Appendices

Council Meeting 20 September 2016

Appendix DEL-1 Peron Naturaliste Partnership Board Meeting Minutes 19-08-2016 Appendix CEO-1 Location Plan Appendix DPDRS-1 dSMSP South Moorlands Structure Plan July 2016 Report

(Appendices to the Plan can be viewed at the Administration Building) Appendix DPDRS-2 dSMSP Schedule of LG Corrections and Modifications (Draft) Appendix DPDRS-3 dSMSP Correspondence from MPM Appendix DPDRS-4 dSMSP Schedule of Submissions SMSP Appendix DPDRS-5 Lot 4354 – Location Plan Appendix DPDRS-6 Lot 4354 Bussell Highway – UPDATED Signage Plans Appendix DPDRS-7 Lot73 18 Ward Street Schedule of Submissions Appendix DPDRS-8 Lot73 18 Ward Street Scheme Amendment 90 Appendix DPDRS-9 Project Management Race Course LP – LAP Project Group Terms of Reference 4 August 2016 Appendix DPDRS-10 Project Management Race Course LP – Stables Mail Merge Including Nomination Form Appendix DPDRS-11 Project Management Race Course LP – Received Nominations Appendix DPDRS-12 Palmer Crescent - Location Plan Appendix DPDRS-13 Palmer Crescent - Council Minutes Extract Appendix DPDRS-14 Palmer Crescent - Letter (compliancde with conditions of Sevelopment Approval) Appendix DPDRS-15 Palmer Crescent - Schedule of Submissions

City of Bunbury 4 Stephen Street Bunbury WA 6230 Correspondence to: Post Office Box 21 Bunbury WA 6231

Telephone: (08) 9792 7000 ◌ Facsimile: (08) 9792 7184 ◌ TTY: (08) 9792 7370 ◌ www.bunbury.wa.gov.au Appendix DEL-1

MINUTES Peron Naturaliste Partnership (PNP) General Board Meeting 19 August 2016 at 10am – Teleconference

Attendees: Cr Tania Jackson , President (Chair) Cr Murray Cook JP City of Bunbury (Board Member) Cr Carmel Boyce (Board Member) Cr Noel Dews , President (Board Member) Cr Murray Scott , President (Board Member) Cr Coralie Tarbotton City of (Proxy Board Member) Tony Free City of (Executive Committee) Brett Brenchley (Executive Committee) Ben Deeley City of Bunbury (Management Committee) Jason Gick Shire of Capel (Planning Committee) Matthew Riordan (Planning committee) Simon Hall Shire of Harvey (Planning Committee) Brett Ashby (Planning Committee) Craig Perry PNP Coordinator Joanne Ludbrook PNP Coordinator

Apologies Cr Caroline Knight City of Mandurah (Deputy Chair) Cr John McCallum City of Busselton (Board Member) Cr Maree Reid , President (Board Member) Cr Leigh Liley City of Rockingham (Board Member) Cr Greg Norton Shire of Capel (Proxy Board Member) Item Details i - Welcome by Meeting started at 10.00am with a welcome from Cr. Tania Jackson, Chair. Chair ii - Apologies Apologies received from:

Cr Caroline Knight - could not phone in due to unviability of phone coverage;

Cr John McCallum - was represented by Cr Coralie Tarbotton;

Cr Maree Reid and Cr Greg Norton - conveyed their apologies. iii - Declaration of None declared interest

PNP Board Meeting Minutes – 27 May 2016 Page 1 of 4

iv - Minutes of The minutes of the previous meeting was accepted as a true reflection of previous meeting what transpired at the last meeting, with no changes made. & Matters arising Accepted by Cr Carmel Boyce and seconded by Cr Murray Scott. v -  WAPC Grant Correspondence Craig informed members that a letter has been received from WAPC, notifying PNP that the grant application has been successful. This was further discussed in the next agenda item (Committee report and major projects)

 DoT Grant Joanne informed members of the successful grant application to the Department of Transport. This was further discussed in the next agenda item (Committee report and major projects)

Following the request for PNP Officers to present on the Partnership and its projects, the Town of Cottesloe would like to run a larger forum next year (2017) for PNP Officers to present. vi - Committee Coastal Planning Committee: Report and Major Projects Craig briefed members on the success of a Western Australian Planning Commission (WAPC) grant for $37,900. This grant is for the purposes of a community engagement project to identity community values - Involving Communities in Developing Values at Risk project. This project will run for twelve months and comprise of workshops and surveys. Officers are developing a brief to engage a consultant.

Motion that the Board approves the PNP undertaking the Involving Communities in Developing Values at Risks Project was moved by Cr Coralie Tarbotton and seconded by Cr Murray Scott. Carried.

Coastal Management Working group

Joanne updated members on the award winning program - Regional Coastal Monitoring Program that has been set up in the last twelve months. Due to its success in securing a Department of Transport (DoT) grant of $50,500 (matched by PNP), the partnership is looking at engaging a consultant.

PNP Board Meeting Minutes – 27 May 2016 Page 2 of 4

A steering group will be formed with members from Capel, Rockingham and Mandurah. DoT will be sitting on the Committee.

Members were further informed that expectations from the participating Councils at present is mainly Officer-time, but may change in the future as the scope of work is drawn up.

The Steering Group’s meeting notes will be available for all members to ensure everyone is abreast with the program’s progress.

Jason Gick asked if Joanne could prepare a paragraph on the PNP’s projects, for members to use in updating their various Councils.

Action - Joanne to provide a brief on PNP projects for members to use in updating their various Councils and Communities. vii –  Australian Coastal Society (ACS) Newsletter Link Communications Members were informed that the ACS have a link of our website in their and Promotions newsletter, thereby increasing the PNP’s coverage.

 PNP newsletter The last PNP newsletter was sent out in June. The next newsletter is due in September. Members encouraged to send in articles and briefs from the various Councils for inclusion in the newsletter.

Action - Members are tasked to forward conversant photos of their respective Councils on to Officers for use in media articles and on the website.

 Presentations to Partner Councils Joanne updated members on the Councils that had invited PNP Officers to their Councils to present on the PNP. Members who had already had the Officers present at their Councils had the following feedback: Capel – Cr Murray Scott said “it is worth the effort and other Councils should get the Officers to present to them” Busselton – Mathew Riordan said “the presentation was great and very informative” Bunbury - Ben Deeley said “Craig’s presentation in Bunbury was very well received” Simon Hall said he will be inviting the PNP Officers to present at the same time as when Harvey Council will be considering the draft Harvey Coastal Hazard Risk Management Adaptation Plan (CHRMAP).

PNP Board Meeting Minutes – 27 May 2016 Page 3 of 4

viii - General  Financial updates Business Brett Brenchley went through the finances with members. The formatting of the information had been reviewed to provide a clearer and better understanding of the figures. All members were given the chance and opportunity to provide feedback and ask questions relating to the budget, which were discussed and answered accordingly.

Cr Murray Scott requested that the figures be updated and tabled to be agreed at the next meeting. However as the budget had already been adopted at the May 2016 Board meeting, the updated version will be tabled as a “budget review”.

Action - Brett Brenchley to update budget figures and present at next meeting.

 Marine Alliance to present at AGM Cr Murray Cook inquired if members are still wanting a presentation from the Marine Alliance at the next meeting (AGM). Members discussed and agreed that the relevance of the presentation by Marine Alliance on “Transforming Bunbury’s Waterfront project” which includes a coastal hazard assessment work in Koombana, supersedes presentation on the “Seabird Project” by the , hence the former will be more relevant at the next meeting.

Action – Simon Hall will liaise with Southwest Development Commission (instead of Marine Alliance) about their presentation at the PNP AGM on 21 October 2016.

 Executive Committee meeting notes Cr Tania brought to the attention of members that the notes the last executive Committee meeting had been sent out to members for their information. ix - Late items No items x - Next Meeting  The next meeting (AGM) will be held on the 21 October, in Australind, Shire of Harvey at 10.00am.

PNP Board Meeting Minutes – 27 May 2016 Page 4 of 4

Appendix CEO-1

UCL

Land to be ceded for Foreshore Reserve (ROS)

50

62

61

Existing Telstra Cable

60 104 OAD 120 58 59 R Proposed portion of road to be closed (332m²)

5 . 5 ~ 39701 5458 Proposed portion of reserve to be purchased 1404m²

Road approved as part of subdivision (WAPC Ref 150058)

ROAD CLOSURE PLAN

® SOUTH SCALE 1 : 500 @ A3 W ESTERN HIGHWAY 0 5 10 15 20 25 PLANNING & SURVEY SOLUTIONS all distances in metres HD Ref: 13428-12A Appendix DPDRS-1A

Town Planning

Engineering

Project Management

South Moorlands Local Structure Plan City of Bunbury September 2015

T 08 9721 4777 | F 08 9721 4666 107 Beach Road, Bunbury WA 6230 E [email protected] | W www.mpmdc.com.au

Table of Contents

Part One – Implementation...... 1 Part Two – Explanatory Section ...... 7

1.1 Structure Plan Area...... 1 1.0 Planning Background ...... 7 1.2 Structure Plan Content...... 3 1.1 Introduction & Purpose ...... 7 1.3 Interpretations & Scheme Relationship...... 3 1.2 Land Description ...... 7 1.4 Operation Date...... 3 1.2.1 Location ...... 7 1.5 Land Use & Subdivision Requirements...... 3 1.2.2 Area & Land Use ...... 7 1.5.1 Land Use Permissibility...... 3 1.2.3 Legal Description & Ownership ...... 10 1.5.2 Residential Density Target...... 3 1.3 Planning Framework ...... 10 1.5.3 Public Open Space...... 3 1.3.1 Zoning ...... 10 1.5.4 Reports/Strategies Required Prior to Subdivision...... 4 Greater Bunbury Region Scheme (GBRS) ...... 10 1.5.5 Conditions of Subdivision Approval...... 4 City of Bunbury Town Planning Scheme No. 7 ...... 10 1.6 Development Requirements...... 6 1.3.2 Regional & Sub-Regional Structure Plans ...... 10 1.7 Other Requirements...... 6 Draft Greater Bunbury Strategy 2011-2031 and Beyond & the Draft Greater Bunbury Structure Plan 2011-2031 ...... 10 1.3.3 Planning Strategies ...... 10 Local Planning Strategy for Activity Centres & Neighbourhoods (LPSACN) ...... 10 1.3.4 Policies ...... 10 Liveable Neighbourhoods ...... 10 2.0 Site Conditions & Environment ...... 13 2.1 Biodiversity & Natural Area Assets ...... 13 2.1.1 Wetland Management Plan ...... 13 2.1.2 Vegetation ...... 13 2.1.3 Fauna Assessment ...... 13 2.2 Landform & Soils ...... 14 2.2.1 Soil Type ...... 14 2.2.2 Topography ...... 14 2.2.3 Acid Sulfate Soils ...... 14 2.2.4 Site Classification ...... 14 2.3 Surface Water & Groundwater ...... 14 2.3.1 Local Surface Water Hydrology ...... 14 2.3.2 Groundwater ...... 14 2.4 Bushfire Hazard ...... 15 2.5 Heritage ...... 15 2.6 Context & Other Land Use Constraints ...... 16 2.6.1 Regional & Local Context ...... 16 3.0 Land Use & Subdivision Requirements ...... 17 3.1 Land Use ...... 17 3.2 Open Space ...... 17 3.3 Residential ...... 17

