Irrigated Agriculture Improvement Project: Canal 15 Subproject – Takeo Province Due Diligence Report on Resettlement

Total Page:16

File Type:pdf, Size:1020Kb

Irrigated Agriculture Improvement Project: Canal 15 Subproject – Takeo Province Due Diligence Report on Resettlement Irrigated Agriculture Improvement Project (RRP CAM 51159-002) Due Diligence Report on Resettlement Draft August 2019 Cambodia: Irrigated Agriculture Improvement Project Canal 15 Subproject – Takeo Province Prepared by the Ministry of Water Resources and Meteorology for the Asian Development Bank. CURRENCY EQUIVALENTS (as of 8 August 2019) Currency unit – riel (KR) KR 1.00 = $0.00024 $1.00 = KR 4,090 ABBREVIATIONS ADB – Asian Development Bank AHs – Affected Households DIMDM – Department of Internal Monitoring and Data Management DMS – Detailed Measurement Survey DPs – Displaced Persons EA – Executing Agency FWUC – Farmer Water User Community GDR – General Department of Resettlement GRM – Grievance Redress Mechanism IOL – Inventory of Losses IRC – Inter-ministerial Resettlement Committee IRC-WG – Inter-ministerial Resettlement Committee-Working Group LAR – Land Acquisition and Resettlement LARP – Land Acquisition and Resettlement Plan MEF – Ministry of Economy and Finance MOWRAM – Ministry of Water Resources and Metrology O&M – Operation and Maintenance PDWRAM – Provincial Department of Water Resources and Meteorology PIB – Project Information Booklet PMIC – Project Management and Implementation Consultant PMU – Project Management Unit PRSC – Provincial Resettlement Sub-Committee PRSC-WG – Provincial Resettlement Sub-Committee Working Group RCS – Replacement Cost Study RDDR – Resettlement Due Diligence Report RGC – Royal Government of Cambodia ROW – Right-of-Way RP – Resettlement Plan SES – Socio-Economic Survey TRTA – Transaction Technical Assistance NOTES In this report, "$" refers to United States dollars. This due diligence report on resettlement is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section on ADB’s website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. GLOSSARY Compensation Refers to payment in cash or in kind for an asset or resource that is acquired or affected by the Project at the time the asset needs to be replaced. All compensation is based on the principle of replacement cost, which is the method of valuing assets to replace the loss at current market rates, plus any transaction costs such as administrative charges, taxes, registration and titling costs. Consultation A process that (i) begins early in the project preparation stage and is carried out on an ongoing basis at different stages of the project and land acquisition and involuntary resettlement cycle; (ii) provides timely disclosure of relevant and adequate information in the language that is understandable and readily accessible to affected people; (iii) is undertaken in an atmosphere free of intimidation or coercion with due regard to cultural norms; and (iv) is gender inclusive and responsive, and tailored to the needs of disadvantaged and vulnerable groups; and (v) enables incorporation of all relevant views of affected people and other stakeholders into decision making, such as project design, mitigation measures and implementation issues. Cut-off Date Date established by RGC that establishes the eligibility for receiving compensation and resettlement assistance by the project affected persons. Displaced Person Any person who is physically displaced (relocation, loss of residential land or loss of shelter) and/or economically displaced (loss of land, assets, access to assets, income sources or means of livelihood) as a result of (i) involuntary acquisition of land, or (ii) involuntary restrictions on land use or on access to legally designated parks and protected areas. Economic Refers to loss of land, assets, access to assets, income sources, or Displacement/Economic means of livelihood as a result of (i) involuntary acquisition of land, or (ii) loss involuntary restrictions on land use or on access to legally designated parks and protected areas. Entitlement Resettlement entitlement with respect to a particular eligibility category are the sum total of compensation and other forms of assistance provided to affected persons in the respective eligibility category. Income Refers to re-establishing productive livelihood of the DPs to enable Restoration/Income income generation equal to or, if possible, better than that earned by the support DPs before the resettlement or of pre-project levels. Involuntary Resettlement Refers to when displaced people have no right to refuse land acquisition or restrictions on land use by the state that result in their displacement which occurs when land is acquired through expropriation by invoking the eminent domain power of the state. Land Acquisition Refers to the process whereby individual, household, firm or private institution is compelled by a public agency to alienate all or part of the land it owns or possesses to the ownership and possession of that agency for public purposes in return for compensation at replacement costs. Physical Refers to relocation due to loss of residential land, or loss of shelter and Displacement/Physical /or business as a result of (i) involuntary acquisition of land; or (ii) loss involuntary restrictions on land use or on access to legally designated parks and protected areas. Replacement Cost Replacement cost involves replacing an asset, including land, at a cost prevailing at the time of its acquisition. This includes fair market value, transaction