Southern Highways Program 2012-2016

MMinistryinistry of Tran sofpor tTransportationation TABLE OF CONTENTS

Introduction...... 3

Section ONE Expansion Projects 2012-2016...... 5

Section TWO Rehabilitation Projects 2012-2016...... 10

Section THREE Projects Beyond 2016...... 40

Section FOUR 2011 Completed Projects...... 45

Southern Highways Program 2012-2016 Page 2 INTRODUCTION Creating Jobs and Building a Stronger

In 2012/13, the Ontario government will be investing $2.4 billion to repair and expand provincial highways and bridges.

This includes $1.87 billion for , creating more than 18,500 direct and indirect jobs. Improving Ontario's transportation network is part of the government’s plan to strengthen the economy. Key highway investments planned between 2012 and 2016 include:

• constructing the Windsor Essex

• extending Highway 407 easterly

• widening Highway 401 express and collector lanes between the

Highway 401/403/410 and Hurontario Street in

Mississauga

• building a new interchange at Highway 6 (Hanlon Expressway)

and Laird Road in

• widening Highway 417 from Nicholas Street to Ottawa

Road 174 in Ottawa

2012 Planned Accomplishments Southern Ontario

New highway 102km

New bridges 5

Highway rehabilitated 410km

Bridges rehabilitated 79

Southern Highways Program 2012-2016 Page 3 QUICK FACTS

• Ontario has 16,600 kilometres of provincial highway and 2,756 bridges.

• Ontario uses new technology and greener construction practices whenever possible, such as recycling existing pavement and using recycled and shredded tires for bridge embankment fill.

Southern Highways Program 2012-2016 Page 4 ONE EXPANSION PROJECTS 2012-2016

ONE Expansion 2012-2016

Southern Highways Program 2012-2016 Page 5 EXPANSION PROJECTS 2012-2016 ONE

Widening Highway 7/8 through Kitchener

Construction crews have begun widening

Highway 7/8 from four to six lanes between

Fischer-Hallman Road and Courtland

Avenue in west Kitchener. Expanding the highway for 6.5 km will ease congestion during rush hour as commuters head to and from west Kitchener neighbourhoods.

Eleven bridges will be widened and repaired, and a new concrete median barrier will be built to separate eastbound and westbound lanes, keeping traffic flowing efficiently and safely. The work begins this year with repairs to the Fischer-Hallman Bridge.

Work will move east in subsequent years, finishing in 2015.

Page 6 Southern Highways Program 2012-2016 ONE ONE EXPANSION PROJECTS 2012-2016

Southern Expansion 2012-2016

Southern Highways Program 2012-2016 Page 7 EXPANSION PROJECTS 2012-2016 ONE

Southern Expansion 2012-2016

Target Map Completion # Region Hwy Location Type of Work Date Leamington to Windsor, Phase 2, Essex County Rd. 1 WR 3 Two to five-lane widening 2012 11 to west junction Essex County Rd. 34

2 WR 6 Hanlon Expressway, Laird Rd., Guelph New interchange 2013

Beyond 3 WR 7N Kitchener to Guelph New four-lane highway 2016

4 CR 7 Brock Rd., Pickering to Hwy 12, Durham, FLOW Two to four-lane widening 2013

5 WR 7 & 8 Fischer-Hallman Rd. to Courtland Ave., Kitchener Four to six-lane widening 2015

Kitchener Waterloo Expressway, Grand River to Four to six and four to eight- 6 WR 8 2012 Highway 401, Build Fund (BCF)* lane widening / resurfacing

Arnprior By-Pass, Phase 1, Regional Rd. 29 to 7 ER 17 Two to four-lane widening 2012 Division St.

Wasaga to Collingwood, Sixth line to existing Hwy 8 CR 26N New four- lane highway 2012 26, Phase 3A, Simcoe

Two to four and five-lane 9 ER 62 Hwy 401 to Foxboro, Belleville 2014 widening

10 CR 401 Hwy 410 to Hurontario St., Peel New interchange / widening 2013

Bridge replacement / Hwy 15 to Frontenac Cty. Rd. 38 - Phase 4 - 11 ER 401 widening / interchange 2015 Montreal St. and CNR overheads, Kingston improvements

Hwy 15 to Frontenac County Rd. 38, Phase 2, west 12 ER 401 Four to six-lane widening 2012 of Sydenham Rd. to west of Montreal St., Kingston

Colonel Talbot Rd. to Veterans Memorial Parkway, New interchange / 13 WR 401 London including Wonderland Road and Veterans 2016 interchange improvements Memorial Pkwy

New six-lane below grade 401 Hwy 401 and Hwy 3 through Tecumseh, LaSalle 14 WR freeway / new four-lane at- 2015 & 3 and Windsor grade service Rd. network

Bluewater Bridge to east of Murphy Rd., Sarnia Two to four westbound-lane 15 WR 402 2014 (BIF)* widening

Oak Park Interchange, Brantford (Parnership with Interchange improvements / 16 WR 403 2013 Brantford) bridge rehabilitation

Page 8 Southern Highways Program 2012-2016 ONE ONE EXPANSION PROJECTS 2012-2016

Southern Expansion 2012-2016

p Target Map Completion # Region Hwy Location Type of Work Date Queensville Side Rd. to Ravenshoe Rd., York, 17 CR 404 New four- lane highway 2014 Phase 4 of 4 (FLOW)

Green Lane to Queensville Side Rd., York, Phase 18 CR 404 New four- lane highway 2014 3 of 4 (FLOW)

19 CR 406 Port Robinson Rd. to Main St., Niagara Two to four-lane widening 2015

New 10km 6-lane highway, 12km 4-lane Brock Rd. to Harmony Rd. including a connection 20 CR 407E highway and 10km 4-lane 2015 to Hwy 401 east of Lake Ridge Rd (Phase 1) freeway to freeway connection

Four to eight and four to 21 ER 417 Eagleson Rd. to Hwy 7, Ottawa (HOV)* 2014 six-lane widening

417 - Hwy 416 to Anderson Rd., Phase 3D, Carling Ave. Bridge replacements / 22 ER 2013 OQW westbound and Kirkwood Ave. bridges, Ottawa widening

417 - Hwy 416 to Anderson Rd., Phase 4B, Cyrville Rd. 23 ER Bridge replacement 2012 OQW bridge, Ottawa

Six to eight-lane widening 417 - Hwy 416 to Anderson Rd., Phase 5, Nicholas St. 24 ER / bridge replacements / 2015 OQW to Ottawa Rd. 174, Ottawa rehabilitation / widenings

Note: Project timing is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

* BCF: Building Canada Fund, BIF: Border Infrastructure Fund, HOV: High Occupancy Vehicle, ISF: Infrastructure Stimulus Fund.

Southern Highways Program 2012-2016 Page 9 REHABILITATION PROJECTS 2012-2016 TWO

TWO Rehabilitation 2012-2016

Page 10 Southern Highways Program 2012-2016 TWO TWO REHABILITATION PROJECTS 2012-2016

Highway 401 in Gets a Facelift

Highway 401 between Avenue Road and

Bayview Avenue in Toronto carries about

400,000 vehicles per day. All express lanes,

east and west bound, and six bridges are

currently undergoing major rehabilitation.