3.4 Mixed Use Precinct (Option B Area) ...... 17 Figure 12 Acid Sulfate Soil Classifications ...... 14 3.5 Movement Networks ...... 18 Figure 13 Bushfire Prone Area Mapping ...... 15 3.6 Water Management ...... 19 Figure 14 Aboriginal Heritage Site ...... 15 3.6.1 Stormwater Management ...... 19 Figure 15 Context, Site Analysis and Opportunities & Constraints Map ...... 16 3.6.2 Groundwater Management ...... 19 Figure 16 Density Code Plan ...... 17 3.6.3 Water Efficiency Measures...... 19 Figure 17 Internal Road Network and Identification ...... 18 3.7 Education Facilities ...... 20 Figure 18 Sample Road Cross Section – Neighbourhood Connector B, 50km/hr (<3000vpd) ...... 19 3.8 Infrastructure Coordination, Servicing & Staging ...... 20 Figure 19 Sample Road Cross Section, Standard Access Street, 40km/h <3000vpd ...... 19 3.8.1 Roads ...... 20 Figure 20 Sample Road Cross Section, Narrow Yield Access Street, 40km/h <1000vpd ...... 19 3.8.2 Site Works ...... 20 Table 6 Technical Appendices Index ...... 22 3.8.3 Sewer ...... 20 3.8.4 Water ...... 20 Appendix 1 South Moorlands Local Structure Plan 3.8.5 Non Potable Water Supply ...... 20 Appendix 2 Certificates of Title 3.8.6 Power ...... 20 Appendix 3 ‘Wetland Management Plan – Lots 310, 311, 312, 314, 315, 316 & 317 Vittoria Road, Glen 3.8.7 Gas ...... 21 Iris/Moorlands’, Bio Diverse Solutions (February, 2016) 3.8.8 Communications ...... 21 Appendix 4 ‘South Moorlands Local Water Management Strategy’, MPM Development Consultants 3.8.9 Drainage ...... 21 (March 2016) 3.9 Developer Contribution Arrangements ...... 21 Appendix 5 ‘Report of an Aboriginal Heritage Survey of Lots Associated with the Glen Iris – Moorlands 3.10 Other Requirements ...... 21 Structure Plan, Bunbury, Western Australia’, Brad Goode and Associates (February, 2013) Appendix 6 ‘Transport Impact Assessment Report’, Donald Veal Consultants (August, 2015) Appendix 7 Bushfire Hazard Level Assessment Appendix 8 Pre-Lodgement Consultation Summary List of Figures, Tables & Appendices

Figure 1 Location Map ...... Executive Summary Page Table 1 Structure Plan Summary Table ...... Executive Summary Page Table 2 Lot Details ...... 1 Figure 2 South Moorlands Local Structure Plan Area ...... 1 Figure 3 South Moorlands Local Structure Plan ...... 2 Table 3 Permissible Use Classes Within The Structure Plan Area ...... 4 Table 4 Calculation of Gross Subdivisible Area & Public Open Space Provision ...... 5 Figure 4 Open Space Plan ...... 5 Figure 5 Location Plan ...... 7 Table 5 Land Ownership ...... 8 Figure 6 Cadastral Boundaries ...... 8 Photo 1 Structure Plan Area from Vittoria Road looking west ...... 8 Photo 2 Structure Plan Area from Kaeshagan Street looking north ...... 8 Figure 7 Aerial Photograph ...... 9 Figure 8 Extract From Greater Bunbury Region Scheme Map ...... 11 Figure 9 Extract From City of Bunbury TPS No 7 Scheme Map ...... 11 Figure 10 Extract From Greater Bunbury Structure Plan 2011-2013 ...... 12 Figure 11 Wetland Mapping ...... 13 This Structure Plan is prepared under the provisions of the City of Bunbury Town Planning Scheme No.7

IT IS CERTIFIED THAT THIS STRUCTURE PLAN WAS APPROVED BY RESOLUTION OF THE WESTERN AUSTRALIAN PLANNING COMMISSION ON

...... Date

Signed for and on behalf of the Western Australian Planning Commission:

...... an officer of the Commission duly authorised by the Commission pursuant to section 16 of the Planning and Development Act 2005 for that purpose,

In the presence of:

...... Witness

...... Date

...... Date of Expiry

Moorlands South Local Structure Plan

Table of Modifications

Modification Description Endorsed by Endorsed by No. of Council WAPC Modification

Moorlands South Local Structure Plan

• provide a walkable and permeable structure; Executive Summary • foster a strong sense of community and identity; Table 1 • provide an inter-connected network of streets to provide for Structure Plan Summary Table The South Moorlands Structure Plan Area is located approximately safe and efficient walking, cycling and driving experiences; 4 kilometres south east of the Bunbury Central Business District (refer • ensure active street/land use interfaces maximising Item Figure 1). The Structure Plan area is bounded by Vittoria Road to surveillance opportunities; Total area covered by the Structure Plan 66.911ha the east, Kaeshagan Street to the south, the Preston River to the • provide for safe and convenient access to the public transport Area of each land use proposed: wet and existing landholdings to the north. network; • provide, as far as possible, a mixed use urban development to R2.5 16.0163ha Figure 1 cater for a variety of living and leisure opportunities. R20 16.3499ha Location Map • provide a wide variety of lot sizes and housing types to cater R30 5.7483ha for a range in housing choice and lifestyle opportunities; R40 3.4091ha • avoid key environmental areas and incorporate these features into the design of the area; ROS 1.1737ha • provide an integrated approach to the design of open space POS 6.0445ha and urban water management; Road Widening 0.1081ha • promote opportunities for affordable housing; and, • ensure the efficient use of the developable portions of the Drainage 0.1850ha structure plan area. Estimated Lot Yield 549 Estimated No of Dwellings 698

Estimated Residential site density 9.98 dwellings per ha

Estimated residential site density (excluding 11.19 dwellings per ROS and POS) ha

Estimated residential site density (excluding 15.29 dwellings per ROS, POS and R2.5) ha Subject Land Estimated population 2163people Estimated Number and % of Public Open Space:

Regional Open Space 1.1737ha 1.75% District Open Space 0ha 0% Source: Google Maps (www.maps.google.com.au) Estimated area and number of parks Neighbourhood parks 6.0445ha 7 parks The South Moorlands Local Structure Plan has been prepared by MPM Development Consultants, on behalf of Moorlands Grazing Estimated number and area of natural area and biodiversity assets 4.9996ha Pty Ltd, and has been formulated using the Structure Plan Preparation Guidelines as released by the Western Australian Planning Commission in August 2012. Notes: 1. Estimated population based on 3.1 persons/dwelling for R20 to R40.

2. Natural area & biodiversity assets sites comprised of The Structure Plan incorporates 4.9996ha of wetlands, 6.0445ha of Wetlands in Table 4 and Figure 4. Public Open Space and 1.1737ha of Regional Open Space. Once 3. Estimated lot yields and numbers of dwellings subject to developed, the Structure Plan is estimated to be capable of detailed design and survey. supporting approximately 698 dwellings and an overall estimated population of 2,163 people.

Greenfield developments such as that proposed by South Moorlands are limited within the Greater Bunbury Region. Appropriate planning and design at Structure Planning stage is of utmost importance as it will have a significant impact on the ability of Bunbury to accommodate forecasted growth.

The Structure Plan embraces the principles of the WAPC’s Liveable Neighbourhoods and seeks to:

Moorlands South Local Structure Plan

P a g e | 1

Figure 2 Part One – Implementation South Moorlands Local Structure Plan Area

1.1 Structure Plan Area

The boundaries of the structure plan area include that portion of the Local Government district of the City of Bunbury as shown on Figure 2 – South Moorlands Local Structure Plan Area.

Vittoria Road generally defines the eastern boundary of the structure plan area with Kaeshagan Street to the south, the Preston River to the west and existing landholdings to the north.

The structure plan area is contained within the inner edge of the broken line shown on the structure plan map. The lots included in the structure plan and the approximate lot areas are included in Table 2 below.

The Structure Plan (refer to Figure 3) incorporates 6.0445ha of Public Open Space (POS) and 1.1737ha of Regional Open Space.

Once developed, the Structure Plan is estimated to be capable of supporting approximately 698 dwellings and an overall estimated population of 2,163 people.

Table 2 Lot Details

Lot Road Plan No. Area (ha) 310 Vittoria Road P43713 20.2335 202 Vittoria Road P56668 12.2378 312 Moorland Avenue P43713 14.255 200 Kaeshagan Street P56668 1.9871 314 Moorland Avenue P43713 4.0224 315 Moorland Avenue P43713 2.9398 316 Moorland Avenue P43713 3.5977 317 Moorland Avenue P43713 3.3112 32 Moorland Avenue P1856 4.0617 61 Moorland Avenue P1856 0.1311 62 Moorland Avenue P1856 0.1337 Total Area 66.911

Source: landgate.wa.gov.au

South Moorlands Local Structure Plan P a g e | 2

Figure 3 South Moorlands Local Structure Plan

South Moorlands Local Structure Plan P a g e | 3

1.2 Structure Plan Content 1.4 Operation Date Areas designated as either:

- “Residential (R2.5)”;

The Structure Plan comprises: In accordance with the Planning and Development (Local - “Residential (R20)”;

Planning Schemes) Regulations 2015, this structure plan shall come - “Residential (R30)”; “Residential (R40)”; or - Part One – Implementation; into operation on the date it is approved by the Western Australian - “Mixed Use Precinct” - Part Two – Explanatory Section; and, Planning Commission. - to be in accordance with the Scheme and the Residential Design - Appendices – Technical reports and supporting plans and maps including: The Structure Plan shall be required to be approved by the Western Codes, as amended and applicable. o South Moorlands Local Structure Plan; Australian Planning Commission (WAPC) prior to the approval of o ‘Wetland Management Plan – 310, 311, 312, 3145, 315, any application for subdivision and/or planning approval, and The permissibility of land uses within the South Moorlands Local 316, 317 Vittoria Road, Bio Diverse Solutions (February, such approvals shall comply with the relevant approved Structure Structure Plan Area is as designated according to Table 3. 2016); Plan. o Certificates of Title; 1.5.2 Residential Density Target o ‘Report of an Aboriginal Heritage Survey of Lots Associated with the Glen Iris – Moorlands Structure Plan, 1.5 Land Use & Subdivision Requirements Excluding the significant areas of Public Open Space and Bunbury, Western Australia’, Brad Goode and Associates Residential R2.5, the Structure Plan establishes a residential site density target of 15.98 dwellings per hectare and a minimum of (February, 2013); The South Moorlands Local Structure Plan Map (Appendix 1) o 698 dwellings within the structure plan area. This compares with ‘Transport Impact Assessment Report’, Donald Veal outlines land use, zones and reserves applicable within the the density target of 15 dwellings per gross hectare established by Consultants (August, 2015); Structure Plan area. o the Department of Planning within the Greater Bunbury Strategy. ‘South Moorlands Local Water Management Strategy’, MPM (March, 2016); and, Appendix 1 and Figure 15 define the residential densities that o Pre-Lodgement Consultation Summary. 1.5.1 Land Use Permissibility apply to specific areas within the Structure Plan.

