Detailed Driving Directions

Total Page:16

File Type:pdf, Size:1020Kb

Detailed Driving Directions Traveling from Philadelphia Area: Take Route 42 South to the Atlantic City Expressway East. Take the Atlantic City Expressway to Exit 2 (Atlantic City via Black Horse Pike - Route 322). You’ll be entering Atlantic City via the Black Horse Pike (Route 322) which becomes Albany Ave. once you enter the city. Cross over the Albany Avenue Bridge, and the Stockton campus will come into view on your righthand side. Stay straight on Albany Ave. until the last traffic light, passing the WWI monument on your left, and the campus on your right. At the last traffic light, where the Knife and Fork restaurant is located on the corner, turn left onto Atlantic Ave. Proceed two blocks, and turn right onto S. Providence Ave. The entrance to the surface parking lot is to your immediate right. The Stockton-Rothenberg Building is located on the corner of Atlantic and S. Providence avenues. Traveling from Northern New Jersey: Take Garden State Parkway South to Exit 38 to Atlantic City Expressway East. OR Travel I-295 South to Route 42 South to the Atlantic City Expressway East. Then Take the Atlantic City Expressway to Exit 2 (Atlantic City via Black Horse Pike - Route 322). You’ll be entering Atlantic City via the Black Horse Pike (Route 322) which becomes Albany Ave. once you enter the city. Cross over the Albany Avenue Bridge, and the Stockton campus will come into view on your righthand side. Stay straight on Albany Ave. until the last traffic light, passing the WWI monument on your left, and the campus on your right. At the last traffic light, where the Knife and Fork restaurant is located on the corner, turn left onto Atlantic Ave. Proceed two blocks, and turn right onto S. Providence Ave. The entrance to the surface parking lot is to your immediate right. The Stockton-Rothenberg Building is located on the corner of Atlantic and S. Providence avenues. Traveling from Southern New Jersey: Take the Garden State Parkway North to Exit 38 toward Atlantic City via the Atlantic City Expressway East. Take the Atlantic City Expressway to Exit 2 (Atlantic City via Black Horse Pike - Route 322). You’ll be entering Atlantic City via the Black Horse Pike (Route 322) which becomes Albany Ave. once you enter the city. Cross over the Albany Avenue Bridge, and the Stockton campus will come into view on your righthand side. Stay straight on Albany Ave. until the last traffic light, passing the WWI monument on your left, and the campus on your right. At the last traffic light, where the Knife and Fork restaurant is located on the corner, turn left onto Atlantic Ave. Proceed two blocks, and turn right onto S. Providence Ave. The entrance to the surface parking lot is to your immediate right. The Stockton-Rothenberg Building is located on the corner of Atlantic and S. Providence avenues. .
Recommended publications
  • Atlantic City Expressway: 1964 – 2014 I
    Celebrating 50 Years of Transportation Investment in Southern New Jersey THE REGIONAL ECONOMI C IMP ACT OF THE ATLANTIC CITY EXPRESSW AY : 1964 –2014 The Regional economic Impact of the atlantic City expressway: 1964 – 2014 i Table of ConTenTs Executive Summary ..................................................................................................................................................iii Introduction ..................................................................................................................................................iii Framework ..................................................................................................................................................iv Highlights ..................................................................................................................................................v Conclusion ..................................................................................................................................................x Section 1: Introduction ..........................................................................................................................................1 Section 2: The Economic Development Impact of Transportation Projects: A Framework ......................................................................................................................................2 Section 3: PHASE I: FROM DREAM TO REALITY, 1932 – 1963 ..................................................................4 ACEx
    [Show full text]
  • 2:19 PM Open Or Not: Manhattan Supermarkets
    2:19 P.M. Open or Not: Manhattan Supermarkets Food Emporium stores in were open for business unless power loss or storm damage made that impossible. Westside Market stores were open except for the West 14th Street branch, where power had been lost. - Winnie Hu 1:58 P.M. Total Death Toll at 38 As searches revealed grim scenes up and down the Eastern Seaboard, the overall death toll from the storm had climbed to 38, officials said. Here are the state-by-state totals, reported by The Associated Press on Tuesday afternoon, with two deaths not listed: New York: 17 Pennsylvania: 5 New Jersey: 4 Connecticut: 3 Maryland: 2 Virginia: 2 West Virginia: 1 North Carolina: 1 Off the coast of North Carolina: 1 - Andy Newman 1:57 P.M. Cultural Cancellations For those interested in finding out about cancellations of cultural events, the Arts Beat blog has an updated list. - The New York Times 1:48 P.M. Obama Signs Disaster Declaration President Obama signed major disaster declarations for New York and New Jersey on Tuesday, authorizing the distribution of direct federal assistance to victims of Hurricane Sandy from the Federal Emergency Management Agency. http://projects.nytimes.com/live-dashboard/mobile/hurricane-sandy[10/30/2012 2:42:52 PM] - The New York Times 1:36 P.M. Congressman's Home Burned Down in Storm Uli Seit for The New York Times Bob Turner at his home in Breezy Point, Queens, in September 2011. Representative Bob Turner’s home in Breezy Point, Queens, was one of dozens that burned down in the storm, a spokeswoman confirmed Tuesday.