The six bridges include the Hogg’s Hollow

Bridge and the Yonge Street .

When repairs are complete, drivers will

notice new pavement and see updated

illumination, a new median and noise

barriers.

This project is one of several projects along

Highway 401 through Toronto and is part

of the Ministry of Transportation’s strategic

rehabilitation program for Highway 401

between Renforth Drive and Warden

Avenue.

Southern Highways Program 2012-2016 Page 11 REHABILITATION PROJECTS 2012-2016 TWO

Central 2012

Page 12 Southern Highways Program 2012-2016 TWO TWO REHABILITATION PROJECTS 2012-2016

Central 2012

Target Project Map Completion Length # Hwy Status Location Type of Work Date (km)

1 QEW Underway Bertie St., Niagara Bridge rehabilitation 2012 n/a

2 QEW Underway Credit River, Peel Bridge rehabilitation 2012 n/a

3 QEW Underway Glover Rd., Fifty Rd., Millen Rd., Hamilton Bridge rehabilitation 2012 n/a

Burlington Bay Skyway, Toronto-bound, 4 QEW Underway Bridge rehabilitation 2012 n/a Burlington/Hamilton

0.3 km east of Victoria Ave. to 1.5 km east 5 QEW New Resurfacing 2012 17.0 of Casablanca Blvd., Toronto-bound, Niagara

6 QEW New Hwy 420 to Lyons Creek Rd., Niagara Resurfacing 2012 9.0

Central Ave. to 0.5 km south of Gilmore Rd., 7 QEW New Resurfacing 2012 4.0 Niagara

QEW/ 8 Underway Thompson Rd. and Chestnut St., Niagara Bridge rehabilitations 2012 n/a 406

4th Line and Coles Crt. intersections in 9 7 New 2012 n/a Acton, Halton improvements

Intersection 10 8 New Hwy 5/8, Peters Corners, Hamilton 2013 n/a improvements

11 11 New Memorial Ave. to Laclie St., Simcoe Resurfacing 2012 8.0

12 11 New Severn River bridge at Severn Bridge Bridge rehabilitation 2012 n/a

Resurfacing / bridge 13 11 New Gull Lake bridges, north of Gravenhurst 2014 n/a rehabilitation

South Muskoka River bridge, south of 14 11 New Bridge rehabilitation 2012 n/a Bracebridge

15 11 New 4.7 km north of Muskoka Rd. 117 Culvert replacement 2012 0.2

16 11 Underway Vernon Lake, northbound lane, Huntsville Bridge rehabilitation 2012 n/a

17 12 Underway Simcoe Rd. 37 to Hwy 93, Simcoe Resurfacing 2012 3.5

18 12 New CNR overhead in Midland, Simcoe Bridge replacement 2013 n/a

Southern Highways Program 2012-2016 Page 13 REHABILITATION PROJECTS 2012-2016 TWO

Central 2012

Target Project Map Completion Length # Hwy Status Location Type of Work Date (km) Atherley Rd. to south junction of Hwy 19 12 New Resurfacing 2012 5.6 11/12, Simcoe

Nottawasaga River to Stayner east 20 26 New Resurfacing 2012 15.6 limits, Simcoe

21 35 New Hwy 118 northerly, Carnarvon Resurfacing 2012 7.9

22 35 New North of Haliburton Rd. 13, Halls Lake Culvert rehabilitation 2012 n/a

Bridge rehabilitations and 23 35/115 Underway Newcastle and CPR bridge, Durham 2012 n/a commuter parking lot

24 48 New Herald Rd., York Signal installation 2012 n/a

Thorold Stone Rd. to Hwy 406, 25 58 New Resurfacing 2013 4.0 Niagara

Oxtongue Lake Narrows bridge, east 26 60 New Bridge replacement 2013 n/a of Hwy 35

Waverley Rd. to north of Hillsdale, Truck climbing lane / 27 93 Underway 2012 1.6 Simcoe traffic signals

West of Hwy 11 westerly, Ullswater 28 141 New Resurfacing 2012 19.8 easterly

Hwy 11 to Hwy 93, northbound and Resurfacing / bridge 29 400 Underway 2013 16.2 southbound lanes, Simcoe rehabilitations

30 400 New Hwy 93 to Simcoe Rd. 19, Simcoe Resurfacing 2014 15.7

1 km south of Major Mackenzie Dr. to 31 400 New 2.3 km north of King Rd., southbound Resurfacing 2012 7.8 lanes, York Hogg’s Hollow, eastbound and 32 401 Underway Bridge rehabilitation 2013 n/a westbound express lanes, Toronto

Jane St. to Kipling Ave., westbound Reconstruction / bridge 33 401 Underway 2013 5.9 collector lanes, Toronto rehabilitation

34 401 Underway Keele St., Toronto Bridge replacement 2013 n/a

35 401 Underway Warden Ave., Toronto Bridge rehabilitation 2013 n/a

Page 14 Southern Highways Program 2012-2016 TWO TWO REHABILITATION PROJECTS 2012-2016

Central 2012

Target Project Map Completion Length # Hwy Status Location Type of Work Date (km) Mill St., Morgans Corners, and Holt Rd., 36 401 New Bridge rehabilitations 2013 n/a Durham

37 401 New Allen Rd. interchange, Toronto Bridge rehabilitations 2012 n/a

38 401 New Bloor St., Durham Bridge rehabilitation 2012 n/a

Noise barrier 39 401 New Noise barrier walls in Oshawa, Durham 2013 n/a replacement

40 403 Underway Various locations, Hamilton Bridge rehabilitation 2012 n/a

Central Parkway to Hwy 401/410 41 403 New Resurfacing 2012 2.8 interchange, eastbound collector lanes, Peel

Burnhamthorpe Rd., Eglinton Ave., 42 403 New Bridge rehabilitations 2013 n/a Mississauga Rd., Peel

King Rd., Waterdown Rd., Lemonville Rd., 43 403 New Bridge rehabilitations 2013 n/a Snake Rd., Halton and Hamilton

Geneva St. to south of Beaverdams Rd., 44 406 New Resurfacing 2013 9.0 Niagara

QEW to Hwy 401, southbound collector Reconstruction / 45 427 Underway 2013 7.3 lanes, Toronto bridge rehabilitations

QEW to Hwy 401, northbound collector Reconstruction / 46 427 Underway 2014 7.3 lanes, Toronto bridge rehabilitations

Overhead sign 401/427 Underway Various locations 2012 n/a structures

Various New Various locations Bridge rehabilitations 2012 n/a

Various New Various locations Resurfacing 2012 n/a

Overhead sign Various New Various locations within GTA, Phase 1 of 2 2013 n/a structures

Note: Project timing is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

Southern Highways Program 2012-2016 Page 15 REHABILITATION PROJECTS 2012-2016 TWO

Central 2013

Page 16 Southern Highways Program 2012-2016 TWO TWO REHABILITATION PROJECTS 2012-2016

