People. Drive. Results

Total Page:16

File Type:pdf, Size:1020Kb

People. Drive. Results ›PEOPLE. Trillium Line South Extension DRIVE. Spring 2021 Update – May 13, 2021 RESULTS. Duncan Elliott, Senior Project Manager Tonight’s Agenda › Overview of what the project includes › TransitNEXT focus for the upcoming construction season › Construction progress at each site (north to south followed by the Airport Link) with anticipated impacts › Video fly-through 2 Trillium Overview 3 2021 Construction Season Focus › Striving to complete our rail-over-road bridges this year. › Progress other structures: › Ellwood Diamond rail bridge › Rideau River pedestrian bridge › Rail bridge over Mosquito Creek › Wildlife crossing over High Road › Accelerate station progress. › Ramp-up trackwork installation with activity in all segments. 4 Construction Update: Bayview Station ›What has been done? › Demolition of the existing platform. › Start of construction on the Trinity pedestrian bridge. What is underway and upcoming? › Construction of a new MUP. › Foundation work for the east side platform. › Civil works. Impacts › Exploring weekend work. 5 Construction Update: Corso Italia (new station, existing line) What has been done? › Rock excavation on the north side of Gladstone Avenue where the station will be constructed to widen the guideway and allow for a second track. What is underway and upcoming? › Utility relocation and platform foundation construction. Impacts › Exploring weekend work. 6 Construction Update: Trench (Highway 417 to Beech Street) What has been done? › Line drilling and hoe ramming to break up rock and widen the trench in preparation for a second track. What is underway and upcoming? › Relocation of a fiber optic cable currently located on the west side of the trench to the east wall of the trench scheduled to take place late in June and July. › Approximately 5-7 days of hoe ramming on the west side of the trench to complete rock breaking activity. › Followed by heavy civil work to remove remaining rock and existing track bed. › Noise mitigation panels will be removed after civil work is complete. › Track installation to start in the fall. Impacts › Final hoe ramming activities to create moderate to high noise impacts. 7 Trench Widening 8 Construction Update: Dow’s Lake Station (formerly Carling) ›What has been done? › Demolition of the existing station platform. › Rock excavation to allow for the lengthening of the new station platform. What is underway and upcoming? › Duct work is being installed. › Once complete, the new platform will be constructed. Impacts › General construction noise and traffic in the area. 9 Construction Update: Carleton Station ›What has been done? › South MUP extension work is complete and the MUP has re-opened. › Station tunnel has been poured. What is underway and upcoming? › Continued work on station repairs. › The underpass under the platform continues. › Next, crews will work on utilities and the platform. Impacts › General construction noise and traffic in the area. 10 Construction Update: Rideau River Rail and Pedestrian Bridges ›What has been done? › Installation of scaffolding around the rail bridge. › Tree clearing to create a work area for the pedestrian bridge. What is underway and upcoming? › Sandblasting the rail bridge is underway as part of bridge rehabilitation. › Columns will be poured to support the prefabricated bridge, which will be launched in late summer/early fall. Impacts › Flaggers are in place on the Rideau River Eastern pathway to help pedestrians and cyclists move safely through our work zone. 11 Rideau River Rail and Pedestrian Bridges 12 Construction Update: Mooney’s Bay Station What has been done? › Old station platform has been demolished. What is underway and upcoming? › Civil work and installation of utilities under the new, future platform is underway. › Platform foundation backfilling is ongoing. Impacts › General construction noise and traffic in the area. 13 Construction Update: Ellwood Diamond Grade Separation What has been done? › Caissons completed, which form the deep foundation of the future rail structure. What is underway and upcoming? › Crews are preparing to pour columns and pier caps in preparation for installation of precast girders. › Once the columns are complete, the existing bridges (Sawmill Creek and the OC Transitway bridge) will be demolished this summer. Impacts › Two ten-hour shifts being explored. 14 Construction Update: Dow’s Lake Tunnel ›What has been done? › Removal of existing rails. › Joint repairs. What is underway and upcoming? › Waterproofing joints and general improvements to the water infiltration management system. › Continued tunnel rehabilitation activities and installation of new tracks. Impacts › No public impacts. 15 Construction Update: Walkley Station (new station, existing line) What has been done? › Excavation and site preparation. › Construction of footing walls. What is underway and upcoming? › Construction of shoring and platform walls. › Relocation of the watermain and installation of duct banks for utilities in the platform area. › Excavation for the station building and plaza. Impacts › Two, ten-hour shifts being explored. 