costs, interest accrued, transitional and restoration costs, and any other applicable payments, if any. Depreciation of assets and structures should not be taken into account for replacement cost. Where there are no active market conditions, replacement cost is equivalent to delivered cost of al building materials, labour cost of construction, and any transaction or relocation costs. Replacement Cost Study This refers to the process involved in determining replacement costs of affected land or other assets based on empirical data. Vulnerable groups These are distinct groups of displaced persons who are likely to be more adversely affected than others and who are likely to have limited ability to re-establish their livelihoods or improve their status and comprise of: (i) households living below the national poverty line established by the Royal Government of Cambodia, (ii) female headed households with dependents living below the poverty line, (iii) disabled headed households, (iv) elderly headed households with no other means of support, and (v) indigenous people. CONTENTS EXECUTIVE SUMMARY ........................................................................................................................ 8 I. INTRODUCTION ............................................................................................................................. 1 1. The Irrigated Agriculture Improvement Project ....................................................................... 1 2. Canal 15 Subproject ................................................................................................................ 1 II. FIELD-WORK AND PUBLIC CONSULTATIONS ........................................................................... 3 1. Field-work ................................................................................................................................ 3 2. Public Consultations ................................................................................................................ 3 III. SCOPE OF LAND ACQUISITION AND INVOLUNTARY RESETTLEMENT ................................. 7 1. Impacts on Land ...................................................................................................................... 7 2. Temporary Impacts ................................................................................................................. 9 IV. INFORMATION DISCLOSURE, PARTICIPATION AND CONSULTATION ................................. 11 1. Information Disclosure and Consultation Carried-out ........................................................... 11 2. Consultation and Information Disclosure Plan during Subproject Implementation Process . 14 3. Post-Project Implementation ................................................................................................. 14 4. Information Disclosure .......................................................................................................... 15 V. GRIEVANCE REDRESS MECHANISM ........................................................................................ 15 VI. LEGAL FRAMEWORK, COMPENSATION AND ENTITLEMENT POLICY.................................. 18 1. Objectives .............................................................................................................................. 18 2. The Legal Basis, Compensation and Entitlements ............................................................... 18 VII. INSTITUTIONAL ARRANGEMENTS ............................................................................................ 27 VIII. RESETTLEMENT BUDGET .......................................................................................................... 31 IX. INTERNAL MONITORING AND REPORTING ............................................................................. 32 APPENDICES ..........................................................................................................................................
Recommended publications
  • Cambodia Msme 2/Bee Project Quarterly Report No. 15 (April 1 – June 30, 2012)
    s page left intentionally blank for double-sided printing. CAMBODIA MSME 2/BEE PROJECT QUARTERLY REPORT NO. 15 (APRIL 1 – JUNE 30, 2012) TASK ORDER NO. 04 JULY 31, 2012 JANUARY 31, 2011 This publication was produced for review by the United States Agency for International ThisDevelopment. publication It was was produced prepared for by reviewDAI. by the United States Agency for International Development. It was prepared by DAI. This page left intentionally blank for double-sided printing. USAID Cambodia MSME2/BEE Project Quarterly Report No. 15 Task Order No. 4 Program Title: Strengthening Micro, Small and Medium Enterprises in Cambodia Sponsoring USAID Office: USAID/Cambodia Contract Number: EEM-I-00-07-00009-00/04 Contractor: DAI Date of Publication: July 31, 2012 Author: Cambodia MSME 2/BEE Project The authors’ views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. Contents Introduction ..................................................................................................................... 8 Background ..................................................................................................................... 8 Project Objectives and Approach .................................................................................... 9 Summary of Project Highlights This Quarter ................................................................. 10 Component 1 - Strengthening Value Chains ........................................
