T RANSBAY - BLOCK 3 PARK Community Meeting 4 | April, 29 2021

The Webinar Presentation will start momentarily. Please wait!

If you would like to keep the interpeter’s video on, please click on the 3 dots on the upper right corner of the interpreter’s video and select “Pin” TONIGHT'S PROGRAM

TIME: INTRODUCTION: OCII & RPD - PROJECT & TEAM BACKGROUND 5 MINUTES - POLL PRESENTATION: DESIGN TEAM I - PROJECT DEVELOPMENT OVERVIEW AND FEEDBACK 25 MINUTES II - PROGRAM & MAIN STREET UPDATE III - STEWARDSHIP BUILDING OPTIONS IV - PLAYGROUND OPTIONS FEEDBACK: COMMUNITY - PUBLIC COMMENT - Q&A 30 MINUTES - ONLINE FEEDBACK SURVEY NEXT STEPS - PROJECT SCHEDULE

BLOCK 3 PARK Building Design & Construction PG. 2 Internal Design Review | April 2021 WELCOME & THANK YOU FOR ATTENDING! YOUR INPUT IS INVALUABLE PROJECT TEAM:

• OFFICE OF COMMUNITY INVESTMENT & INFRASTRUCTURE (OCII) LAURA SHIFLEY - PROJECT MANAGER / ASSOCIATE PLANNER, URBAN DESIGNER BENJAMIN BRANDIN - ACTING TRANSBAY PROJECT MANAGER SALLY OERTH - INTERIM EXECUTIVE DIRECTOR ALOK VYAS - ASSOCIATE PLANNER, URBAN DESIGNER

RECREATION AND PARKS MONICA SCOTT - PROJECT MANAGER STACY BRADLEY - DEPUTY DIRECTOR OF PLANNING YAEL GOLAN - PLANNER ERIC ANDERSEN - SUPERINTENDENT OF PARKS AND OPEN SPACE STEVE CISMOWSKI - PARK SERVICE MANAGER

• SAN FRANCISCO PUBLIC WORKS KATHLEEN O’DAY - PROJECT MANAGER BRETT DESMARAIS - DESIGN LIZZY HIRSCH - PROJECT LEAD FOR DESIGN TEAM LAWRENCE CUEVAS - DESIGN EOANNA GOODWIN - DESIGN VERONICA CHAN - DESIGN ERICA RUIZ - DESIGN WINNIE CHANG - DESIGN BLOCK 3 PARK Building Design & Construction PG. 3 Internal Design Review | April 2021 VIRTUAL MEETING FEEDBACK OVERVIEW

HOW TO PROVIDE FEEDBACK:

• PLEASE ENTER ALL QUESTIONS, COMMENTS, OR FEEDBACK INTO THE Q&A AT ANY POINT DURING THE PRESENTATION

• QUESTIONS WILL BE READ AND ANSWERED ALOUD DURING THE Q&A PERIOD FOLLOWING THE PRESENTATION

• A SUMMARY OF THE Q&A, INCLUDING ANY OUTSTANDING QUESTIONS THAT WERE NOT ANSWERED DURING THE MEETING, WILL BE POSTED TO THE PROJECT WEBSITE FOLLOWING THIS MEETING

• AGREE TO BE OPEN MINDED, LISTEN TO EACH OTHER’S IDEAS, COMMUNICATE WITH RESPECT

NOTE: THIS IS A WEBINAR FORMAT AND ONLY PANELISTS AND MODERATORS WILL BE SEEN OR HEARD. ADDITIONALLY, IT IS BEING RECORDED FOR PUBLIC DISTRIBUTION.

POST-MEETING SURVEY LINK:

https://www.surveymonkey.com/r/TB3ParkCM4Survey

BLOCK 3 PARK Building Design & Construction PG. 4 Internal Design Review | April 2021 POLL

DID YOU ATTEND BLOCK 3 PARK COMMUNITY MEETING #3 IN NOVEMBER 2020?