Consistent with sub-clause 6.2.8.4 of the Scheme, the Structure Part One contains all information required to have statutory effect 1.5.3 Public Open Space Plan, adopted and endorsed in accordance with the Scheme, will and includes the structure plan map and all the standards, be used by the City of Bunbury and the Western Australian requirements and prerequisites for subdivision and development The provision of a minimum of 10 per cent public open space Planning Commission, respectively as a guide for the assessment of within the structure plan area. (POS) is to be achieved in accordance with the WAPC’s Liveable Applications for Planning Approval under the Scheme and of Neighbourhoods. Public Open Space is to be provided generally Applications for Approval to Subdivide Land under the provisions Part Two serves as a reference guide to explain and implement the in accordance with Table 4 and Figure 4 with an updated public of Part 10 of the Planning and Development Act 2005. The statutory provisions in Part One. open space schedule to be provided at the time of subdivision for subdivision of land within the structure plan area shall require determination by the WAPC, upon the advice of the City of further assessment and any approvals shall be conditioned with Bunbury. 1.3 Interpretations & Scheme Relationship respect to the development control of issues of local and regional importance, additional infrastructure requirements to support the The words and expressions used in this Structure Plan shall have the scale and nature of proposed development, and more detailed respective meanings given to them in the City of Bunbury Town local planning considerations. Planning Scheme No 7 (the Scheme), including any amendments gazetted thereto. The subdivision, development and use of land included in the structure plan area is to be in accordance with the general Pursuant to the Scheme and the provisions of the Planning and standards for land use and development of the Scheme, the Development (Local Planning Scheme Regulations) 2015 deemed Residential Design Codes, and the following requirements and/or provisions for local planning schemes Clause 27(1), a decision conditions of the Structure Plan to the satisfaction of both the Local maker for an application for development approval or subdivision Government and the Western Australian Planning Commission approval in an area that is covered by a structure plan that has (WAPC). been approved by the Western Australia Planning Commission is to have due regard to, but is not bound by, the structure plan when The subdivision, development and use of land within the structure deciding the application. plan area will be in accordance with the South Moorlands Local Structure Plan and Table 3. Part Two of this Structure Plan and all appendices, are to be used as a reference only to clarify and guide interpretation and As identified on the Local Structure Plan, an ‘Option B Area – Mixed implementation of Part One. Use Precinct’ has been proposed at the north-eastern corner of the structure plan area. This Option B area identifies a possible site to cater for ‘local’ demand for retail, medical and alternative uses consistent with the definition given to ‘Mixed Use’ and having regard to the limited area outlined.

South Moorlands Local Structure Plan P a g e | 4

1.5.4 Reports/Strategies Required Prior to Subdivision Table 3 Permissible Use Classes Within The Structure Plan Area Prior to the lodgement of subdivision applications to the WAPC, the Structure Plan Zonings & Reserves Permissible Use Classes & Associated Requirements following management plans are to be prepared, as applicable, Areas designated as either: i) All land uses permitted within the ‘Residential Zone’, in accordance with the Scheme and the Residential to the satisfaction of the relevant authority and provided with the • ‘Residential (R2.5)’; Design Codes, as amended. • application for subdivision (approving authority in brackets): ‘Residential (R20)’; • ‘Residential (R30)’; • ‘Residential (R40)’; i) Local Water Management Strategy (Department of Water); • Option B ‘Mixed Use ii) All land uses consistent with the definition given to ‘Mixed Use’ within the Scheme and being uses that will ii) Wetland Management Plan (Department of Parks and Precinct’ not undermine the primacy of the proposed Glen Iris Neighbourhood Centre. Wildlife); iii) Transport Impact Assessment; Areas designated as ‘Parks and i) Public Open Space for passive and active recreational uses in accordance with Part 3 – Reserves under the iv) Bushfire Hazard Level Assessment; and Recreation’ - Scheme. v) Aboriginal Heritage Survey. ii) May have a maximum of 2% of public open space used as restricted dual use function for drainage in accordance with Liveable Neighbourhoods.

1.5.5 Conditions of Subdivision Approval Areas designated as ‘Regional i) Public Open Space for conservation, passive and active recreational uses in accordance with the Greater Open Space’ - Bunbury Region Scheme (GBRS). At the time of subdivision conditions may be recommended, as applicable, requiring the preparation and/or implementation of Areas designated as ‘Resource i) Land uses for the purposes of protecting natural environments from impacts in order to maintain public the following strategies (approving authorities in brackets): Enhancement Wetland’ - health or ecological values, in accordance with Part 3 – Reserves under the Scheme. i) Geotechnical Investigations Report (City of Bunbury); ii) May be used as restricted public open space for the purposes of aesthetic landscaping and incidental ii) Acid Sulphate Soil Investigation (Department of Environment passive recreation and/or pedestrian linkage. Regulation); iii) Urban Water Management Plan (Department of Water); and Areas designated as ‘Roads’ - i) Local Development Plans shall be required for, and shall show access restrictions to, lots located along the iv) Local Development Plans (City of Bunbury). sections of those roads providing access into the Local Structure Plan Area. The extent of the access restrictions to be determined during detailed design. v) Mosquito-borne Disease and Nuisance Risk Assessment (City of

Bunbury); vi) Infrastructure and Servicing Strategy (City of Bunbury); vii) Development Contribution Legal Agreement (City of Bunbury); viii) Wetland Management Plan (Department of Parks and Wildlife).

At the time of subdivision the City of Bunbury shall recommend to the WAPC the implementation of the following strategies which have been prepared and approved as part of the Structure Plan as conditions of subdivision: i) Wetland Management Plan; ii) Local Water Management Strategy.

South Moorlands Local Structure Plan P a g e | 5

Table 4 Figure 4 Calculation of Gross Subdivisible Area & Public Open Space Provision Open Space Plan (refer to Figure 4) (ha) (ha) (ha) Site Area 66.9110 Less Environmental Protection policy areas Wetlands to be ceded 4.9996 Regional Open Space to be ceded 1.1737 6.1733 Total 6.1733 Net Site Area 60.7377 Deductions Drainage Areas in Areas 0.1850 Vittoria Road Widening 0.1081 0.2931 Gross Subdivisible Area 60.4446 Public Open Space @ 10% 6.0445 Public Open Space Contribution - Proposed Apportionments of 10% Requirement Unrestricted Public Open Space - 100% Restricted Public Open Space - 0% Unrestricted Public Open Space Sites 7 local parks P1 1.9538 P2 0.7852 P3 0.5590 P4 1.1269 P5 1.2858 P6 0.1637 P7 0.1701 6.0445 Public Open Space Provision 6.0445

Note: Gross subdivisible area includes house lots, access roads, and any land incidental to the subdivision. The gross subdivisible area does not include areas for schools, shopping centres, infrastructure (e.g. land required for sewer pump stations), dedicated drainage sites not having a recreational function and land set aside for arterial roads and other non-residential uses.

The Structure Plan proposes a contribution of approximately 10% of the Gross Subdivisible Area as public open space.

South Moorlands Local Structure Plan P a g e | 6

1.6 Development Requirements Provisions contained within the Planning

and Development (Local Planning Local Development Plans are to be prepared in accordance with the Planning and Development (Local Planning Schemes) Schemes) Regulations 2015 take effect Regulations 2015 for medium density and high density residential from 19 October 2015. precincts (ie in excess of the R30 density code).

The Local Development Plans are to be prepared in accordance with the Regulations, Liveable Neighbourhoods and the Residential Design Codes and must show such detail to the satisfaction of the Local Government that the development of land within the development site is consistent with orderly and proper planning and the achievement of the highest appropriate level of amenity.

In addition to those matters required in accordance with the Regulations, the Local Development Plan may include information or detail dealing with, but not be limited to, the following – a) standards and requirements for development site planning and building design; b) lot layout of subdivision design and building envelopes; c) extent of land uses in accordance with the Zoning Table of the Scheme; d) interface and buffer treatments between the surrounding residential uses and the development site; e) residential densities where residential use is permissible; f) urban design treatment of streetscapes and residential interfaces; g) traffic management, including accessways and internal circulation; h) vehicle parking and circulation areas and treatments; i) pedestrian access and movement; j) building height and scale; k) development setbacks from boundaries; l) landscaping within setback areas and between buildings; and, m) views to and from the site (e.g. with regard to inland residential areas).

1.7 Other Requirements

The occurrence of Moderate to High Risk Acid Sulphate Soils within the structure plan area may necessitate the preparation and approval of an Acid Sulphate Soils Management Plan to be imposed as a condition of subdivision approval. The Plan may be required to be submitted to, and approved by the Department of Environment Regulation before any subdivision works or development are commenced.

A Wetland Management Plan has been prepared for the wetland area and is included as Appendix 3.

South Moorlands Local Structure Plan P a g e | 7

Figure 5 Part Two – Explanatory Section Location Plan

1.0 Planning Background 1.1 Introduction & Purpose

The purpose of the Structure Plan is to provide for the orderly and proper planning of the Moorlands urban area in accordance with the State Planning Framework and the City of Bunbury Local Planning Policy Framework.

The intent of this Structure Plan is to guide the subdivision, development and infrastructure servicing of the South Moorlands Local Structure Plan Area as a residential neighbourhood that is integrated with the surrounding Glen Iris local area.

1.2 Land Description 1.2.1 Location

The structure plan area is located approximately 4 kilometres south east of the Bunbury Central Business District within the Locality of Glen Iris. The structure plan area is generally bounded by Vittoria Road to the east, Kaeshagan Street to the south, the Preston River to the west and existing landholdings to the north (refer to Figure 5).

1.2.2 Area & Land Use

The structure plan area incorporates 10 lots as detailed in Table 5 and Figure 6. The structure plan area comprises a total of 66.911 hectares and has historically supported rural land use activities (primarily grazing and agistment). Some low intensity grazing and agistment still occurs on the subject land.

