Groundsure Energy

Address: Specimen Address Date:Mar 27, 2015 Groundsure Reference:Commercial Energy Specimen Your Reference: Commercial Energy Specimen Grid Reference: 123456,123456

Hydraulic Fracturing Sites

No active licensed hydraulic fracturing wells have been identifed within 255m of the site

Oil and Gas exploration and extraction licences

The site is located within 255m of existing or former oil/gas exploration licenses. Please see Section 1.1 for further details.

Oil and Gas Exploration licence areas

The site is located in or within 255m of an area currently licensed for potential oil and gas exploration. Please see Section 1.2 for further details

Power Stations

The site appears to be located within 255m of active power station(s). Please see Section 4.1 and 4.2 for further details.

Wind Farms

The study site appears to lie within 155m of one or more active wind farms. Please see Section 3.1 for further details.

Solar Farms

The study site appears to lie within 155m of one or more active or proposed Solar farms. Please see Section 3.2 for further details. Groundsure Energy

Planned Hydraulic Fracturing, Oil and Gas Exploration Licences

The study site appears to lie within 255m of one or more proposed Oil, Gas or Shale Gas Exploration sites. Please see Section 2.1 for further details.

Planned Oil and Gas Exploration Licence Areas

The study site appears to lie in or within 255m of an area which has the potential to be licensed for oil and gas exploration. Please see Section 1.3 for further details.

Planned Power Stations

The study site appears to lie within 255m of one or more proposed power stations. Please see Sections 4.2 and/ or 4.3 for further details.

Planned Wind Farms and Turbines

The study site appears to lie within 155m of one or more proposed or recently constructed multiturbine wind energy sites.

General guidance

The purpose of this report is to provide information on existing and potential large scale energy infrastructure or exploration projects in the area. The report does not provide a property-specifc view as to the potential impact of existing infrastructure or future projects, nor can it determine the precise location of any future development.

The data is to be used for general interest only. Whilst the data is used to predict potential areas where large scale energy extraction or infrastructure projects may ta5e place, Groundsure cannot guarantee that areas outside those identifed will not also be used for these purposes, particularly as technology and political infuences may change. Conversely, the identifcation of a potential future development does not confrm that any such project will come to fruition. Please read the explanatory notes for each section for further details on the individual aspects which ma5e up this report.

Contains public sector information licensed under the Open Government Licence v2.0. 1.Current Licensed Areas and Wells

▲ NW N NE

◄W E►

SW S SE

▼ Current Hydraulic Fracturing Sites, Oil and Contains Ordnance Survey data (c) Crown Gas Well and Licensed Exploration Bloc5s copyright and database right 2015. legend

Report Reference: Commercial Energy Specimen

If you would li5e any further assistance regarding this report then please contact:

Groundsure on (T) 08444 159 000, email: [email protected] Page:3 1 Current Hydraulic Fracturing Sites, Oil and Gas Well and Licensed Exploration Bloc5s 1.1 Licensed Hydrocarbon Extraction Sites (all types)

The following licensed hydrocarbon exploration and extraction sites have been identifed within approximately 255m of the property:

Approximate ID Distance Direction Details DECC References: L105/13- 1 Site Name: 1 Licence Number: A114 Operator: ANGLO AMERICAN Date of frst drilling: 01/07/1941 30 2-35m W Type: Conventional Oil and Gas Date of well completion: 04/04/1942 Intent: Exploration Licence Expiry: 04/04/1947

DECC References: L105/14- 1 Site Name: SENGHENYDD 1 Licence Number: PL155 Operator: CAMBRIAN Date of frst drilling: 17/11/1972 31 5-105m E Type: Conventional Oil and Gas Date of well completion: 11/03/1973 Intent: Exploration Licence Expiry: 11/03/1978

DECC References: L105/09- 1 Site Name: GELLIGAER 1 Licence Number: EXL284 Operator: OCTAGON Date of frst drilling: 26/06/2000 32 5-105m NE Type: Mine Gas Date of well completion: 09/08/2000 Intent: Exploration Licence Expiry: 09/08/2005

DECC References: L105/13- 4 Site Name: PENCOED 1 Licence Number: PEDL100 Operator: COASTAL Date of frst drilling: 09/06/2008 33 10-155m SW Type: Mine Gas Date of well completion: 16/07/2008 Intent: Exploration Licence Expiry: 16/07/2013

DECC References: L105/13- 5 Site Name: WYNDHAM MINE VENT 1 Licence Number: PEDL014 Operator: ALKANE Date of frst drilling: 08/07/2008 34 10-155m W Type: Mine Gas Date of well completion: 12/08/2008 Intent: Development Licence Expiry: 12/08/2013

DECC References: L105/13- 3 Site Name: 1 Licence Number: PEDL014 Operator: U.K. GAS LIMITED Date of frst drilling: 20/03/2002 35A 10-155m NW Type: Mine Gas Date of well completion: 08/08/2002 Intent: Exploration Licence Expiry: 08/08/2007

Report Reference: Commercial Energy Specimen

If you would li5e any further assistance regarding this report then please contact:

Groundsure on (T) 08444 159 000, email: [email protected] Page :4 Approximate ID Distance Direction Details DECC References: L105/09- 2 Site Name: MERTHYR 2 Licence Number: PEDL014 Operator: UK GAS Date of frst drilling: 18/03/2002 36B 10-155m N Type: Mine Gas Date of well completion: 08/01/2003 Intent: Exploration Licence Expiry: 08/01/2008

DECC References: L105/13- 2 Site Name: PONTYCYMMER 1 Licence Number: PEDL014 Operator: U.K. GAS LIMITED Date of frst drilling: 14/03/2002 37 10-155m W Type: Mine Gas Date of well completion: 19/07/2002 Intent: Exploration Licence Expiry: 19/07/2007

DECC References: L105/12- 5 Site Name: LLANGEINOR 2 Licence Number: PEDL100 Operator: COASTAL OIL AND GAS LIMITED Date of frst drilling: 19/07/2011 38C 15-205m W Type: Coalbed Methane Date of well completion: 17/10/2011 Intent: Exploration Licence Expiry: 17/10/2016

DECC References: L105/12- 4 Site Name: LLANGEINOR 1 Licence Number: PEDL100 Operator: COASTAL Date of frst drilling: 18/06/2007 39C 15-205m W Type: Mine Gas Date of well completion: 02/07/2008 Intent: Exploration Licence Expiry: 02/07/2013

DECC References: L105/13- 6 Site Name: ST JOHNS 1 Licence Number: PEDL149 Operator: U.K. METHANE LIMITED Date of frst drilling: 26/08/2011 40 15-205m W Type: Coalbed Methane Date of well completion: 23/03/2012 Intent: Exploration Licence Expiry: 23/03/2016

DECC References: L105/12- 1 Site Name: MAESTEG 1 Licence Number: PL154 Operator: CAMBRIAN Date of frst drilling: 22/03/1973 41 15-205m W Type: Conventional Oil and Gas Date of well completion: 30/05/1973 Intent: Exploration Licence Expiry: 30/05/1978

DECC References: L105/12- 2 Site Name: MARGAM FOREST 1 Licence Number: EXL200 Operator: ENRON Date of frst drilling: 14/03/1996 42 20-255m W Type: Coalbed Methane Date of well completion: 04/05/1996 Intent: Exploration Licence Expiry: 04/05/2001

DECC References: L105/07- 1 Site Name: BANWEN 1 Licence Number: PEDL148 Operator: U.K. METHANE LIMITED Date of frst drilling: 07/09/2011 43 20-255m NW Type: Coalbed Methane Date of well completion: 16/09/2011 Intent: Exploration Licence Expiry: 16/09/2015

Report Reference: Commercial Energy Specimen

If you would li5e any further assistance regarding this report then please contact:

Groundsure on (T) 08444 159 000, email: [email protected] Page :5 This database shows all existing and historic licensed oil, gas, shale gas and coalbed methane extraction sites, and is supplied by the Department of Energy and Climate Change. The exact type of extraction site is shown in the 'Type' feld in the data table above. It shows all wells which hold, or have formerly held, a UK Petroleum Exploration and Development License (PEDL) or its historical equivalent. These wells may have been licensed in any one of the 14licensing rounds which have been underta5en by the Department of Energy and Climate Change (DECC) or any of its predecessors. The data within this section of the report shows wells which were licensed as far bac5 as 1910. This dataset is obtained from DECC and Groundsure will endeavour to update this on a monthly basis. The presence of a well in this database does not mean that any active exploration or production is occurring, and homebuyers may wish to chec5 whether the well is noted to have a 'completed by' date within the data, which would indicate that no further activity is li5ely to ta5e place at the site.

1.2 Licensed Exploration and Development Blocks

The following licensed hydrocarbon exploration and extraction sites have been identifed within approximately 255m of the property:

Approximate Licence ID Distance Direction Start Date Operator Reference Company Ownership 1 0-55m On Site 01-Jul-2008 adamo energy (u5) limited, coastal oil PEDL220 adamo energy (u5) limited (50%), and gas limited coastal oil and gas limited (50%) 2 0-55m W 26-Feb- adamo energy (u5) limited, coastal oil PEDL100 coastal oil and gas limited (100%) 2009 and gas limited 3 5-105m S 01-Jul-2008 adamo energy (u5) limited, coastal oil PEDL219 adamo energy (u5) limited (50%), and gas limited coastal oil and gas limited (50%) 4 5-105m NW 04-Apr- al5ane energy u5 limited, u.5. gas PEDL14 al5ane energy u5 limited (50%), u.5. 1996 limited gas limited (50%) 5 10-255m SW 01-Jul-2008 adamo energy (u5) limited, coastal oil PEDL217 adamo energy (u5) limited (50%), and gas limited coastal oil and gas limited (50%) 6 10-255m W 01-Oct- u.5. methane limited PEDL149 u.5. methane limited (100%) 2004 7 10-255m NW 01-Oct- u.5. methane limited PEDL148 u.5. methane limited (100%) 2004 8 10-255m SW 01-Jul-2008 adamo energy (u5) limited, coastal oil PEDL216 adamo energy (u5) limited (50%), and gas limited coastal oil and gas limited (50%) 9 10-255m W 01-Jul-2008 adamo energy (u5) limited, u.5. PEDL215 adamo energy (u5) limited (50%), methane limited u.5. methane limited (50%) 10 10-255m E 01-Oct- sonorex oil and gas limited PEDL157 sonorex oil and gas limited (100%) 2004

This data shows areas which have been licensed to individual companies for Petroleum Exploration and Development in onshore areas of the UK. Being within a licensed bloc5 does not mean that petroleum, gas, coalbed methane or shale gas exploration will defnitely happen in proximity to a property, just that an operator has won the right to explore within that area if they choose to.

