The National Aeronautics and Space Administration (NASA)'S

Total Page:16

File Type:pdf, Size:1020Kb

The National Aeronautics and Space Administration (NASA)'S Current Status of NASA’s Heavy Lift Plans Steve Creech Ares V Integration Manager, Ares Projects Martin Burkey Technical Writer Ares Projects, NASA Marshall Space Flight Center 35812 Points of Contact: Martin Burkey (1-256-544-6867) Numerous studies since the Apollo Program of the 1960s have highlighted the benefits of – and the need for - a national heavy lift launch capability to support human exploration, science, national security, and commercial development of space. NASA’s most recent and most refined effort to develop that heavy lift capability is the Ares V. Ares V is a key element of NASA’s Constellation Program. It’s overall goal s part of approved national space policy is to retire the Space Shuttle and develop its successor, complete the International Space Station, and resume human exploration beyond low Earth orbit (LEO), beginning with exploration of the Moon as a step to other destinations in the Solar System. Ares V’s first role is that of cargo vehicle to carry a lunar lander into Earth orbit, rendezvous with astronauts launched on the smaller Ares I crew launch vehicle, and perform the trans lunar injection (TLI) mission to send the mated crew and lander vehicles to the Moon. The design reference missions (DRMs) envisioned for it also include direct lunar cargo flights and a human Mars mission. Although NASA’s priority from the start of the Constellation Program to the present has been development of the Ares I and Orion crew vehicle to replace the retiring Shuttle fleet, the Ares team has made significant progress in understanding the performance, design trades, technology needs, mission scenarios, ground and flight operations, cost, and other factors associated with heavy lift development. The current reference configuration was selected during the Lunar Capabilities Concept Review (LCCR) in fall 2008. That design has served since then as a point of departure for further refinements and trades among five participating NASA field centers. Ares V development to date has benefited from progress on the Ares I due to commonality between the vehicles. The Ares I first stage completed a successful firing of a 5-segment solid rocket motor. The Ares I-X launch successfully demonstrated in suborbital flight the ability to assemble, prepare, launch, control and recover the Ares I configuration and compare performance to computer models. Component tests continue on the J-2X engine, which will put both the Ares I and Ares V upper stages into orbit. In addition, more than 100,000 parts have been manufactured or on the assembly line for the first J-2X powerpack and the first two development engines, with hot fire tests to begin in 2011. This paper will further detail the progress to date on the Ares V and planned activities for the remainder of 2010. In addition, the Ares V team has continued its outreach to potential user communities in science and national security. Through the Constellation Program, NASA has amassed an enormous knowledge base in the design, technologies, and operations of heavy lift launch vehicles that will be a national asset for any future launch vehicle decision. This early phase of the design presents the best opportunity to incorporate where possible the insights and needs of other users. .
Recommended publications
  • Evolution of the Rendezvous-Maneuver Plan for Lunar-Landing Missions
    NASA TECHNICAL NOTE NASA TN D-7388 00 00 APOLLO EXPERIENCE REPORT - EVOLUTION OF THE RENDEZVOUS-MANEUVER PLAN FOR LUNAR-LANDING MISSIONS by Jumes D. Alexunder und Robert We Becker Lyndon B, Johnson Spuce Center ffoaston, Texus 77058 NATIONAL AERONAUTICS AND SPACE ADMINISTRATION WASHINGTON, D. C. AUGUST 1973 1. Report No. 2. Government Accession No, 3. Recipient's Catalog No. NASA TN D-7388 4. Title and Subtitle 5. Report Date APOLLOEXPERIENCEREPORT August 1973 EVOLUTIONOFTHERENDEZVOUS-MANEUVERPLAN 6. Performing Organizatlon Code FOR THE LUNAR-LANDING MISSIONS 7. Author(s) 8. Performing Organization Report No. James D. Alexander and Robert W. Becker, JSC JSC S-334 10. Work Unit No. 9. Performing Organization Name and Address I - 924-22-20- 00- 72 Lyndon B. Johnson Space Center 11. Contract or Grant No. Houston, Texas 77058 13. Type of Report and Period Covered 12. Sponsoring Agency Name and Address Technical Note I National Aeronautics and Space Administration 14. Sponsoring Agency Code Washington, D. C. 20546 I 15. Supplementary Notes The JSC Director waived the use of the International System of Units (SI) for this Apollo Experience I Report because, in his judgment, the use of SI units would impair the usefulness of the report or I I result in excessive cost. 16. Abstract The evolution of the nominal rendezvous-maneuver plan for the lunar landing missions is presented along with a summary of the significant developments for the lunar module abort and rescue plan. A general discussion of the rendezvous dispersion analysis that was conducted in support of both the nominal and contingency rendezvous planning is included.
