Publication of Award of Contract for Works Information Notice

Total Page:16

File Type:pdf, Size:1020Kb

Publication of Award of Contract for Works Information Notice PUBLICATION OF AWARD OF CONTRACT FOR WORKS INFORMATION NOTICE Publication date: Country: Kenya Executing Agency: Athi Water Works Development Agency Name of Project: Kenya Towns Sustainable Water Supply and Sanitation Program Loan/Grant Number: 200200000501 Name of Tender: Construction works for Kiambu and Ruaka Water supply and Sewerage Project Lot Number & Name (If different from Tender): Procurement mode: ICB Domestic preference (Yes or No): No Regional preference (Yes or No): No Borrower’s Tender Number:AWSB/AfDB/KTSWSSP/W/01/2018 Date of receipt by the Bank of the draft Tender document: 12th March 2018 Date of approval by the Bank of the Tender Document: 28th March 2018 Tender issuing date: 10th April 2018 Closing date of the Tender: 26th June 2018 Date of Tender opening: 26th June 2018 Date of receipt by the Bank of the Tender evaluation report: 23rd July 2018 Date of approval by the Bank of the Tender evaluation: 4th September 2018 Name of the winning Bidder: China Henan International Cooperation Group Co. Ltd Nationality: Chinese Address : No. 11, Dongming Road, Zhengzhou, Henan Province, China Contract Award Price: KShs. 1,292,917,545.01 Contract Start date: 07th January, 2019 Contract Duration: 18 Months Summary of Scope of Contract Awarded: The Scope of the Works Consists but not limited to: i) Rehabilitation of existing STW. ii) Rehabilitation of existing problematic sewers; - Trunk Sewers DN450 PCC in m as; (Riara River, Kiu outfall,Riara River Branchtrunk, Thindigwa Kasarani River, Ruaka River, Ndenderu, Thindigwa Kigwa River, Githogoro trunk) totaling approximately 55Km. - Lateral Sewers DN300 Upvc in m as;(Kiambu Town reticulation, Ndumberi reticulation, Kirigiti reticulation, Ruaka & Mucatha reticulation, Mugumo reticulation, Kiamumbi reticulation, Thindigwa reticulation, Kanda Komu reticulation) Totalling to approximately 53Km. iii) Construction of 4No ablution blocks for Kiambu and Ruaka. Water Supply Works i) Water Distribution lines uPVC ranging from DN 50 to DN 160, Totaling to approximately 25Km ii) Drilling and equipping of 6No Boreholes for Kiambu community point sources. iii) Kiameru RC Weir 6.5m high. iv) Kigongo Water Treatment 4,000m3/d The Rehabilitation Works will include: i) Replace existing aerators and add the missing aerator; Replace corroded sluice gate; ii) Rehabilitate existing building (electrical wiring and painting); Install new electrical control system; iii) Install new screw pump; 4 iv) Unblock existing sewers v) Rehabilitate manhole including replacing of the manhole covers; New generator room; vi) New Inlet Works; New sludge beds; vii) New settling tank (to demolish one of the dysfunction existing settling tanks) There was a revision in the scope of the project (addendum No.1) comprising of the following works; i) Kahuti Pipeline - HDPE pipes of 315 OD; approximately 23Km. ii) Kiameru Water Distribution network – HDPE pipes from OD 110mm to 225mm; approximately totaling to about 30Km. Total Number of Bidders:25 For each Bidder: 1. Name: Nangchang Foreign Eng. Co. Ltd & Nanchang Municipal Engineering Devpt Group Nationality: Chinese Address: P.O Box 21826-00505 Nairobi, Kenya Bid Price as Read-out: 1,851,059,369.53 Evaluated Price: N/A Bid Accepted / Rejected : Rejected Reason for Rejection: Incomplete bid – Bill 23 missing from their bid 2. Name: China State Construction Engineering Corp Ltd Nationality: Chinese Address: 100037, Beijing, P.R China CSCEC Mansion, No. 15 Sanlihe Road. Bid Price as Read-out: 1,937,240,298.09 Evaluated Price: 1,943,084,888.70 Bid Accepted / Rejected : Rejected Reason for Rejection: Bid price was ranked higher financially than the lowest responsive bidder. 