Appendix C: Utility and Unit Identification Codes

Total Page:16

File Type:pdf, Size:1020Kb

Appendix C: Utility and Unit Identification Codes Appendix C: Utility and Unit Identification Codes Utility Identification Code NERC assigns each utility participating in the Generating Availability Data System (GADS) a unique identification code. This three digit code allows each system's data to be uniquely catalogued and filed in the database. This appendix contains a list of the codes for each utility system presently participating or assigned a NERC-GADS utility code. Unit Identification Code Each utility participating in GADS assigns unique identification codes to its units. This three digit code allows each unit's data to be uniquely catalogued and filed in the database. Note that each utility must assign identification codes for individual units based on the following criteria: Table 1: Unit Identification Codes Unit Type Coding Series Fossil (Steam) 100 - 199 (Use 600-649 if additional numbers are needed) Nuclear 200 - 299 Combustion Turbines (Gas Turbines or Jet Engines) 300 - 399 (Use 700-799 if additional numbers are needed) Diesel Engines 400 - 499 Hydro/Pumped Storage 500 - 599 (Use 900-999 if additional numbers are needed) Fluidized Bed Combustion 650 - 699 Miscellaneous 800 - 899 (Multi-Boiler/Multi-Turbine, Geothermal, Combined Cycle Block) NERC | 2021 GADS Data Reporting Instructions | January 2021 C-1 Appendix C: Utility and Unit Identification Codes Northeast Power Coordinating Council (NPCC) Northeast Power Coordinating Council 1040 Avenue of the Americas (6th Avenue) 10th Floor New York, New York 10018-3703 212-840-1070; 212-921-1040 NPCC Utility Code Utility Name 003 Ontario Power Generation, Inc. 004 NB Power 008 Emera Energy Inc. 043 Nova Scotia Power 098 Dynegy Generation 100 Brookfield Power 102 Constellation Energy 105 Central Maine Power Company 107 Connecticut Light And Power Co. 108 Consolidated Edison Co. Of New York, Inc. 108 Astoria Energy, LLC 108 Astoria Energy II LLC 109 Glenwood Energy Center 110 Port Jefferson Energy Center 111 Connecticut Light And Power Co. 113 National Grid 115 Transcanada 117 Upstate New York Power Producers, Inc. 117 Somerset Operating Company 118 NRG Energy 119 Dominion Energy 120 New York Power Authority 121 Public Service Of New Hampshire 122 Rochester Gas & Electric Corp. 126 Mass. Municipal Wholesale Elec. Co. 127 Dominion Nuclear Connecticut 127 Brayton Point Energy 130 Covanta SEMASS 131 Exelon New England Holding, LLC 132 Hawkeye Energy Greenport 133 NextEra Energy Resources 136 Mirant New England 137 Ocean State Power 141 NRG Energy - New England 144 Entergy Nuclear Northeast 145 Berkshire Power Company 147 Braintree Electric Light Department NERC | 2021 GADS Data Reporting Instructions | January 2021 C-2 Appendix C: Utility and Unit Identification Codes NPCC Utility Code Utility Name 149 Milford Power Company 150 Connecticut Municipal Electric Energy Coop. 151 US Power Generating Company 152 NRG Energy - New York 153 Broome Energy Resources 155 Calpine Corporation 161 PPL Generation Co. 161 Wallingford Energy, LLC 164 EP Energy Massachusetts LLC 164 EP Newington Energy 167 Taunton Municipal Light 170 Masspower 173 NextEra Energy Seabrook 175 Wheelabrator Millbury, Inc. 176 Wheelabrator Technologies, Inc. 190 FirstLight Hydro Generating Company 191 PS&H Ipps 192 