I for SCOPING for EIA STUDY for Durgapur Captive Power Project – III (2X20 MW)

Total Page:16

File Type:pdf, Size:1020Kb

I for SCOPING for EIA STUDY for Durgapur Captive Power Project – III (2X20 MW) FORM - I FOR SCOPING FOR EIA STUDY FOR Durgapur Captive Power Project – III (2x20 MW) NTPC-SAIL POWER COMPANY PVT. LTD. (A JOINT VENTURE OF NTPC & SAIL) ENGINEERING DEPARTMENT 4TH Floor, NBCC Tower, 15, Bhikaji Kama Place, New Delhi-110066 SPECIFICATION NO. : 4130-603-POG-M-002 This is Technical Specification for conducting EIA Study for Durgapur Captive Power Project – III (2x20 MW). This Document has a restricted distribution and may be used by the recipients only for the performance of official duties. Its contents shall not be disclosed/loaned/copied other is part or as whole without written permission of NSPCL. FORM –I for Scoping for EIA study Doc. No. : 4130-603-POG-M-002 for Durgapur Captive Power Rev No. : 0 Project – III (2x20 MW) Rev Date : 03.10.13 Page 1 of 12 FORM - l (I) Basic Information Sl. Item Details No. 1 Name of the Project Durgapur CPP – III (2x20 MW) within the boundary of Durgapur Steel Plant in Burdwan Dist., West Bengal 2 S. No. in the Schedule 3 Proposed capacity/ area length /tonnage to be Capacity: 2x20 MW handled/ command area / lease area / number of wells to be drilled 4 New/ Expansion/Modernization New 5 Existing Capacity/ Area In-lieu-of Turbo Alternator of Old Power Plant (4X5 MW) 6 Category of the project 'B' category 7 Does it attract the General condition? If yes, NA please specify 8 Does it attract the special condition? If yes, NA please specify 9 Location The site is located within the boundary of Durgapur Steel Plant in Burdwan District of West Bengal. Latitude: 23° 32' 48'' N to 23° 32' 33'' N and Longitude: 87°14' 25' ' E to 87°14' 43' ' E. Plot / Survey/ Khasra No. Mouza: MEJEDIHI J.L. No.: 65 Khatian No: 104, 41 Plot Nos.: 852 to 872; 919 to 946 & 982 Village Within existing premises of DSP Tehsil Durgapur District Burdwan State West Bengal 10 Nearest railway station / airport along with i. Nearest Railway Station: Waria about distance in kms. 1 kms. ii. The nearest commercial air port is at Kolkata which is approximately at a distance of 190 kms 11 Nearest Town, city, District Headquarters Durgapur City, 2 kms from the project along with distance in kms. site 12 Village Panchayats, Zila Parishad, Municipal Mayor, Durgapur Municipal Corporation Corporation, Local body(complete postal Durgapur City Centre, P.O – Durgapur addressed with telephone nos. to be given) Dist : Burdwan PIN : 713 216 Phone : 0343-545828 FORM –I for Scoping for EIA study Doc. No. : 4130-603-POG-M-002 for Durgapur Captive Power Rev No. : 0 Project – III (2x20 MW) Rev Date : 03.10.13 Page 2 of 12 13 Name of the applicant NTPC-SAIL Power Co (P) Ltd 14 Registered Address 4th Floor, NBCC Tower 15, Bhikaji Cama Place New Delhi- 110 066 15 Address for correspondence Name Mr K R C Murthy Designation (Owner/Partner/CEO) Business Unit Head Address CPP-II, DSP Complex Durgapur (W.B.) Pin Code 713 203 E-mail [email protected] Telephone No. 0343-2574308 Fax No. 0343-2584720 16 Details of Alternative Sites examined, if any. The proposed power plant is planned to Location of these sites should be shown on a be located on the North-West of topo sheet NSPCL’s existing power plant of 2x60 MW (CPP-II) inside the boundary of Durgapur Steel Plant. The area inside Durgapur Steel Plant (DSP) where main plant & its auxiliaries are proposed to be set up has already been identified to NSPCL by DSP. However, the actual requirement of land, arising out of feasibility study, will be suitably considered by DSP. Alternative sites are not considered since the project will be mainly used as a captive generation plant of SAIL, raw water required for Power Plant is already available with DSP and shall be supplied from their existing pipe network . Secondly, no metropolitan city, national park, wildlife sanctuary, archaeological /historical /cultural/ defence installation exist within 10km radius of the site. No forest or prime agricultural land will be utilized for setting up the project as area identified is already within the existing DSP premises. The proposed stack does not fall within approach funnel of any airport. 17 Interlinked Projects ---------- 18 Whether separate application of interlinked N.A. project has been submitted? 