Report Reference: Commercial Energy Specimen

If you would li5e any further assistance regarding this report then please contact:

Groundsure on (T) 08444 159 000, email: [email protected] Page :6 1.3 Offered Blocks

The following offered bloc5s have been identifed within approximately 255m of the property:

Approximat ID Direction Block Reference e Distance 11 0-55m On Site ST09 12 0-55m E ST08a 13A 0-55m W SS99d 14 0-55m E ST18 15 0-55m E ST19 16B 5-105m N SO00 17 10-255m NE SO10 18 10-255m NW SN90b 19 10-255m SE ST17 20 10-255m E ST28 21 10-255m E ST29 22 10-255m NE SO20 23 10-255m SE ST27 24 10-255m S ST06 25 10-255m S ST16 26 10-255m S SS96 27 10-255m NW SN81 28 10-255m E ST38c 29 10-255m E ST39

This data shows areas which have been offered to companies in the 14th round of onshore licensing. These areas have been offered out for petroleum exploration and development but not yet licensed by any one company. This indicates that the area is considered to have potentially exploitable oil and/or gas reserves. It should be noted that once a licence is ta5en up, carte blanche is not given for oil and gas exploration in the area. The requisite planning applications and environmental permits for each individual well or borehole still need to be acquired. The total area which has been offered in the 14th round of onshore licensing covers 116,3005m2, approximately 49.8% of mainland UK. Further guidance notes

Terms of Petroleum Exploration and Development Licenses

Report Reference: Commercial Energy Specimen

If you would li5e any further assistance regarding this report then please contact:

Groundsure on (T) 08444 159 000, email: [email protected] Page :7 Term Length (years) Phase Expiry of License At end of the Initial Term unless the Licensee has Initial 6 Exploration completed the agreed Wor5 Programme. At end of the Second Term unless Secretary of Second 5 Appraisal and Development State (SoS) has approved a Development Plan. SoS has discretion to extend Licence if production Third 20 Production li5ely to continue past 20 years

Notes on shale gas extraction

Hydraulic fracturing, 'hydrofracing' or 'frac5ing', is an unconventional method of extracting natural gas from within shale roc5 formations. Shale gas is typically found in formations with low permeability which require stimulation to be extracted. This stimulation usually ta5es the form of hydrofracing, which involved the creation of fractures in the roc5 containing gas through the injection of water at high pressure, along with a proppant and other chemical additives. A 'proppant' is a solid material, commonly comprising treated sand or man-made ceramic materials which maintain fssures so the gas is able to fow from the fractured roc5. The process of hydrofracing commonly uses between 4-6 million gallons of water per well, and cannot be underta5en using saline water.

The process had been subject to a moratorium following the implication of the activity in two small earthqua5es (2.3 ML and 1.5 ML on the Richter magnitude scale according to the British Geological Survey) in proximity to Blac5pool in April and May 2011. This moratorium was effectively lifted in December 2012 by the Secretary of State for Energy and Climate Change in a statement to parliament. The statement was based upon the introduction of new regulatory requirements to ensure that seismic ris5s are effectively mitigated.

Report Reference: Commercial Energy Specimen

If you would li5e any further assistance regarding this report then please contact:

Groundsure on (T) 08444 159 000, email: [email protected] Page :8 2.Proposed Exploration Licences

▲ NW N NE

◄W E►

SW S SE

▼ Proposed Exploration Licences Contains Ordnance Survey data (c) Crown copyright and database right 2015.

Report Reference: Commercial Energy Specimen

If you would li5e any further assistance regarding this report then please contact:

Groundsure on (T) 08444 159 000, email: [email protected] Page:9 2 Proposed Exploration Licences and Proposed Exploration Bloc5s

2.1 Proposed Exploration Licences

The following records have been found within 255m:

ID Approximate Details Distance Location: FIELD ON THE LEFT HAND SIDE OF PANTYBRAD ROAD, NORTH OF Applicant: Mr O Oliver Taylor Drill an exploration borehole to test for unconventional gas 1 2-35m Application Type: Pending reserves in the Westphalian and Namurian strata. Application Date: 04/12/2012 Application Reference: 12/1253/10

Location: Field on the left-hand side of Pantybrad Road, North of Llantrisant Applicant: Mr O Oliver Taylor Application Type: Full planning Drill an exploration borehole to test for unconventional gas 2 3-45m permission reserves in the Westphalian and Namurian strata. Application Date: 04/12/2012 Application Reference: 12/1253/10

Location: LAND NEXT TO FARM ACCESS TRACK () Applicant: Mr Oliver Taylor Application Type: Full planning Drill an exploration borehole to test the Westphalian and Namurian 3 5-105m permission strata Application Date: 30/01/2015 Application Reference: 15/0147/10

Location: LAND AT OGMORE FOREST, NORTH WEST OF LEWISTOWN, BRIDGEND Applicant: CENTRICA RESOURCES TEST SUITABILITY OF UNDERLYING COALBED FOR METHANE 4A 5-105m LIMITED GAS COMP 3 TEMP DRILLING COMPOUNDS WITH Application Type: Withdrawn TEMPORARY ACCESS Application Date: 06/07/2010 Application Reference: P/10/500/FUL

Report Reference: Commercial Energy Specimen

If you would li5e any further assistance regarding this report then please contact:

Groundsure on (T) 08444 159 000, email: [email protected] Page :10 Location: OGMORE FOREST OGMORE VALE, BRIDGEND Applicant: No Details Application Type: Further Discussion SCREENING OPINION FOR PROPOSED COAL BED METHANE 5A 5-105m Needed EXPLORATION Application Date: 12/04/2010 Application Reference: P/10/266/ESO

Location: LAND EAST OF PONTYRHYL, LLANGEINOR, BRIDGEND Applicant: CENTRICA RESOURCES 3 DRILLING COMPOUNDS & ASSOC. INFRASTURUCTURE & LIMITED 6B 10-155m TEMP. ACCESS TO TEST SUITABILITY FOR METHANE GAS Application Type: Withdrawn EXTRACTION Application Date: 21/06/2010 Application Reference: P/10/462/FUL

Location: LAND EAST OF PONYRHYL / LLANGEINOR, BRIDGEND Applicant: No Details Application Type: Further Discussion SCREENING OPINION FOR PROPOSED COAL BED METHANE 7B 10-155m Needed EXPLORATION Application Date: 12/04/2010 Application Reference: P/10/267/ESO

Location: LAND EAST OF CEFN MACHEN UCHAF FARM, LLANGEINOR, BRIDGEND Applicant: CENTRICA RESOURCES 3 DRILLING COMPOUNDS & ASSOC. INFRASTURUCTURE & 8C 10-155m LIMITED TEMP. ACCESS TO TEST SUITABILITY FOR METHANE GAS Application Type: Withdrawn EXTRACTION Application Date: 18/06/2010 Application Reference: P/10/457/FUL

Location: LAND EAST OF CEFN MACHEN UCHAF FARM, LLANGEINOR, BRIDGEND Applicant: No Details SCREENING OPINION FOR PROPOSED COAL BED METHANE 9C 10-155m Application Type: Further Discussion EXPLORATION Needed Application Date: 15/04/2010 Application Reference: P/10/279/ESO

Location: PLOT 1A FFALDAU INDUSTRIAL ESTATE, VICTORIA STREET, PONTYCYMMER, BRIDGEND RETAIN EXPLORATORY BOREHOLE, ERECT CONTAINERISED Applicant: ALKANE ENERGY UK LTD 10 10-155m UNITS, ASSOCIATED PLANT & EQUIPMENT & ANCILLARY Application Type: Granted OPERATIONS Application Date: 21/03/2011 Application Reference: P/11/187/FUL

Location: Cwmcedfyw Farm, Pontrhydycyff, Bridgend, CF34 0EB Applicant: Coastal Oil and Gas Limited 11 15-205m Application Type: Granted (Conditions) Drill and test permeability of coal and associated strata. Application Date: 10/03/2011 Application Reference: P/10/816/FUL

Report Reference: Commercial Energy Specimen

If you would li5e any further assistance regarding this report then please contact:

Groundsure on (T) 08444 159 000, email: [email protected] Page :11 Location: Land on the west side of the road leading from Llancarfan to Bonvilston (Grid ref. 305209:172962) Applicant: Coastal Oil and Gas Limited Drill an exploration borehole to test for conventional gas reserves in 12D 15-205m Application Type: Pending the Devonian Application Date: 11/04/2013 Application Reference: 2013/00335/FUL

Location: Land on the west side of the road leading from Llancarfan to Bonvilston (Grid ref. 305209:172962) Applicant: Coastal Oil and Gas Limited Application Type: Full Planning Drill an exploration borehole to test for conventional gas reserves in 13D 15-205m Application the Devonian Application Date: 11/04/2013 Application Reference: 2013/00335/FUL

Location: FORMER ST JOHNS COLLIERY, MAESTEG, BRIDGEND Applicant: UK METHANE LIMITED DRILL 3 BOREHOLES INTO ANDONED WORKINGS FROM ST 14E 15-205m Application Type: Approved temporarily JOHNS COLLIERY & THE GENERATION OF ELECTRICITY Application Date: 05/10/2012 Application Reference: P/12/718/FUL

Location: Former St Johns Colliery, Maesteg, Bridgend, CF34 0DH Applicant: UK Methane Ltd 15E 15-205m Application Type: Granted (Conditions) Drill and test the in situ Namurian Shale and associated strata. Application Date: 08/04/2011 Application Reference: P/11/12/FUL

Location: Site located in feld 400m along an un-named road between the A4266 and Duffryn (grid ref 308215 : 171623) Applicant: Coastal Oil and Gas Limited 16F 15-205m Drill a single vertical exploration borehole Application Type: Pending Application Date: 11/04/2013 Application Reference: 2013/00333/FUL

Location: Site located in feld 400m along an un-named road between the A4266 and Duffryn (grid ref 308215 : 171623) Applicant: Coastal Oil and Gas Limited 17F 15-205m Application Type: Full Planning Drill a single vertical exploration borehole Application Application Date: 11/04/2013 Application Reference: 2013/00333/FUL

Report Reference: Commercial Energy Specimen

If you would li5e any further assistance regarding this report then please contact:

