The City of Toronto's Transportation Strategy

Total Page:16

File Type:pdf, Size:1020Kb

The City of Toronto's Transportation Strategy The City of Toronto’s Transportation Strategy July 2007 Presentation Outline • Transportation Statistics • Transportation Building Blocks • Toronto’s Official Plan • Transportation and City Building Vision • Projects and Studies • Ongoing and Future City/TTC Studies • Union Station Revitalization • GO Transit • Pedestrian Planning • TTC Union Subway Station • Other Transportation Priorities • Pedestrian • Cycling • Choices for the Environment • Intelligent Transportation Systems (ITS) • Delivering Toronto’s Transportation Vision • Toronto Transit Commission Initiatives • Ridership Growth Strategy Program • Fully Accessible TTC Services • Toronto Transit City Light Rail Plan Transportation Statistics City of Toronto Boundary (a.m. peak – 6:30 – 9:30 a.m.) • Inbound Vehicles 350,000 300,000 • Inbound and outbound vehicle 250,000 200,000 flows across the cordon have 150,000 Number of Vehicles of Number 100,000 continued to grow and reached 50,000 0 peak levels in 2004. 1985 1987 1989 1991 1993 1995 1998 2001 2004 2006 Inbound Outbound • Inbound Persons 450,000 1,400,000 400,000 • Inbound person trips have 1,200,000 350,000 continued to increase 300,000 1,000,000 t 250,000 800,000 200,000 steadily and peaked in TripsPerson 600,000 150,000 Total Employmen 400,000 2006. Between 2004 and 100,000 200,000 2006, inbound travel 50,000 0 0 increased from 370,400 1985 1987 1989 1991 1993 1995 1998 2001 2004 2006 Inbound Outbound Total Employment trips to 386,400 trips (+4%). Transportation Statistics Central Area Cordon (a.m. peak – 7:00 – 10:00 a.m.) • Inbound Vehicles 120,000 100,000 • no significant differences noted 80,000 since start of Cordon Count 60,000 Program Vehicles Inbound 40,000 • indicative of road system at 20,000 0 1985 1987 1989 1991 1993 1995 1998 2001 2004 2006 capacity Year INBOUND OUTBOUND • Inbound Persons 350,000 450,000 400,000 300,000 • The number of inbound person 350,000 250,000 trips peaked in 2006 300,000 200,000 250,000 150,000 200,000 • Between 1985 and 2006, inbound 150,000 100,000 Person Trips (All Modes) 100,000 Total Central Area Employment trips increased by 10% from 50,000 50,000 300,550 persons in 1985 to 0 0 1985 1987 1989 1991 1993 1995 1998 2001 2004 2006 331,600 persons in 2006. Between Inbound Outbound Total Employment 2004 and 2006, inbound person trips increased by 5%. Transportation Statistics Central Area Cordon (a.m. peak – 7:00 – 10:00 a.m.) 180,000 • Toronto Transit Commission 160,000 140,000 120,000 • ridership has fluctuated 100,000 80,000 Person Trips with economic conditions 60,000 40,000 20,000 0 1985 1987 1989 1991 1993 1995 1998 2001 2004 2006 Year • GO Transit • most of the growth in trips 70,000 60,000 accommodated by GO rail 50,000 40,000 30,000 Person Trips Person 20,000 10,000 0 1985 1987 1989 1991 1993 1995 1998 2001 2004 2006 Year Transportation Building Blocks Toronto’s Official Plan Regional connections Toronto cannot plan in isolation or expect to stand alone in dealing with the effects of urban growth. Toronto’s Official Plan Supportive land use planning - transportation and land use Direct growth to the centres, downtown and avenues to concentrate people and jobs in areas well served by transit. Parking standards are being lowered. Toronto’s Official Plan Transportation infrastructure – roads Protect existing and planned network of major roads through designated public right-of-ways shown on map 3 and schedule 2. Toronto’s Official Plan Transportation infrastructure - rapid transit Protect existing and planned rapid transit networks (busways, streetcar/LRT and subways) shown on map 4. Implement new lines over the LONGER TERM as needs identified, EA studies completed and funding becomes available. Toronto’s Official Plan Transportation infrastructure- surface transit priority Make more efficient use of transportation network by giving greater priority to buses and streetcars (signal priority, restrict on- street parking and exclusive transit lanes) as shown on map 5. Transportation and City Building Vision Kingston Road Transportation and City Building Vision Ongoing and Future City/TTC Transit Studies Union Station Revitalization •Revitalization initiative is an ongoing priority: •Union Station Master Plan (December 2004) •Union Station District Plan (May 2006) •Union Station Pedestrian Planning •VIA Rail – ‘Renaissance of Rail Travel’ •Pearson Air-Link Group - Full EA