    [Show full text]
  • Annual Report
    South Jersey Transportation Authority 2016 ANNUAL REPORT Table of Contents Letter of Transmittal from the Board Chairman . 1 SJTA Board of Commissioners . 2 Letter of Transmittal from the Executive Director . 3 Mission, Vision and Core Values . 4 Core Functions . 5 Atlantic City Expressway . pp . 6 - 9 E-ZPass . 6 Emergency Service Patrol . 7 Honoring One Who Served . 8 9/11 Memorial . 9 100 Days of Summer . 10 Transportation Services . pp . 11 - 12 The Route 54/40 Community Shuttle . 11 Pureland East West Community Shuttle . 11 Camden Rising Shuttle . 12 Atlantic City International Airport . pp . 13 - 15 Taxiway ALPHA Rehabilitation Project . 13 Runway 4-22 Blast Pad Reconstruction Project . 13 ACY Parking Garage Rehabilitation Project . 14 A Night at the Ball Park . 15 iFLYACY Continues to Reward its Members . 15 ACY’s 4th Annual Customer/Employee Appreciation Day . 15 Charts and Graphs . pp . 16 - 17 Certification of Annual Audit and Financial Audit . 18 i SJTA The South Jersey Transportation Authority was established by the Legislature in June 1991 to assume operational responsibilities for the Atlantic City Expressway, Atlantic City International Airport, and parking facilities in Atlantic City . As the successor to the New Jersey Expressway Authority and Atlantic County Transportation Authority (ACTA), the SJTA serves six counties: Atlantic, Camden, Cape May, Cumberland, Gloucester, and Salem . Legislation (South Jersey Transportation Authority Act), L 1991,. c . 252 § 1, eff . Aug 9, 1991 (N .J .S .A . 27:25A-1 et seq ). charged the Authority with coordinating South Jersey’s transportation system, including addressing the region’s highway network, aviation facilities, and transportation needs .
    [Show full text]
  • Directions to the Mays Landing Campus
    Atlantic Cape Community College 5100 Black Horse Pike Mays Landing, NJ 08330 609-625-1111 Directions to the Mays Landing Campus The Campus is situated off of the U.S. Route 322 (Black Horse Pike) midway between the Pike’s intersection with U.S. Routes 40 and 50; it is 2.2 miles west of the Hamilton Mall. From the East: Take U.S. Route 322 west or take the Atlantic City Expressway (toll road) to exit 12. Turn left at exit (Wrangleboro Road) and a right turn onto Route 322 West. Atlantic Cape is 2.2 miles on the left, take U-turn to access entrance. From the North: Take the Garden State Parkway (toll road) to exit 38A. Take the Atlantic City Expressway (toll road) to exit 12. Turn left at exit, (Wrangleboro Road) and a right turn onto Route 322 West. Atlantic Cape is 2.2 miles on the left, take U-turn to access entrance. From the South: Take the Garden State Parkway (toll road) to exit 38A. Take the Atlantic City Expressway (toll road) to exit 12. Turn left at exit, (Wrangleboro Road) and a right turn onto Route 322 West. Atlantic Cape is 2.2 miles on the left, take U-turn to access entrance. From Philadelphia and West: Take U.S. Routes 42 and 322 east or, take the Atlantic City Express (toll road) to exit 17. Turn right at exit. Drive 2.8 miles to top of overpass and turn left onto U.S. Route 322 east. Atlantic Cape is 1.8 miles on the right.