Central 2013

Target Project Map Completion Length # Hwy Status Location Type of Work Date (km)

1 QEW New Beck Rd., Niagara Bridge rehabilitation 2013 n/a

2 QEW New Gilmore Rd., Niagara Bridge rehabilitation 2013 n/a

3 QEW New Grays Rd., Fruitland Rd., Winona Rd., Hamilton Bridge rehabilitations 2014 n/a

Operational 4 QEW New Westbound lanes near Brant St., Halton 2013 1.1 improvements

5 5 New Spencer Creek, Hamilton Bridge replacement 2013 n/a

6 11 New CNR and CPR overhead, north of Orillia, Simcoe Bridge replacements 2014 n/a

7 12 New Sturgeon River, Simcoe Bridge replacement 2014 n/a

8 26 New Wilson Dr., Simcoe Traffic signals 2013 n/a

Jane St. to Avenue Rd., eastbound collector Reconstruction / 9 401 New 2017 7.4 lanes, Toronto bridge rehabilitations

10 401 New Hope Townline Rd. and Cobbledick Rd., Durham Bridge replacements 2014 n/a

11 58/140 New Fork’s Rd., CNR and CPR bridges, Niagara Bridge replacements 2015 n/a

Richmond St., Pine St., Queen St., Glendale 12 58/406 New Bridge rehabilitations 2014 n/a Ave., Beaverdams Rd., Niagara Resurfacing / bridge York / Simcoe boundary to Essa Rd., Simcoe, 13 400 New rehabilitations / 2015 32.0 Phase 1 of 2 median barrier

14 400 New Hwy 400 / 401 interchange, Toronto Bridge rehabilitations 2015 n/a

15 400 New Crown Hill, Simcoe Bridge replacement 2014 n/a

Resurfacing / culvert 16 400 New North of Muskoka Rd. 5 northerly, Port Severn 2013 10.9 rehabilitation

Hwy 2, Hamilton Dr., Fiddler’s Green, Southcote 17 403 New Bridge rehabilitations 2014 n/a Rd., Golf Links Rd., Mohawk Rd., Hamilton

1 km west of Hwy 6 to 1 km west of Aberdeen 18 403 New Resurfacing 2013 5.0 Ave., Hamilton

Southern Highways Program 2012-2016 Page 17 REHABILITATION PROJECTS 2012-2016 TWO

Central 2013

Target Project Completion Length Map # Hwy Status Location Type of Work Date (km)

Various New Various locations Bridge rehabilitations 2013 n/a

Various New Various locations Resurfacing 2013 n/a

Note: Project timing is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

Page 18 Southern Highways Program 2012-2016 TWO TWO REHABILITATION PROJECTS 2012-2016

Central 2014-2016

Project Length Hwy Location Type of Work (km)

6 York Blvd. Hamilton Bridge rehabilitation n/a

8 Hwy 5 to west of Safari Rd., Hamilton Resurfacing 13.5

9 Holland Canal, York Bridge replacement n/a

11 CNR Bridge near Washago, Simcoe Bridge rehabilitation n/a

11 Hawk Rock Creek, Kashe River, south of Gravenhurst Culvert rehabilitation n/a

11 Muskoka Road 44 northerly, south of Huntsville Resurfacing 9.6

11 Stephenson Rd. 12 northerly Preventive resurfacing 5.1

12 Simcoe Rd. 37 to Hwy 400, Simcoe Resurfacing 12.5

35 Halls Lake Culvert, north of Hwy118, Hall's Lake Culvert rehabilitation n/a

69 Structures, south of Muskoka Road 169, Foot's Bay Bridge rehabilitation n/a

89 Hwy 400 to Essa Township 8th Line, Simcoe Resurfacing 7.6

89 Innisfil Creek Bridge, Simcoe Bridge replacement n/a

118 Anson Creek and Black River Bridgess, west of Hwy 35 Bridge rehabilitation n/a

141 Rosseau River Bridge, east of Hwy 632, Rosseau Bridge rehabilitation n/a

400 South of Crooked Bay Road northerly, Crooked Bay Resurfacing 8.9

400 North Simcoe County Rd. 23, Simcoe Bridge rehabilitation n/a

400 Lower Big Chute Rd., Coldwater River Bridge, Simcoe Bridge rehabilitation n/a

Bridge rehabilitation / 400 Severn River Bridge, Port Severn, Simcoe n/a replacement

Southern Highways Program 2012-2016 Page 19 REHABILITATION PROJECTS 2012-2016 TWO

Central 2014-2016

Project Length Hwy Location Type of Work (km) Bridge rehabilitation / 400 Severn River Boat Channel Bridge, Port Severn, Simcoe n/a replacement

Resurfacing / bridge 400 York / Simcoe boundary to Essa Rd., Simcoe, Phase 2 of 2 7.8 rehabilitations / median barrier

401 Hogg’s Hollow, eastbound & westbound collector, Toronto Structual coating n/a

401 Hwy 403 ramp, Peel Bridge rehabilitation n/a

401 Renforth Dr. to Hwy 410, express lanes, Peel Resurfacing 5.8

401 Eastbound ramp over Heart Lake Rd., Peel Bridge rehabilitation n/a

401 Dixie Rd., Peel Bridge rehabilitation n/a

401 Kipling Ave, Toronto Bridge rehabilitation n/a

401 Hwy 48 to Warden Ave., westbound express, Toronto Resurfacing 5.7

Resurfacing and bridge 401 Trafalgar Rd. to Halton Rd. 25, Halton 9.2 rehabilitations

403 Desjardin Canal eastbound lanes, Halton Bridge rehabilitation n/a

403 CNR Subway, Hamilton Bridge rehabilitation n/a

403 Plains Rd., Hamilton Bridge rehabilitation n/a

403 CPR Subway and Longwood Rd., Halton, Hamilton Bridge rehabilitations n/a

Central Parkway to Hwy 401/410 interchange, express lanes 403 Resurfacing 4.4 and eastbound collector lanes, Peel

1 km west of Winston Churchill Blvd. to Ford Dr., Halton / 403 Resurfacing 6.2 Peel

404 McNicoll Ave., Toronto Bridge rehabilitation n/a

404 Van Horne Ave., Toronto Bridge rehabilitation n/a

Page 20 Southern Highways Program 2012-2016 TWO TWO REHABILITATION PROJECTS 2012-2016

Central 2014-2016 Central 2014-2016

Project Length Hwy Location Type of Work (km)

404 John St., York Bridge rehabilitation n/a

404 19th Ave., York Bridge rehabilitation n/a

404 Steeles Ave., York Bridge rehabilitation n/a

404 St. John Sd. Rd., York Bridge rehabilitation n/a

406 QEW interchange to Geneva St., Niagara Resurfacing 6.0

409 Belfield structure, Toronto Bridge rehabilitation n/a

410 Bovaird Dr. to Queen St., Peel Resurfacing 3.3

427 Bloor St., Toronto Bridge rehabilitation n/a

427 Burnhamthorpe Rd., Toronto Bridge rehabilitation n/a

427 Rathburn Rd., Toronto Bridge rehabilitation n/a

427 Albion Rd. and CNR bridge, Toronto Bridge rehabilitations n/a

427 Hwy 401 to Campus Rd., Toronto Resurfacing 2.9

1 km east of Victoria Ave. to 0.6 km west of Seventh St., QEW Resurfacing 5.6 Niagara