underway •Toronto Waterfront Revitalization Transportation Statistics – GO Transit Ridership GO Transit Annual Ridership (1976 - 2005) 50 40 30 20 10 0 Year Union Station - Major Transit Initiatives • GO Transit • Union Station Rail Corridor Infrastructure Improvement Plan • estimated project cost- $600 million • targeted for completion in 2014 • Toronto Transit Commission • Union Subway - Second Platform Project • estimated project cost - $90 million • targeted for completion in 2012 Transportation Context GO Rail Ridership to Union Station (All Trips - a.m. peak period) TO Number of Trips to Downtown Number of Trips to Downtown Toronto Toronto FROM - All modes - GO Transit Rail % Toronto 237,987 7,057 3.0% Durham 16,776 9,888 58.9% York 33,845 7,928 23.4% Peel 36,313 16,448 45.3% Halton 15,578 10,258 65.8% Hamilton 3,236 1,885 58.3% Total 343,735 53,464 15.6% Source: 2001 Transportation Tomorrow Survey GO Transit - Rail Infrastructure Program (GO TRIP) GO Transit - Union Station Program ElementsGO Transit’s Rail Improvement Program (GO TRIP) RailRail Plant/SignalsPlant/Signals ImprovedImproved AccessAccess toto TrainTrain ShedShed PlatformsPlatforms RoofRoof 6/7,6/7, 5/6,5/6, 4/54/5 BayBay EastEast TeamwayTeamway PlatformPlatform 13/1413/14 DoubleDouble PlatformsPlatforms TracksTracks 5/6/75/6/7 RailRail Plant/SignalsPlant/Signals TrainTrain StorageStorage Pedestrian Planning Modeling and Simulation – GO East Concourse Pedestrian Planning Modeling and Simulation– Future East Concourse Toronto Transit Commission Union Station Subway Second Platform Project • to double capacity at Union • expand and reconfigure concourse area • $90 million project (funded by TWRC) • targeted for completion in 2012 • construction underway • will include complete removal and re-construction of Front Street Other Transportation Priorities - Pedestrian • The Toronto Pedestrian Charter • sets out six principles necessary to ensure that walking is a safe and convenient mode of urban travel: • accessibility • equity • health and well-being • environmental sustainability • personal and community safety • community cohesion and vitality Other Transportation Priorities - Bicycles • The Toronto Bike Plan • Vision for cycling in Toronto • towards a more bicycle friendly city • Sets out integrated principles, objectives and recommendations regarding: • safety • education • promotional programs • cycling related infrastructure Choices for the Environment – TDM Initiatives Choices for the Environment – Change is in the Air • Setting Toronto’s Action Plan • Toronto’s reduction targets for greenhouse gas emissions, from the 1990 levels of approximately 22 million tonnes per year for the Toronto urban area, are: • 6% by 2012 (The “Kyoto Target”) • 30% by 2020 • 80% by 2050 • The plan will help to build a sustainable transportation system • unanimously approved by Council on July 16, 2007 Smart Commute Initiative • Smart Commute gets results. In less than three years, we have achieved the following: • More than 17,400 tonnes of greenhouse gas emissions were avoided • Over 100 tonnes of air pollution were prevented • 75.7 million kilometres of car travel were eliminated • Nearly 1.3 million single occupant vehicle (SOV) trips were not taken • Almost 10,000 cars removed from local roads and highways on workdays Intelligent Transportation Systems (ITS) • City of Toronto ITS Group formed Delivering Toronto’s Transportation Vision What is Needed ? • New Approval Process • Political Will • Public Mind Shift • Money - Long Term Sustainable Funding / Annual Budget Toronto’s Transit Options Current TTC Initiatives • Ridership Growth Strategy (RGS) Program • Fully Accessible TTC Services • Toronto Transit City Light Rail Plan Making Cost-Effective Transit Investment Decisions • Systematically compare a wide range of investment options • Fares, service, capital construction projects • Business-based Return on Investment (ROI) approach • Strong “Pro-transit” Official Plan in Toronto Why People Choose Transit • Travellers on any mode want • speed, reliability • comfort, convenience and • low cost • In direct competition with the automobile • many TTC passengers have access to a car • must be realistic about where transit can be competitive Less Crowding – More Frequent Service • RGS policy changes to reduce crowding • more frequent service • Off-peak improvements on 45 routes in 2004/2005 • 47 million passenger trips benefit • Peak service improvements on 65 routes in 2007 • 76 million passenger trips benefit Other RGS Initiatives • fare incentives (freeze Metropass, transferable pass, weekly pass) • 2005/2006 • surface rapid transit rights-of-way • St Clair under construction, York University busway 2008 • Waterfront EAs – East Bayfront, West Don, Waterfront West • expand capacity of the Scarborough RT • Approved for 2008 – 2012 • restore, improve off-peak services • proposed for 2008 -2009 Accessible Transit Service • accessible conventional services benefit everyone • long history of accessibility • 1973 pilot of door-to-door service • Since 1989 Choices for the Future – continuous program of making conventional services accessible • permanent