    [Show full text]
  • 44321-013: Climate Resilient Rice Commercialization Sector
    Initial Environmental Examination Project Number: 44321-013 November 2019 Cambodia: Climate Resilient Rice Commercialization Sector Development Program Loans 3006/3007/8271-CAM Grants 0349/0350-CAM Prepared by Ministry of Economy and Finance for the Royal Government of Cambodia and the Asian Development Bank. This initial environmental examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. KINGDOM OF CAMBODIA Nation Religion King Ministry of Economy and Finance Climate-Resilient Rice Commercialization Sector Development Program ADB Loans 3006/3007/8271 and Grants 0349/0350-CAM Initial Environmental Examination for Establishment of Paddy Drying and Storage Facility at Phou Poy Rice Mill in Chumnik Village, Anlong Vil Commune, Sangkae District, Battambang Province November 2019 CURRENCY EQUIVALENTS (November 2019) Currency Unit – riel (KR) KR1.00 = $0.00025 $1.00 = KR4, 000 ABBREVIATIONS ADB Asian Development Bank CLAC Commune Land Acquisition Committee DD & CS Detailed Design and Construction Supervision EHS Environmental, Health and Safety EIA Environmental Impact Assessment EMP Environmental Management Plan
    [Show full text]
  • A Future for Cambodia's Children: My Journey to the Villages of Battambang Cerise Fritsch
    Public Interest Law Reporter Volume 13 Article 6 Issue 2 Spring 2008 2008 A Future for Cambodia's Children: My Journey to the Villages of Battambang Cerise Fritsch Follow this and additional works at: http://lawecommons.luc.edu/pilr Part of the Human Rights Law Commons Recommended Citation Cerise Fritsch, A Future for Cambodia's Children: My Journey to the Villages of Battambang, 13 Pub. Interest L. Rptr. 141 (2008). Available at: http://lawecommons.luc.edu/pilr/vol13/iss2/6 This Article is brought to you for free and open access by LAW eCommons. It has been accepted for inclusion in Public Interest Law Reporter by an authorized administrator of LAW eCommons. For more information, please contact [email protected]. Fritsch: A Future for Cambodia's Children: My Journey to the Villages of B No. 2 * Spring 2008 A FUTURE FOR CAMBODIA'S CHILDREN: MY JOURNEY TO THE VILLAGES OF BATTAMBANG by CERISE FRITSCH my knowledge of the school in the United States and M lawsy first affecting year of lawchildren in conflict with the law in Cambodia proved inadequate in preparing me for my journey to the northeastern villages of Cambodia, a country marked by a history of civil war, turmoil and genocide by the Khmer Rouge. In a Battambang Province court room, a 9-year-old boy sat next to his brother, swaying his feet back and forth. He appeared small for his age, his clothes were torn and stained, his bare feet were infected with sores, and his head 141 Published by LAW eCommons, 2008 1 Public Interest Law Reporter, Vol.
