(NABL) Directory of Accredited Testing Laboratories
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Report on Fly Ash Generation and Its
REPORT ON FLY ASH GENERATION AT COAL / LIGNITE BASED THERMAL POWER STATIONS AND ITS UTILIZATION IN THE COUNTRY FOR THE 1ST HALF OF THE YEAR 2020-2021 (April 2020 to September 2020) CENTRAL ELECTRICITY AUTHORITY NEW DELHI MARCH 2021 CONTENTS PARA No. PAGE DESCRIPTION No. 1.0 Background 1 2.0 Ash Generation & Utilization during the 1st Half Year 2020-21 2 2.1 A Brief Summary 2 Power Utilitywise Status of Fly Ash Generation & its utilization during 2.2 3 the 1st Half Year 2020-21 State wise Status of Fly Ash Generation & its utilization during the 1st 2.3 9 Half Year 2020-21 Present Status of Fly Ash Utilization as per MoEF’s amendment 3.0 10 notification dated 3rd November, 2009 3.1 Range of Fly Ash Utilization during the 1st Half Year 2020-21 11 Thermal Power Stations that have achieved 100% or more ash 3.2 11 utilization during the 1st Half Year 2020-21 Power Stations in Fly Ash Utilization level of 90% to less than 100% 3.3 17 during the 1st Half Year 2020-21 Power Stations in Fly Ash Utilization level of 70% to less than 90% 3.4 18 during the 1st Half Year 2020-21 Power Stations in Fly Ash Utilization level of 50% to less than 70% 3.5 20 during the 1st Half Year 2020-21 Power Stations with Fly Ash utilization level of less than 50% during 3.6 22 the 1st Half Year 2020-21 Power Stations with no Fly Ash Generation during the 1st half of the 3.7 24 Year 2020-21 4.0 Modes of Fly Ash utilization during the 1st Half Year 2020-21 25 5.0 Conclusions & Recommendations 27 List of Abbreviations 31 Fly Ash Generation and its Utilization at Coal / Lignite based Thermal Annexure-I Power Stations in the country during the 1st Half Year of 2020-21 (Power Utility Wise) i LIST OF TABLES & FIGURES TABLE PAGE TITLE OF TABLE No. -
Report on Fly Ash Generation and Its
REPORT ON FLY ASH GENERATION AT COAL / LIGNITE BASED THERMAL POWER STATIONS AND ITS UTILIZATION IN THE COUNTRY FOR 1ST HALF OF THE YEAR 2019-2020 (April 2019 to September 2019) CENTRAL ELECTRICITY AUTHORITY NEW DELHI APRIL 2020 CONTENTS PARA DESCRIPTION PAGE No. No. 1.0 Background 1 2.0 Ash Generation & Utilization during the 1st Half Year 2019-20 2 2.1 A Brief Summary 2 2.2 Power Utility wise Status of Fly Ash Generation & its utilization during 2 the 1st Half Year 2019-20 2.3 State wise Status of Fly Ash Generation & its utilization during the 1st 8 Half Year 2019-20 3.0 Present Status of Fly Ash Utilization as per MoEF’s amendment 9 notification dated 3rd November, 2009 3.1 Range of Fly Ash Utilization during the 1st Half Year 2019-20 9 3.2 Thermal Power Stations that have achieved 100% or more ash 10 utilization during the 1st Half Year 2019-20 3.3 Power Stations in Fly Ash Utilization level of 90% to less than 100% 14 during the 1st Half Year 2019-20 3.4 Power Stations in Fly Ash Utilization level of 70% to less than 90% 15 during the 1st Half Year 2019-20 3.5 Power Stations in Fly Ash Utilization level of 50% to less than 70% 18 during the 1st Half Year 2019-20 3.6 Power Stations with Fly Ash utilization level of less than 50% during 19 the 1st Half Year 2019-20 3.7 Power Stations with no Fly Ash Generation during the 1st half of the 21 Year 2019-20 4.0 Modes of Fly Ash utilization during the 1st Half Year 2019-20 22 5.0 Conclusions & Recommendations 24 List of Abbreviations Annex-I Fly ash generation and its utilization at coal/lignite based thermal power stations in the country during the 1st Half Year 2019-20 (Power Utility Wise) i LIST OF TABLES & FIGURE TABLE PAGE TITLE OF TABLE No. -