Recommended publications
  • 3. Description of the Potentially Affected Environment
    ENVIRONMENTAL ASSESSMENT 3. Description of the Potentially Affected Environment The purpose of Chapter 3 is to present an overview of the environment potentially affected by the SWP to create familiarity with issues to be addressed and the complexity of the environment likely to be affected by the Project. All aspects of the environment within the Project Study Area (see Figure 2- 1 in Chapter 2) relevant to the Project and its potential effects have been described in this chapter. The chapter is divided into three sections which capture different components of the environment: 1. Physical environment: describes the coastal and geotechnical processes acting on the Project Study Area; 2. Natural environment: describes terrestrial and aquatic habitat and species; and, 3. Socio-economic environment: describes existing and planned land use, land ownership, recreation, archaeology, cultural heritage, and Aboriginal interests. The description of the existing environment is based on the information from a number of studies, which have been referenced in the relevant sections. Additional field surveys were undertaken where appropriate. Where applicable, future environmental conditions are also discussed. For most components of the environment, existing conditions within the Project Area or Project Study Area are described. Where appropriate, conditions within the broader Regional Study Area are also described. 3.1 Physical Environment Structures and property within slopes, valleys and shorelines may be susceptible to damage from natural processes such as erosion, slope failures and dynamic beaches. These processes become natural hazards when people and property locate in areas where they normally occur (MNR, 2001). Therefore, understanding physical natural processes is vital to developing locally-appropriate Alternatives in order to meet Project Objectives.
    [Show full text]
  • Transit City Etobicoke - Finch West LRT
    Delcan Corporation Toronto Transit Commission / City of Toronto Etobicoke-Finch West Light Rail Transit Transit Project Assessment Environmental Project Report - Appendices Transit City Etobicoke - Finch West LRT APPENDIX M – Consultation Record March 2010 March 2010 Appendix M Delcan Corporation Toronto Transit Commission / City of Toronto Etobicoke-Finch West Light Rail Transit Transit Project Assessment Environmental Project Report - Appendices 3.0 List of Interested Persons Participating in the Consultations 1.0 Introduction This appendix documents in detail the consultations carried out with the technical agencies, the public, Consultation was carried out to encourage technical agencies to provide input during the course of the and the First Nations communities. study. The following agencies were invited to be involved and provide comment on the TPAP study for the EFWLRT: 2.0 Description of Consultations and Follow-up Efforts The general public, government agencies and various interest groups were provided opportunities to Government Review Agencies Technical Agencies Canadian Environmental Assessment All Stream review and comment on this project during the course of the study. The City of Toronto Public Agency Consultation Team was involved in the overall public consultation process. They offered a wide range Environmental Canada MTA All Stream Inc. of communication methods to the public, including project web site, dedicated telephone number, fax, Department of Fisheries and Oceans Telus and email address for contacting the project team. Indian and Northern Affairs Canada Enwave Energy Corporation (INAC) Transportation Canada-Ontario Region Group Telecom/360 Network Technical agencies, including federal, provincial, municipal agencies, utilities, and potential interested Ministry of Aboriginal Affairs Hydro One Network Inc.
