Air Force KC-46A Pegasus Tanker Aircraft Program

Total Page:16

File Type:pdf, Size:1020Kb

Air Force KC-46A Pegasus Tanker Aircraft Program Air Force KC-46A Pegasus Tanker Aircraft Program Updated April 21, 2020 Congressional Research Service https://crsreports.congress.gov RL34398 Air Force KC-46A Pegasus Tanker Aircraft Program Summary On February 24, 2011, the Department of Defense (DOD) announced the Boeing Company as the winner of a competition to build 179 new KC-46A aerial refueling tankers for the Air Force, a contract valued at roughly $35 billion. Prior to the announcement, the program had been known as KC-X. The first four KC-46s were delivered in January 2019. The KC-46A acquisition program is a subject of congressional interest because of the dollar value of the contract, the number of jobs it would create, the importance of tanker aircraft to U.S. military operations, and because previous attempts to acquire a new tanker since 2001 had ultimately failed. It has also attracted attention due to cost growth, schedule delays, and other issues with program execution. DOD’s KC-46A acquisition strategy poses potential oversight issues for Congress, including What alternatives does the Air Force have to extend KC-135 service life or cope in other ways with the KC-46 delays? What are the effects of budget cuts on executability of the KC-46A program? Do contracts that place cost risk on contractors create positive incentives for performance? FY2020 defense authorization bill: The explanatory statement accompanying S. 1790 recommended $2.199 billion for the KC-46A program, $36.0 million less than the Administration’s request. FY2020 defense appropriations bill: The Joint Explanatory Statement of the Committee of Conference on S. 2474 approved $2.14 billion for the KC-46A program, a decrease of $94.8 million from the Administration’s request. The Administration requested $2.85 billion in procurement funding for the KC-46 in FY2021. FY2021 defense authorization and appropriations bills were in progress as of the date of this report. Congressional Research Service Air Force KC-46A Pegasus Tanker Aircraft Program Contents Introduction ..................................................................................................................................... 1 Recent Developments ...................................................................................................................... 2 Initial Deliveries ........................................................................................................................ 2 Ongoing Technical Issues .......................................................................................................... 2 Refueling Boom and Remote Vision System ...................................................................... 2 Leaking Fuel System........................................................................................................... 3 Load Floor ........................................................................................................................... 3 Foreign Debris Contamination ............................................................................................ 3 Financial Consequences ...................................................................................................... 4 Alternative tanking capability ............................................................................................. 4 Background ..................................................................................................................................... 4 Air Force Refueling Tankers ..................................................................................................... 4 Roles and Missions ............................................................................................................. 4 Current Tanker Fleet ........................................................................................................... 4 KC-46A Program Basics ........................................................................................................... 7 Numbers of Aircraft ............................................................................................................ 7 Acquisition Cost ................................................................................................................. 8 Contract Structure ............................................................................................................... 8 Program Schedule ............................................................................................................... 8 Basing ........................................................................................................................................ 9 Foreign Interest in Acquiring KC-46As .................................................................................... 9 Statements on KC-X Priority .................................................................................................. 10 Industrial Base ......................................................................................................................... 10 Asserted Employment Effects ........................................................................................... 10 Acquisition Strategy and Draft RFP......................................................................................... 11 Response to the Draft RFP ................................................................................................ 12 Final RFP .......................................................................................................................... 