Dakshin Haryana Bijli Vitran Nigam Limited
Total Page:16
File Type:pdf, Size:1020Kb
DAKSHIN HARYANA BIJLI VITRAN NIGAM LIMITED SCHEME FOR HOUSEHOLD ELECTRIFICATION DISTRICT : Jind (HARYANA) (AS PER SUPLEMENTRY DPR) DEEN DAYAL UPADHYAYA GRAM JYOTI YOJANA Table of Contents Sl.No. Format No. Name Page No. 1 A General Information 1 2 A(I) Brief Writeup 2 3 A(II) Minutes 2 4 A(III) Pert Chart 2 5 A(IV) Certificate 2 6 A(V) Basic Details of District 2 7 A(VI) Abstract : Scope of Work & Estimated Cost 4 8 A(VII) Financial Bankability 17 9 B Electrification of UE villages 19 10 B(I) Block-wise coverage of villages 20 11 B(II) Villagewise/Habitation wise coverage 21 12 B(III) Existing Habitation Wise Infrastructure 21 13 B(IV) Village Wise/Habitation Proposed Works 21 14 B(V) Existing REDB Infrastructure 21 15 B(VI) Block-Wise Substation 24 16 B(VII) Feederwise DTs 25 17 C Feeder Segregation 40 18 D Connecting unconnected RHHs 41 19 D(I) Block-wise coverage of villages 42 20 D(II) Villagewise/Habitation wise coverage 43 21 D(III) Existing Habitation Wise Infrastructure 43 22 D(IV) Village Wise/Habitation Proposed Works 43 23 D(V) Existing REDB Infrastructure 43 24 D(VI) Block-Wise Substation 46 25 D(VII) Eligibility for Augmentation of Existing 33/11 KV Substations 47 26 D(VIII) Feederwise DTs 57 27 E Metering 72 28 E(I) DTR Metering 73 29 E(II) Consumer Metering 193 30 E(III) Shifting of Meters 196 31 E(IV) Feeder Metering 197 32 F System Strengthening and Augmentation 198 33 F(I) Block-Wise Substation 199 34 F(II) EHV Substation Feeding the District 200 35 F(III) Districtwise Details of Existing 66 KV or 33 KV Lines 222 36 F(IV) Districtwise Details of Existing 11 KV or 22 KV Lines 224 37 F(V) Details of New 11 KV or 22 KV Lines 238 38 F(VI) Augmentation of 11 KV or 22 KV Line 242 39 G SAGY 252 40 G(I) Block-wise coverage of villages 253 41 G(II) Villagewise/Habitation wise coverage 254 42 G(III) Existing Habitation Wise Infrastructure 255 43 G(IV) Village Wise/Habitation Proposed Works 256 Section -A Basic Details of District State : HARYANA District : Jind Page 1 of 257 28/12/2015 (AS PER SUPLEMENTRY DPR) A(V) Basic Details of District for Supplementry DPR State : HARYANA District : Jind Name of Project Implementing Agency Dakshin Haryana Bijli Vitran Nigam Limited Name of DISCOM Dakshin Haryana Bijli Vitran Nigam Limited Name of State HARYANA Name of District Jind Total Population of district 1334152 Total Geographical Area(SqKm) 2702 Percentage of Hilly area 0 Total Block in the district 7 Total Urban Town in the district 2 Total Urban Population in the district 305583 Population Of Urban Area 305583 Total Census Revenue Villages in the district 307 Total Habitations in the district 0 Total Rural Population in the district 1028569 House Holds Details :- Description 2001 Census 2011 Census CAGR Total HHs by Total HHs by 31.03.2015 as derived 31.03.2019 as derived Total House Holds in the district 214559 249141 3.19 252380 255661 Rural HH in the district 167722 190594 1.16 193072 195582 Urban HH in the district 46837 58547 2.03 59308 60079 Total Energised HH in the district 143232 209470 3.48 212193 214952 Urban HH electrified in the district 45890 57376 2.03 58122 58877 Rural HH electrified in the district 97342 152094 4.1 154071 156074 Balance Un-electrified Rural HH 70380 38500 -2.94 39001 39508 Page 2 of 257 28/12/2015 (AS PER SUPLEMENTRY DPR) A(V) Basic Details of District for Supplementry DPR State : HARYANA District : Jind Balance Un-electrified Urban HH 947 1171 0 1186 1202 Balance Total un-electrified HH in the 0 0 0 0 0 district Status of Already Sanctioned 10th / 11th / 12th Plan Projects :- Plan Un-Electrified Villages Intensive Electrified Villages Total Habitation RHH Incl. BPL BPL Coverage Achievement Coverage Achievement Coverage Achievement Coverage Achievement Coverage Achievement 10th 0 0 0 0 0 0 0 0 0 0 11th 0 0 0 0 0 0 0 0 0 0 12th 0 0 0 0 0 0 0 0 0 0 Page 3 of 257 28/12/2015 (AS PER SUPLEMENTRY DPR) A(VI) Abstract : Scope of Work & Estimated Cost for Supplementry DPR State : HARYANA District : Jind S.No. Item of Works Sub Item Unit Quantity Unit Cost(In Total Cost(In Lac) Lac) C.Sansad Adarsh Gram Yozna BPL Hhs 1 Uchana Total BPL Hhs proposed to