    [Show full text]
  • Collaborative Exploration of Capsicum Genetic Resources in Northern Cambodia, 2016
    〔AREIPGR Vol. 33: 207-221, 2017〕 Original Paper Collaborative Exploration of Capsicum Genetic Resources in Northern Cambodia, 2016 Toru SUGITA 1)*, Hiroshi MATSUNAGA 2), Sim THEAVY 3), Sakhan SOPHANY 3) 1) Miyazaki Agricultural Research Institute, Shimonaka 5805, Sadowara, Miyazaki, Miyazaki 880- 0212, Japan 2) Institute of Vegetable and Floriculture Science, NARO, Kusawa 360, Ano, Tsu, Mie 514-2392, Japan 3) Cambodian Agricultural Research and Development Institute, National Road 3, Prateahlang, Dangkor, P.O. Box 01, Phnom Penh, Cambodia *Present affiliation: Faculty of Environmental and Horticultural Science, Minami Kyushu University, Tateno 3764-1, Miyakonojyo, Miyazaki 885-0035, Japan Communicated by K. EBANA (Genetic Resources Center, NARO) Received May 7, 2017, Accepted Jan. 20, 2018 Corresponding author: H. MATSUNAGA (e-mail: [email protected]) Summary The National Agriculture and Food Research Organization (NARO) and the Cambodian Agricultural Research and Development Institute (CARDI) have collaborated under the Plant Genetic Resources in Asia project to survey the vegetable genetic resources available in Cambodia, since 2014. As part of this project, two field surveys of solanaceous crops were conducted in November 2014 and 2015 in western and eastern Cambodia, respectively. In November 2016, we conducted a third field survey in northern Cambodia, in Kampong Thom, Siem Reap, Oddar Meanchey, and Preah Vihear provinces. We collected 46 chili pepper fruit samples from markets and farmer yards, including 13 Capsicum annuum and 33 Capsicum frutescens fruits. Harvested seeds were evenly transferred to the CARDI and the NARO gene banks. KEY WORDS: Capsicum annuum, Capsicum frutescens, chili pepper, genetic resources, Cambodia Introduction There are abundant vegetable genetic resources available in Southeast Asia, many of them within Solanaceae (Yamamoto and Nawata 2005; Matsunaga et al.
    [Show full text]
  • Fish Price Monitoring in Kandal, Prey Veng and Takeo Provinces of Cambodia
    Fish Price Monitoring in Kandal, Prey Veng and Takeo Provinces of Cambodia by 1 1 2 Ker Naret , Sem Viryak and Don Griffiths 1. Fishery Officer, Department of Fisheries, and Counterpart of the MRC/DoF/Danida Fisheries Project in Cambodia 2. Chief Technical Advisor, MRC - Rural Extension for Aquaculture Development Project ABSTRACT Fish marketing data are vital for any aquaculture development project because it influences potential supply, demand and distribution channels of fish. The Rural Extension for Aquaculture Development (READ) Cambodian Sub-Component monitored fish prices eight times per month throughout 1999, in representative markets in Kandal, Prey Veng and Takeo provinces in Cambodia. A total of 90 fish dealers (30 per province) were also interviewed. Results showed that River Catfish (Pangasianodon hypophthalmus), Snakeheads (Channa spp.) and Walking Catfish (Clarias spp.) were the major cultured fish by weight in all markets on sampling days. The quantities of cultured fish traded in Prey Veng markets was less than for Kandal and Takeo markets. In Kandal 38% of fish traded was cultured. Snakeheads (Channa spp.), Goonch (Bagarius bagarius), Climbing Perch (Anabas testudineus), Catfish (Mystus spp. and Clarias spp.), Silver Barb (Barbodes gonionotus) and Riel (Henicorhynchus spp.) were the major wild fish species found in each province. Wild fish prices were generally highest from June to August and lowest from December to February. Mackerel (Scomber spp.) was the only marine fish species in the markets of each province. There were greater quantities of Mackerel in Kandal and Takeo than in Prey Veng province, and Mackerel was available year round in Kandal market. The main fish supply channels were through Saang district in Kandal province; Angkor Borei, Bourei Cholsar and Kaoh Andaet districts in Takeo province, and Kampong Leav district in Prey Veng province.
    [Show full text]
  • No. 5 TRANSPORTATION SWING TYPE MACHINE
    Cambodian Mine Action Centre (CMAC) Page 103 of 168 PROJECT FOR RESEARCH AND DEVELOPMENT OF DEMINING RELATED EQUIPMENT IN CAMBODIA No. 5 TRANSPORTATION SWING TYPE MACHINE FINAL REPORT – YAMANASHI HITACHI SWING TYPE DEMINING MACHINE Cambodian Mine Action Centre (CMAC) Page 104 of 168 15. TRANSPORTATION OF THE MACHINE DURING TEST With lack of CMAC transport vehicle big enough to move demining machine from port to the test field and via versa, Transido which is a private transportation company, had been hired to provide this services under close cooperation with CMAC. During transportation, transido took care of transport, safety and insurance while CMAC would conduct the offload and reload the machine to/from truck trailer or to/from ship at international Sihanouk ville port. Road assessment and route selection prior to transportation will be done by CMAC and transido. Transport compahy address: TRANNSINDO JAPAN CAMBODIA CO., LTD. #29, MAO TSE TOUNG STREET, PHNOM PENH, CAMBODIA TEL: +855.23.217061 FAX: +855.23.216524 The selection of the transport route is primary related to total gross weight of the machine (in combination with truck trailer) and the condition of road particularly the condition of the bridge. To open access road to the test site at Siem Reap, a poor, weak wooden bridge was dismantle and a new concrete bridge strong enough to support the gross weight of the demining machines was constructed. In other area, steel plates had been temporary laid on top of the existing pipe culvert to strengthen the structure and potholes had been refilled by earth/rock or leveled by CMAC bulldozer.
