Table of Contents

Total Page:16

File Type:pdf, Size:1020Kb

Table of Contents Table of contents 3 Letter to the Minister 4 Chief Executive’s message 6 Highlights Published by: 8 Corporate overview Corporate Planning VicRoads 16 Corporate governance 60 Denmark Street Kew Victoria 3101 32 Report on operations September 2006 32 Improving road safety Also published on www.vicroads.vic.gov.au 42 Assisting economic and regional development Graphic design by VicRoads, Graphic and Publication Services. © Copyright State of Victoria 2006 54 Providing integrated and sustainable transport This publication is copyright. No part may be reproduced by 66 Protecting and enhancing the environment any process except in accordance with the provisions of the Copyright Act 1968. 76 Improving customer service Authorised by the Victorian Government 84 Developing and sustaining our capabilities 60 Denmark Street, Kew 94 Financial management Printed by McLaren Press Pty. Ltd. 11-19 Lithgow Street, Abbotsford, Victoria, 3607 104 Financial report VicRoads would like to acknowledge the contributions of all 152 Other mandatory disclosures photographers and particularly thank Abigroup for supplying several photos. 162 Appendices International standards serial number (ISSN): 1832-0732 164 Membership of Advisory Councils VicRoads publication identification number: 01700 167 VicRoads offices This report is printed on 35 per cent recycled Australian made paper. 170 Infrastructure projects completed or in progress in 2005–06 190 Disclosure index 191 General index Letter to the Minister The Honourable Peter Batchelor MP Minister for Transport Level 26 80 Collins Street Melbourne Victoria 3000 Dear Minister VicRoads 2005–06 Annual Report I have much pleasure in submitting to you, for your presentation to Parliament, the annual report of the Roads Corporation (VicRoads) for the period 1 July 2005 to 30 June 2006. Yours sincerely David Anderson Chief Executive Victorian Minister for Transport, Peter Batchelor celebrated the opening of the Edgars Road improvement project with members of the community. page 3 Chief Executive’s message This report outlines the outputs and services delivered by VicRoads in 2005–06 which continued to be driven by Government strategies such as Growing Victoria Together, Melbourne 2030, the Metropolitan Transport Plan and arrive alive! Our achievements in 2005–06 reflect the ongoing improvement to VicRoads capability through extensive management and staff development programs on which I also reported in 2004–05. Having consolidated a great deal of planning activity in 2004–05, particularly in the road network development area, 2005–06 was a year of great productivity for VicRoads. Significant on-ground works resulted in an increase in capital expenditure of $198.2 million when compared with 2004–05. The highly awarded Craigieburn Bypass was completed and significant progress was made on other major road links including the Tullamarine-Calder interchange, Calder Highway upgrade and Deer Park and Pakenham bypasses. A further highlight was VicRoads significant contribution to the transport arrangements for the Commonwealth Games which, from all points of view, were highly successful. I would like to acknowledge the many VicRoads staff who helped ensure that the Games were a wonderful promotion for the State of Victoria. In addition to the huge effort that went into the Commonwealth Games, we also put a great deal of work into planning for a fully integrated transport system, culminating in the Government’s release of Meeting Our Transport Challenges in May 2006. Managing road system assets VicRoads $230 million road and bridge maintenance program contributed to a safe and efficient network. The downward trend in road roughness continued, providing 94 per cent of travel on smooth roads in regional Victoria and 93 per cent in the metropolitan area. VicRoads continued to strengthen bridges, ensuring that 99 per cent of the network remained accessible to high productivity freight vehicles – the highest access level of any Australian state. Whilst dry climatic conditions continue to be helpful in maintaining the good condition of our road network particularly in rural areas, VicRoads has commenced preparing contingency plans that would be used in the event that ‘normal’ rainfall returns. During 2005–06 we also put in place a strategy for the programmed replacement of over $500 million worth of traffic signals and Intelligent Transport Systems (ITS) equipment. The strategy recognises the need to be able to respond flexibly to rapid changes in technology. page 4 Improving road safety As always, improving road safety is a key component of Government strategies and consequently VicRoads activities. The world renowned collaborative arrangements in Victoria continued to provide positive road safety results. With the ongoing investment of funds from the Transport Accident Commission, over 2,000 road safety projects have been implemented or commenced over the past four years. We are now starting to see the benefits that this investment is having on Victoria’s fight against road trauma. The 2006 road toll has the potential to be one of the lowest, if not the lowest, on record. Meeting Our Transport Challenges provides nearly $600 million for further specific road safety programs, ensuring that Victoria will continue to invest about $60 to $80 million per annum in this sort of work. In 2005–06 VicRoads established a comprehensive procedure for managing such a long term and intensive program. Managing the network In 2005–06 VicRoads also bedded down procedures for improving the management of road use, particularly in