    [Show full text]
  • 3131 Lower Don River West Lower Don River West 4.0 DESCRIPTION
    Lower Don River West Environmental Study Report Remedial Flood Protection Project 4.0 DESCRIPTION OF LOWER DON 4.1 The Don River Watershed The Don River is one of more than sixty rivers and streams flowing south from the Oak Ridges Moraine. The River is approximately 38 km long and outlets into the Keating Channel, which then conveys the flows into Toronto Harbour and Lake Historic Watershed Ontario. The entire drainage basin of the Don urbanization of the river's headwaters in York River is 360 km2. Figure 4.1 and Figure 4.2, on the Region began in the early 1980s and continues following pages, describe the existing and future today. land use conditions within the Don River Watershed. Hydrologic changes in the watershed began when settlers converted the forests to agricultural fields; For 200 years, the Don Watershed has been many streams were denuded even of bank side subject to intense pressures from human vegetation. Urban development then intensified settlement. These have fragmented the river the problems of warmer water temperatures, valley's natural branching pattern; degraded and erosion, and water pollution. Over the years often destroyed its once rich aquatic and during the three waves of urban expansion, the terrestrial wildlife habitat; and polluted its waters Don River mouth, originally an extensive delta with raw sewage, industrial/agricultural marsh, was filled in and the lower portion of the chemicals, metals and other assorted river was straightened. contaminants. Small Don River tributaries were piped and Land clearing, settlement, and urbanization have buried, wetlands were "reclaimed," and springs proceeded in three waves in the Don River were lost.
    [Show full text]
  • Volume 5 Has Been Updated to Reflect the Specific Additions/Revisions Outlined in the Errata to the Environmental Project Report, Dated November, 2017
    DISCLAIMER AND LIMITATION OF LIABILITY This Revised Final Environmental Project Report – Volume 5 has been updated to reflect the specific additions/revisions outlined in the Errata to the Environmental Project Report, dated November, 2017. As such, it supersedes the previous Final version dated October, 2017. The report dated October, 2017 (“Report”), which includes its text, tables, figures and appendices) has been prepared by Gannett Fleming Canada ULC (“Gannett Fleming”) and Morrison Hershfield Limited (“Morrison Hershfield”) (“Consultants”) for the exclusive use of Metrolinx. Consultants disclaim any liability or responsibility to any person or party other than Metrolinx for loss, damage, expense, fines, costs or penalties arising from or in connection with the Report or its use or reliance on any information, opinion, advice, conclusion or recommendation contained in it. To the extent permitted by law, Consultants also excludes all implied or statutory warranties and conditions. In preparing the Report, the Consultants have relied in good faith on information provided by third party agencies, individuals and companies as noted in the Report. The Consultants have assumed that this information is factual and accurate and has not independently verified such information except as required by the standard of care. The Consultants accept no responsibility or liability for errors or omissions that are the result of any deficiencies in such information. The opinions, advice, conclusions and recommendations in the Report are valid as of the date of the Report and are based on the data and information collected by the Consultants during their investigations as set out in the Report. The opinions, advice, conclusions and recommendations in the Report are based on the conditions encountered by the Consultants at the site(s) at the time of their investigations, supplemented by historical information and data obtained as described in the Report.