Groundsure on (T) 08444 159 000, email: [email protected] Page :12 Location: LAND OFF TYLA LANE, METHYR, MAWR, BRIDGEND, CF32 0LT Applicant: No Details DRILL AN EXPLORATION BOREHOLE TO TEST THE DEVONIAN 18H 15-205m Application Type: Undecided STRATA Application Date: 29/04/2013 Application Reference: P/13/322/FUL

Location: Unit 1, Llandow Industrial Estate, Cowbridge Applicant: Coastal Oil and Gas Limited Application Type: Withdrawn 19G 15-205m Drill and test the insitu lower limestone shale and associated strata Application Date: 27/01/2011 Application Reference: 2011/00115/FUL

Location: Unit 1, Llandow Industrial Estate, Llandow Applicant: No Details Application Type: Approved Drill and test the insitu lower limestone and associated strata for 20G 15-205m Application Date: No Details the presence of gas Application Reference: Appeal_11/2167112

Location: Unit 1, Llandow Industrial Estate, Llandow Applicant: Coastal Oil and Gas Limited Application Type: Granted on appeal Drill and test the insitu lower limestone and associated strata for 21G 15-205m Application Date: 06/07/2012 the presence of gas. Application Reference: 2011/00812/FUL

Location: Land off Tyla Lane, Methyr Mawr, Bridgend, CF32 0LT Applicant: Coastal Oil and Gas Limited 22H 15-205m Application Type: Undecided Drill an exploration borehle to test the Devonian strata. Application Date: 29/04/2013 Application Reference: P/13/322/FUL

Location: Unit 20, Sutton Spring Road, Llandow Trading Estate Applicant: Coastal Oil and Gas Limited Application Type: Full Planning 23G 15-205m Application To drill a single vertical exploration borehole Application Date: 11/04/2013 Application Reference: 2013/00334/FUL

Location: Unit 20, Sutton Spring Road, Llandow Trading Estate Applicant: Coastal Oil and Gas Limited Application Type: Pending 24G 15-205m To drill a single vertical exploration borehole Application Date: 11/04/2013 Application Reference: 2013/00334/FUL

Report Reference: Commercial Energy Specimen

If you would li5e any further assistance regarding this report then please contact:

Groundsure on (T) 08444 159 000, email: [email protected] Page :13 Location: LAND AT SOUTHERN SLOPE, MYNYDD MARGAM, MARGAM, PORT TALBOT Applicant: NEATH PORT TALBOT C B 3 DRILLING COMPOUNDS & ASSOC. WORKS TO TEST 25 20-255m COUNCIL METHANE GAS EXTRACTION (REVISED ACCESS ROUTE) Application Type: Granted Application Date: 01/09/2011 Application Reference: P/11/674/OBS

Location: Land East of Banwen adjacent Intervalley Road, Neath Applicant: UK Methane Ltd Construction of a compound for gas exploration including, offces, 26 20-255m Application Type: Full plans approved toilets, fuel store, generators, par5ing area drilling rig and Application Date: 19/07/2011 associated drilling equipment for a temporary period of 12 wee5s. Application Reference: P2010/1183

This dataset shows planning applications for sites intended to be used for the exploration, appraisal and extraction of hydrocarbons. Please be aware this may also include applications for subsurface geological exploration unrelated to hydrocarbon extraction. This data is derived from Local Authority planning records and is the most up to date information available, updated on a wee5ly basis. Groundsure would advise further research into any planning applications identifed to determine the full nature of the activities proposed.

Please note that due to differing methodologies adopted by Local Authorities, some planning applications identifed as having been refused may have subsequently been granted on appeal without appearing as such within this report. If any refused applications are identifed within this report which would have a bearing on a purchaser's decision if they were to have been granted, you are advised to see5 further clarifcation from the Local Authority on the application's status. Whilst Groundsure ma5es every effort to ensure that data is sourced from reliable providers, it is unable to ensure that the information is accurate, complete or up to date. Groundsure shall not be liable for any losses or damages incurred by the client or benefciary, including but not limited to any losses or damages that arise as a result of any error, omission or inaccuracy in any part of the Groundsure Materials where such part is based on any Third Party Content or any reasonable interpretation of Third Party Content. If the existence or absence of a planning application, consent or similar may have a material impact with regard to the decision to purchase a property, the client or benefciary should ma5e independent thorough enquiries of the local authority.

If any applications have been identifed within this report, Groundsure have included the planning reference so that further enquiries may be made with the planning authority.

Please note that the information within this report is presented for information only. Groundsure do not hold any additional information other than that which is presented within the report, and do not offer advice or opinion on the potential impacts of any hydrocarbon extraction or exploration projects, renewable or non-renewable power generation projects or any future plans for such projects. Additional information regarding projects may be available from the individual organisations' websites, or from the local planning authority.

Report Reference: Commercial Energy Specimen

If you would li5e any further assistance regarding this report then please contact:

Groundsure on (T) 08444 159 000, email: [email protected] Page :14 3.Wind Farms and Solar Farms

▲ NW N NE

◄W E►

SW S SE

▼ Wind Farm and Wind Turbines legend Contains Ordnance Survey data (c) Crown copyright and database right 2015.

Report Reference: Commercial Energy Specimen

If you would li5e any further assistance regarding this report then please contact:

Groundsure on (T) 08444 159 000, email: [email protected] Page:15 3 Wind Farms and Solar Farms 3.1 Wind Farms and Wind Turbines 3.1.1 Existing and Consented Wind Installations

The following records have been identifed within 155m of the property:

ID Approximate Direction Details Distance 1 5-105m SW Site Name: Mynydd Portref (Taff Ely Type of project: Onshore Extension), nr and Pencoed, South Number of Turbines: 11 Wales Turbine Capacity: 0.85MW Operator/Developer: Tegni Total project capacity: 9.35MW Status of Project: Operational Approximate Grid Reference: 299830,185800 Date of Status: 07-Jun-2012

2A 5-105m W Site Name: Fforch Nest Wind Farm 2, north of Type of project: Onshore Glynogwr and south of - SSA (F), Number of Turbines: 7 South Wales Turbine Capacity: 2.5MW Operator/Developer: Pennant Walters Total project capacity: 17.5MW Status of Project: Operational Approximate Grid Reference: 296720,190060 Date of Status: 24-May-2013

3A 5-105m W Site Name: Fforch Nest Wind Farm 1, north of Type of project: Onshore Glynogwr and south of Clydach Vale - SSA (F), Number of Turbines: 4 South Wales Turbine Capacity: 2.5MW Operator/Developer: Pennant Walters Total project capacity: 10MW Status of Project: Operational Approximate Grid Reference: 296720,190060 Date of Status: 24-May-2013

4 5-105m SW Site Name: Mynydd Portref, Argoed Edwin Type of project: Onshore Farm, Llanharan, , South Wales Number of Turbines: 6 Operator/Developer: REG WINDPOWER Turbine Capacity: 2MW Status of Project: Approved Total project capacity: 12MW Date of Status: 19-Dec-2014 Approximate Grid Reference: 300020,183690

5C 5-105m W Site Name: Pant-y-Wal, Mynydd Maesteg & Type of project: Onshore Mynydd yr Aber, nr Princetown - SSA (F), Number of Turbines: 10 South Wales Turbine Capacity: 2.5MW Operator/Developer: Pennant Walters Total project capacity: 25MW Status of Project: Operational Approximate Grid Reference: 296420,190840 Date of Status: 01-Apr-2013

6B 5-105m SW Site Name: Taff Ely, , South Wales Type of project: Onshore Operator/Developer: Perma Energy Number of Turbines: 20 Status of Project: Operational Turbine Capacity: 0.45MW Date of Status: 01-Aug-1993 Total project capacity: 9MW Approximate Grid Reference: 297020,185980

Report Reference: Commercial Energy Specimen

If you would li5e any further assistance regarding this report then please contact:

Groundsure on (T) 08444 159 000, email: [email protected] Page :16 ID Approximate Direction Details Distance 7B 5-105m SW Site Name: Taff Ely (Headwind - Repower), Type of project: Onshore and Maendy Farms, Gilfach Goch, Number of Turbines: 7 South Wales Turbine Capacity: 2.5MW Operator/Developer: RWE Npower Total project capacity: 17.5MW Renewables Approximate Grid Reference: 297020,185980 Status of Project: Approved Date of Status: 18-Apr-2013

8 5-105m NW Site Name: Ferndale, Mynydd Tyâ??n Tyle Type of project: Onshore Ridge, Rhondda Valley, South Wales Number of Turbines: 8 Operator/Developer: Infnergy Turbine Capacity: 0.8MW Status of Project: Operational Total project capacity: 6.4MW Date of Status: 15-Jun-2011 Approximate Grid Reference: 298890,196570

9 5-105m N Site Name: Tir Coo5 Farm, Treharris, South Type of project: Onshore Wales Number of Turbines: 1 Operator/Developer: G2 Energy Renewable Turbine Capacity: 0.5MW Developments Total project capacity: 0.5MW Status of Project: Operational Approximate Grid Reference: 308370,199390 Date of Status: 12-Nov-2014

10 10-255m E Site Name: Bryn Ysgawen Farm, Mountain Type of project: Onshore Road, Maesycwmmer, South Wales Number of Turbines: 1 Operator/Developer: G2 Energy Renewable Turbine Capacity: 0.5MW Developments Total project capacity: 0.5MW Status of Project: Approved Approximate Grid Reference: 315820,193570 Date of Status: 28-Nov-2013

11 10-255m SW Site Name: Hill House Farm, St Marys Hill, Type of project: Onshore Bridgend, South Wales Number of Turbines: 1 Operator/Developer: G2 Energy Renewable Turbine Capacity: 0.5MW Developments Total project capacity: 0.5MW Status of Project: Operational Approximate Grid Reference: 296600,178880 Date of Status: 12-Nov-2014

12 10-255m NW Site Name: , Tynewydd Forest, Type of project: Onshore Rhondda Fach, South Wales Number of Turbines: 8 Operator/Developer: Velocita Energy Turbine Capacity: 3MW Status of Project: Operational Total project capacity: 24MW Date of Status: 31-Aug-2013 Approximate Grid Reference: 295120,201000

This dataset is sourced from Renewables UK, and shows all wind projects registered with the UK Wind Energy Database (UKWED). The dataset includes details on operating company, number of turbines, project and turbine capacity, and the status of the project on a given date. Please note that projects may subsequently have progressed since the 'Status Date'.