Much of the subject land, due to its previous rural use, is generally cleared with some intermittent trees. Subject Land

Three dwellings together with associated outbuildings and sheds are located within the structure plan area on the western portion of the property. The balance of the land remains vacant. (refer to Figure 7 – Aerial Photograph). Source: Google Maps (www.maps.google.com.au)

South Moorlands Local Structure Plan P a g e | 8

Table 5 Land Ownership Photo 1 Lot Owner Certificate of Title Area (ha) Structure Plan Area from Vittoria Road looking west 310 Amoeba Nominees Pty Ltd 2685/786 20.2335 202 C. Piacentini 2754/978 12.2378 200 C. Piacentini 2754-977 1.9871 312 Moorlands Grazing Co Pty Ltd 2685/788 14.2550 314 K. & A. Piacentini 2685/790 4.0224 315 B. & T. Piacentini 2685/791 2.9398 316 Amoeba Nominees Pty Ltd 2685/792 3.5977 317 Amoeba Nominees Pty Ltd 2685/793 3.3112 32 Amoeba Nominees Pty Ltd 2683/684 4.0617 61 T. & J. Jeffrey 2721/389 0.1311 62 T. & J. Jeffrey 2721/390 0.1337 Total Area 66.911ha

Figure 6 Cadastral Boundaries

Photo 2 Structure Plan Area from Kaeshagan Street looking north

Source: www.landgate.wa.gov.au

South Moorlands Local Structure Plan P a g e | 9

Figure 7 Aerial Photograph

Source: www.landgate.wa.gov.au

South Moorlands Local Structure Plan P a g e | 10

1.2.3 Legal Description & Ownership 1.3.3 Planning Strategies Local Planning Strategy for Activity Centres & Neighbourhoods The legal descriptions and ownership details of lots within the (LPSACN) structure plan area are summarised in Table 5 and copies of the The Local Planning Strategy for Activity Centres & Neighbourhoods Certificates of Title are provided in Appendix 2. (LPSACN) adopted by the City of Bunbury in March 2011 provides a ‘principles’ based general strategy to guide town planning 1.3 Planning Framework scheme zoning, policy development and decision making in relation to residential, commercial and mixed use developments. 1.3.1 Zoning Greater Bunbury Region Scheme (GBRS) The principle aim of the LPSACN is to facilitate a network of Under the terms of the Greater Bunbury Region Scheme (GBRS) the mutually supportive residential neighbourhoods and activity subject land is predominantly zoned ‘Urban’, with the exception of centres that contribute to the economic, social and environmental Lot 312 that is zoned “Urban Deferred” and portion of Lot 200 that sustainability of the City of Bunbury. is reserved as ‘Regional Open Space’. Lot 312 was rezoned in 2013 from ‘Public Purpose - Relief Floodway’ as the land was no longer Based on a range of factors such as location, physical required for that purpose (refer to Figure 8). appearance, existing or proposed size and classification as well as results compiled from modelling data, the Strategy identifies City of Bunbury Town Planning Scheme No.7 centres regarded as being most suitable for designation as activity The South Moorlands Local Structure Plan area is predominantly centres. zoned ‘Development Zone - Residential’ within the City of Bunbury Town Planning Scheme No 7 with portion of Lot 200 reserved as The South Moorlands structure plan area is located in the vicinity of ‘Regional Open Space’ - refer Figure 9. the area described as the ‘Gateway Commercial Precinct’. “The Gateway Commercial Precinct is intended to provide a distinctive The stated objective of the ‘Development Zone – Residential’ is ‘to mixed business area at a strategic location on one of the main facilitate the comprehensive planning and development of future approaches into Bunbury. It is intended that this area will provide urban areas in accordance with adopted structure plans..’ alternative opportunities for a range of Other Retail and low intensity Office/ Business uses. As indicated on the Strategy Map, it The provisions of Clause 6.2.8 apply in accordance with the is intended that the Gateway precinct will form the northern discussion at Section 1.3 Interpretations & Scheme Relationship of section of a small activity corridor that will transition into a more Part 1 of the structure plan report. urban-intensive mixed use area towards the south, where it will terminate within the future Glen Iris/ Moorlands neighbourhood 1.3.2 Regional & Sub-Regional Structure Plans centre.” Greater Bunbury Strategy 2013 & the Greater Bunbury Structure Plan 2013 1.3.4 Policies Liveable Neighbourhoods The Greater Bunbury Strategy 2013 and the Greater Bunbury Liveable Neighbourhoods (2007) operates as a neighbourhood Structure Plan 2013 (refer Figure 10) have been prepared by the design code, intended to facilitate the development of Department of Planning to guide urban and regional planning in sustainable communities. The policy has many aspects but the Greater Bunbury sub-region. fundamentally the principle idea is to promote walkable mixed-use neighbourhoods. The Greater Bunbury Strategy incorporates the Greater Bunbury Structure Plan which is based on ensuring a 25 year supply of The South Moorlands Structure Plan has been formulated to undeveloped land. The main purpose of the Structure Plan is to comply with the objectives and intentions of Liveable identify land ahead of the rezoning process and to stage the Neighbourhoods. rezoning of that land in response to future growth trends.

The Strategy advocates that land that is already zoned, such as the South Moorlands Local Structure Plan area, should be encouraged and prioritised for development given the considerable supply of land that has already been deemed suitable, or potentially suitable, for new urban development and that has already been zoned accordingly under the Greater Bunbury Region Scheme.

South Moorlands Local Structure Plan P a g e | 11

Figure 8 Figure 9 Extract from Greater Bunbury Region Scheme Extract from City of Bunbury TPS No 7 Scheme Map

South Moorlands Local Structure Plan P a g e | 12

Figure 10 Extract from Greater Bunbury Structure Plan 2011-2031+

South Moorlands

Local Structure Plan Area

South Moorlands Local Structure Plan P a g e | 13

Buffers around the two wetlands within the survey area (UFI1109 vegetation in core areas of the wetlands being assessed as “Good 2.0 Site Conditions & Environment and UFI 1110) are proposed at a minimum of 15m. The buffers will condition”. Most of the CCW sites were graded as “Good” or 2.1 Biodiversity & Natural Area Assets be rehabilitated to pre-cleared habitats, being, Eucalyptus “Degraded”. The CCW field assessment/records undertaken by Bio Woodlands, Melaleuca Woodlands and Sedgelands. Diverse Solutions, revealed no areas of “Very Good Vegetation”. In early 2014, Biodiverse Solutions was commissioned to prepare a As the wetlands are listed as Environmentally Sensitive Areas (ESA’s) Wetland Management Plan to assess the wetlands on site, Where cattle had minimal penetration into the wetlands from all construction work and infrastructure is to be located outside of including assessment of vegetation and flora species. grazing and watering due to thick sedges and rushes being the ESA boundaries. The wetlands buffer areas have included the present, the site was rated as “Good Condition”. Areas where The findings are summarised in the following extracts from the ESA boundary and any works (landscaping, revegetation, cattle had accessed the banks of the wetlands but had some BioDiverse Solutions Wetland Management Plan as follows: adjacent construction) inside and adjacent to these areas are to native vegetation cover were rated as “Degraded Condition”. be at the approval of DPaW prior to work commencing. Approval Sedimentation and localised deaths of vegetation from trampling 2.1.1 Wetland Management Plan of the revegetation and landscaping plans by the formal approval was evident in these areas.

of this WMP by DPaW will guide any landscaping and revegetation The Wetland Management Plan for the structure plan area is Sites where minimal native vegetation cover existed were rated as included in the appendices (Appendix 3). of these areas. “Completely degraded”. These areas had only some clumps of Juncus pallidus with many introduced grasses and weeds and was The development footprint associated with the structure plan There are 4 Geomorphic Wetlands located on the site, and the proposals seeks to maximise the conservation of vegetation and heavily accessed by cattle for grazing. Preston River, along the western and southern boundaries of the associated fauna habitats by ensuring location of these areas site is also a mapped geomorphic wetland – refer Figure 11. within public open space areas. A search of the Threatened (Declared Rare) Flora Database, WA

Herbarium database and the Declared Rare Flora and Priority Figure 11 In balancing these objectives with those of Liveable Species List did not identify evidence of any Priority Flora or Wetland Mapping Neighbourhoods, the Structure Plan includes a connection to the Declared Rare Flora in the survey area. land adjoining to the north. It is recommended that during detailed design of this location, care should be taken to minimise 2.1.3 Fauna Assessment the extent of impacts and removal of significant vegetation. In the survey area there was minimal areas of ‘Good’ quality fauna 2.1.2 Vegetation habitat, mostly degraded habitat was identified during the site assessment. No areas of ‘Very Good’ fauna habitat were A Level 1 Flora Survey was undertaken of the survey area in March identified. 2014. This was not a spring survey, however the survey area is predominantly devoid of native vegetation cover excepting at An assessment of Conservation Significant Fauna was undertaken fringe wetland areas. A follow up targeted threatened flora survey that indicated 14 species that could possibly occur in the survey was undertaken in September, 2015. area, with low and moderate risks of occurring. Those species with a ‘moderate’ risk of occurring include the Forest Red-tailed Black A total of 27 species were recorded from the survey area, of which Cockatoo, Baudin’s Black-Cockatoo, Carnaby’s Black-Cockatoo, 12 or 44% were native (15weed species recorded). Short-billed Black-Cockatoo, Great Egret, White Egret and Cattle A total of four vegetation types were present on site, being: Egret.

Three of the mapped wetlands in the northern portion of the site - Eucalyptus Open Woodland; The survey identified that the fox, feral European rabbit, feral or (1080, 1110 and 1109) are categorised as Resource Enhancement - Perennial Sedgeland; semi-domestic cats and at least one species of introduced rat are and the fourth, over the whole of the site (14329) is categorised as - Melaleuca preissianna Low Open Woodland; likely to occur within the survey area. Multiple Use. - Bare areas.

BioDiverse’s report concluded that the degraded nature of the wetlands has resulted from historical land use activities, in Generally the higher slopes supported bare areas with some particular cattle grazing, that has created multiple pathways isolated tree species of Eucalyptus gomphocephala (Tuart) and throughout the wetland. Corymbia calophylla (Marri), while the lower slopes supported perennial herbland/sedgelands and low open Melaleuca As part of the structure plan design process for the site, the two woodlands along the fringe of wetlands. wetlands along the northern boundary (UFI 1110 and 1109) were identified as significant features to be protected. A series of buffers The vegetation condition for the subject area (as per the scale of and revegetation strategies provide this opportunity. Keighley (1994)) shows that fringing the remnant native vegetation

along the wetlands there are varying degrees of degradation caused by exposure and weed invasion. This has led to the

South Moorlands Local Structure Plan P a g e | 14

2.2 Landform & Soils Figure 12 2.2.1 Soil Type Acid Sulphate Soil Classifications Results from modelling indicated that Moorlands Stage 1 (now an existing development north of the site) and Moorlands Stage 2 (the

site) will alter the Preston River floodplain flow and levels. The SKM The Bunbury 1:50,000 Geology Sheet indicated that the site is (2013) report shows an increase in some areas and a reduced underlain by Alluvial, sand derived from Tamala Limestone and flood level in others. All modelling scenarios included the presence Guildford Formation. of the western levee along the Preston River and no overtopping

of the western levee was observed as a result of the “Moorlands A summary of the ground conditions is described as: Full Development Scenario.” Topsoil - a surface layer of dark grey to dark brown sand with rootlets to an average depth of 0.1m. Moderate To High Sand - multi coloured, generally medium grained sand encountered across the majority of the site. 2.3.2 Groundwater Clay – soft to hard sandy clay includes some organic material encountered in low lying areas considered to be recent alluvial Groundwater flow is generally in a westerly direction across the site deposits. and is at its lowest in the north western portion of the site. The Sandstone – gravel and cobbles dark brown cemented sand average annual maximum groundwater level (AAMGL) at the where encountered within the grey sand across the site. monitoring bores ranged from 1.01m AHD to 6.17m AHD, with the depth to groundwater varying from ponding at the surface to an Moderate to 2.2.2 Topography Low approximate depth of 2.59m. (Hyd20, 2015)

The structure plan area is best described as gently undulating with levels varying from 10m AHD central to the site, to approximately 5m AHD in the lower wetland areas of the subject land.