    [Show full text]
  • Yonge Subway Extension Transit Project Assessment
    Yonge Subway Extension Transit Project Assessment Councillors Briefing January 22, 2009 inter-regional connectivity is the key to success 2 metrolinx: 15 top priorities ● On November 28, 2008 Regional Transportation Plan approved by Metrolinx Board ● Top 15 priorities for early implementation include: ¾ Viva Highway 7 and Yonge Street through York Region ¾ Spadina Subway extension to Vaughan Corporate Centre ¾ Yonge Subway extension to Richmond Hill Centre ¾ Sheppard/Finch LRT ¾ Scarborough RT replacement ¾ Eglinton Crosstown LRT 3 …transit city LRT plan 4 yonge subway – next steps TODAY 5 what’s important when planning this subway extension? You told us your top three priorities were: 1. Connections to other transit 2. Careful planning of existing neighbourhoods and future growth 3. Destinations, places to go and sensitivity to the local environment were tied for the third priority In addition, we need to address all the technical and operational requirements and costs 6 yonge subway at a crossroads ● The Yonge Subway is TTC’s most important asset ● Must preserve and protect existing Yonge line ridership ● Capacity of Yonge line to accommodate ridership growth a growing issue ● Extension of Yonge/Spadina lines matched by downstream capacity ● Three major issues: 1. Capacity of Yonge Subway line 2. Capacity of Yonge-Bloor Station 3. Sequence of events for expansion 7 yonge-university-spadina subway – peak hour volumes 8 yonge subway capacity: history ● Capacity of Yonge line an issue since early 1980s ● RTES study conclusions (2001) ¾
    [Show full text]
  • Peer Review EA Study Design Billy Bishop Toronto City Airport BBTCA
    Imagine the result Peer Review – EA Study Design Billy Bishop Toronto City Airport (BBTCA) Runway Expansion and Introduction of Jet Aircraft Final Report August 2015 BBTCA Peer Review of EA Study Design Report ACRONYMS AND ABBREVIATIONS ii 1.0 INTRODUCTION 1-1 1.1 Background 1-1 1.2 Current Assignment 1-3 2.0 PEER REVIEW APPROACH 2-1 2.1 Methodology 2-1 3.0 FINDINGS OF PEER REVIEW OF AECOM’S DRAFT STUDY DESIGN REPORT 3-1 3.1 EA Process and Legislation 3-1 3.2 Public Consultation & Stakeholder Engagement 3-1 3.3 Air Quality 3-2 3.4 Public Health 3-5 3.5 Noise 3-6 3.6 Natural Environment 3-10 3.7 Socio-Economic Conditions 3-11 3.8 Land Use & Built Form 3-14 3.9 Marine Physical Conditions and Water Quality 3-15 3.10 Transportation 3-15 3.11 Archaeology & Cultural Heritage 3-18 4.0 SUMMARY RECOMMENDATIONS 4-1 APPENDIX A Presentation Given to the Working Group (22 June 2015) B Presentation of Draft Phase I Peer Review Report Results (13 July 2015) i BBTCA Peer Review of EA Study Design Report ACRONYMS AND ABBREVIATIONS AERMOD Atmospheric Dispersion Modelling System ARCADIS ARCADIS Canada Inc. BBTCA Billy Bishop Toronto City Airport CALPUFF Meteorological and Air Quality Monitoring System CCG Canadian Coast Guard CEAA Canadian Environmental Assessment Act CO Carbon Monoxide COPA Canadian Owners and Pilots Association dBA Decibel Values of Sounds EA Environmental Assessment EC Environment Canada GBE Government Business Enterprise GWC Greater Waterfront Coalition HEAT Habitat and Environmental Assessment Tool INM Integrated Noise Model Ldn Day-Night
    [Show full text]
  • York Region Transit Downsview Subway Station and Busway Agreement
    Report No. 7 of the Transit Committee Regional Council Meeting of June 25, 2009 4 YORK REGION TRANSIT DOWNSVIEW SUBWAY STATION AND BUSWAY AGREEMENT The Transportation and Works Committee recommends the adoption of the recommendations contained in the following report dated June 4, 2009, from the Commissioner of Transportation Services. 1. RECOMMENDATIONS It is recommended that: 1. The existing agreement between The Regional Municipality of York and the Toronto Transit Commission to permit York Region Transit/Viva access to the Downsview subway station bus terminal be extended for an additional five-year term and also be amended to include use of the York University busway, as well as other administrative amendments as outlined in this report. 2. The Regional Chair and Regional Clerk be authorized to sign the necessary agreements, subject to terms and conditions acceptable to the Commissioner of Transportation Services, and the approval of Legal Services as to form and content. 2. PURPOSE This report seeks authorization for the renewal of the current agreement between the Regional Municipality of York and the Toronto Transit Commission (TTC) with respect to the use of the Downsview subway station bus terminal. The amended agreement would continue to permit York Region Transit (YRT)/Viva buses to access the TTC bus terminal at the Downsview subway station for the purpose of servicing passengers who use the Spadina subway line. The report also seeks authorization to amend the agreement with the TTC for use of the new York University busway, as well as to facilitate other administrative adjustments. 3. BACKGROUND Viva Orange service was implemented in late 2005 with approximately 176 daily trips connecting with the TTC’s Downsview subway bus terminal, via York University, from Vaughan.
