Southern Highways Program 2012-2016
MMinistryinistry of Tran sofpor tTransportationation TABLE OF CONTENTS
Introduction...... 3
Section ONE Expansion Projects 2012-2016...... 5
Section TWO Rehabilitation Projects 2012-2016...... 10
Section THREE Projects Beyond 2016...... 40
Section FOUR 2011 Completed Projects...... 45
Southern Highways Program 2012-2016 Page 2 INTRODUCTION Creating Jobs and Building a Stronger Ontario
In 2012/13, the Ontario government will be investing $2.4 billion to repair and expand provincial highways and bridges.
This includes $1.87 billion for southern Ontario, creating more than 18,500 direct and indirect jobs. Improving Ontario's transportation network is part of the government’s plan to strengthen the economy. Key highway investments planned between 2012 and 2016 include:
• constructing the Windsor Essex Parkway
• extending Highway 407 easterly
• widening Highway 401 express and collector lanes between the
Highway 401/403/410 interchange and Hurontario Street in
Mississauga
• building a new interchange at Highway 6 (Hanlon Expressway)
and Laird Road in Guelph
• widening Highway 417 from Nicholas Street to Ottawa
Road 174 in Ottawa
2012 Planned Accomplishments Southern Ontario
New highway 102km
New bridges 5
Highway rehabilitated 410km
Bridges rehabilitated 79
Southern Highways Program 2012-2016 Page 3 QUICK FACTS
• Ontario has 16,600 kilometres of provincial highway and 2,756 bridges.
• Ontario uses new technology and greener construction practices whenever possible, such as recycling existing pavement and using recycled and shredded tires for bridge embankment fill.
Southern Highways Program 2012-2016 Page 4 ONE EXPANSION PROJECTS 2012-2016
ONE Expansion 2012-2016
Southern Highways Program 2012-2016 Page 5 EXPANSION PROJECTS 2012-2016 ONE
Widening Highway 7/8 through Kitchener
Construction crews have begun widening
Highway 7/8 from four to six lanes between
Fischer-Hallman Road and Courtland
Avenue in west Kitchener. Expanding the highway for 6.5 km will ease congestion during rush hour as commuters head to and from west Kitchener neighbourhoods.
Eleven bridges will be widened and repaired, and a new concrete median barrier will be built to separate eastbound and westbound lanes, keeping traffic flowing efficiently and safely. The work begins this year with repairs to the Fischer-Hallman Bridge.
Work will move east in subsequent years, finishing in 2015.
Page 6 Southern Highways Program 2012-2016 ONE ONE EXPANSION PROJECTS 2012-2016
Southern Expansion 2012-2016
Southern Highways Program 2012-2016 Page 7 EXPANSION PROJECTS 2012-2016 ONE
Southern Expansion 2012-2016
Target Map Completion # Region Hwy Location Type of Work Date Leamington to Windsor, Phase 2, Essex County Rd. 1 WR 3 Two to five-lane widening 2012 11 to west junction Essex County Rd. 34
2 WR 6 Hanlon Expressway, Laird Rd., Guelph New interchange 2013
Beyond 3 WR 7N Kitchener to Guelph New four-lane highway 2016
4 CR 7 Brock Rd., Pickering to Hwy 12, Durham, FLOW Two to four-lane widening 2013
5 WR 7 & 8 Fischer-Hallman Rd. to Courtland Ave., Kitchener Four to six-lane widening 2015
Kitchener Waterloo Expressway, Grand River to Four to six and four to eight- 6 WR 8 2012 Highway 401, Build Canada Fund (BCF)* lane widening / resurfacing
Arnprior By-Pass, Phase 1, Regional Rd. 29 to 7 ER 17 Two to four-lane widening 2012 Division St.
Wasaga to Collingwood, Sixth line to existing Hwy 8 CR 26N New four- lane highway 2012 26, Phase 3A, Simcoe
Two to four and five-lane 9 ER 62 Hwy 401 to Foxboro, Belleville 2014 widening
10 CR 401 Hwy 410 to Hurontario St., Peel New interchange / widening 2013
Bridge replacement / Hwy 15 to Frontenac Cty. Rd. 38 - Phase 4 - 11 ER 401 widening / interchange 2015 Montreal St. and CNR overheads, Kingston improvements
Hwy 15 to Frontenac County Rd. 38, Phase 2, west 12 ER 401 Four to six-lane widening 2012 of Sydenham Rd. to west of Montreal St., Kingston
Colonel Talbot Rd. to Veterans Memorial Parkway, New interchange / 13 WR 401 London including Wonderland Road and Veterans 2016 interchange improvements Memorial Pkwy
New six-lane below grade 401 Hwy 401 and Hwy 3 through Tecumseh, LaSalle 14 WR freeway / new four-lane at- 2015 & 3 and Windsor grade service Rd. network
Bluewater Bridge to east of Murphy Rd., Sarnia Two to four westbound-lane 15 WR 402 2014 (BIF)* widening
Oak Park Interchange, Brantford (Parnership with Interchange improvements / 16 WR 403 2013 Brantford) bridge rehabilitation
Page 8 Southern Highways Program 2012-2016 ONE ONE EXPANSION PROJECTS 2012-2016
Southern Expansion 2012-2016
p Target Map Completion # Region Hwy Location Type of Work Date Queensville Side Rd. to Ravenshoe Rd., York, 17 CR 404 New four- lane highway 2014 Phase 4 of 4 (FLOW)
Green Lane to Queensville Side Rd., York, Phase 18 CR 404 New four- lane highway 2014 3 of 4 (FLOW)
19 CR 406 Port Robinson Rd. to Main St., Niagara Two to four-lane widening 2015
New 10km 6-lane highway, 12km 4-lane Brock Rd. to Harmony Rd. including a connection 20 CR 407E highway and 10km 4-lane 2015 to Hwy 401 east of Lake Ridge Rd (Phase 1) freeway to freeway connection
Four to eight and four to 21 ER 417 Eagleson Rd. to Hwy 7, Ottawa (HOV)* 2014 six-lane widening
417 - Hwy 416 to Anderson Rd., Phase 3D, Carling Ave. Bridge replacements / 22 ER 2013 OQW westbound and Kirkwood Ave. bridges, Ottawa widening
417 - Hwy 416 to Anderson Rd., Phase 4B, Cyrville Rd. 23 ER Bridge replacement 2012 OQW bridge, Ottawa
Six to eight-lane widening 417 - Hwy 416 to Anderson Rd., Phase 5, Nicholas St. 24 ER / bridge replacements / 2015 OQW to Ottawa Rd. 174, Ottawa rehabilitation / widenings
Note: Project timing is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
* BCF: Building Canada Fund, BIF: Border Infrastructure Fund, HOV: High Occupancy Vehicle, ISF: Infrastructure Stimulus Fund.
Southern Highways Program 2012-2016 Page 9 REHABILITATION PROJECTS 2012-2016 TWO
TWO Rehabilitation 2012-2016
Page 10 Southern Highways Program 2012-2016 TWO TWO REHABILITATION PROJECTS 2012-2016
Highway 401 in Toronto Gets a Facelift
Highway 401 between Avenue Road and
Bayview Avenue in Toronto carries about
400,000 vehicles per day. All express lanes,
east and west bound, and six bridges are
currently undergoing major rehabilitation.