    [Show full text]
  • Federal Communications Commission Record 10 FCC Red No
    DA 95-1699 Federal Communications Commission Record 10 FCC Red No. 17 3. Under the Act, however, the Commission is also di Before the rected to consider changes in ADI areas. Section 614(h) Federal Communications Commission provides that the Commission may: Washington, D.C. 20554 with respect to a particular television broadcast sta tion, include additional communities within its tele In re: vision market or exclude communities from such station©s television market to better effectuate the Petition of Greater Philadelphia CSR-4446-A purposes of this section. Cablevision, Inc. In considering such requests, the 1992 Cable Act provides For Modification of the ADI of that: Station WWAC, Atlantic City, NJ the Commission shall afford particular attention to the value of localism by taking into account such MEMORANDUM OPINION AND ORDER factors as- (I) whether the station, or other stations located in Adopted: July 31,1995; Released: August 17,1995 the same area, have been historically carried on the cable system or systems within such community; By the Cable Services Bureau: (II) whether the television station provides coverage or other local service to such community; INTRODUCTION (III) whether any other television station that is eli 1. Before the Commission is a petition filed by Greater gible to be carried by a cable system in such commu Philadelphia Cablevision, Inc. ("Greater Media" or "oper nity in fulfillment of the requirements of this section ator") seeking to modify the Philadelphia, PA "area of provides news coverage of issues of concern to such dominant influence" ("ADI") and to exclude that area of community or provides carriage or coverage of sport the City of Philadelphia it serves from the television mar ing and other events of interest to the community; ket of station WWAC (Ch.
    [Show full text]
  • Proposed Capital Improvement Program
    PROPOSED CAPITAL IMPROVEMENT PROGRAM SOUTH JERSEY TRANSPORTATION AUTHORITY APRIL 2020 SOUTH JERSEY TRANSPORTATION AUTHORITY PROPOSED CAPITAL IMROVEMENT PROGRAM 11 8 1 7 2 12 10 9 3 4 5 1. AC Expressway Resurfacing 2. Interchange Lighting Improvements 3. Pleasantville Maintenance Garage Replacement 4. AC Expressway Connector, Rt 30, Rt 87, Rt 187, AC Corridor Resurfacing 5. AC Expressway Connector & Tunnel LED Lighting Upgrades 6. AC Expressway Fleet Replacement 7. All Electronic Tolling & ITS Upgrades 8. AC Expressway Third Lane Widening 9. AC Expressway Interchange 7 Improvements 10. AC Expressway / ACY Direct Connector 11. Glassboro-Camden Light Rail Line 12. Upgrades to Atlantic City Rail Line Note: Project schedules detailed herein do not begin concurrently APRIL 2020 with the adoption of this Capital Plan PAGE 1 OF 13 ATLANTIC CITY EXPRESSWAY RESURFACING SYSTEM-WIDE ATLANTIC CITY EXPRESSWAY RESURFACING PROJECT DESCRIPTION LOCATION System-wide This project involves supplemental pavement milling and resurfacing to maintain state of good repair for the Atlantic City Expressway mainline TOTAL PROJECT COST in 2020. It is also intended that beginning in 2021 the Authority’s annual $10 Million resurfacing program will receive a bump over current funding which has averaged $1.5M to $2.5M a year over the last five years. SCHEDULE Planning & Design: POTENTIAL ENVIRONMENTAL / AGENCY COORDINATION 3 months None Anticipated Construction: 3 months POTENTIAL RIGHT-OF-WAY IMPACTS None Anticipated BENEFITS Safety State of Good Repair UTILITIES Customer Satisfaction None Anticipated STATUS To be programmed APRIL 2020 PAGE 2 OF 13 INTERCHANGE LIGHTING IMPROVEMENTS SYSTEM-WIDE INTERCHANGE LIGHTING IMPROVEMENTS PROJECT DESCRIPTION LOCATION Atlantic County This project involves modernization of interchange ramp lighting at Interchanges 5, 7, 12, 14, 28, and 31 on the Expressway.