This dataset is provided for information only, with no guarantee given as to its completeness or accuracy. Renewables UK are excluded from any liability for any such inaccuracies or errors. Groundsure would advise further independent research of any sites of interest to determine exact locations and details of projects.

Report Reference: Commercial Energy Specimen

If you would li5e any further assistance regarding this report then please contact:

Groundsure on (T) 08444 159 000, email: [email protected] Page :17 3.1.2 Multiple Wind Turbine Planning Records and Applications

The following records have been identifed within 155m of the property:

ID Approximate Direction Details Distance 13 0-55m E Site Name: Bryntail Farm Bryntail Application Date: 18-OCT-13 Road, , Pontypridd, Mid Planning Stage: Detailed Plans , CF37 5LJ Submitted Planning Application Reference: Project Details: Scheme comprises 13/1057/10 installation of a pair of twin bladed Type of Project: 2 Wind Turbines 2505w wind turbines at 55 metres to hub and 71 metres to blade tip. Approximate Grid Reference: 309340,189830 14 5-105m W Site Name: Ty Newydd & Maendy Application Date: 23-DEC-11 Farms Glamorgan Terrace, Gilfach Planning Stage: Detail Plans Granted Goch, , Mid Glamorgan, CF39 Project Details: Scheme comprises 8RA decommissioning of 20 wind turbines Planning Application Reference: (blade tip height of 53.5m), 11/1468/10 transformers, substation and other Type of Project: 7 Wind Turbines infrastructure and construction of 7 wind turbines (blade tip height of 110m) to form scheme 5nown as 'Headwind Taff Ely Wind Farm', also Approximate Grid Reference: 298180,189270 15 5-105m SW Site Name: Mynydd Portref Extension Application Date: 29-Jun-12 Argoed Edwin Farm, Llanharan, Planning Stage: Detailed Plans Pontyclun, Mid Glamorgan, CF72 9NG Submitted Planning Application Reference: Project Details: Scheme comprises 12/0704/10 construction of up to 7 wind turbines Type of Project: 7 Wind Turbines up to 110 metres tip height, access trac5s, cables, electrical substation and associated ancillary equipment. Approximate Grid Reference: 300260,184460 16 5-105m S Site Name: Tesco Store Green Par5, Application Date: 13-Oct-08 , Pontyclun, Mid Planning Stage: Detailed Plans Glamorgan, CF72 8RB Submitted Planning Application Reference: Project Details: Scheme comprises 08/1625/10 construction of two 10.6m high micro Type of Project: 2 Wind Turbines wind turbine and associated wor5s for a period of 15 years. Approximate Grid Reference: 304350,182720 17 5-105m SW Site Name: Glynogwr, , Blac5mill, Application Date: 05/11/2008 Bridgend, Mid Glamorgan, CF35 6 Planning Stage: Detail Plans Granted Planning Application Reference: Project Details: Scheme comprises P2008/1398 installation of 4 wind turbines, Type of Project: 4 Wind Turbines substation, trac5s, masts and access off A4093. Approximate Grid Reference: 298150,186390

Report Reference: Commercial Energy Specimen

If you would li5e any further assistance regarding this report then please contact:

Groundsure on (T) 08444 159 000, email: [email protected] Page :18 ID Approximate Direction Details Distance 18C 5-105m W Site Name: Pant Y Wal Wind Farm, , Application Date: 10-Nov-08 Gilfach Goch, Porth, Mid Glamorgan, Planning Stage: Detail Plans Granted CF39 8AW Project Details: Scheme comprises Planning Application Reference: windfarm of 11 turbines with the P2008/1399 capacity of 2.5MW each with Type of Project: Wind Farm associated mast and substations. Approximate Grid Reference: 296450,191010 19C 5-105m W Site Name: Mynydd Pwllyrhebog, Application Date: 02-Dec-08 South Of Clydach Vale, North West Of, Planning Stage: Detail Plans Granted Gilfach Goch, Neath, West Glamorgan Project Details: Scheme comprises Planning Application Reference: installation of 7 wind turbines, trac5s, P2008/1496 masts & extra stretch of bridleway. Type of Project: 7 Wind Turbines Approximate Grid Reference: 296440,191040 20D 5-105m W Site Name: Pant-y-Wal Wind Farm, Application Date: 29/04/2014 Blac5mill, Bridgend, Mid Glamorgan, Planning Stage: Detailed Plans CF35 6EG Submitted Planning Application Reference: Project Details: Scheme comprises P/14/293/FUL extension of pantywal wind farm Type of Project: 12 Wind Turbines including 12 wind turbines (36mw) and (Extension) associated wor5s for period of 25 years. The associated wor5s include sewer systems, landscaping, infrastructure and enabling wor5s. Approximate Grid Reference: 294520,187740 21D 5-105m W Site Name: Pant Y Wal Wind Farm, Application Date: 14/05/2014 Blac5mill, Bridgend, Mid Glamorgan, Planning Stage: Detail Plans Granted CF35 6EG Project Details: Scheme comprises Planning Application Reference: extension to Pant-y-Wal wind farm P2014/0457 with an installed capacity of up to Type of Project: 12 Wind Turbines 36mw, comprising 12 wind turbines, (Extension) anemometer mast, substation and control building, access trac5s and all associated building and engineering operations and landscapi Approximate Grid Reference: 294520,187740 22E 10-255m NW Site Name: Craig Yr Aber Land North Application Date: 18-JUL-13 East Forch-Or5y, , Mid Planning Stage: Detail Plans Granted Glamorgan, CF42 6TF Project Details: Scheme comprises Planning Application Reference: installation of 3 wind turbines. P/13/543/OBS Approximate Grid Reference: Type of Project: 3 Wind Turbines 296580,197980

23E 10-255m NW Site Name: Craig Yr Aber Land to the Application Date: 27-JUN-13 NE o, Forch-Or5y, Treorchy, Mid Planning Stage: Detailed Plans Glamorgan, CF42 6TF Submitted Planning Application Reference: Project Details: Scheme comprises 13/0663/10 installation of three wind turbines and Type of Project: 3 Wind Turbines construction of associated infrastructure on upland. The maximum height to blade tip of each turbine will be 146.5m above ground level. Infrastructure associated with the wind turbines includes: 1. Approximate Grid Reference: 296600,198020

Report Reference: Commercial Energy Specimen

If you would li5e any further assistance regarding this report then please contact:

Groundsure on (T) 08444 159 000, email: [email protected] Page :19 ID Approximate Direction Details Distance 24 10-255m N Site Name: Land at Bedlinog Farm, Application Date: 09/09/2011 Bedlinog, Treharris, Mid Glamorgan, Planning Stage: Detail Plans Refused CF46 6SL Project Details: Scheme comprises Planning Application Reference: construction of 3 wind turbines (up to P/11/0250 126.5m in overall height), creation of Type of Project: 3 Wind Turbines associated roads, crane pads, electrical and communication cables, electrical switchroom and ancillary wor5s. Approximate Grid Reference: 309780,201820 25 10-255m NE Site Name: Cwmcaesingrug Farm Application Date: 18-Feb-13 Mynyddislwyn, Mountain Road, Planning Stage: Detailed Plans Blac5wood, Gwent, NP12 2BG Submitted Planning Application Reference: Project Details: Scheme comprises 13/0053/FULL construction of two wind turbines. Type of Project: 2 Wind Turbines Approximate Grid Reference: 316760,195890 26 10-255m NW Site Name: Maerdy Wind Farm, Application Date: 04-Apr-11 Maerdy Coal Tip Tynewydd Forest, Planning Stage: Detail Plans Granted , Mynydd T'yn Tyle Ridge, Project Details: Scheme comprises , Mid Glamorgan, CF44 construction of 8 wind turbines with a Planning Application Reference: maximum height to blade of 145m 11/0198/10 together with ancillary infrastructure Type of Project: Wind Farm and the formation of a 95m anemometer mast which is to be incorporated with the access trac5s, substation, cabling, crane pads, Approximate Grid Reference: 295500,200250 27F 10-255m NW Site Name: Common Wind Application Date: 11-Jul-09 Farm, Hirwaun Common, Mynydd Planning Stage: Plans Appr on Appeal Bwllfa, Hirwaun, Aberdare, Mid Project Details: Scheme comprises Glamorgan, CF44 construction of 12 wind turbines Planning Application Reference: together with ancillary infrastructure. C/02504/09/FUL Approximate Grid Reference: Type of Project: 12 Wind Turbines 295680,201920

28F 10-255m NW Site Name: Hirwaun Common Wind Application Date: 05-May-09 Farm, Hirwaun Common, Mynydd Planning Stage: Plans Appr on Appeal Bwllfa, Hirwaun, Aberdare, Mid Project Details: Scheme comprises Glamorgan, CF44 construction of 12 wind turbines Planning Application Reference: together with ancillary infrastructure. 09/0393/10 Approximate Grid Reference: Type of Project: 12 Wind Turbines 295680,201920

This dataset is derived from planning data supplied by Glenigan, and applications which did not meet location accuracy criteria were further geocoded by Groundsure. Glenigan is the largest provider of planning data in the UK. The company has been collecting and processing planning application data since 1973. Glenigan trac5s applications from initial planning and tender through to contracts awarded. This report contains the most up to date commercially available information on planning applications made in the vicinity of the subject property since 2008. The dataset displays planning applications involving two or more wind turbines and is searched to 155m.

Report Reference: Commercial Energy Specimen

If you would li5e any further assistance regarding this report then please contact:

Groundsure on (T) 08444 159 000, email: [email protected] Page :20 Please note that due to differing methodologies adopted by Local Authorities, some planning applications identifed as having been refused may have subsequently been granted on appeal without appearing as such within this report. If any refused applications are identifed within this report which would have a bearing on a purchaser's decision if they were to have been granted, you are advised to see5 further clarifcation from the Local Authority on the application's status. Whilst Groundsure ma5es every effort to ensure that data is sourced from reliable providers, it is unable to ensure that the information is accurate, complete or up to date. Groundsure shall not be liable for any losses or damages incurred by the client or benefciary, including but not limited to any losses or damages that arise as a result of any error, omission or inaccuracy in any part of the Groundsure Materials where such part is based on any Third Party Content or any reasonable interpretation of Third Party Content. If the existence or absence of a planning application, consent or similar may have a material impact with regard to the decision to purchase a property, the client or benefciary should ma5e independent thorough enquiries of the local authority.