National Thermal Power Corporation Limited (Ntpc) Ministry of Power Committee on Public Undertakings (2020-21) Eighth Report Se
8 NATIONAL THERMAL POWER CORPORATION LIMITED (NTPC) MINISTRY OF POWER COMMITTEE ON PUBLIC UNDERTAKINGS (2020-21) EIGHTH REPORT SEVENTEENTH LOK SABHA LOK SABHA SECRETARIAT NEW DELHI EIGHTH REPORT COMMITTEE ON PUBLIC UNDERTAKINGS (2020-21) (SEVENTEENTH LOK SABHA) NATIONAL THERMAL POWER CORPORATION LIMITED (NTPC) MINISTRY OF POWER Presented to Lok Sabha on 24.03.2021 Laid in Rajya Sabha on 24.03.2021. LOK SABHA SECRETARIAT NEW DELHI March, 2021/Chaitra, 1942 (Saka) ii C O N T E N T S Page No. Composition of the Committee (2020-21) (vi) Introduction (vii) PART – I CHAPTER - I PROFILE OF THE COMPANY 1 1. Brief History 1 2. Pioneering Role in Power Sector 2 3. Contribution to Exchequer 2 4. Creation of Employment (Direct & Indirect) 2 5. Developing the Communities around the Plants 3 6. Objectives of NTPC 4 7. Composition of Board of Directors 4 8. Independent Directors - Need for Domain Expertise 5 9. Absence of Required Number of Independent Directors 6 10. Representation of Women in Board of Directors 8 11. MoU with Ministry of Power 9 CHAPTER-II PHYSICAL PERFORMANCE 11 1. Details of Plants of NTPC 11 2. Growth in Installed Power Generation Capacity 12 3. Capacity Addition (Installed & Commercial) 13 4. Coal-based Power Generation 14 5. Gas-based Power Generation 14 6. Renewable (solar,wind,bio-mass) Based Power Generation 15 7. Domestic Content Requirements in RE Projects 19 8. Joint Ventures with ONGC for RE Projects 20 9. Hydro-Power Generation 20 10. Comparison of NTPC with International Counterparts in Performace Metrics 22 CHAPTER –III FINANCIAL PERFORMANCE 24 1. -
Company Reliance Industries Limited Tata Consultancy Services
Top 1000 Private Sector Companies (Rank-wise List) Company Reliance Industries Limited Tata Consultancy Services (TCS) Infosys Technologies Ltd Wipro Limited Bharti Tele-Ventures Limited ITC Limited Hindustan Lever Limited ICICI Bank Limited Housing Development Finance Corp. Ltd. TATA Steel Limited Ranbaxy Laboratories Limited HDFC Bank Ltd Tata Motors Limited Larsen & Toubro Limited (L&T) Satyam Computer Services Ltd. Maruti Udyog Limited Bajaj Auto Ltd. HCL Technologies Ltd. Hero Honda Motors Limited Hindalco Industries Ltd Reliance Energy Limited Grasim Industries Limited Jet Airways (India) Ltd. Sun Pharmaceuticals Industries Ltd Cipla Ltd. Gujarat Ambuja Cements Ltd. Videsh Sanchar Nigam Limited The Tata Power Company Limited Sterlite Industries (India) Ltd. Associated Cement Companies Ltd. Nestlé India Ltd. Hindustan Zinc Limited GlaxoSmithKline Pharmaceuticals Limited Siemens India Ltd. Motor Industries Company Limited Mahindra & Mahindra Limited UTI Bank Ltd. Zee Telefilms Limited Bharat Forge Limited ABB Limited i-Flex Solutions Ltd. Dr. Reddy's Laboratories Ltd. Nicholas Piramal India Limited Kotak Mahindra Bank Limited Reliance Capital Ltd. Ultra Tech Cement Ltd. Patni Computer Systems Ltd. Wockhardt Limited Indian Petrochemicals Corporation Limited Biocon India Limited Essar Oil Limited. Asian Paints Ltd. Dabur India Limited Jaiprakash Associates Limited JSW Steel Limited Tata Chemicals Limited Tata Tea Limited Tata Teleservices (Maharashtra) Limited The Indian Hotels Co. Ltd. Glenmark Pharmaceuticals Limited NIRMA Limited Jindal Steel & Power Ltd HCL Infosystems Ltd. Cadila Healthcare Limited Colgate-Palmolive (India) Limited The Great Eastern Shipping Company Limited Aventis Pharma India Ltd Ashok Leyland Limited Pantaloon Retail (India) Limited Indian Rayon And Industries Limited Financial Technologies (India) Ltd United Phosphorus Limited Matrix Laboratories Limited Sesa Goa Limited Lupin Ltd Cummins India Limited Crompton Greaves Limited. -