    [Show full text]
  • Rapid Transit in Toronto Levyrapidtransit.Ca TABLE of CONTENTS
    The Neptis Foundation has collaborated with Edward J. Levy to publish this history of rapid transit proposals for the City of Toronto. Given Neptis’s focus on regional issues, we have supported Levy’s work because it demon- strates clearly that regional rapid transit cannot function eff ectively without a well-designed network at the core of the region. Toronto does not yet have such a network, as you will discover through the maps and historical photographs in this interactive web-book. We hope the material will contribute to ongoing debates on the need to create such a network. This web-book would not been produced without the vital eff orts of Philippa Campsie and Brent Gilliard, who have worked with Mr. Levy over two years to organize, edit, and present the volumes of text and illustrations. 1 Rapid Transit in Toronto levyrapidtransit.ca TABLE OF CONTENTS 6 INTRODUCTION 7 About this Book 9 Edward J. Levy 11 A Note from the Neptis Foundation 13 Author’s Note 16 Author’s Guiding Principle: The Need for a Network 18 Executive Summary 24 PART ONE: EARLY PLANNING FOR RAPID TRANSIT 1909 – 1945 CHAPTER 1: THE BEGINNING OF RAPID TRANSIT PLANNING IN TORONTO 25 1.0 Summary 26 1.1 The Story Begins 29 1.2 The First Subway Proposal 32 1.3 The Jacobs & Davies Report: Prescient but Premature 34 1.4 Putting the Proposal in Context CHAPTER 2: “The Rapid Transit System of the Future” and a Look Ahead, 1911 – 1913 36 2.0 Summary 37 2.1 The Evolving Vision, 1911 40 2.2 The Arnold Report: The Subway Alternative, 1912 44 2.3 Crossing the Valley CHAPTER 3: R.C.
    [Show full text]
  • The Fish Communities of the Toronto Waterfront: Summary and Assessment 1989 - 2005
    THE FISH COMMUNITIES OF THE TORONTO WATERFRONT: SUMMARY AND ASSESSMENT 1989 - 2005 SEPTEMBER 2008 ACKNOWLEDGMENTS The authors wish to thank the many technical staff, past and present, of the Toronto and Region Conservation Authority and Ministry of Natural Resources who diligently collected electrofishing data for the past 16 years. The completion of this report was aided by the Canada Ontario Agreement (COA). 1 Jason P. Dietrich, 1 Allison M. Hennyey, 1 Rick Portiss, 1 Gord MacPherson, 1 Kelly Montgomery and 2 Bruce J. Morrison 1 Toronto and Region Conservation Authority, 5 Shoreham Drive, Downsview, ON, M3N 1S4, Canada 2 Ontario Ministry of Natural Resources, Lake Ontario Fisheries Management Unit, Glenora Fisheries Station, Picton, ON, K0K 2T0, Canada © Toronto and Region Conservation 2008 ABSTRACT Fish community metrics collected for 16 years (1989 — 2005), using standardized electrofishing methods, throughout the greater Toronto region waterfront, were analyzed to ascertain the current state of the fish community with respect to past conditions. Results that continue to indicate a degraded or further degrading environment include an overall reduction in fish abundance, a high composition of benthivores, an increase in invasive species, an increase in generalist species biomass, yet a decrease in specialist species biomass, and a decrease in cool water Electrofishing in the Toronto Harbour thermal guild species biomass in embayments. Results that may indicate a change in a positive community health direction include no significant changes to species richness, a marked increase in diversity in embayments, a decline in non-native species in embayments and open coasts (despite the invasion of round goby), a recent increase in native species biomass, fluctuating native piscivore dynamics, increased walleye abundance, and a reduction in the proportion of degradation tolerant species.