13 Legislative Activity for 2020 ......................................................................................................... 14 FY2020 Funding Request ....................................................................................................... 14 FY2020 Defense Authorization Act (H.R. 2500/S. 1790) ....................................................... 14 House ................................................................................................................................ 14 Senate ................................................................................................................................ 15 Final Action ....................................................................................................................... 15 FY2020 Defense Appropriations Act (H.R. 2968/S. 2474) ..................................................... 15 House ................................................................................................................................ 15 Senate ................................................................................................................................ 15 Final Action ....................................................................................................................... 16 Figures Figure 1. KC-46A Pegasus .............................................................................................................. 1 Figure 2. KC-135 Stratotanker ........................................................................................................ 6 Figure 3. KC-10 Extender ............................................................................................................... 7 Congressional Research Service Air Force KC-46A Pegasus Tanker Aircraft Program Tables Table 1. KC-46 LRIP Lots ............................................................................................................... 9 Table 2. Major Differences Between KC-X Draft RFP and Final Document ............................... 13 Appendixes Appendix A. Potential Longevity of KC-135 Fleet ....................................................................... 17 Contacts Author Information ........................................................................................................................ 18 Congressional Research Service Air Force KC-46A Pegasus Tanker Aircraft Program Introduction Figure 1. KC-46A Pegasus Source: U.S. Air Force photo by Master Sgt. Michael Jackson. Note: Shown with F-15E Strike Eagle above Edwards AFB, CA. On February 24, 2011, the Department of Defense (DOD) announced the Boeing Company as the winner of a competition to build 179 new KC-46A aerial refueling tankers for the Air Force, a contract valued at roughly $35 billion. These KC-46As, to be procured at a maximum rate of 15 aircraft per year, are to replace roughly one-third of the Air Force’s aging fleet of KC-135 aerial refueling tankers. The Air Force and the U.S. Transportation Command state that replacing the KC-135s is their highest recapitalization priority. The Administration’s proposed FY2021 defense budget requested $2.85 billion in Air Force procurement funding to continue KC-46A acquisition. The KC-46A acquisition program is a subject of interest because of the dollar value of the contract, the number of jobs it may create, the importance of tanker aircraft to U.S. military operations, and because previous attempts by DOD to move ahead with a KC-X acquisition program over the last several years have led to controversy and ultimately failed. The history of those earlier attempts forms an important part of the context for DOD’s KC-X competition, particularly in defining the required capabilities for the KC-46A and designing and conducting a fair and transparent competition. Further, the Air Force has recently changed its acquisition objective for the KC-46 program and its plan for the future composition of the tanker fleet.
Recommended publications
  • Home at Airbus
    Journal of Aircraft and Spacecraft Technology Original Research Paper Home at Airbus 1Relly Victoria Virgil Petrescu, 2Raffaella Aversa, 3Bilal Akash, 4Juan M. Corchado, 2Antonio Apicella and 1Florian Ion Tiberiu Petrescu 1ARoTMM-IFToMM, Bucharest Polytechnic University, Bucharest, (CE), Romania 2Advanced Material Lab, Department of Architecture and Industrial Design, Second University of Naples, 81031 Aversa (CE), Italy 3Dean of School of Graduate Studies and Research, American University of Ras Al Khaimah, UAE 4University of Salamanca, Spain Article history Abstract: Airbus Commerci al aircraft, known as Airbus, is a European Received: 16-04-2017 aeronautics manufacturer with headquarters in Blagnac, in the suburbs of Revised: 18-04-2017 Toulouse, France. The company, which is 100% -owned by the industrial Accepted: 04-07-2017 group of the same name, manufactures more than half of the airliners produced in the world and is Boeing's main competitor. Airbus was Corresponding Author: founded as a consortium by European manufacturers in the late 1960s. Florian Ion Tiberiu Petrescu Airbus Industry became a SAS (simplified joint-stock company) in 2001, a ARoTMM-IFToMM, Bucharest subsidiary of EADS renamed Airbus Group in 2014 and Airbus in 2017. Polytechnic University, Bucharest, (CE) Romania BAE Systems 20% of Airbus between 2001 and 2006. In 2010, 62,751 Email: [email protected] people are employed at 18 Airbus sites in France, Germany, the United Kingdom, Belgium (SABCA) and Spain. Even if parts of Airbus aircraft are essentially made in Europe some come from all over the world. But the final assembly lines are in Toulouse (France), Hamburg (Germany), Seville (Spain), Tianjin (China) and Mobile (United States).