3. Name: Zhongmei Engineering Group Ltd & NCWEC JV Nationality: Chinese Address: P.O Box 104507-00101 Nairobi, Kenya Bid Price as Read-out: 2,370,077,945.07 Evaluated Price: N/A Bid Accepted / Rejected : Rejected Reason for Rejection: Power of Attorney provided but not notarized 4. Name: Njuca Consolidated Company Ltd Nationality: Kenyan Address: P.O Box 55-01020 Kenol, Kenya Bid Price as Read-out: 2,163,712,353.39 Evaluated Price: 2,330,772,384.30 Bid Accepted / Rejected : Rejected Reason for Rejection: Bid price was ranked higher financially than the lowest responsive bidder 5. Name: XPCC & Jilk Construction Co. Ltd Nationality: Kenyan Address: P.O Box 27500-00100 Nairobi, Kenya Bid Price as Read-out: 2,117,635,861.55 Evaluated Price: 2,096,770,786.55 Bid Accepted / Rejected : Rejected Reason for Rejection: Bid price was ranked higher financially than the lowest responsive bidder. 6. Name: J & K Investments Nationality: Kenyan Address: P.O Box 64782-00620 Wandanyi Road, Off Lungalunga Rd Industrial Area, Nairobi. Bid Price as Read-out: 2,041,261,618.15 Evaluated Price: 2,079,341,223.88 Bid Accepted / Rejected : Rejected Reason for Rejection: Bid price was ranked higher financially than the lowest responsive bidder. 7. Name: Zhonghao Overseas Construction Eng. Co. Ltd Nationality: Chinese Address: P.O Box 1992-40100 Nairobi, Kenya Bid Price as Read-out: 1,687,873,783.75 Evaluated Price: 1,693,615,785.03 Bid Accepted / Rejected : Rejected Reason for Rejection: Bid price was ranked higher financially than the lowest responsive bidder. 8. Name: BMK Private Limited Nationality: Kenyan Address: P.O Box 4562-005060, HNo 4, Plot No 172, Raphta Road, Westlands, Nairobi, Kenya Bid Price as Read-out: 1,703,266,496.23 Evaluated Price: 1,693,635,349.77 Bid Accepted / Rejected : Rejected Reason for Rejection: Bid price was ranked higher financially than the lowest responsive bidder. 9. Name: Guangxi Hydroelectric Construction Bureau Nationality: Kenyan Address: P.O Box 24655-00100 Nairobi, Kenya Bid Price as Read-out: 2,860,196,491.00 Evaluated Price: 2,824,130,951.29 Bid Accepted / Rejected : Rejected Reason for Rejection: Bid price was ranked higher financially than the lowest responsive bidder. 10. Name: Warimwe General Contractors Ltd Nationality: Kenyan Address: P.O Box 170 Ngong Hills Bid Price as Read-out: 1,300,000,000.00 Evaluated Price:N/A Bid Accepted / Rejected : Rejected Reason for Rejection: i. Letter of Bid not provided. ii. Submitted two copies and one original of their bid documents while the requirement was one original and four copies. iii. Bid security validity period less than the specified 148 days. 11. Name: Nightgale Enterprises Ltd Nationality: Kenyan Address: P.O Box 76752-00620 Kimathi House, Kimathi Street Nairobi, Kenya Bid Price as Read-out: 1,702,318,196.61 Evaluated Price: 1,704,538,348.47 Bid Accepted / Rejected : Rejected Reason for Rejection: Bid price was ranked higher financially than the lowest responsive bidder. 12. Name: China Gansu International Corporation for Economic & Tech Cooperation (K) Ltd Nationality: Kenyan Address: House 121, Manyani East Road, Lavignton, Nairobi, Kenya Bid Price as Read-out: 2,516,643,419.54 Evaluated Price: 2,539,815,898.54 Bid Accepted / Rejected : Rejected Reason for Rejection: Bid price was ranked higher financially than the lowest responsive bidder 13. Name: Sinohydro Corporation Ltd Nationality: Chinese Address: No. 2 Building, No.22 Yard, Chgongzhuang West Road, Haidian District, Beijing China Bid Price as Read-out: 1,575,740,842.98 Evaluated Price: N/A Bid Accepted / Rejected : Rejected Reason for Rejection: Bid security validity period less than the specified 148 days 14. Name: Xiyulong Water & Hydropower Engineer (K) Ltd Nationality: Chinese Address: P.O Box 50724-00100 Nairobi,Kenya Bid Price as Read-out: 1,635,354,792.72 Evaluated Price: 1,643,265,992.72 Bid Accepted / Rejected : Rejected Reason for Rejection: Bid price was ranked higher financially than the lowest responsive bidder. 15. Name: CJIC & CTCE JV Nationality: Chinese Address: P.O Box 21802-00505 Nairobi, Kenya Bid Price as Read-out: 308,906,210.46 Evaluated Price: N/A Bid Accepted / Rejected : Rejected Reason for Rejection: Power of Attorney provided was not notarized and had no specimen signature. 