16 Construction Update: Walkley MSF What has been done? › Foundation work and exterior envelope is complete. What is underway and upcoming? › Slab on-grade concrete pours are ongoing inside the building. › Mechanical rough-in. › Work on the train inspection building and on the train wash building foundation. › Work will soon begin on underground utilities in the yard. Impacts › General construction noise and traffic in the area. 17 Construction Update: Greenboro Station What has been done? › Demolition of the old platform. › Excavation to create a footprint for the new, longer station platform. What is underway and upcoming? › Working on existing and new platform footings. › Preparing to lay track in this section. Track work between Walkley Station and Greenboro Station is expected to be the first segment complete this summer/fall. Impacts › General construction noise and traffic in the area. 18 Construction Update: South Keys Station What has been done? › Concrete foundation work is complete. What is underway and upcoming? › Forming and reinforcement for the walls that will support the platform continue. › Installation of engineered, lightweight fill. › Crews will soon start on mechanical and electrical work for the base slab. › Preparations are underway for the platform slab. › Structural steel starting later this summer. Impacts › General construction noise and traffic in the area. 19 Construction Update: Hunt Club Road Rail Bridge & MUP What has been done? › Relocation of overhead utilities into underground duct banks. › Caissons drilled on either side of the road and in the centre median. What is underway and upcoming? › Continued work in the centre median. › Construction of columns and pier caps expected to start soon. › Once pier caps are complete, precast girders will be installed and deck work will commence. Impacts › Night work during concrete pours and girder installation for safety of workers and public. › Increased truck traffic along Mac Street from Bridle Path Drive to accommodate the transport of rail from a trackwork laydown area. 20 Hunt Club Road Rail Bridge & MUP 21 Construction Update: Lester & Leitrim Rail Bridges ›What has been done? › Precast girders installed. › Parapet wall and end diaphragm construction is complete at Lester. What is underway and upcoming? › Waterproofing upcoming in preparation for track installation at Lester. › Track installation over Lester is scheduled soon. › Deck pour took place earlier this week at Leitrim with parapet walls and deck work to continue. Impacts › General construction noise and traffic in the area. 22 Lester Rail Bridge Leitrim Rail Bridge 23 Construction Update: New Leitrim Station What has been done? › Excavation and clearing the new station footprint. What is underway and upcoming? › Excavation, formwork, rebar and concrete placement is underway and will continue. › Starting underground duct banks and watermain installation is upcoming. › Over the remainder of the year, the focus will be on the construction of the station, the platforms, the park and ride facility and bus loop. Impacts › General construction noise and traffic in the area. 24 Construction Update: Earl Armstrong & Bowesville Rail Bridges What has been done? › Pier cap and column construction complete at Earl Armstrong and Bowesville. › Pre-cast girder have been installed at both. › Parapet walls poured this week at Earl Armstrong. What is underway and upcoming? › Micro piles underway on either side of Bowesville in preparation for embankment construction. › Deck work continuing at both Earl Armstrong and Bowesville. › Final stage will be waterproofing in preparation for track installation. Impacts › General construction noise and traffic in the area. › Two, ten-hour shifts being explored at Earl Armstrong. › Exploring weekend work at both. 25 Earl Armstrong Rail Bridge Bowesville Rail Bridge 26 Construction Update: Intersection work ›What is upcoming? › In late summer/fall, work will begin on ditching, intersection realignment and traffic light installation at Earl Armstrong and Bowesville Roads. Impacts › Anticipate temporary lane closure may be required. 27 Construction Update: New Bowesville Station What has been done? › Crews have mobilized and prepared the site. What is underway and upcoming? › Continued work on the train approach slab. › Work is underway on the station foundation. › Focus of the upcoming season on completion of the foundation,
Recommended publications
  • Appendix 5 Station Descriptions And
    Appendix 5 Station Descriptions and Technical Overview Stage 2 light rail transit (LRT) stations will follow the same standards, design principles, and connectivity and mobility requirements as Stage 1 Confederation Line. Proponent Teams were instructed, through the guidelines outlined in the Project Agreement (PA), to design stations that will integrate with Stage 1, which include customer facilities, accessibility features, and the ability to support the City’s Transportation Master Plan (TMP) goals for public transit and ridership growth. The station features planned for the Stage 2 LRT Project will be designed and built on these performance standards which include: Barrier-free path of travel to entrances of stations; Accessible fare gates at each entrance, providing easy access for customers using mobility devices or service animals; Tactile wayfinding tiles will trace the accessible route through the fare gates, to elevators, platforms and exits; Transecure waiting areas on the train platform will include accessible benches and tactile/Braille signs indicating the direction of service; Tactile warning strips and inter-car barriers to keep everyone safely away from the platform edge; Audio announcements and visual displays for waiting passengers will precede each train’s arrival on the platform and will describe the direction of travel; Service alerts will be shown visually on the passenger information display monitors and announced audibly on the public-address system; All wayfinding and safety signage will be provided following the applicable accessibility standards (including type size, tactile signage, and appropriate colour contrast); Clear, open sight lines and pedestrian design that make wayfinding simple and intuitive; and, Cycling facilities at all stations including shelter for 80 per cent of the provided spaces, with additional space protected to ensure cycling facilities can be doubled and integrated into the station’s footprint.
