OFFICE of the EXECUTIVE ENGINEER MINOR IRRIGATION DIVISION, KHARIAR No

Total Page:16

File Type:pdf, Size:1020Kb

OFFICE of the EXECUTIVE ENGINEER MINOR IRRIGATION DIVISION, KHARIAR No OFFICE OF THE EXECUTIVE ENGINEER MINOR IRRIGATION DIVISION, KHARIAR No. 2607 /EEMIDKHR/15-16 Dt..30.10.2015 GOVERNMENT OF ODISHA e-PROCUREMENT NOTICE BID IDENTIFICATION No: Online/04/EE MIDKHR/2015-16 e-mail Id : [email protected] Name of work Construction of Check Dams for the year 2015 -16 in different Blocks of Nuapada District. No. of works 35(Thirty F ive Nos ). Estimated cost: Approximately Rs. 15.97 lakhs to Rs. 39.8 6 lakhs Tender paper cost Rs. 6000 /- with VAT 5% for different work s. (Non-refundable) Period of completion 03(Three) to 04 (Four ) calendar months . Date & Time of availability of bid From 07.11 .2015 at 10 .00 Hours To 18 .11.2015 documents in the portal. up to 17.00 Hours in website. (www.tendersodisha.gov.in ) Last Date /Time for receipt of bids in the 18 .11 .201 5 up to 17.00 Hours Portal. Date of Submission of Original documents 19.11.2015 at 10.00 AM to 21.11.2015 upto 17.00 hours at Office of the Executive Engineer,M.I.Division,Khariar & O/O the S.E.K.B.K.M.I.Circle-I,Bhawanipatna Date of opening of bid documents At 11 .00A.M of 23 .11 .2015 in the O/O E.E. M.I.Division, Khariar. Date of lottery If stipulation arises the tender will be decided through transparent lottery system to be conducted in the O/O the undersigned at 11.00A.M on 28.11.2015 as per codal provision. Digital signature certificat e of Bidder The bidder must possess compatible digital signature certificate (DSC) of Class-II or Class-III. The detail tender call notice can also be seen in the DOWR website- http://dowrodisha.gov.in Name & Address of the OIT: Executive Engineer, M.I.Division, Khariar, At/PO: Khariar Dist: Nuapada PIN-766107, Ph-06671-224284 Further details can be seen from the e-Procurement market place. http://tenderodisha.gov.in Sd/- Executive Engineer M.I.Division, Khariar. ANNEXURE TO BID NOTICE Date of Approx. Bid Cost of Bid Sl. Name of the project & online Sale Class of Time for Estd. cost security @ Document No. location & receipt of contractor completion . (in lakhs) 1% in Rs. s Tender 1 2 3 4 5 6 7 8 Construction of Check dam 01. over Darlipada nalla-I near 07.11.15 to village Darlipada of Rs 6000/- 04 (Four) 18.11.15 up calendar months Kendumunda G.P in 30.83 31000/- + VAT 5% “C” & “B” to 17.00hrs Sinapali Block of Nuapada District 2015-16 Construction of Check dam over Dhangrital nalla-I 04 (Four) 02. near village Dhangrital of Rs 6000/- 07.11.15 to calendar months Ghatmal G.P in Sinapali 29.19 29500/- + VAT 5% 18.11.15 up “C” & “B” Block of Nuapada District to 17.00hrs 2015-16 Construction of Check dam over Tileipalana Nalla-I 03. 07.11.15 to 04 (Four) near village Tileipalana of Rs 6000/- calendar months Ghatmal G.P in Sinapali 26.83 27000/- + VAT 5% 18.11.15 up “C” & “B” Block of Nuapada District to 17.00hrs 2015-16 Construction of Check dam over Jogbhata Nalla-Inear 04 (Four) 04. Rs 6000/- 07.11.15 to village Jogbhata of Ghatmal calendar months 33.39 34000/- + VAT 5% 18.11.15 up “C” & “B” G.P in Sinapali Block of Nuapada District 2015-16 to 17.00hrs Construction of Check dam over Modosiljore nalla-I 04 (Four) 05. near village Bairagipada of Rs 6000/- 07.11.15 to calendar months Nangalbod G.P in Sinapali 31.80 32000/- + VAT 5% 18.11.15 up “C” & “B” Block of Nuapada District to 