16. Name: China WU YI Co. Ltd in JV With Shanxi Geological Exploration Institute Nationality: Chinese Address: P.O Box 49282-00100 Nairobi, Kenya Bid Price as Read-out: 1,933,998,886.78 Evaluated Price: 1,942,351,705.01 Bid Accepted / Rejected : Rejected Reason for Rejection: Bid price was ranked higher financially than the lowest responsive bidder. 17. Name: Jiangxi Water & Hydropower Construction (K) Ltd Nationality: Chinese Address: No. 156, Yanjiang North Road, Nanchang,Jiangxi, China Bid Price as Read-out: 1,569,491,455.00 Evaluated Price: 1,574,669,081.97 Bid Accepted / Rejected : Rejected Reason for Rejection: Bid price was ranked higher financially than the lowest responsive bidder. 18. Name: Jiangsu Geology & Engineering Co Ltd Nationality: Chinese Address: Building B, No. 700 Zhujiang Street, Nanjing, 210018, P.R China Bid Price as Read-out: 1,992,121,611.71 Evaluated Price: 2,020,471,913.84 Bid Accepted / Rejected : Rejected Reason for Rejection: Bid price was ranked higher financially than the lowest responsive bidder. 19. Name: C.M Construction (EA) Ltd Nationality: Kenyan Address: P.O Box 3880-00506 Nairobi, Kenya Bid Price as Read-out: 1,389,750,992.37 Evaluated Price:N/A Bid Accepted / Rejected : Rejected Reason for Rejection: i. Power of Attorney provided but not witnessed by a commissioner of oaths, hence considered invalid. ii. Bid security validity period less than the specified 148 days. iii. Bid security provided from Housing Finance Corporation, which is not listed as a bank by the Central Bank of Kenya. 20. Name: China Railway No. 10 Engineering Ltd Nationality: Chinese Address: No. 7 Building, Shuntai Square, Jinan New and High Tech Development Zone, Shangdong China Bid Price as Read-out: 1,536,544,483.71 Evaluated Price: 1,540,110,074.31 Bid Accepted / Rejected : Rejected Reason for Rejection: Bid price was ranked higher financially than the lowest responsive bidder. 21. Name: China Civil Engineering Construction Corporation Nationality: Chinese Address: No.
Recommended publications
  • The Top 225 Global Contractors
    The Top 225 International Contractors The Top 225 Global Contractors August 18, 2008 This annual issue ranks the 225 largest construction contracting firms from around the world. It also ranks the largest firms in a wide variety of market sectors and geographic markets: Building, Manufacturing, Power, Water, Industrial/Petroleum, Transportation, Hazardous Waste, Sewer/Waste and Telecommunications. In addition, readers will get insights from executives of these top firms about the markets and issues affecting the industry around the world. This and other ENR survey issues are used as reference tools throughout the industry. Companies are ranked according to construction revenue generated in 2007 in US$ millions. Main story: "Prices Soar in a Boom Market" Tables - The 2008 Top 225 International Contractors based on Contracting Revenue from Projects Outside Home Country (with description about how to use the tables) - The 2008 Top 225 Global Contractors based on Total Firm Contracting Revenue (with descriptions about how to use the tables) - The 2008 Top 225 At a Glance: Volume, Profitability, Professional Staff, Backlog, Market Analysis, International Regions - Top 10 by Market: Building, Manufacturing, Power, Water, Transportation, Hazardous Waste, Sewer/Waste, Telecommunications - Top 20 Non-US Firms in International Construction Management/Program Management Fees - Top 20 Non-US in Total CM/PM Fees - Top 10 By Region: Middle East, Asia, Africa, Latin America/Caribbean, Europe, U.S., Canada - How the Top 225 International Contractors Shared the 2007 Market - Where to Find The Top 225 International Contractors - Where to Find The Top 225 Global Contractors Web Only Supplements: "Subsidiaries By Rank"-includes in-depth listings of each firm's subsidiaries "Where the 2008 Top 225 Contractors Worked"-lists the countries in which these firms had work or offices during 2007.