19 If yes, date of submission N.A. 20 If no, reason N.A. 21 Whether the proposal involves approval / No clearance as under: If yes, details of the same and their status to be given. (a) The Forest (Conservation) Act, 1980 FORM –I for Scoping for EIA study Doc. No. : 4130-603-POG-M-002 for Durgapur Captive Power Rev No. : 0 Project – III (2x20 MW) Rev Date : 03.10.13 Page 3 of 12 (b) The Wildlife (Protection) Act, 1972 (c) The C.R.Z. Notification, 1991 22 Whether there is any Government Order / No separate clearances to be sought as Policy relevant / relating to the site? ash generated from the proposed power plant shall be dumped in the existing ash dyke. 23 Forest land involved (hectares) NIL 24 Whether there is any litigation pending No litigation. against the project and / or land in which the project is proposed to be set up? (a) Name of the Court (b) Case No. (c) Orders / directions of the Court, if any and its relevance with the proposed project. (I) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S. No. Information / Checklist Yes/No Details thereof (with. approximate Confirmation quantities/ rates, wherever possible) with source of information data 1.1 Permanent or temporary change in No The project and its facilities shall be land use, land including increase located in the existing premises of in intensity of cover or topography SAIL, Durgapur. land use (with respect to local land use plan) 1.2 Clearance of existing land, No ------------ vegetation and buildings? 1.3 Creation of new land uses? No ------------ 1.4 Pre-construction investigations Yes Soil and Geo Technical investigations e.g. bore houses, soil testing? have to be carried out for the proposed 2x20 MW project envisaged by NSPCL. 1.5 Construction works? Yes Construction of Main Plant and related auxiliaries. 1.6 Demolition works? No ------------ 1.7 Temporary sites used for Yes Temporary accommodation facilities construction works or housing of with proper sanitation for construction construction workers? workers would be provided. These sites shall be located within the existing premises. 1.8 Above ground buildings, Yes Main Plant Buildings. Earthwork structures or earthworks including involving excavations cut and fill FORM –I for Scoping for EIA study Doc. No. : 4130-603-POG-M-002 for Durgapur Captive Power Rev No. : 0 Project – III (2x20 MW) Rev Date : 03.10.13 Page 4 of 12 linear structures, cut and fill or activities. excavations 1.9 Underground works including No ------------ mining or tunnelling? 1.10 Reclamation works? No ------------ 1.11 Dredging? No ------------ 1.12 Offshore structures? No ------------ 1.13 Production and manufacturing Yes Electricity generation of 2x20 MW(In processes? present Ist Phase) 1.14 Facilities for storage of goods or Yes Storage of Coal, Water, Chemicals and materials? Oil etc. are envisaged. 1.15 Facilities for treatment or disposal Yes A comprehensive Environmental of solid waste or liquid effluents? Management Plan shall be formulated which shall include disposal of solid waste and liquid effluents. These measures will be highlighted in the EIA report. 1.16 Facilities for long term housing of No Residential and infrastructure facilities operational workers? are being extended by DSP, NSPCL’s own arrangements are not envisaged at present. 1.17 New road, rail or sea traffic Yes New road & rail approach to the project during construction or operation? site will be constructed within NSPCL’s land already identified by DSP. 1.18 New road, rail, air waterborne or No ------------ other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion .of existing No ------------ transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines Yes Power at 11 kV will be stepped up to 33 or pipelines? kV and connected to existing MRS, Sajara and Sajara-2 Substations located within DSP premises. 1.21 Impoundment, damming, No ------------ culverting, realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No ------------ 1.23 Abstraction or transfers of water Yes The source of water shall be from form ground or surface waters? existing DSP network. Use of ground water sources is not envisaged. 1.24 Changes in water bodies or the Yes No changes in water bodies. A surface land surface affecting drainage or water drainage study will be undertaken. run-off? FORM –I for Scoping for EIA study Doc. No. : 4130-603-POG-M-002 for Durgapur Captive Power Rev No. : 0 Project – III (2x20 MW) Rev Date : 03.10.13 Page 5 of 12 1.25 Transport of personnel or Yes Construction Material, Labour and Main materials for construction, Plant Equipment shall be transported operation or decommissioning? during construction phase. Most of the transportation shall be through roads/rail route. - Coal and Oil shall be transported during operation phase through railways. - Chemicals shall be transported through roads. - Personnel during construction and operation would use public transport or their own means 1.26 Long-term dismantling or No ------------ decommissioning or restoration works? 1.27 Ongoing activity during No ------------ decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in Yes Proposed project will generate either temporarily or permanently? employment avenues both during construction and operation phases leading to influx of people in the area.