    [Show full text]
  • Atlantic City Expressway, Atlantic City International Airport and Parking Facilities in Atlantic City in 1992
    Celebrating 20 Years Of Excellence 1992-2012 2012 Annual Report South Jersey Transportation Authority IN JUNE 1991 THE LEGISLATURE CREATED THE SOUTH JERSEY TRANSPORTATION AUTHORITY, SERVING SIX COUNTIES — ATLANTIC, CAMDEN, CAPE MAY, CUMBERLAND, GLOUCESTER AND SALEM. IT IS A SUCCESSOR TO THE NEW JERSEY EXPRESSWAY AUTHORITY AND ATLANTIC COUNTY TRANSPORTATION AUTHORITY. THE NEW BODY WILL ASSUME OPERATIONAL RESPONSIBILITIES FOR THE ATLANTIC CITY EXPRESSWAY, ATLANTIC CITY INTERNATIONAL AIRPORT AND PARKING FACILITIES IN ATLANTIC CITY IN 1992. 3 Table of Contents Letter Of Transmittal From The 4 Board Chairman 5 Board Of Commissioners Letter Of Transmittal From The 6 Acting Executive Director 7 Mission, Vision And Core Values 8 Core Functions 9 Organizational Chart 10 2012: Nature Challenges The SJTA 11 Atlantic City International Airport 15 Atlantic City Expressway 19 Transportation Services 21 Economic Impact 22 Key Dates In SJTA History Certification Of Annual Audit And 26 Finanical Audit 4 Letter of Transmittal from the Board Chairman Operating the Atlantic City Expressway and the Atlantic City International Airport in a safe and efficient manner remained the fundamental responsibility for the South Jersey Transportation Authority (SJTA) in 2012. The authority focused resources on maintaining its assets in a state-of-good-repair and coordinated with state transportation and law enforcement agencies during severe weather events to help keep New Jersey residents safe. 2012 was a year of progress for SJTA, as important highway and aviation projects reached milestones or were completed. On the Atlantic City Expressway, SJTA completed Phase Two of the westbound widening project that carried three lanes into Hammonton. Phase Three has begun and will expand the Expressway from the Garden State Parkway to Exit 31 in Winslow Township.
    [Show full text]
  • EHT Map & Directions.Qxp
    ATLANTIC COUNTY LIBRARY/ EGG HARBOR TOWNSHIP 1 Swift Avenue, Egg Harbor Township, NJ 08234 (609) 927-8664 50 HAMILTON 322 MALL MAYS LA 40 40 40 MAYS NDING-SO 50 LANDING MERS POINT RD. ENGLISH CREEK SHOPPING CENTER 40 ATLANTIC CIT 322 575 Y EXPRESS WAY 559 EK AVE. OCEAN HEIGHTS AVE. ENGLISH CRE GARDEN STATE PARKWAY HIGH SCHOOL EGG HARBOR . TOWNSHIP 662 INTOWN RD ALT MILL RD 559 BARGA 575 MAYS LANDING-SOMERS POINT RD. ATLANTIC COUNTY LIBRARY/ . SWIFT AVE. EGG HARBOR 559 AVE SWIFT TOWNSHIP & SLAYBAUGH SCHOOLS ZION RD. ENGLISH CREEK OCEAN HEIGHTS AVE. 615 615 651 9 559 LLE RD. 585 ALT STEELMANVI 559 MAYS LANDING-SOMERS POINT RD. NEW RD. 651 LINWOOD SHORE RD. BETHEL RD. SOMERS POINT 559 9 GARDEN STATE PARKWAY DIRECTIONS TO ATLANTIC COUNTY LIBRARY SYSTEM/ EGG HARBOR TOWNSHIP I Swift Avenue, Egg Harbor Township, NJ 08234 (609) 927-8664 FROM THE WEST Mays Landing Take Route 559 south to Alternate Route 559. Bear left on to Alternate 559, heading south. Continue about 5 miles to Swift Drive. Make a right on to Swift Drive at the light, library is on left. Vineland, Millville Take Route 552 (Millville-Mays Landing Road) to Mays Landing. Proceed as above. Philadelphia/Camden Take Route 42 (North-South Freeway) south to Atlantic City Expressway. Continue on Expressway to Exit 12. Turn right on to Route 575 and go to traffic light at intersection with Route 40/322. Take jughandle to go east. Go 2 miles, then turn right (south) on to Route 575 (English Creek Avenue). Go 3 miles and turn left at intersection with Alternate Route 559 (Ocean Heights Avenue).