    [Show full text]
  • 2016 Top 250 International Contractors – Subsidiaries by Rank Rank Company Subsidiary Rank Company Subsidiary
    Overview p. 38 // International Market Analysis p. 38 // Past Decade’s International Contracting Revenue p. 38 // International Region Analysis p. 39 // 2015 Revenue Breakdown p. 39 // 2015 New Contracts p. 39 // Domestic Staff Hiring p. 39 // International Staff Hiring p. 39 // Profit-Lossp. 40 // 2015 Backlog p. 40 // Top 10 by Region p. 40 // Top 10 by Market p. 41 // Top 20 Non-U.S. International Construction/Program Managers p. 42 // Top 20 Non-U.S. Global Construction/Program Managers p. 42 // VINCI Builds a War Memorial p. 43 // How Contractors Shared the 2015 Market p. 44 // How To Read the Tables p. 44 // Top 250 International Contractors List p. 45 // International Contractors Index p. 50 // Top 250 Global Contractors List p. 53 // Global Contractors Index p. 58 THE FALCON EMERGES Turkey’s Polimeks is building the NUMBER 40 $2.3-billion Ashgabot International Airport in Turkmenistan. The terminal shape is based on a raptor species. PHOTO COURTESY OF POLIMAEKS INSAATTAAHUT VE SAN TIC. AS TIC. VE SAN OF POLIMAEKS INSAATTAAHUT PHOTO COURTESY International Contractors Seeking Stable Markets Political and economic uncertainty in several regions have global firms looking for markets that are reliable and safe By Peter Reina and Gary J. Tulacz enr.com August 22/29, 2016 ENR 37 0829_Top250_Cover_1.indd 37 8/22/16 3:52 PM THE TOP 250 INTERNATIONAL CONTRACTORS 27.9% Transportation $139,563.9 22.9% Petroleum 21.4% Int’l Market Analysis $114,383.2 Buildings $106,839.6 (Measured $ millions) 10.8% Power $54,134.5 6.0% Other 2.2% 4.1% $29,805.5 0.8% Manufacturing Industrial Telecom $10,808.9 $20,615.7 $ 4,050.5 2.8% 0.2% 1.0% Water Hazardous Sewer/Waste $13,876.8 Waste $4,956.0 $1,210.5 SOURCE: ENR DATA.
    [Show full text]
  • Gregor Dobler China and Namibia, 1990 to 2015: How a New Actor Changes the Dynamics of Political Economy
    Gregor Dobler China and Namibia, 1990 to 2015: how a new actor changes the dynamics of political economy The Version of Records of this manuscript has been published and is available in the Journal Review of African Political Economy 2017 (153): 449-465. http://www.tandfonline.com/doi/abs/10.1080/03056244.2016.1273828 DOI: 10.1080/03056244.2016.1273828 The article identifies changes in Namibia’s society linked to China’s new role. To understand such changes, it is important to avoid isolating ‘Chinese actors’ from their host society. The author analyses links between Chinese and Namibian actors in three domains: ‘soft power’, Chinese traders and the construction industry. In all three, the presence of Chinese actors does not simply change Namibia’s relations with the world. It has important repercussions on Namibian society, it influences the distribution of capital within Namibia and it engenders shifts in the internal balance of power. Since Chinese influence does not remain external, the line between ‘Chinese’ and ‘Namibian’ actors has long become blurred – turning Namibian political elites into constituent parts of the ‘external’ dynamics they are charged with regulating. 1. Introduction Discussions about China’s new role in Africa have come a long way since the topic first entered the debate in the mid-2000s. Criticism of China’s ‘new imperialism’ (often driven by fears for Western powers’ hegemony) and enthusiasm about its ‘win-win’ approach alike have given place to a soberer and more nuanced perspective. Scholars have tried to unpack the amorphous unity of ‘China’, analysing the multitude of actors and institutions and their different agendas and ways of acting; they have differentiated between African countries and their economic and political trajectories; and they have increasingly propagated a bottom-up approach that looks at things as they appear in the real world, not in policy statements or contracts signed in Beijing.