If any applications have been identifed within this report, Groundsure have included the planning reference to enable further enquiries to be made with the local authority. This dataset is updated on a quarterly basis.

3.1.3 Single Wind Turbine Planning Records and Applications

The following records have been identifed within 55m of the property:

ID Approximate Direction Details Distance 29 0-55m S Site Name: Penbwch Isaf Farm Penycoedcae Application Date: 30/09/2013 Road, Penycoedcae, Pontypridd, Mid Planning Stage: Detail Plans Granted Glamorgan, CF37 1PU Project Details: Scheme comprises Installation Planning Application Reference: 13/0989/10 of a 1 very small scale Evoco 10 Kw wind Type of Project: Wind Turbine turbine on a 15m monopole mast. Approximate Grid Reference: 305670,186860 30 0-55m SE Site Name: Llantwit Application Date: 23-Nov-09 Road, , Student Car Par5, Pontypridd, Planning Stage: Detailed Plans Submitted Mid Glamorgan, CF37 1DL Project Details: Scheme comprises installation Planning Application Reference: 09/1081/10 of wind turbine in student car par5 area. Type of Project: Wind Turbine Approximate Grid Reference: 308250,188600

31 0-55m NE Site Name: Pontypridd High School Application Date: 07-Jan-09 Road, , Cilfynydd, Pontypridd, Mid Glamorgan, Planning Stage: Detailed Plans Submitted CF37 4SF Project Details: Scheme comprises installation Planning Application Reference: 09/0008/10 of 6KW wind turbine consisting of 15m tower Type of Project: Wind Turbine and blades of 5.5m diameter (total height to blade tip of 17.75 metres). Approximate Grid Reference: 308610,192540 32G 0-55m W Site Name: Land Associated With Application Date: 25-JUN-13 Farm, , , Mid Glamorgan, CF40 1SE Planning Stage: Detailed Plans Submitted Planning Application Reference: 13/0658/10 Project Details: Scheme comprises installation Type of Project: Wind Turbine of 5005W wind turbine (39m rotor, 50m tower) at penrhiwfer farm. Approximate Grid Reference: 300180,189970

Report Reference: Commercial Energy Specimen

If you would li5e any further assistance regarding this report then please contact:

Groundsure on (T) 08444 159 000, email: [email protected] Page :21 ID Approximate Direction Details Distance 33G 0-55m W Site Name: Penrhiwfer Farm Pleasant View, Application Date: 06-Feb-12 Penrhiwfer, Tonypandy, Mid Glamorgan, CF40 Planning Stage: Detail Plans Granted 1SE Project Details: Scheme comprises Planning Application Reference: 12/0088/10 construction of microgeneration wind turbine Type of Project: Wind Turbine in adjoining feld. Approximate Grid Reference: 300180,189970 34 0-55m NE Site Name: Garth Fawr Farm, Cilfynydd, Application Date: 07/04/2014 Pontypridd, Mid Glamorgan, CF37 4HP Planning Stage: Detailed Plans Submitted Planning Application Reference: 14/0440/10 Project Details: Scheme comprises installation Type of Project: Wind Turbine of a single small (5005W) wind turbine measuring 77.9m to tip with ancillary structures. Approximate Grid Reference: 309290,193940

This dataset is derived from planning data supplied by Glenigan, and applications which did not meet location accuracy criteria were further geocoded by Groundsure. Glenigan is the largest provider of planning data in the UK. The company has been collecting and processing planning application data since 1973. Glenigan trac5s applications from initial planning and tender through to contracts awarded. This report contains the most up to date commercially available information on planning applications made in the vicinity of the subject property since 2008. The dataset displays planning applications involving single wind turbines only and is searched to 55m.

Please note that due to differing methodologies adopted by Local Authorities, some planning applications identifed as having been refused may have subsequently been granted on appeal without appearing as such within this report. If any refused applications are identifed within this report which would have a bearing on a purchaser's decision if they were to have been granted, you are advised to see5 further clarifcation from the Local Authority on the application's status. Whilst Groundsure ma5es every effort to ensure that data is sourced from reliable providers, it is unable to ensure that the information is accurate, complete or up to date. Groundsure shall not be liable for any losses or damages incurred by the client or benefciary, including but not limited to any losses or damages that arise as a result of any error, omission or inaccuracy in any part of the Groundsure Materials where such part is based on any Third Party Content or any reasonable interpretation of Third Party Content. If the existence or absence of a planning application, consent or similar may have a material impact with regard to the decision to purchase a property, the client or benefciary should ma5e independent thorough enquiries of the local authority.

If any applications have been identifed within this report, Groundsure have included the planning reference to enable further enquiries to be made with the local authority. This dataset is updated on a quarterly basis.

Report Reference: Commercial Energy Specimen

If you would li5e any further assistance regarding this report then please contact:

Groundsure on (T) 08444 159 000, email: [email protected] Page :22 3.2 Solar Energy Solar farms are the large-scale application of Solar Photovoltaic (PV) installations used to generate electricity. Solar farms go through a rigorous planning procedure to get approval. This ta5es into account the suitability of the site, any potential impact on the locality and relevant renewable energy targets. Generally the land beneath can still be used for agricultural grazing, and can be returned to general agricultural use at the end of the solar farm’s lifespan. The UK needs solar power to meet the 15% EU renewable energy targets by 2020. DECC considers that solar PV could contribute up to 20 gigawatts (GW) of generating capacity by 2020. For every 5MW installed, a solar farm will power 1,515 homes for a year and save 2,150 tonnes of CO2. 5MW of generating capacity requires approximately 25 acres of land. 3.2.1DECC-registered Solar Farms

The following records have been found within 155m of the study site:

ID Distance Address Contractor LPA Name Capacity Application Pre Consent Post Consent Date (MW) Date Status Status Commenced 35 0-55m Rhondda Valley Solar Western Solar Rhondda 4.8 03/03/2011 Application N/A - Farm, , adjacent to the Cynon Taff Submitted Rhondda Golf Club, County Borough Council 36I 5-105m Maes Bach Farm, , Lightsource Rhondda 4.86 31/07/2014 Application N/A - Maes Bach, Willowford SPV 105 Ltd Cynon Taff Submitted Road, Tonte, County Pontypridd, Mid Borough Glamorgan, CF38 1SL Council 37J 5-105m PEN RHIW Lightsource Rhondda 8.0 03/09/2013 Application N/A - CARADOG, , SPV 58 Ltd Cynon Taff Submitted FARMHOUSE, County PENRHIW CRADOC Borough FARM, LLANWONNO Council ROAD, MOUNTAIN ASH, CF45 3UX 38 5-105m Hendai Farm, , Land At Solar Securities Caerphilly 13.8 10/12/2013 Application Awaiting - Hendai Farm Heol Group Ltd County Approved Construction Adam Gelligaer Borough Hengoed CF82 8FU Council 39H 10-155m Cwmcaesingrug Farm, , KS SPV50 Ltd Caerphilly 10.0 06/05/2014 Application Awaiting - Cwmcaesingrug Farm County Approved Construction Mynyddislwyn Borough Mountain Road Council Mynyddislwyn Blac5wood NP12 2BG 40H 10-155m Penrhiwarwydd Farm, , MTS Hill Farm Caerphilly 8.5 29/07/2014 Application N/A - Penrhiwarwydd Farm Solar Ltd County Submitted Mynyddislwyn Borough Mountain Road Council Mynyddislwyn Newport NP11 7BB 41 10-155m Mynydd Bwllfa solar DHM Rhondda 7.5 11/04/2014 Application N/A - farm, , E/O Mynydd Consultancy Cynon Taff Submitted Bwllfa Wind Farm, Ltd - County Aberdare, Mid dalehart@walte Borough Glamorgan, CF44 rs-group.co.u5 Council

Report Reference: Commercial Energy Specimen

If you would li5e any further assistance regarding this report then please contact:

Groundsure on (T) 08444 159 000, email: [email protected] Page :23 This database shows all operational and proposed sites intended to be used as solar photovoltaic farms. This data is sourced from the Department of Energy and Climate Change (DECC) and is updated on a monthly basis. This dataset includes details on installed capacity, operating company and the status of the project on a given date. 3.2.2Planning records of Solar Farms

The following records have been found within 155m of the study site:

ID Distanc Location Application Name Application Application Application no Proposal e Status Date 42I 5-105m MAES BACH, Ms D Bowhay Request for 08/10/201 14/02343/MJ REQUEST FOR OBS - INSTALLATION OF WILLOWFORD ROAD, observations 4 R A SOLAR FARM AND ASSOCIATED , INSFRSTRUCTURE, INCLUDING PONTYPRIDD, PHOTOVOLTAIC PLANELS, MOUNTING FRAMES, INVERTERS, TRANSFORMERS, SUBSTATIONS, COMMUNICATIONS BUILDING, FENCE AND POLE MOUNTED SECURITY CAMERAS FOR THE LIFE OF THE SOLAR FARM 43I 5-105m MAES BACH, Mr Lightsource Full planning 31/07/201 14/1014/10 Installation of a solar farm and associated WILLOWFORD ROAD, permission 4 infrastructure,including photovoltaic TONTEG, panels, mounting frames, inverters, PONTYPRIDD, CF38 transformers, substations, 1SL, communications building, fence and pole mounted security cameras, for the life of the solar farm 44J 5-105m FARMHOUSE, Lightsource SPV Full planning 03/09/201 13/0901/10 Installation and operation of a solar farm PENRHIW CRADOC 58 Ltd permission 3 and associated infrastructure, including FARM, LLANWONNO photovoltaic panels, mounting frames, ROAD, MOUNTAIN inverters, transformers, substations, ASH, CF45 3UX communications building, fence and pole mounted security cameras, for the life of the solar farm. 45H 10- Cwmcaesingrug Farm Lightsource SPV Full 17/11/201 14/0775/FUL Erect a communications building ancillary 155m Mynyddislwyn 121 Limited Application 4 L to approved solar farm (planning Mountain Road reference number: 14/0276/FULL) Mynyddislwyn Blac5wood, NP12 2BG 46H 10- Cwmcaesingrug Farm Caerphilly Referral by 12/05/201 P/14/0127 Photovoltaic solar farm and ancillary 155m Mynyddislwyn, County Borough Adj. 4 infrastructure Mountain Road, Council Authority Mynyddislwyn, Blac5wood 47 10- Land at Court Farm, Sybac Solar Full Planning 09/01/201 2015/00026/ Installation of a 2.2MW solar farm and 155m Treoe, Vale of International Application 5 FUL associated infrastructure Glamorgan GmbH 48F 10- LAND TO THE EAST Mr Dale Hart Full planning 11/04/201 14/0466/10 Solar Photovoltaic Farm, six inverter 155m OF MYNYDD BWLLFA permission 4 cabins, cabling lin5ing the arrays to the WIND FARM, substation (on the adjacent wind farm ABERDARE, site) and the extension of the wind farm access trac5 to the proposed solar farm 49F 10- LAND TO THE EAST Simon Gale - 21/07/201 P2014/0716 Solar Farm, including 6 cabins, cable 155m OF MYNYDD BWLLFA 4 connection to sub-station and alteration WIND FARM, to windfarm access trac5 (Consultation ABERDARE, from )

Report Reference: Commercial Energy Specimen

If you would li5e any further assistance regarding this report then please contact:

Groundsure on (T) 08444 159 000, email: [email protected] Page :24 This database shows application for planning permission relating to solar farms. The is data is sourced from the public register of planning information and is updated on a wee5ly basis. Please note that sites may have multiple applications for different aspects of their design and operation, and the presence of planning permission is not an indication of the permission having been granted.