The six bridges include the Hogg’s Hollow
Bridge and the Yonge Street overpass.
When repairs are complete, drivers will
notice new pavement and see updated
illumination, a new median and noise
barriers.
This project is one of several projects along
Highway 401 through Toronto and is part
of the Ministry of Transportation’s strategic
rehabilitation program for Highway 401
between Renforth Drive and Warden
Avenue.
Southern Highways Program 2012-2016 Page 11 REHABILITATION PROJECTS 2012-2016 TWO
Central 2012
Page 12 Southern Highways Program 2012-2016 TWO TWO REHABILITATION PROJECTS 2012-2016
Central 2012
Target Project Map Completion Length # Hwy Status Location Type of Work Date (km)
1 QEW Underway Bertie St., Niagara Bridge rehabilitation 2012 n/a
2 QEW Underway Credit River, Peel Bridge rehabilitation 2012 n/a
3 QEW Underway Glover Rd., Fifty Rd., Millen Rd., Hamilton Bridge rehabilitation 2012 n/a
Burlington Bay Skyway, Toronto-bound, 4 QEW Underway Bridge rehabilitation 2012 n/a Burlington/Hamilton
0.3 km east of Victoria Ave. to 1.5 km east 5 QEW New Resurfacing 2012 17.0 of Casablanca Blvd., Toronto-bound, Niagara
6 QEW New Hwy 420 to Lyons Creek Rd., Niagara Resurfacing 2012 9.0
Central Ave. to 0.5 km south of Gilmore Rd., 7 QEW New Resurfacing 2012 4.0 Niagara
QEW/ 8 Underway Thompson Rd. and Chestnut St., Niagara Bridge rehabilitations 2012 n/a 406
4th Line and Coles Crt. intersections in Intersection 9 7 New 2012 n/a Acton, Halton improvements
Intersection 10 8 New Hwy 5/8, Peters Corners, Hamilton 2013 n/a improvements
11 11 New Memorial Ave. to Laclie St., Simcoe Resurfacing 2012 8.0
12 11 New Severn River bridge at Severn Bridge Bridge rehabilitation 2012 n/a
Resurfacing / bridge 13 11 New Gull Lake bridges, north of Gravenhurst 2014 n/a rehabilitation
South Muskoka River bridge, south of 14 11 New Bridge rehabilitation 2012 n/a Bracebridge
15 11 New 4.7 km north of Muskoka Rd. 117 Culvert replacement 2012 0.2
16 11 Underway Vernon Lake, northbound lane, Huntsville Bridge rehabilitation 2012 n/a
17 12 Underway Simcoe Rd. 37 to Hwy 93, Simcoe Resurfacing 2012 3.5
18 12 New CNR overhead in Midland, Simcoe Bridge replacement 2013 n/a
Southern Highways Program 2012-2016 Page 13 REHABILITATION PROJECTS 2012-2016 TWO
Central 2012
Target Project Map Completion Length # Hwy Status Location Type of Work Date (km) Atherley Rd. to south junction of Hwy 19 12 New Resurfacing 2012 5.6 11/12, Simcoe
Nottawasaga River to Stayner east 20 26 New Resurfacing 2012 15.6 limits, Simcoe
21 35 New Hwy 118 northerly, Carnarvon Resurfacing 2012 7.9
22 35 New North of Haliburton Rd. 13, Halls Lake Culvert rehabilitation 2012 n/a
Bridge rehabilitations and 23 35/115 Underway Newcastle and CPR bridge, Durham 2012 n/a commuter parking lot
24 48 New Herald Rd., York Signal installation 2012 n/a
Thorold Stone Rd. to Hwy 406, 25 58 New Resurfacing 2013 4.0 Niagara
Oxtongue Lake Narrows bridge, east 26 60 New Bridge replacement 2013 n/a of Hwy 35
Waverley Rd. to north of Hillsdale, Truck climbing lane / 27 93 Underway 2012 1.6 Simcoe traffic signals
West of Hwy 11 westerly, Ullswater 28 141 New Resurfacing 2012 19.8 easterly
Hwy 11 to Hwy 93, northbound and Resurfacing / bridge 29 400 Underway 2013 16.2 southbound lanes, Simcoe rehabilitations
30 400 New Hwy 93 to Simcoe Rd. 19, Simcoe Resurfacing 2014 15.7
1 km south of Major Mackenzie Dr. to 31 400 New 2.3 km north of King Rd., southbound Resurfacing 2012 7.8 lanes, York Hogg’s Hollow, eastbound and 32 401 Underway Bridge rehabilitation 2013 n/a westbound express lanes, Toronto
Jane St. to Kipling Ave., westbound Reconstruction / bridge 33 401 Underway 2013 5.9 collector lanes, Toronto rehabilitation
34 401 Underway Keele St., Toronto Bridge replacement 2013 n/a
35 401 Underway Warden Ave., Toronto Bridge rehabilitation 2013 n/a
Page 14 Southern Highways Program 2012-2016 TWO TWO REHABILITATION PROJECTS 2012-2016
Central 2012
Target Project Map Completion Length # Hwy Status Location Type of Work Date (km) Mill St., Morgans Corners, and Holt Rd., 36 401 New Bridge rehabilitations 2013 n/a Durham
37 401 New Allen Rd. interchange, Toronto Bridge rehabilitations 2012 n/a
38 401 New Bloor St., Durham Bridge rehabilitation 2012 n/a
Noise barrier 39 401 New Noise barrier walls in Oshawa, Durham 2013 n/a replacement
40 403 Underway Various locations, Hamilton Bridge rehabilitation 2012 n/a
Central Parkway to Hwy 401/410 41 403 New Resurfacing 2012 2.8 interchange, eastbound collector lanes, Peel
Burnhamthorpe Rd., Eglinton Ave., 42 403 New Bridge rehabilitations 2013 n/a Mississauga Rd., Peel
King Rd., Waterdown Rd., Lemonville Rd., 43 403 New Bridge rehabilitations 2013 n/a Snake Rd., Halton and Hamilton
Geneva St. to south of Beaverdams Rd., 44 406 New Resurfacing 2013 9.0 Niagara
QEW to Hwy 401, southbound collector Reconstruction / 45 427 Underway 2013 7.3 lanes, Toronto bridge rehabilitations
QEW to Hwy 401, northbound collector Reconstruction / 46 427 Underway 2014 7.3 lanes, Toronto bridge rehabilitations
Overhead sign 401/427 Underway Various locations 2012 n/a structures
Various New Various locations Bridge rehabilitations 2012 n/a
Various New Various locations Resurfacing 2012 n/a
Overhead sign Various New Various locations within GTA, Phase 1 of 2 2013 n/a structures
Note: Project timing is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
