I for SCOPING for EIA STUDY for Durgapur Captive Power Project – III (2X20 MW)
Total Page:16
File Type:pdf, Size:1020Kb
FORM - I FOR SCOPING FOR EIA STUDY FOR Durgapur Captive Power Project – III (2x20 MW) NTPC-SAIL POWER COMPANY PVT. LTD. (A JOINT VENTURE OF NTPC & SAIL) ENGINEERING DEPARTMENT 4TH Floor, NBCC Tower, 15, Bhikaji Kama Place, New Delhi-110066 SPECIFICATION NO. : 4130-603-POG-M-002 This is Technical Specification for conducting EIA Study for Durgapur Captive Power Project – III (2x20 MW). This Document has a restricted distribution and may be used by the recipients only for the performance of official duties. Its contents shall not be disclosed/loaned/copied other is part or as whole without written permission of NSPCL. FORM –I for Scoping for EIA study Doc. No. : 4130-603-POG-M-002 for Durgapur Captive Power Rev No. : 0 Project – III (2x20 MW) Rev Date : 03.10.13 Page 1 of 12 FORM - l (I) Basic Information Sl. Item Details No. 1 Name of the Project Durgapur CPP – III (2x20 MW) within the boundary of Durgapur Steel Plant in Burdwan Dist., West Bengal 2 S. No. in the Schedule 3 Proposed capacity/ area length /tonnage to be Capacity: 2x20 MW handled/ command area / lease area / number of wells to be drilled 4 New/ Expansion/Modernization New 5 Existing Capacity/ Area In-lieu-of Turbo Alternator of Old Power Plant (4X5 MW) 6 Category of the project 'B' category 7 Does it attract the General condition? If yes, NA please specify 8 Does it attract the special condition? If yes, NA please specify 9 Location The site is located within the boundary of Durgapur Steel Plant in Burdwan District of West Bengal. Latitude: 23° 32' 48'' N to 23° 32' 33'' N and Longitude: 87°14' 25' ' E to 87°14' 43' ' E. Plot / Survey/ Khasra No. Mouza: MEJEDIHI J.L. No.: 65 Khatian No: 104, 41 Plot Nos.: 852 to 872; 919 to 946 & 982 Village Within existing premises of DSP Tehsil Durgapur District Burdwan State West Bengal 10 Nearest railway station / airport along with i. Nearest Railway Station: Waria about distance in kms. 1 kms. ii. The nearest commercial air port is at Kolkata which is approximately at a distance of 190 kms 11 Nearest Town, city, District Headquarters Durgapur City, 2 kms from the project along with distance in kms. site 12 Village Panchayats, Zila Parishad, Municipal Mayor, Durgapur Municipal Corporation Corporation, Local body(complete postal Durgapur City Centre, P.O – Durgapur addressed with telephone nos. to be given) Dist : Burdwan PIN : 713 216 Phone : 0343-545828 FORM –I for Scoping for EIA study Doc. No. : 4130-603-POG-M-002 for Durgapur Captive Power Rev No. : 0 Project – III (2x20 MW) Rev Date : 03.10.13 Page 2 of 12 13 Name of the applicant NTPC-SAIL Power Co (P) Ltd 14 Registered Address 4th Floor, NBCC Tower 15, Bhikaji Cama Place New Delhi- 110 066 15 Address for correspondence Name Mr K R C Murthy Designation (Owner/Partner/CEO) Business Unit Head Address CPP-II, DSP Complex Durgapur (W.B.) Pin Code 713 203 E-mail [email protected] Telephone No. 0343-2574308 Fax No. 0343-2584720 16 Details of Alternative Sites examined, if any. The proposed power plant is planned to Location of these sites should be shown on a be located on the North-West of topo sheet NSPCL’s existing power plant of 2x60 MW (CPP-II) inside the boundary of Durgapur Steel Plant. The area inside Durgapur Steel Plant (DSP) where main plant & its auxiliaries are proposed to be set up has already been identified to NSPCL by DSP. However, the actual requirement of land, arising out of feasibility study, will be suitably considered by DSP. Alternative sites are not considered since the project will be mainly used as a captive generation plant of SAIL, raw water required for Power Plant is already available with DSP and shall be supplied from their existing pipe network . Secondly, no metropolitan city, national park, wildlife sanctuary, archaeological /historical /cultural/ defence installation exist within 10km radius of the site. No forest or prime agricultural land will be utilized for setting up the project as area identified is already within the existing DSP premises. The proposed stack does not fall within approach funnel of any airport. 17 Interlinked Projects ---------- 18 Whether separate application of interlinked N.A. project has been submitted? 