Santa Monica Smiley Sand Tram
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Interstate Commerce Commission Washington
INTERSTATE COMMERCE COMMISSION WASHINGTON REPORT NO. 3374 PACIFIC ELECTRIC RAILWAY COMPANY IN BE ACCIDENT AT LOS ANGELES, CALIF., ON OCTOBER 10, 1950 - 2 - Report No. 3374 SUMMARY Date: October 10, 1950 Railroad: Pacific Electric Lo cation: Los Angeles, Calif. Kind of accident: Rear-end collision Trains involved; Freight Passenger Train numbers: Extra 1611 North 2113 Engine numbers: Electric locomo tive 1611 Consists: 2 muitiple-uelt 10 cars, caboose passenger cars Estimated speeds: 10 m. p h, Standing ft Operation: Timetable and operating rules Tracks: Four; tangent; ] percent descending grade northward Weather: Dense fog Time: 6:11 a. m. Casualties: 50 injured Cause: Failure properly to control speed of the following train in accordance with flagman's instructions - 3 - INTERSTATE COMMERCE COMMISSION REPORT NO, 3374 IN THE MATTER OF MAKING ACCIDENT INVESTIGATION REPORTS UNDER THE ACCIDENT REPORTS ACT OF MAY 6, 1910. PACIFIC ELECTRIC RAILWAY COMPANY January 5, 1951 Accident at Los Angeles, Calif., on October 10, 1950, caused by failure properly to control the speed of the following train in accordance with flagman's instructions. 1 REPORT OF THE COMMISSION PATTERSON, Commissioner: On October 10, 1950, there was a rear-end collision between a freight train and a passenger train on the Pacific Electric Railway at Los Angeles, Calif., which resulted in the injury of 48 passengers and 2 employees. This accident was investigated in conjunction with a representative of the Railroad Commission of the State of California. 1 Under authority of section 17 (2) of the Interstate Com merce Act the above-entitled proceeding was referred by the Commission to Commissioner Patterson for consideration and disposition. -
Interstate Commerce Commission in Re
INTERSTATE COMMERCE COMMISSION IN RE INVESTIGATION OF AM" ACCIDENT WHICH OCCURRED ON THE DENVER & INTERURBAN RAILROAD, NEAR GLOBEVILLE, COLO , ON SEPTEMBER 6, 1920 November 17, 1920 To the Commission On September G, 1920, there was a hoad-end collision between two passenger tiams on the Denvei & Intemiban Railioad neai Globe ville, Colo , which lesulted m the death of 11 passengeis and 2 em ployees, and the injury of 209 passengers and 5 employees This accident was investigated jointly with the Public Utilities Commis sion of Coloiado, and as a result of this investigation I lespectfully submit the following lepoit The Dem ei & Interurban Railioacl is a bianch of the Coloiado & Southern Railway, the rules of which govern Denver & Interurban trains Donvei & Intemiban tiains aie opeiated between Denvei and Bouldei, 31 miles noith of Denvei, over the Denvei Tiamway Co's tiacks between Denvei and Globeville and ovei Denvei & In temiban tiacks between Globeville and Denver & Inteiuiban Junc tion, at which point the line blanches, one line extending to Louis ville Junction and the othei to Webb Junction, and between these two junctions and Bouldei the trains of the Denvei & Inteiuiban j.»,ailroad opeiate over the tiacks of the Colorado & Southern Kail- way From Marshall, between Louisville Junction and Bouldei, a bianch line .extends to Eldorado Spimgs, this is also used jointly by the tiams of the two laihoads On this line Denvei & Intel urban employees aie ordinarily re lieved by Denver Tiamway employees at Globeville, the tiamway employees -
From the 1832 Horse Pulled Tramway to 21Th Century Light Rail Transit/Light Metro Rail - a Short History of the Evolution in Pictures
From the 1832 Horse pulled Tramway to 21th Century Light Rail Transit/Light Metro Rail - a short History of the Evolution in Pictures By Dr. F.A. Wingler, September 2019 Animation of Light Rail Transit/ Light Metro Rail INTRODUCTION: Light Rail Transit (LRT) or Light Metro Rail (LMR) Systems operates with Light Rail Vehicles (LRV). Those Light Rail Vehicles run in urban region on Streets on reserved or unreserved rail tracks as City Trams, elevated as Right-of-Way Trams or Underground as Metros, and they can run also suburban and interurban on dedicated or reserved rail tracks or on main railway lines as Commuter Rail. The invest costs for LRT/LMR are less than for Metro Rail, the diversity is higher and the adjustment to local conditions and environment is less complicated. Whereas Metro Rail serves only certain corridors, LRT/LRM can be installed with dense and branched networks to serve wider areas. 