Southern Highways Program 2012-2016 Page 15 REHABILITATION PROJECTS 2012-2016 TWO
Central 2013
Page 16 Southern Highways Program 2012-2016 TWO TWO REHABILITATION PROJECTS 2012-2016
Central 2013
Target Project Map Completion Length # Hwy Status Location Type of Work Date (km)
1 QEW New Beck Rd., Niagara Bridge rehabilitation 2013 n/a
2 QEW New Gilmore Rd., Niagara Bridge rehabilitation 2013 n/a
3 QEW New Grays Rd., Fruitland Rd., Winona Rd., Hamilton Bridge rehabilitations 2014 n/a
Operational 4 QEW New Westbound lanes near Brant St., Halton 2013 1.1 improvements
5 5 New Spencer Creek, Hamilton Bridge replacement 2013 n/a
6 11 New CNR and CPR overhead, north of Orillia, Simcoe Bridge replacements 2014 n/a
7 12 New Sturgeon River, Simcoe Bridge replacement 2014 n/a
8 26 New Wilson Dr., Simcoe Traffic signals 2013 n/a
Jane St. to Avenue Rd., eastbound collector Reconstruction / 9 401 New 2017 7.4 lanes, Toronto bridge rehabilitations
10 401 New Hope Townline Rd. and Cobbledick Rd., Durham Bridge replacements 2014 n/a
11 58/140 New Fork’s Rd., CNR and CPR bridges, Niagara Bridge replacements 2015 n/a
Richmond St., Pine St., Queen St., Glendale 12 58/406 New Bridge rehabilitations 2014 n/a Ave., Beaverdams Rd., Niagara Resurfacing / bridge York / Simcoe boundary to Essa Rd., Simcoe, 13 400 New rehabilitations / 2015 32.0 Phase 1 of 2 median barrier
14 400 New Hwy 400 / 401 interchange, Toronto Bridge rehabilitations 2015 n/a
15 400 New Crown Hill, Simcoe Bridge replacement 2014 n/a
Resurfacing / culvert 16 400 New North of Muskoka Rd. 5 northerly, Port Severn 2013 10.9 rehabilitation
Hwy 2, Hamilton Dr., Fiddler’s Green, Southcote 17 403 New Bridge rehabilitations 2014 n/a Rd., Golf Links Rd., Mohawk Rd., Hamilton
1 km west of Hwy 6 to 1 km west of Aberdeen 18 403 New Resurfacing 2013 5.0 Ave., Hamilton
Southern Highways Program 2012-2016 Page 17 REHABILITATION PROJECTS 2012-2016 TWO
Central 2013
Target Project Completion Length Map # Hwy Status Location Type of Work Date (km)
Various New Various locations Bridge rehabilitations 2013 n/a
Various New Various locations Resurfacing 2013 n/a
Note: Project timing is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
Page 18 Southern Highways Program 2012-2016 TWO TWO REHABILITATION PROJECTS 2012-2016
Central 2014-2016
Project Length Hwy Location Type of Work (km)
6 York Blvd. Hamilton Bridge rehabilitation n/a
8 Hwy 5 to west of Safari Rd., Hamilton Resurfacing 13.5
9 Holland Canal, York Bridge replacement n/a
11 CNR Bridge near Washago, Simcoe Bridge rehabilitation n/a
11 Hawk Rock Creek, Kashe River, south of Gravenhurst Culvert rehabilitation n/a
11 Muskoka Road 44 northerly, south of Huntsville Resurfacing 9.6
11 Stephenson Rd. 12 northerly Preventive resurfacing 5.1
12 Simcoe Rd. 37 to Hwy 400, Simcoe Resurfacing 12.5
35 Halls Lake Culvert, north of Hwy118, Hall's Lake Culvert rehabilitation n/a
69 Structures, south of Muskoka Road 169, Foot's Bay Bridge rehabilitation n/a
89 Hwy 400 to Essa Township 8th Line, Simcoe Resurfacing 7.6
89 Innisfil Creek Bridge, Simcoe Bridge replacement n/a
118 Anson Creek and Black River Bridgess, west of Hwy 35 Bridge rehabilitation n/a
141 Rosseau River Bridge, east of Hwy 632, Rosseau Bridge rehabilitation n/a
400 South of Crooked Bay Road northerly, Crooked Bay Resurfacing 8.9
400 North Simcoe County Rd. 23, Simcoe Bridge rehabilitation n/a
400 Lower Big Chute Rd., Coldwater River Bridge, Simcoe Bridge rehabilitation n/a
Bridge rehabilitation / 400 Severn River Bridge, Port Severn, Simcoe n/a replacement
Southern Highways Program 2012-2016 Page 19 REHABILITATION PROJECTS 2012-2016 TWO
Central 2014-2016
Project Length Hwy Location Type of Work (km) Bridge rehabilitation / 400 Severn River Boat Channel Bridge, Port Severn, Simcoe n/a replacement
Resurfacing / bridge 400 York / Simcoe boundary to Essa Rd., Simcoe, Phase 2 of 2 7.8 rehabilitations / median barrier
401 Hogg’s Hollow, eastbound & westbound collector, Toronto Structual coating n/a
401 Hwy 403 ramp, Peel Bridge rehabilitation n/a
401 Renforth Dr. to Hwy 410, express lanes, Peel Resurfacing 5.8
401 Eastbound ramp over Heart Lake Rd., Peel Bridge rehabilitation n/a
401 Dixie Rd., Peel Bridge rehabilitation n/a
401 Kipling Ave, Toronto Bridge rehabilitation n/a
401 Hwy 48 to Warden Ave., westbound express, Toronto Resurfacing 5.7
Resurfacing and bridge 401 Trafalgar Rd. to Halton Rd. 25, Halton 9.2 rehabilitations
403 Desjardin Canal eastbound lanes, Halton Bridge rehabilitation n/a
403 CNR Subway, Hamilton Bridge rehabilitation n/a
403 Plains Rd., Hamilton Bridge rehabilitation n/a
403 CPR Subway and Longwood Rd., Halton, Hamilton Bridge rehabilitations n/a
Central Parkway to Hwy 401/410 interchange, express lanes 403 Resurfacing 4.4 and eastbound collector lanes, Peel
1 km west of Winston Churchill Blvd. to Ford Dr., Halton / 403 Resurfacing 6.2 Peel
404 McNicoll Ave., Toronto Bridge rehabilitation n/a
404 Van Horne Ave., Toronto Bridge rehabilitation n/a
Page 20 Southern Highways Program 2012-2016 TWO TWO REHABILITATION PROJECTS 2012-2016
Central 2014-2016 Central 2014-2016
Project Length Hwy Location Type of Work (km)
404 John St., York Bridge rehabilitation n/a
404 19th Ave., York Bridge rehabilitation n/a
404 Steeles Ave., York Bridge rehabilitation n/a
404 St. John Sd. Rd., York Bridge rehabilitation n/a
406 QEW interchange to Geneva St., Niagara Resurfacing 6.0