ReEnergy Stratton Lp 194 NextEra Energy Resources 197 Peabody Municipal Light 1A0 Brookfield Power (NYISO) 1A1 Brookfield Power 1A2 Morris Energy 1A3 Rensselaer Cogeneration LLC 1A4 NAES Corporation-Kleen Energy Systems 1A6 Cogen Technologies 1A7 Selkirk Cogen Partners, L.P. 1A9 Bayonne Energy Center 1B3 Allegany Generating Station 1B4 Wheelabrator Bridgeport, L.P. 1B6 Velco 182 1B8 Dartmouth Power Associates 1B9 Lockport Energy Associates 1C1 Tiverton Power Inc. 1C5 Fortistar North Tonawanda 1C8 AP (Curtis Palmer) 1D1 Waterside Power, LLC 1D2 Indeck – Silver Springs 1D3 Entergy Wholesale Commodities 1D8 Lakeside Energy 1D9 ReEnergy Black River 1E1 Dighton Power, LLC 1E2 Indeck-Corinth LP 1E3 Capital District Energy Center 1E4 ReEnergy Lyonsdale 1E5 CCI Roseton LLC NERC | 2021 GADS Data Reporting Instructions | January 2021 C-3 Appendix C: Utility and Unit Identification Codes NPCC Utility Code Utility Name 1E7 Astoria II LLC 1E8 Plainfield Renewable Energy 1E9 New Athens 1F2 Indeck-Olean LP 1F3 Nassau Energy Corp 1F4 Niagara Generation 1F5 Kendall Green Energy 1F6 Danskammer Energy 1F7 Binghamton BOP 1F8 Bucksport Generation 1F9 SBF New York 1G1 Verso Maine Energy LLC 1G2 Indeck-Oswego LP 1G3 L’Energia Energy Center 1G6 Milford Power LLC 1G7 Helix Ravenswood 1H1 Penobscot Energy Recovery Company 1H2 Indeck-Yerkes LP 1H3 Pittsfield Generating Company LP 1J2 Jamestown Board of Utilites 1L2 Carthage Energy LLC 1L3 Lake Road Generating Company, LP 1M3 Burlington Electric Department 1N1 Saranac Energy 1N2 Seneca Power Partners, L.P. 1N3 Firstlight Hydro Generating Company 1P3 Rumford Power Inc. 1Q1 CLI Energy Center 1Q2 Dynegy Generation 1R2 Sterling Power Partners, L.P. 1R3 Millennium Power Partners L.P. 1S1 Empire Generating Co, LLC 1S3 Waterbury Generation 1T1 Bridgeport Energy LLC 1T2 Wheelabrator Westchester Inc 1U1 Nextera Energy Resources 1U2 PSEG Power New York 1V2 PSEG Power Connecticut 1W2 Shoreham Energy LL 1X2 Edgewood Energy LLC 1Y2 Equus Power LP 1 1Z1 Castleton Power, LLC 1Z2 Pinelawn Power LLC NERC | 2021 GADS Data Reporting Instructions | January 2021 C-4 Appendix C: Utility and Unit Identification Codes ReliabilityFirst (RF) ReliabilityFirst 3 Summit Park Drive, Suite 600 Cleveland, Ohio 44131 216-503-0660 RF Utility Code Utility Name 200 Safe Harbor Water Corporation – Brookfield Utility 201 Conectiv (AE) 201 Chambers Cogeneration 202 Constellation Energy 202 Constellation Maryland Peaker Fleet 203 Delaware Municipal Utilities 205 Jersey Central Power & Light Company 206 Easton Utilites Commission 207 Forked River Power 208 First Energy (Metropolitan Edison Company) 209 Vineland Municipal Electric Utilities 210 Panda Brandywine LP 211 First Energy (Pennnsylvania Electric Company) 212 PPL Generation Co 212 Schuylkill Energy 213 Exelon Generation Co., LLC (Philadelphia Electric Company) 215 Public Service Electric And Gas Co. 216 UGI Corporation 218 Horthampton 220 EME Homer City Generation 222 PEI Power Corp. 223 Nextera Energy Resources 223 Wisconsin Electric Power Co. 230 Integrys Energy Services 231 Pedricktown Cogen 232 Amergen - MAAC 234 Commonwealth Chesapeake 235 GenOn Energy 236 Genon Energy (East) 237 Genon Energy (Central) 238 Genon Energy (West) 242 NRG Energy - Mid Atlantic 244 Convanta Energy 248 Old Dominion Electric Cooperative 249 AES Energy 250 Calpine Corporation 251 Delaware City Refining