1 In India the new buzzword for LRT/LMR is “METROLIGHT” or “METROLITE”. The Indian Central Government proposes to run light urban metro rail ‘Metrolight’ or Metrolite” for smaller towns of various states. These transits will operate in places, where the density of people is not so high and a lower ridership is expected. The Light Rail Vehicles will have three coaches, and the speed will be not much more than 25 kmph. The Metrolight will run along the ground as well as above on elevated structures. Metrolight will also work as a metro feeder system. Its cost is less compared to the metro rail installations. -
2708 N. California Mixed-Used Property
2708 N. CALIFORNIA MIXED-USED PROPERTY Strong Cash Flow Property In Appreciating Area! Priced to sell! Great place to live-work! MULTIFAMILY INVESTMENT OPPORTUNITY CONTENTS CONFIDENTIALITY & DISCLAIMER PROPERTY INFORMATION 3 The information contained herein is proprietary and confidential. It is intended only for the use of the party receiving it from First Western Properties, Inc. and is LOCATION INFORMATION 8 not to be duplicated or distributed to any other party without the written approval of First Western Properties, Inc. FINANCIAL ANALYSIS 12 The purpose of this analysis is to provide summary information to prospective DEMOGRAPHICS 16 investors and to establish a preliminary level of interest in the property. THE INFORMATION IS NOT A SUBSTITUTE FOR A THOROUGH DUE DILIGENCE ADVISOR BIOS 18 INVESTIGATION BY THE PROSPECTIVE INVESTOR. Although the information contained herein has been secured by sources believed to be reliable, First Western Properties, Inc. makes NO REPRESENTATION OF WARRANTY, EXPRESS OF IMPLIED, AS TO THE ACCURACY OF THE INFORMATION, including but not limited to number of legal units, income and expenses of the property; projected financial performance of the property; size and square footage of the property; presence or absence of contaminating substances, lead, PCB’s or asbestos; compliance with the Americans with Disabilities Act; physical condition or age of the property or improvements’ suitability for a prospective investors’ intended us; or financial PRESENTED BY condition of occupancy plans of tenant. First Western Properties, Inc. has not conducted an investigation for verified the information. ALL POTENTIAL INVESTORS ARE RESPONSIBLE TO TAKE APPROPRIATE STEPS TO VERIFY ALL INFORMATION SET FORTH HEREIN AND CONDUCT THEIR OWN THOROUGH DE DILIGENCE BEFORE PURCHASING THE PROPERTY. -
Pacific Coast OCS Office 300 N. Los Angeles St. Los Angeles, Calif
IN REPLY REFER TO: UNITED STATES XS-P 0182 DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT Date CE1VF.D Pacific Coast OCS Office February 6, 1968 300 N. Los Angeles St. State Los Angeles, Calif. 90012 California Area Channel 3Island s Tract Number Block Number DECISION Hal. S2N 77W Name Hurable Oil & Refining Co. Description I80O Avenue of the Stars Los Angeles, Calif. 90067 Standard Oil Co. of Cal. 225 Bush St. San Francisco, Cal. 9^120 Rental Balance of Bonus $ 17.280 $1,650,216.96 T LEASE FORMS TRANSMITTED FOR EXECUTION Pursuant to Section 8 of the Outer Continental Shelf Lands Act (67 Stat. 462; 43 U.S.C. 1337), and the regulations per• taining thereto (43 CFR 3380 et seq.), your bid for the above tract is accepted. Your qualifications have been examined and are satisfactory. Accordingly, in order to perfect your rights hereunder, the following action must be taken: [x] L Execute and return the three copies of attached lease. (If lease is executed by an agent, evidence must be furnished of agent's authorization.) 2. Pay the balance of bonus bid and the first year's rental indicated above. x 3. Execute and return three copies of the stipulation(s) attached to lease. c0Py to; Tafi MAR 1 4 ;96o Coaliriga L°s Angeles M'"- Class,- Thirty days from receipt of this decision are allowed for compliance with the above requirements, failing in which your rights to acquire a lease and the deposit of 1/5 of the bonus bid will be forfeited. IMPORTANT: The lease form requires the attachment of the CORPORATE SEAL to all leases executed by corporations. -