Recommended publications
  • (India) Durgapur Local Centre
    33rd National Convention and National Conference on ‘Climate Responsive Technologies vis-a-vis Iron and Steel Production Scenario’ January 17-18, 2020 33 rd National Convention of Metallurgical and Materials Engineers & NNaattiioonnaall CCoonnffeerreennccee oonn CClliimmaattee RReessppoonnssiivvee TTeecchhnnoollooggiieess vviiss--aa--vviiss IIrroonn aanndd SStteeeell PPrroodduuccttiioonn SScceennaarriioo OOrrggaanniisseedd BByy The Institution of Engineers (India) Durgapur Local Centre SSppoonnssoorreedd BByy 1 33rd National Convention and National Conference on ‘Climate Responsive Technologies vis-a-vis Iron and Steel Production Scenario’ January 17-18, 2020 National Advisory Committee Chairman Dr T M Gunaraja, FIE, President, IEI Co-Chairman Prof N R Bandyopadhyay, FIE, Chairman, MMDB, IEI Convenor Dr.Debasish Ghosh, FIE ,Sr. Principal Scientist, CSIR-CMERI, Durgapur Members : Mr K KMehrotra, FIE, Member, MMDB, IEI Mr V Parthasarathy, FIE, Member, MMDB, IEI Mr Asish Gupta, FIE, Member, MMDB, IEI Mr. P. K. Pradhan, FIE, Executive Director, SAIL- DSP , Durgapur Mr. M K Biswal,Honorary Secretary, IEI, Durgapur Local Centre Technical Committee Chairman Prof. H.B. Goswami, FIE, Council Member, IEI Convenor Mr.Lohitendu Badu, General Manager, SAIL-DSP, Durgapur Jt. Convenor Mr. P. S. Banerjee, MIE, Committee Member, IEI, Durgapur Local Centre Technical Advisors Dr. Amit Ganguly, Former Steel Chair Professor Mr Rajeev Kumar, Chief General Manager, SAIL-DSP, Durgapur Mr R K Bhattacharyya, Jt. General Manager, MECON Limited, Durgapur Shri B BMajumder,GeneralManager,MECON Ltd., Burnpur Dr Siddhartha Mukherjee, Former Director, School of Mines & Metallurgy, KNU Dr. P. K. Sinha, Principal, DIATM, Durgapur Members Mr. R K Roy, FIE, IEI, Durgapur Local Centre Dr P Adhvaryyu, FIE, Principal, SIT, Techno India Group Dr. C Bhattacharya, Dy.
    [Show full text]
  • Report on Fly Ash Generation and Its
    REPORT ON FLY ASH GENERATION AT COAL / LIGNITE BASED THERMAL POWER STATIONS AND ITS UTILIZATION IN THE COUNTRY FOR THE 1ST HALF OF THE YEAR 2020-2021 (April 2020 to September 2020) CENTRAL ELECTRICITY AUTHORITY NEW DELHI MARCH 2021 CONTENTS PARA No. PAGE DESCRIPTION No. 1.0 Background 1 2.0 Ash Generation & Utilization during the 1st Half Year 2020-21 2 2.1 A Brief Summary 2 Power Utilitywise Status of Fly Ash Generation & its utilization during 2.2 3 the 1st Half Year 2020-21 State wise Status of Fly Ash Generation & its utilization during the 1st 2.3 9 Half Year 2020-21 Present Status of Fly Ash Utilization as per MoEF’s amendment 3.0 10 notification dated 3rd November, 2009 3.1 Range of Fly Ash Utilization during the 1st Half Year 2020-21 11 Thermal Power Stations that have achieved 100% or more ash 3.2 11 utilization during the 1st Half Year 2020-21 Power Stations in Fly Ash Utilization level of 90% to less than 100% 3.3 17 during the 1st Half Year 2020-21 Power Stations in Fly Ash Utilization level of 70% to less than 90% 3.4 18 during the 1st Half Year 2020-21 Power Stations in Fly Ash Utilization level of 50% to less than 70% 3.5 20 during the 1st Half Year 2020-21 Power Stations with Fly Ash utilization level of less than 50% during 3.6 22 the 1st Half Year 2020-21 Power Stations with no Fly Ash Generation during the 1st half of the 3.7 24 Year 2020-21 4.0 Modes of Fly Ash utilization during the 1st Half Year 2020-21 25 5.0 Conclusions & Recommendations 27 List of Abbreviations 31 Fly Ash Generation and its Utilization at Coal / Lignite based Thermal Annexure-I Power Stations in the country during the 1st Half Year of 2020-21 (Power Utility Wise) i LIST OF TABLES & FIGURES TABLE PAGE TITLE OF TABLE No.