Company 253 Dominion Energy NERC | 2021 GADS Data Reporting Instructions | January 2021 C-5 Appendix C: Utility and Unit Identification Codes RF Utility Code Utility Name 254 East Coast Power 256 Newmarket Power Company, LLC 257 Liberty Electric Power, LLC. 260 Ontelaunee Power Operating Co. 261 Allegheny Energy Supply 262 Brookfield Power 263 Sunbury Generation LP 265 Cape May Holdings 267 Elmwood Park Power, LLC 270 EFS Parlin 271 Wheelabrator Frackville 275 Monmouth Energy 280 Eagle Point Power Generation, LLC 281 Covanta Essex 282 Scrubgrass Generating Company 284 USACE – Detroit District 287 US Operating Services Company – Logan 288 Northeast Maryland 290 Brandon Shores LLC 291 C.P. Crane LLC 292 H.A. Wagner LLC 294 Wheelabrator Baltimore, L.P. 297 Seneca Generation, LLC (LS Power) 298 West Deptford Energy 2A2 Invenergy Nelson 2A3 Newark Energy Center 2A4 CPV Shore 2A7 Panda Liberty 2A8 Wabash Valley Power Association 2A9 Panda Patriot LLC 2B1 CPV Maryland, 2B2 Lightstone Generation 2B4 Oregon Clean Energy, LLC 2B5 Troy Energy, LLC 2B6 Armstrong Power 2B7 Helix Ironwood 2B8 Carroll County Energy 2C3 Buchanan Generation 2C4 Essential Power 2C5 Lakewood Generation 2C8 Red Oak Power 2D1 Hunterstown Combined Cycle Generating Station 2D3 Rock Springs 2D6 Walleye Power 325 Warrick 394 Wheelabrator Portsmouth NERC | 2021 GADS Data Reporting Instructions | January 2021 C-6 Appendix C: Utility and Unit Identification Codes RF Utility Code Utility Name 400 Duke Energy Commercial Asset Management 401 Appalachian Power Co. (AEP) 404 First Energy 406 Consumers Energy 407 Dayton Power And Light Company 408 Detroit Edison Co. 411 Indiana Michigan Power Company (AEP) 412 Indiana-Kentucky Electric Corp. (OVEC) 413 Indianapolis Power & Light Company 414 Kentucky Power Company (AEP) 417 FirstEnergy – Regulated NUG’s 418 Northern Indiana Public Service Co. 419 First Energy 421 Ohio Valley Electric Corp. (OVEC) 422 First Energy (Pennsylvania Power Co) 425 Vectren Power Supply 426 First Energy (Toledo Edison Co.) 427 Allegheny Energy Supply 430 Cinergy 431 Genon Energy (Reliant Energy Midwest) 437 Duke Energy Trading 440 DPL Energy LLC 441 American Municipal Power-Ohio, Inc 442 Indiana Municipal Power Agency (IMPA) 445 LS Power 447 Hoosier Energy 449 Tenaska 449 Rolling Hills Generating, L.L.C 449 Wolf Hills Energy, LLC 450 Buckeye Power 452 Entergy Nuclear Northeast 453 New Covert Generating Company, LLC 454 Midland Cogeneration Venture, L.P. 456 Michigan South Central Power Agency 458 CMS Enterprise 458 Dearborn Industrial Generation, L.L.C 458 Consumers Energy 459 Whiting Clean Energy 464 Michigan Public Power Agency 470 City of Lansing Board Of Water & Light 472 GenPower Services LLC/Longview Power 476 Richland Stryker Generation 498 Birchwood 499 AEP Generation Resources Inc 501 University Park Energy, LLC 502 Cordova Energy Company NERC | 2021 GADS Data Reporting Instructions | January 2021 C-7 Appendix C: Utility and Unit Identification
Recommended publications
  • In the United States Bankruptcy Court for the Southern District of Texas Houston Division