17.00hrs 2015-16 Construction of Check dam over Gadiajore Nalla-I near 04 (Four) 06. village Dhangrital of Rs 6000/- 07.11.15 to calendar months Ghatmal G.P in Sinapali 29.14 29500/- + VAT 5% 18.11.15 up “C” & “B” Block of Nuapada District to 17.00hrs 2015-16 Construction of Check dam over Tukla Nalla-I near 04 (Four) 07. Rs 6000/- 07.11.15 to village Tukla of Tukla G.P calendar months 23.96 24000/- + VAT 5% 18.11.15 up “C” & “B” in Khariar Block of Nuapada District 2015-16 to 17.00hrs Construction of Check dam over Dhadapada Nalla-I 08. 07.11.15 to 04 (Four) near village Dhadapada of Rs 6000/- calendar months Ranimunda G.P in Khariar 22.12 22500/- + VAT 5% 18.11.15 up “C” & “B” Block of Nuapada District to 17.00hrs 2015-16 Construction of Check dam Rs 6000/- over Dhadapada Nalla-II + VAT 5% “C” & “B” 04 (Four) 09. near village Dhadapada of 07.11.15 to Ranimunda G.P in Khariar 22.1 3 22500 /- 18.11.15 up calendar months Block of Nuapada District to 17.00hrs 2015-16 Construction of Check dam over Palma Nalla-III near 10. 07.11.15 to 04 (Four) village Palma of Rs 6000/- calendar months Ranimunda G.P in Khariar 28.34 28500/- + VAT 5% 18.11.15 up “C” & “B” Block of Nuapada District to 17.00hrs 2015-16 Construction of Check dam over Balipada Nalla-I near 11. 07.11.15 to 04 (Four) village Balipada of Rs 6000/- calendar months Ranimunda G.P in Khariar 25.20 25500/- + VAT 5% 18.11.15 up “C” & “B” Block of Nuapada District to 17.00hrs 2015-16 Construction of Check dam over Ghardhara Nalla-III 12. 07.11.15 to 04 (Four) near village Gardhara of Rs 6000/- calendar months Sanmaheswar G.P in 28.99 29000/- + VAT 5% 18.11.15 up “C” & “B” Khariar Block of Nuapada to 17.00hrs District 2015-16 Construction of Check dam over Rajamunda Nalla-I 04 (Four) 13. near village Rajamunda of Rs 6000/- 07.11.15 to calendar months Sanmaheswar G.P in 25.69 26000/- + VAT 5% 18.11.15 up “C” & “B” Khariar Block of Nuapada to 17.00hrs District 2015-16 Construction of Check dam over Dahimal Nalla-I near 14. 07.11.15 to 04 (Four) village Dhobei of Rs 6000/- calendar months Bhainsadhani G.P in Boden 34.96 35000/- + VAT 5% 18.11.15 up “C” & “B” Block of Nuapada District to 17.00hrs 2015-16 Construction of Check dam over Baharajore Nalla-II 15. 07.11.15 to 04 (Four) near village Sunamudi of Rs 6000/- calendar months Bairgaon G.P in Boden 30.42 31000/- + VAT 5% 18.11.15 up “C” & “B” Block of Nuapada District to 17.00hrs 2015-16 Construction of Check dam over Datoljore Nalla-II 16. 07.11.15 to 04 (Four) near village Margaon of Rs 6000/- calendar months Dumjhar G.P in Boden 37.74 38000/- + VAT 5% 18.11.15 up “C” & “B” Block of Nuapada District to 17.00hrs 2015-16 Construction of Check dam 07.11.15 to over Latiama Nalla-I near 18.11.15 up 17. village Sunamudi of Rs 6000/- 04 (Four) to 17.00hrs calendar months Bairgaon G.P in Boden 24.97 25000/- + VAT 5% “C” & “B” Block of Nuapada District 2015-16 Construction of Check dam 18. over Pilakachha Nalla-I 07.11.15 to 04 (Four) calendar months near village Analabhata of Rs 6000/- 18.11.15 up Litisargi G.P in Boden 29.96 30000/- + VAT 5% to 17.00hrs “C” & “B” Block of Nuapada District 2015-16 Construction of Check dam over Tentulikhunti Nalla-I 19. 07.11.15 to 04 (Four) near village Kotagaon of Rs 6000/- calendar months Bhainsadhani G.P in Boden 39.86 40000/- + VAT 5% 18.11.15 up “C” & “B” Block of Nuapada District to 17.00hrs 2015-16 Construction of Check dam over Katapada nalla-II near 20. 