    [Show full text]
  • Land Transactions in Rural Cambodia a Synthesis of Findings from Research on Appropriation and Derived Rights to Land
    Études et Travaux en ligne no 18 Pel Sokha, Pierre-Yves Le Meur, Sam Vitou, Laing Lan, Pel Setha, Hay Leakhena & Im Sothy Land Transactions in Rural Cambodia A Synthesis of Findings from Research on Appropriation and Derived Rights to Land LES ÉDITIONS DU GRET Land Transactions in Rural Cambodia Document Reference Pel Sokha, Pierre-Yves Le Meur, Sam Vitou, Laing Lan, Pel Setha, Hay Leakhen & Im Sothy, 2008, Land Transactions in Rural Cambodia : A synthesis of Findings from Research on Appropriation and Derived Rights to Land, Coll. Études et Travaux, série en ligne n°18, Éditions du Gret, www.gret.org, May 2008, 249 p. Authors: Pel Sokha, Pierre-Yves Le Meur, Sam Vitou, Laing Lan, Pel Setha, Hay Leakhen & Im Sothy Subject Area(s): Land Transactions Geographic Zone(s): Cambodia Keywords: Rights to Land, Rural Development, Land Transaction, Land Policy Online Publication: May 2008 Cover Layout: Hélène Gay Études et Travaux Online collection This collection brings together papers that present the work of GRET staff (research programme results, project analysis documents, thematic studies, discussion papers, etc.). These documents are placed online and can be downloaded for free from GRET’s website (“online resources” section): www.gret.org They are also sold in printed format by GRET’s bookstore (“publications” section). Contact: Éditions du Gret, [email protected] Gret - Collection Études et Travaux - Série en ligne n° 18 1 Land Transactions in Rural Cambodia Contents Acknowledgements..................................................................................................................................
    [Show full text]
  • World Bank Document
    Royal Government of Cambodia Public Disclosure Authorized Asian Development Bank World Bank Inter-Ministerial Resettlement Committee Ministry of Economy and Finance Ministry of Industry Mines and Energy Loan No. 2052-CAM (SF) POWER DISTIRBUTION Public Disclosure Authorized AND GREATER MEKONG SUBREGION TRANSMISSION PROJECT Credit Number 3840-KH Rural Electrification and Transmission Project RESETTLEMENT ACTION PLAN Public Disclosure Authorized Final Version Public Disclosure Authorized January 2005 Inter-Ministerial Resettlement Committee Resettlement Resettlement Unit Action Plan Final Version January 2005 POWER DISTRIBUTION AND GREATER MEKONG SUBREGION TRANSMISSION PROJECT RESETTLEMENT ACTION PLAN FINAL VERSION January 2005 Inter-Ministerial Resettlement Committee Resettlement Resettlement Unit Action Plan Final Version January 2005 CONTENTS Abbreviations, Acronyms etc iv Definition of Terms vi Executive Summary vii 1 INTRODUCTION 1 2 SCOPE OF LAND ACQUISITION AND RESETTLEMENT 3 2.1 Project Description 3 2.1.1 Design Criteria COI Easements and WWP and TSS Substations 3 2.2 Proposed Transmission Line Route 6 2.2.1 Land Use 6 2.2.2 Administrative Areas 8 2.3 Route Selection 12 2.3.1 Engineering Survey - Use of GPS 12 2.3.2 Social Survey - Use of GPS for Field Work and Development of GIS Database 12 2.3.3 Route Selection 13 2.3.4 Connection Point in Phnom Penh 14 2.3.5 Northern Section: Phnom Penh to Takeo Town 14 2.3.6 Southern Section: Takeo Town to Vietnam Border 15 2.4 Project Impacts 16 2.4.1 Land Acquisition 16 2.4.2 Temporary Effects
    [Show full text]
  • Poverty and Socioeconomic Condition