    [Show full text]
  • The Following Are Edited Excerpts from Two Interviews Conducted with Dr
    Interviews with Dr. Wernher von Braun Editor's note: The following are edited excerpts from two interviews conducted with Dr. Wernher von Braun. Interview #1 was conducted on August 25, 1970, by Robert Sherrod while Dr. von Braun was deputy associate administrator for planning at NASA Headquarters. Interview #2 was conducted on November 17, 1971, by Roger Bilstein and John Beltz. These interviews are among those published in Before This Decade is Out: Personal Reflections on the Apollo Program, (SP-4223, 1999) edited by Glen E. Swanson, whick is vailable on-line at http://history.nasa.gov/SP-4223/sp4223.htm on the Web. Interview #1 In the Apollo Spacecraft Chronology, you are quoted as saying "It is true that for a long time we were not in favor of lunar orbit rendezvous. We favored Earth orbit rendezvous." Well, actually even that is not quite correct, because at the outset we just didn't know which route [for Apollo to travel to the Moon] was the most promising. We made an agreement with Houston that we at Marshall would concentrate on the study of Earth orbit rendezvous, but that did not mean we wanted to sell it as our preferred scheme. We weren't ready to vote for it yet; our study was meant to merely identify the problems involved. The agreement also said that Houston would concentrate on studying the lunar rendezvous mode. Only after both groups had done their homework would we compare notes. This agreement was based on common sense. You don't start selling your scheme until you are convinced that it is superior.
    [Show full text]
  • The Apollo Lunar Orbit Rendezvous Architecture Decision Revisited
    Student Session II Paper No. GT-SSEC.E.2 The Apollo Lunar Orbit Rendezvous Architecture Decision Revisited David M. Reeves1 Georgia Institute of Technology National Institute of Aerospace, Hampton, VA, 23666 Michael D. Scher2 University of Maryland National Institute of Aerospace, Hampton, VA, 23666 Dr. Alan W. Wilhite3 Georgia Institute of Technology National Institute of Aerospace, Hampton, VA, 23666 Dr. Douglas O. Stanley4 Georgia Institute of Technology National Institute of Aerospace, Hampton, VA, ABSTRACT The 1962 Apollo architecture mode decision process was revisited with modern analysis and systems engineer tools to determine driving selection criteria and technology/operational mode design decisions that may be used for NASA’s current Space Exploration program. Results of the study agreed with the Apollo selection of the Lunar Orbit Rendezvous mode based on the technology maturity and politics in 1962. Using today’s greater emphasis on human safety and improvements in technology and design maturity, a slight edge may be given to the direct lunar mode over lunar orbit rendezvous. Also, the NOVA direct mode and Earth orbit rendezvous mode are not competitive based any selection criteria. Finally, reliability and development, operations, and production costs are major drivers in today’s decision process. 1Graduate Research Assistant, Georgia Institute of Technology, 100 Exploration Way, AIAA Student Member. 2 Graduate Research Assistant, University of Maryland, 100 Exploration Way, AIAA Student Member. 3 Langley Professor, Georgia Institute of Technology, 100 Exploration Way, AIAA Associate Fellow. 4 Langley Professor, Georgia Institute of Technology, 100 Exploration Way, AIAA Member. Page 1 of 12 Pages Student Session II Paper No.
    [Show full text]
  • The Influence of Early Research and Development Programs on Apollo, Saturn, and Legacy System Development
    https://ntrs.nasa.gov/search.jsp?R=20200002742 2020-05-24T04:41:34+00:00Z Paving the way: The influence of early research and development programs on Apollo, Saturn, and legacy system development. Charles E. Cockrell, Jr.* and Robert Wyman** NASA Langley Research Center, Hampton, Virginia, USA Introduction As we celebrate the 50th anniversary of the first successful human landings on the surface of the Moon in 1969, it is insightful to review the many historic accomplishments that contributed to this astounding human achievement. While the Apollo Program officially began following the charge by United States President John F. Kennedy in 1961, much of the foundation for Apollo was already underway with early research and development that began as early as the close of the second World War. Innovations and key decisions prior to the formal initiation of the Apollo Program, and even prior to the formation of the National Aeronautics and Space Administration (NASA), enabled the relatively rapid development of the Saturn V rocket, the Apollo capsule, and the Lunar Lander systems needed to achieve the goal of landing humans on the Moon and returning them safely to Earth by the close of the 1960s. The history of aerospace research and development in the United States of America (USA) begins with the establishment of the National Advisory Committee for Aeronautics (NACA) in 1915. At the dawn of World War I, prominent scientists and engineers in the United States became concerned about the lack of advancement in aviation just a few short years following the historic flights of the Wright brothers.