    [Show full text]
  • From the Line in the Sand: Accounts of USAF Company Grade Officers In
    ~~may-='11 From The Line In The Sand Accounts of USAF Company Grade Officers Support of 1 " 1 " edited by gi Squadron 1 fficer School Air University Press 4/ Alabama 6" March 1994 Library of Congress Cataloging-in-Publication Data From the line in the sand : accounts of USAF company grade officers in support of Desert Shield/Desert Storm / edited by Michael P. Vriesenga. p. cm. Includes index. 1. Persian Gulf War, 1991-Aerial operations, American . 2. Persian Gulf War, 1991- Personai narratives . 3. United States . Air Force-History-Persian Gulf War, 1991 . I. Vriesenga, Michael P., 1957- DS79 .724.U6F735 1994 94-1322 959.7044'248-dc20 CIP ISBN 1-58566-012-4 First Printing March 1994 Second Printing September 1999 Third Printing March 2001 Disclaimer This publication was produced in the Department of Defense school environment in the interest of academic freedom and the advancement of national defense-related concepts . The views expressed in this publication are those of the authors and do not reflect the official policy or position of the Department of Defense or the United States government. This publication hasbeen reviewed by security andpolicy review authorities and is clearedforpublic release. For Sale by the Superintendent of Documents US Government Printing Office Washington, D.C . 20402 ii 9&1 gook L ar-dicat£a to com#an9 9zacL orflcF-T 1, #ait, /2ZE4Ent, and, E9.#ECLaL6, TatUlLE. -ZEa¢ra anJ9~ 0 .( THIS PAGE INTENTIONALLY LEFT BLANK Contents Essay Page DISCLAIMER .... ... ... .... .... .. ii FOREWORD ...... ..... .. .... .. xi ABOUT THE EDITOR . ..... .. .... xiii ACKNOWLEDGMENTS . ..... .. .... xv INTRODUCTION .... ..... .. .. ... xvii SUPPORT OFFICERS 1 Madzuma, Michael D., and Buoniconti, Michael A.
    [Show full text]
  • Gallery of USAF Weapons Note: Inventory Numbers Are Total Active Inventory figures As of Sept
    Gallery of USAF Weapons Note: Inventory numbers are total active inventory figures as of Sept. 30, 2014. By Aaron M. U. Church, Associate Editor I 2015 USAF Almanac BOMBER AIRCRAFT flight controls actuate trailing edge surfaces that combine aileron, elevator, and rudder functions. New EHF satcom and high-speed computer upgrade B-1 Lancer recently entered full production. Both are part of the Defensive Management Brief: A long-range bomber capable of penetrating enemy defenses and System-Modernization (DMS-M). Efforts are underway to develop a new VLF delivering the largest weapon load of any aircraft in the inventory. receiver for alternative comms. Weapons integration includes the improved COMMENTARY GBU-57 Massive Ordnance Penetrator and JASSM-ER and future weapons The B-1A was initially proposed as replacement for the B-52, and four pro- such as GBU-53 SDB II, GBU-56 Laser JDAM, JDAM-5000, and LRSO. Flex- totypes were developed and tested in 1970s before program cancellation in ible Strike Package mods will feed GPS data to the weapons bays to allow 1977. The program was revived in 1981 as B-1B. The vastly upgraded aircraft weapons to be guided before release, to thwart jamming. It also will move added 74,000 lb of usable payload, improved radar, and reduced radar cross stores management to a new integrated processor. Phase 2 will allow nuclear section, but cut maximum speed to Mach 1.2. The B-1B first saw combat in and conventional weapons to be carried simultaneously to increase flexibility. Iraq during Desert Fox in December 1998.