Report Reference: Commercial Energy Specimen

If you would li5e any further assistance regarding this report then please contact:

Groundsure on (T) 08444 159 000, email: [email protected] Page :25 4.Power Stations and Major Energy Infrastructure ▲ NW N NE

◄W E►

SW S SE

▼ Power Stations and major energy infrastructure Contains Ordnance Survey data (c) Crown copyright and database right 2015.

Report Reference: Commercial Energy Specimen

If you would li5e any further assistance regarding this report then please contact:

Groundsure on (T) 08444 159 000, email: [email protected] Page:26 4 Power Stations and Major Energy Infrastructure 4.1 Active Power Stations

The following records have been identifed within 255m of the property:

Approximate Power Station Type of Power Total Capacity ID Direction Company Name Operating Since Distance Name Station (MW) 85 10-255m N EDF Energy Aberdare gas 10.0 2002 District Energy, Wales 86 10-255m W Sca Hygiene Sca CHP Combined Heat 9.0 No Details Products Tissue and Power Ltd 87 10-255m S Dow Corning Ltd Dow Corning Combined Heat 27.2 No Details Chp C/O Dow and Power Corning Ltd 88A 10-255m S RWE Npower Plc Aberthaw B, coal 1586.0 1971 Wales 89A 10-255m S Centrica Barry, Wales CCGT 140.0 1998 90A 10-255m S RWE Npower Plc Aberthaw GT, gas oil 51.0 1971 Wales

This dataset is derived from the Digest of United Kingdom Energy Statistics (DUKES) 5.11. This details all active power generation stations with a capacity of over 1 MW of the following types:

Type Combined Cycle Gas Turbine (CCGT ) Oil Mine Gas Gas/Oil Poultry Litter Rapeseed Oil Coal Coal/Oil Straw/Gas Gas Coal/Gas Waste Diesel Meat and bone Combined Heat and Power Gas CHP Pumped Storage Biomass

In 2011, UK electricity generation (including pumped storage) fell by 3.7%, from 382 TWh in 2010 to 368 TWh in 2011. Total electricity supply (including net imports) decreased by 2.7%.

NB 1 terawatt hour (1 TWh) = 1,000,000,000,000 watt hours (1012 watt hours).

Report Reference: Commercial Energy Specimen

If you would li5e any further assistance regarding this report then please contact:

Groundsure on (T) 08444 159 000, email: [email protected] Page :27 Pie charts showing Electricity Generation for 2012/ 13. UK Electricity generation 2012 UK Electricity generation 2013

4.2Nuclear Power Stations (existing and planned)

The following records have been identifed within 255m of the study site:

Approximate ID Distance Direction Operator Parent Company Site Name Location Type of site GE Chemical plant The Maynard 84 10-255m SE GE Healthcare Ltd - Healthcare and other Centre, Cardiff Cardiff facilties

This dataset is derived from a combination of sources and details existing, decommissioned and planned nuclear energy sites. Sources include the Health and Safety Executive, the Nuclear Decommissioning Authority, the National Infrastructure Planning Programme and the Nuclear Advanced Manufacturing Centre.

Existing nuclear power stations may be in 'Operational', 'Defuelling' or 'Decommissioning' states. Further information about each site can be found at http://www.hse.gov.u5/nuclear/regulated-sites.htm.

Report Reference: Commercial Energy Specimen

If you would li5e any further assistance regarding this report then please contact:

Groundsure on (T) 08444 159 000, email: [email protected] Page :28 4.3 Proposed Energy Infrastructure Projects

The following records have been identifed within 255m of the study site:

Approximate ID Direction Operator Site Name Summary Stage Distance Stage 4. Brig y Cwm Energy Applicati Covanta Brig y 1 10-255m N from Waste - on Cwm Ltd Generating Station withdraw n Hirwaun Power Hirwaun Power A gas-fred power station with a nominal Stage 5. 2 10-255m NW Limited Station generating capacity of up to 299 MW Decision Tidal lagoon electricity generating station with a potential generating capacity of 1800MW up to a possible 2800 MW. A seawall attached to the foreshore, at its Stage 1. western extent approximately 2 5m from the 3 10-255m SE Alex Herbert Tidal Lagoon Cardiff Initial entrance to Cardiff Bay, and at its eastern contact extentapproximately 25m from the mouth of the River Us5. The furthest offshore extent is approximately 85m from the foreshore to the centre of the Severn Estuary.

This data shows details of major national energy infrastructure projects ta5en from publicly available datasets. Major national energy infrastructure projects in this context are proposed large-scale energy generation projects which have been submitted to the Planning Inspectorates (formerly 5nown as the Infrastructure Planning Commission). Further details for each project may be found on the National Infrastructure Planning website at http://infrastructure.planningportal.gov.u5/projects/

4.4 Major Energy Infrastructure

This dataset shows all high capacity electricity transmission lines, strategic gas pipes and feeders and general National Grid infrastructure associated with electricity generation and transmission and gas transmission. The dataset only shows major and strategic gas and electricity supply infrastructure, and does not show any gas and electricity infrastructure on a local level, for example small substations, domestic/commercial gas supply pipes. It also does not show any pipelines operated by companies other than National Grid. This information has been extracted from databases held by National Grid and is provided for information only with no guarantee as to its completeness or accuracy. National Grid do not offer any warranty as to the accuracy of the available data and are excluded from any liability for any such inaccuracies or errors.

Report Reference: Commercial Energy Specimen

If you would li5e any further assistance regarding this report then please contact:

Groundsure on (T) 08444 159 000, email: [email protected] Page :29 5. References and Sources of Further Information Department of Energy and Climate Change (DECC) DECC are the main regulatory body for conventional and unconventional oil and gas wells in the UK. https://www.gov.u5/oil-and-gas-onshore-exploration-and-production

UK Wind Energy Database (UKWED) This is produced by RenewableUK, the UK's leading not-for-proft renewable energy trade association. http://www.renewableu5.com/en/renewable-energy/wind-energy/u5-wind-energy-database/index.cfm/

Planning Inspectorate On 1 April 2012, under the Localism Act 2011, the Planning Inspectorate became the agency responsible for operating the planning process for nationally signifcant infrastructure projects (NSIPs). http://infrastructure.planningportal.gov.u5/projects/

National Grid http://www.nationalgrid.com/u5/LandandDevelopment/DDC/GasElectricNW/

British Geological Survey (BGS)

The BGS act as a consultee on shale gas, and other extractive hydrocarbon sources. http://www.bgs.ac.u5/research/energy/shaleGas/home.html

Environment Agency. The Environment Agency are responsible for regulating several aspects of hydrocarbon extraction. http://www.environment-agency.gov.u5/business/topics/126689.aspx

Please note that the provision of lin5s do not imply an endorsement of this report by any companies lin5ed to, and these lin5s are provided solely to enable further independent research. Furthermore, the provision of these lin5s does not imply that Groundsure endorse the content of any such website.

Report Reference: Commercial Energy Specimen

If you would li5e any further assistance regarding this report then please contact:

Groundsure on (T) 08444 159 000, email: [email protected] Page :30 Search Code IMPORTANT CONSUMER PROTECTION INFORMATION This search has been produced by Groundsure Ltd, Sovereign House, Church Street, Brighton, BN1 1UJ. Tel: 08444 159 000. Email: [email protected] which is registered with the Property Codes Compliance Board (PCCB) as a subscriber to the Search Code. The PCCB independently monitors how registered search frms maintain compliance with the Code. The Search Code: • provides protection for homebuyers, sellers, estate agents, conveyancers and mortgage lenders who rely on the information included in property search reports underta5en by subscribers on residential and commercial property within the United Kingdom • sets out minimum standards which frms compiling and selling search reports have to meet • promotes the best practice and quality standards within the industry for the beneft o f c onsumers a nd p roperty professionals • enables consumers and property professionals to have confdence in frms which subscribe to the code, their products and services. By giving you this information, the search frm is confrming that they 5eep to the principles of the Code. This provides important protection for you. The Code’s core principles Firms which subscribe to the Search Code will: • display the Search Code logo prominently on their search reports • act with integrity and carry out wor5 with due s5ill, care and diligence • at all times maintain adequate and appropriate insurance to protect consumers • conduct business in an honest, fair and professional manner • handle complaints speedily and fairly • ensure that products and services comply with industry registration rules and standards and relevant laws • monitor their compliance with the Code COMPLAINTS If you have a query or complaint about your search, you should raise it directly with the search frm, and if appropriate as5 for any complaint to be considered under their formal internal complaints procedure. If you remain dissatisfed with the frm’s f nal r e sponse, a f ter y o ur c o mplaint h a s b e en f o rmally c o nsidered, o r i f t h e f r m ha s exc eeded th e re s ponse timescales, you may refer your complaint for consideration under The Property Ombudsman scheme (TPOs). The Ombudsman can award compensation of up to £5,000 to you if he fnds that you have suffered actual loss as a result of your search provider failing to 5eep to the Code. Please note that all queries or complaints regarding your search should be directed to your search provider in the frst instance, not to TPOs or to the PCCB. TPOs Contact Details: The Property Ombudsman scheme Milford House 43-55 Milford Street Salisbury Wiltshire SP1 2BP Tel: 01722 333306 Fax: 01722 332296 Email: [email protected] You can get more information about the PCCB from www.propertycodes.org.uk. PLEASE ASK YOUR SEARCH PROVIDER IF YOU WOULD LIKE A COPY OF THE SEARCH CODE

Report Reference: Commercial Energy Specimen

If you would li5e any further assistance regarding this report then please contact:

Groundsure on (T) 08444 159 000, email: [email protected] Page :31 COMPLAINTS PROCEDURE • If you want to ma5e a complaint, we will: • Ac5nowledge it within 5 wor5ing days of receipt. • Normally deal with it fully and provide a fnal response, in writing, within 20 wor5ing days of receipt. • Keep you informed by letter, telephone or e-mail, as you prefer, if we need more time. • Provide a fnal response, in writing, at the latest within 40 wor5ing days of receipt. • Liaise, at your request, with anyone acting formally on your behalf. Complaints should be sent to: Operations Director, Groundsure Ltd, Sovereign House, Church Street, Brighton, BN1 1UJ. Tel: 08444 159 000. Email: [email protected] If you are not satisfed with our fnal response, or if we exceed the response timescales, you may refer the complaint to The Property Ombudsman scheme (TPOs): Tel: 01722 333306, E-mail: [email protected]. We will co-operate fully with the Ombudsman during an investigation and comply with his fnal decision.