    Case 17-33695 Document 1249 Filed in TXSB on 12/12/17 Page 1 of 4 IN THE UNITED STATES BANKRUPTCY COURT FOR THE SOUTHERN DISTRICT OF TEXAS HOUSTON DIVISION ) In re: ) Chapter 11 ) GENON ENERGY, INC., et al.,1 ) Case No. 17-33695 (DRJ) ) Debtors. ) (Jointly Administered) ) ) Re: Docket No. 1213 NOTICE OF FILING OF REDLINE OF THIRD AMENDED JOINT CHAPTER 11 PLAN OF REORGANIZATION OF GENON ENERGY, INC. AND ITS DEBTOR AFFILIATES PLEASE TAKE NOTICE that on December 12, 2017, GenOn Energy, Inc., et al., the above-captioned debtors and debtors in possession (collectively, the “Debtors”) filed the proposed Order Confirming the Third Amended Joint Chapter 11 Plan of Reorganization of Genon Energy, Inc. and Its Debtor Affiliates [Docket No. 1247] (the “Proposed Confirmation Order”) with the United States Bankruptcy Court for the Southern District of Texas (the “Court”). 1 The Debtors in these chapter 11 cases, along with the last four digits of each debtor’s federal tax identification number, are: GenOn Energy, Inc. (5566); GenOn Americas Generation, LLC (0520); GenOn Americas Procurement, Inc. (8980); GenOn Asset Management, LLC (1966); GenOn Capital Inc. (0053); GenOn Energy Holdings, Inc. (8156); GenOn Energy Management, LLC (1163); GenOn Energy Services, LLC (8220); GenOn Fund 2001 LLC (0936); GenOn Mid-Atlantic Development, LLC (9458); GenOn Power Operating Services MidWest, Inc. (3718); GenOn Special Procurement, Inc. (8316); Hudson Valley Gas Corporation (3279); Mirant Asia-Pacific Ventures, LLC (1770); Mirant Intellectual Asset Management and Marketing, LLC (3248); Mirant International Investments, Inc. (1577); Mirant New York Services, LLC (N/A); Mirant Power Purchase, LLC (8747); Mirant Wrightsville Investments, Inc.
    [Show full text]
  • In Re: in the UNITED STATES BANKRUPTCY COURT for THE
    IN THE UNITED STATES BANKRUPTCY COURT FOR THE SOUTHERN DISTRICT OF TEXAS HOUSTON DIVISION ) ) r .J In re: Chapter I I c::. ) -J 1 0 GENON ENERGY, INC.. et a/., ) Case No. 17-33695 (DRJ) n (""") ) ~ Debtors. ) (Jointly Administered) (....) ________________________________ ) -~ ,.. "--- .,..., c. co NOTICE OF HEARING TO CONSIDER ( .,l:"" r CONFIRMATION OF THE CHAPTER 11 PLAN FILED BY THE co DEBTORS AND RELATED VOTING AND OBJECTION DEADLINES PLEASE TAKE NOTICE THAT on October 5, 2017, the United States Bankruptcy Court for the Southern District of Texas (the "Court") entered an order [Docket No. 860] (the "Disclosure Statement Order"): (a) authorizing GenOn Energy, Inc. and its affiliated debtors and debtors in possession (collectively, the "Debtors"), to solicit acceptances for the Second Amended Joint Chapter II Plan ofReorgan ization ofGenOn Energy. Inc. and its Debtor Affiliates (as modified, amended, or supplemented from time to time, the "Plan");2 The Debtors in these chapter II cases, along with the last four digits of each debtor's federal tax identification number, are: GenOn Energy, Inc. (5566); GenOn Americas Generation, LLC (0520); GenOa Americas Procurement, inc. (8980); GenOa Asset Management, LLC (1966); GenOn Capital lac. (0053); GenOn Energy Holdings, Inc. (8156); GenOa Energy Management, LLC ( 1163); GcnOn Energy Services, LLC (8220); GenOn Fund 200 I LLC (0936); GenOa Mid-Atlantic Development, LLC (9458); GenOa Power Operating Services MidWest, Inc. (3718); GenOa Special Procurement, Inc. (8316); Hudson Valley Gas Corporation (3279); Mirant Asia-Pacific Ventures, LLC ( 1770); Mirant Intellectual Asset Management and Marketing, LLC (3248); Mirant Jnternational Investments, inc. ( 1577); Mirant New York Services, LLC (N/A); Mirant Power Purchase, LLC (8747); Mirant Wrightsville Investments, Inc.