409 Belfield structure, Toronto Bridge rehabilitation n/a
410 Bovaird Dr. to Queen St., Peel Resurfacing 3.3
427 Bloor St., Toronto Bridge rehabilitation n/a
427 Burnhamthorpe Rd., Toronto Bridge rehabilitation n/a
427 Rathburn Rd., Toronto Bridge rehabilitation n/a
427 Albion Rd. and CNR bridge, Toronto Bridge rehabilitations n/a
427 Hwy 401 to Campus Rd., Toronto Resurfacing 2.9
1 km east of Victoria Ave. to 0.6 km west of Seventh St., QEW Resurfacing 5.6 Niagara
QEW Christie St. and Maple Ave., Niagara Bridge rehabilitations n/a
Burlington Bay Skyway, Niagara-bound, Burlington / QEW Bridge rehabilitation n/a Hamilton
QEW Burloak Dr., Halton Bridge rehabilitation n/a
QEW Glendale Ave., Niagara Bridge rehabilitation n/a
QEW Hwy 403 ramp over Ford Dr., Halton Bridge rehabilitation n/a
Southern Highways Program 2012-2016 Page 21 REHABILITATION PROJECTS 2012-2016 TWO
Central 2014-2016
Project Length Hwy Location Type of Work (km)
QEW Baker Rd., Niagara Bridge rehabilitation n/a
QEW Netherby Rd., Niagara Bridge rehabilitation n/a
QEW Townline Rd., Niagara Bridge rehabilitation n/a
QEW Black Creek bridge, Niagara Bridge replacement n/a
QEW Bowen Rd., Niagara Bridge replacement n/a
QEW Walkers Line, Halton Bridge rehabilitation n/a
QEW Dorval Dr., Halton Bridge rehabilitation n/a
QEW Winston Churchill Blvd., Halton Bridge rehabilitation n/a
QEW Seventh St., Niagara Bridge replacement n/a
Various Various locations Bridge rehabilitations n/a
Various Various locations Resurfacing n/a
Note: Project timing is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
Page 22 Southern Highways Program 2012-2016 TWO TWO REHABILITATION PROJECTS 2012-2016
Eastern 2012
Southern Highways Program 2012-2016 Page 23 REHABILITATION PROJECTS 2012-2016 TWO
Eastern 2012
Target Project Map Completion Length # Hwy Status Location Type of Work Date (km)
1 7 Underway Havelock to Norwood Resurfacing / passing lanes 2012 7.7
South Junction Hwy 115 to Resurfacing / structural 2 7 Underway 2012 3.6 Peterborough Rd. 15 culvert replacement
Scott Rd. westerly to Hwy 41, 3 7 New Resurfacing / passing lane 2013 15.0 Kaladar
4 7 New Sharbot Lake westerly to Scott Rd. Resurfacing 2012 25.0
Passng lanes / intersection 5 7 New Wemyss to Maberly 2013 1.0 Improvements
6 7 New Marmora to Havelock Resurfacing 2013 13.6
7 7A/7 New Trout Creek Bridge and CNR bridge Bridge rehabilitations 2013 n/a
8 17 Underway CNR overhead, Renfrew Bridge rehabilitation 2012 n/a
9 17 Underway CPR overhead, Petawawa Bridge rehabilitation 2012 n/a
East of Renfrew Cr. 42 to Renfrew 10 17 Underway Resurfacing 2012 5.4 Cr. 26
11 17 New Snake River bridge, Cobden Bridge rehabilitations 2012 n/a
12 17 New Stonecliffe to Bissett Creek Resurfacing 2012 12.5
13 28 Underway Renfrew Rd. 514 to Denbigh Resurfacing 2012 18.7
Peterborough / Haliburton boundary 14 28 Underway Resurfacing 2012 11.6 to Haliburton/Hastings Boundary
Former Hwy 134 northerly to Realignment / Intersection 15 28 New 2013 2.6 Stoney Lake Rd. Improvements
Hastings County Line to Bancroft 16 28 New Resurfacing 2013 12.8 south limits
17 35 Underway Rd. 121, Long Beach Intersection improvements 2012 n/a
18 41 New Eganville to Griffith Pavement presevation 2012 43.0
Page 24 Southern Highways Program 2012-2016 TWO TWO REHABILITATION PROJECTS 2012-2016
Eastern 2012
Target Project Map Completion Length # Hwy Status Location Type of Work Date (km)
19 60 Underway Bonnechere River bridge at Deacon Bridge rehabilitation 2012 n/a
20 60 Underway Renfrew Rd. 61 to Douglas Resurfacing 2012 6.5
21 62 New Bancroft to Hickey Settlement Rd. Pavement presevation 2012 10.0
Papineau Creek and Little Mississippi bridges, 22 127 Underway Bridge rehabilitations 2012 n/a Maynooth
23 138 New North Raisin River bridges, south of Rd. 43 Bridge rehabilitations 2013 n/a
24 148 Underway Hazley Bay bridge, Pembroke Bridge rehabilitation 2012 n/a
Bridge rehabilitation / 25 401 Underway Trent River bridge, Trenton 2012 n/a widening
26 401 Underway CNR & Boundary Rd Bridges, Cornwall Bridge replacements 2014 n/a
Moulinette underpass, interchange 778, Long 27 401 Underway Bridge replacement 2012 n/a Sault
28 401 Underway Carman Rd. underpass, Iroquois Bridge replacement 2012 n/a
CNR overhead and Hwy 37 underpass, 29 401 Underway Bridge rehabilitations 2013 n/a Belleville
Crystal Springs 1000, LaRue Mills Rd. and 30 401 Underway Bridge rehabilitations 2013 n/a County Rd. 2 underpasses
Lennox and Addington Rd. 41 to Wymans Rd, 31 401 Underway Resurfacing 2012 15.1 Napanee
Frontenac Rd. 38 to Lennox and Addington 32 401 New Resurfacing 2013 17.5 Rd. 4
33 401 New Hwy 416 to Carmen Rd. Resurfacing 2012 17.0
Dickinson Dr. underpass, Brookdale Ave. 34 401 New underpass, McConnell Ave. underpass Bridge rehabilitations 2013 n/a Summerstown Rd Underpass, Cornwall Area
Beechwood Rd. underpass and Palace Rd. 35 401 New Bridge rehabilitations 2013 n/a overpass
Southern Highways Program 2012-2016 Page 25 REHABILITATION PROJECTS 2012-2016 TWO
Eastern 2012
Target Project Map Completion Length # Hwy Status Location Type of Work Date (km)
36 401 New Moulinette Rd. to Upper Canada Resurfacing 2012 20.5
37 401 New Mallorytown Rd. to Brockville Resurfacing 2012 9.0
38 401 New East of North Augusta, Brockville Noise barriers 2012 1.0
Bridge 39 401 New Cornwall Centre Rd. overpass 2014 n/a replacements
1.4 km north of Rd. 43 to Rd. 6, 40 416 Underway Resurfacing 2012 13.5 Roger Stevens Dr.