19 If yes, date of submission N.A. 20 If no, reason N.A. 21 Whether the proposal involves approval / No clearance as under: If yes, details of the same and their status to be given. (a) The Forest (Conservation) Act, 1980 FORM –I for Scoping for EIA study Doc. No. : 4130-603-POG-M-002 for Durgapur Captive Power Rev No. : 0 Project – III (2x20 MW) Rev Date : 03.10.13 Page 3 of 12 (b) The Wildlife (Protection) Act, 1972 (c) The C.R.Z. Notification, 1991 22 Whether there is any Government Order / No separate clearances to be sought as Policy relevant / relating to the site? ash generated from the proposed power plant shall be dumped in the existing ash dyke. 23 Forest land involved (hectares) NIL 24 Whether there is any litigation pending No litigation. against the project and / or land in which the project is proposed to be set up? (a) Name of the Court (b) Case No. (c) Orders / directions of the Court, if any and its relevance with the proposed project. (I) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S. No. Information / Checklist Yes/No Details thereof (with. approximate Confirmation quantities/ rates, wherever possible) with source of information data 1.1 Permanent or temporary change in No The project and its facilities shall be land use, land including increase located in the existing premises of in intensity of cover or topography SAIL, Durgapur. land use (with respect to local land use plan) 1.2 Clearance of existing land, No ------------ vegetation and buildings? 1.3 Creation of new land uses? No ------------ 1.4 Pre-construction investigations Yes Soil and Geo Technical investigations e.g. bore houses, soil testing? have to be carried out for the proposed 2x20 MW project envisaged by NSPCL. 1.5 Construction works? Yes Construction of Main Plant and related auxiliaries. 1.6 Demolition works? No ------------ 1.7 Temporary sites used for Yes Temporary accommodation facilities construction works or housing of with proper sanitation for construction construction workers? workers would be provided. These sites shall be located within the existing premises. 1.8 Above ground buildings, Yes Main Plant Buildings. Earthwork structures or earthworks including involving excavations cut and fill FORM –I for Scoping for EIA study Doc. No. : 4130-603-POG-M-002 for Durgapur Captive Power Rev No. : 0 Project – III (2x20 MW) Rev Date : 03.10.13 Page 4 of 12 linear structures, cut and fill or activities. excavations 1.9 Underground works including No ------------ mining or tunnelling? 1.10 Reclamation works? No ------------ 1.11 Dredging? No ------------ 1.12 Offshore structures? No ------------ 1.13 Production and manufacturing Yes Electricity generation of 2x20 MW(In processes? present Ist Phase) 1.14 Facilities for storage of goods or Yes Storage of Coal, Water, Chemicals and materials? Oil etc. are envisaged. 1.15 Facilities for treatment or disposal Yes A comprehensive Environmental of solid waste or liquid effluents? Management Plan shall be formulated which shall include disposal of solid waste and liquid effluents. These measures will be highlighted in the EIA report. 1.16 Facilities for long term housing of No Residential and infrastructure facilities operational workers? are being extended by DSP, NSPCL’s own arrangements are not envisaged at present. 1.17 New road, rail or sea traffic Yes New road & rail approach to the project during construction or operation? site will be constructed within NSPCL’s land already identified by DSP. 1.18 New road, rail, air waterborne or No ------------ other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion .of existing No ------------ transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines Yes Power at 11 kV will be stepped up to 33 or pipelines? kV and connected to existing MRS, Sajara and Sajara-2 Substations located within DSP premises. 1.21 Impoundment, damming, No ------------ culverting, realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No ------------ 1.23 Abstraction or transfers of water Yes The source of water shall be from form ground or surface waters? existing DSP network. Use of ground water sources is not envisaged. 1.24 Changes in water bodies or the Yes No changes in water bodies. A surface land surface affecting drainage or water drainage study will be undertaken. run-off? FORM –I for Scoping for EIA study Doc. No. : 4130-603-POG-M-002 for Durgapur Captive Power Rev No. : 0 Project – III (2x20 MW) Rev Date : 03.10.13 Page 5 of 12 1.25 Transport of personnel or Yes Construction Material, Labour and Main materials for construction, Plant Equipment shall be transported operation or decommissioning? during construction phase. Most of the transportation shall be through roads/rail route. - Coal and Oil shall be transported during operation phase through railways. - Chemicals shall be transported through roads. - Personnel during construction and operation would use public transport or their own means 1.26 Long-term dismantling or No ------------ decommissioning or restoration works? 1.27 Ongoing activity during No ------------ decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in Yes Proposed project will generate either temporarily or permanently? employment avenues both during construction and operation phases leading to influx of people in the area.