    [Show full text]
  • Current Report of Genon Holdings, Inc
    Current Report of GenOn Holdings, Inc. Delivered Pursuant to Section 6.01(a) of the Stockholders Agreement Date of Report: December 14, 2018 IMPORTANT EXPLANATORY NOTE On December 14, 2018, GenOn Holdings, Inc. (the “Company”) entered into the Stockholders Agreement (the “Stockholders Agreement”) with each of the stockholders party thereto from time to time (the “Stockholders”). Section 6.01(a) of the Stockholders Agreement requires the Company to furnish to the Stockholders certain of the current reports that would be required to be filed with the Securities and Exchange Commission (the “SEC”) on Form 8-K if the Company was required to file such reports with the SEC to the extent such reports relate to the occurrence of any event which would require such report to be filed, subject to the exceptions described therein. This Current Report has been prepared pursuant to the requirements of Section 6.01(a) of the Stockholders Agreement. The Company does not file reports with the SEC and the preparation of this report and the posting of this information to the Company’s website pursuant to the requirements of the Stockholders Agreement shall in no way be interpreted as an undertaking on the part of the Company to otherwise comply with all of the rules and regulations that are applicable to a company subject to the reporting requirements of the Securities Exchange Act of 1934, as amended. Item 1.01 Entry into a Material Definitive Agreement Plan of Reorganization As previously disclosed, on June 14, 2017, GenOn Energy, Inc. (“GenOn”) and certain of its directly and indirectly- owned subsidiaries (collectively, the “Debtors”) filed voluntary petitions for reorganization under Chapter 11 of the United States Bankruptcy Code in the United States Bankruptcy Court for the Southern District of Texas (the “Bankruptcy Court”) and on December 12, 2017, the Bankruptcy Court entered an order (the “Confirmation Order”) confirming the Debtors’ Third Amended Joint Chapter 11 Plan of Reorganization (the “Plan”).
    [Show full text]
  • IN the UNITED STATES BANKRUPTCY COURT for the SOUTHERN DISTRICT of TEXAS HOUSTON DIVISION in Re: ) Chapter 11 GENON ENERGY, INC., Et Al.,1 ) Case No
    IN THE UNITED STATES BANKRUPTCY COURT FOR THE SOUTHERN DISTRICT OF TEXAS HOUSTON DIVISION In re: ) Chapter 11 GENON ENERGY, INC., et al.,1 ) Case No. 17-33695 (DRJ) Debtors. ) (Jointly Administered) Re: Docket No. 1250 NOTICE OF (I) ENTRY OF ORDER CONFIRMING THE THIRD AMENDED JOINT CHAPTER 11 PLAN OF REORGANIZATION OF GENON ENERGY, INC. AND ITS DEBTOR AFFILIATES AND (II) DEADLINE FOR THE FILING OF POST-PETITION INTEREST REQUESTS PLEASE TAKE NOTICE that on December 12, 2017, the Honorable David R. Jones, United States Bankruptcy Judge for the United States Bankruptcy Court for the Southern District of Texas (the “Bankruptcy Court”), entered the Order Confirming the Third Amended Joint Chapter 11 Plan of Reorganization of GenOn Energy, Inc. and Its Debtor Affiliates [Docket No. 1250] confirming the Plan2 of the above-captioned debtors and debtors-in-possession (collectively, the “Debtors”). PLEASE TAKE FURTHER NOTICE that the Effective Date of the Plan will occur after all the conditions precedent set forth in Article X.B of the Plan either occur or are waived. Under the Debtors’ Restructuring Support Agreement, the outside date for the occurrence of the Effective Date is currently set for June 30, 2018 or September 30, 2018, if regulatory approvals are still pending. PLEASE TAKE FURTHER NOTICE that the Bankruptcy Court has approved certain discharge, release, exculpation, injunction, and related provisions in Article IX of the Plan. PLEASE TAKE FURTHER NOTICE, that, pursuant to the Plan and the Confirmation Order, the deadline for filing requests for payment of Administrative Claims, other than Professional Fee Claims, shall be 30 days after the Effective Date.