    [Show full text]
  • ANSWERED ON:05.08.2010 INCREASE in PRODUCTION of STEEL Ahir Shri Hansraj Gangaram
    GOVERNMENT OF INDIA STEEL LOK SABHA UNSTARRED QUESTION NO:1969 ANSWERED ON:05.08.2010 INCREASE IN PRODUCTION OF STEEL Ahir Shri Hansraj Gangaram Will the Minister of STEEL be pleased to state: (a) whether there is a constant increase in the production of steel in the country; (b) if so, whether employment is also increasing at the same ratio with the increase in production in Steel Authority of India Ltd. and other Public Sector Undertakings of the country; (c) the comperative details of production in various steel plants vis a vis direct employment; (d) whether any proposal in under consideration of the Government to increase employment in steel plants; and (e) if so, the details thereof? Answer THE MINISTER OF STATE IN THE MINISTRY OF STEEL(SHRI A. SAI PRATHAP) (a) There has been a significant increase in production of steel during the last few years. The data on production of crude steel in the country during the last five years are as under: Year Crude steel production (in million tonnes) Quantity Growth rate over last year (%) 2005-06 46.46 6.96 2006-07 50.81 9.38 2007-08 53.86 5.98 2008-09 58.44 8.50 2009-10# 64.88 11.02 Source: Joint Plant Committee (JPC); # =Provisional (b) There is no correlation of increase in employment with the increase in production capacity. It is not necessary that the employment should increase at the same ratio with the increase in production due to technological developments, automation, process improvement & best practices and the need to progressively reduce manpower per million tonne of steel production which made it possible to achieve higher production targets with less manpower.
    [Show full text]
  • Vindhyachal Super Thermal Power Project Vindhy
    CUST CONSIGNEE_ADDRESS INVOICE_ADDRESS 2048 MANAGER (STORES) SR.MANAGER (FINANCE) VINDHYACHAL SUPER THERMAL POWER PROJECT VINDHYACHAL SUPER THERMAL POWER PROJECT NTPC LTD NTPC LTD VINDHYACHAL VINDHYACHAL DISTT.SIDHI (M.P) DISTT.SIDHI (M.P) 486885 486885 3315 CHIEF MANAGER(PROJECTS) DY GENERAL MANAGER ( MATERIALS) TNPL-KAGITHAPURAM M/S TAMIL NADU NEWSPRINT & PAPERS LTD., KARUR KAGITHAPURAM, TAMIL NADU KARUR DISTRICT 639136 639136 3321 MANAGER/PROJECTS MANAGER/PROJECTS M/S JINDAL STEEL & POWER LTD M/S JINDAL STEEL & POWER LIMITED, KHARSIA ROAD P.B.NO.16, RAIGARH KHARSIA ROAD, MADHYAPRADESH RAIGARH - 496 001 496001 3322-23 ADE/STORES & TRANSPORT CHIEF ENGINEER / O & M VIJAYAWADA THERMAL POWER ANDHRA PRADESH POWER GENERATION CORPN STATION VIJAYAWADA THERMAL POWER STATION/APGENCO IBRAHIMPATINAM IBRAHIMPATNAM ANDRAPRADESH VIJAYAWADA DIST 521456 ANDHRAPRADESH STATE 521456 3326-27 DY.GENERAL MANAGER (R&M) CHIEF MATERIALS MANAGER TAHCHER THERMAL POWER STATION TALCHER THERMAL POWER STATION NTPC LTD, TALCHER THEMAL - P.O ANGUL DISTRICT DIST.ANGUL ORISSA STATE ORISSA INDIA 759101 759101 3341 EXECUTIVE ENGINEER/STORES CHIEF ENGINEER (GEN, O&M) MAJOR STORE 'A' MAHARASTRA STATE ELECTRICITY BOARD NASIK TPS EKLAHARE POST EKLAHARE NASIK ROAD MAHARASHTRA MAHARASTRA / INDIA 422105 422105 3347-48 ASST.DIVISINAL ENGGR/STORES CHIEF ENGINEER/ O&M M/S APGENCO KOTHAGUDAM THERMAL POWER STATION KOTHAGUDAM TPS- B STAGE UNIT 5&6 UNIT 'B' STATION UNIT-5,PALONCHA PALONCHA TOWN KHAMMAM DIST. AP KHAMMAM DISTRICT 507115 ANDRAPRADESH. INDIA 507115 3349 CHIEF ENGINEER/GEN(O&M) CHIEF ACCOUNTS OFFICER NASIK TPS MAHARASHTRA STATE ELECTRICITY BOARD EKLAHARE PRAKASHGAD 3 RD FLOOR MAHARASHTRA BANDRA EAST / MUMMBAI 422105 MAHARASHTRA / INDIA 400051 3351 ASST.DIVISIONAL ENGINEER THE SUPERINTENDING ENGINEER/E& CONSTRUCTION STORES E&M / CONSTRUCTION KOTHAGUDAM THERMAL POWER STN.
    [Show full text]
  • Report on Fly Ash Generation and Its
    REPORT ON FLY ASH GENERATION AT COAL / LIGNITE BASED THERMAL POWER STATIONS AND ITS UTILIZATION IN THE COUNTRY FOR 1ST HALF OF THE YEAR 2019-2020 (April 2019 to September 2019) CENTRAL ELECTRICITY AUTHORITY NEW DELHI APRIL 2020 CONTENTS PARA DESCRIPTION PAGE No. No. 1.0 Background 1 2.0 Ash Generation & Utilization during the 1st Half Year 2019-20 2 2.1 A Brief Summary 2 2.2 Power Utility wise Status of Fly Ash Generation & its utilization during 2 the 1st Half Year 2019-20 2.3 State wise Status of Fly Ash Generation & its utilization during the 1st 8 Half Year 2019-20 3.0 Present Status of Fly Ash Utilization as per MoEF’s amendment 9 notification dated 3rd November, 2009 3.1 Range of Fly Ash Utilization during the 1st Half Year 2019-20 9 3.2 Thermal Power Stations that have achieved 100% or more ash 10 utilization during the 1st Half Year 2019-20 3.3 Power Stations in Fly Ash Utilization level of 90% to less than 100% 14 during the 1st Half Year 2019-20 3.4 Power Stations in Fly Ash Utilization level of 70% to less than 90% 15 during the 1st Half Year 2019-20 3.5 Power Stations in Fly Ash Utilization level of 50% to less than 70% 18 during the 1st Half Year 2019-20 3.6 Power Stations with Fly Ash utilization level of less than 50% during 19 the 1st Half Year 2019-20 3.7 Power Stations with no Fly Ash Generation during the 1st half of the 21 Year 2019-20 4.0 Modes of Fly Ash utilization during the 1st Half Year 2019-20 22 5.0 Conclusions & Recommendations 24 List of Abbreviations Annex-I Fly ash generation and its utilization at coal/lignite based thermal power stations in the country during the 1st Half Year 2019-20 (Power Utility Wise) i LIST OF TABLES & FIGURE TABLE PAGE TITLE OF TABLE No.