    [Show full text]
  • Repoblica De Mogambique Fundo De Estradas (FE)
    Public Disclosure Authorized RepOblica de Mogambique Fundo de Estradas (FE) Public Disclosure Authorized Financial Statements For the year ended 31 December 2018 Public Disclosure Authorized FUNDO DE ESTRADAS Public Disclosure Authorized FUNDO DE ESTRADAS AGGREGATED FINANCIAL STATEMENTS 31 December 2018 INDEX PAGES Statement of management responsibilities 1 Independent Auditor's Report 2 Aggregated Road Sector Accounts - Balance Sheet 5 Aggregated Road Sector Accounts - Income Statement 6 Road Fund Accounts - Balance Sheet 7 Road Fund Accounts - Income Statement 8 ANE Accounts - Balance Sheet 9 ANE Accounts - Income Statement 10 Provinces Accounts (ANE and Road Fund Delegations) - Balance Sheet 11 Provinces Accounts (ANE and Road Fund Delegations) - Income Statement 12 Municipalities Accounts - Balance Sheet 13 Municipalities Accounts - Income Statement 14 Districts Accounts - Balance Sheet 15 Districts Accounts - Income Statement 16 Office of Zambeze Bridge Project Accounts - Balance Sheet 17 GNPT - Office of New Bridge of Tete Accounts - Balance Sheet 18 GNPT - Office of New Bridge of Tete Accounts - Income Statement 19 Road Fund Operating - Balance Sheet 20 Notes to the Financial Statements 21 STATEMENT OF MANAGEMENT RESPONSIBILITIES The directors are responsible for the preparation of the financial statements that present fairly the aggregated financial statements of Fundo de Estradas, comprising the balance sheet as at 31 December 2018 and the statement of income and expenditure for the year then ended, and the notes to the financial statements, which include a summary of significant accounting policies and other explanatory notes, in accordance with the modified cash receipts and disbursements basis of accounting disclosed in Note 2. The financial statements have been audited by the independent accounting firm, Deloitte & Touche (Moyambique), Lda, which were given unrestricted access to to all financial records and related data.
    [Show full text]
  • Paving the Road to Recovery As Global Construction Rebounds, Contractors Eye Infrastructure Spending As a Chance to Grow Revenue
    Overview p. 48 // International Market Analysis p. 48 // International Region Analysis p. 49 // 2020 Revenue Breakdown p. 49 2020 New Contracts p. 49 // Domestic Staff Hiring p. 49 // International Staff Hiring p. 49 // Top 10 by Region p. 50 Top 10 by Market p. 51 // Top 20 Non-U.S. International Construction/Program Managers p. 52 // Top 20 Non-U.S. Global Construction/Program Managers p. 52 // Profit-Lossp. 53 // Total Backlog p. 53 // Past Decade’s International Contractor Revenue p. 53 // How Contractors Shared the 2020 Market p. 54 // How To Read the Tables p. 55 // Hochtief's Highway Expansion p. 55 // Top 250 International Contractors List p. 57 // International Contractors Index p. 62 // Top 250 Global Contractors List p. 63 // Global Contractors Index p. 68 NUMBER 170 NUMBER TUNNEL VISION ICM SpA is contractor for the A26 Linzer Autobahn project in Austria, which includes construction of junction tunnels and a cable-stayed bridge. PHOTO COURTESY OF ICM SPA PHOTO COURTESY International Contractors Paving the Road to Recovery As global construction rebounds, contractors eye infrastructure spending as a chance to grow revenue. By Emell Adolphus, Peter Reina and Jonathan Keller enr.com August 16/23, 2021 ENR 47 0823_Top250_Intro.indd 47 8/17/21 6:34 PM nternational contractors on the long road to rebounding from the COVID-19 pandemic might find a shortcut to recovery in infrastructure projects, as countries ramp up spending to help build economies back to normal. While the global construction market is red hot for some firms, it is Istone cold for others as contractors deal with unpredictable project risks while readying for new growth opportunities.