41 416 New Hwy 401 to County Rd. 44 Resurfacing 2012 30.2
Bridge 42 417 Underway Boundary Rd. underpass, Ottawa 2014 n/a rehabilitation
Prescott Russell Rd. 14 and Rd. 10 Bridge 43 417 Underway 2012 n/a bridge overpasses rehabilitations
Stormont Dundas and Glengary Rd. Bridge 44 417 New 2013 n/a 20, Casselman rehabilitations
Resurfacing Thousand Islands 45 1000 Underway Resurfacing 2012 11.0 Parkway
Bridge 1000 New Thousand Islands Parkway bridges 2013 n/a rehabilitations
Culvert various New Various highways 2012 n/a replacements
Note: Project timing is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
Page 26 Southern Highways Program 2012-2016 TWO TWO REHABILITATION PROJECTS 2012-2016
Eastern 2013
Southern Highways Program 2012-2016 Page 27 REHABILITATION PROJECTS 2012-2016 TWO
Eastern 2013
Target Project Map Completion Length # Hwy Status Location Type of Work Date (km) Culvert replacement/ 1 7 New Structural culverts, Oakwood 2013 n/a rehabilitation
2 7 New Structural culvert, McGarry Creek Culvert replacement 2013 n/a
Bridge 3 17 New Petawawa River bridge, Petawawa 2015 n/a rehabilitations
Resurfacing / 4 15 New Seeleys Bay northerly to Crosby 2014 23.9 passing lanes
5 35 New Trent Canal bridge, Rosedale Bridge rehabilitation 2014 n/a
6 138 New St. Andrews bridge Bridge rehabilitation 2013 n/a
7 401 New County Rd. 45, underpass, Division St. Bridge rehabilitation 2014 n/a
8 401 New Mitchell Rd. underpass Bridge rehabilitation 2013 10.0
9 401 New Trent River bridge, Quinte West Bridge rehabilitation 2014 n/a
10 401 New Glen Miller Rd. interchange 526 bridge Bridge rehabilitation 2014 n/a
Bridge 11 417 New Hwy 34 and Hwy 138 underpasses 2014 n/a rehabilitations
12 417 New Casselman Rd. underpass Bridge rehabilitation 2013 n/a
13 417 New 8th Line to Russell Rd. Resurfacing 2013 7.1
Ferry Stella, Amherst Island and Millhaven, 14 New Dock replacement 2014 0.5 Docks Hwy 33
Culvert Various New Various highways 2013 n/a replacements
Page 28 Southern Highways Program 2012-2016 TWO TWO REHABILITATION PROJECTS 2012-2016
Eastern 2013 Eastern 2014-2016
Project Length Hwy Location Type of Work (km)
7 Fall River bridge, Sharbot Lake Bridge rehabilitation n/a
7 Crowe River bridge, Marmora Bridge rehabilitation n/a
7 Salmon River bridge, Arden Bridge replacement n/a
7 Otonabee River and CNR eastbound lane bridges Bridge rehabilitation n/a
Hwy 7 Ouse River bridge, Norwood, Hwy 28 Eels Creek Bridge replacements / 7,28,118 n/a bridge, Woodview, Hwy 118 Irondale River culvert replacement
Resurfacing / bridge 15 County Rd. 42 to Youngs Hill Rd. and Crosby Creek bridge 2.8 replacement
17 Renfrew Rd. 26 To Petawawa Township boundary Resurfacing 6.6
17 Mississippi River bridge, Arnprior Bridge rehabilitation n/a
33 Frontenac Rd. 20 to Bath Resurfacing 14.5
35 City of Kawartha Lakes Rd. 121 northerly to Coboconk Resurfacing 19.9
41 Hydes Creek bridge, Griffith Bridge rehabilitation n/a
41 North of Rankin Culvert replacement n/a
41 Hydes Creek bridge, Griffith Bridge rehabilitation n/a
41 Hwy 60 to Hwy 17 Resurfacing 29.0
62 Ashley St. to Hastings Rd. 14, Foxboro Resurfacing 3.4
62 Moria Lake bridge Bridge rehabilitation n/a
62 Foxboro / Stirling 14 to Ivanhoe S Lt. Resurfacing 10.3
62 Structural Culverts Eldorado, Crofton and Bannockurn Culvert replacements n/a
Realignment / bridge 132 Constant Creek bridge 1.0 replacement
138 Monkland to Hwy 417 Resurfacing 16.9
148 CPR overhead bridge, Pembroke Bridge rehabilitation n/a
401 & 62 Hwy 401 east of Rd. 30 and Hwy 62, Pearsall Creek Culvert replacements n/a
Southern Highways Program 2012-2016 Page 29 REHABILITATION PROJECTS 2012-2016 TWO
Eastern 2014-2016
Project Length Hwy Location Type of Work (km)
401 Cornwall to Morrisburg bridges Bridge rehabilitations n/a
401 Napanee area bridges Bridge rehabilitations n/a
401 Upper Canada Rd. underpass, Morrisburg Bridge rehabilitation n/a
401 Aultsville County Rd. underpass Bridge rehabilitation n/a
Lennox and Addington County Rd. 41 overpass and 401 Bridge rehabilitations n/a Napanee River and Selby Creek bridges
401 County Rd. 2 / Highway 34 underpass Bridge rehabilitation n/a
401 Power Dam Drive underpass, Cornwall Bridge rehabilitation n/a
Lennox and Addington County Rd. 4 to County Rd. 41, 401 Resurfacing 14.6 Napanee
417 Bearbrook Road bridges Bridge Rehabilitations n/a
417 Limoges Rd. to 8th Line Rd., Ottawa Resurfacing 19.6
417 St. Eugene Rd. underpass Bridge rehabilitation n/a
417 Ramsayville Rd. overpass Bridge rehabilitation n/a
417 Hwy 7 to March Rd., Ottawa Resurfacing 9.2
Bridge rehabilitation / 1000 Landons Bay and Jones Creek bridges n/a replacement
Various Various highways Culvert Replacements n/a
Note: Project timing is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
Page 30 Southern Highways Program 2012-2016 TWO TWO REHABILITATION PROJECTS 2012-2016
Eastern 2014-2016 West 2012
Southern Highways Program 2012-2016 Page 31 REHABILITATION PROJECTS 2012-2016 TWO
West 2012
Target Project Map Completion Length # Hwy Status Location Type of Work Date (km)
1 3 New Grand River bridge, Cayuga Bridge replacement 2014 n/a
Resurfacing / culvert 2 6 Underway Wellington Rd. 7 to Fergus 2012 12.1 rehabilitation
Resurfacing / bridge rehabilitation 3 6 New Port Dover to Jarvis 2012 13.2 / intersection improvements
North of Laird Rd. to Woodlawn Rd., 4 6 New Resurfacing 2012 8.8 Guelph
Middlesex Rd. 50 to Perth Rd. 9, St. Resurfacing / bridge / 5 7 Underway 2013 17.8 Marys culvert rehabilitation
Resurfacing / bridge 6 7 Underway Rockwood to Halton Rd. 32 2012 4.1 rehabilitation
MTO Commuter Parking Lot / GO 7 8 New TRANSIT FACILITY at Sportsworld Commuter parking lot 2012 n/a Drive
8 10/89 New Shelburne to Primrose Resurfacing 2012 5.5