the metropolitan area of Melbourne, through the adoption of a network approach. We saw significant improvements in travel times in areas where this approach had been adopted and the technique promises to provide significant benefits into the future. Responding to customers With an ever increasing demand for information about Victoria’s roads and road use, VicRoads continued to improve its customer response systems. We launched an Enquiry Tracking System to help ensure a timely response to customer enquiries that require follow up action. We also linked our metropolitan and rural call centres to more effectively respond to the annual growth in telephone calls. VicRoads website received a major design upgrade, allowing customers to more easily access the information they needed, especially during the Commonwealth Games. Developing our capabilities The Developing and sustaining our capabilities section of this report provides a great deal of information about the development of VicRoads people. This continues to be a very high priority for the successful management of Victoria’s principal road network. In 2005–06 VicRoads developed a program to encourage staff to work in regional areas and maintained its focus on improving leadership skills through our Leadership Program which was recognised in the 2005 Victorian (Engineers Australia) Engineering Excellence Awards. Our partnerships with national and international agencies continued to provide VicRoads with extensive information, particularly in the areas of road safety and road network management. With high levels of infrastructure development occurring in Victoria and other parts of Australia, workforce development and management will remain a high priority for VicRoads into the future. Thanks to our people and partners The achievements outlined in this report would not have been possible without the dedication and effort of VicRoads staff who have delivered a huge program of work in 2005–06. I thank all of them for their enthusiasm and ongoing commitment. Our partnerships with other public and private sector organisations have also helped us to get things done. I extend my thanks to the individuals in these organisations with whom we have worked throughout the year. As always, the members of VicRoads Advisory Board and advisory councils have provided valuable advice that has helped us to understand and respond to the needs of Victorian communities. page 5 David Anderson Chief Executive Highlights Melbourne 2006 Commonwealth Games The success of the traffic and transport management at the Melbourne 2006 Commonwealth Games was one of VicRoads major highlights in 2005–06. VicRoads worked in partnership with the Office of Commonwealth Games Coordination, the Department of Infrastructure, Victoria Police, Melbourne City Council and Melbourne’s public transport providers to take on this key challenge. VicRoads primary role was to manage roads and traffic to ensure efficient Games transport services to athletes, officials, media and VIPs, while facilitating the movement of on-road public transport and providing for Melbourne’s normal transport demands. Enhanced signal operations and real time traffic management resulted in key roads being able to carry more traffic than normal during peak periods and there were no significant incidents or problems reported on the road network during the Games. A key to the successful management of traffic in and around Games precincts was the Traffic Operations Centre (TOC), which was set up at VicRoads Kew office to support the Games Operations Centre. Staff from VicRoads, Victoria Police and Melbourne City Council worked in the TOC during the Games to assist with the integrated management of Games traffic operations. Meeting Our Transport Challenges In May 2006 the State Government released Meeting Our Transport Challenges, a fully integrated transport plan for shaping Victoria’s transport system into the future. VicRoads contributed
Recommended publications
  • Investigation of Low Density Residential and Farming Zone Land
    Investigation of Low Density Residential and Farming Zone Land 1 Contents Introduction ....................................................................................................................... 5 Map of the Study Area ....................................................................................................... 6 Summary of Recommendations......................................................................................... 8 Sites to be investigated further ........................................................................................ 12 Site 1: Simpsons Road ................................................................................................. 12 East Bendigo ................................................................................................................... 15 Site 2: South of Heinz Street, East of Murphy Street, West of the Airport ..................... 15 Epsom ............................................................................................................................. 20 Site 3: Allen Street to Jones Road................................................................................ 20 Site 4: Area bounded by Jones Road, Station Street, Sargeants Road and Midland Hwy .................................................................................................................................... 23 Site 5: Area bounded by Sargeants Road, Station Street, Midland Highway and Ligar Street ..........................................................................................................................