    [Show full text]
  • Download the ENR Ranking
    Overview p. 34 // International Market Analysis p. 34 // Past Decade’s International Contracting Revenue p. 34 // International Region Analysis p. 35 // 2019 Revenue Breakdown p. 35 // 2019 New Contracts p. 35 // Domestic Staff Hiring p. 35 International Staff Hiring p. 35 // Profit-Loss p. 36 // 2019 Backlog p. 36 // Top 10 by Region p. 36 // Top 10 by Market p. 37 Top 20 Non-U.S. International Construction/Program Managers p. 38 // Top 20 Non-U.S. Global Construction/Program Managers p. 38 // Larsen & Toubro Ltd. Installs Massive Fusion Equipment p. 39 // How Contractors Shared the 2019 Market p. 40 // How To Read the Tables p. 40 // Top 250 International Contractors List p. 41 // International Contractors Index p. 46 // Top 250 Global Contractors List p. 47 // Global Contractors Index p. 52 CONNECTIONS China Communications 4 NUMBER Construction Group Ltd. is building the $500-million, 7,887-ft cable-stayed bridge connecting the Pelješac Peninsula with Croatia’s mainland. PHOTO COURTESY OF CHINA COMMUNICATIONS CONSTRUCTION GROUP LTD. GROUP CONSTRUCTION COMMUNICATIONS CHINA OF COURTESY PHOTO International Contractors Struggling With COVID-19 Rocked by the worldwide pandemic and plunging oil prices, the global construction market attempts to cope. By Gary J. Tulacz & Peter Reina enr.com August 17/24, 2020 ENR 33 0824_Top250_Intro_3.indd 33 8/18/20 5:44 PM 31.0% Transportation THE TOP 250 INTERNATIONAL CONTRACTORS $146,582.3 26.1% Buildings $123,456.9 Int’l Market Analysis 15.0% Petroleum $70,934.4 (2019 revenue measured in millions) 10.3% Power $48,556.6 5.6% Other 2.3% 3.4% $26,447.9 1.7% Manufacturing Industrial Telecom $10,822.1 $16,048.1 $7,842.1 % 0.1% 1.7% 2.9 Hazardous Sewer/Waste Water Waste $7,948.7 $13,904.0 $525.0 SOURCE: ENR Comparing the Past Decade’s International $383.7 $453.0 $511.1 $544.0 $521.6 $501.1 $468.1 $482.4 $487.3 $473.1 Contractor Revenue 2010* 2011* 2012 2013 2014 2015 2016 2017 2018 2019 (in $ billions) * Figures for 2010-2011 represent the Top 225 International Contractors before ENR expanded the list to 250.
    [Show full text]
  • Das Wirtschaftliche Engagement Der Volksrepublik China Im Portugiesischsprachigen Afrika Am Beispiel Angolas Und Mosambiks
    Christiane Tholen Das wirtschaftliche Engagement der Volksrepublik China im portugiesischsprachigen Afrika am Beispiel Angolas und Mosambiks OSTASIEN Verlag Deutsche Ostasienstudien 17 Christiane Tholen Das wirtschaftliche Engagement der Volksrepublik China im portugiesischsprachigen Afrika am Beispiel Angolas und Mosambiks Deutsche Ostasienstudien 17 OSTASIEN Verlag Bibliographische Information der Deutschen Nationalbibliothek Die Deutsche Nationalbibliothek verzeichnet diese Publikation in der Deutschen Nationalbibliographie; detaillierte bibliographische Daten sind im Internet über http://dnb.d-nb.de abrufbar. ISSN 1868-3665 ISBN 978-3-940527-76-9 © 2013. OSTASIEN Verlag, Gossenberg (www.ostasien-verlag.de) 1. Auflage. Alle Rechte vorbehalten Redaktion, Satz und Umschlaggestaltung: Martin Hanke und Dorothee Schaab-Hanke Druck und Bindung: Rosch-Buch Druckerei GmbH, Scheßlitz Printed in Germa Inhalt Danksagung Vobemerkung Abstract 1 Einleitung 1 1.1 Chinesisch-Afrikanische Beziehungen im Fokus der Weltöffentlichkeit 1 1.2 Forschungsstand und Methodik 2 2 Schwarzer Kontinent und gelbe Gefahr 5 2.1 China und Afrika: 1949–1978 5 2.2 China und Afrika: 1978 bis heute 7 2.2.1 Politik 8 2.2.2 Wirtschaft 11 2.3 Neokolonialismus oder Süd-Süd-Kooperation? 15 2.3.1 Afrika 15 2.3.2 China 17 2.3.3 Der Westen und andere 19 2.4 Vorläufiges Ergebnis 25 3 China 27 3.1 1978 bis 1984 27 3.2 1984 bis 1989 28 3.3 1989: Der Tiananmen-Vorfall und seine Konsequenzen 30 3.4 1993 bis heute 31 3.5 Strukturelle Probleme 35 3.6 Themenrelevante Einzelaspekte 40
    [Show full text]
  • The China Analyst 战略 采购 投资 中国分析家 Strategy • Sourcing • Investment a Knowledge Tool by the BEIJING AXIS for Executives with a China Agenda January 2010
    The China Analyst 战略 采购 投资 中国分析家 Strategy • Sourcing • Investment A knowledge tool by THE BEIJING AXIS for executives with a China agenda January 2010 China Marches on... FeaturesF FightingFighting forfor Trade:Trade: ChinaChina andand thethe ThreatThreat ofof ProtectionismProt 6 Rare Earths: China’s Contribution to Modern Technology 9 FOCAC: A Win-Win Formula for Sino-African Relations? 12 Regulars Macroeconomic Monitor 16 China Sourcing Strategy 26 China Capital: Inbound and Outbound M&A, Markets and Finance 32 Regional Focus: China-Africa 43 Regional Focus: China-Australia 48 Regional Focus: China-Latin America 52 Regional Focus: China-Russia 56 flickr / mt33 Sixty years ago today, the Chinese people finally won the great victory in the Chinese revolution… Today, a socialist China that is oriented to modernisation, to the world, and to the future is standing toweringly in the eastern world. Looking forward to the future, the prospect of China’s development is infinitely bright. Chinese President Hu Jintao addressing the Chinese people on the 60th anniversary of the People’s Republic of China, 1 October 2009 At the Highest Level China has recovered from the financial crisis-induced slowdown in better shape than ever, with solid pros- pects for 2010. With the stimulus of government investment, China’s economy left the financial crisis in its wake to march on past 8% GDP growth in 2009. Now, poised to become the world’s second-biggest econ- omy, China is readying itself for the challenges of 2010 and the next stage of its relentless rise. t the start of the second decade of nomic recovery in the last year is only half of the story.