QEW Christie St. and Maple Ave., Niagara Bridge rehabilitations n/a

Burlington Bay Skyway, Niagara-bound, Burlington / QEW Bridge rehabilitation n/a Hamilton

QEW Burloak Dr., Halton Bridge rehabilitation n/a

QEW Glendale Ave., Niagara Bridge rehabilitation n/a

QEW Hwy 403 ramp over Ford Dr., Halton Bridge rehabilitation n/a

Southern Highways Program 2012-2016 Page 21 REHABILITATION PROJECTS 2012-2016 TWO

Central 2014-2016

Project Length Hwy Location Type of Work (km)

QEW Baker Rd., Niagara Bridge rehabilitation n/a

QEW Netherby Rd., Niagara Bridge rehabilitation n/a

QEW Townline Rd., Niagara Bridge rehabilitation n/a

QEW Black Creek bridge, Niagara Bridge replacement n/a

QEW Bowen Rd., Niagara Bridge replacement n/a

QEW Walkers Line, Halton Bridge rehabilitation n/a

QEW Dorval Dr., Halton Bridge rehabilitation n/a

QEW Winston Churchill Blvd., Halton Bridge rehabilitation n/a

QEW Seventh St., Niagara Bridge replacement n/a

Various Various locations Bridge rehabilitations n/a

Various Various locations Resurfacing n/a

Note: Project timing is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

Page 22 Southern Highways Program 2012-2016 TWO TWO REHABILITATION PROJECTS 2012-2016

Eastern 2012

Southern Highways Program 2012-2016 Page 23 REHABILITATION PROJECTS 2012-2016 TWO

Eastern 2012

Target Project Map Completion Length # Hwy Status Location Type of Work Date (km)

1 7 Underway Havelock to Norwood Resurfacing / passing lanes 2012 7.7

South Junction Hwy 115 to Resurfacing / structural 2 7 Underway 2012 3.6 Peterborough Rd. 15 culvert replacement

Scott Rd. westerly to Hwy 41, 3 7 New Resurfacing / passing lane 2013 15.0 Kaladar

4 7 New Sharbot Lake westerly to Scott Rd. Resurfacing 2012 25.0

Passng lanes / intersection 5 7 New Wemyss to Maberly 2013 1.0 Improvements

6 7 New Marmora to Havelock Resurfacing 2013 13.6

7 7A/7 New Trout Creek Bridge and CNR bridge Bridge rehabilitations 2013 n/a

8 17 Underway CNR overhead, Renfrew Bridge rehabilitation 2012 n/a

9 17 Underway CPR overhead, Petawawa Bridge rehabilitation 2012 n/a

East of Renfrew Cr. 42 to Renfrew 10 17 Underway Resurfacing 2012 5.4 Cr. 26

11 17 New Snake River bridge, Cobden Bridge rehabilitations 2012 n/a

12 17 New Stonecliffe to Bissett Creek Resurfacing 2012 12.5

13 28 Underway Renfrew Rd. 514 to Denbigh Resurfacing 2012 18.7

Peterborough / Haliburton boundary 14 28 Underway Resurfacing 2012 11.6 to Haliburton/Hastings Boundary

Former Hwy 134 northerly to Realignment / Intersection 15 28 New 2013 2.6 Stoney Lake Rd. Improvements

Hastings County Line to Bancroft 16 28 New Resurfacing 2013 12.8 south limits

17 35 Underway Rd. 121, Long Beach Intersection improvements 2012 n/a

18 41 New Eganville to Griffith Pavement presevation 2012 43.0

Page 24 Southern Highways Program 2012-2016 TWO TWO REHABILITATION PROJECTS 2012-2016

Eastern 2012

Target Project Map Completion Length # Hwy Status Location Type of Work Date (km)

19 60 Underway Bonnechere River bridge at Deacon Bridge rehabilitation 2012 n/a

20 60 Underway Renfrew Rd. 61 to Douglas Resurfacing 2012 6.5

21 62 New Bancroft to Hickey Settlement Rd. Pavement presevation 2012 10.0

Papineau Creek and Little Mississippi bridges, 22 127 Underway Bridge rehabilitations 2012 n/a Maynooth

23 138 New North Raisin River bridges, south of Rd. 43 Bridge rehabilitations 2013 n/a

24 148 Underway Hazley Bay bridge, Pembroke Bridge rehabilitation 2012 n/a

Bridge rehabilitation / 25 401 Underway bridge, Trenton 2012 n/a widening

26 401 Underway CNR & Boundary Rd Bridges, Cornwall Bridge replacements 2014 n/a

Moulinette underpass, interchange 778, Long 27 401 Underway Bridge replacement 2012 n/a Sault

28 401 Underway Carman Rd. underpass, Iroquois Bridge replacement 2012 n/a

CNR overhead and Hwy 37 underpass, 29 401 Underway Bridge rehabilitations 2013 n/a Belleville

Crystal Springs 1000, LaRue Mills Rd. and 30 401 Underway Bridge rehabilitations 2013 n/a County Rd. 2 underpasses

Lennox and Addington Rd. 41 to Wymans Rd, 31 401 Underway Resurfacing 2012 15.1 Napanee

Frontenac Rd. 38 to Lennox and Addington 32 401 New Resurfacing 2013 17.5 Rd. 4

33 401 New Hwy 416 to Carmen Rd. Resurfacing 2012 17.0

Dickinson Dr. underpass, Brookdale Ave. 34 401 New underpass, McConnell Ave. underpass Bridge rehabilitations 2013 n/a Summerstown Rd Underpass, Cornwall Area

Beechwood Rd. underpass and Palace Rd. 35 401 New Bridge rehabilitations 2013 n/a overpass

Southern Highways Program 2012-2016 Page 25 REHABILITATION PROJECTS 2012-2016 TWO

Eastern 2012

Target Project Map Completion Length # Hwy Status Location Type of Work Date (km)

36 401 New Moulinette Rd. to Upper Canada Resurfacing 2012 20.5

37 401 New Mallorytown Rd. to Resurfacing 2012 9.0

38 401 New East of North Augusta, Brockville Noise barriers 2012 1.0

Bridge 39 401 New Cornwall Centre Rd. overpass 2014 n/a replacements

1.4 km north of Rd. 43 to Rd. 6, 40 416 Underway Resurfacing 2012 13.5 Roger Stevens Dr.