2.2.3 Acid Sulfate Soils (ASS)

Published acid sulphate soil risk mapping indicates that the site is Source: www.landgate.wa.gov.au (WA Atlas) located within areas of: • high to moderate risk and associated with areas of alluvium as depicted by the published geological mapping; 2.3 Surface Water & Groundwater • moderate to low risk and associated with areas of

Bassendean sand and clayey materials of the Guildford Hyd20 has prepared a Stormwater and Groundwater Formation as depicted by the geological mapping; and Management Strategy for the development that is incorporated • low to no risk and associated with areas of sand derived into the Local Water Management Strategy (MPM) (refer to from Tamala Limestone as depicted by the published Appendix 4) geological mapping (refer to Figure 12).

The Douglas Partners preliminary investigation concluded that acid sulphate soils are likely to be present within 3m of the natural soil 2.3.1 Local Surface Water Hydrology surface, in particular, within areas of alluvium. There are no existing surface water flow paths within the site. 2.2.4 Site Classification The site is located within the – Preston River Site classification based on the finding of the Douglas Partners Catchment. The main drainage for the catchment is the Preston geotechnical investigation, and assuming suitable site preparation River which is located outside the site and flows predominately in a indicates that the majority of the site is identified as class ‘A’ with northern direction. some areas of class ‘S’. Subject to the extent of the proposed cut and fill operations it is considered that the majority of the site could Extensive flood mapping of the Preston River has been performed achieve a site class ‘A’ following suitable site preparation. by SKM (2013). The flood study estimated the extent of the flood path during the 100 year ARI event and indicated that with the existing conditions, an area of the south western part of the site would be affected by the floodwater. Flood levels that would inundate this portion of the site range from 5 to 5.75m AHD, approximately 0.75m above the existing natural surface in this area.

South Moorlands Local Structure Plan P a g e | 15

2.4 Bushfire Hazard 2.5 Heritage

The development is not adjacent to any large bushland areas and An Aboriginal Heritage Survey was undertaken over the area by the Preston River is limited in vegetation cover. However, portions Brad Goode and Associates in early 2013. The report stated that of the site have been identified in the mapping prepared by the there are no previously recorded ethnographic Aboriginal heritage Department of Fire and Emergency Services as ‘Bushfire Prone sites or places. There is one archaeological site and one Areas’(refer to Figure 13). archaeological other heritage place within the area – refer Figure 14. In accordance with State Planning Policy 3.7 Planning in Bushfire Prone Areas, a Bushfire Hazard Level Assessment has been Should works be undertaken in the Regional Open Space there is prepared for the structure plan area. potential for the Preston River site to be affected.

A BAL Contour Map will be prepared when the detailed lot layout Consultation is continuing with Aboriginal representatives and a is confirmed and will accompany any subdivision application in Section 18 will be required prior to any disturbance of the the structure plan area. Aboriginal Sites. Figure 14 Notwithstanding, the road layout enables safe vehicular and Aboriginal Heritage Site pedestrian access/egress in the event of a fire emergency. Reticulated water is also proposed to service the development which enables a source of water for fire fighting purposes. Hydrant locations will be detailed at detailed engineering design stage.

The Bushfire Hazard Level Assessment is included as Appendix 7.

Figure 13 Bushfire Prone Area Mapping

Source: Department of Fire and Emergency Services

South Moorlands Local Structure Plan P a g e | 16

Figure 15 2.6 Context & Other Land Use Constraints Site Context, Opportunities & Constraints Map 2.6.1 Regional & Local Context

The structure plan area is located within the locality of Glen Iris and is approximately 4.5km (by road) south of the Bunbury City centre.

A range of community facilities and employment opportunities are within close proximity to the site including: - Bunbury CBD; - Bunbury Forum Shopping Centre; and - A number of local primary schools.

The Structure Plan site is situated on Vittoria Road, providing excellent connectivity to the city centre and outer regional areas via the Forrest and South Western Highways which are both Primary Regional Roads.

Within the structure plan area and with the exception of Moorlands Avenue, there are currently no existing internal roads, pedestrian or cycle networks.

There are no existing public transport facilities within the structure plan area, although the transport provider, Bunbury City transit currently operates in the vicinity of the site.

Figure 15 provides a context and site analysis identifying the key opportunities and constraints related to the structure plan area. The figure identifies the regional open space that encompasses the Preston River, an analysis of existing neighbourhood form in surrounding areas, the cultural heritage site and surrounding road and community infrastructure. The structure plan area is generally devoid of topographic features. View corridors are focussed onto the central ROS areas.

South Moorlands Local Structure Plan P a g e | 17

The location of public open space is site responsive catering for plan area. The R-Codes will “outline the 'rules' which apply to 3.0 Land Use & Subdivision wetland management objectives as well as providing residential development”. (R Codes) Requirements opportunities for both passive and active recreational pursuits. The location of open space areas also assists in the creation of a Medium density sites (R30 and R40) are generally focussed around “Sense of Place” consistent with Liveable Neighbourhood points of interest including overlooking public open space areas, 3.1 Land Use objectives. The objective of meeting the needs of a broad range and provide opportunities for the development of units and of users is achieved within the structure plan. ‘cottage’(narrow lot) housing. The South Moorlands Local Structure Plan is generally regarded as a self-contained greenfields site. The South Moorlands Local Each open space area is located so as to achieve clear sightlines The R20 sites are located throughout the structure plan area and Structure Plan has regard to existing residential development within from nearby buildings and so as to be safe and conveniently provide for single residential housing. The structure plan proposes the Glen Iris and Moorlands locality. located to serve the majority of future structure plan area the development of this land consistent with the average 450m2 residents. applicable to R20 coded land. The South Moorlands Local Structure Plan proposes a range of land uses; Residential R2.5, R20, R30 and R40, and public and regional 3.3 Residential Consistent with the ‘General Objectives’ of the R-Codes, the South open space. Moorlands Local Structure Plan: Consistent with current WAPC policy (including the Residential

As per the Structure Plan Summary Table contained in the Design Codes and Liveable Neighbourhoods), the Structure Plan a) provides for a full range of housing types and densities that Executive Summary, the Structure Plan incorporates 6 hectares of provides for a range of residential densities and therefore housing meet the needs of a broad range of people; local public open space and 1.1737 hectares of Regional Open choice and lifestyle opportunities. Proposed densities range from b) provides for local variations in neighbourhood character;

Space. Once developed, the Structure Plan is estimated to be R2.5 through to R40 (refer to Figure 16). c) ensures, as far as possible, high levels of local amenity; capable of supporting approximately 698 dwellings and an overall d) makes provision for on-site facilities; population of 2,163 people. Figure 16 e) seeks to protect and enhance the amenity of adjoining residential areas; and, Density Code Plan The structure plan has been formulated to take advantage of the f) incorporates environmentally sensitive design. outlook to the Preston River and adjoining wetlands. It is based on a permeable road network providing for ease of access as well as The Structure Plan responds to the residential density target of 15 a variety of areas having different outlook opportunities. dwellings per gross hectare established for the preferred growth scenario within the Draft Greater Bunbury Strategy. The residential 3.2 Open Space site density is 15.98 dwellings per hectare.

The Structure Plan layout seeks to maximise the outlook Public Open Space is a major feature of the South Moorlands opportunities for residential development taking advantage of the Local Structure Plan. Several areas of public open space are significant areas of local and adjoining regional public open proposed throughout the structure plan area and are illustrated in space. The grid road pattern seeks to maximise opportunities for Figure 4 and summarised in Table 4. solar orientation of housing and provide for high levels of

permeability, equity and accessibility. The road layout provides for The location and provision of public open space and parkland diversity and interest in the local street environments to assist in the areas has been determined based on both the physical attributes development of local character and a sense of place consistent of the structure plan area as well as the guiding principles with Liveable Neighbourhood objectives. embodied in Liveable Neighbourhoods.

Two of the open space areas contain wetlands and associated 3.4 Mixed Use Precinct (Option B Area) buffers. The inclusion of conservation based open space has been balanced against the requirement for suitable areas of open The Structure Plan includes an Option B Area at its north-eastern space to cater for active pursuits. An open space corridor also corner. The area is strategically located to assist with the possible provides a link from the larger wetland area through to the Preston future creation of a small ‘Mixed Use’ precinct to cater for such River. uses as medical centre, consulting rooms, child care centre, family day care centre and/or grouped dwellings etc. Its location in close The public open space areas have been located so as to be proximity to a busy intersection would result in a high level of central to residential areas to provide: accessibility to such services for the broader Glen iris/Moorlands community while minimising potential impacts on the

1. a focal point for local neighbourhoods; neighbourhood centre identified at the corner of Jeffery and 2. for ease of access; and, Vittoria Roads within the endorsed Glen iris Structure Plan. 3. high levels of surveillance. The Structure Plan has been formulated to meet the requirements of Liveable Neighbourhoods. The Residential Design Codes, administered by the City of Bunbury, will provide a comprehensive basis for the control of residential development within the structure

South Moorlands Local Structure Plan P a g e | 18

In addition, this alternative use would result in the precinct Figure 17 interfacing with Vittoria Road as opposed to residential Road Network Layout and Identification development that would, in all likelihood, be forced to back on to Vittoria Road in order to achieve required levels of amenity for residents.

Option B achieves the following ‘Principal Aims’ of the WAPC’s Liveable Neighbourhoods: • To provide for an urban structure of walkable neighbourhoods clustering to form towns of compatible mixed uses in order to reduce car dependence for access to employment, retail and community facilities. • To ensure that walkable neighbourhoods and access to services and facilities are designed for all users, including those with disabilities. • To ensure active street-land use interfaces, with building frontages to streets to improve personal safety through increased surveillance and activity. • To facilitate new development which supports the efficiency of public transport systems where available, and provides safe, direct access to the system for residents. • To facilitate mixed-use urban development which provides for a wide range of living, employment and leisure activities, capable of adapting over time as the community changes and which reflects appropriate community standards of health, safety and amenity.

Further investigations into this option will be undertaken prior to detailed subdivision and/ or development including this area being subject to a Local Development Plan.

3.5 Movement Networks

The internal road layout has been designed to achieve a high level of permeability as well as to provide safe and efficient access to facilities for vehicles, pedestrians and cyclists.

The layout is well integrated with the surrounding road network and developed areas with two strong east-west links through the development connecting with Vittoria Road. An opportunity is also provided for a road connection to the north.

A Transport Impact Assessment Report has been prepared by Donald Veal Consultants and is included as Appendix 6. The report:

• examines the existing road network and volumes; • describes and justifies road network and hierarchy; • assesses the proposed road network capacity for peak demand; • describes existing roads and intersections together with upgrading requirements; • provides estimates of traffic volumes; • provides indicative road cross sections for each road type, showing carriageway and verge widths and accommodation of service infrastructure and street trees;

South Moorlands Local Structure Plan P a g e | 19

• considers options for the proposed public transport network; The volume of traffic expected to be generated by this Figure 20 • identifies required intersection controls and traffic development is 6,543 vpd with 588 and 605 am and pm peak hour Sample Road Cross Section, Narrow Yield Access Street, 40km/h management issues; and, trips respectively. <1000vpd • describes the proposed pedestrian and cyclist network and links with the existing path network. Currently there is one bus stop along Vittoria Road abutting the proposed development at the southern end. With the addition of The proposed road network is shown in Figure 17. As the roads are another bus stop towards the northern end approximately 50% of currently un-named, the roads have been provided with the development will be within 400m walking distance of a bus identifying names. stop. If a bus route is developed through the subdivision it is estimated that approximately 80% of the development would be The proposed road reserve widths generally range from 20m for within the 400m walking distance. the major connectors to 15m for the minor access streets. These widths are consistent with the range stated in Liveable The Structure Plan includes an internal network of shared use and

Neighbourhoods (WAPC 2009). pedestrian paths to facilitate cyclist and pedestrian movements.