9 21 New Tiverton to Port Elgin Resurfacing 2012 20.8
10 21 New Sheppardton to Kingsbridge Resurfacing 2012 9.8
Resurfacing / culvert 11 21 New Bayfield to Goderich rehabilitation / 2014 20.0 replacement
12 21 New Amberley to Kincardine Resurfacing 2012 17.9
Resurfacing / culvert 13 21 New Grand Bend to Hendrick Rd. rehabilitation / 2012 7.8 replacement Various locations including Thames Bridge / culvert 14 23 New River Bridge, Flat Creek Bridge, replacement / bridge 2012 n/a north of Mitchell rehabilitation
Glenn Morris Rd. to Waterloo Rd. 43, Resurfacing / culvert 15 24 New 2012 5.6 south of Cambridge rehabilitation
Page 32 Southern Highways Program 2012-2016 TWO TWO REHABILITATION PROJECTS 2012-2016
West 2012 West 2012
Target Project Map Completion Length # Hwy Status Location Type of Work Date (km)
Resurfacing / culvert 16 24 New Simcoe to Scotland 2012 15.9 rehabilitation
Resurfacing / culvert 17 26 Underway Woodford to Meaford 2012 9.8 rehabilitation
Various locations, Chatham to Bridge / culvert 18 40 New 2012 n/a Wallaceburg rehabilitations
Stanley Line to Courtright Line, south of 19 40 New Resurfacing 2012 6.8 Sarnia
Lancaster St. to Waterloo Rd. 15, Resurfacing / culvert / 20 85 New 2015 7.6 Waterloo bridge rehabilitation
Chatham-Kent Rd. 2 and Dillon Rd. 21 401 Underway Bridge rehabilitation 2012 n/a underpass, east of Tilbury
Putnam Commercial Vehicle Inspection 22 401 Underway Rehabilitation 2013 n/a Facilities
23 401 New Kenesserie Rd., Duart Rd., Chatham-Kent Bridge rehabilitation 2012 n/a
24 401 New Drake Rd., Chatham-Kent Bridge rehabilitation 2012 n/a
25 401 New Bloomfield Rd., Chatham-Kent Bridge rehabilitation 2012 n/a
Wellington Rd. 32, Wellington Rd. 35, 26 401 New Bridge rehabilitation 2013 n/a Hwy 6, Guelph
Interchange 27 401 New Hwy 6, west ramp terminal, Morriston improvement / 2012 n/a resurfacing
28 401 New Blacks Rd. to Currie Rd., West Lorne Resurfacing 2012 22.2
29 401/402 New Interchange ramps, west of London Resurfacing 2012 n/a
Various locations, Chatham-Kent, Elgin 30 401/403 Underway Bridge rehabilitations 2013 n/a County, Brantford
Southern Highways Program 2012-2016 Page 33 REHABILITATION PROJECTS 2012-2016 TWO
West 2012
Target Project Map Completion Length # Hwy Status Location Type of Work Date (km)
31 401/403 New Interchange ramps, east of London Resurfacing 2012 n/a
London Line, First School Rd., Arkona Rd., Bridge 32 402 Underway 2012 n/a Centre Rd. underpasses, west of Strathroy rehabilitations
Culvert 33 402 New East of Strathroy 2012 n/a rehabilitation
1.7 km east of Hwy. 21 to Kerwood Rd., 34 402 New Resurfacing 2012 19.6 Warwick
35 402 New Front St. to Mandaumin, eastbound lanes Resurfacing 2012 15.3
Note: Project timing is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
Page 34 Southern Highways Program 2012-2016 TWO TWO REHABILITATION PROJECTS 2012-2016
West 2012 West 2013
Southern Highways Program 2012-2016 Page 35 REHABILITATION PROJECTS 2012-2016 TWO
West 2013
Target Project Map Completion Length # Hwy Status Location Type of Work Date (km)
Reconstruction / 1 3 New Canfield, Haldimand County 2013 0.7 drainage
Kettle Creek, Balaclava St. underpass, 2 3 New First Ave. underpass, Burwell Rd. Bridge rehabilitations 2014 n/a underpass, St. Thomas
3 3 New Delhi to Simcoe Resurfacing 2013 14.1
4 6 New Chatsworth to Owen Sound Resurfacing 2013 11.0
Springmount to Hepworth including Resurfacing / bridge 5 6 & 21 New Shallow Lake Bridge, Stokes River Bridge, rehabilitation/ bridge 2014 14.7 Sauble River Bridge / culvert replacement Mount Forest to Shelburne including South Saugeen River Bridge west, South Bridge replacement / 6 89 New 2014 n/a Saugeen River Bridge east, Mud Creek rehabilitation Bridge, Grand River Bridge
Resurfacing / culvert 7 89 New Harriston to Mount Forest 2013 14.5 replacements
Victoria Rd. to Orford Rd., westbound 8 401 New Resurfacing 2013 8.0 lanes Chatham-Kent
Kent Bridge Rd. to Victoria Rd. eastbound 9 401 New Resurfacing 2013 7.3 lanes, Chatham-Kent
Bridge replacement / culvert rehabilitation 10 401 New Highway 40 interchange, Chatham-Kent 2014 n/a / interchange improvements
Note: Project timing is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
Page 36 Southern Highways Program 2012-2016 TWO TWO REHABILITATION PROJECTS 2012-2016
West 2013 West 2014-2016
Project Length Hwy Location Type of Work (km)
Intersection 3 Hwy 19 / Vienna Rd., Tillsonburg n/a improvements
3 Essex Rd. 34 to Essex Rd. 27, west of Leamington Resurfacing 10.2
4 Kippen River Bridge and Ausable River Bridge, Hensall Bridge rehabilitation n/a
4 Talbotville to Middlesex Rd. 35 Resurfacing 5.9
4 Medway Creek Bridges, north of London Bridge rehabilitations n/a
6 Argyle St. Grand River Bridge, Caledonia, Highway 7191 Bridge replacement n/a
6 Hwy. 401 to south of Clair Rd. Resurfacing 4.8
6 Various locations, Hepworth to Tobermory Culvert rehabilitations n/a
6 Rocky Saugeen River Bridge and Pottawatomi River Bridge Bridge rehabilitation n/a
6 Jarvis to Hagersville Resurfacing 8.2
6 Hagersville to Caledonia Resurfacing 14.0
6 Morriston to Hwy 401 Resurfacing 1.1
Resurfacing / culvert 7 Perth Rd. 9, Wildwood Conservation area to Stratford 9.0 rehabilitations
7 Kitchener to Guelph Resurfacing 9.7
7 Guelph to Rockwood Resurfacing 6.8
Southern Highways Program 2012-2016 Page 37 REHABILITATION PROJECTS 2012-2016 TWO
West 2014-2016
Project Length Hwy Location Type of Work (km)
8 Mitchell to Sebringville Resurfacing 9.4
9 Kincardine to Bruce Rd. 7 Resurfacing 8.0
21 Port Elgin to Southampton to Alvanley Resurfacing 26.2
23 Bornholm to Monkton Resurfacing 8.8
23 Mitchell to Bornholm Resurfacing 7.4
24 Brant Rd. 5 to Glen Morris Rd., north of Brantford Resurfacing 4.8
26 Thornbury to Collingwood Rehabilitation 13.2