    Uplands Irrigation and Water Resources Management Sector Project (RRP CAM 44328) POVERTY AND SOCIOECONOMIC CONDITION A. Introduction 1. This report presents the socioeconomic and poverty situation in the project areas of the Uplands Irrigation and Water Resources Management Sector Project in Cambodia. The project areas are located in the provinces of Battambang and Kampong Thom. The proposed project is planned to enhance agricultural and rural economic productivity through increased efficiency of irrigation systems and improved management of water resources. It will be implemented in two irrigation schemes, namely, Prek Chik Irrigation Scheme located in Battambang Province and Taing Krasaing Irrigation Scheme located in Kampong Thom Province. The social and poverty assessment of the project examines the socioeconomic conditions in the project areas and identifies the population that will be impacted. It identifies the existing irrigation and agriculture situation in relation to poverty condition of the existing population within the proposed irrigation schemes. It presents the poverty situation in terms of the poverty rate and identifies the vulnerable population which may be impacted by the project. B. Development Scenario and Socioeconomic Development Policies and Plans 2. Over the last decade, Cambodia has been experiencing economic development with a growth rate of 10.2% for the period of 2004–2008. Though the gross domestic product (GDP) decreased to 0.1 in 2009, it recovered in 2010 and 2011 with a growth rate of 6.0%. Agriculture, fisheries and forestry have shown tremendous growth in 2005 with 15.7% compared to other sectors such as industry with 12.7% and services with 13.1%.
    [Show full text]
  • Trip-Report-Cambodia-G-Jonson.Pdf
    Feed the Future: Innovation Lab for Integrated Pest Management Trip Report Country(s) Visited: Cambodia Dates of Travel: Sept 12 to 17, 2016 Travelers’ Names and Affiliations: Gilda Jonson (GJ), Senior Associate Scientist, Genetics and Biotechnology Division, International Rice Research Institute (IRRI), Philippines Parameas Kong (PK), Research Assistant, Plant Protection Office, Cambodia Agriculture Research and Development Institute (CARDI). Purpose of Trip: To examine the distribution of rice viral diseases in provinces located east of Phnom Penh to Cambodia - Vietnam border, and To assess the facilities for identification of rice virus diseases in CARDI and other institutes in Cambodia. Sites Visited: GJ and PK visited four provinces, Takeo, Kampong Cham, Prey Veng, and Svay Rieng (Fig. 1), and collected rice leaves suspected to be infected with viruses. Rice leaves were collected from a total of 14 sites in the four provinces (Fig.1). Two districts in an opposite direction (southern and northern part) per province were selected so that the sampling sites represent the entire province. Fig 1. Location of four provinces surveyed for rice viral diseases. 1 Methods: Leaf samples were collected in one to two sites per district (Table 1). At a site, leaf samples were collected from 20 plants that were suspected to be infected with viruses. All collected leaves were brought to IRRI, Philippines and tested for the presence of Rice tungro bacilliform virus (RTBV), Rice tungro spherical virus (RTSV), Rice grassy stunt virus (RGSV), Rice ragged stunt virus (RRSV) by enzyme-linked immunosorbent assays (ELISA) using antibodies specific to the respective viruses. Examination of leaves for the infection with rice orange leaf phytoplasma (ROLP) was done by a polymerase chain reaction (PCR) using DNA oligonucleotides specific to the ROLP genome.