Trolleybuses: Applicability of UN Regulation No
Submitted by the expert from OICA Informal document GRSG-110-08-Rev.1 (110th GRSG, 26-29 April 2016, agenda item 2(a)) Trolleybuses: Applicability of UN Regulation No. 100 (Electric Power Train Vehicle) vs. UN Regulation No. 107 Annex 12 (Construction of M2/M3 Vehicles) for Electrical Safety 1. At 110th session of GRSG Belgium proposes to amend UN R107 annex 12 by deleting the requirements for trolleybuses (see GRSG/2016/05) and transfer the requirements into UN R100 (see GRSP/2016/07), which will be on the agenda of upcoming GRSP session in May 2016. 2. Due to the design of a trolleybus and stated in UN Regulation No. 107, trolleybuses are dual- mode vehicles. They can operate either: (a) in trolley mode, when connected to the overhead contact line (OCL), or (b) in bus mode when not connected to the OCL. When not connected to the OCL, they can also be (c) in charging mode, where they are stationary and plugged into the power grid for battery charging. 3. The basic principles of the design of the electric powertrain of the trolleybus and the connection to the OCL is based on international standards developed for trams and trains and is implemented and well accepted in the market worldwide. 4. Due to the fact that the trolleybus is used on public roads the trolleybus has to fulfil the regulations under the umbrella of the UNECE regulatory framework due to the existing national regulations (e.g. European frame work directive). 5. Therefore the annex 12 in UN R107 was amended to align the additional safety prescriptions for trolleybuses with the corresponding electrical standards. -
Minutes of Claremore Public Works Authority Meeting Council Chambers, City Hall, 104 S
MINUTES OF CLAREMORE PUBLIC WORKS AUTHORITY MEETING COUNCIL CHAMBERS, CITY HALL, 104 S. MUSKOGEE, CLAREMORE, OKLAHOMA MARCH 03, 2008 CALL TO ORDER Meeting called to order by Mayor Brant Shallenburger at 6:00 P.M. ROLL CALL Nan Pope called roll. The following were: Present: Brant Shallenburger, Buddy Robertson, Tony Mullenger, Flo Guthrie, Mick Webber, Terry Chase, Tom Lehman, Paula Watson Absent: Don Myers Staff Present: City Manager Troy Powell, Nan Pope, Serena Kauk, Matt Mueller, Randy Elliott, Cassie Sowers, Phil Stowell, Steve Lett, Daryl Golbek, Joe Kays, Gene Edwards, Tim Miller, Tamryn Cluck, Mark Dowler Pledge of Allegiance by all. Invocation by James Graham, Verdigris United Methodist Church. ACCEPTANCE OF AGENDA Motion by Mullenger, second by Lehman that the agenda for the regular CPWA meeting of March 03, 2008, be approved as written. 8 yes, Mullenger, Lehman, Robertson, Guthrie, Shallenburger, Webber, Chase, Watson. ITEMS UNFORESEEN AT THE TIME AGENDA WAS POSTED None CALL TO THE PUBLIC None CURRENT BUSINESS Motion by Mullenger, second by Lehman to approve the following consent items: (a) Minutes of Claremore Public Works Authority meeting on February 18, 2008, as printed. (b) All claims as printed. (c) Approve budget supplement for upgrading the electric distribution system and adding an additional Substation for the new Oklahoma Plaza Development - $586,985 - Leasehold improvements to new project number assignment. (Serena Kauk) (d) Approve budget supplement for purchase of an additional concrete control house for new Substation #5 for Oklahoma Plaza Development - $93,946 - Leasehold improvements to new project number assignment. (Serena Kauk) (e) Approve budget supplement for electrical engineering contract with Ledbetter, Corner and Associates for engineering design phase for Substation #5 - Oklahoma Plaza Development - $198,488 - Leasehold improvements to new project number assignment. -
Los Angeles Transportation Transit History – South LA