40 Churchill Rd. to McGregor Rd., Sarnia Resurfacing 3.2
40 Chatham to Wallaceburg Resurfacing 20.4
Resurfacing / bridge 85 Krug St. to Lancaster St., Kitchener 2.8 rehabilitations
401 Hespeler Rd. underpass, Cambridge Bridge rehabilitation n/a
Bridge replacement / 401 Fountain St., Speedsville Rd., Hwy 8 Ramp, Cambridge n/a rehabilitation
Bridge replacement / 401 Hwy 19 underpass n/a interchange improvements
Bridge replacement / 401 Norwich Ave. underpass n/a interchange improvements
Bridge replacement / 401 Dorchester Rd. underpass n/a interchange improvements
Page 38 Southern Highways Program 2012-2016 TWO TWO REHABILITATION PROJECTS 2012-2016
West 2014-2016
Project Length Hwy Location Type of Work (km) Miller Rd., Springer Rd., Carriage Rd., Sharon Rd., Woodhull 402 Rd., Westdel Bourne, White Oak Rd. underpasses, west of Bridge rehabilitations n/a London
Kerwood Rd. to Middlesex Rd. 81, west of Strathroy, 402 Resurfacing 20.3 eastbound lanes
402 Strathroy to London Bridge rehabilitations n/a
Adelaide Rd. underpass, CNR overpass, Sydenham River 402 Bridge rehabilitations n/a Bridge east of Strathroy
Hwy 402, Front St., and CNR overpass and Hwy 40 / C.N.R. 402 / 40 Bridge rehabilitations n/a overhead, Sarnia
Ewing Dr., Tollgate Rd., Hwy 24 / King George Rd., North 403 Park St., West St. and Wayne Gretzky Pkwy underpasses, Bridge rehabilitations n/a Brantford
403 Grand River Bridge, west of Brantford Bridge rehabilitation n/a
Note: Project timing is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
Southern Highways Program 2012-2016 Page 39 PROJECTS BEYOND 2016 THREE
THREEProjects Beyond 2016
Page 40 Southern Highways Program 2012-2016 THREE THREE PROJECTS BEYOND 2016
Planning for the Future
Ontario continuously looks at its long-term
transportation infrastructure needs to determine
where the greatest benefits can be realized for
our economy and the lives of Ontarians. Planning
beyond 2016 ensures our highways and bridges
are built and maintained to support traffic levels
and transportation needs for decades to come.
Identified on the following pages are some
projects in the planning stages that could
support growth, improve traffic flow and increase
safety in southern Ontario. These projects are
still subject to further study and prioritization,
and may be considered for future development.
Southern Highways Program 2012-2016 Page 41 PROJECTS BEYOND 2016 THREE
Southern Ontario — Beyond 2016
Area Planning Studies Description
GTA - West Corridor Planning and EA Study
Niagara to GTA Corridor Planning and EA Study
Peterborough / Hwy 7 Area Planning and Highway Corridor Study
Simcoe Area Multi-Modal Transportation Strategy
Brantford to Cambridge Corridor Study
Highway Description
3 Windsor to Leamington, Phase 3
5/6 Interchange, Hamilton
6 Hanlon Expressway interchanges, Guelph
6N Extension to Caledonia
6N North of Freelton to Maltby Rd., Guelph
7 Hwy 7, Town of Perth limits
7 Scott’s Corners to Fowlers Corners, Peterborough
7/8 Stratford to New Hamburg
8 Sportsworld Dr. to Hwy 401, interchange improvements, Kitchener
12 South Jct. Hwy 48 to north Jct. County Rd. 48, Beaverton
17 Arnprior to Renfrew
26 Stayner to Thornbury
Page 42 Southern Highways Program 2012-2016 THREE THREE PROJECTS BEYOND 2016
Southern Ontario — Beyond 2016
Highway Description
35 Hwy 115 to Lindsay
40 Lambton Rd. 34 to Hwy 402, Sarnia
89 Hwy 400 to Rosemont
400 Toronto to Barrie
400 Major Mackenzie Dr. to King Rd., York (HOV lanes)*
401/400 Interchange, Toronto
401 Montreal St. to Hwy 15, Kingston
401 Burnham St. to County Rd. 45, Cobourg
401 Mississauga to Milton
401 Cambridge to Wellington County / Halton region boundary
401 Hwy 8 to Hespeler Rd., Cambridge
401 Chatham - Kent
403 QEW to Hwy 407, Oakville / Mississauga
404 Hwy 7 to Newmarket
406 Welland to Port Colborne
410 Hwy 401 to Bovaird Dr., Brampton
427 Hwy 409 to Hwy 407, Toronto (HOV lanes)*
427 Extension (Regional Road 7 to Major Mackenzie Dr.), York
Southern Highways Program 2012-2016 Page 43 PROJECTS BEYOND 2016 THREE
Southern Ontario — Beyond 2016
Highway Description
QEW McLeod Rd. to Mountain Rd., Niagara Falls
QEW Garden City Skyway, Niagara
QEW Hwy 403 interchange, Oakville
QEW Hwy 403 to Hwy 427
* BCF: Building Canada Fund, BIF: Border Infrastructure Fund, HOV: High Occupancy Vehicle, ISF: Infrastructure Stimulus Fund.
Page 44 Southern Highways Program 2012-2016 THREE FOUR COMPLETED PROJECTS 2011
FOUR Completed 2011
Southern Highways Program 2012-2016 Page 45 COMPLETED PROJECTS 2011 FOUR
In 2011, the Ontario government committed $1.36 billion to expand and repair southern Ontario highways and bridges. The following pages contain all major southern Ontario highway projects completed last year.
2011 Southern Ontario Accomplishments
New highways 62 km
New bridges 5
Highways rehabiliated 562 km
Bridges rehabiliated 56
Page 46 Southern Highways Program 2012-2016 FOUR FOUR COMPLETED PROJECTS 2011
Twinning Highway 7 near Carleton Place
Highway 7 was widened from two lanes to
four lanes west of Ottawa from Highway 417
to Carleton Place, a growing area in Eastern
Ontario. Economic benefits of this widening
include an increase in development and the
number of businesses.
The drive to downtown Ottawa has been
shortened by 25 minutes and commuters can
use HOV lanes and carpool. They can also use
two new commuter parking lots at Dwyer Hill
Road and Cemetery Road.
Between Highway 417 and Carleton Place,
26 kilometres of highway was widened. An
8-kilometre stretch was paved using perpetual
pavement. This type of pavement is tough
enough to withstand serious stress for at least
50 years. If needed, in the future only the
surface layer of the highway will be repaved
saving time and money.