    [Show full text]
  • Investor Presentation
    INTERRENT REIT INVESTOR PRESENTATION March 2018 INTERRENT REIT IS A GROWTH- ORIENTED REAL ESTATE INVESTMENT TRUST ENGAGED IN INCREASING VALUE AND CREATING A GROWING AND SUSTAINABLE DISTRIBUTION THROUGH THE ACQUISITION AND OWNERSHIP OF MULTI-RESIDENTIAL PROPERTIES. FORWARD LOOKING STATEMENTS This presentation contains “forward-looking statements” within the meaning of applicable Canadian securities legislation. Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as “plans”, “anticipated”, “expects” or “does not expect”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates” or “does not anticipate”, or “believes”, or variations of such words and phrases or state that certain actions, events or results “may”, “could”, “would”, “might” or “will be taken”, “occur” or “be achieved”. InterRent is subject to significant risks and uncertainties which may cause the actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the forward looking statements contained in this release. A full description of these risk factors can be found in InterRent’s publicly filed information which may be located at www.sedar.com. InterRent cannot assure investors that actual results will be consistent with these forward-looking statements and InterRent assumes no obligation to update or revise the forward-looking statements contained in this presentation to reflect actual events or new circumstances. 157 Pearl | Hamilton InterRent REIT | 2018 3 ABOUT INTERRENT ROADMAP TO THE PRESENT 12¢ 12¢ 13.65¢ 18.68¢ 20.36¢ 22.15¢ 23.30¢ 24.75¢ Start September 30, 2009 End As at March 22, 2018 Unit Price $1.50 to $10.09 Cumulative Distributions $1.51 Total Return 701% Number of 4,033 to 120% Suites 8,880 Since current management took over, InterRent has been one of the best performing REITs in Canada with a total return of 701%.
    [Show full text]
  • September 2020 Update
    September 2020 Update Transportation Services Department FEDCo September 1, 20201 2 O-Train South Design Progress • The following submissions have been Issued-For- Construction: – Structures throughout the alignment including Rail Bridges at Airport Parkway, Uplands, Leitrim, Bowesville, Earl Armstrong and Lester; and, – Utility Relocations throughout the alignment. 3 O-Train South Design Progress • The City has received construction drawings of the following project elements: – Airport Station; – Guideway for the Airport Link; and, – Structures throughout the alignment including High Road MUP Bridge, Limebank Road Elevated Guideway, Airport Elevated Guideway, VIA Grade Separation, Rideau River Pedestrian Bridge. 4 O-Train South Design Progress • The City has received final design drawings of the following project elements: – Guideway for the South Extension to Limebank; – Guideway for the existing portion of the line; – Landscape design for the existing line and Airport Link; – Dow’s Lake Tunnel, including Tunnel Ventilation; and – Vehicle elements, including the driver’s cab, interior layout and HVAC System. 5 O-Train South Design Progress • The City has received pre-final design drawings of the following project elements: – Walkley Yard Maintenance and Storage Facility (MSF); – Operational Modelling for the Overall System and the MSF; – Signaling and Train Control System; – Greenboro, Carleton, Mooney’s Bay, Gladstone and Walkley Stations; and, – Communication Systems designs for Greenboro and Carleton Stations and interface control documents for several subsystems on the project. 6 O-Train South Construction Progress • Rock excavation started on Gladstone Station; • Walkley Maintenance and Storage Facility structure construction has commenced; • Work has commenced at Ellwood Diamond grade separation. Caisson construction is underway; • Work has begun on Carleton south MUP; and, • Commenced work at South Keys and Bowesville Stations.