Los Angeles Transportation Transit History – South LA Matthew Barrett Metro Transportation Research Library, Archive & Public Records - metro.net/library Transportation Research Library & Archive • Originally the library of the Los • Transportation research library for Angeles Railway (1895-1945), employees, consultants, students, and intended to serve as both academics, other government public outreach and an agencies and the general public. employee resource. • Partner of the National • Repository of federally funded Transportation Library, member of transportation research starting Transportation Knowledge in 1971. Networks, and affiliate of the National Academies’ Transportation • Began computer cataloging into Research Board (TRB). OCLC’s World Catalog using Library of Congress Subject • Largest transit operator-owned Headings and honoring library, forth largest transportation interlibrary loan requests from library collection after U.C. outside institutions in 1978. Berkeley, Northwestern University and the U.S. DOT’s Volpe Center. • Archive of Los Angeles transit history from 1873-present. • Member of Getty/USC’s L.A. as Subject forum. Accessing the Library • Online: metro.net/library – Library Catalog librarycat.metro.net – Daily aggregated transportation news headlines: headlines.metroprimaryresources.info – Highlights of current and historical documents in our collection: metroprimaryresources.info – Photos: flickr.com/metrolibraryarchive – Film/Video: youtube/metrolibrarian – Social Media: facebook, twitter, tumblr, google+, -
VOLT Owner's Manual
19_CHEV_VOLT_COV_en_US_84044803A_2018JUN22.ai 1 6/14/2018 10:17:33 AM 2019 VOLT C M Y CM MY CY CMY VOLT K Owner’s Manual 84044803 A Chevrolet VOLT Owner Manual (GMNA-Localizing-U.S./Canada/Mexico- 12163007) - 2019 - crc - 6/11/18 Contents Introduction . 2 In Brief . 5 Keys, Doors, and Windows . 30 Seats and Restraints . 52 Storage . 99 Instruments and Controls . 102 Lighting . 143 Infotainment System . 150 Climate Controls . 151 Driving and Operating . 158 Vehicle Care . 236 Service and Maintenance . 321 Technical Data . 334 Customer Information . 337 Reporting Safety Defects . 348 OnStar . 351 Connected Services . 359 Index . 363 Chevrolet VOLT Owner Manual (GMNA-Localizing-U.S./Canada/Mexico- 12163007) - 2019 - crc - 6/11/18 2 Introduction Introduction This manual describes features that Helm, Incorporated may or may not be on the vehicle Attention: Customer Service because of optional equipment that 47911 Halyard Drive was not purchased on the vehicle, Plymouth, MI 48170 model variants, country USA specifications, features/applications that may not be available in your Using this Manual region, or changes subsequent to To quickly locate information about the printing of this owner’s manual. the vehicle, use the Index in the The names, logos, emblems, Refer to the purchase back of the manual. It is an slogans, vehicle model names, and documentation relating to your alphabetical list of what is in the vehicle body designs appearing in specific vehicle to confirm the manual and the page number where this manual including, but not limited features. it can be found. to, GM, the GM logo, CHEVROLET, the CHEVROLET Emblem, VOLT, Keep this manual in the vehicle for and the VOLT logo are trademarks quick reference. -
The Neighborly Substation the Neighborly Substation Electricity, Zoning, and Urban Design
MANHATTAN INSTITUTE CENTER FORTHE RETHINKING DEVELOPMENT NEIGHBORLY SUBstATION Hope Cohen 2008 er B ecem D THE NEIGHBORLY SUBstATION THE NEIGHBORLY SUBstATION Electricity, Zoning, and Urban Design Hope Cohen Deputy Director Center for Rethinking Development Manhattan Institute In 1879, the remarkable thing about Edison’s new lightbulb was that it didn’t burst into flames as soon as it was lit. That disposed of the first key problem of the electrical age: how to confine and tame electricity to the point where it could be usefully integrated into offices, homes, and every corner of daily life. Edison then designed and built six twenty-seven-ton, hundred-kilowatt “Jumbo” Engine-Driven Dynamos, deployed them in lower Manhattan, and the rest is history. “We will make electric light so cheap,” Edison promised, “that only the rich will be able to burn candles.” There was more taming to come first, however. An electrical fire caused by faulty wiring seriously FOREWORD damaged the library at one of Edison’s early installations—J. P. Morgan’s Madison Avenue brownstone. Fast-forward to the massive blackout of August 2003. Batteries and standby generators kicked in to keep trading alive on the New York Stock Exchange and the NASDAQ. But the Amex failed to open—it had backup generators for the trading-floor computers but depended on Consolidated Edison to cool them, so that they wouldn’t melt into puddles of silicon. Banks kept their ATM-control computers running at their central offices, but most of the ATMs themselves went dead. Cell-phone service deteriorated fast, because soaring call volumes quickly drained the cell- tower backup batteries. -