    [Show full text]
  • Submission Cover Sheets
    Submission Cover Sheet North East Link Project EES IAC 402 Request to be heard?: No, but please email me th Full Name: Phil Turner Organisation: Maroondah City Council Affected property: Attachment 1: Maroondah_Coun Attachment 2: Maroondah_Coun Attachment 3: Comments: To the North East Link Inquiry & Advisory Committee (IAC) Maroondah Council provides the following submission to the IAC, in relation to the EES for the North East Link project. While Council formally supports the objectives of the NEL project, I advise that the support of Maroondah Council has been conditional on appropriate traffic considerations being made with regard to the impact of the project on the Eastlink tunnels, the Ringwood Bypass and by extension the Ringwood Metropolitan Activity Centre. Council previously commissioned a review by O’Brien Traffic that considered the project in the context of the tunnels and impacts on Ringwood, and it was determined that without ancillary works to take traffic pressure off the Eastlink tunnels and the Ringwood Bypass, the project would potentially fail and have a major detrimental impact on the viability of the Ringwood Metropolitan Activity Centre. The O’Brien Traffic report attached to this submission details the basis for those concerns. Council’s concerns were previously forwarded to NELA and Council officers have met with NELA officers on these matters, however, to date Council has not received an appropriate response that addresses these concerns, including within the ESS. In support of this submission, the following documents have also been uploaded: o A submission letter signed by Council’s Mayor Rob Steane documenting the history of Council’s dealings regarding NEL, and outlining Council’s concerns current with the project; o Council Report September 2018; o O’Brien Traffic Review dated 12 September 2017; o Council letter to NELA (26 February 2018) and NELA response (14 March 2018); o Correspondence from Council on Bypass concerns (including technical reports); and o Minutes from MCC / NELA meetings 6 April 2018 and 30 April 2018.
    [Show full text]
  • Road Safety Camera Locations in Victoria
    ROAD SAFETY CAMERA LOCATIONS IN VICTORIA Approved Sites — April 2006 — Road Safety Camera Locations in Victoria – Location of Road Safety Cameras – Red light only wet film cameras (84 sites) • Armadale, Kooyong Road and Malvern Road • Ascot Vale, Maribyrnong Road and Mt Alexander Road • Balwyn, Balwyn Road and Whitehorse Road • Bayswater, Bayswater Road and Mountain Highway • Bendigo, High Street and Don Street • Bendigo, Myrtle Street and High Street • Box Hill, Canterbury Road and Station Street • Box Hill, Station Street and Thames Street • Brighton, Bay Street and St Kilda Street • Brunswick, Melville Road and Albion Street • Brunswick, Nicholson Street and Glenlyon Road • Bulleen, Manningham Road and Thompsons Road • Bundoora, Grimshaw Street and Marcorna Street • Bundoora, Plenty Road and Settlement Road • Burwood, Highbury Road and Huntingdale Road • Burwood, Warrigal Road and Highbury Road • Camberwell, Prospect Hill Road and Burke Road • Camberwell, Toorak Road and Burke Road • Carlton, Elgin Street and Nicholson Street • Caulfield, Balaclava Road and Kooyong Road • Caulfield, Glen Eira Road and Kooyong Road • Chadstone, Warrigal Road and Batesford Road • Chadstone, Warrigal Road and Batesford Road • Cheltenham, Warrigal Road and Centre Dandenong Road • Clayton, Dandenong Road and Clayton Road • Clayton, North Road and Clayton Road • Coburg, Harding Street and Sydney Road • Collingwood, Johnston Street and Hoddle Street • Corio, Princes Highway and Purnell Road • Corio, Princes Highway and Sparks Road • Dandenong, McCrae Street
    [Show full text]
  • Victoria Rural Addressing State Highways Adopted Segmentation & Addressing Directions