41 416 New Hwy 401 to County Rd. 44 Resurfacing 2012 30.2

Bridge 42 417 Underway Boundary Rd. underpass, Ottawa 2014 n/a rehabilitation

Prescott Russell Rd. 14 and Rd. 10 Bridge 43 417 Underway 2012 n/a bridge rehabilitations

Stormont Dundas and Glengary Rd. Bridge 44 417 New 2013 n/a 20, Casselman rehabilitations

Resurfacing 45 1000 Underway Resurfacing 2012 11.0 Parkway

Bridge 1000 New Thousand Islands Parkway bridges 2013 n/a rehabilitations

Culvert various New Various highways 2012 n/a replacements

Note: Project timing is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

Page 26 Southern Highways Program 2012-2016 TWO TWO REHABILITATION PROJECTS 2012-2016

Eastern 2013

Southern Highways Program 2012-2016 Page 27 REHABILITATION PROJECTS 2012-2016 TWO

Eastern 2013

Target Project Map Completion Length # Hwy Status Location Type of Work Date (km) Culvert replacement/ 1 7 New Structural culverts, Oakwood 2013 n/a rehabilitation

2 7 New Structural culvert, McGarry Creek Culvert replacement 2013 n/a

Bridge 3 17 New Petawawa River bridge, Petawawa 2015 n/a rehabilitations

Resurfacing / 4 15 New Seeleys Bay northerly to Crosby 2014 23.9 passing lanes

5 35 New Trent Canal bridge, Rosedale Bridge rehabilitation 2014 n/a

6 138 New St. Andrews bridge Bridge rehabilitation 2013 n/a

7 401 New County Rd. 45, underpass, Division St. Bridge rehabilitation 2014 n/a

8 401 New Mitchell Rd. underpass Bridge rehabilitation 2013 10.0

9 401 New Trent River bridge, Quinte West Bridge rehabilitation 2014 n/a

10 401 New Glen Miller Rd. interchange 526 bridge Bridge rehabilitation 2014 n/a

Bridge 11 417 New Hwy 34 and Hwy 138 underpasses 2014 n/a rehabilitations

12 417 New Casselman Rd. underpass Bridge rehabilitation 2013 n/a

13 417 New 8th Line to Russell Rd. Resurfacing 2013 7.1

Ferry Stella, Amherst Island and Millhaven, 14 New Dock replacement 2014 0.5 Docks Hwy 33

Culvert Various New Various highways 2013 n/a replacements

Page 28 Southern Highways Program 2012-2016 TWO TWO REHABILITATION PROJECTS 2012-2016

Eastern 2013 Eastern 2014-2016

Project Length Hwy Location Type of Work (km)

7 Fall River bridge, Sharbot Lake Bridge rehabilitation n/a

7 Crowe River bridge, Marmora Bridge rehabilitation n/a

7 Salmon River bridge, Arden Bridge replacement n/a

7 Otonabee River and CNR eastbound lane bridges Bridge rehabilitation n/a

Hwy 7 Ouse River bridge, Norwood, Hwy 28 Eels Creek Bridge replacements / 7,28,118 n/a bridge, Woodview, Hwy 118 Irondale River culvert replacement

Resurfacing / bridge 15 County Rd. 42 to Youngs Hill Rd. and Crosby Creek bridge 2.8 replacement

17 Renfrew Rd. 26 To Petawawa Township boundary Resurfacing 6.6

17 Mississippi River bridge, Arnprior Bridge rehabilitation n/a

33 Frontenac Rd. 20 to Bath Resurfacing 14.5

35 City of Kawartha Lakes Rd. 121 northerly to Coboconk Resurfacing 19.9

41 Hydes Creek bridge, Griffith Bridge rehabilitation n/a

41 North of Rankin Culvert replacement n/a

41 Hydes Creek bridge, Griffith Bridge rehabilitation n/a

41 Hwy 60 to Hwy 17 Resurfacing 29.0

62 Ashley St. to Hastings Rd. 14, Foxboro Resurfacing 3.4

62 Moria Lake bridge Bridge rehabilitation n/a

62 Foxboro / Stirling 14 to Ivanhoe S Lt. Resurfacing 10.3

62 Structural Culverts Eldorado, Crofton and Bannockurn Culvert replacements n/a

Realignment / bridge 132 Constant Creek bridge 1.0 replacement

138 Monkland to Hwy 417 Resurfacing 16.9

148 CPR overhead bridge, Pembroke Bridge rehabilitation n/a

401 & 62 Hwy 401 east of Rd. 30 and Hwy 62, Pearsall Creek Culvert replacements n/a

Southern Highways Program 2012-2016 Page 29 REHABILITATION PROJECTS 2012-2016 TWO

Eastern 2014-2016

Project Length Hwy Location Type of Work (km)

401 Cornwall to Morrisburg bridges Bridge rehabilitations n/a

401 Napanee area bridges Bridge rehabilitations n/a

401 Upper Canada Rd. underpass, Morrisburg Bridge rehabilitation n/a

401 Aultsville County Rd. underpass Bridge rehabilitation n/a

Lennox and Addington County Rd. 41 overpass and 401 Bridge rehabilitations n/a Napanee River and Selby Creek bridges

401 County Rd. 2 / Highway 34 underpass Bridge rehabilitation n/a

401 Power Dam Drive underpass, Cornwall Bridge rehabilitation n/a

Lennox and Addington County Rd. 4 to County Rd. 41, 401 Resurfacing 14.6 Napanee

417 Bearbrook Road bridges Bridge Rehabilitations n/a

417 Limoges Rd. to 8th Line Rd., Ottawa Resurfacing 19.6

417 St. Eugene Rd. underpass Bridge rehabilitation n/a

417 Ramsayville Rd. overpass Bridge rehabilitation n/a

417 Hwy 7 to March Rd., Ottawa Resurfacing 9.2

Bridge rehabilitation / 1000 Landons Bay and Jones Creek bridges n/a replacement

Various Various highways Culvert Replacements n/a

Note: Project timing is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

Page 30 Southern Highways Program 2012-2016 TWO TWO REHABILITATION PROJECTS 2012-2016

Eastern 2014-2016 West 2012

Southern Highways Program 2012-2016 Page 31 REHABILITATION PROJECTS 2012-2016 TWO

West 2012

Target Project Map Completion Length # Hwy Status Location Type of Work Date (km)

1 3 New Grand River bridge, Cayuga Bridge replacement 2014 n/a

Resurfacing / culvert 2 6 Underway Wellington Rd. 7 to Fergus 2012 12.1 rehabilitation

Resurfacing / bridge rehabilitation 3 6 New Port Dover to Jarvis 2012 13.2 / intersection improvements

North of Laird Rd. to Woodlawn Rd., 4 6 New Resurfacing 2012 8.8 Guelph

Middlesex Rd. 50 to Perth Rd. 9, St. Resurfacing / bridge / 5 7 Underway 2013 17.8 Marys culvert rehabilitation

Resurfacing / bridge 6 7 Underway Rockwood to Halton Rd. 32 2012 4.1 rehabilitation

MTO Commuter Parking Lot / GO 7 8 New TRANSIT FACILITY at Sportsworld Commuter parking lot 2012 n/a Drive

8 10/89 New Shelburne to Primrose Resurfacing 2012 5.5

9 21 New Tiverton to Port Elgin Resurfacing 2012 20.8

10 21 New Sheppardton to Kingsbridge Resurfacing 2012 9.8

Resurfacing / culvert 11 21 New Bayfield to Goderich rehabilitation / 2014 20.0 replacement