    [Show full text]
  • Annual Report 2018-19
    Annual Report 2018-19 Shri Narendra Modi, Hon’ble Prime Minister of India launching “Saubhagya” Yojana Contents Sl No. Chapter Page No. 1 Performance Highlights 3 2 Organisational Set-Up 11 3 Capacity Addition Programme 13 4 Generation & Power Supply Position 17 5 Ultra Mega Power Projects (UMPPs) 21 6 Transmission 23 7 Status of Power Sector Reforms 29 8 5XUDO(OHFWULÀFDWLRQ,QLWLDWLYHV 33 ,QWHJUDWHG3RZHU'HYHORSPHQW6FKHPH ,3'6 8MMZDO'LVFRP$VVXUDQFH<RMDQD 8'$< DQG1DWLRQDO 9 41 Electricty Fund (NEF) 10 National Smart Grid Mission 49 11 (QHUJ\&RQVHUYDWLRQ 51 12 Charging Infrastructure for Electric Vehicles (EVs) 61 13 3ULYDWH6HFWRU3DUWLFLSDWLRQLQ3RZHU6HFWRU 63 14 International Co-Operation 67 15 3RZHU'HYHORSPHQW$FWLYLWLHVLQ1RUWK(DVWHUQ5HJLRQ 73 16 Central Electricity Authority (CEA) 75 17 Central Electricity Regulatory Commission (CERC) 81 18 Appellate Tribunal For Electricity (APTEL) 89 PUBLIC SECTOR UNDERTAKING 19 NTPC Limited 91 20 NHPC Limited 115 21 Power Grid Corporation of India Limited (PGCIL) 123 22 Power Finance Corporation Ltd. (PFC) 131 23 5XUDO(OHFWULÀFDWLRQ&RUSRUDWLRQ/LPLWHG 5(& 143 24 North Eastern Electric Power Corporation (NEEPCO) Ltd. 155 25 Power System Operation Corporation Ltd. (POSOCO) 157 JOINT VENTURE CORPORATIONS 26 SJVN Limited 159 27 THDC India Ltd 167 STATUTORY BODIES 28 Damodar Valley Corporation (DVC) 171 29 Bhakra Beas Management Board (BBMB) 181 30 %XUHDXRI(QHUJ\(IÀFLHQF\ %(( 185 AUTONOMOUS BODIES 31 Central Power Research Institute (CPRI) 187 32 National Power Training Institute (NPTI) 193 OTHER IMPORTANT
    [Show full text]
  • National Thermal Power Corporation Limited (Ntpc) Ministry of Power Committee on Public Undertakings (2020-21) Eighth Report Se
    8 NATIONAL THERMAL POWER CORPORATION LIMITED (NTPC) MINISTRY OF POWER COMMITTEE ON PUBLIC UNDERTAKINGS (2020-21) EIGHTH REPORT SEVENTEENTH LOK SABHA LOK SABHA SECRETARIAT NEW DELHI EIGHTH REPORT COMMITTEE ON PUBLIC UNDERTAKINGS (2020-21) (SEVENTEENTH LOK SABHA) NATIONAL THERMAL POWER CORPORATION LIMITED (NTPC) MINISTRY OF POWER Presented to Lok Sabha on 24.03.2021 Laid in Rajya Sabha on 24.03.2021. LOK SABHA SECRETARIAT NEW DELHI March, 2021/Chaitra, 1942 (Saka) ii C O N T E N T S Page No. Composition of the Committee (2020-21) (vi) Introduction (vii) PART – I CHAPTER - I PROFILE OF THE COMPANY 1 1. Brief History 1 2. Pioneering Role in Power Sector 2 3. Contribution to Exchequer 2 4. Creation of Employment (Direct & Indirect) 2 5. Developing the Communities around the Plants 3 6. Objectives of NTPC 4 7. Composition of Board of Directors 4 8. Independent Directors - Need for Domain Expertise 5 9. Absence of Required Number of Independent Directors 6 10. Representation of Women in Board of Directors 8 11. MoU with Ministry of Power 9 CHAPTER-II PHYSICAL PERFORMANCE 11 1. Details of Plants of NTPC 11 2. Growth in Installed Power Generation Capacity 12 3. Capacity Addition (Installed & Commercial) 13 4. Coal-based Power Generation 14 5. Gas-based Power Generation 14 6. Renewable (solar,wind,bio-mass) Based Power Generation 15 7. Domestic Content Requirements in RE Projects 19 8. Joint Ventures with ONGC for RE Projects 20 9. Hydro-Power Generation 20 10. Comparison of NTPC with International Counterparts in Performace Metrics 22 CHAPTER –III FINANCIAL PERFORMANCE 24 1.