    [Show full text]
  • R&T Activities on Composite Structures
    PUBLIC RELEASE R&T activities on composite structures for existing and future military A/C platforms at Airbus DS, Military Aircraft Mircea Calomfirescu, Rainer Neumaier, Thomas Körwien, Kay Dittrich Airbus Defence and Space GmbH Rechliner Str. 1 85077 Manching GERMANY [email protected] ABSTRACT This paper gives a short overview on the state of the art in composite aerostructures for civil and military aircraft. Major challenges are highlighted in this context and the requirements from military aircraft point of view are illustrated, derived from existing and future military aircraft perspectives. The main objective of the paper is to present the R&T activities in the aerostructure research program called FFS, advanced aerostructures. The activities range here from structural bonding, advanced radomes, new thermoplastic composite technologies and new materials and structures for low observability purposes. A brief insight is given to each of the topic highlighting the challenges and approaches, finishing with a summary of future trends and emerging technologies. 1.0 INTRODUCTION Composites offer several advantages over metallic aerostructures in civil as well as in military aircraft industry including reduced weight, less maintenance effort and costs due to “corrosion-free” composites and a superior fatigue behaviour compared to aluminium. The thermal expansion is much less and the material waste (“buy to fly ratio”) is more advantageous compared to aluminium structures. However, these advantages come along with higher material and manufacturing costs. For the prepreg technology for example the material has to be stored at -18°C, energy and investment intensive autoclaves are necessary and for quality assurance 100% non-destructive testing (NDT) is required in contrast to aluminium structures.
    [Show full text]
  • Kc-10A, T/N 83-0080 9Th Air Refueling Squadron 60Th Air Mobility Wing Travis Air Force Base, California
    UNITED STATES AIR FORCE AIRCRAFT ACCIDENT INVESTIGATION BOARD REPORT KC-10A, T/N 83-0080 9TH AIR REFUELING SQUADRON 60TH AIR MOBILITY WING TRAVIS AIR FORCE BASE, CALIFORNIA LOCATION: NEAR MOUNTAIN HOME AFB, IDAHO DATE OF ACCIDENT: 1 NOVEMBER 2016 BOARD PRESIDENT: COL PERRY M. LONG III Conducted IAW Air Force Instruction 51-503 ACTION OF THE CONVENING AUTHORITY 1 0 JUL 2117 The report of the accident investigation board, conducted under the provisions of AFI 51-503, that investigated the 1 November 2016 mishap that occurred near Mountain Home Air Force Base, Idaho, involving KC-10A, T/N 83-0080, assigned to the 60th Air Mobility Wing, Travis Air Force Base, California, complies with applicable regulatory and statutory guidance and on that basis is approved. \\signed\\ fHOMA^J; Major General, U| Vice Commander United States Air Force Accident Investigation Board Report Class A Mishap, Near Mountain Home AFB, ID EXECUTIVE SUMMARY UNITED STATES AIR FORCE AIRCRAFT ACCIDENT INVESTIGATION KC-10A, T/N 83-0080 NEAR MOUNTAIN HOME AFB, IDAHO 1 NOVEMBER 2016 On 1 November 2016, at 1546 hours Zulu time (Z), a United States Air Force KC-10A Extender, tail number 83-0080, the mishap aircraft, assigned to the 60th Air Mobility Wing, departed from its home station of Travis Air Force Base (AFB), California, on a training mission in support of two flights of F-15s and a C-17. The scheduled flight profile was a formation departure from Travis AFB, refueling for approximately one hour with the F-15s, refueling training for approximately 1 hour 15 minutes with the C-17, and approximately one half hour of approach training before landing at Travis AFB.