DEPARTMENT of COMMERCE International
This document is scheduled to be published in the Federal Register on 11/13/2017 and available online at https://federalregister.gov/d/2017-24517, and on FDsys.gov DEPARTMENT OF COMMERCE International Trade Administration Initiation of Antidumping and Countervailing Duty Administrative Reviews AGENCY: Enforcement and Compliance, International Trade Administration, Department of Commerce SUMMARY: The Department of Commerce (the Department) has received requests to conduct administrative reviews of various antidumping and countervailing duty orders and findings with September anniversary dates. In accordance with the Department’s regulations, we are initiating those administrative reviews. DATES: Applicable [Insert date of publication in the Federal Register]. FOR FURTHER INFORMATION CONTACT: Brenda E. Waters, Office of AD/CVD Operations, Customs Liaison Unit, Enforcement and Compliance, International Trade Administration, U.S. Department of Commerce, 1401 Constitution Avenue, NW, Washington, DC 20230, telephone: (202) 482-4735. SUPPLEMENTARY INFORMATION: Background The Department has received timely requests, in accordance with 19 CFR 351.213(b), for administrative reviews of various antidumping and countervailing duty orders and findings with September anniversary dates. All deadlines for the submission of various types of information, certifications, or comments or actions by the Department discussed below refer to the number of calendar days from the applicable starting time. 2 Notice of No Sales If a producer or exporter named in this notice of initiation had no exports, sales, or entries during the period of review (POR), it must notify the Department within 30 days of publication of this notice in the Federal Register. All submissions must be filed electronically at http://access.trade.gov in accordance with 19 CFR 351.303.1 Such submissions are subject to verification in accordance with section 782(i) of the Tariff Act of 1930, as amended (the Act). -
Issn 2229-4104 Asia Pacific Journal of Research
APJRBM Volume 3, Issue 1 (January, 2012) ISSN 2229-4104 The Journal of Sri Krishna Research & Educational Consortium ASIA PACIFIC JOURNAL OF RESEARCH IN BUSINESS MANAGEMENT Internationally Indexed & Listed Referred e-Journal APPLICATION OF Z SCORE ANALYSIS IN EVALUATING STEEL INDUSTRY IN INDIA DR. KAVITA CHAVALI*; MS. KARTHIKA.S** *Associate Professor, Alliance University, Bangalore – 562106. **Research Associate, Alliance University, Bangalore – 562106. ABSTRACT The paper is an empirical study to understand the financial soundness of steel industry in India. For this purpose twenty large and medium steel units which are listed are taken. A sample period of 2001 - 2010 was selected for the study. The financial performance of the Steel industry was monitored and measured by using Altman’s Z-score model which was extensively used by practitioners and researchers in the past. This study analyses the possibility of business failure with reasonable accuracy by using the z-score model. The research findings are that the steel industry is in good financial performance inspite of the impact of sluggish demand and global economic slowdown with an exception of two companies in the study period. KEYWORDS: Steel Industry, Z score, Bankruptcy, Financial