    [Show full text]
  • List of Interviewees
    mCÄmNÐlÉkßrkm<úCa DOCUMENTATION CENTER OF CAMBODIA Phnom Penh, Cambodia LIST OF POTENTIAL INFORMANTS FROM MAPPING PROJECT 1995-2003 Banteay Meanchey: No. Name of informant Sex Age Address Year 1 Nut Vinh nut vij Male 61 Banteay Meanchey province, Mongkol Borei district 1997 2 Ol Vus Gul vus Male 40 Banteay Meanchey province, Mongkol Borei district 1997 3 Um Phorn G‘¿u Pn Male 50 Banteay Meanchey province, Mongkol Borei district 1997 4 Tol Phorn tul Pn ? 53 Banteay Meanchey province, Mongkol Borei district 1997 5 Khuon Say XYn say Male 58 Banteay Meanchey province, Mongkol Borei district 1997 6 Sroep Thlang Rswb føag Male 60 Banteay Meanchey province, Mongkol Borei district 1997 7 Kung Loeu Kg; elO Male ? Banteay Meanchey province, Phnom Srok district 1998 8 Chhum Ruom QuM rYm Male ? Banteay Meanchey province, Phnom Srok district 1998 9 Than fn Female ? Banteay Meanchey province, Phnom Srok district 1998 Documentation Center of Cambodia Searching for the Truth EsVgrkKrBit edIm, IK rcg©M nig yutþiFm‘’ DC-Cam 66 Preah Sihanouk Blvd. P.O.Box 1110 Phnom Penh Cambodia Tel: (855-23) 211-875 Fax: (855-23) 210-358 [email protected] www.dccam.org 10 Tann Minh tan; mij Male ? Banteay Meanchey province, Phnom Srok district 1998 11 Tatt Chhoeum tat; eQOm Male ? Banteay Meanchey province, Phnom Srok district 1998 12 Tum Soeun TMu esOn Male 45 Banteay Meanchey province, Preah Net Preah district 1997 13 Thlang Thong føag fug Male 49 Banteay Meanchey province, Preah Net Preah district 1997 14 San Mean san man Male 68 Banteay Meanchey province,
    [Show full text]
  • Address of ACLEDA Bank Plc. 
    Address of ACLEDA Bank Plc. NO. OFFICE NAME OFFICE TYPE ADDRESS TEL / FAX / E-MAIL VARIATION 1 HEADQUARTERS HQ (OPD) #61, Preah Monivong Blvd., Sangkat Srah Chork, Tel: (855) 23 430 999 / 998 777 (OPERATION DIVISION) Khan Daun Penh, Phnom Penh. Fax: (855) 23 430 555 / 998 666 P.O. Box: 1149 E-mail: [email protected] Website: www.acledabank.com.kh SWIFT Code: ACLBKHPP For Customer Inquiry Call: Tel: (855) 23 994 444 (855) 15 999 233 E-mail: [email protected] OPERATION DIVISION Tel: (855) 23 998 357 Fax: (855) 15 900 444 E-mail: [email protected] 2 SIEM REAP PB #1,2,3 & 4 , Sivatha Street, Phum Mondul 2 , Tel: (855) 63 963 251 / 660 Sangkat Svay Dangkum, Krong Siem Reap, (855) 15 900 396 Siem Reap Province. Fax: (855) 63 963 280 / 63 966 070 P.O. Box: 1149 E-mail: [email protected] Website: www.acledabank.com.kh SWIFT Code: ACLBKHPP 3 BANTEAY SREI DISTRICT DBC Group 5, Banteay Srei Village, Khnar Sanday Commune, Tel: (855) 15 900 164 BRANCH-KHNAR SANDAY Banteay Srei District, Siem Reap Province. Fax: (855) 63 963 280 / 63 966 070 E-mail: [email protected] COMMUNE 4 BANTEAY SREI DISTRICT DBC Group 10, Preah Dak Village, Preah Dak Commune, Tel: (855) 15 600 246 BRANCH-PREAH DAK COMMUNE Banteay Srei District, Siem Reap Province. Fax: (855) 63 963 280 / 63 966 070 E-mail: [email protected] 5 BANTEAY MEANCHEY PB Group 3, Kourothan Village, Sangkat Ou Ambel, Tel: (855) 54 958 821 / 958 634 / 958 541 Krong Serei Saophoan, Banteay Meanchey Province.
    [Show full text]