    [Show full text]
  • Voices from an Old Warrior Why KC-135 Safety Matters
    Voices from an Old Warrior Why KC-135 Safety Matters Foreword by General Paul Selva GALLEON’S LAP PUBLISHING ND 2 EDITION, FIRST PRINTING i Hoctor, Christopher J. B. 1961- Voices from an Old Warrior: Why KC-135 Safety Matters Includes bibliographic references. 1. Military art and science--safety, history 2. Military history 3. Aviation--history 2nd Edition – First Printing January 2014 1st Edition (digital only) December 2013 Printed on the ©Espresso Book Machine, Mizzou Bookstore, Mizzou Publishing, University of Missouri, 911 E. Rollins Columbia, MO 65211, http://www.themizzoustore.com/t-Mizzou-Media-About.aspx Copyright MMXIII Galleon's Lap O'Fallon, IL [email protected] Printer's disclaimer Opinions, conclusions, and recommendations expressed or implied within are solely those of the author. They do not represent the opinions of Mizzou Publishing, or the University of Missouri. Publisher's disclaimer, rights, copying, reprinting, etc Opinions, conclusions, and recommendations expressed or implied within are solely those of the author, except where cited otherwise. They do not represent any U.S. Govt department or agency. This book may be copied or quoted without further permission for non-profit personal use, Air Force safety training, or academic research, with credit to the author and Galleon's Lap. To copy/reprint for any other purpose will require permission. Author's disclaimers Sources can be conflicting, especially initial newspaper reports compared to official information released to the public later. Some names may have a spelling error and I apologize for that. I changed many of the name spellings because I occasionally found more definitive sources written by family members.
    [Show full text]
  • Air-To-Air Refuelling Flight Plan an Assessment
    February 2 011 Air-to-Air Refuelling Flight Plan An Assessment Joint Air Power Competence Centre von-Seydlitz-Kaserne Römerstraße 140 | 47546 Kalkar (Germany) | www.japcc.org Joint Air Power Competence Centre Title picture © Armée de l’Air Queries and comments on this document should be directed to the Branch Head, Combat Support Branch, JAPCC, von-Seydlitz-Kaserne, Römerstraße 140, D-47546 Kalkar. Please visit our website www.japcc.org for the latest information on JAPCC, or email us at [email protected]. Releasable to the Public Disclaimer: This is a Joint Air Power Competence Centre (JAPCC) assessment of NATO AAR capabilities. The JAPCC is a Centre of Excellence established to provide NATO with a source of independent insight, advice and innovation on Air and Space Power. The views expressed herein do not represent official positions or policies of NATO or any of its member nations. Denotes images digitally manipulated FROM: The Executive Director of the Joint Air Power Competence Centre (JAPCC) SUBJECT: Air-to-Air Refuelling Flight Plan – An Assessment Joint Air Power Competence Centre DISTRIBUTION: Centre de Compétence All NATO Military and Civilian Structures, NATO Nations and Relevant Organisations – de la Puissance Releasable to the Public Aérienne Interarmées von-Seydlitz-Kaserne Römerstraße 140 47546 Kalkar I am pleased to release the “Air-to-Air Refuelling Flight Plan” document, comprising an overall Germany/Allemagne assessment of current Air-to-Air Refuelling (AAR) capabilities within NATO and building a joint www.japcc.org perspective inside future requirements and development. This Flight Plan is part of a more ambitious project titled “Enhancing NATO AAR Interoperability,” which has been in develop - TEL +49 2824 90 2200 NCN +234 or 239 2200 ment since 2004 and aims to better utilise a limited resource – in this case AAR capability – FAX +49 2824 90 2274 providing formal guidance on interoperability and standardisation issues.
    [Show full text]
  • Boom Operator's Coin/Card Rules
    Fellow Boom Operators, Thank you for making 2018 another outstanding year. Continually, anyone with a background in tankers can see how busy we are by watching the news. Booms around the world provided POTUS support, disaster relief, refueled conflicts in the Middle East, and executed countless coronets, AE missions, and hours of alert. At home, we stayed busy focusing on technical skills such as MITO, chemical defense operations, cargo loading, and integrated missions. Despite this, we continued to develop professionally and personally. The cover of this year’s edition features a photograph from the first KC-46 delivery ceremony at McConnell AFB. Though it occurred this year on 25 January 2019, it wouldn’t have been possible without professionals everywhere completing testing, writing guidance, conducting training, and getting the airfield ready. The work of the last few years brought us the Pegasus in 2019. As we look to the future, we’ll no doubt see continued changes. Though some of these initiatives may change, cancel, or return, I know our career field is always ready and tackles challenges when required. Thank you for serving our great nation, answering the call of duty, and taking care of the Airman to your left and your right. As always, no one kicks ass without tanker gas! //Signed// CHRISTOPHER M. RUECKERT, CMSgt, USAF AMC 1A0 Functional Manager Scott AFB, IL DSN 779-3582 The Boom Signal Dedication Table of Contents Tanker Unit Locations Disclaimer Entries Altus AFB Bangor ANGB Edwards AFB Fairchild AFB Forbes Field ANGB Gen Billy Mitchell ANGB Joint Base McGuire-Dix-Lakehurst Kadena AB MacDill AFB McConnell AFB Pease ANGB RAF Mildenhall Ramstein AFB Scott AFB Seymour-Johnson AFB Tinker AFB Travis AFB Tyndall AFB Appendix Boom Operator Coin & Card Rules SMSgt Albert L.