BLOCK 3 PARK Building Design & Construction PG. 5 Internal Design Review | April 2021 PARK DEVELOPMENT

MEETING 1: MARCH 2020

INITIAL DESIGN INSPIRATION

CLIMATE MEETING 2: SEPTEMBER 2020 COMPREHENSIVE RESPONSIVE COMMUNITY DESIGN OUTREACH DESIGN ALTERNATIVES

MEETING 3: NOVEMBER, 2020 PLACE-BASED DESIGN CONCEPTS DESIGN SYNTHESIS

MEETING 4: APRIL 29, 2021

DESIGN UPDATE: DESIGN DEVELOPMENT PLAYGROUND & STEWARDSHIP

RPD COMMISSION OCII COMMISION

COMMUNITY INPUT SCHEDULE

CBD - Park RPD Monitoring - Security Patrols - Park Ownership - Movable - Facility Furniture Deployment management - Maintenance - Permitting - Programming - Reservations

JOINT

OWNERSHIP AND MANAGEMENT EAST CUT COMMUNITY BENEFIT DISTRCIT (CBD) BLOCK 3 PARK Building Design & Construction PG. 6 Community Meeting 3 | 11.18.2020 PART I - PROJECT OVERVIEW & FEEDBACK

BLOCK 3 PARK Building Design & Construction PG. 7 Internal Design Review | April 2021 SITE: CONTEXTUAL FRAMEWORK

BLOCK 4

BLOCKPARK 3

BLOCK 2

0 0.5 1 Miles BLOCK 3 PARK Building Design & Construction PG. 8 Community Meeting 3 | 11.18.2020 EXISTING SITE:

MAIN ST LOOKING NORTHWEST

BEALE ST LOOKING NORTH BEALE ST LOOKING NORTHEAST

BLOCK 3 PARK Building Design & Construction PG. 9 Community Meeting 3 | 11.18.2020 FERRY BUILDING

DRUMM STREET BLOCK 3 ADJACENT OPEN SPACE

CALIFORNIA STREET

DAVIS STREET RINCON PARK

STEUART STREET

PG&E SF BAY

FRONT STREET

RINCON MARKET STREET RINCON CENTER PARK

USF SCHOOL OF BATTERY STREET BATTERY MANAGEMENT

BUSH STREET MISSION STREET

GAP HQ

THE EMBARCADERO SANSOME STREET SANSOME PARK TOWER SUTTER STREET BAY BRIDGE HOWARD STREET

BLOCK 4 SPEAR STREET TRANSBAY

SALESFORCE TOWER FDIC HILLS PLAZA PARK ECKER STREETELIM ALLEY BLOCKPARK 3 INFINITY FUTURE

GOLDENGATE MONTGOMERY STREET MONTGOMERY AFFORDABLE UNIVERSITY HOUSING JESSIE STREET MAIN STREET POST STREET BLOCK 2 GAP STEVENSON STREET FOLSOM STREET ANTHONY STREET DIGITALDATA REALITY CENTER

LUMINA CLEMENTINA STREET FOUNDRY SQUARE BEALE STREET SOLAIRE

MISSION STREET BAY AREA PORTSIDE 101 METRO CENTER

2ND ST SALESFORCE PARK (ELEVATED) PLACE ZENO

FREMONT STREET333 TEHAMA STREET FREMONT HARRISON STREET

PG&E

SUBSTATION NATOMA STREET 399

FREMONT 1ST STREET UNDER RAMP 340 MALDEN ALLEY THE FREMONT

UNDER RAMPSTREET ECKER METROPOLITAN PARK

PARK (FUTURE) SAILORS MINNA STREET UNIONTHE OF (FUTURE) PACIFIC BRYANT STREET GUY PLACE RINCON GREEN APARTMENTS

COURTYARDMARRIOTT BY LANSING STREET HILL Base map courtesy of The East Cut CBD ONE RINCON

TERRA GALLERY 2ND STREET BLOCK 3 PARK 303 2ND ST Building Design & Construction PG. 10 Community Meeting 3 | 11.18.2020

RINCON STREET STERLING STREET

I 80

FEDERAL STREET NEIGHBORING BLOCK DEVELOPMENTS Neighboring Block Designs Howard Street HOWARD STREET

DRAFT TB4TB 4 Phase - Schematic

TEHAMATEHAMA

TB3TB3 Phase - Schematic MAIN STREET BEALE STREET Beale Street Main Street

CLEMENTINACLEMENTINA

TB2TB2 Phase - Conceptual

DRAFT

Drawing Scale FolsomFOLSOM Street STREET TRANSBAY BLOCK 2 BLOCK 3 PARK TB3 Park Meeting Building Design & Construction PG. 11 Internal Design Review | April 2021 29 January, 2021 PREFERRED PLAN Community Meeting #3

THE CLEARING THE COMMONS THE RIPPLE

OPEN FLEXIBLE SPACES GATHERING SPACES SEATING PLAY BLOCK 3 PARK Building Design & Construction PG. 12 Community Meeting 3 | 11.18.2020 PREFERRED DESIGN ALTERNATIVE Community Meeting #3