    [Show full text]
  • A Long-Term Vision CONFEDERATION HEIGHTS 1950-2050
    A Long-Term Vision CONFEDERATION HEIGHTS 1950-2050 A Long Term Vision for Confederation Heights Presented by: John Caldwell | Nicolas Church | Jessica D’Aoust | Brad Holmes | Joseph Lefaive | NoorAli Meghani Graeme Muir | Yi Qin | Michael Shmulevitch | René Tardif | Barrett Wagar SURP 824 Project Course December 2015 School of Urban and Regional Planning Department of Geography and Planning Queen’s University SCHOOL OF Urban and Regional Planning In partnership with: Public Services and Services Publics et Procurement Canada Approvisionnement Canada The contents of this document do not necessarily reflect the views and policies of Public Service and Procurement Canda or of the National Capital Commission. The contents reflect solely the advice and views of the Queen’s University School of Urban and Regional Planning authors as part of the SURP 824 Project Course. EXECUTIVE SUMMARY A LONG-TERM VISION FOR CONFEDERATION HEIGHTS Produced by: the School of Urban and Regional Planning, Queen’s University OBJECTIVE FROM 1950 TO 2050 Public Services and Procurement Canada (PSPC) and the National In the 1950s, Jacques Gréber created the Plan for the National Capital Commission (NCC) requested the creation of a strategic Capital, which intended to decentralize federal employment in the long-term vision for Confederation Heights, an existing federal National Capital Region The plan resulted in the establishment of office node located in Ottawa, Ontario. The Project Team has been a single-use federal office node at Confederation Heights, which retained to develop a 35-year, long-term plan that will help guide was auto-centric and characterized by sprawling parking lots the future redevelopment of the site.
    [Show full text]
  • Preliminary Development Concept Review: Moose Rail Linked Localities (Part A) V.0.2
    – DRAFT - PRELIMINARY DEVELOPMENT CONCEPT REVIEW: MOOSE RAIL LINKED LOCALITIES (PART A) V.0.2 3.1. Preliminary Analysis of Proposed System .................................................................................................... 5 a. System Overview .......................................................................................................................................... 5 b. Preliminary Observations & Analysis ........................................................................................................... 6 3.2. Review of Real Estate Context ..................................................................................................................... 8 a. Zoning and Planning Considerations, Urban & Rural Locations, Eastern Ontario........................................ 8 b. Principle One: Local Community Selection ................................................................................................ 10 c. Commercial and Residential Real Estate Context, Urban & Rural Locations, Eastern Ontario .................. 15 d. Commercial and Residential Real Estate Context, Urban & Rural Locations, Western Quebec. ............... 15 3.3. Planning Process and Urban & Rural Design for Typical Sites .................................................................... 15 a. Quebec - General ....................................................................................................................................... 15 b. Ontario - General ......................................................................................................................................
    [Show full text]
  • As We Heard It”
    “AS WE HEARD IT” Questions and comments from the O-Train South Extension Information Sessions Airport Link to Limebank Station, held at Rideauview Community Centre on February 5, 2020 Bayview Station to Carling Station, held at Hintonburg Community Centre on February 10, 2020 Carleton Station to South Keys Station, held at Jim Durrell Recreation Centre on February 13, 2020 Summary • Members of the public interested in the South Extension were invited to a series of information sessions to review project information sorted by station areas: o Airport Link to Limebank Station (Attendance: ~70) o Bayview Station to Carling Station (Attendance: 65) o Carleton Station to South Keys Station (Attendance: 55) • These drop-in meetings included a series of information boards and subject matter experts to provide context and further explanation. • On February 13th, a presentation and questions and answer period were added to the event at the request of Councillors. • Community members are always welcome submit questions and feedback via [email protected]. General Questions 1. Will stations be enclosed/weather protected? Outdoor stations will feature weather protection barriers and platform coverage; station design updates are expected to be available for the public in 2020. Councillors are in discussions with the Rail Construction Program office to look at additional weather mitigation features where possible and feasible. 2. Will there be wider platforms, stairwells, and bus loop platforms at new stations? Space constraints vary based on each location; station design updates are expected to be available for the public in 2020. 3. How frequently will trains come? 12-minute headways will be maintained on both the Bayview-Limebank line as well as the Airport Link.