    [Show full text]
  • Airbus Group
    Defense & Aerospace Companies, Volume II - International Airbus Group Outlook · In March 2015, Airbus Group initiated a second divestment of its shares in Dassault Aviation · Airbus Group is riding the boom in the commercial aircraft market that has fueled a record backlog of EUR857 billion · Airbus D&S is being restructured via mergers and divestments; some 5,000 jobs will be eliminated, primarily in Europe · The company has consolidated its focus in India in hopes of winning upcoming contracts Headquarters Airbus Group SE In mid-2013, following a failed merger attempt with 4, rue du Groupe d'Or BAE Systems, EADS's ownership structure was BP 90112 drastically altered as shareholders changed a Franco- 31703 – Blagnac Cedex, France German ownership pact in favor of greater management Telephone: + 33 0 5 81 31 75 00 freedom. Under the plan, France and Germany now Website: http://www.airbus-group.com hold core stakes of 12 percent each, Spain holds 4 percent, and the rest is floated freely to investors. In 2014, the European Aeronautic Defence and Space Prior to the changes, the triumvirate of nations held over Company (EADS) rebranded itself as Airbus Group, 50 percent of the firm. As part of the changes, France after its largest operation. agreed to give up veto powers over the company's Originally, EADS was formed through Europe's post- industrial policy. Cold War consolidation efforts. At the time of its At the start of 2015, Airbus Group employed about formation in 2000, EADS comprised the activities of the 138,622 people around the world. founding partners Aerospatiale Matra SA of France, Construcciones Aeronáuticas SA (CASA) of Spain, and Note: For details on Airbus Group's major subsidiaries, DaimlerChrysler Aerospace AG (DASA) of Germany.
    [Show full text]
  • Norwegian Defence and Security Industries Association Giving Your Capability the Edge
    6/2018 NORWEGIAN DEFENCE And SECURITY IndUSTRIES AssOCIATION Giving your capability the edge. Contribution to situational awareness Support for surfacing decision Proven ESM system combining the advantages of R-ESM and C-ESM Learn more at saab.no © thyssenkrupp Marine Systems Saab_0249_Submarine_annons_210x297.indd 1 2019-01-11 08:47 CONTENTS CONTENTS: SIXT-GENERATION FIGHTER Editor-in-Chief: 2 The sixth-generation fighter fight M.Sc. Bjørn Domaas Josefsen MAL RPAS 6 A key project for European autonomy 6TH GENERATION FIGHTERS: KNM HELGE INGSTAD EUROPE LOSES AGAIN? 8 KNM Helge Ingstad ready to be raised Several countries are already at work with programmes for the development FSi of the next generation of fighter aircraft, planned to enteroperational 9 Norwegian Defence and service after 2040. Security industries association In Europe, France and Germany have indicated that they will collaborate on a fighter plane for the future. At the same time, Great FIGHTER FOR FINLAND Britain is being kept out of the French-German programme. 14 Finland to choose fighter planes in 2021 The European nations have a long and colourful, if not very successful, story on the joint development of fighter aircraft. The airplanes that have GRIPEN come out of European development have been really excellent aircraft as 16 Gripen for the Philippines? such, but the economics of the projects have let the side down. The joint European projects have been suffering from each participating nation’s interests taking precedence over the overall picture, leading to increased BULLETIN BOARD FOR DEFENCE, costs. The tangible results are that European fighters like the Tornado INDUSTRY AND TRADE and Eurofighter have hardly been sold outside the partnering nations 17 Poland; New Fighter Aircraft Programme Accelerates themselves, while the US competition like the F-5, F-16, F-18, and more 19 F-16 fighter jets for Slovakia recently the F-35 Eagle, can point to an extensive list of export customers.