Tehama

Tehama Main Beale

Grove Dog Relief Upper Deck 760 SF 2,500 SF Clementina Meadow

Stewardship Lower Deck Building 950 SF

Jc Decaux Legend Beale Main Major Circulation Playground Grove Minor Circulation

Open Flexible Spaces

Clementina Gathering Spaces

Seating

Play

BLOCK 3 PARK Building Design & Construction PG. 13 Internal Design Review | April 2021 COMPOSITE SURVEY RESULTS Community Meeting #3

WHO? 223 total respondents CLEARING CONCEPT

17% attended community meeting 1 Are you in favor of the final concept design presented at Community Meeting 3? 14% attended community meeting 2

94% live in the neighborhood NO 68% work in the neighborhood 8% 26% have children

23% have dogs 28% NO RESPONSE Note: for Community Meeting 3 = 79 attendees YES 64%

Age of Respondents: 55+ 22% 20-35 33.5%

45%

35-55 BLOCK 3 PARK Building Design & Construction PG. 14 Internal Design Review | April 2021 BIRD'S EYE VIEW LOOKING NORTHEAST TOWARDS MAIN ST Tehama Main Beale

Clementina

BLOCK 3 PARK Building Design & Construction PG. 15 Internal Design Review | April 2021 DECK VIEW Tehama Main Beale

Clementina

BLOCK 3 PARK Building Design & Construction PG. 16 Community Meeting 3 | 11.18.2020 PART I I - PROGRAM & MAIN STREET UPDATE

BLOCK 3 PARK Building Design & Construction PG. 17 Internal Design Review | April 2021 BLOCK 3 ADJACENT PROGRAMS WITHIN A 10 MIN. WALK: DOG, CHILDCARE, PLAYGROUNDS, AND RESTROOMS

LEGEN

LOC PAR UTURE CHILDCARE

PLAYGROUND

UTURE DOG LOCATION

RESTROOM

MINUTE ALING RADIUS

BLOCK 3 PARK Building Design & Construction PG. 18 Internal Design Review | April 2021 MAIN STREET/DOG RELIEF ZONE

Tehama Beale Main

Clementina

BLOCK 3 PARK Building Design & Construction PG. 19 Internal Design Review | April 2021 MAIN STREET/DOG RELIEF ZONE Main

Main St Tehama Clementina

Beale Tehama Clementina

INITIAL CONCEPT

Main St Tehama Clementina

UPDATED DESIGN

BLOCK 3 PARK Building Design & Construction PG. 20 Internal Design Review | April 2021 MAIN STREET/DOG RELIEF ZONE

Street Edge: Living Street Zone Dog Relief Zone Surface Material Options: Permeable concrete paving or artificial turf

BLOCK 3 PARK Building Design & Construction PG. 21 Internal Design Review | April 2021 PART III - STEWARDSHIP BUILDING OPTIONS

BLOCK 3 PARK Building Design & Construction PG. 22 Internal Design Review | April 2021 STEWARDSHIP BUILDING

Tehama Beale Main

Clementina

BLOCK 3 PARK Building Design & Construction PG. 23 Internal Design Review | April 2021 BEALE/TEHAMA CORNER ENTRANCE VIEW LOOKING SOUTHEAST Tehama Main Beale

Clementina

BLOCK 3 PARK Building Design & Construction PG. 24 Internal Design Review | April 2021 STEWARDSHIP BUILDING Community Preferences from Meeting #3

32% 24% 22% STEWARDSHIP BUILDING A lasting structure that - Draws neighbors to the park - Illuminates from within - Stores furniture and maintenance materials

12% 10%

BLOCK 3 PARK Building Design & Construction PG. 25 Internal Design Review | April 2021 STEWARDSHIP BUILDING Option 1: ENVELOP 300 sf FORM INSPIRATION FORM MATERIAL INSPIRATION MATERIAL

MAINTENANCE Beale STORAGE Beale COMMUNITY STORAGE FLOOR PLAN FLOOR

Clementina SITE PLAN BLOCK 3 PARK Building Design & Construction PG. 26 Internal Design Review | April 2021

STEWARDSHIP BUILDING Option 1: ENVELOP 300 sf Beale

Clementina

Daytime View - Looking West onto Beale Street BLOCK 3 PARK Building Design & Construction PG. 27 Internal Design Review | April 2021

STEWARDSHIP BUILDING Option 1: ENVELOP 300 sf Beale

Clementina

Nighttime View- Looking West onto Beale Street BLOCK 3 PARK Building Design & Construction PG. 28 Internal Design Review | April 2021 STEWARDSHIP BUILDING Option 2: BOW 300 sf FORM INSPIRATION FORM MATERIAL INSPIRATION MATERIAL Beale COMMUNITY STORAGE Beale FLOOR PLAN FLOOR