    [Show full text]
  • Working in a Tough Market the International Construction Market Has Been Sluggish, and Often Unforgiving, but Many Firms Still Are Finding Surprising Success
    General Building p. 66 // Transportation p. 68 // Manufacturing, Industrial Process and Telecommunications p. 70 // Power p. 72 Petrochemical p. 74 // Water, Sewer and Hazardous Waste p. 76 // Global Firms Market Overview p. 78 // International Contractor Market Analysis p. 78 // How the Top 250 International Contractors Shared the Market p. 78 // The Top 10 International Contractors by Region p. 79 // Top 250 Reporting Profit-Loss p. 79 // Top 250 Total Backlog p. 79 // International Design Firms Market Analysis p. 80 // How the Top 225 International Design Firms Shared the Market p. 80 // The Top 10 International Design Firms by Region p. 81 // Petroleum Market Begins to Rebound p. 81 // Number of Firms Reporting Total Backlog in the Top 225 p. 81 How To Read the Tables p. 82 // The Top 225 International Design Firms List p. 83 // The Top 150 Global Design Firms List p. 88 The Top 250 International Contractors List p. 91 // The Top 250 Global Contractors List p. 96 HEALTH CARE U.S.-based HKS and SSH of Bahrain designed the planned 792-bed, 6.3-million-sq-ft Kuwait Children’s Hospital, which will be the largest children’s hospital of its kind in the world. NUMBER 81 & 121 81 NUMBER PHOTO COURTESY OF SSH PHOTO COURTESY Working in a Tough Market The international construction market has been sluggish, and often unforgiving, but many firms still are finding surprising success. enr.com December 16, 2019 ENR SOURCEBOOK 65 1216_GSB_Intro_3.indd 65 12/10/19 5:42 PM SOURCEBOOK GENERAL BUILDING Australia Major Hospital Expansion CPB Contractors, part of Hochtief’s CIMIC Group, recently began con- struction of the $431-million Camp- belltown Hospital Redevelopment Stage 2 project near Sydney.
    [Show full text]
  • The Management and Staff of Zhongmei Engineering Group
    The Management and staff of Zhongmei Engineering Group Limited wish H.E President Yoweri Kaguta Museveni, the President of the Republic of Uganda and all Ugandans a Happy 30th NRM Anniversary. Zhongmei Engineering Group Limited (hereinafter referred to as Zhongmei) is a prestigious international corporate group based on Nanchang, Capital of Jiangxi Province, China. It is one of the Top 250 International Contractors (previously known as Top 225 International Contractors) awarded by ENR and the Top 50 Most Innovative International Contractors awarded by the Ministry of Commerce of China. Based on international contracts and focused on foreign aid projects, Zhongmei Group is an active player in international projects and we gradually deepen cooperation in agricultural development, mining and energy development, foreign investment, foreign real estate development and other fields. The company has businesses and branches in dozens of countries and areas including Ethiopia, Kenya, Zambia, Ghana, Uganda, Namibia, Togo, Liberia, Rwanda, Laos, Myanmar, Cambodia, Dubai, Hong Kong and many others. Zhongmei currently has 67 branches at home and abroad with more than 1,500 official employees and nearly 20,000 working staff. A cow donated to a church Machines at work We are proud to be one of the leading enterprises of China orphans who benefited from this donation thanked God for such a Going Global Project and also the successful model to undertake miracle because they didn’t have the money to buy for themselves international projects. In Uganda, Zhongmei is currently a) We widen the road embankment by 1.5 -2 metres to ensure food on that day.