    23 0 00 00 00 00 00 00 00 00 00 MILDURA Direction of Rural Numbering 0 Victoria 00 00 Highway 00 00 00 Sturt 00 00 00 110 00 Hwy_name From To Distance Bass Highway South Gippsland Hwy @ Lang Lang South Gippsland Hwy @ Leongatha 93 Rural Addressing Bellarine Highway Latrobe Tce (Princes Hwy) @ Geelong Queenscliffe 29 Bonang Road Princes Hwy @ Orbost McKillops Rd @ Bonang 90 Bonang Road McKillops Rd @ Bonang New South Wales State Border 21 Borung Highway Calder Hwy @ Charlton Sunraysia Hwy @ Donald 42 99 State Highways Borung Highway Sunraysia Hwy @ Litchfield Borung Hwy @ Warracknabeal 42 ROBINVALE Calder Borung Highway Henty Hwy @ Warracknabeal Western Highway @ Dimboola 41 Calder Alternative Highway Calder Hwy @ Ravenswood Calder Hwy @ Marong 21 48 BOUNDARY BEND Adopted Segmentation & Addressing Directions Calder Highway Kyneton-Trentham Rd @ Kyneton McIvor Hwy @ Bendigo 65 0 Calder Highway McIvor Hwy @ Bendigo Boort-Wedderburn Rd @ Wedderburn 73 000000 000000 000000 Calder Highway Boort-Wedderburn Rd @ Wedderburn Boort-Wycheproof Rd @ Wycheproof 62 Murray MILDURA Calder Highway Boort-Wycheproof Rd @ Wycheproof Sea Lake-Swan Hill Rd @ Sea Lake 77 Calder Highway Sea Lake-Swan Hill Rd @ Sea Lake Mallee Hwy @ Ouyen 88 Calder Highway Mallee Hwy @ Ouyen Deakin Ave-Fifteenth St (Sturt Hwy) @ Mildura 99 Calder Highway Deakin Ave-Fifteenth St (Sturt Hwy) @ Mildura Murray River @ Yelta 23 Glenelg Highway Midland Hwy @ Ballarat Yalla-Y-Poora Rd @ Streatham 76 OUYEN Highway 0 0 97 000000 PIANGIL Glenelg Highway Yalla-Y-Poora Rd @ Streatham Lonsdale
    [Show full text]
  • Building a Better Victoria
    Victorian Budget 2014|15 Building a Better Victoria Budget Overview Contents 01 Budget at a glance 02 Strengthening Victoria’s finances 03 Building a stronger Victorian economy 04 State-shaping infrastructure to build a better Victoria 05 State-shaping infrastructure to build a better Victoria – Rail 08 State-shaping infrastructure to build a better Victoria – Integrating road and rail 09 State-shaping infrastructure to build a better Victoria – Road 10 Victoria’s infrastructure program 12 I nvesting in our future – Boosting skills, education and training 13 Strengthening health care and community services 14 Building a better regional Victoria 16 Building a safer Victoria The Secretary This publication makes reference to the This work, 2014-15 Budget Overview, is Department of Treasury and Finance 2014-15 Budget Paper set which includes: licensed under a Creative Commons Attribution 1 Treasury Place Budget Paper No. 1 – Treasurer’s Speech 3.0 Australia licence. You are free to re-use the work under that licence, on the condition that Melbourne Victoria, 3002 Budget Paper No. 2 – Strategy and Outlook you credit the State of Victoria (Department of Australia Budget Paper No. 3 – Service Delivery Treasury and Finance) as author and comply Telephone: +61 3 9651 5111 Budget Paper No. 4 – State Capital Program with the other licence terms. The licence does Facsimile: +61 3 9651 2062 Budget Paper No. 5 – Statement of Finances not apply to any images, photographs or Website: budget.vic.gov.au (incorporating Quarterly Financial Report No. 3) branding, including the Victorian Coat of Arms, the Victorian Government logo and the Authorised by the Victorian Government © State of Victoria 2014 Department of Treasury and Finance logo.
    [Show full text]
  • International Trade Prospectus Welcome
    INTERNATIONAL TRADE PROSPECTUS WELCOME As one of the fastest growing areas in Australia, our city represents a new frontier for business growth in Melbourne’s south east. With a population set to exceed 549,000 by 2041 and Our region is centrally located to Victoria’s major activity strong growth likely to continue well into the future, the centres, including Melbourne’s CBD, airport and ports time to invest in our City is now. via key arterial routes within our boundaries. Our City is characterised by strong population growth, These easy connections also offer easy access to the but our competitive advantages, broad growth across beauty of the neighbouring Mornington Peninsula and a range of sectors and business confidence ensure Dandenong Ranges, and the abundant resources of that we have the right mix of conditions to allow your Gippsland. business to thrive. Strong confidence in our region from both the public Given our growth, the City of Casey is committed to and private sectors attracts hundreds of millions in providing conveniences akin to those in major cities, with residential and commercial investments annually, which world-class sporting facilities and community centres presents exciting new opportunities for local businesses enjoyed by all members of the community. to leverage. Considering the region’s city conveniences, award The region’s investors also enjoy pronounced savings winning open spaces and residential estates, it is little from an abundance of affordable, well-serviced and surprise that we are forecast to grow by a further 54% ready-to-develop land, as well as Council’s commitment by 2041.
