 “ 〓 ,一 L C ヽ 〓, 3 5 目 , ● こ ヽ ● ● う ● 〓 ‘ ■ i 署 ご 片 0 2 ヽ 〓, ¨ ● L ¨ き ” 、 〓 ョ ι も ヽ さ〓 ¨ 0 こ ヽ e 蜃 ξ ヨ ● ロ も , R ● 歪 2 ■ 〓 ■ な 一 お 1 ■ F ● ヽ, 「 ¥ E E 0 E 螢 P 晏 」 曇 蜃 三 “ ● 8 さ 9 ‘ ヨ ヽ こ , 沢 あ ュ 1 ョ ミ 〓 , ● 毒 0 毀 , L ご せ 8 , ● 0 ■ ●∽ “ ヽ メ ) コ ピ 8 一 2 菫 “ E 7 う 6 P a 遍 , 整 〓 3 ● , ち 員 8 1 F I こ 〓 4 ス お B I 4 B , t 8 “ ^ 瑠 C , e ー 「 ら ヨ ” 〓 F 手 理 一 ヽ‘ 昌 〓 > I ぼ ■ 3 o 要 , X ヨ , 一 B 〓 3 8∽ ● 至 , 2 I つ 〓 ● 0 重 ‥ 蜜 ■ も , ● ■ タ , E ョ 五 螢E 苺 薔 目 ´ 憑 ロ , つ ¨ ゞ も コ コ ‥ 0 ■ P 6 〓 f 一‘ ● ■ 5 ■ ー o 」 o● 踊 壕 “ ゝ 露 こ ョ > 、 8 ど g F ョ ●, あ 8 静 , こ 一 彗 馨 0 ” ■ 警 “ ● 一 ● E 8 0 “ ● 〓 0 〓 L , ■ ● ヽ 留 I 0 ■ 「 8 2 ■ ♂ ξ e 熱 〓 E S ゛ F F 8 0 凛 8 ヽ , ■ コ お 1 ¨ T J 8 霞 ■ 8 ■ ● ■ お “ 三 る2 ュ s 2 ● ‥ ‥ 〓 2 F 「 ‥ ス ■ B 黎 一 8 ヨ 場 こ ● 〓 t E 2 I 彎 口 h 8 コ ● ● ラ 01一 O 鵬 9 ■ 醸 ξ L E ¨ヽ 一 」 ユ 0 、 3 e コ l ■ I F 贅 二 ■ E ‘ 一 一 ロ 0 Fエ f ■ こ o こ 〇 8 〓 ■ 一 〓 一 ﹈ o.rqtdq qrq tqrco ...... -r..,.,.s_...... c-qr{d sRfr e_ac fudr crd

Ч■llur I17

鰤籠ftt ЧlqIき ヽ 引抽|‖ _… 却1`|[li¨ ¨令摘 薇 f赫 ∞Юa細 7翁 闘 N鋼 嚇可赫 可wFT翻 取輛 為習

― ⌒ 1鳥 赫゛計市出 ヽ ]、「ll.| 期ヽЧ● Tl円 iF711● d 、、、■111■ り|‖ ЧЧlq。 _ぞ11■ 1… …

。 す i

qn.rqfdq ,..1q qand qqrra sftffr t"[c ffi-fi qrff

TRPr嘱

,輌綸踊 硼 F:'■ 日咆面lrilil幸 =麻 ゛、黒 駅a画 倉柿 03032017■)Rくれ I=41哺 ごlh“ 猜ηふ 昴:噂日、凛li取 鎌i 41● ,さ |:

職 神 二、キ |⊃ノ多易フ q-drqd 赫 朝|‖ 輛 Hftfr +6e fumr crff

Ч‖lUI可可

赫 輛 朝ldlさ fお aり |‖ Ч.l劇 0「イム1■ it三 二¨¨命 →た可鷲 =¬「 W31M鮨怖o3032“ 7諭 闘 Fゴ OM濡 ポ融可ЧI■ ●劇1孤 輛 ダ ・Iqlさ |

′ ‐1

⌒ ッ‖爺澪 輛 可衡可 ヽ1く Ч司

りI‖ Ч●I● 0 ■=1__■ …… りl‖

赫 州τ繭 … …・輛 爾 減 師 輔 轟ビ

Ч‖:u:ロ

赫 舗 輛 諭 甜 州赫 …豊薫 :冷 摘 朧 w ttf称万o3032017諭 熊■I藤 命鋪師ポ謙可ЧI■ ■劇I訳 帥

lЧ ・Iさ | ヽ ...tilT:!:七 111〔:キ「ョ ‐ (■ ッl‖ 0同可テ可含■喪千≒oFf● ■て :計 ,l‖ 輛 …l li'1子 (・ ) ・