07.11.15 to 04 (Four) village Banjibahal of Rs 6000/- calendar months Khaira G.P in Boden Block 31.97 32000/- + VAT 5% 18.11.15 up “C” & “B” of Nuapada District 2015- to 17.00hrs 16 Construction of Check dam over Dhakadiadhar Nalla-I 21. 07.11.15 to 04 (Four) near village chikalchuan of Rs 6000/- calendar months Bairgaon G.P in Boden 32.97 33000/- + VAT 5% 18.11.15 up “C” & “B” Block of Nuapada District to 17.00hrs 2015-16 Construction of Check dam over Barpada Nalla near 04 (Four) 22. Rs 6000/- 07.11.15 to village Barpada of Tanwat calendar months 20.84 21000/- + VAT 5% 18.11.15 up “C” & “B” G.P in Nuapada Block of Nuapada District 2015-16 to 17.00hrs Construction of Check dam over Gidhini Nalla near 03 (Three) 23. Rs 6000/- 07.11.15 to village Gidhini of Tanwat calendar months 19.14 19500/- + VAT 5% 18.11.15 up “D” & “C” G.P in Nuapada Block of Nuapada District 2015-16 to 17.00hrs Construction of Check dam over Pandripani Nalla-II 24. 07.11.15 to 03 (Three) near village Pandripani of Rs 6000/- calendar months Chullabhat G.P in Nuapada 15.97 16000/- + VAT 5% 18.11.15 up “D” & “C” Block of Nuapada District to 17.00hrs 2015-16 Construction of Check dam over Kermeli Nalla near 03 (Three) 25. Rs 6000/- 07.11.15 to village Kermeli of Kermeli calendar months 18.64 19000/- + VAT 5% 18.11.15 up “D” & “C” G.P in Nuapada Block of Nuapada District 2015-16 to 17.00hrs Construction of Check dam over Junapada Nalla near 03 (Three) 26. Rs 6000/- 07.11.15 to village Junapada of Tanwat calendar months 19.92 20000/- + VAT 5% 18.11.15 up “D” & “C” G.P in Nuapada Block of Nuapada District 2015-16 to 17.00hrs Construction of Check dam over Malikmura Nalla near 04 (Four) 27.
Recommended publications
  • Annual Report 2017-18
    ANNUAL REPORT 2017-18 Address for Communication AT/Po: Bramhin pada, ward no-12 Khariar, Dist: Nuapada, Orissa, Pin: 766107 (India) Mob: 7683857858, 8249831193 (Near Dadhibaman temple) ANNUAL REPORT 2017-18 DIRECTOR’S NOTE In this Annual Report for the year 2017-2018 contains summary of activities carried out during the year by the AYAUSKAM. While our core activities are centered on health and Nutrition, Governance, livelihood and improvement of socio-economic status of women in community, The report presented in the ensuing pages will give an idea of progress made during the year. We have try to share our experiences and learning during organizing the activities in this report. In addition, THE AYAUSKAM has had a satisfying year in promoting massage across all sections of citizen involved in social change at the level of planning, implementation and monitoring with active community mobilization. I would like to gratefully acknowledge valuable help and cooperation received in ample measure from community, patron organizations, various friends and well wishers of THE AYAUSKAM and staffs of THE AYAUSKAM for their efforts and hard work. Dr. Ajit Kumar Panda Director 2 ANNUAL REPORT 2017-18 ORGANIZATION AT A GLANCE 1. Name of the Organization : THE AYAUSKAM 2. Registered Office : Gandabahali Dist: Nuapada, (Orissa) Pin: 766118, Cell No: 07683857858 Administrative Office: AT/Po: Brahman Pada, Near Dadhibaman Mandir, Ward No-12, Khariar, Dist: Nuapada, Orissa, Pin: 766107 (India) Cell No: 07683857858 E-mail: ayauskam@ rediffmail.com [email protected] Website: www.ayauskam.org 3. Chief functionary Contact Person : Dr. Ajit Kumar Panda Director Cell No: 07683857858/8249831193 4.