12 21 New Amberley to Kincardine Resurfacing 2012 17.9

Resurfacing / culvert 13 21 New Grand Bend to Hendrick Rd. rehabilitation / 2012 7.8 replacement Various locations including Thames Bridge / culvert 14 23 New River Bridge, Flat Creek Bridge, replacement / bridge 2012 n/a north of Mitchell rehabilitation

Glenn Morris Rd. to Waterloo Rd. 43, Resurfacing / culvert 15 24 New 2012 5.6 south of Cambridge rehabilitation

Page 32 Southern Highways Program 2012-2016 TWO TWO REHABILITATION PROJECTS 2012-2016

West 2012 West 2012

Target Project Map Completion Length # Hwy Status Location Type of Work Date (km)

Resurfacing / culvert 16 24 New Simcoe to Scotland 2012 15.9 rehabilitation

Resurfacing / culvert 17 26 Underway Woodford to Meaford 2012 9.8 rehabilitation

Various locations, Chatham to Bridge / culvert 18 40 New 2012 n/a Wallaceburg rehabilitations

Stanley Line to Courtright Line, south of 19 40 New Resurfacing 2012 6.8 Sarnia

Lancaster St. to Waterloo Rd. 15, Resurfacing / culvert / 20 85 New 2015 7.6 Waterloo bridge rehabilitation

Chatham-Kent Rd. 2 and Dillon Rd. 21 401 Underway Bridge rehabilitation 2012 n/a underpass, east of Tilbury

Putnam Commercial Vehicle Inspection 22 401 Underway Rehabilitation 2013 n/a Facilities

23 401 New Kenesserie Rd., Duart Rd., Chatham-Kent Bridge rehabilitation 2012 n/a

24 401 New Drake Rd., Chatham-Kent Bridge rehabilitation 2012 n/a

25 401 New Bloomfield Rd., Chatham-Kent Bridge rehabilitation 2012 n/a

Wellington Rd. 32, Wellington Rd. 35, 26 401 New Bridge rehabilitation 2013 n/a Hwy 6, Guelph

Interchange 27 401 New Hwy 6, west ramp terminal, Morriston improvement / 2012 n/a resurfacing

28 401 New Blacks Rd. to Currie Rd., West Lorne Resurfacing 2012 22.2

29 401/402 New Interchange ramps, west of London Resurfacing 2012 n/a

Various locations, Chatham-Kent, Elgin 30 401/403 Underway Bridge rehabilitations 2013 n/a County, Brantford

Southern Highways Program 2012-2016 Page 33 REHABILITATION PROJECTS 2012-2016 TWO

West 2012

Target Project Map Completion Length # Hwy Status Location Type of Work Date (km)

31 401/403 New Interchange ramps, east of London Resurfacing 2012 n/a

London Line, First School Rd., Arkona Rd., Bridge 32 402 Underway 2012 n/a Centre Rd. underpasses, west of Strathroy rehabilitations

Culvert 33 402 New East of Strathroy 2012 n/a rehabilitation

1.7 km east of Hwy. 21 to Kerwood Rd., 34 402 New Resurfacing 2012 19.6 Warwick

35 402 New Front St. to Mandaumin, eastbound lanes Resurfacing 2012 15.3

Note: Project timing is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

Page 34 Southern Highways Program 2012-2016 TWO TWO REHABILITATION PROJECTS 2012-2016

West 2012 West 2013

Southern Highways Program 2012-2016 Page 35 REHABILITATION PROJECTS 2012-2016 TWO

West 2013

Target Project Map Completion Length # Hwy Status Location Type of Work Date (km)

Reconstruction / 1 3 New Canfield, Haldimand County 2013 0.7 drainage

Kettle Creek, Balaclava St. underpass, 2 3 New First Ave. underpass, Burwell Rd. Bridge rehabilitations 2014 n/a underpass, St. Thomas

3 3 New Delhi to Simcoe Resurfacing 2013 14.1

4 6 New Chatsworth to Owen Sound Resurfacing 2013 11.0

Springmount to Hepworth including Resurfacing / bridge 5 6 & 21 New Shallow Lake Bridge, Stokes River Bridge, rehabilitation/ bridge 2014 14.7 Sauble River Bridge / culvert replacement Mount Forest to Shelburne including South Saugeen River Bridge west, South Bridge replacement / 6 89 New 2014 n/a Saugeen River Bridge east, Mud Creek rehabilitation Bridge, Grand River Bridge

Resurfacing / culvert 7 89 New Harriston to Mount Forest 2013 14.5 replacements

Victoria Rd. to Orford Rd., westbound 8 401 New Resurfacing 2013 8.0 lanes Chatham-Kent

Kent Bridge Rd. to Victoria Rd. eastbound 9 401 New Resurfacing 2013 7.3 lanes, Chatham-Kent

Bridge replacement / culvert rehabilitation 10 401 New Highway 40 interchange, Chatham-Kent 2014 n/a / interchange improvements

Note: Project timing is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

Page 36 Southern Highways Program 2012-2016 TWO TWO REHABILITATION PROJECTS 2012-2016

West 2013 West 2014-2016

Project Length Hwy Location Type of Work (km)

Intersection 3 Hwy 19 / Vienna Rd., Tillsonburg n/a improvements

3 Essex Rd. 34 to Essex Rd. 27, west of Leamington Resurfacing 10.2

4 Kippen River Bridge and Ausable River Bridge, Hensall Bridge rehabilitation n/a

4 Talbotville to Middlesex Rd. 35 Resurfacing 5.9

4 Medway Creek Bridges, north of London Bridge rehabilitations n/a

6 Argyle St. Grand River Bridge, Caledonia, Highway 7191 Bridge replacement n/a

6 Hwy. 401 to south of Clair Rd. Resurfacing 4.8

6 Various locations, Hepworth to Tobermory Culvert rehabilitations n/a

6 Rocky Saugeen River Bridge and Pottawatomi River Bridge Bridge rehabilitation n/a

6 Jarvis to Hagersville Resurfacing 8.2

6 Hagersville to Caledonia Resurfacing 14.0

6 Morriston to Hwy 401 Resurfacing 1.1

Resurfacing / culvert 7 Perth Rd. 9, Wildwood Conservation area to Stratford 9.0 rehabilitations

7 Kitchener to Guelph Resurfacing 9.7

7 Guelph to Rockwood Resurfacing 6.8

Southern Highways Program 2012-2016 Page 37 REHABILITATION PROJECTS 2012-2016 TWO

West 2014-2016

Project Length Hwy Location Type of Work (km)

8 Mitchell to Sebringville Resurfacing 9.4

9 Kincardine to Bruce Rd. 7 Resurfacing 8.0

21 Port Elgin to Southampton to Alvanley Resurfacing 26.2

23 Bornholm to Monkton Resurfacing 8.8

23 Mitchell to Bornholm Resurfacing 7.4

24 Brant Rd. 5 to Glen Morris Rd., north of Brantford Resurfacing 4.8

26 Thornbury to Collingwood Rehabilitation 13.2

40 Churchill Rd. to McGregor Rd., Sarnia Resurfacing 3.2

40 Chatham to Wallaceburg Resurfacing 20.4

Resurfacing / bridge 85 Krug St. to Lancaster St., Kitchener 2.8 rehabilitations

401 Hespeler Rd. underpass, Cambridge Bridge rehabilitation n/a

Bridge replacement / 401 Fountain St., Speedsville Rd., Hwy 8 Ramp, Cambridge n/a rehabilitation