Report Reference: Commercial Energy Specimen

If you would li5e any further assistance regarding this report then please contact:

Groundsure on (T) 08444 159 000, email: [email protected] Page :32 Standard Terms and Conditions 2.1 Groundsure agrees to provide the Services in accordance with the Contract. 1 Defnitions In these terms and conditions unless the context otherwise requires: 2.2 Groundsure shall exercise reasonable s5ill and care in the provision of the Services. “Benefciaryy means the person or entity for whose beneft the Client has obtained the Services. 2.3 Subject to clause 7.3 the Client ac5nowledges that it has not relied on any statement or representation made by or on behalf of Groundsure which “Clienty means the party or parties entering into a Contract with is not set out and expressly agreed in writing in the Contract and all such Groundsure. statements and representations are hereby excluded to the fullest extent permitted by law. “Commercialy means any building or property which is not Residential. 2.4 The Client ac5nowledges that terms and conditions appearing on a “Confdential I nformationy means the contents of this Contract and all Client’s order form, printed stationery or other communication, or any information received from the Client as a result of, or in connection with, terms or conditions implied by custom, practice or course of dealing shall be this Contract other than of no effect, and that this Contract shall prevail over all others in relation to (i) information which the Client can prove was rightfully in the Order. its possession prior to disclosure by Groundsure and 2.5 If the Client or Benefciary requests insurance in conjunction with or as (ii) any information which is in the public domain (other a result of the Services, Groundsure shall use reasonable endeavours to than by virtue of a breach of this Contract). recommend such insurance, but ma5es no warranty that such insurance shall be available from insurers or that it will be offered on reasonable “Support Servicesy means Support Services provided by Groundsure terms. Any insurance purchased by the Client or Benefciary shall be subject including, without limitation, interpreting third party and in-house solely to the terms of the policy issued by insurers and Groundsure will have environmental data, providing environmental support advice, underta5ing no liability therefor. In addition you ac5nowledge and agree that environmental audits and assessments, Site investigation, Site monitoring Groundsure does not act as an agent or bro5er for any insurance providers. and related items. The Client should ta5e (and ensure that the Benefciary ta5es) independent “Contracty means the contract between Groundsure and the Client for the advice to ensure that the insurance policy requested or offered is suitable provision of the Services, and which shall incorporate these terms and for its requirements. conditions, the Order, and the relevant User Guide. 2.6 Groundsure's quotations or proposals are valid for a period of 30 days “Third Party Data Providery means any third party providing Third Party only unless an alternative period of time is explicitly stipulated by Content to Groundsure. Groundsure. Groundsure reserves the right to withdraw any quotation or proposal at any time before an Order is accepted by Groundsure. “Data Reportsy means reports comprising factual data with no Groundsure's acceptance of an Order shall be binding only when made in accompanying interpretation. writing and signed by Groundsure's authorised representative or when accepted through the Order Website. “Feesy has the meaning set out in clause 5.1. 3 The Client’s obligations “Groundsurey means Groundsure Limited, a company registered in England and Wales under number 03421028. 3.1The Client shall comply with the terms of this Contract and “Groundsure Materialsy means all materials prepared by Groundsure and (i) procure that the Benefciary or any third party relying provided as part of the Services, including but not limited to Third Party on the Services complies with and acts as if it is bound by the Contract and Content, Data Reports, Mapping, and Ris5 Screening Reports. (ii) be liable to Groundsure for the acts and omissions of “Intellectual Propertyy means any patent, copyright, design rights, trade or the Benefciary or any third party relying on the Services as if such acts and service mar5, moral rights, data protection rights, 5now-how or trade mar5 omissions were those of the Client. in each case whether registered or not and including applications for the 3.2 The Client shall be solely responsible for ensuring that the Services are same or any other rights of a similar nature anywhere in the world. appropriate and suitable for its and/or the Benefciary’s needs. “Mappingy means a map, map data or a combination of historical maps of 3.3 The Client shall supply to Groundsure as soon as practicable and without various ages, time periods and scales. charge all requisite information (and the Client warrants that such “Ordery means an electronic, written or other order form submitted by the information is accurate, complete and appropriate), including without Client requesting Services from Groundsure in respect of a specifed Site. limitation any environmental information relating to the Site and shall give such assistance as Groundsure shall reasonably require in the provision of “Ordnance Surveyy means the Secretary of State for Business, Innovation the Services including, without limitation, access to the Site, facilities and and S5ills, acting through Ordnance Survey, Adanac Drive, Southampton, equipment. SO16 0AS, UK. 3.4 Where the Client’s approval or decision is required to enable “Order Websitey means the online platform through which Orders may be Groundsure to carry out wor5 in order to provide the Services, such placed by the Client and accepted by Groundsure. approval or decision shall be given or procured in reasonable time and so as not to delay or disrupt the performance of the Services. “Reporty means a Ris5 Screening Report or Data Report for Commercial or Residential property. 3.5 Save as expressly permitted by this Contract the Client shall not, and shall procure that the Benefciary shall not, re-sell, alter, add to, or amend “Residentialy means any building or property used as or intended to be used the Groundsure Materials, or use the Groundsure Materials in a manner for as a single dwelling. which they were not intended. The Client may ma5e the Groundsure “Risk Screening Reporty means a ris5 screening report comprising factual Materials available to a third party who is considering acquiring some or all data with an accompanying interpretation by Groundsure. of, or providing funding in relation to, the Site, but such third party cannot rely on the same unless expressly permitted under clause 4. “Servicesy means any Report, Mapping and/or Support Services which Groundsure has agreed to provide by accepting an Order pursuant to clause 3.6 The Client is responsible for maintaining the confdentiality of its user 2.6. name and password if using the Order Website and the Client ac5nowledges that Groundsure accepts no liability of any 5ind for any loss or damage "Site" means the area of land in respect of which the Client has requested suffered by the Client as a consequence of using the Order Website. Groundsure to provide the Services. “Third Party Contenty means data, database information or other information which is provided to Groundsure by a Third Party Data Provider. "User Guide" means the user guide, as amended from time to time, available upon request from Groundsure and on the website (www.groundsure.com) and forming part of this Contract. 2 Scope of Services, terms and conditions, requests for insurance and quotations 4 Reliance (iv) not combine the Services with or incorporate such 4.1The Client ac5nowledges that the Services provided by Groundsure Services into any other information data or service; consist of the presentation and analysis of Third Party Content and other (v) not reformat or otherwise change (whether by content and that information obtained from a Third Party Data Provider modifcation, addition or enhancement), the Services (save that those acting cannot be guaranteed or warranted by Groundsure to be reliable. for the Benefciary in a professional capacity shall not be in breach of this 4.2 In respect of Data Reports, Mapping and Ris5 Screening Reports, the clause 6.4(v) where such reformatting is in the normal course of providing following classes of person and no other are entitled to rely on their advice based upon the Services); contents; (vi) where a Report and/or Mapping contains material (i) the Benefciary, belonging to Ordnance Survey, ac5nowledge and agree that such content is protected by Crown Copyright and shall not use such content for any (ii) the Benefciary's professional advisers, (iii) any person purpose outside of receiving the Services; and providing funding to the Benefciary in relation to the Site (whether directly or as part of a lending syndicate), (vii) not copy in whole or in part by any means any map prints or run-on copies containing content belonging to Ordnance Survey (iv) the frst purchaser or frst tenant of the Site, and (other than that contained within Ordnance Survey’s OS Street Map) (v) the professional advisers and lenders of the frst without frst being in possession of a valid Paper Map Copying Licence from purchaser or tenant of the Site. Ordnance Survey, 4.3 In respect of Support Services, only the Client, Benefciary and parties 6.5 Notwithstanding clause 6.4, the Client may ma5e reasonable use of the expressly named in a Report and no other parties are entitled to rely on its Groundsure Materials in order to advise the Benefciary in a professional contents. capacity. However, Groundsure shall have no liability in respect of any advice, opinion or report given or provided to Benefciaries by the Client. 4.4 Save as set out in clauses 4.2 and 4.3 and unless otherwise expressly agreed in writing, no other person or entity of any 5ind is entitled to rely on 6.6 The Client shall procure that any person to whom the Services are made any Services or Report issued or provided by Groundsure. Any party available shall notify Groundsure of any request or requirement to disclose, considering such Reports and Services does so at their own ris5. publish or disseminate any information contained in the Services in accordance with the Freedom of Information Act 2000, the Environmental 5 Fees and Disbursements Information Regulations 2004 or any associated legislation or regulations in 5.1Groundsure shall charge and the Client shall pay fees at the rate and force from time to time. frequency specifed i n t he w ritten p roposal, O rder W ebsite o r O rder 7.Liability: Particular Attention Should Be Paid To This Clause ac5nowledgement form, plus (in the case of Support Services) all proper disbursements incurred by Groundsure. The Client shall in addition pay all 7.1 This Clause 7 sets out the entire liability of Groundsure, including any value added tax or other tax payable on such fees and disbursements in liability for the acts or omissions of its employees, agents, consultants, relation to the provision of the Services (together “Fees”). subcontractors and Third Party Content, in respect of: 5.2 The Client shall pay all outstanding Fees to Groundsure in full without (i) any breach of contract, including any deliberate breach deduction, counterclaim or set off within 30 days of the date of of the Contract by Groundsure or its employees, agents or Groundsure’s invoice or such other period as may be agreed in writing subcontractors; between Groundsure and the Client ("Payment Date"). Interest on late (ii) any use made of the Reports, Services, Materials or any payments will accrue on a daily basis from the Payment Date until the date part of them; and of payment (whether before or after judgment) at the rate of 8% per annum. (iii) any representation, statement or tortious act or 5.3 The Client shall be deemed to have agreed the amount of any