    [Show full text]
  • Brass Bands of the World a Historical Directory
    Brass Bands of the World a historical directory Kurow Haka Brass Band, New Zealand, 1901 Gavin Holman January 2019 Introduction Contents Introduction ........................................................................................................................ 6 Angola................................................................................................................................ 12 Australia – Australian Capital Territory ......................................................................... 13 Australia – New South Wales .......................................................................................... 14 Australia – Northern Territory ....................................................................................... 42 Australia – Queensland ................................................................................................... 43 Australia – South Australia ............................................................................................. 58 Australia – Tasmania ....................................................................................................... 68 Australia – Victoria .......................................................................................................... 73 Australia – Western Australia ....................................................................................... 101 Australia – other ............................................................................................................. 105 Austria ............................................................................................................................
    [Show full text]
  • The Triumph Trumpet
    TCCV GENERAL COMMITTEE President - Peter Welten Vice President - Graeme Oxley THETHE Mb 0409 511 002 Mb 0413 135 779 [email protected] [email protected] Secretary & Public Officer Treasurer - Fraser Faithfull TRIUMPHTRIUMPH - Terry Roche (03) 59662461 (03) 9877 0120 Mb 0400960029 [email protected] [email protected] TRUMPETTRUMPET Committee - Chris Burgess Committee - Colin Jenkins (03) 9775 9920 Mb 0412 484 995 Mb 0428 310 355 [email protected] [email protected] Volunteer Positions AOMC Delegates Ian Cameron Tel: (03) 9749 1341 Book , Tool Librarian, & Paul Wallace Tel: 0417 721 013 Club Regalia Officer Club Permit Secretary Syd Gallagher Tel: (03) 9772 6537 Collation Co-ordinator Terry Hickey Tel: (03) 9735 1693 Events Co-ordinator Graeme Oxley Tel: 0413 135 779 Membership Promotion John & Fay Seeley Tel: (03) 9359 2415 Membership Secretary Colin Jenkins Tel: 0412 484 995 Media Liaison Officer Terry Hickey Tel: (03) 9735 1693 August 2012 Webmaster - Col Colson Editor - Peter Truman 0417 394 302 0418 368 093 [email protected] [email protected] Monthly General MeeƟngs are held on the third Wednesday of each month except December. The Magazine of the Venue: Koornang UniƟng Church, 117 Murrumbeena Road, Murrunbeena, Vic. Melways Ref; 69A5 Triumph Car Club of Victoria Inc. on the internet; hƩp://www.tccv.net Triumph Car Club of Victoria Inc. TRIUMPH SPARES P/L Proprietors: AJ & AE Ansell 99 Hannans RD, Mandurang South P.O. Box 185, Bendigo, 3552 Victoria Ph: (03) 54 395 491 Fax: (03) 54 393 691 Mob: 0427 811 184 FULL RANGE OF NEW AND USED PARTS FOR ALL MODELS [email protected] MECHANICAL REPAIRS MEMBERSHIP INFORMATION CURRENT ADVERTISING RATES CITY - $50.00 which automatically includes voting membership for partner and non-voting membership for dependents.
    [Show full text]
  • 901 Bus Time Schedule & Line Route
    901 bus time schedule & line map 901 Frankston View In Website Mode The 901 bus line (Frankston) has 2 routes. For regular weekdays, their operation hours are: (1) Frankston: 4:47 AM - 11:50 PM (2) Melbourne Airport: 12:10 AM - 11:40 PM Use the Moovit App to ƒnd the closest 901 bus station near you and ƒnd out when is the next 901 bus arriving.