Bridge replacement / 401 Hwy 19 underpass n/a interchange improvements

Bridge replacement / 401 Norwich Ave. underpass n/a interchange improvements

Bridge replacement / 401 Dorchester Rd. underpass n/a interchange improvements

Page 38 Southern Highways Program 2012-2016 TWO TWO REHABILITATION PROJECTS 2012-2016

West 2014-2016

Project Length Hwy Location Type of Work (km) Miller Rd., Springer Rd., Carriage Rd., Sharon Rd., Woodhull 402 Rd., Westdel Bourne, White Oak Rd. underpasses, west of Bridge rehabilitations n/a London

Kerwood Rd. to Middlesex Rd. 81, west of Strathroy, 402 Resurfacing 20.3 eastbound lanes

402 Strathroy to London Bridge rehabilitations n/a

Adelaide Rd. underpass, CNR overpass, Sydenham River 402 Bridge rehabilitations n/a Bridge east of Strathroy

Hwy 402, Front St., and CNR overpass and Hwy 40 / C.N.R. 402 / 40 Bridge rehabilitations n/a overhead, Sarnia

Ewing Dr., Tollgate Rd., Hwy 24 / King George Rd., North 403 Park St., West St. and Wayne Gretzky Pkwy underpasses, Bridge rehabilitations n/a Brantford

403 Grand River Bridge, west of Brantford Bridge rehabilitation n/a

Note: Project timing is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

Southern Highways Program 2012-2016 Page 39 PROJECTS BEYOND 2016 THREE

THREEProjects Beyond 2016

Page 40 Southern Highways Program 2012-2016 THREE THREE PROJECTS BEYOND 2016

Planning for the Future

Ontario continuously looks at its long-term

transportation infrastructure needs to determine

where the greatest benefits can be realized for

our economy and the lives of Ontarians. Planning

beyond 2016 ensures our highways and bridges

are built and maintained to support traffic levels

and transportation needs for decades to come.

Identified on the following pages are some

projects in the planning stages that could

support growth, improve traffic flow and increase

safety in southern Ontario. These projects are

still subject to further study and prioritization,

and may be considered for future development.

Southern Highways Program 2012-2016 Page 41 PROJECTS BEYOND 2016 THREE

Southern Ontario — Beyond 2016

Area Planning Studies Description

GTA - West Corridor Planning and EA Study

Niagara to GTA Corridor Planning and EA Study

Peterborough / Hwy 7 Area Planning and Highway Corridor Study

Simcoe Area Multi-Modal Transportation Strategy

Brantford to Cambridge Corridor Study

Highway Description

3 Windsor to Leamington, Phase 3

5/6 Interchange, Hamilton

6 Hanlon Expressway interchanges, Guelph

6N Extension to Caledonia

6N North of Freelton to Maltby Rd., Guelph

7 Hwy 7, Town of Perth limits

7 Scott’s Corners to Fowlers Corners, Peterborough

7/8 Stratford to New Hamburg

8 Sportsworld Dr. to Hwy 401, interchange improvements, Kitchener

12 South Jct. Hwy 48 to north Jct. County Rd. 48, Beaverton

17 Arnprior to Renfrew

26 Stayner to Thornbury

Page 42 Southern Highways Program 2012-2016 THREE THREE PROJECTS BEYOND 2016

Southern Ontario — Beyond 2016

Highway Description

35 Hwy 115 to Lindsay

40 Lambton Rd. 34 to Hwy 402, Sarnia

89 Hwy 400 to Rosemont

400 Toronto to Barrie

400 Major Mackenzie Dr. to King Rd., York (HOV lanes)*

401/400 Interchange, Toronto

401 Montreal St. to Hwy 15, Kingston

401 Burnham St. to County Rd. 45, Cobourg

401 Mississauga to Milton

401 Cambridge to Wellington County / Halton region boundary

401 Hwy 8 to Hespeler Rd., Cambridge

401 Chatham - Kent

403 QEW to Hwy 407, Oakville / Mississauga

404 Hwy 7 to Newmarket

406 Welland to Port Colborne

410 Hwy 401 to Bovaird Dr.,

427 Hwy 409 to Hwy 407, Toronto (HOV lanes)*

427 Extension (Regional Road 7 to Major Mackenzie Dr.), York

Southern Highways Program 2012-2016 Page 43 PROJECTS BEYOND 2016 THREE

Southern Ontario — Beyond 2016

Highway Description

QEW McLeod Rd. to Mountain Rd., Niagara Falls

QEW Garden City Skyway, Niagara

QEW Hwy 403 interchange, Oakville

QEW Hwy 403 to Hwy 427

* BCF: Building Canada Fund, BIF: Border Infrastructure Fund, HOV: High Occupancy Vehicle, ISF: Infrastructure Stimulus Fund.

Page 44 Southern Highways Program 2012-2016 THREE FOUR COMPLETED PROJECTS 2011

FOUR Completed 2011

Southern Highways Program 2012-2016 Page 45 COMPLETED PROJECTS 2011 FOUR

In 2011, the Ontario government committed $1.36 billion to expand and repair southern Ontario highways and bridges. The following pages contain all major southern Ontario highway projects completed last year.

2011 Southern Ontario Accomplishments

New highways 62 km

New bridges 5

Highways rehabiliated 562 km

Bridges rehabiliated 56

Page 46 Southern Highways Program 2012-2016 FOUR FOUR COMPLETED PROJECTS 2011

Twinning Highway 7 near Carleton Place

Highway 7 was widened from two lanes to

four lanes west of Ottawa from Highway 417

to Carleton Place, a growing area in Eastern

Ontario. Economic benefits of this widening

include an increase in development and the

number of businesses.

The drive to downtown Ottawa has been

shortened by 25 minutes and commuters can

use HOV lanes and carpool. They can also use

two new commuter parking lots at Dwyer Hill

Road and Cemetery Road.

Between Highway 417 and Carleton Place,

26 kilometres of highway was widened. An

8-kilometre stretch was paved using perpetual

pavement. This type of pavement is tough

enough to withstand serious stress for at least

50 years. If needed, in the future only the

surface layer of the highway will be repaved

saving time and money.