Soundness. ______________________________________________________________________________ INTRODUCTION Companies exist for making profits and to create value to the share holder. It is very important for bankers, researchers, regulatory agencies to predict the bankruptcy to lessen the impact of it. If a company goes bankrupt / fail the shareholders of the company and also the public at large get affected. The impact is much more if it is a manufacturing industry like Steel. “Failure” is defined as the inability of a firm to pay its financial obligations as they mature (Beaver, 1966). -
Ministry of Steel
Report No. 21 of 2015 (Volume II) CHAPTER V: MINISTRY OF STEEL Steel Authority of India Limited 5.1 Investment of SAIL in Joint Ventures 5.1.1 Introduction Steel Authority of India Limited (the company) had 23 Joint Venture Companies (JVCs) as on 31 March 2014 with total investment of ` 778.82 crore. Out of 23 JVCs, only seven1 are fully functional of which three2 are regularly generating profits. Seventy nine per cent (` 614.28 crore) of the Company’s total equity investment was in two power JVCs viz NTPC-SAIL Power Company Private Limited (NSPCL) and Bokaro Power Supply Company Private Limited (BPSCL). Nine JVCs were formed in partnership with Central Public Sector Undertakings (CPSUs) and State Government/State owned companies. Remaining 14 joint ventures were formed with equity participation of 50 per cent or more from Private Enterprises which also had management control. Four JVCs3 were being wound up. The company formulated its policy guidelines on entering into MOUs/JVCs in November 2013. The objectives of this audit were to assess whether selection process of JV partners was transparent, fair and not disadvantageous to the interests of the Company and the JVCs had achieved the intended objectives of their formation. Audit examination covered 154 JVCs formed during 2007-2013, the records of which were available with the Company. Reply of the Company (January 2015) has been suitably considered in this report. 5.1.2 Audit Findings 5.1.2.1 Terms and conditions of JVC obligations were disadvantageous to SAIL The Company formed two JVCs5, one each at Bhilai and Bokaro in April 2007 and March 2008 respectively, with Jaypee Cement Limited (JCL) which had equity stake of 74 per cent and management control. -
NTPC-SAIL Power Company Limited (A Joint Venture of NTPC & SAIL) Regd
NTPC-SAIL Power Company Limited (A Joint Venture of NTPC & SAIL) Regd. Office: NBCC Tower, 15, 4th Floor, Bhikaji Cama Place, New Delhi – 110066 Website: www.nspcl.co.in Advt. No.-01/2019 NTPC-SAIL POWER COMPANY LIMITED (NSPCL) is a premier joint venture company of two Maharatnas - NTPC Limited and SAIL having business units at Bhilai, Durgapur, Rourkela and its Corporate Centre at New Delhi. NSPCL has been an outperformer since its inception and has been consistently paying dividend to the promoters. To fuel its ambitious growth plan, NSPCL is looking for experienced professional for engagement as Assistant Company Secretary (1 post - UR) on fixed term basis for a period of 06 (six) months, extendable by 03 (three) tenure of 06 (six) months each, up to a maximum of 02 (two) years. The qualifying requirement are as under: Qualification: Graduate from a recognized University and Qualified Member of the Institute of Company Secretaries of India. Experience Requirement: 01 year of post-qualification experience in the relevant area in a Govt./Public Sector Undertaking or private company of repute. Experience Profile: Should have knowledge & experience in following areas: a) Holding and Managing Board Meetings, Committee Meetings and Annual General Meetings/ Extra Ordinary General Meetings. b) Preparing and circulating the agenda notes/ circular memorandums. c) Preparing the minutes of the Board/ Committee/ General Meetings. d) Managing statutory compliances including filling and filing of forms to be filed with MCA/ROC, Statutory Returns, Statistical Books. e) Preparing and maintaining statutory records and registers. f) Advising the company on various company law related matters. -