    [Show full text]
  • Chinese International Contractors in Africa: Structure and Agency Hong Zhang
    WORKING PAPER NO. 47 MAY 2021 Chinese International Contractors in Africa: Structure and Agency Hong Zhang sais-cari.org WORKING PAPER SERIES NO. 47 | MAY 2021: “Chinese International Contractors in Africa: Structure and Agency” by Hong Zhang TO CITE THIS PAPER: Hong Zhang. 2021. Chinese International Contractors in Africa: Structure and Agency Working Paper No. 2021/47. China Africa Research Initiative, School of Advanced International Studies, Johns Hopkins University, Washington, DC. Retrieved from http://www.sais-cari.org/publications. CORRESPONDING AUTHOR: Hong Zhang Email: [email protected] ACKNOWLEDGEMENTS: This project is funded by Johns Hopkins SAIS-CARI. I am grateful to Aoqi Wu, Peter Grinsted and Yoon Jung Park for their comments that helped improve the paper. I also thank Daniela Solano-Ward for her excellent editing. NOTE: The papers in this Working Paper series have undergone only limited review and may be updated, corrected or withdrawn. Please contact the corresponding author directly with comments or questions about this paper. Editor: Daniela Solano-Ward 2 CHINA-AFRICA RESEARCH INITIATIVE ABSTRACT SAIS-CARI WORKING PAPER As the builders of many of Africa’s mega infrastructure NO. 47 | MAY 2021: projects, Chinese international construction and engineering “Chinese International Contractors in Africa: Structure contractors (ICECs) are a significant group of actors in Africa. and Agency” Although Chinese ICECs and have attained a dominant by Hong Zhang position in the African market, there have been no systematic studies into this group. This paper is an initial attempt to unpack the role of ICECs in China’s international economic relations. Drawing on primary Chinese sources, I trace the historical evolution of China’s international contracting industry.
    [Show full text]
  • THE TOP 225 INTERNATIONAL CONTRACTORS the Top 225 International Contractors Webhead to Come
    THE TOP 225 INTERNATIONAL CONTRACTORS The Top 225 International Contractors Webhead to come STRABAG SE broke through on its tunnel boring on May 13, 2011, on the 6.3-mile #08 water tunnel under Niagara Falls, Ontario, for Ontario Power Generation. With Traditionally Strong Markets in Decline, Firms Look to Break Through in New Regions By Peter Reina and Gar y Tulacz The international contracting community has been enduring diffi cult economic headwinds during the past three years. However, even as the U.S. continues to fi ght off the prospect of a double-dip recession and European nations pull back from stimulus programs to stabilize the troubled euro, opportunities are bubbling for international contractors in developing countries, particularly those rich in resources. T H E TOP 225 INTERNATIONAL CONTRACTORS 4 6 Overview 4 8 Top 10 by region 51 How to read the tables 4 6 Market analysis 48 Backlog analysis 53 The Top 225 International 4 6 Hiring 4 9 Top 10 by market Contractors 5 8 4 7 International regions 5 0 Top Global CM/PM fi rms Index of International Contractors 61 4 7 Analysis of past decade 5 1 How the Top 225 International The Top 225 Global Contractors 6 6 47 Profi t/loss analysis Contractors shared the 2010 market Index of Global Contractors PHOTO COURTESY OF STRABAG OF COURTESY PHOTO enr.com August 29, 2011 ENR 45 ENR08292011TL_Top225Opener.indd 45 8/22/11 7:15:48 PM THE TOP 225 INTERNATIONAL CONTRACTORS General Building Transportation Market Analysis 83,026.4 (21.6%) 109,007.2 (28.4%) Petroleum 89,320.8 (23.3%) Industrial Power Other 20,948.0 (5.5%) 38,598.1 (10.1%) 15,749.3 (4.1%) Sewer Waste 6,389.3 (1.7%) Manufacturing 4652.6 (1.2%) Water 12,380.8 (3.2%) Hazardous Waste 630.2 (0.2%) Telecom 2,959.6 (0.8%) (Measured $ millions) Source: McGraw-Hill Construction Reasearch & Analytics/ENR.
    [Show full text]