    [Show full text]
  • Directors' Report
    Directors' Report To, The Members, The Directors have pleasure in presenting the 33rd Annual Report of your Company together with audited accounts for the year ended 31st March, 2005. FINANCIAL REVIEW The year 2004-05 witnessed a growth of about 32% in sales turnover at Rs.31,800 crore (previous year Rs.24178 crore), which was the highest ever turnover achieved by your Company. Your company has recorded a Net Profit after Tax (PAT) of Rs.6817 crore during the year as compared to Rs.2512 crore in the previous year, recording an improvement of 171% mainly through increase in sales volume in the domestic market, improved product-mix, buoyancy in steel market, cost reduction measures and reduction in borrowings. Thrust on reduction in borrowings continued and there was a reduction of Rs.2920 crore during the year. This has been achieved by all round improvement in sales and better cash management. Reduction in debt resulted in interest savings of Rs.296 crore. Debt equity ratio has improved to 0.58:1 (as on 31.03.05) from 1.87:1 (as on 31.03.04). Considering short term deposits with Banks of surplus funds of Rs. 5670 crore, your company is virtually a debt free company. The Company continued its thrust on cost control management. Cost control measures focused on reduction in usage of coke rate/other raw materials, improvement in yields and techno-economic parameters, reduction in energy consumption and control on administrative expenditure etc. The Institute of Cost and Works Accountants of India (ICWAI) recognized SAIL’s Cost Management efforts for the second year consecutively.
    [Show full text]
  • The Mineral Industry of Iindia in 2001
    THE MINERAL INDUSTRY OF INDIA By Chin S. Kuo India’s economy in 2001 was characterized by a gross Government Policies and Programs domestic product (GDP) growth of 5.4%. Fiscal deficit was projected to be 4.7% of GDP (Far Eastern Economic Review, India’s import duty on gold had been reduced from $8.57 per 2001a). Interest rates were low with the Reserve Bank of India 10 grams (g) of metal to $5.35 per 10 g in an attempt to reduce lending rate at 7%. Agriculture encompassed 25% of GDP and smuggling. The tariff on imports of second-choice and was forecast at 3.5% growth rate. Industrial production growth defective quality steel was raised from 25% to 35%. The rate declined compared to that for 2000. The Government reduced duty rate of 5% on scrap for melting, currently scrapped various surcharges on corporate income tax, simplified available only to electric arc furnace operators, had been excise duties, and cut interest rates. It also sold its stakes in extended to all steel producers irrespective of process route. state-owned enterprises through privatization. The rate of Meanwhile, dumping action had restricted Indian flat producers’ growth of exports led by jewelry, leather goods, machinery, exports to Canada, the European Union, and the United States. software, and textiles declined in 2001 and total exports The Government asked the U.S. Government to suspend represented 10% of GDP. dumping duties on its steel exports in exchange for tonnage India is endowed with vast mineral resources, and their quotas and price limits (Metal Bulletin, 2001j).
    [Show full text]
  • ANSWERED ON:19.12.2005 MODERNISATION of SAIL Khaire Shri Chandrakant Bhaurao;Patel Shri Kishanbhai Vestabhai;Singh Shri Sugrib
    GOVERNMENT OF INDIA STEEL LOK SABHA UNSTARRED QUESTION NO:3877 ANSWERED ON:19.12.2005 MODERNISATION OF SAIL Khaire Shri Chandrakant Bhaurao;Patel Shri Kishanbhai Vestabhai;Singh Shri Sugrib Will the Minister of STEEL be pleased to state: (a) whether the Government has approved a modernization plan for Steel Authority of India; (b) if so, the details thereof, plant-wise; (c) the expenditure likely to be incurred thereon; and (d) the time by which the said plan is likely to be completed, plant-wise? Answer MINISTER OF CHEMICALS & FERTILIZERS AND MINISTER OF STEEL (SHRI RAM VILAS PASWAN) (a)to(d): To achieve capacity expansion, up-gradation and cost effective production, Steel Authority of India Ltd.(SAIL) has prepared its corporate plan, which aims to reach a level of 22.88 MT of Hot Metal production including Indian Iron & Steel Company Limited (IISCO) by 2012. The plant-wise details of these projects and expenditure likely to be incurred thereon are given below: S.No. Plant The major projects Total investment upto 2011-12 (Rs. in crore) 1. Bhilai steel plant i) Rebuilding of existing coke oven batteries. ii) A new battery in place of Battery 7 & 8, iii) Installation of coal dust injection(CDI) in Blast Furnaces 1,5 &7, iv) Modernisation of the existing Blast Furnaces including Gas Cleaning Plants (GCP). v) Installation of Steel Melting Shop (SMS)- III 9000 of 3.9 MT per annum capacity with 150 t converters, ladle furnaces, billet caster, Thin slab caster, and Compact Strip Mill (CSP) with other associated facility to phase out SMS-I and Blooming & Billet Mill (BBM) etc.