LM123/LM323A/LM323 3-Amp, 5-Volt Positive Regulator Datasheet (Rev. B)
LM123, LM323-N, LM323A www.ti.com SNVS757B –MAY 2004–REVISED NOVEMBER 2004 LM123/LM323A/LM323-N 3-Amp, 5-Volt Positive Regulator Check for Samples: LM123, LM323-N, LM323A 1FEATURES The 3 amp regulator is virtually blowout proof. Current limiting, power limiting, and thermal shutdown 2• Ensured 1% Initial Accuracy (A Version) provide the same high level of reliability obtained with • 3 Amp Output Current these techniques in the LM109 1 amp regulator. • Internal Current and Thermal Limiting No external components are required for operation of • 0.01Ω Typical Output Impedance the LM123. If the device is more than 4 inches from • 7.5V Minimum Input Voltage the filter capacitor, however, a 1 μF solid tantalum capacitor should be used on the input. A 0.1 μF or • 30W Power Dissipation larger capacitor may be used on the output to reduce • P+ Product Enhancement tested load transient spikes created by fast switching digital logic, or to swamp out stray load capacitance. DESCRIPTION An overall worst case specification for the combined The LM123 is a three-terminal positive regulator with effects of input voltage, load currents, ambient a preset 5V output and a load driving capability of 3 temperature, and power dissipation ensure that the amps. New circuit design and processing techniques LM123 will perform satisfactorily as a system are used to provide the high output current without element. sacrificing the regulation characteristics of lower current devices. For applications requiring other voltages, see LM150 series adjustable regulator data sheet. The LM323A offers improved precision over the standard LM323-N. Parameters with tightened Operation is specified over the junction temperature specifications include output voltage tolerance, line range −55°C to +150°C for LM123, −40°C to +125°C regulation, and load regulation. -
The Urban Rail Development Handbook
DEVELOPMENT THE “ The Urban Rail Development Handbook offers both planners and political decision makers a comprehensive view of one of the largest, if not the largest, investment a city can undertake: an urban rail system. The handbook properly recognizes that urban rail is only one part of a hierarchically integrated transport system, and it provides practical guidance on how urban rail projects can be implemented and operated RAIL URBAN THE URBAN RAIL in a multimodal way that maximizes benefits far beyond mobility. The handbook is a must-read for any person involved in the planning and decision making for an urban rail line.” —Arturo Ardila-Gómez, Global Lead, Urban Mobility and Lead Transport Economist, World Bank DEVELOPMENT “ The Urban Rail Development Handbook tackles the social and technical challenges of planning, designing, financing, procuring, constructing, and operating rail projects in urban areas. It is a great complement HANDBOOK to more technical publications on rail technology, infrastructure, and project delivery. This handbook provides practical advice for delivering urban megaprojects, taking account of their social, institutional, and economic context.” —Martha Lawrence, Lead, Railway Community of Practice and Senior Railway Specialist, World Bank HANDBOOK “ Among the many options a city can consider to improve access to opportunities and mobility, urban rail stands out by its potential impact, as well as its high cost. Getting it right is a complex and multifaceted challenge that this handbook addresses beautifully through an in-depth and practical sharing of hard lessons learned in planning, implementing, and operating such urban rail lines, while ensuring their transformational role for urban development.” —Gerald Ollivier, Lead, Transit-Oriented Development Community of Practice, World Bank “ Public transport, as the backbone of mobility in cities, supports more inclusive communities, economic development, higher standards of living and health, and active lifestyles of inhabitants, while improving air quality and liveability.