    [Show full text]
  • Hizb Ambush in J&K Leaves Three Soldiers, Civilian Dead
    follow us: friday, february 24, 2017 Delhi City Edition thehindu.com 36 pages ț ₹10.00 facebook.com/thehindu twitter.com/the_hindu SC agrees to hear Over 61% polling in Bharti Airtel to buy Indian bowlers Nambi Narayanan’s phase 4 of Uttar Telenor's India unit keep Australia on petition in April Pradesh elections in no-cash deal a tight leash page 7 page 11 page 13 Page 15 Printed at . Chennai . Coimbatore . Bengaluru . Hyderabad . Madurai . Noida . Visakhapatnam . Thiruvananthapuram . Kochi . Vijayawada . Mangaluru . Tiruchirapalli . Kolkata . Hubballi . Mohali . Allahabad . Malappuram . Mumbai NEARBY Hizb ambush in J&K leaves BJP sweeps Maharashtra, three soldiers, civilian dead trails Sena in Mumbai Boost for Fadnavis as party wins 8 out of 10 municipalities Abhay Chautala arrested for violating orders Lt. Colonel, Major among 5 injured as militants attack Army convoy in Shopian Alok Deshpande CHANDIGARH Mumbai Punjab police on Thursday Peerzada Ashiq The Bharatiya Janata Party arrested Indian National Srinagar (BJP) continued its political Lok Dal (INLD) leaders Three soldiers were killed dominance in Maharashtra including Leader of and five others, including a with resounding electoral opposition in Haryana Lieutenant Colonel and a victories in key municipalit- Assembly Abhay Chautala Major, were injured when ies and zilla parishads across for violating prohibitory militants ambushed an Army the State. It won eight of the orders. convoy in Shopian early on 10 municipal elections that NORTH Ī PAGE 2 Thursday. One woman was were held on February 21. Modi lights into Akhilesh also killed in the crossfire. The Shiv Sena, its erstwhile for ‘donkey’ barb A Srinagar-based police ally, won in Mumbai and Bahraich (U.P.) spokesman told The Hindu Thane.
    [Show full text]
  • Annual Report : 2019-20 Lower Indra Canal Division, Khariar
    ANNUAL REPORT : 2019-20 LOWER INDRA CANAL DIVISION, KHARIAR Brief Notes on activities of the Division: Lower Indra Canal Division is at Khariar of Nuapada District and under Administrative control of the Chief Construction Engineer, Lower Indra Irrigation Project, Nuapada, Site Office, Khariar. This Division looks after the works of defunct L.I.Dam Division, Tikhali and defunct L.I.Mechanical Division, Khariar in adition to it’s own works. At present total Head works of the Lower Indra Irrigation Project such as dam, spillway, 3 Nos. of Dykes and canal networks for command area of 12515.31 Ha. are coming under Jurisdiction of this Division. The total CCA of the Project is 29900Ha. All the head works including gate work of the spillway are completed. AERIAL VIEW OF DAM & SPILLWAY H.R OF LEFT MAIN CANAL H.R OF RIGHT MAIN CANAL Total length of canal network under jurisdiction of this Division as per DPR was 237.14Km. to irrigate an ayacut of 12515.31 Ha . Out of this, construction of canal upto157.73km length is completed covering Main canal 2 Nos. 20+8.22=28.22 Km, Distributaries 4 Nos. 35.64 Km, Minors 18 Nos. 37.52Km and Sub-minors 49 Nos. 56.35 Km. Command area under balance length of canals 79.41Km is being taken up through underground pipe line (UGPL) canal system. Out of 12515.31 Ha., 7495.56 Ha. is coming under open canal network & 5019.75 Ha. by UGPL canal network. CAD & WM work for entire ayacut is simultaneously under progress with balance distribution system by UGPL canal network.