    [Show full text]
  • South Jersey Transportation Authority 2021 New Jersey Asphalt Paving Association
    South Jersey Transportation Authority 2021 New Jersey Asphalt Paving Association Atlantic City Expressway ● Transportation Services ● Atlantic City International Airport Stephen M. Mazur, PE, PP, PTOE, CME Chief Engineer / Director of Engineering Atlantic City Expressway • 44.5 Miles from Atlantic City to Route 42 in Camden County • 265 Lanes Miles & 88 Shoulder Miles • 45 Ramps totaling 35 Lane and Shoulder Miles Atlantic City Expressway • NJDOT Specifications • Typical Mill & Pave - 2” • Typical Section • 6’ Left Shoulder • 2 or 3 - 12’ lanes • 10’ Right Shoulder • Rumble Strips on Left & Right Shoulders • Recessed Pavement Markers Atlantic City Expressway Resurfacing • Fall 2020 - $6.1M • 44 Lane, Shoulder, & Ramp Miles • Spring 2021 - $3.9M • 33 Lane, Shoulder, & Ramp Miles • Fall 2021 - $6.0M SJTA’s Atlantic City Transportation Assets • AC Expressway Connector • Route 30 • Route 87 • Route 187 • AC Corridor SJTA Atlantic City Resurfacing • AC Expressway Connector & 26 Ramps • 17 lane, ramp, & shoulder miles • Route 30 - 8 lane, ramp, & shoulder miles • Route 87 - 4 lane, ramp, & shoulder miles • Route 187 - 6 lane, ramp, & shoulder miles • Atlantic City Corridor – 2 lane, ramp, & shoulder miles • Budget – $7.4M Third Lane Widening • $150M Project Cost • Interchange 31 to Route 42 • Challenges • Environmental Constraints • Route 42 Connection • Bridge Reconstruction Atlantic City International Airport • Primary Runway 13-31 is 10,000 Feet Long • Crosswinds Runway 4-22 is 6,144 Feet Long • Twelve Taxiways Taxiway A Rehabilitation Project
    [Show full text]
  • AC Manual.Pub
    DIRECTIONS & PARKING Atlantic City Convention Center 1 Convention Boulevard, Atlantic City, NJ 08401 DIRECTIONS From the Atlantic City Expressway At the end of the Expressway, make a left on Arctic Ave. and then a left on Michigan Ave. straight into the Atlantic City Convention Center parking garage. Another entrance to the parking garage is via the Atlantic City Connector. To take this route, bear to the right at the end of the Atlantic City Expressway and follow the Atlantic City Connector. After railroad tracks take the first exit on the right marked Convention Center/ Bacharach Boulevard. While on Bacharach Boulevard, there are four (4) entrances into the parking garage on the right. HOTEL From Philadelphia and West Exit the Pennsylvania Turnpike at Valley Forge, Exit 24, onto Schuylkill Expressway (Route 76 East) through Philadelphia to the Walt Whitman Bridge. & TRAVEL From New York and North Major Interstate Highways connect with the Garden State Parkway South. Follow Garden State Parkway South to Exit 38 (Atlantic City Expressway). Follow Atlantic City Expressway directions. From Baltimore, Washington & South Take I-95 to the Walt Whitman Bridge (Philadelphia). Hotel Reservations Cross the Walt Whitman Bridge and follow N/S Freeway to the Atlantic City Expressway. Follow Atlantic City Expressway directions. Directions & Parking From Norfolk, VA area Follow Route 13 and Route 9 to Cape May-Lewes Ferry, then take Garden State Parkway North to Exit 38 (Atlantic City Expressway) into Atlantic City. Follow Parking Map Atlantic City Expressway directions. Public PARKING — Pricing subject to change. — https://meetac.com/meet/ac/parking Transportation There are numerous public lots and garages in proximity of the Center.