    [Show full text]
  • Proposed Redistribution of Victoria Into Electoral Divisions: April 2017
    Proposed redistribution of Victoria into electoral divisions APRIL 2018 Report of the Redistribution Committee for Victoria Commonwealth Electoral Act 1918 Feedback and enquiries Feedback on this report is welcome and should be directed to the contact officer. Contact officer National Redistributions Manager Roll Management and Community Engagement Branch Australian Electoral Commission 50 Marcus Clarke Street Canberra ACT 2600 Locked Bag 4007 Canberra ACT 2601 Telephone: 02 6271 4411 Fax: 02 6215 9999 Email: [email protected] AEC website www.aec.gov.au Accessible services Visit the AEC website for telephone interpreter services in other languages. Readers who are deaf or have a hearing or speech impairment can contact the AEC through the National Relay Service (NRS): – TTY users phone 133 677 and ask for 13 23 26 – Speak and Listen users phone 1300 555 727 and ask for 13 23 26 – Internet relay users connect to the NRS and ask for 13 23 26 ISBN: 978-1-921427-58-9 © Commonwealth of Australia 2018 © Victoria 2018 The report should be cited as Redistribution Committee for Victoria, Proposed redistribution of Victoria into electoral divisions. 18_0990 The Redistribution Committee for Victoria (the Redistribution Committee) has undertaken a proposed redistribution of Victoria. In developing the redistribution proposal, the Redistribution Committee has satisfied itself that the proposed electoral divisions meet the requirements of the Commonwealth Electoral Act 1918 (the Electoral Act). The Redistribution Committee commends its redistribution
    [Show full text]
  • Viable, Safe, Sustainable and Efficient Road Transport Industry’, My Submission Relates to the Following Items from the Terms of Reference B
    Regarding the enquiry for a ‘viable, safe, sustainable and efficient road transport industry’, my submission relates to the following items from the Terms of Reference b. the development and maintenance of road transport infrastructure to ensure a safe and efficient road transport industry; e. the social and economic impact of road-related injury, trauma and death; h. the importance of establishing a formal consultative relationship between the road transport industry and all levels of government in Australia. My concern relates specifically to VicRoads granting permits for road trains and super heavy vehicles to travel from the top end of the state; i.e. Mildura and Robinvale Victoria etc to Melbourne and to Dooen etc along roads that are not designed for these size trucks and without passing lanes for hundreds of kms.. Below I have number of questions that relate to my concerns. What about passing lanes? There are none on the Calder Highway for 350kms from nth Hattah to Ravenswood (sth Bendigo) and the 240kms from nth Hattah to Dooen/Horsham. (involving the Calder, Sunraysia and Henty Highways. What happens with vehicles travelling at different speeds? Imagine a situation where a caravan is cruising at 80km/hr, followed by a road trains at its 90km/hr, followed by B Doubles at 100km/h and then a line of cars at 100km/hr; with north of Wycheproof at 110km/h; Without passing lanes for hundreds of kms it is a terrible risk to the public. Should there be consideration to the fact that the only public transport we have involves the same roads? We do not have a rail public transport system.
    [Show full text]
  • What We Heard
    What we heard Summary Report March 2021 Sunbury Craigieburn Mernda Building Melbourne Airport Rail Epping Hume Freeway Sunbury/Bendigo Melbourne Upfield Airport A new premium station Tullamarine Freeway at Melbourne Airport The new train station at Melbourne Campbellfield Camp Rd Ring Road Airport will provideMelton Highway easy access between the train and all airport terminals. Calder Freeway Bundoora Eltham Glenroy Rd High St Glenroy Sydenham Reservoir Western Ring Road Essendon New bridge over the Maribyrnong River Airport At 383m in length and 55m high, the Plenty Rd Maribyrnong River Bridge is the second highest bridge in Victoria after the West Gate Bridge. Preston Western Freeway Murray Rd Rockbank Caroline Coburg Planning is underway for a second rail bridge Lower Plenty Rd Springs Bell St over the Maribyrnong River, to stand alongside Main Rd Rosanna the existing bridge. CityLink Essendon St Albans Moreland Rd Buckley St Furlong Rd Ballarat St Georges Rd Brunswick Sunshine Station Brunswick Rd Albion Deer Park Sunshine Station will become a key Alphington Doncaster interchange for Melbourne Airport Rail Sunshine Melbourne services, connecting to growth areas in Grange Rd Balwyn Springvale Rd Melbourne’s north and west, and regional Arden Parkville Eastern Freeway Victoria. City State Library Kew Whitehorse Rd Box Hill Geelong CBD Town Hall West Gate Freeway Richmond Canterbury Rd Blackburn CityLink Heatherdale Rd Heatherdale Direct access from Port Melbourne Melbourne’s south-east Anzac Toorak Rd The Cranbourne / Pakenham lines
    [Show full text]