    [Show full text]
  • Perley. Lecturevi
    PERLEY. LECTUREVI Bhat Boy Bhat Boy was born in London, England somewhere in the latter half of the 20th Century. He immigrated to Canada on a steam ship in 1966, and became a naturalized Canadian and grew up in the Nation's Capital with his parents - a cleaning lady and a spy. After a sojourn in Europe in the 80’s too colourful to describe to gallery goers, Bhat Boy returned to Canada to attend the Ontario College of Art disguised as mild mannered Ian Van Lock. His studies included a year in Florence, Italy, where he learnt the technique of the masters. Bhat Boy spends much of his time traveling about with his paintings, selling work in Canada, the United States and Europe. He has had shows in Florence, Toronto, San Francisco, London, New York, Miami, Fort Lauderdale and Ottawa. His work can be found on every continent but Antarctica. Bhat Boy's time is divided between the Nation's Capital where he has executed several public commissions and is founder of "Art in the Park" (an annual arts festival), and London, where pursues his professional carrer. He is an internationally renowned artist, and refers to himself and his work as an Envisionist. Bhat Boy is well known as a community activist and organizer in Ottawa. He has been an active member of the International Society of Art of the Imagination, since 1991. He continues to live and work in Canada’s National Capital. His hobbies include drinking tea, and drawing maps. “Simply Ottawa” series by Jay Anderson, which draws people into scenes with familiar Ottawa landmarks, such as the Champlain Lookout, the Rideau River, Hog’s Back Falls, and Chinatown Stephen Hutchings Stephen Hutchings lives in Ottawa.
    [Show full text]
  • 8-O-Train Light Rail Transit Stage 1 and Stage 2 Quarterly Update Q1 2021 21
    M E M O / N O T E D E S E R V I C E To / Destinataire Mayor and Members of Council File/N° de fichier: From / Expéditeur Director, Rail Construction Program Transportation Services Department Subject / Objet O-Train Light Rail Transit Stage 1 and Date: April 30, 2021 Stage 2 Quarterly Update (Q1 2021) The following memorandum outlines the milestones achieved on the O-Train Stage 1 Confederation Line, Stage 2 Confederation Line and Trillium Line extension projects in Q1 2021 and provides an overview of the planned work for Q2 2021. The City of Ottawa continues to closely monitor the COVID-19 pandemic in relation to both the maintenance and operation of the Stage 1 Confederation Line and the delivery of the Stage 2 Project. The various maintenance, design, and construction teams working on light rail in Ottawa are adhering to all guidance provided by Ottawa Public Health and the Province of Ontario. In addition to monitoring the local construction impacts, staff are working with Rideau Transit Group to monitor potential impacts on the Alstom manufacturing facility in Brampton, Ontario and are working with TransitNEXT to monitor potential impacts on the Stadler manufacturing facility in Bussnang, Switzerland. At present, vehicle deliveries from the Brampton facility are continuing and the initial vehicle deliveries from Switzerland are expected to begin this year, as scheduled. Construction continues in all geographic areas of the project and the City is monitoring the potential impacts on the projects closely. The City is working closely with the contractors to understand if there will be any impacts to these projects as a result of the COVID-19 environment locally and abroad.
    [Show full text]
  • OC Transpo O-Train Trillium Line Fare Gates Testing Go-Live
    FAQs – OC Transpo O-Train Trillium Line Fare Gates Testing Go-Live Q1. When will the O-Train Trillium Line fare gates be activated? A1. Starting November 1, 2017, OC Transpo will begin a phased customer testing period on O-Train Trillium Line fare gates and ticket machines at Carling, Carleton, Confederation and Greenboro stations. Customer testing will start at Carling Station on November 1 and make its way to Carleton Station on November 3, Confederation Station on November 6, and Greenboro Station on November 8. Testing is expected to be ongoing. Q2. What exactly will change for customers on Nov. 1? A2. At each station where the fare gate system has been activated, customers will enter through the fare gates by simply tapping their smartcard or scanning their transfer. New ticket machines will allow customers to check their Presto card balance and easily buy a single-ride fare, a DayPass or load their Presto Cards, using cash, debit and credit cards. Once purchased, customers can use their fare products immediately. Q3. Which functions will not go live starting Nov. 1? A3. During the first phase of customer testing, the live video chat feature where customers can communicate virtually with OC Transpo customer relations staff will not be available. Q4. Why is OC Transpo doing this in a phased approach? A4. OC Transpo is taking a phased customer testing approach to ensure a stable and successful system roll-out. This approach will also allow customers a chance to get to know the new O-Train Trillium Line fare gate functions in a real-life, high-traffic environment, and will allow OC Transpo an opportunity to work out any issues that may arise.