    [Show full text]
  • Seeking a Human Spaceflight Program Worthy of a Great Nation
    SEEKING A HUMAN SPACEFLIGHT PROGRAM WORTHY OF A GREAT NATION Review of U.S. HUMAN SPACEFLIGHT Plans Committee Review of U.S. Human Spaceflight Plans Committee 1 SEEKING A HUMAN SPACEFLIGHT PROGRAM WORTHY OF A GREAT NATION 2 Review of U.S. Human Spaceflight Plans Committee SEEKING A HUMAN SPACEFLIGHT PROGRAM WORTHY OF A GREAT NATION “We choose...to do [these] things, not because they are easy, but because they are hard...” John F. Kennedy September 12, 1962 Review of U.S. Human Spaceflight Plans Committee 3 SEEKING A HUMAN SPACEFLIGHT PROGRAM WORTHY OF A GREAT NATION Table of Contents Preface .......................... ...................................................................................................................................... 7 Executive Summary ..... ...................................................................................................................................... 9 Chapter 1.0 Introduction ............................................................................................................................... 19 Chapter 2.0 U.S. Human Spaceflight: Historical Review ............................................................................ 27 Chapter 3.0 Goals and Future Destinations for Exploration ........................................................................ 33 3.1 Goals for Exploration ............................................................................................................... 33 3.2 Overview of Destinations and Approach .................................................................................
    [Show full text]
  • Apollo's Lunar Module Bridged Technological Leap to the Moon
    Apollo's Lunar Module Bridged Technological Leap to the Moon President John F. Kennedy, speaks in front of an early design for the Apollo lunar module. The large windows were later replaced with smaller, down-facing windows. Seats also were removed resulting in a design in which the astronauts stand. NASA Administrator James Webb, Vice President Lyndon Johnson, Dr. Robert Gilruth, director of NASA's Manned Spacecraft Center (now Johnson Space Center) in Houston, and others participate in the activity on Sept. 12, 1962. Credits: White House/Cecil Stoughton On July 24, 1962, Dr. John Houbolt explains his lunar orbit rendezvous concept for landing on the Moon. His approach called for a separate lander which saved weight from the "direct ascent" design in which the entire spacecraft landed on the lunar surface. Credits: NASA (upper left) In the Manned Spacecraft Operations (now the Neil Armstrong Operations and Checkout) Building at NASA's Kennedy Space Center in Florida, the lunar module for Apollo 10 is being moved for mating with the spacecraft lunar module adapter. Apollo 10 orbited the Moon in May 1969 and served as a "rehearsal" for the first lunar landing. Credits: NASA (upper right) Apollo 11 commander Neil Armstrong participates in training on June 19, 1969, in the Apollo lunar module (LM) mission simulator. Simulators for both the LM and command module were located in the Flight Crew Training Building at NASA's Kennedy Space Center. Credits: NASA (upper left) On July 20, 1969, the Sun's glare helps illuminate the Apollo 11 lunar module (LM) with Neil Armstrong and Buzz Aldrin aboard.
    [Show full text]
  • Lunar Outpost the Challenges of Establishing a Human Settlement on the Moon Erik Seedhouse Lunar Outpost the Challenges of Establishing a Human Settlement on the Moon
    Lunar Outpost The Challenges of Establishing a Human Settlement on the Moon Erik Seedhouse Lunar Outpost The Challenges of Establishing a Human Settlement on the Moon Published in association with Praxis Publishing Chichester, UK Dr Erik Seedhouse, F.B.I.S., As.M.A. Milton Ontario Canada SPRINGER±PRAXIS BOOKS IN SPACE EXPLORATION SUBJECT ADVISORY EDITOR: John Mason, M.Sc., B.Sc., Ph.D. ISBN 978-0-387-09746-6 Springer Berlin Heidelberg New York Springer is part of Springer-Science + Business Media (springer.com) Library of Congress Control Number: 2008934751 Apart from any fair dealing for the purposes of research or private study, or criticism or review, as permitted under the Copyright, Designs and Patents Act 1988, this publication may only be reproduced, stored or transmitted, in any form or by any means, with the prior permission in writing of the publishers, or in the case of reprographic reproduction in accordance with the terms of licences issued by the Copyright Licensing Agency. Enquiries concerning reproduction outside those terms should be sent to the publishers. # Praxis Publishing Ltd, Chichester, UK, 2009 Printed in Germany The use of general descriptive names, registered names, trademarks, etc. in this publication does not imply, even in the absence of a speci®c statement, that such names are exempt from the relevant protective laws and regulations and therefore free for general use. Cover design: Jim Wilkie Project management: Originator Publishing Services, Gt Yarmouth, Norfolk, UK Printed on acid-free paper Contents Preface ............................................. xiii Acknowledgments ...................................... xvii About the author....................................... xix List of ®gures ........................................ xxi List of tables ........................................