    [Show full text]
  • Traffic Congestion and Infant Health: Evidence from E-Zpass
    NBER WORKING PAPER SERIES TRAFFIC CONGESTION AND INFANT HEALTH: EVIDENCE FROM E-ZPASS Janet Currie Reed Walker Working Paper 15413 http://www.nber.org/papers/w15413 NATIONAL BUREAU OF ECONOMIC RESEARCH 1050 Massachusetts Avenue Cambridge, MA 02138 October 2009 We are grateful to the MacArthur foundation for financial support. We thank Katherine Hempstead and Matthew Weinberg of the New Jersey Department of Health, and Craig Edelman of the Pennsylvania Department of Health for facilitating our access to the data. We are grateful to James MacKinnon and seminar participants at Harvard University, Princeton University, Queens University, Tulane University, the University of Maryland, the University of Massachusetts- Amherst, the University of Rome, Uppsala University, the NBER Summer Institute, and the SOLE/EALE 2010 meetings for helpful comments. All opinions and any errors are our own. The views expressed herein are those of the author(s) and do not necessarily reflect the views of the National Bureau of Economic Research. NBER working papers are circulated for discussion and comment purposes. They have not been peer- reviewed or been subject to the review by the NBER Board of Directors that accompanies official NBER publications. © 2009 by Janet Currie and Reed Walker. All rights reserved. Short sections of text, not to exceed two paragraphs, may be quoted without explicit permission provided that full credit, including © notice, is given to the source. Traffic Congestion and Infant Health: Evidence from E-ZPass Janet Currie and Reed Walker NBER Working Paper No. 15413 October 2009, Revised April 2012 JEL No. I12,Q51,Q53 ABSTRACT We exploit the introduction of electronic toll collection, (E-ZPass), which greatly reduced both traffic congestion and vehicle emissions near highway toll plazas.
    [Show full text]
  • Passengers Told to ^Hunker Over9 PORTLAND, Ore
    A barn-garage battle is heating-up in River Plaza •l_ aav A a» Bnu ^ B^«•••mst •y WABHN 1ICHEV foot, 2t-foot-ull bam style two car garage and workshop on Graman and "neighbors within MO feet who signed the campaign and purchased an ad which accused the Demo- HIDDLETOWN - A Hlver Plata resident yeiterday West Front Street. petition against the structure." cratic mayor of nepotism. •Vied out DM 10 make .point The advertisement went on to assail the Middletown "There are so many people being run over in Mid- Mr. Graman, who lives near the garage, said be is The resident, Eugene Grimm of I Applegate St., took Township Zoning Board of Adjustment and the Middletown dletown Township, it's about lime someone started waking considering taking out another "normal garage" advertise- out a display advertisement on page three of The Daily building department for their involvement in the granting some people up," Mr. Graman said last night, explaining ment in the newspaper, though he said that the second Register to make 1 point In a neighborhood battle which he of variances for the building after the new garage was why he decided to take the advertisement out in the probably wouldn't be as large as the first. appears to have lost. already 75 percent constructed. newspaper. The Applegate Street resident said that he received The advertisement led oH with: "Does This Look Like a "How would you feel?," the advertisement concludes, Neither the tactic, nor the issue are new to Middletown many phone calls, in support of his advertisement, adding "Normal Garage?" The beading was accompanied by a and then goes on to announce that the statement in the During the November general election, local Re- that he is currently considering appealing the variance photograph of a recently constructed two-story, 712 square- advertisement was representative of the feelings of Mr.
    [Show full text]