Cross sections for the internal road network are yet to be 3.6 Water Management confirmed. Figures 18, 19, and 20 show sample cross sections for A Local Water Management Strategy (LWMS) has been prepared various categories of access roads as contained in Liveable Figure 18 for the South Moorlands Structure Plan, and is attached as Neighbourhoods (WAPC 2009). Sample Road Cross Section – Neighbourhood Connector B, Appendix 10. 50km/hr (<3000vpd) The transport assessment undertaken by DVC demonstrated that the major internal roads (Roads A and B as per Figure 16) are 3.6.1 Stormwater Management expected to carry the highest volume of traffic at their eastern ends where they connect with Vittoria Road. They are expected In accordance with Water Sensitive Urban Design (WSUD) to carry approximately 3,270 vehicles per day at these principles, stormwater management principles for the South connections and a Neighbourhood Connector B is considered Moorlands Local Structure Plan area will include: appropriate. The other roads within the structure plan area will function as access streets, with varying reserve widths, and • Use of POS areas for ephemeral stormwater infiltration and laneways. Roads C and D connect Roads A and B and have the detention areas; and potential for a high parking demand given their location adjacent • ‘Green link’ network (using swales) to optimise overland flow to open spaces and R30 residential areas. paths and the use of biofiltration areas. (Hyd2o, 2015)

As per the requirements for built up areas, the proposed speed limit is 50km/h, with the exception of school zones. Figure 19 3.6.2 Groundwater Management

Sample Road Cross Section, Standard Access Street, 40km/h Most of the intersections within the internal road network are Development levels across the site will be established by a cut to fill <3000vpd priority T junctions, however, there are also nine roundabouts operation to achieve the minimum separation between building proposed to assist in speed reduction over long lengths of road. floor levels and groundwater.

The proposed internal road network will result in the creation of four Subsoil drainage may be used, subject to detailed design, in areas connections to the external road network as follows: where minimum separation to groundwater cannot be achieved with the proposed fill levels. (Hyd20, 2015)

- Road A with Vittoria Road;

- Road B with Vittoria Road. 3.6.3 Water Efficiency Measures - 2 connections to Kaeshagen Street.

Consistent with the Water Corporation’s “Waterwise” land The intersection of Kaeshaegan Street with Vittoria Road will be development criteria, measures will be introduced to reduce closed at the appropriate stage of development. scheme water consumption within the development, including:

The intersection of Road A with Vittoria Road will form a 4 way - promotion of waterwise practices including water efficient intersection with Woodley Road. It is proposed that ultimately, the fixtures and fittings; intersection will be controlled by traffic signals. - use of native plants in POS areas;

- use of groundwater bores for irrigation of POS and common The intersection of Road B with Vittoria Road will form a four way areas; intersection with Erica Entrance. It is proposed that ultimately, the - where practicable, maximising on site retention of stormwater; intersection will be controlled by a roundabout. - use of rainwater tanks for non-potable water.

South Moorlands Local Structure Plan P a g e | 20

appropriate and within the proposed Parks and Recreation 3.7 Education Facilities Reserves and Wetland areas. The future development of the LSP area will necessitate the developer funding the installation of a gravity sewer network Fill will be provided at sufficient depth above the existing water Currently there are three primary schools located in the Glen Iris throughout, providing each proposed residence with a connection vicinity; Picton Primary School, Djidi Djidi Primary School table on the site to allow disposal of roof stormwater by soakage on the lots in conjunction with a sub soil drainage system within the to reticulated sewer, that would connect to either of the relevant (specialised) and Grace Christian Private School. Neither Picton or pumpstations and the Water Corporation network. Djidi Djidi Primary Schools have defined local intake areas and road reserves, and in order to achieve the minimum separation between lot level and groundwater level. associated boundaries. It should be noted that the sewer servicing strategy for this LSP

area, including any potential funding options for headworks The Department of Education has previously indicated that a lot Roads may be constructed lower than the lots to reduce fill yield of 1500 lots would require a primary school site to be volumes and provide overland flow paths for extreme storm infrastructure requires further detailed discussion with the Water identified. The estimated lot yield of 691 lots confirms that a site is events. Detailed earthwork specifications will be investigated Corporations Land Servicing Division, prior to proceeding to not required. during the detailed design of subdivision. detailed design or reference to any potential funding by the Water

Corporation. 3.8.3 Sewer

3.8 Infrastructure Coordination, Servicing & The subject land falls within an area licensed to the Water 3.8.4 Water Staging Corporation for the provision of sewer infrastructure and services. Aqwest is the current ERA licensed service provider for provision of At the time of preparing this report no decisions have been made The Water Corporation have provided their future sewer planning water supply to this site. in relation to the staging and timing of the development. and existing infrastructure for the area inclusive of the location of the existing sewer pumpstations relevant for the site. The A 300 mm water main is located along the western side of Vittoria However, it is considered likely that development would development site is influenced by two existing and one proposed Road abutting the site. commence in the vicinity of Vittoria Road and progress westwards. sewer pumpstation, which will all play a part in the servicing of the A ring main feeder system will distribute water along the roads development with reticulated sewer. Existing Glen Iris pumpstation within the proposed development. Standard water reticulation A is to the east of the site and provides the outlet/discharge point 3.8.1 Roads mains will be provided to each relevant part of the development for sewer collected on the development site. Existing Styx Lane to provide a potable drinking water supply to each lot. All streets will be developed by the land owners/developers and Pumpstation (Pumpstation 3) is a Type 10 pumpstation, was will be standard kerb with asphalt seal. Detailed road design will be completed in 2012 and is located north of the development site. External water mains upgrades to service this site would be undertaken as part of the planning of subdivision. Styyx Lane pumps to Glen Iris PS A. negotiated with Aqwest.

Generally, streets adjoining Public Open Space (POS) will have a Any subdivision development within the LSP will be required to 3.8.5 Non Potable Water Supply one-way cross fall towards the public open space and propose to connect to reticulated sewer. have a flush kerb on the POS side to enable street runoff to enter There are currently no ERA licensed service providers in this area the POS via overland flow. The verges and POS are to be stabilized providing non potable water supplies. and/or grassed or vegetated to prevent erosion. The original Water Corporation sewer catchment planning indicates that the LSP is split into two different catchments. The If a licensed operator is established prior to construction of this Generally the proposed movement network hierarchy will consist revised catchment planning for Styx Lane PS 3 indicates that it is development then a non potable water supply could be of three distinct types: capable of servicing 2.56ha of Rural residential, 0.82 ha of R40 and developed to each lot via a “third pipe” system.

8.94ha of R20 development from within the South Moorlands • 18m and 20m entry roads incorporating footpaths, street Detailed investigations should be undertaken to determine if a Structure Plan area. However, this planning does not consider the parking and landscaping; licensed operator is likely to occur closer to development of this • 15 to 16m residential streets incorporating footpaths, street removal of the Glen Iris relief floodway and its conversion to site. parking and landscaping; residential development land under this LSP. The remaining area of • 6m laneways incorporating service easements, street lighting the LSP is required to be serviced by a new sewer pumpstation, 3.8.6 Power and occasional tree planting. Glen Iris PS B.

Initial inspection of the development site indicates that, based Rear laneways of 6.01m are used in places to provide rear loading upon the extent of existing infrastructure in the area, that the LSP on smaller cottage style lots. Liaison has been ongoing with the Water Corporation regarding the inclusion of Glen Iris PSB onto the Water Corporations 5 year area can be supplied with underground power, as will be a WAPC condition of subdivisional approval. Internally of the development funding programme, however no formal arrangements have been 3.8.2 Site Works a network of underground cables, transformers and overhead agreed with regards to any potential funding options available power relocations will be required to be designed, supplied and Site works will include earthworks (i.e. cutting and filling as when the development takes place. It is therefore noted that the installed by the developer. The existing rural residential supplies to required), with earthwork areas to be stabilised during construction of this pumpstation cannot be termed ‘prefunded’ at the existing three houses on the property will eventually be construction. Existing remnant vegetation is to be kept where this stage of discussion. converted to underground as the development stages proceed

South Moorlands Local Structure Plan P a g e | 21 and install a new underground supply network to the requirements ownership of any of the land within the SPA change to a non of Western Power. South Moorlands presents an ideal opportunity to showcase the related entity. latest developments in Water Sensitive Urban Design (WSUD) while 3.8.7 Gas also leading to an efficient, cost effective design. All of these 3.10 Other Requirements concepts can be further developed at the subdivision design The proposed LSP area is presently fronted with reticulated gas stage and would be further detailed in an Urban Water Once approved, the South Moorlands Local Structure Plan forms infrastructure, that is controlled locally by Atco Gas Australia. Management Plan for each stage of the subdivision. the statutory framework to guide subdivision and development Liaison and discussions with Atco Gas has indicated that a within the structure plan area. As the development progresses it connection to reticulated gas is possible for the development A series of biofiltration swales and basins are proposed to collect, may be necessary to vary aspects of the Structure Plan and as however the extent of any external upgrades to their network that transfer and discharge storm events to predevelopment flow rates such the plan is intended to be adaptable subject to suitable may be required, would be subject to detailed demand design at and locations based upon the approximate pre-development justification. Modifications to the adopted Structure Plan are to be the time of subdivision. catchments. undertaken in accordance with the Planning and Development (Local Planning Schemes) Regulations 2015. Stormwater modelling of flood storage and conveyance 3.8.8 Communications mechanisms have been undertaken utilising XP Storm and are included within the LWMS. Having regard to the proximity of the land to the recently established residential development area north of Jeffrey Road The basic principles in the adopted strategy would be to treat the and the extensive residential development of Glen Iris to the east following storm events: of the LSP area and its associated infrastructure, it is anticipated that the land will have access to the existing array of • 1 in 1 year event treated for water quality outcomes; communications infrastructure and technology. Based upon the • 1 in 5 year event catered for in minor conveyance system for number of lots created at subdivision approval stage, the minor flooding protection and serviceability; and, development will be eligible for connection to the NBN Co network • 1 in 100 year event designed for to ensure flood protection of for the provision of telecommunication services for all future lots. the development. This connection will be subject to NBN Co approval at the time of development. The development, under Department of Water approval, is not required to detain the 100 year storm event from internally of the Should the developer choose, the development will be required to site. It is proposed to ensure road and swale flow paths throughout design, supply and install a communications pit and pipe network the development to enable discharge of this event directly to the for NBN Co. Preston River. This enables any 100 year event occurring on the site to pass through the Preston River system prior to the peak floor 3.8.9 Drainage height of the river system occurring up to several days later. 62 The stormwater collection and disposal within South Moorlands will The water quality targets to be used in detail design of the WSUD be designed in accordance with the Local Water Management treatment train are: Strategy (LWMS) included at Appendix 4. The emphasis is on retention, treatment, use, and environmental and cultural benefit • At least 80% reduction in total suspended solids; from stormwater systems, rather than conveyance (i.e. drainage) • At least 60% reduction in total phosphorus; and disposal. • At least 45% reduction in total nitrogen; • At least 70% reduction in gross pollutants. “Stormwater management is proposed to be undertaken consistent with DoW water sensitive urban design practices. Final details of the proposed stormwater drainage system are to be detailed in the Urban Water Management Plan for each stage of The system will consist of pipes, swales, and ephemeral water the subdivision. storage areas with biofiltration to infiltrate and attenuate peak surface water flows and provide water quality treatment for the proposed development. 3.9 Developer Contribution Arrangements