Southern Highways Program 2012-2016 Page 47 COMPLETED PROJECTS 2011 FOUR
Central 2011
Hwy Location Type of Work
7 Brock Rd. to Durham Rd. 30, Durham Resurfacing
9 Hwy 27 to Simcoe Rd. 10, Shomberg Resurfacing
11 Laclie St. to South Sparrow Lake Rd., Simcoe Resurfacing
11 Killworthy, Sparrow underpass, Gravenhurst Bridge rehabilitation
11 Hwy 118 to Muskoka Road 117, Bracebridge Preventive resurfacing
12 CNR overhead bridge, Orillia Bridge replacement
26 Hwy 26 at Simcoe County Rd. 28 Signal installation
35 Muskoka Road 117 southerly, Dorset Preventive resurfacing
35/115 Wilmot Creek and Farewell Creek culverts, Clarington Culvert rehabilitation
48 South of York Rd. 9 to 4 km north of York Rd. 9 Resurfacing
60 Hwy 35 to Oxtongue Lake Narrows, Dwight Resurfacing
60 Algonquin Park West Gate westerly Resurfacing
89 Nottawasaga River Bridge, Alliston Bridge rehabilitation
400 St. Vincent St. Bridge, Barrie (ISF)* Bridge rehabilitation
400 Innisfil Creek culvert, Innisfil (ISF)* Culvert rehabilitation
Interchange 400 Hwy 88 interchange, Simcoe reconstruction
400 Simcoe Road 19 to north junction Hwy 12/400 interchange, Simcoe Resurfacing
400 King Road to Hwy 9, York Resurfacing
Page 48 Southern Highways Program 2012-2016 FOUR FOUR COMPLETED PROJECTS 2011
Central 2011
Hwy Location Type of Work
401 Renforth Dr. north and southbound Bridges (ISF)* Bridge rehabilitations
401 Dixie Road underpass, Mississauga (ISF)* Bridge rehabilitation
401 Various locations Overhead sign structures
401 Trafalgar Rd., Milton Bridge rehabilitation
Noise barrier panel 401 Hwy 404 to Victoria Park Ave. eastbound collector, 500 m replacement
403 Central Parkway to Winston Churchill Blvd., Mississuaga Resurfacing
404 Aurora Rd. to Stouffville Rd., York Resurfacing
Resurfacing / bridge rehabilitations /median 409 Hwy 401 to Hwy 427, Toronto barrier replacement / highway lighting
QEW Victoria Ave. to East of Casablanca Blvd. (Niagara Bound) Resurfacing
Various Various culverts, Toronto-Durham Area Culvert rehabilitation
Various Various locations Bridge rehabilitation
Various Various locations Selective resurfacing
* BCF: Building Canada Fund, BIF: Border Infrastructure Fund, HOV: High Occupancy Vehicle, ISF: Infrastructure Stimulus Fund.
Southern Highways Program 2012-2016 Page 49 COMPLETED PROJECTS 2011 FOUR
Eastern 2011
Hwy Location Type of Work
7 Resurfacing - Perth East To West Limits Resurfacing
Hwy 417 to Carleton Place , Phase 3 of 3, Ashton Station Rd to 2 to 4 lane widening/ 7 Carleton Place bridge rehabilitation
7A Fleetwood Creek Bridge Bridge Rehabilitation
17 Deux Rivieres to northeast regional boundary Resurfacing
17 Renfrew Rd 40 to Cobden Resurfacing
17 Renfrew Rd. 4 westerly to Renfrew Rd. 61 Resurfacing
Resurfacing and 28 Stoney Lake Rd to Youngs Point Intersection improvements
Intersection 33 Intersection Improvements Speers Blvd, Amherstview Improvements
35 Durham Rd. 20 To Hwy 7A Resurfacing
37 Moira River Bridge, North Of Belleville Bridge Rehabilitation
41 Vennachar Junction northerly to Hwy 28 Resurfacing
41 Snake River Bridge Bridge Rehabilitation
62 Crofton To Rossmore Resurfacing
Resurfacing/concrete 115 Hwy 35 To Tapley Quarter Line re-texuring
401 Frontenac Rd. 38 To Lennox & Addington Rd. 4 New paved shoulders
401 Trenton To Brighton Resurfacing
401 CPR Overhead Removal, Prescott Bridge Rehabilitation
Interchange 401 Hwy 15 to Frontenac Cty. Rd. 38 - Division St., Kingston improvements
Page 50 Southern Highways Program 2012-2016 FOUR FOUR COMPLETED PROJECTS 2011
Eastern 2011
Hwy Location Type of Work
416 Rd 6 To Rd 73, Manotick Resurfacing
417 Kenyon-Roxborough Rd to Limoges, westbound lanes Resurfacing
417 Tayside Municipal Drain Culvert Replacement
417 Skye Rd Overpass, St. Bernardin Bridge Rehabilitation
Hwy 416 to Anderson Rd. (Phase 3A) Carling Ave. eastbound bridge, Bridge replacements/ 417 - OQW Ottawa widening
Various Culvert replacements various highways Culvert replacements
Southern Highways Program 2012-2016 Page 51 COMPLETED PROJECTS 2011 FOUR
West 2011
Hwy Location Type of Work
3 Dry Lake Rd. To Cayuga Resurfacing
3 Aylmer to Carter Rd. Resurfacing
3 John Pound Rd. To Simcoe St., Tillsonburg Resurfacing
Resurfacing / culvert 4 Kippen to Clinton rehabilitations
Intersection 6 Hanlon Expressway, Guelph improvements
6 Durham to Dornoch Resurfacing
7&8 Waterloo Rd. 51 to Fischer-Hallman Rd., Kitchener Resurfacing
7&8 Shakespeare to New Hamburg Resurfacing
Resurfacing / bridge 8 Perth Rd. 135 to Stratford rehabilitation
21 Hwy. 9 to Tiverton Resurfacing
21 Shashawanda Creek Bridge, north of Forest Bridge replacement
21 Amberley to Kincardine, various locations Bridge rehabilitations
21 Underwood to Port Elgin Culvert rehabilitations
21/9 Tiverton to Underwood and Kincardine to Bruce County Rd. 7 Culvert rehabilitations
Resurfacing / bridge 24 Brant Rd. 53 to Hwy 403, west of Brantford replacement
24 Brant Rd. 23 to Brant Rd. 5, north of Brantford Resurfacing
Resufacing / bridge 40 Rokeby Line to Churchill Line, Sarnia rehabiliations
Bridge / culvert 40 Wallaceburg to Chatham-Kent Rd. 33 rehabilitations
Blacks Rd., Fumival Rd., Dunorough Rd., Southminister Bourne, 401 Bridge Rehabilitations west of London
Page 52 Southern Highways Program 2012-2016 FOUR FOUR COMPLETED PROJECTS 2011
West 2011
Hwy Location Type of Work
401 Hwy 4 to Hwy 402, London Resurfacing
401 Highbury Ave., London to Regional Boundary, various locations Resurfacing
Four to six-lane 401 Woodstock to Cambridge widening
402 Nauvoo Rd. to Centre Rd., Strathroy Resurfacing
Waterworks Rd., Camlachie Rd., Oil Heritage Rd., Hwy 21, east of 402 Bridge Rehabilitations Sarnia
402 Longwoods Rd. To Woodhull Rd., London Resurfacing
Resurfacing / guide 403 Paris Rd. To Garden Ave., Brantford rail improvements
Southern Highways Program 2012-2016 Page 53 FOUR COMPLETED PROJECTS 2011
Published November 2012 ISSN 1913-4673
Southern Highways Program 2012-2016 Page 54