Final Draft of CEA Anual Report 2019-20
CEA ANNUAL REPORT 2019-20 CENTRAL ELECTRICITY AUTHORITY GOVERNMENT OF INDIA MINISTRY OF POWER The AUTHORITY (As on 31.03.2020) Sh. Prakash Mhaske Chairperson & Addl. Charge of Member (Power System) Dr. Somit Dasgupta Sh. P.D. Siwal Member (E&C) Member (Thermal) (upto 31.12.2019) (upto 29.02.2020) Sh.Sandesh Kumar Sharma Sh. Dinesh Chandra Member (Planning) Member (Hydro) Addl.charge Member(E&C) Addl.Charge of Member (GO&D) ORGANIZATION CHART OF CEA (AS ON 31.03.2020) CHAIRPERSON (Prakash Mhaske) MEMBER MEMBER MEMBER MEMBER MEMBER MEMBER (THERMAL) (HYDRO) (POWER SYSTEM) (GRID OPN. & (ECONOMIC & COMM.) (PLANNING (P.D. Siwal) (Dinesh Chandra) Addl. Charge DISTN.) (Dr. Somit Dasgupta) (Sandesh Kumar Sharma) with Chairperson, CEA Addl. Charge with (प्रकाश मके) CHIEF ENGINEER PRINCIPAL CHIEF ENGINEER CHIEF ENGINEER CHIEF ENGINEER PRINCIPAL CHIEF ENGINEER (INTEGRATED (HYDRO (POWER SYSTEM (FINANCIAL CHIEF ENGINEER-I (THERMAL CHIEF ENGINEER–II SECERETARY RESOURCE ENGINEERING AND PLANNING & STUDIES & (Chander Shakhar) PROJECT (B.K. Sharma) (P.C. KUREEL) PLANNING) RENOVATION & APPRAISAL-I) ANALYSIS) MONITORING-I) MODERNIZATION) CHIEF ENGINEER CHIEF ENGINEER CHIEF ENGINEER (FUEL CHIEF ENGINEER CHIEF ENGINEER (GRID CHIEF ENGINEER (COORDINATION) MANAGEMENT) (THERMAL CHIEFI ENGINEER (POWER SYSTEM MANAGEMENT) (FINANCIAL & PROJECT APPRAISAL PROJECT (HYDRO PROJECT PLANNING & APPRAISAL) COMMERCIAL COMMITTEE MONITORING-II) APPRAISAL-II) CHIEF ENGINEER APPRAISAL) CHIEF ENGINEER CHIEF ENGINEER (POWER DATA MS (NRPC) (DISTRIBUTION (HUMAN CHIEF ENGINEER CHIEF -
Petition No. 211/MP/2011 Coram
CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI Petition No. 211/MP/2011 Coram Shri Gireesh B. Pradhan, Chairperson Shri A. K. Singhal, Member Shri A S Bakshi, Member Dr. M.K. Iyer, Member Dated: 5th of October, 2017 In the matter of: Petition under Regulations 20 and 21 of the Central Electricity Regulatory Commission (Sharing of inter-State Transmission Charges and Losses), Regulations, 2010 and against the alleged arbitrary action of Western Regional Load Despatch Centre by loading transmission losses on the 220 kV lines being used for transfer of power from the generating station of NSPCL to Bhilai Steel Plant. And In the matter of: Steel Authority of India Limited ….Petitioner Bhilai Steel Plant Bhilai-490 001 Chattisgarh Vs Western Regional Load Despatch Centre (WRLDC) ….Respondent Power System Operation Corporation (POSOCO) F-3, MIDS Area Marol, Andheri (East) Mumbai-400 093 Advocates/Parties present: Shri MG Ramchandran, Advocate for the Petitioner Ms. Anushree Bardhan, Advocate, SAIL ORDER The Steel Authority of India Limited (SAIL) filed the present petition challenging the action of the Western Regional Load Dispatch Centre (WRLDC) calling upon SAIL to bear Order in Petition No. 211/MP/2011 Page 1 the transmission losses on the dedicated transmission lines used by Bhilai Steel Plant of SAIL (SAIL-BSP) for getting electricity from the generating station/units of NTPC SAIL Power Company Limited (NSPCL). The Central Commission by Order dated 20.11.2013 decided the petition holding that the SAIL is liable to share the transmission -