be electrified Nos. 118 0.03 3.54 Sub-Total (BPL Hhs) 118 3.54 Capacity Augmentation of DTR 2 Uchana From Existing to 100 KVA Nos. 7 1.6927 11.8489 Sub-Total (Capacity Augmentation of DTR) 7 11.8489 Conversion of existing LT Overhead lines to ABC Cable 3 Uchana 3X95+1X70 Kms. 12.1 5.3706 64.98426 Sub-Total (Conversion of existing LT Overhead lines to ABC Cable) 12.1 64.98426 New 11 KV Line DTR 4 Uchana 100 KVA (3 Ph) Nos. 3 2.241 6.723 Sub-Total (New 11 KV Line DTR) 3 6.723 New 11 KV Spur Line 5 Uchana 11 KV Rabbit Conductor Kms. 1.8 4.2398 7.63164 Sub-Total (New 11 KV Spur Line) 1.8 7.63164 New LT AB Cable 6 Uchana 3X95+1X70 Kms. 0.6 5.3706 3.22236 Sub-Total (New LT AB Cable) 0.6 3.22236 Total (C.Sansad Adarsh Gram Yozna) 97.95016 E.Metering LT Metering(Consumer Metering) Page 4 of 257 28/12/2015 (AS PER SUPLEMENTRY DPR) A(VI) Abstract : Scope of Work & Estimated Cost for Supplementry DPR State : HARYANA District : Jind S.No. Item of Works Sub Item Unit Quantity Unit Cost(In Total Cost(In Lac) Lac) 1 Alewa Replacement of Defective Meters(1-Ph Domestic and Nos. 602 0.0131 7.8862 Commercial Meters) Replacement of Electro-Mechanical Meters(1-Ph Domestic and Nos. 130 0.0212 2.756 Commercial Meters) 2 Jind Replacement of Defective Meters(1-Ph Domestic and Nos. 501 0.0131 6.5631 Commercial Meters) Replacement of Electro-Mechanical Meters(1-Ph Domestic and Nos. 140 0.0212 2.968 Commercial Meters) 3 Julana Replacement of Defective Meters(1-Ph Domestic and Nos. 588 0.0131 7.7028 Commercial Meters) Replacement of Electro-Mechanical Meters(1-Ph Domestic and Nos. 207 0.0212 4.3884 Commercial Meters) 4 Narwana Replacement of Defective Meters(1-Ph Domestic and Nos. 590 0.0131 7.729 Commercial Meters) Replacement of Electro-Mechanical Meters(1-Ph Domestic and Nos. 135 0.0212 2.862 Commercial Meters) 5 Pillu Khera Replacement of Defective Meters(1-Ph Domestic and Nos. 674 0.0131 8.8294 Commercial Meters) Replacement of Electro-Mechanical Meters(1-Ph Domestic and Nos. 122 0.0212 2.5864 Commercial Meters) 6 Safidon Replacement of Defective Meters(1-Ph Domestic and Nos. 190 0.0131 2.489 Commercial Meters) Replacement of Electro-Mechanical Meters(1-Ph Domestic and Nos. 612 0.0212 12.9744 Commercial Meters) 7 Uchana Replacement of Defective Meters(1-Ph Domestic and Nos. 20 0.0131 0.262 Commercial Meters) Sub-Total (LT Metering(Consumer Metering)) 4511 69.9967 Total (E.Metering) 69.9967 F.System Strengthening 11 KV or 22 KV Line Augmentation Page 5 of 257 28/12/2015 (AS PER SUPLEMENTRY DPR) A(VI) Abstract : Scope of Work & Estimated Cost for Supplementry DPR State : HARYANA District : Jind S.No. Item of Works Sub Item Unit Quantity Unit Cost(In Total Cost(In Lac) Lac) 1 132KV S/S Kheritalod-Beri Khera AP Control Points Nos. 1 0.072 0.072 Poles Nos. 30 0.0252 0.756 2 132KV S/S Kheritalod-Beri Khera AP(A To B) Raccon-80 sqmm. Kms. 2.5 4.038 10.095 3 132KV S/S Kheritalod-Bhurain RDS Control Points Nos. 1 0.072 0.072 Poles Nos. 24 0.0252 0.6048 4 132KV S/S Kheritalod-Bhurain RDS(A To B) Raccon-80 sqmm. Kms. 2 4.038 8.076 5 132KV S/S Kheritalod-Budhakhera AP Control Points Nos. 2 0.072 0.144 Poles Nos. 29 0.0252 0.7308 6 132KV S/S Kheritalod-Budhakhera AP(A To B) Raccon-80 sqmm. Kms. 2 4.038 8.076 7 132KV S/S Kheritalod-Budhakhera AP(B To C) Rabbit-50 sqmm. Kms. 1.5 4.038 6.057 8 132KV S/S Kheritalod-Jamni RDS Control Points Nos. 1 0.072 0.072 Poles Nos. 24 0.0252 0.6048 9 132KV S/S Kheritalod-Jamni RDS(A To B) Raccon-80 sqmm. Kms. 2 4.038 8.076 10 132KV S/S Kheritalod-Kalwa AP Control Points Nos. 2 0.072 0.144 Poles Nos. 24 0.0252 0.6048 11 132KV S/S Kheritalod-Kalwa AP(A To B) Raccon-80 sqmm. Kms. 2 4.038 8.076 12 132KV S/S Kheritalod-Mohd khera AP Control Points Nos. 2 0.072 0.144 Poles Nos. 24 0.0252 0.6048 13 132KV S/S Kheritalod-Mohd khera AP(A To B) Raccon-80 sqmm. Kms. 2 4.038 8.076 14 132KV S/S Kheritalod-Pilluhera MU Control Points Nos. 1 0.072 0.072 Poles Nos. 54 0.0252 1.3608 15 132KV S/S Kheritalod-Pilluhera MU(A To B) Raccon-80 sqmm. Kms. 3 4.038 12.114 16 132KV S/S Kheritalod-Rajana Kl AP Control Points Nos. 1 0.072 0.072 Page 6 of 257 28/12/2015 (AS PER SUPLEMENTRY DPR) A(VI) Abstract : Scope of Work & Estimated Cost for Supplementry DPR State : HARYANA District : Jind S.No.