Key elements of the system which are reflected in the structure Given that the South Moorlands Local Structure Plan Area is in the plan include: ownership of one developer a voluntary agreement between the developer and the City of Bunbury with the relevant contributions • “Green Link” network (using swales) to optimise overland flow to be implemented through voluntary legal agreements will be paths and the use of the biofiltration areas. prepared. • Use of POS areas for ephemeral stormwater infiltration and detention areas. Adequate provisions may be made through the legal agreement Reference Hyd20 to require the preparation of a Developer Contribution Plan should

South Moorlands Local Structure Plan P a g e | 22

Table 6 Technical Appendices Index

Appendix No. Document Title Nature of Document Referral/approval agency Summary of doc modifications

1 South Moorlands Local Structure Plan Planning City of Bunbury & Western Australian Planning Commission

2 Certificates of Title, Landgate General

3 ‘Wetland Management Plan – Lots 310, 311, 312, 314, 315, Environmental Department of Environment 316 & 317 Vittoria Road, Glen Iris/Moorlands’, Bio Diverse Solutions (February, 2016) 4 ‘South Moorlands Local Water Management Strategy’, Water Management Department of Water MPM Development Consultants (March, 2016) 5 ‘Report of an Aboriginal Heritage Survey of Lots Associated Heritage Department of Aboriginal Affairs with the Glen Iris – Moorlands Structure Plan, Bunbury, Western Australia’, Brad Goode and Associates (February, 2013) 6 ‘Transport Impact Assessment Report’, Donald Veal Transport Main Roads WA, City of Bunbury Consultants (August, 2015) 7 ‘Bushfire Mapping and Assessment’, BioDiverse Solutions Bushfire Department of Fire and Emergency Services (February, 2016) 8 Pre-Lodgement Consultation Summary General

DPDRS-1B Separate Document Appendix DPDRS-2

Schedule of Local Government Corrections and Modifications for Noting – Local Structure Plan South Moorlands

General

Clause/Page Reference Explanation/Issue Modification Various Main Document Spelling /Typo Kaeshagan Street Kaeshagen Street Up-date commentary, figures and tables Not all text, figures and tables have been up-dated to reflect changes introduced upon the Various Main Document throughout the main document and appendices as modified structure plan map submitted 26 July 2016. relevant to ensure consistency. Several of the technical appendices are in draft form and are expected to be revised (e.g. Local Water Management Strategy, Wetlands Management Plan and Traffic Impact Up-date text, figures and tables within the main Various Main Document Assessment). Revisions/relevant commentary from final (but not necessarily approved) document as appropriate to ensure consistency versions should be transferred and accurately reflected within appropriate sections of the with supporting appendices. main document.

Preamble

Clause/Page Reference Explanation/Issue Modification Table of Not populated Table requires up-dating to reflect changes introduced. Up-date as necessary. Modifications

Part 1

Clause/Page Reference Explanation/Issue Modification Figure 3 Page 2 Colouring error Shading extends over a parcel of Residential Zone (adjacent to Parks and Recreation Reserve) Remove shading error. The structure plan map does not accommodate the GBRS designated “Primary Regional Road Vittoria Road Correct mapping and reflect within supporting text Figure 3 Page 2 Reserve” that extends along the southern section of Vittoria Road (leading from the South Reserve and documentation as appropriate. Western Highway / adjacent to Kaeshagen Street junction). Clause/Page Reference Explanation/Issue Modification Supplement the Land Use Notes appearing upon the structure plan map with matters requested to be captured in sections 1.5.4 and 1.5.5 of the Part 1 text (below). Figure 3 Page 2 Land Use Notes Up-date as appropriate. Also include the requirement for an LDP over the Mixed Use Precinct (should this be supported by WAPC and form part of the endorsed structure plan) The existing LWMS, WMP and TIA are recognised as being in draft form and will need to be revised (as ‘final drafts’) - to reflect in part changes already made to the submitted and advertised version of the draft South Moorlands Structure Plan (dSMSP); relevant sections of the main document should then be subsequently up-dated in to ensure consistency with these finalised drafts. Final ‘approved’ versions should be prepared in consultation with the responsible authorising agency, the City of Bunbury, and other government departments with vested interests prior to lodgement of a sub-division application. It is recommended that the existing commentary therefore be replaced/modified as follows: Reports/Strategies Section 1.5.4 “Prior to the lodgement of subdivision applications to the WAPC, the following management to be Required Prior Up-date commentary accordingly. Page 4 plans are to be prepared to the satisfaction of and receive the approval of the relevant to Subdivision authority (in brackets): i) Local Water Management Strategy (Department of Water, in consultation with the City of Bunbury and Department of Parks and Wildlife) ii) Wetland Management Plan (Department of Wildlife, in consultation with the City of Bunbury) iii) Transport Impact Assessment (City of Bunbury) iv) Bushfire Hazard Level Assessment (Fire and Emergency Services) v) Aboriginal Heritage Survey (Department of Aboriginal Affairs) The existing list in this section should be supplemented to satisfactorily capture the following:

Section 1.5.5 Conditions of Sub- ix) Foreshore Management Plan over Lot 200 Kaeshagen Street (Department of Water, in Up-date commentary accordingly. Page 4 Division Approval consultation with relevant other State government agencies and the City of Bunbury). x) Landscaping Plan (Department of Parks and Wildlife and City of Bunbury) xi) Re-vegetation Plan (Department of Parks and Wildlife and City of Bunbury) Clause/Page Reference Explanation/Issue Modification xii) Bushfire Management Plan/BAL Contour Map (Department of Fire and Emergency Services in consultation with the Department of Parks and Wildlife, Department of Water and City of Bunbury) Clarification that the preparation of an Acid Sulfate Soil (ASS) investigation is the logical first Sections 1.7 Acid Sulfate Soils step, with an ASS management plan typically only then required where the ASS investigation Up-date commentary accordingly. Page 6 indicates the presence of potential or actual acid sulfate soils

Part 2

Clause/Page Reference Explanation/Issue Modification Section 2.5 Heritage It is understood that a Section 18 application has been made through DAA (in accordance Page 15 with the Aboriginal Heritage Act 1972) and this has resulted in the confirmation of a heritage significant tree. The confirmed status of this ‘dream tree’ and resulting arrangements for its Up-date commentary accordingly. protection (and any other matters related to the Section 18 application) should be provided within the text of the main document. Include within the text the site identification Section 2.5 It is not clear that the text refers to three individual sites (DAA 4917, DAA 5449 and DAA Heritage numbers for the three Aboriginal heritage sites Page 15 19795). mentioned. Section 2.5 Heritage Lot 200 Kaeshagen Street is included upon the State Heritage Register (Place No.382 – Picton Up-date commentary accordingly. Page 15 Inn Hotel). The heritage significance requires identification and acknowledgement. The residential land zoned R2.5 is situated within the floodplain of the Preston River and faces development constraints that have not been substantially acknowledged or addressed within the main text. Explanation/indication of road linkages and infrastructure provision to Section 3.3 Residential service these lots is also lacking. Given existing floodplain management constraints the Supplement text/figures accordingly. Page 17 feasibility of additional development occurring upon these lots is somewhat questionable and as such their suitability for such zoning needs to be demonstrated – ultimately to the satisfaction of the Department of Water.

Clause 3.8 One of the roundabout connections into the new subdivision connector road (either road A or Staging Plan Include staging plan to reflect this arrangement. Page 20 road B) is to be constructed prior to clearance of the 1st stage of subdivision. A staging plan is required to determine at what stage of development the second access is required (2nd RAB) Clause/Page Reference Explanation/Issue Modification and when other infrastructure upgrades will be required i.e. upgrade of Vittoria Road. Further clarification regarding future arrangements for developer contributions is desirable, List specific infrastructure upgrade requirements Clause 3.9 Developer including a statement advising that the subdivider will be required to provide a pro rata and details in respect to when legal agreements are Page 21 Contributions contribution to up-grading of the intersection of Vittoria Road and required to be in place i.e. prior to subdivision including a roundabout (to be designed and constructed to the satisfaction of MRWA ). application.

Appendices

Section/Page Reference Explanation/Issue Modification Traffic Impact Assessment (TIA) The TIA text, figures and tables have yet to be up-dated to reflect changes introduced upon Up-date commentary throughout document as General All the modified structure plan map submitted 26 July 2016. relevant. The TIA proposes a signalised intersection at the junction of Vittoria Road and Woodley Road however this is does not represent an optimal arrangement. Based on the 'Concept Layout Vittoria Road between Australind Bypass and Picton Road', MRWA comments and the City of Bunbury’s preference, a roundabout shall be installed (by the developer) at the intersection. The City's stance is justified when considering future traffic flow analysis. Modify the proposed road configuration to Table 5.4 provides SIDRA output for ultimate PM Peak Volumes at the intersection of Vittoria incorporate a roundabout at the intersection of General All - Woodley - Road A using traffic signals control. The total vehicle demand in the peak hour Vittoria - Woodley - New Road A. for all approaches to the intersection is 1264, and results in an overall LOS C at the Up-date analysis/subsequent commentary intersection. If compared with table 5.8 (page 28), which details SIDRA output for ultimate throughout document as relevant. PM Peak Volumes at the intersection of Vittoria - Erica - Road B using a roundabout as intersection control, it can be seen that the total vehicle demand in the peak hour is greater than the former (being 1477 vehicles), yet the intersection is estimated to operate at an overall LOS A. Lower degrees of saturation are also witnessed for the roundabout controlled intersection General All Spelling/Typo ‘Moorlands’ Avenue Correct to ‘Moorland’ Avenue. Photo 3.2 Up-date commentary as relevant and aerial photo Existing Road The aerial photo 3.2 showing the intersection of Vittoria Road and Jeffrey Road is out of Section 3.1.1 to reflect current intersection layout (i.e. with a Infrastructure date. Page 8 / 9 roundabout). Section/Page Reference Explanation/Issue Modification