    [Show full text]
  • Item # PO Branch Description Professional / Consulting Services
    TRANSIT SERVICES PURCHASE ORDERS ≥ $25,000 AWARDED UNDER DELEGATION OF AUTHORITY Document 1 FOR THE PERIOD JULY 1, 2015 TO DECEMBER 31, 2015 Professional / Follow-on / Item # PO Branch Description Consulting Amount Vendor Non-Competitive Rationale Amendment Services 1 45080625 CSP Professional services to undertake Busology Safety Campaign for Transit Services Department. PE $ 54,784.53 MEDIAPLUS ADVERTISING OTTAWA ON 2 45079372 CSP Professional procurement services related to the Automated Fare Collection Devices and PE A $ 76,808.09 PPI CONSULTING LIMITED Services RFP Initiatives. NEPEAN ON 3 45080733 CSP Professional services to undertake the ongoing project management during the planning, PE $ 126,882.00 IBISKA TELECOM INC development and implementation phases of the O-Train fare control system. OTTAWA ON 4 45080836 CSP Supply and Installation of Gates to an existing public crossing at McCarthy Road, at mile 4.76 $ 134,766.87 CANADIAN NATIONAL RAILWAY Section 22(1)(d) Walkley Line Spur off mileage 72.73 on the CN Alexandria Subdivision, Ottawa. MONTREAL QC Absence of competition for technical or other reasons 5 45080870 CSP Supply of 16,500 PRESTO cards for the Presto Automated Fare Collection system at OC $ 83,952.00 METROLINX Section 22(1)(a) Transpo. TORONTO ON Proprietary Rights 6 45078121 CSP Provision of SMS (Short Message Service) to support OC Transpo's 560560 texting service for E $ 97,893.12 CLX NETWORKS CANADA Section 22(1)(a) a period of four (4) months. MONTREAL QC Proprietary Rights 7 45081121 CSP Professional services to undertake the modernization and optimization of OC Transpo’s PE $ 83,933.08 JANET LEBLANC + ASSOCIATES customer service operations in support of its new multi-modal transformation program.
    [Show full text]
  • Stage 2 LRT Report, Titled 106
    1 Report to Rapport au: Council Conseil 27 February 2019 / 27 février 2019 Submitted on February 22, 2019 Soumis le 22 février 2019 Submitted by Soumis par : John Manconi, General Manager/Directeur général, Transportation Services Department/Direction générale des transports Contact Person Personne ressource: Chris Swail, Director/Directeur, O-Train Planning/Planification du O-Train 613-580-2424 ext./poste 12408, [email protected] Ward :CITY WIDE / À L'ÉCHELLE DE LA File Number: ACS2019-TSD-OTP-0001 VILLE SUBJECT: Contract Award of Ottawa’s Stage 2 Light Rail Transit Projects and Related Matters OBJET: Attribution du contrat de l’Étape 2 des projets de train léger sur rail d’Ottawa et questions connexes REPORT RECOMMENDATIONS 1. That City Council receive and table the “Contract Award of Ottawa’s Stage 2 Light Rail Transit Projects and Related Matters” report at its Special meeting of February 27, 2019, for subsequent consideration by Council at its regular meeting of March 6, 2019; 2. That, at its regular meeting of March 6, 2019, City Council: a. Receive the results of the Request for Proposals (RFP) for the Stage 2 Ottawa Light Rail Transit project, as described in this report and as overseen by a Fairness Commissioner, and related matters, including the status associated with the Environmental Assessments and approvals, and the progress achieved to date through the Memorandum of Understanding related to vehicles and maintenance for the Confederation Line East and West, as described in this report; 2 b. Approve the selection of TransitNEXT as the Preferred Proponent to design, build, finance and maintain the Trillium Line Extension Project, including the bundled projects and civic works, in the manner described in this report, including as follows: i.
    [Show full text]
  • Transit Commission
    Transit Commission Draft Operating and Capital Budget Tax Supported Programs Tabled November 9, 2016 Table of Contents Transit Commission Briefing Note..............................................................................................................................................................................................1 Operating Resource Requirement.............................................................................................................................................................3 User Fees..................................................................................................................................................................................................4 Capital Program Summary and Funding...................................................................................................................................................5 Supplemental Operating and Capital Information.....................................................................................................................................8 Analysis.........................................................................................................................................................................................8 Explanatory Notes.........................................................................................................................................................................9 Capital Budget.............................................................................................................................................................................11
    [Show full text]