    [Show full text]
  • Cloud Download
    Enchanted Rendezvous John C. Houbolt and the Genesis of the Lunar-Orbit Rendezvous Concept Enchanted Rendezvous: John C. Houbolt and the Genesis of the Lunar-Orbit Rendezvous Concept by James R. Hansen NASA History Office Code Z NASA Headquarters Washington DC 20546 MONOGRAPHS IN AEROSPACE HISTORY SERIES #4 December 1995 Foreword One of the most critical technical decisions made during the conduct of Project Apollo was the method of flying to the Moon, landing on the surface, and returning to Earth. Within NASA during this debate, several modes emerged. The one eventually chosen was lunar-orbit rendezvous (LOR), a proposal to send the entire lunar spacecraft up in one launch. It would head to the Moon, enter into orbit, and dispatch a small lander to the lunar surface. It was the simplest of the various methods, both in terms of development and operational costs, but it was risky. Because rendezvous would take place in lunar, instead of Earth, orbit, there was no room for error or the crew could not get home. Moreover, some of the trickiest course corrections and maneuvers had to be done after the spacecraft had been committed to a circumlunar flight. Between the time of NASA's conceptualization of the lunar landing program and the decision in favor of LOR in 1962, a debate raged among the advocates of the various methods. John C. Houbolt, an engineer at the Langley Research Center in Hampton, Virginia, was one of the most vocal of those supporting LOR and his campaign in 1961 and 1962 helped shape the deliberations in a fundamental way.
    [Show full text]
  • Flight to the Moon Spacecraft Attitude Control, MIT IAP 16.S585
    1/17/21 Earth-Moon Orbit Orbital Period: 27-1/2 days One side of Moon always faces Earth Flight to the Moon Spacecraft Attitude Control, MIT IAP 16.S585 Robert Stengel Princeton University There is no “Dark Side” January 14, 2021 1 ALL SIDES are dark once a month 2 1 2 The Earth and the Moon December 17, 1958 Earth mass = 81.4 x Moon mass Orbit eccentricity = 0.05 1st Cosmonaut Mercury 7, 1959 Class, 1959 3 4 3 4 1 1/17/21 April 12, 1961 February 20, 1962 John Glenn Vostok 1 Friendship 7 Mercury-Atlas Yuri Gagarin 5 6 5 6 Project Gemini [1965-66] Lunar Missions 10 crewed Titan II missions June 1961 Competition among contractors for the spacecraft and launch rockets US takes Space Race Lead 7 8 7 8 2 1/17/21 First Apollo Program Contract MIT Instrumentation Laboratory August 9, 1961 HOWEVER … Lunar landing technique had not been decided 9 10 9 10 Alternative Landers Saturn 3rd Stage 11 12 11 12 3 1/17/21 Proposed Saturn Launch Vehicles July 1962 Two Saturn 5s One or One Saturn 5 Nova Ten Saturn 1s Saturn 1 Saturn 5 Nova (Saturn 8) 13 14 13 14 Saturn Launch Vehicles Saturn 1B Saturn 5 The Apollo Modules Earth Orbit Missions Lunar Missions Service Command Lunar Module Module Module North American Grumman 15 16 15 16 4 1/17/21 First Manned Flight, Apollo 7 Apollo 8, December 21-27, 1968 October 11, 1968 • Earth-orbit mission to test LM planned • More ambitious mission was pursued st Eisele Schirra Cunningham • Repurposed to 1 manned flight to the Moon • 6-day mission, no Lunar Module Coast Reentry Trans- Moon’s Lunar Coast Injection “Sphere
    [Show full text]
  • From Apollo LM to Altair: Design, Environments, Infrastructure, Missions, and Operations
    AIAA SPACE 2009 Conference & Exposition AIAA 2009-6404 14 - 17 September 2009, Pasadena, California From Apollo LM to Altair: Design, Environments, Infrastructure, Missions, and Operations Marc M. Cohen∗ Northrop Grumman Corporation, El Segundo, CA 90245 Abstract This essay presents a comparison between the Apollo Lunar Module (LM) and the current concepts and requirements for the Altair Lunar Lander. The basis of comparison reflects the difference between the Apollo Program, pursuing a Cold War era “Flag and Footsteps” mission, and the Constellation Program creating a more expansive program of exploration leading to a permanent human presence on the moon. The specific areas of comparison derive largely from the changes in mission philosophy and exploration strategy – not from technology or engineering. These factors illuminate the differences in the current design drivers for the Altair compared to the Apollo LM. Nomenclature ALARA As Low As Reasonably Achievable, refers to radiation exposure. ALHAT Autonomous Lander Hazard Avoidance Technology. Altair NASA’s Lunar Lander to return crew and cargo to the moon. Ascent Module The Altair module with the flight crew station where the crew pilot the vehicle; the Ascent Module launches from the surface to return the crew to the Orion in LLO, leaving the DM behind. Ascent Stage The Apollo LM module with the flight crew station where the crew pilot the vehicle. The Ascent Stage launches from the surface to return the crew to the CSM in LLO, leaving the Descent Stage behind. BFO Blood forming organs. CARD Constellation Architecture Requirements Document, NASA CxP-70000. CEV Crew Exploration Vehicle. CM The Apollo Command Module, also the Orion Crew Module.