    [Show full text]
  • Council Report Final PDF Version IIM Members 1707.Pdf
    COUNCIL REPORT ___________ FY 2019-20 0 TABLE OF CONTENTS Agenda Particulars Page Point [s] Number[s] Notice for AGM 2 Notice for nomination to serve as Council membe r 3 1 Organisational 1.1 Advisory Committee of Former Presidents: 4-5 Decisions taken in FY 2019-20 1.2 IIM National Council: Decisions taken & 6-7 implemented in FY 2019-20 1.3 IIM National Committees: Structure & 7-14 modus operandi [Special Mention: AFRC Deliberations, Council Meeting Deliberations] 2 IIM Buildings & Premises 14 3 Another Year Passed By: 14 -20 Major Take-Away 4 IIM Events & Happenings 20 -24 [In chronological order] 5 Global Alliance 25 -26 6 Publications 26 -28 7 Associate Membership Examination 28 -29 8 IIM Memorial Lectures 29 9 Chapters & Divisional Activities 30 -33 10 Membership: A way forward 33 -35 11 Chapter relations Committee: Meetings & 35 -36 Deliberations 12 Accolades 37 13 Measures adopted by IIM to combat adverse impact of 37 -38 Pandemic 15 Post Face & Conclusion 38 16 Vision & Mission 39 1 THE INDIAN INSTITUTE OF METALS “METAL HOUSE’ PLOT NO: 13/4, BLOCK-AQ, SALT LAKE, SECTOR-V, KOLKATA- 700 091 17 th July 2020 NOTICE To: All the members of The Indian Institute of Metals Notice is hereby given that the Annual General Meeting of the shareholders of The Indian Institute of Metals will be held through Video Conferencing on Friday, the 31 st of July, 2020 at 14:00 hrs to consider and if thought fit to transact the following : ORDINARY BUSINESS Resolution No 1 To approve and adopt the Report of the Council for the year 2019-20 (1 st April 2019 to 31 st March 2020) Resolution No 2 To appoint the council and the office bearers for the period 1 st August 2020 to 31 st July 2021 (as tenure of the current council is getting over on 31st July, hence AGM is called to elect the new council members).
    [Show full text]
  • Iron, Steel and Scrap and Slag
    Indian Minerals Yearbook 2019 (Part- II : Metals & Alloys) 58th Edition IRON, STEEL & SCRAP AND SLAG (ADVANCE RELEASE) GOVERNMENT OF INDIA MINISTRY OF MINES INDIAN BUREAU OF MINES Indira Bhavan, Civil Lines, NAGPUR – 440 001 PHONE/FAX NO. (0712) 2565471 PBX : (0712) 2562649, 2560544, 2560648 E-MAIL : [email protected] Website: www.ibm.gov.in December, 2020 IRON, STEEL & SCRAP AND SLAG 9 Iron, Steel & Scrap and Slag ron & steel is decidedly the vital component of a Visveswaraya Iron & Steel Ltd and a few electric arc Icountry's economy and is considered pivotal furnace-based plants. In the period till 1947, the viable amongst the driving forces of modernisation. The steel producers in the country that operated with a level of per capita consumption of steel is treated as capacity of about 1 million tonne was wholly under one of the important indicators of the Private Sector. The provisions of the economic socio-economic development and living policy implemented during the different phase of standards in any country. Steel continues to time engendered several marked changes in Indian be the foremost of engineering materials, which is Steel Industry. From the fledgling one million tonne not only environment-friendly but also is recyclable. capacity status at the time of independence, India nd The total finished steel (alloy/stainless+non- has now risen to be the 2 largest crude steel alloy) production in India has grown from a mere 1.1 producer in the world and the largest producer of million tonnes in 1951 to 101.287 million tonnes Sponge Iron. From a negligible global presence, the (measured in terms of crude steel equivalent) in 2018- Indian Steel Industry is now globally acknowledged 19.
    [Show full text]