Steel Authority of India Limited Durgapur Steel Plant Environment Control Department
Steel Authority of India Limited Durgapur Steel Plant Environment Control Department Sub : Expansion-cum-modernization plan of Durgapur Steel Plant (2.088 MTPA to 3.50 MTPA, Gross Hot Metal) and Captive Power Plant (40 MW) at Faridpur, Burdwan, Durgapur, West Bengal by M/s Steel Authority of India (SAIL) : Environmental Clearance Ref: Office Memorandum No. J-11011/492/2007-IA II (I), dated 10th Sept, 2007 Ministry of Environment & Forests, Government of India, ParyavaranBhawan, C.G.O.Complex, Lodi Road, New Delhi – 110003 and subsequent amendment dtd. 23.12.08, 05.07.13, 20.11.14 & 19.02.16 Status report of the half yearly compliance to the conditions stipulated in the above mentioned Environment clearance as on 31.03.2017. A. Specific Conditions I. Dust extraction (DE) system with electrostatic precipitator (ESP) to Sinter plant, Steel melting shop (SMS) and DE system with ESP to Blast furnace (BF); DE system to dolomite calcination plant and coal based Power plant shall be provided to control emissions within 50 mg/Nm3 . All the BFs shall be provided coal dust injection system to reduce air emissions. Waste flue gas generated in BF shall be reused in BF. High Pressure Liquid Aspiration (HPLA) system, new charging cars with screw feeders and hydro-jet door cleaners shall be provided to Coke oven battery. On-line stack monitoring facilities for all the stacks shall be provided and reports submitted to the WBPCB, CPCB and Ministry’s Regional Office at Bhubaneswar. a. Care has been taken to include above systems in Expansion-cum-modernization units. -
List of Factories in Durg S.No Industryname Postal Communication Contact No. 1 Shri Tirupati Rice Mill Village & Post
LIST OF FACTORIES IN DURG S.NO INDUSTRYNAME POSTAL COMMUNICATION CONTACT NO. VILLAGE & POST- JANJGIRI, DURG RIPUR 1 SHRI TIRUPATI RICE MILL 9329207365 G.E. ROAD,DURG BAJRANG RICE MILL LEASEE- VILLAGE-KHAPRI NEAR CHIKHLI NALA, 2 9098932800 MAYANK TRADERS POST-JEORA SIRSA, VILLAGE-JEORA(SIRSA), DHAMDHA 3 SHRADDHA AGRO INDIA 9329755444 ROAD,DURG 4 RAKESH INDUSTRIES (RICE MILL) VILLAGE-CHANDKHURI,BALOD ROAD, 9926567368 JAGDAMBA PADDY PROCESSING 5 PVT.LTD LEASEE VILLAGE-JEORA (SIRSA), 9630474646 B.S.ENTERPRISES VILLAGE- SIRSAKHURD, DHAMDHA 6 HANUMAT PADDY PROCESSES 9406221111 ROAD,DURG VILLAGE-SAMODA,DHAMDAH 7 BAJRANG AGROTECH (I) PVT.LTD 9302270706 ROAD.DURG 8 CHANDAN PERBOILING VILLAGE-JEORA(SIRSA),DISTT-DURG 7566603006 VILLAGE-SAMIDA, DHAMDHA 9 PUNAM RICE INDUSTRIES 9424104219 ROAD,DURG JINDAL RICE MILL LEASEE JINDAL VILLAGE-CHANDKHURI,DURG BALOD 10 9584445344 PADDY PROCESSING UN ROAD,DURG VILLAGE-MURMUNDA,TAH.- 11 SHRI GANGA PARBOILING DHAMDHA,DISTT-DURG C.G.STATE CO- 12 DHAMDHA NAKA DURG, 9981994475 MKTG,FED.LTD,KISAN RICE MILE C.G.STATE CO- 13 PATAN ROAD SELUD, 9685449556 MKTG,FED.LTD,KISAN RICE MILE C.G.STATE CO- 14 KISAN RICE MILE DHAMDHA MKTG,FED.LTD,KISAN RICE MILE VILLAGE-KONARI,BAARDA ROAD,PO- 15 GAJANAN RICE MILL 9827040172 PEESEGAON,DURG 16 MAHAVEER DHAN KUTAI KENDRA VILLAGE-KARANJA BHILAI,DISTT-DURG 9302777744 8-A,INDUSTRIAL ESTATE,DHAMDHA 17 JAIN UDYOG 9329010301 ROAD DURG 18 NAMAN FOOD PRODUCTS VILLAGE-JEORA(SIRSA), 7828203006 19 SHRI GANGA PADDY PROCESSORS VILLAGE-MURMUNDA,DISTT-DURG 7032291379 20 SATYANARAYAN TIMBER CO. STATION CHOWK,KUMHARI 9977068225 21 SHANKAR VIJAY SAW MILL STATION CHOWK,G.E.ROAD,KUMHARI 9753554401 22 MAHALAXMI TIMBER CO.