    [Show full text]
  • Benchmarking of Crewed Lunar and Mars Mission Architectures Skylar Eiskowitz,1 Sydney Dolan,2 Bruce Cameron,3 Edward Crawley4
    Benchmarking of Crewed Lunar and Mars Mission Architectures Skylar Eiskowitz,1 Sydney Dolan,2 Bruce Cameron,3 Edward Crawley4 Massachusetts Institute of Technology, 77 Massachusetts Avenue 33-409, Cambridge, MA 02139, United States of America Fuel selection is a strong driver of the mass fraction for many proposed lunar and Mars missions, but fuel technology trends have not been comprehensively evaluated for their impact on the system in literature. We evaluate the impact of fuel selection on overall lunar architectures. Our analysis shows that although hydrogen architectures have a higher wet mass cost, they provide more payload capacity to the lunar surface than non- hydrogen architectures given the same number of campaign launches. The Moon has been viewed as a stepping stone for future planetary exploration, so we evaluate both Mars and lunar architectures. We functionally decompose architectural decisions and compare key campaign decisions across 18 notable Mars architectural studies. The 18 landers are classified into four groups depending on which of the four the functional capabilities the lander performs, namely outbound transit, mars descent, mars ascent, and inbound transit. We find that there is no strong relationship between the Martian landers’ wet mass and the length of crewed Martian surface. Furthermore, fuel type selection did not have a clear trend with the aforementioned capabilities. The lack of similarities across Mars architectures suggests the reference studies had a wide range of depths of analysis along with an array of different methods. Furthermore, they were completed at various points in history, some with high political pressure. Introduction A. General objective The race to the moon has attracted the attention of government, academic, and commercial firms to pursue technical studies of proposed architectures and campaign details.
    [Show full text]
  • ASTR 308 "Into the Final Frontier" Mercury and Gemini 1. the Mode
    ASTR 308 "Into the Final Frontier" Mercury and Gemini 1. The Mode (a) There were three “modes” being debated for how to get a manned rocket to the moon and back. State what each mode was. 1. Direct 2. Earth Orbit Rendezvous (EOR) 3. Lunar Orbit Rendezvous (LOR) (b) Briefly describe each mode. Provide advantages (if any) and/or disadvantages (if any) associated with each mode. The Direct Mode required a single gigantic rocket that carried all fuel and all equipment for landing on the moon and returning. The rocket being designed for this mode was called the NOVA. The disadvantages were (1) it required a gigantic rocket that would be a serious engineering challenge to design and build, (2) there were serious doubts that a rocket like this could land backwards on the moon and then take off again, given the large launch complex and millions of requirements and how many people are involved to launch a rocket from Earth. In the end, this mode had no real advantages over EOR or LOR except that orbital rendezvous had never been attempted while this mode was being decided upon, and orbital rendezvous, not being proven, was considered a fail-risk of the mode. Earth Orbit Rendezvous: required two rockets. The first rocket carried the bulk of the fuel required to get the second rocket to the moon and back. The second rocket carried the astronauts and equipment for the moon landing. Advantages included (1) smaller rockets, and (2) orbital rendezvous in Earth orbit, where if something went wrong the astronauts could return safely to Earth.
    [Show full text]