invoice omission (including negligence) arising under or in connection with the unless an objection is made in writing within 28 days of the date of the Contract. invoice. As soon as reasonably practicable after being notifed o f a n objection, without prejudice to clause 5.2 a member of Groundsure’s 7.2 All warranties, conditions and other terms implied by statute or common management team will contact the Client and the parties shall then use all law are, to the fullest extent permitted by law, excluded from the Contract. reasonable endeavours to resolve the dispute within 15 days. 7.3 Nothing in the Contract limits or excludes the liability of the Supplier for 6 Intellectual Property and Confdentiality death or personal injury resulting from negligence, or for any damage or 6.1 Subject to liability incurred by the Client or Benefciary a s a r esult o f f raud o r fraudulent misrepresentation. (i) full payment of all relevant Fees and 7.4 Groundsure shall not be liable for (ii) compliance with this Contract, the Client is granted (and is permitted to sub-licence to the Benefciary) a r oyalty-free, (i) loss of profts; worldwide, non-assignable and (save to the extent set out in this Contract) (ii) loss of business; non-transferable licence to ma5e use of the Groundsure Materials. (iii) depletion of goodwill and/or similar losses; 6.2 All Intellectual Property in the Groundsure Materials are and shall remain owned by Groundsure or Groundsure's licensors (including without (iv) loss of anticipated savings; limitation the Third Party Data Providers) the Client ac5nowledges, and (v) loss of goods; shall procure ac5nowledgement by the Benefciary o f, s uch o wnership. Nothing in this Contract purports to transfer or assign any rights to the (vi) loss of contract; Client or the Benefciary in respect of such Intellectual Property. (vii) loss of use; 6.3 Third Party Data Providers may enforce any breach of clauses 6.1 and 6.2 against the Client or Benefciary. (viii) loss or corruption of data or information; 6.4 The Client shall, and shall procure that any recipients of the Groundsure (ix) business interruption; Materials shall: (x) any 5ind of special, indirect, consequential or pure (i) not remove, suppress or modify any trade mar5, economic loss, costs, damages, charges or expenses; copyright or other proprietary mar5ing belonging to Groundsure or any (xi) loss or damage that arise as a result of the use of all or third party from the Services; part of the Groundsure Materials in breach of the Contract; (ii) use the information obtained as part of the Services in (xii) loss or damage arising as a result of any error, omission respect of the subject Site only, and shall not store or reuse any information or inaccuracy in any part of the Groundsure Materials where such error, obtained as part of the Services provided in respect of adjacent or nearby omission or inaccuracy is caused by any Third Party Content or any sites; reasonable interpretation of Third Party Content; (iii) not create any product or report which is derived (xiii) loss or damage to a computer, software, modem, directly or indirectly from the Services (save that those acting in a telephone or other property; and professional capacity to the Benefciary may provide advice based upon the Services); (xiv) loss or damage caused by a delay or loss of use of Groundsure’s internet ordering service. 7.5 Groundsure’s total liability in relation to or under the Contract shall be 11.2 Breach of this Clause 11 shall be deemed a material breach of this limited to £10 million for any claim or claims Contract. 7.6 Groundsure shall procure that the Benefciary s hall b e b ound b y 12 General limitations and exclusions of liability in favour of Groundsure which accord 12.1 The Mapping contained in the Services is protected by Crown with those detailed in clauses 7.4 and 7.5 (subject to clause 7.3) in respect of copyright and must not be used for any purpose other than as part of the all claims which the Benefciary may bring against Groundsure in relation to Services or as specifcally provided in the Contract. the Services or other matters arising pursuant to the Contract. 12.2 The Client shall be permitted to ma5e one copy only of each Report or Mapping Order. Thereafter the Client shall be entitled to ma5e unlimited 8 Groundsure’s right to suspend or terminate copies of the Report or Mapping Order only in accordance with an 8.1 If Groundsure reasonably believes that the Client or Benefciary has not Ordnance Survey paper map copy license available through Groundsure. provided the information or assistance required to enable the proper provision of the Services, Groundsure shall be entitled to suspend all further 12.3 Groundsure reserves the right to amend or vary this Contract. No performance of the Services until such time as any such defciency has been amendment or variation to this Contract shall be valid unless signed by an made good. authorised representative of Groundsure. 8.2 Groundsure shall be entitled to terminate the Contract immediately on 12.4 No failure on the part of Groundsure to exercise, and no delay in written notice in the event that: exercising, any right, power or provision under this Contract shall operate as a waiver thereof. (i) the Client fails to pay any sum due to Groundsure within 30 days of the Payment Date; or 12.5 Save as expressly provided in this Contract, no person other than the persons set out therein shall have any right under the Contract (Rights of (ii) the Client (being an individual) has a ban5ruptcy order Third Parties) Act 1999 to enforce any terms of the Contract. made against him or (being a company) shall enter into liquidation whether compulsory or voluntary or have an administration order made against it or 12.6 The Secretary of State for Business, Innovation and S5ills (“BIS”) or BIS’ if a receiver shall be appointed over the whole or any part of its property successor body, as the case may be, acting through Ordnance Survey may assets or underta5ing or if the Client is struc5 off the Register of Companies enforce a breach of clause 6.4(vi) and clause 6.4(vii) of these terms and or dissolved; or conditions against the Client in accordance with the provisions of the Contracts (Rights of Third Parties) Act 1999. (iii) the Client being a company is unable to pay its debts within the meaning of Section 123 of the Insolvency Act 1986 or being an 12.7 Groundsure shall not be liable to the Client if the provision of the individual appears unable to pay his debts within the meaning of Section 268 Services is delayed or prevented by one or more of the following of the Insolvency Act 1986 or if the Client shall enter into a composition or circumstances: arrangement with the Client’s creditors or shall suffer distress or execution to be levied on his goods; or (i) the Client or Benefciary’s failure to provide facilities, access or information; (iv) the Client or the Benefciary breaches any term of the Contract (including, but not limited to, the obligations in clause 4) which is (ii) fre, storm, food, tempest or epidemic; incapable of remedy or if remediable, is not remedied within fve days of (iii) Acts of God or the public enemy; notice of the breach. (iv) riot, civil commotion or war; 9. Client’s Right to Terminate and Suspend 9.1 Subject to clause 10.1, the Client may at any time upon written notice (v) stri5es, labour disputes or industrial action; terminate or suspend the provision of all or any of the Services. (vi) acts or regulations of any governmental or other 9.2 In any event, where the Client is a consumer (and not a business) he/she agency; hereby expressly ac5nowledges and agrees that: (vii) suspension or delay of services at public registries by (i) the supply of Services under this Contract (and Third Party Data Providers; therefore the performance of this Contract) commences immediately upon (viii) changes in law; or Groundsure's acceptance of the Order; and (ix) any other reason beyond Groundsure’s reasonable (ii) the Reports and/or Mapping provided under this control. Contract are In the event that Groundsure is prevented from performing the Services (or (a) supplied to the Client's specifcation(s) and in any any part thereof) in accordance with this clause 12.6 for a period of not less event than 30 days then Groundsure shall be entitled to terminate this Contract (b) by their nature cannot be returned. immediately on written notice to the Client. 12.8 Any notice provided shall be in writing and shall be deemed to be 10 Consequences of Withdrawal, Termination or Suspension properly given if delivered by hand or sent by frst class post, facsimile or by 10.1 Upon termination of the Contract: email to the address, facsimile number or email address of the relevant party (i) Groundsure shall ta5e steps to bring to an end the as may have been notifed by each party to the other for such purpose or in Services in an orderly manner, vacate any Site with all reasonable speed and the absence of such notifcation the last 5nown address. shall deliver to the Client and/or Benefciary a ny property of the Client 12.9 Such notice shall be deemed to have been received on the day of and/or Benefciary in Groundsure’s possession or control; and delivery if delivered by hand, facsimile or email (save to the extent such day (ii) the Client shall pay to Groundsure all and any Fees payable in is not a wor5ing day where it shall be deemed to have been delivered on the respect of the performance of the Services up to the date of next wor5ing day) and on the second wor5ing day after the day of posting if termination or suspension. In respect of any Support Services sent by frst class post. provided, the Client shall also pay Groundsure any additional costs incurred in relation to the termination or suspension of the Contract. 11 Anti-Bribery 11.1 The Client warrants that it shall: (i) comply with all applicable laws, statutes and regulations relating to anti-bribery and anti-corruption including but not limited to the Bribery Act 2010; (ii) comply with such of Groundsure's anti-bribery and anti-corruption policies as are notifed to the Client from time to time; and (iii) promptly report to Groundsure any request or demand for any undue fnancial or other advantage of any 5ind received by or on behalf of the Client in connection with the performance of this Contract. 12.10 The Contract constitutes the entire agreement between the parties and shall supersede all previous arrangements between the parties relating to the subject matter hereof. 12.11 Each of the provisions of the Contract is severable and distinct from the others and if one or more provisions is or should become invalid, illegal or unenforceable, the validity and enforceability of the remaining provisions shall not in any way be tainted or impaired. 12.12 This Contract shall be governed by and construed in accordance with English law and any proceedings arising out of or connected with this Contract shall be subject to the exclusive jurisdiction of the English courts.12.13 Groundsure is an executive member of the Council of Property Search Organisation (CoPSO) and has signed up to the Search Code administered by the Property Codes Compliance Board (PCCB). All Ris5 Screening Reports shall be supplied in accordance with the provisions of the Search Code.12.14 If the Client or Benefciary has a complaint about the Services, written notice should be given to the Compliance Offcer a t Groundsure who will respond in a timely manner. 12.15 The Client agrees that it shall, and shall procure that each Benefciary shall, treat in confdence a ll C onfdential I n formation a n d shall n o t, an d shall procure that each Benefciary shall not (i) disclose any Confdential Information to any third party other than in accordance with the terms of this Contract; and (ii) use Confdential Information for a purpose other than the exercise of its rights and obligations under this Contract. Subject to clause 6.6, nothing shall prevent the Client or any Benefciary f rom disclosing Confdential Information to the extent required by law. © Groundsure Limited June 2013