Section 3.1.3 It is unclear how existing and future dwellings obtain access when full development within this area is achieved given that there will only be a pedestrian and cyclist link. It appears that Page 10 Moorland Avenue Further commentary/explanation required. two dwellings within the structure plan area are currently served by the Moorland Ave access. Fig 4.1 details the proposed road network. To reduce traffic speed and associated risks Figure 4.1 Proposed Road indicative local area traffic calming devices locations should be included (or at very least the Section 4.1.1 Revise figure and commentary accordingly. Network - Layout intent to provide them flagged) whilst also having regard to the access needs of public buses, Page 12 waste trucks etc. Roads A, B, C, D and E would be of primary concern. Proposed bin pads for garbage collection appear to show 'dead-end' areas where waste Up-date and revise to ensure that each cul-de-sac Figure 4.1 Proposed Road collection trucks will be forced to perform a reversing manoeuvre to exit the laneway. This is provided with a minimum turning radius for Section 4.1.1 Network - Layout approach should be avoided due to reduced safety of a heavy vehicle reversing / potential waste collection vehicles (or extend laneway Page 12 noise nuisance. sections through to nearest road). Connections to Section 4.2.1 The ultimate intersection construction is to be in the form of a roundabout and not traffic External Road Revise commentary accordingly. Page 17 control signals. Network Vittoria Road, Section 5.5.3.1 The ultimate intersection construction is to be in the form of a roundabout and not traffic Woodley Road, Revise commentary accordingly. Page 21 control signals. Road A Vittoria Road, Section 5.5.3.1 The ultimate intersection construction is to be in the form of a roundabout and not traffic Woodley Road, Revise commentary accordingly. Page 23 control signals. Road A Vittoria Road, Section 5.5.3.1 Provide for the construction of a roundabout by the developer at the Vittoria - Woodley - Woodley Road, Revise commentary accordingly. Page 25 Road intersection. Road A Section 6.2 The City agrees that Figure 6.5 would provide the preferred future bus route. Traffic calming Routes to Bus Stops Supplement commentary accordingly. Page 31 locations are likely on this road and so should be considered and comment provided here. The summary and conclusion should provide comment / recommendations on the following: • Recommendation of a RAB at the intersection of Vittoria - Woodley - Road A Section 8.0 Summary and Supplement commentary accordingly. Page 34 Conclusion • Recommend internal bus stop location based on PTA and CoB preference. • Recommend traffic calming locations • Recommend solution for proposed garbage collection that doesn't require Section/Page Reference Explanation/Issue Modification reversing • Recommend upgrading / reconstruction of Vittoria Road and Kaeshagen in-line with standard practice for subdivisions noting the significant increase in traffic that the development of the LSP area will bring to Vittoria Road in particular Wetlands Management Plan (WMP) The two south eastern wetland areas located within Lot 202 Vittoria Road warrant reference and discussion. Existing and potential hollow bearing trees upon this lot should be mapped (taking Lot 202 Vittoria information from the reported 2014 survey if appropriate) and included within the WMP; Up-date commentary accordingly (and in General Road significant trees should be marked and retained prior to subdivision occurring on site. consultation DPaW and the City of Bunbury). Notwithstanding, any clearing of the black cockatoo habitat trees should be undertaken outside of the Oct-May breeding season and it should also be noted that a “Post Clearing Report” would need to be provided to DPaW within 28 days of any clearing event. Up-date WMP accordingly or alternatively provide supplementary information (prepared in General UFI 1080 The management of ‘UFI 1080’ is not currently addressed. consultation with DPaW and the City of Bunbury) to accompany the final WMP. WMP to express that any fencing (particularly along wetland buffers/edge of roads and Ensure fringe areas of environmentally sensitive areas / habitat are appropriately pathways/edge of ROS) will be addressed and General Fencing/barriers managed/protected. confirmed within Landscaping Plan and Re- vegetation Plans that are to be prepared in consultation with DPaW and the City of Bunbury. General All References to Banksia menziesii should be corrected to Banksia attenuata . Correct commentary as appropriate. References to Department of Conservation or ‘DEC’ need to be up-dated to refer to the General All Correct commentary as appropriate. Department of Water and ‘DoW’ Section 3.7.7 All Spelling / typo: C. callophylla amend to C. calophylla Correct commentary as appropriate. page 19 Section 6.8 Management Modify references to relate to a 4 year Page 42 In the interests of certainty, programs and timeframes should be consistent. Programs ‘management, monitoring, reporting and Section 17 revegetation program’ conducted in accordance Section/Page Reference Explanation/Issue Modification Page 57 with the Landscaping and Revegetation Plans to be prepared in consultation with and approved by Section 18 DPaW and the City of Bunbury. Page 58 Section 19 and 19.1, Page 59 Long Term Table 14 Reference to ‘annual progress reports’ should be included (per commentary found within Management Include reference within Table 14 Section 19.1) Page 55 Considerations Local Water Management Strategy General All The LWMS text, figures and tables have yet to be up-dated to reflect changes introduced Up-date commentary throughout document as upon the modified structure plan map submitted 26 July 2016. relevant. Notwithstanding that this figure needs to be up-dated to reflect revisions subsequently introduced by the proponent, the current information shown depicts high water use public open space (e.g. turf) adjacent to the buffer of the larger wetland.

Figure 4 Installation of turf adjacent to a wetland buffer is not recommended as the expansion of turf into the buffer area may present an ongoing management problem. It is therefore Relevant commentary/amendment to figure 4 to Section 2.2 Landscape Concept recommended that a water-wise garden abut the wetland buffer as is proposed elsewhere be captured within the WMP (and followed through within subsequent Landscaping Plan) Page 16 i.e. a buffer be created between the wetland buffer and any proposed turf areas. If the proponent wishes to progress with the installation of turf adjacent to the wetland buffer as is currently proposed, it is recommended that consideration be given to installing an impervious barrier between the two zones to a sufficient height and depth above/below ground respectively in order to prevent turf encroachment into the wetland buffer. Flush kerbing is proposed to be installed adjacent to all public open space areas and it is therefore assumed that this treatment will be applied along the road directly adjacent to the north western corner of the larger wetland. Standard kerbing or a suitable alternative is Relevant commentary to be captured within the Section 6.5 Ecological preferred in order guard against the discharge of road-based pollutants directly into the WMP (and followed through within subsequent Protection Page 37 wetland without any form of bio-filtration. Consideration may need to be given to installing Landscaping Plan) a kerb in this section or otherwise constructing the road so as to prevent the direct discharge of stormwater from the road into the wetland.

Appendix DPDRS-3

Appendix DPDRS-4 SCHEDULE OF PUBLIC SUBMISSIONS LOCAL DEVELOPMENT PLAN PROPOSED SOUTH MOORLANDS LOCAL STRUCTURE PLAN

No Name & Nature of Submission Proponents Comments upon Planning Services Comments on Submission Submission Address Fiona Snelling We wish to advise that ATCO Gas Australia has 1 Noted Noted Atco Gas Australia High Pressure (DN150ST 1.5HP 1900kPa) gas 81 Prinsep Road mains and gas infrastructure in the immediate JANDAKOT WA 6164 vicinity of the identified Lots predominantly within the surrounding road reserves including Vittoria Road. The High Pressure gas main is within the Vittoria Road road reserve. Medium pressure mains exist in the other surrounding road reserves.

ATCO has no objection to the proposed Structure Plan, please see the attached Figure for your record.

ATCO Gas does request that prior to any future construction works commencing and ground disturbance being finalised, that our gas infrastructure is physically located to ensure ATCO Gas can fully assess the impact of the works in this location. Before any ground disturbing works are to commence within the road reserves, the applicant must arrange to prove, pothole and protect the installed gas infrastructure at this location.

ATCO Gas requires that the applicant agrees to coordinate and meet the cost of initially locating the gas services, and if it is required, the costs of the additional protection or relocation of any ATCO Gas assets in this immediate area. ATCO Gas recommends early consultation with our Engineering Services team during the design stage of the Vittoria Road road widening.

Please find enclosed in this email a copy of the ATCO Gas Australia Additional Information document which must be complied with (please read carefully).

Please ensure the applicants’ and contractors’ acknowledge and adhere to Section 6 High Pressure Gas Infrastructure – Mandatory requirements within the abovementioned document.

Although not indicated in detail on the attached plan it should also be noted that a number of the properties in the vicinity have individual domestic gas services lines installed that will also need to be proved and protected during any roadworks. 2 Paul Davies I refer to your correspondence of 18 April 2016 During the preparation of the Widening of Vittoria Road Reserve Main Roads WA – South West and advise that Main Roads has concerns in Structure Plan the City of Bunbury Noted. The City considers that Region regard to the proposed Structure Plan and were involved in discussions accommodating the up‐grade of PO Box 5010 associated Transport Impact Assessment report regarding the future upgrading and Vittoria Road to a dual carriageway BUNBURY WA 6231 recommendations. widening of Vittoria Road. standard and consequently the The OPUS Report, Concept Layout Vittoria Road The Vittoria Rd design was provided requested 10m increase (in between Australind Bypass and Picton Road 2013 by the City and the necessary sections) of the road reserve is generally refers to traffic volumes on Vittoria widenings resulting from that excess to requirements. Road of up to 20,000 vehicles per day at the review have been shown on the

northern end and 10,000 at the southern end. proposed Structure Plan. The Western Australian Planning Commission has Redesign of the Vittoria Road / Discussions during the preparation previously advised that Vittoria Road would be Woodley Road Intersection of the plan also highlighted the likely to expect future traffic volumes in excess of City’s preference for a controlled Supported. The City considers that a 20,000 vehicles per day which would likely intersection at the four way Vittoria roundabout at this intersection is warrant development of a dual carriageway / Woodley Road intersection. more appropriate and ultimately standard road. more efficient in terms of managing The southern extent of Vittoria Main Roads current traffic forecasts for Vittoria traffic flow. A roundabout is also Road and the whole of the South Road for 2031 suggest traffic demands of 10,000 currently indicated upon the Western Highway (including the to 14,000 vehicles per day at the northern end proposed realigned section through endorsed Glen Iris Structure Plan depending on the extent of commercial Picton) are identified as ‘Primary 2010 (GISP). development proposed and 8,000 vehicles per Regional Roads’ within the Greater day at the southern end. The current road Bunbury Region Scheme. reserve for Vittoria Road is only 20 metres wide in Pro‐rata Developer Contributions MRWA’s request for a pro rata some sections which may not be adequate for towards the up‐grade of the Vittoria contribution for the upgrading of future upgrading requirements. Road and South Western Highway the intersection of Vittoria Road intersection. It is anticipated that a road reserve widening of 10 and South Western Highway must metres may be required in some sections to have regard to the extent of Noted and supported. facilitate future upgrading of Vittoria Road as well subdivision already approved within as requirements for location of services and the Glen Iris/Moorlands precinct pedestrian and cycle paths. It is recommended and the traffic volumes generated that the proposed Structure Plan be modified to by this as well as existing schools include appropriate future road reserve widening and recent commercial activity. for Vittoria Road. Regard should also be had to the current and proposed volumes on The Transport Impact assessment report suggests South Western Highway. that proposed four way intersections will operate adequately at Woodley Road and Erica Entrance Any pro‐rata contribution sought by while traffic volumes along Vittoria Road remain the MRWA should be reflective of at the current levels. It is noted that the City of these considerations. Bunbury, Glen Iris Structure Plan indicates provision of roundabouts at these intersections. The Transport Impact Assessment report suggests that the four way intersection with Woodley Road and Vittoria Road will ultimately be controlled with traffic lights. Main Roads current policy is to require provision of roundabouts at road intersections and will only consider traffic lights if a roundabout is unworkable or inappropriate. Main Roads will not approve traffic lights in this location as the other intersections along Vittoria Road are proposed to be controlled by roundabouts. It is anticipated that the roundabouts will need to be constructed for the proposed four ways intersections when the intersections are created to accommodate the traffic demands along