    [Show full text]
  • NRG Energy, Inc. (Exact Name of Registrant As Specified in Its Charter) Delaware 41-1724239 (State Or Other Jurisdiction of Incorporation Or Organization) (I.R.S
    UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C. 20549 Form 10-K ☒ ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 For the Fiscal Year ended December 31, 2020. ☐ TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 For the Transition period from to . Commission file No. 001-15891 NRG Energy, Inc. (Exact name of registrant as specified in its charter) Delaware 41-1724239 (State or other jurisdiction of incorporation or organization) (I.R.S. Employer Identification No.) 804 Carnegie Center , Princeton , New Jersey 08540 (Address of principal executive offices) (Zip Code) (609) 524-4500 (Registrant's telephone number, including area code) Securities registered pursuant to Section 12(b) of the Act: Title of Each Class Trading Symbol(s) Name of Exchange on Which Registered Common Stock, par value $0.01 NRG New York Stock Exchange Securities registered pursuant to Section 12(g) of the Act: None Indicate by check mark if the registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act. Yes ☒ No ☐ Indicate by check mark if the registrant is not required to file reports pursuant to Section 13 or Section 15(d) of the Exchange Act. Yes ☐ No ☒ Indicate by check mark whether the registrant (1) has filed all reports to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.
    [Show full text]
  • Centerpoint Energy Inc
    CENTERPOINT ENERGY INC FORM 10-K (Annual Report) Filed 02/26/16 for the Period Ending 12/31/15 Address 1111 LOUISIANA ST HOUSTON, TX 77002 Telephone 7132073000 CIK 0001130310 Symbol CNP SIC Code 4911 - Electric Services Industry Electric Utilities Sector Utilities Fiscal Year 12/31 http://www.edgar-online.com © Copyright 2016, EDGAR Online, Inc. All Rights Reserved. Distribution and use of this document restricted under EDGAR Online, Inc. Terms of Use. UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C. 20549 ______________________ Form 10-K (Mark One) þ ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 FOR THE FISCAL YEAR ENDED DECEMBER 31, 2015 OR o TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 FOR THE TRANSITION PERIOD FROM TO Commission File Number 1-31447 ______________________ CenterPoint Energy, Inc. (Exact name of registrant as specified in its charter) Texas 74-0694415 (State or other jurisdiction of incorporation or organization) (I.R.S. Employer Identification No.) 1111 Louisiana Houston, Texas 77002 (713) 207-1111 (Address and zip code of principal executive offices) (Registrant’s telephone number, including area code) Securities registered pursuant to Section 12(b) of the Act: Title of each class Name of each exchange on which registered Common Stock, $0.01 par value New York Stock Exchange Chicago Stock Exchange Securities registered pursuant to Section 12(g) of the Act: None Indicate by check mark if the registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act.
    [Show full text]
  • 2012 NRG Corporate Responsibility Report ABOUT THIS REPORT Post-Merger NRG
    2012 NRG Corporate Responsibility Report ABOUT THIS REPORT Post-merger NRG RETAIL CUSTOMERS CUSTOMER REACH The 2012 NRG Corporate Responsibility Report is our third 2.2 40 million homes published annual report and reflects a period of continued million that our generation can support residential, commercial and growth and acquisition aimed at positioning NRG for a very industrial customers different future within the energy industry. Based on input TOTAL REVENUES FOR 2012 WHERE WE DO BUSINESS from customers, investors and other stakeholders, this report outlines our strategy and commitment to a sustainable future and summarizes our 2012 progress with key metrics. $8.4 billion Since NRG’s merger with GenOn — nearly doubling the size of our generation fleet — closed in mid-December, this report GENERATION CAPACITY and the information in our GRI response matrix focuses on 2012 19 states performance of pre-merger NRG, unless otherwise specified. In 2013, we are working to integrate NRG’s larger fleet while remaining a leader in safety, adopting best practices from both 47,000 and the megawatts District of companies, establishing new baseline metrics, and setting Columbia new targets to ensure continued progress in operational and eco efficiency. The 2013 Corporate Responsibility Report will JOB CREATION fossil, nuclear and establish new baselines and targets as we move to the next renewable generation chapter of providing a more sustainable energy future. 8,000 8,800 new jobs full time GENERATING & THERMAL LOCATIONS created employees NRG’s GRI response can be found at through repowering in the and solar projects United States http://www.nrgenergy.com/responsibility/gri/2012/gri.html (2007–2014) and provides more detail and information on the GRI indicators.