    [Show full text]
  • Billy Bishop Airport Master Planning Process Takes Off with First Public Meeting Scheduled for February 7 from 5:00 P.M
    Billy Bishop Airport Master Planning Process Takes Off with First Public Meeting Scheduled for February 7 from 5:00 p.m. to 8:30 p.m. Meeting to include topic tables, formal presentation and Q&A Toronto (January 15, 2018) – Billy Bishop Toronto City Airport (Billy Bishop Airport) will hold its first public meeting in association with updating its Master Plan on February 7, 2018. The planning process for the Billy Bishop Airport 2018 Master Plan will include a robust public consultation process that will include the public, neighbourhood community groups, airport stakeholders, government agencies, and first nations communities. The first public meeting is scheduled for: Wednesday, February 7, 2018 Metro Toronto Convention Centre – North Building Level 200 – East Meeting Rooms 205 & 206 5:00 p.m. to 8:30 p.m. Format: 5:00 to 6:30 p.m. – Open House with topic tables set up for small group discussion and Q&A. Topics will include: master plan process, noise management, wildlife management, ground transportation, emergency services, security and public safety, infrastructure, and environmental sustainability. 6:45 to 7:15 p.m. – Formal Presentation of Master Plan process and objectives 7:15 to 8:30 p.m. – Group Q&A Background: The primary purpose of an airport Master Plan is to establish an orderly development concept for the airport that establishes priorities and options for the airport’s operation and development over an extended period of time, while at the same time allowing the airport to avail itself of new opportunities to serve the needs of the community and operators.
    [Show full text]
  • Sec 2-Core Circle
    TRANSFORMATIVE IDEA 1. THE CORE CIRCLE Re-imagine the valleys, bluffs and islands encircling the Downtown as a fully interconnected 900-hectare immersive landscape system THE CORE CIRLE 30 THE CORE CIRLE PUBLIC WORK 31 TRANSFORMATIVE IDEA 1. THE CORE CIRCLE N The Core Circle re-imagines the valleys, bluffs and islands E encircling the Downtown as a fully connected 900-hectare immersive landscape system W S The Core Circle seeks to improve and offer opportunities to reconnect the urban fabric of the Downtown to its surrounding natural features using the streets, parks and open spaces found around the natural setting of Downtown Toronto including the Don River Valley and ravines, Lake Ontario, the Toronto Islands, Garrison Creek and the Lake Iroquois shoreline. Connecting these large landscape features North: Davenport Road Bluff, Toronto, Canada will create a continuous circular network of open spaces surrounding the Downtown, accessible from both the core and the broader city. The Core Circle re- imagines the Downtown’s framework of valleys, bluffs and islands as a connected 900-hectare landscape system and immersive experience, building on Toronto’s strong identity as a ‘city within a park’ and providing opportunities to acknowledge our natural setting and connect to the history of our natural landscapes. East: Don River Valley Ravine and Rosedale Valley Ravine, Toronto, Canada Historically, the natural landscape features that form the Core Circle were used by Indigenous peoples as village sites, travelling routes and hunting and gathering lands. They are regarded as sacred landscapes and places for spiritual renewal. The Core Circle seeks to re-establish our connection to these landscapes.
    [Show full text]
  • Transit City Etobicoke - Finch West LRT
    Delcan Corporation Toronto Transit Commission / City of Toronto Etobicoke-Finch West Light Rail Transit Transit Project Assessment Environmental Project Report - Appendices Transit City Etobicoke - Finch West LRT APPENDIX C - Existing and Future Traffic Operations March 2010 March 2010 Appendix C Delcan Corporation Toronto Transit Commission / City of Toronto Etobicoke-Finch West Light Rail Transit Transit Project Assessment Environmental Project Report It is assumed that with the introduction of the LRT in the median, the majority of the Finch Avenue West corridor will 1. ASSUMPTIONS AND METHODOLOGY FOR TRAFFIC ANALYSIS OF maintain two through lanes for general traffic in each direction. The exception is the section of Finch Avenue West in ETOBICOKE-FINCH WEST LRT CORRIDOR proximity to Highway 400, between Jane Street and Weston Road, where three lanes in each direction have been retained (except under the CPR structure just east of Weston Road, which will narrow to two traffic lanes in each direction). [The Highway 400 portion of Finch Avenue will be discussed later in this section, and, as noted, the Existing traffic conditions in the corridor have been analyzed using the Synchro 7 software program and its Sim-Traffic analysis is described in detail in Appendix E.] microsimulation component to model traffic behaviour on the streets and intersections of the study area. Due to the significance of the operations of the corridor at the interface with Highway 400, a separate detailed microsimulation The level of service for traffic at major intersections is expected to be lower (more congested) than at present with the was carried out in the vicinity of Highway 400 using the AIMSUN program.
    [Show full text]