MAINTENANCE STORAGE Clementina SITE PLAN BLOCK 3 PARK Building Design & Construction PG. 29 Internal Design Review | April 2021

STEWARDSHIP BUILDING Option 2: BOW 300 sf Beale

Clementina

Daytime View - Looking West onto Beale Street BLOCK 3 PARK Building Design & Construction PG. 30 Internal Design Review | April 2021

STEWARDSHIP BUILDING Option 2: BOW 300 sf Beale

Clementina

Daytime View - Looking South onto Beale Street BLOCK 3 PARK Building Design & Construction PG. 31 Internal Design Review | April 2021

STEWARDSHIP BUILDING Option 2: BOW 300 sf Beale

Clementina

Nighttime View- Looking South onto Beale Street BLOCK 3 PARK Building Design & Construction PG. 32 Internal Design Review | April 2021 STEWARDSHIP BUILDING Option 1: Envelop Option 2: Bow

Prismatic form Organic form frames views to each corner Offset location within grove Central location within grove Responds to new architectural forms nearby Replicates curves from site design Perforated metal skin Earthy materials and color palette Can glow internally at night Integrated with landscape

BLOCK 3 PARK Building Design & Construction PG. 33 Internal Design Review | April 2021 PART IV - PLAYGROUND OPTIONS

BLOCK 3 PARK Building Design & Construction PG. 34 Internal Design Review | April 2021 PLAYGROUND

Tehama Beale Main

Clementina

BLOCK 3 PARK Building Design & Construction PG. 35 Internal Design Review | April 2021 PLAYGROUND PROGRAM AGE RANGE OPTIONS Community Meeting #3 Preferences

BLOCK 3 PLAYGROUND SALESFORCE PLAYGROUND MOSCONE EAST PLAYGROUND SOUTH PARK 3,800 SQ FT 2,600 SQ FT 2,000 SF + 3,600 SF PLAYGROUND 3,100 SF

0-5 yrs toddler 0-5 yrs or 5-12 yrs combined age 0-12 yrs? 0-12 yrs

5-12 yrs

PERCENTAGE VOTES FOR EACH OPTION: for toddler 26% 0-5 yrs

for combined age 74% 0-12 yrs

BLOCK 3 PARK Building Design & Construction PG. 36 Internal Design Review | April 2021 PLAY INSPIRATION Community Meeting #3 Preferences Which of the following images are you most drawn to for each of the two age brackets listed below? TODDLER PLAY 0-5 YRS PLAY TODDLER

38% 33% 29% COMBINED AGES PLAY 0-12 YRS PLAY AGES COMBINED 47% 30% 23% BLOCK 3 PARK Building Design & Construction PG. 37 Internal Design Review | April 2021 PLAY ELEMENTS Community Meeting #3 Preferences Which of the images below of different play types would you like to see incorporated in the playground’s design?

STRUCTURE BASED PLAY BASED STRUCTURE 38% 28% 17% 17% IMAGINATIVE PLAY IMAGINATIVE 49% 26% 14% 11%

INTERACTIVE ELEMENTS INTERACTIVE 42% 28% 20% 10% BLOCK 3 PARK Building Design & Construction PG. 38 Internal Design Review | April 2021 PLAY ELEMENTS Community Meeting #3 Preferences How important to you that each of the following play elements are included in the playground’s design?

Rank 5 4 3 2 1 most important least important

Swinging 44 25 21 10 18

Sliding 40 25 24 12 14

Climbing 37 30 17 16 15

Sand Play 15 10 13 15 60

Spinning 11 18 29 19 38

BLOCK 3 PARK Building Design & Construction PG. 39 Internal Design Review | April 2021 PLAYGROUND DEVELOPMENT: INTERTIDAL INSPIRATION

Illustration from Natural History of SF Bay by A. Rubissow Okamoto and K. Wong View of playground site from Beale/Clementina park entry corner

Brown Pelican

Brown Pelican Eel Grass Bufflehead Duck Play Interpretation SITE PLAN WITH PLAYGROUND OPTION 1

Tehama Main Beale *

Playground Entry Clementina *

BLOCK 3 PARK Building Design & Construction PG. 41 Internal Design Review | April 2021 PLAYGROUND - OPTION 1

+0”

D A B C

B G E F +18” D 4.5%

A Waterfowl Play Structure Example (actual design would be customized to fit site character)

F Saucer Swing B Reed Poles

C Picnic Tables D Boulder Steps E Custom Tower w/ Slide G Teeter-totter PLAYGROUND - OPTION 1 ALTERNATE