Southern Highways Program 2012-2016 Page 47 COMPLETED PROJECTS 2011 FOUR

Central 2011

Hwy Location Type of Work

7 Brock Rd. to Durham Rd. 30, Durham Resurfacing

9 Hwy 27 to Simcoe Rd. 10, Shomberg Resurfacing

11 Laclie St. to South Sparrow Lake Rd., Simcoe Resurfacing

11 Killworthy, Sparrow underpass, Gravenhurst Bridge rehabilitation

11 Hwy 118 to Muskoka Road 117, Bracebridge Preventive resurfacing

12 CNR overhead bridge, Orillia Bridge replacement

26 Hwy 26 at Simcoe County Rd. 28 Signal installation

35 Muskoka Road 117 southerly, Dorset Preventive resurfacing

35/115 Wilmot Creek and Farewell Creek culverts, Clarington Culvert rehabilitation

48 South of York Rd. 9 to 4 km north of York Rd. 9 Resurfacing

60 Hwy 35 to Oxtongue Lake Narrows, Dwight Resurfacing

60 Algonquin Park West Gate westerly Resurfacing

89 Nottawasaga River Bridge, Alliston Bridge rehabilitation

400 St. Vincent St. Bridge, Barrie (ISF)* Bridge rehabilitation

400 Innisfil Creek culvert, Innisfil (ISF)* Culvert rehabilitation

Interchange 400 Hwy 88 interchange, Simcoe reconstruction

400 Simcoe Road 19 to north junction Hwy 12/400 interchange, Simcoe Resurfacing

400 King Road to Hwy 9, York Resurfacing

Page 48 Southern Highways Program 2012-2016 FOUR FOUR COMPLETED PROJECTS 2011

Central 2011

Hwy Location Type of Work

401 Renforth Dr. north and southbound Bridges (ISF)* Bridge rehabilitations

401 Dixie Road underpass, Mississauga (ISF)* Bridge rehabilitation

401 Various locations Overhead sign structures

401 Trafalgar Rd., Milton Bridge rehabilitation

Noise barrier panel 401 Hwy 404 to Victoria Park Ave. eastbound collector, 500 m replacement

403 Central Parkway to Winston Churchill Blvd., Mississuaga Resurfacing

404 Aurora Rd. to Stouffville Rd., York Resurfacing

Resurfacing / bridge rehabilitations /median 409 Hwy 401 to Hwy 427, Toronto barrier replacement / highway lighting

QEW Victoria Ave. to East of Casablanca Blvd. (Niagara Bound) Resurfacing

Various Various culverts, Toronto-Durham Area Culvert rehabilitation

Various Various locations Bridge rehabilitation

Various Various locations Selective resurfacing

* BCF: Building Canada Fund, BIF: Border Infrastructure Fund, HOV: High Occupancy Vehicle, ISF: Infrastructure Stimulus Fund.

Southern Highways Program 2012-2016 Page 49 COMPLETED PROJECTS 2011 FOUR

Eastern 2011

Hwy Location Type of Work

7 Resurfacing - Perth East To West Limits Resurfacing

Hwy 417 to Carleton Place , Phase 3 of 3, Ashton Station Rd to 2 to 4 lane widening/ 7 Carleton Place bridge rehabilitation

7A Fleetwood Creek Bridge Bridge Rehabilitation

17 Deux Rivieres to northeast regional boundary Resurfacing

17 Renfrew Rd 40 to Cobden Resurfacing

17 Renfrew Rd. 4 westerly to Renfrew Rd. 61 Resurfacing

Resurfacing and 28 Stoney Lake Rd to Youngs Point Intersection improvements

Intersection 33 Intersection Improvements Speers Blvd, Amherstview Improvements

35 Durham Rd. 20 To Hwy 7A Resurfacing

37 Moira River Bridge, North Of Belleville Bridge Rehabilitation

41 Vennachar Junction northerly to Hwy 28 Resurfacing

41 Snake River Bridge Bridge Rehabilitation

62 Crofton To Rossmore Resurfacing

Resurfacing/concrete 115 Hwy 35 To Tapley Quarter Line re-texuring

401 Frontenac Rd. 38 To Lennox & Addington Rd. 4 New paved shoulders

401 Trenton To Brighton Resurfacing

401 CPR Overhead Removal, Prescott Bridge Rehabilitation

Interchange 401 Hwy 15 to Frontenac Cty. Rd. 38 - Division St., Kingston improvements

Page 50 Southern Highways Program 2012-2016 FOUR FOUR COMPLETED PROJECTS 2011

Eastern 2011

Hwy Location Type of Work

416 Rd 6 To Rd 73, Manotick Resurfacing

417 Kenyon-Roxborough Rd to Limoges, westbound lanes Resurfacing

417 Tayside Municipal Drain Culvert Replacement

417 Skye Rd Overpass, St. Bernardin Bridge Rehabilitation

Hwy 416 to Anderson Rd. (Phase 3A) Carling Ave. eastbound bridge, Bridge replacements/ 417 - OQW Ottawa widening

Various Culvert replacements various highways Culvert replacements

Southern Highways Program 2012-2016 Page 51 COMPLETED PROJECTS 2011 FOUR

West 2011

Hwy Location Type of Work

3 Dry Lake Rd. To Cayuga Resurfacing

3 Aylmer to Carter Rd. Resurfacing

3 John Pound Rd. To Simcoe St., Tillsonburg Resurfacing

Resurfacing / culvert 4 Kippen to Clinton rehabilitations

Intersection 6 Hanlon Expressway, Guelph improvements

6 Durham to Dornoch Resurfacing

7&8 Waterloo Rd. 51 to Fischer-Hallman Rd., Kitchener Resurfacing

7&8 Shakespeare to New Hamburg Resurfacing

Resurfacing / bridge 8 Perth Rd. 135 to Stratford rehabilitation

21 Hwy. 9 to Tiverton Resurfacing

21 Shashawanda Creek Bridge, north of Forest Bridge replacement

21 Amberley to Kincardine, various locations Bridge rehabilitations

21 Underwood to Port Elgin Culvert rehabilitations

21/9 Tiverton to Underwood and Kincardine to Bruce County Rd. 7 Culvert rehabilitations

Resurfacing / bridge 24 Brant Rd. 53 to Hwy 403, west of Brantford replacement

24 Brant Rd. 23 to Brant Rd. 5, north of Brantford Resurfacing

Resufacing / bridge 40 Rokeby Line to Churchill Line, Sarnia rehabiliations

Bridge / culvert 40 Wallaceburg to Chatham-Kent Rd. 33 rehabilitations

Blacks Rd., Fumival Rd., Dunorough Rd., Southminister Bourne, 401 Bridge Rehabilitations west of London

Page 52 Southern Highways Program 2012-2016 FOUR FOUR COMPLETED PROJECTS 2011

West 2011

Hwy Location Type of Work

401 Hwy 4 to Hwy 402, London Resurfacing

401 Highbury Ave., London to Regional Boundary, various locations Resurfacing

Four to six-lane 401 Woodstock to Cambridge widening

402 Nauvoo Rd. to Centre Rd., Strathroy Resurfacing

Waterworks Rd., Camlachie Rd., Oil Heritage Rd., Hwy 21, east of 402 Bridge Rehabilitations Sarnia

402 Longwoods Rd. To Woodhull Rd., London Resurfacing

Resurfacing / guide 403 Paris Rd. To Garden Ave., Brantford rail improvements

Southern Highways Program 2012-2016 Page 53 FOUR COMPLETED PROJECTS 2011

Published November 2012 ISSN 1913-4673

Southern Highways Program 2012-2016 Page 54