    [Show full text]
  • Genon Morgantown Generating Station Renewal 2017
    GenOn MID-ATLANTIC, LLC. MORGANTOWN GENERATING STATION 12620 CRAIN HIGHWAY, NEWBURG, MD 20664 PART 70 OPERATING PERMIT NO. 24-017-0014 RENEWAL 2017 SECTION I SOURCE IDENTIFICATION ....................................................................4 1. DESCRIPTION OF FACILITY ..........................................................................4 2. FACILITY INVENTORY LIST ...........................................................................5 SECTION II GENERAL CONDITIONS ........................................................................9 1. DEFINITIONS ..................................................................................................9 2. ACRONYMS ....................................................................................................9 3. EFFECTIVE DATE.........................................................................................10 4. PERMIT EXPIRATION...................................................................................10 5. PERMIT RENEWAL.......................................................................................10 6. CONFIDENTIAL INFORMATION ...................................................................11 7. PERMIT ACTIONS.........................................................................................11 8. PERMIT AVAILABILITY .................................................................................12 9. REOPENING THE PART 70 PERMIT FOR CAUSE BY THE EPA.................12 10. TRANSFER OF PERMIT ...............................................................................12
    [Show full text]
  • Assessment of Corrective Measures Report Ccr Release Incident Ash Valley Refuse/Disposal Area
    ASSESSMENT OF CORRECTIVE MEASURES REPORT CCR RELEASE INCIDENT ASH VALLEY REFUSE/DISPOSAL AREA Prepared for: GenOn Northeast Management Company Conemaugh Generating Station New Florence, PA 15944 Prepared by: Aptim Environmental & Infrastructure, Inc. Pittsburgh, Pennsylvania January 2019 Table of Contents ________________________________________________ List of Tables ................................................................................................................................................................. iii List of Figures ............................................................................................................................................................... iii List of Appendices ......................................................................................................................................................... iii List of Acronyms & Abbreviations ................................................................................................................................. iv 1.0 Introduction ....................................................................................................................................................... 1 2.0 Facility Overview ............................................................................................................................................... 2 3.0 Summary of the Ash Release............................................................................................................................ 3 4.0
    [Show full text]
  • US Faced with 'Good Problem' As Gas Glut Stabilizes Prices Calpine
    Thursday, March 24, 2011 US faced with ‘good problem’ Merger Stories Deal Approval as gas glut stabilizes prices AEShttp://www.snl.com/interactivex/snapshot.aspx?id=4055465 Corp. EL AES Close: $12.46 -0.01 (-0.1%) Vol: 5,063,626 (78% of Avg.) by Petermailto:[email protected] Marrin Semprahttp://www.snl.com/interactivex/snapshot.aspx?id=4057062 Energy DE SRE The growth of shale gas production has stabilized natural gas prices Close: $52.04 -0.34 (-0.6%) Vol: 3,116,520 (179% of Avg.) and provides an opportunity to expand the efficient use of gas in Southernhttp://www.snl.com/interactivex/snapshot.aspx?id=4057146 California Gas Co. NG the U.S., a national producer-consumer task force said in a March FERC on March 18 approved AES Corp. subsidiary AES California 22 report. Management Co.’s Feb. 18 request to sell its ownership interest in The group, led by the Bipartisan Policy Center and the American AES Placerita to Clean Energy Systems Inc. Clean Skies Foundation, convened a yearlong review to produce the 70-page report, finding that governments need to “encourage the continued on page 3 development of domestic natural gas resources, subject to appro- priate environmental safeguards.” Comprising gas producers, distributors, consumer groups, large- teractivex/MyInteractive.aspx industrial users, independent experts, state regulatory commis- http://www.snl.com/inNow Featured on sions and environmental groups, the diverse task force noted that increased gas use can reduce air emissions, enhance energy security Wary of potential fines, PG&E requests and “improve the prospects of U.S.-based energy-intensive manu- more time to complete pipe inspections facturers.” “While we wish we could have completed all this work by now, In addition, the report said, gas is abundant.