SCULPTURAL WATERFOWL PLAY STRUCTURE TIMBER PLAY STRUCTURE - ALTERNATE

OR

BLOCK 3 PARK Building Design & Construction PG. 43 Internal Design Review | April 2021 SITE PLAN WITH PLAYGROUND OPTION 2

Tehama Main Beale * Playground Entry Clementina *

BLOCK 3 PARK Building Design & Construction PG. 44 Internal Design Review | April 2021 PLAYGROUND - OPTION 2

4.5%

4.5% F C D B +0” +18” A C F +0” G E

A Waterfowl Play Structure Example (actual design would be customized to fit site character)

C Reed Poles E Toddler Swing

B Rope Swing D Picnic Tables F Hexagon Steps G Wave Climber PLAYGROUND - OPTION 2 ALTERNATE

SCULPTURAL WATERFOWL PLAY STRUCTURE TOWER PLAY STRUCTURE - ALTERNATE

OR

BLOCK 3 PARK Building Design & Construction PG. 46 Internal Design Review | April 2021 PLAYGROUND - OPTION COMPARISON Option 1: Integrated Play Option 2: Zoned Play

Supports mixed- Separates toddler play age play on park from school age play by level and provides a stepped 18” elevation school age play at change elevated corner MIXED SCHOOL AGES AGE SCHOOL TOTS AGE

Park Level Elevated (18") Elevated (18") Park Level Elevated (18") Park Level Diagrammatic Section Diagrammatic Section

4.5%

+0”

+0” +18” +18” +0”

4.5%

BLOCK 3 PARK Building Design & Construction PG. 47 Internal Design Review | April 2021 PLAYGROUND - SWING OPTIONS

Multi-user Swing Toddler Swing

A B C Saucer Swing Rope Swing 3-Tier Swing

BLOCK 3 PARK Building Design & Construction PG. 48 Internal Design Review | April 2021 Q&A SESSION

BLOCK 3 PARK Building Design & Construction PG. 49 Internal Design Review | April 2021 SITE PLAN

Tehama

Grove Upper Deck 2,500 SF Meadow Dog Relief 760 SF Stewardship Lower Deck Building 950 SF Jc Decaux Beale Main Playground Grove

Clementina

BLOCK 3 PARK Building Design & Construction PG. 51 Internal Design Review | April 2021 PROJECT SCHEDULE

PROJECT SCHEDULE: DECEMBER 2019 - FEBRUARY 2025 CONCEPT/PLANNING 11 MONTHS DEC, 2019 - MID NOV, 2020 SCHEMATIC DESIGN 8.5 MONTHS MID NOV, 2020 - JULY, 2021 DESIGN DEVELOPMENT 5 MONTHS AUG, 2021 - DEC, 2021 CONSTRUCTION DOCUMENTS 8 MONTHS JAN, 2022 - AUG, 2022 BID/AWARD 4.5 MONTHS SEP, 2022 - JAN, 2023 CONSTRUCTION 24 MONTHS FEB, 2023 - FEB 2025 MEETING 1: MARCH 2020

INITIAL DESIGN INSPIRATION

CONCEPT PHASE - OUTREACH SCHEDULE MEETING 2: SEPTEMBER 2020

COMMUNITY MEETING 1: INFORMATION GATHERING DESIGN ALTERNATIVES

COMMUNITY MEETING 2: INITIAL DESIGN IDEAS MEETING 3: NOVEMBER, 2020

COMMUNITY MEETING 3: DESIGN REFINEMENT, PUBLIC SURVEYS DESIGN SYNTHESIS

MEETING 4: APRIL 29, 2021

DESIGN UPDATE: SCHEMATIC PHASE - COMMUNITY UPDATE PLAYGROUND & STEWARDSHIP

COMMUNITY MEETING 4: DESIGN UPDATE: PLAYGROUND FOCUS RPD COMMISSION OCII COMMISION

BLOCK 3 PARK Building Design & Construction PG. 54 Internal Design Review | April 2021 CONTACT

PLEASE FILL OUT THE SURVEY WITHIN THE NEXT TWO WEEKS: https://www.surveymonkey.com/r/TB3ParkCM4Survey

FOR REGULAR UPDATES, VISIT THE PUBLIC WORKS WEBSITE: http://sfpublicworks.org/Block3Park

BLOCK 3 PARK

FOR QUESTIONS OR MORE INFORMATION, PLEASE CONTACT KATHLEEN O’DAY: [email protected]; (415) 218-7515

BLOCK 3 PARK Building Design & Construction PG. 55 Internal Design Review | April 2021