    [Show full text]
  • July 2021 Newsletter
    ARSAG INTERNATIONAL Aerial Refueling Systems Advisory Group NEWSLETTER J ULY 2021 From the desk of the Chairman We are pleased to announce that the 14 – 16 September ARSAG Workshop / Meeting of the Joint Standardization Board (JSB) for Aerial Refueling Systems will be held as planned in Dayton, Ohio. Around the globe, meetings, family gatherings, social, business, sports and entertainment events are returning to normal in varying degrees. ARSAG’s September Workshop / JSB meeting will be a part of that trend toward “business as usual”. ARSAG Workshops / JSB meeting welcomes about eighty military/government and industry representatives of NATO nations plus Australia. Attendees meet in seven Working Groups at individual table settings, developing the vital ARSAG documents that become critical sources of technical and operational information for allied aerial refueling nations. Many of the Working Groups have continued to develop their documents through virtual meetings, and they are to be commended; nevertheless, those remote meetings cannot replace the momentum and essential networking of face-to-face meetings. We encourage you to attend the September meeting. We expect the ARSAG calendar of events to continue on schedule, and particularly look forward to seeing you at the ARSAG Annual Meeting in San Diego in April of 2022. John B. Sams, Jr., Lieutenant General USAF, Ret. ARSAG Chairman and Chief Executive Officer Registration for 14 – 16 September 2021 ARSAG Workshop / Joint Standardization Board (JSB) for Aerial Refueling Systems Meeting Register for the 14 – 16 September ARSAG Workshop / JSB meeting on the ARSAG website at: www.arsaginc.com A hotel room reservation link for the meeting site, the Holiday Inn I675 Dayton (Fairborn) Ohio, is available on the ARSAG website.
    [Show full text]
  • Conceptual Design of a Passenger Aircraft for In-Flight Refueling
    Master of Science Thesis Conceptual design of a passenger aircraft for in-flight refueling operations P.P.M. van der Linden B.Sc. 5 July 2013 Faculty of Aerospace Engineering ¤ Delft University of Technology Conceptual design of a passenger aircraft for in-flight refueling operations Master of Science Thesis For obtaining the degree of Master of Science in Aerospace Engineering at Delft University of Technology P.P.M. van der Linden B.Sc. 5 July 2013 Faculty of Aerospace Engineering ¤ Delft University of Technology Delft University of Technology Copyright c P.P.M. van der Linden B.Sc. All rights reserved. Delft University Of Technology Department Of Design, Integration and Operations of Aircraft and Rotorcraft The undersigned hereby certify that they have read and recommend to the Faculty of Aerospace Engineering for acceptance a thesis entitled \Conceptual design of a passenger aircraft for in-flight refueling operations" by P.P.M. van der Linden B.Sc. in partial fulfillment of the requirements for the degree of Master of Science. Dated: 5 July 2013 Head of department: Prof.Dr.-Ing. G. Eitelberg Supervisor: Dr.ir. G. La Rocca Reader: Dipl.-Ing. S. Zajac Reader: Mo Li M.Sc. Summary Nowadays a big challenge in aviation is represented by the scarcity of fossil fuels. Hence, there is a need for a more fuel efficient air transport system. A possible innovation is a change in operating mode. Conceptual design studies showed staged flight operations to be up to 40% more fuel efficient than non-stop operations. Staged flight operation uses extra stops to split up long range missions.
    [Show full text]