    [Show full text]
  • Final Creditor Listing
    Just Energy Group - List of Known Creditors USD to CAD 1.2724 Notes to consolidated list of creditors 1. The attached list of creditors was prepared based on information available from the books and records of Just Energy Group Inc. and subsidiaries as of March 9, 2021 (the "Filing Date"). 2. The list is provided pursuant to section 23(1)(a) of the CCAA and regulations made thereunder. The list of creditors has been prepared without admission as to the liability for, or the quantum of, any of the amounts shown. 3. The dollar amounts are not to be used for the purpose of valuing any claims against Just Energy, as they are subject to change based on updated or additional information. 4. If a Claims Procedure is approved by the Court, creditors will be notified by the Monitor and invited to submit a proof of claim at that time. Vendor Name Address Line 1 Address Line 2 City State/Province Postal/Zip Code Country Amount ($CAD) Accounting Principals, Inc. Dba Parker+Lynch & Ajilon Profession 20 Greenway Plaza Suite 1050 Houston TX 77046 US 63,624.85 Ace American Insurance Company And Affiliates 436 Walnut St Philadelphia PA 19106 US 636,200.00 ACR Collections Inc. 100 King St W. Toronto ON M5X 1A3 CA 1,196.66 Adastra Corporation Royal Bank Plaza, South Tower 200 Bay Street, Suite 1401 Toronto ON M5J 2J2 CA 4,793.86 ADP International Services BV Po Box 842875 Boston MA 02284-2875 US 10,357.43 AEP Texas Central 539 N. Carancahua Street Corpus Christi TX 78478 US 1,834,827.47 AEP Texas North 539 N.
    [Show full text]
  • January 29, 2020 Honorable Kimberly D. Bose Secretary Federal Energy
    PJM Interconnection, L.L.C. 2750 Monroe Boulevard Audubon, PA 19403 Steven R. Pincus Associate General Counsel T: (610) 666-4438 ǀ F: (610) 666-8211 [email protected] January 29, 2020 Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E., Room 1A Washington, D.C. 20426 Re: PJM Interconnection, L.L.C., Docket No. ER20-______-000 PJM Operating Agreement, Schedule 12 Membership List Amendments PJM Reliability Assurance Agreement, Schedule 17 Amendments Dear Secretary Bose: Pursuant to section 205 of the Federal Power Act, 16 U.S.C § 824d (2006), and section 35.13 of the Federal Energy Regulatory Commission’s (the “Commission’s” or “FERC’s”)1 regulations, 18 C.F.R. Part 35, PJM Interconnection, L.L.C. (“PJM”) submits for filing proposed revisions to the Amended and Restated Operating Agreement of PJM Interconnection, L.L.C. (“Operating Agreement”), Schedule 12, and Reliability Assurance Agreement among Load Serving Entities in the PJM Region (“RAA”), Schedule 17, to update these lists to include new members, remove withdrawn members, reflect the signatories to the RAA, and reflect corporate name changes for the fourth quarter of 2019 beginning October 1, 2019 and ending December 31, 2019. I. BACKGROUND On December 6, 2002, as revised December 20, 2002, PJM filed amendments to the “Membership Requirements” provisions of the Operating Agreement (1) to delete the requirement 1 Capitalized terms not otherwise defined herein have the meaning specified in the PJM Operating Agreement, PJM Open Access
    [Show full text]