    [Show full text]
  • Office of the Executive Engineer, Minor Irrigation Division, Khariar
    GOVERNMENT OF ODISHA OFFICE OF THE EXECUTIVE ENGINEER, MINOR IRRIGATION DIVISION, KHARIAR e- Procurement Notice Bid Identification No.- 09 /EE MIDKHR/2020-21 e-mail ID : [email protected] No.-201 Dt. 28.01.2021 1 Name of the work :- Construction of civil Work under M.I.Division,Khariar. 2 No of Works :- 1 ( one) No 3 Estimated cost :- Approximately from Rs. 42.00 lakhs 4 Cost of Tender paper:- Rs. 6000/- (Non-Refundable) (Online) 5 Class of Contractor:- “B” & “A” 6 Period of completion:- 45 (Forty Five) days 7 Date and Time of availability of bid From 03.02.2021 (10.00 AM) to 09.02.2021 (5.00 PM) Documents in the portal:- 8 Last date / time of receipt of bids in 09.02.2021 (5.00 PM) the portal :- 9 Date of opening of Bid documents:- On dt. 10.02.2021 at 10.00 A.M in the Office of the Executive Engineer,M.I. Division,Khariar 10 Date of lottery (if required) 12.02.2021 at 11.00 AM 11 The detail tender call notice can also be seen in the e-procurement portal:- http://tendersodisha.gov.in 12 Digital Signature Certificate of Bidder The bidders must possess Compatible Digital . Signature Certificate (DSC) 13 Name & Address of the Officer Inviting Tender: - Executive Engineer, M.I.Division, Khariar, At/PO: Khariar Dist: Nuapada PIN-766107, Ph. No. - 06671-224284 Email ID: [email protected] Further details can be seen from the e-Procurement market place. http://tendersodisha.gov.in Sd/-28.01.2021 Executive Engineer M.I.
    [Show full text]
  • Water Smart Solution Reports by Cohort 2.0
    WATER SMART SOLUTION REPORTS BY COHORT 2.0 Partners #Water Smart Solution Final Reports by Cohort 2.0 of C4Y-IWP Water Champions Youth Fellowship Programme 2020 I The water smart solution reports presented in this publication are developed as part of the Cohort 2.0 Fellow’s deliverables under C4Y-IWP Water Champions Youth Fellowship Programme 2020. Copyright: Ideas, Innovations and Work presented in this publication belongs to the respective partner organisations - © CSE 2020; © CEEW 2020; © DA 2020; © Taru Leading Edge; © J S Water Life Co. and © WaterAid 2020 This publication also represents the opinions of the fellows of Cohort 2.0. This report does not represent the position or opinions of Centre for Youth (C4Y), India Water Partnership (IWP), WAPCOS and Department of Water Resources, River Development & Ganga Rejuvenation, Ministry of Jal Shakti, Government of India, nor of the official position of any staff members in this publication. Disclaimer All rights reserved. No part of this publication may be reproduced or utilised in any form or by any means, electronic or mechanical including photocopying or recording, or by any information storage or retrieval system without the prior permission of the fellowship partners and the respective partner organisations. #Water Smart Solution Final Reports by Cohort 2.0 of C4Y-IWP Water Champions Youth Fellowship Programme 2020 II CONTENTS 1.0 PROJECT: SHIT FLOW DIAGRAM (SFD) TO UNDERSTAND THE SANITATION STATUS OF THE LAKHIMPUR CITY BY ABHISHEK BHARTI 2 2.0 PROJECT: DECENTRALISED WASTEWATER MANAGEMENT AND LOCAL REUSE by PREETHI VASUDEVAN ........................................ 16 3.0 PROJECT: DEVELOPING SHIT FLOW DIAGRAM (SFD) TO UNDERSTAND THE SANITATION STATUS OF THE DHARAMSHALA CITY BY SAIYAMI BHARDWAJ ...................................................................................................................................................................
    [Show full text]
  • ?RUUR Er\Vd Fa 3;A Cvz D
    % ! !"#$ -./! !"#$" !" ',,'- &'()*+ '.*/ 5-#*! 7 , %&% ' *) %7( ( , ( % ( )*% +( , % % , + 8 9 + 0.%. 12 34 0 5/. $$ ## $ % &' &(%()()*+ !, R JP working president Jagat BPrakash Nadda on Monday " took over the reins of the party from Amit Shah and is faced with several tough electoral and # $ organisational challenges in the days ahead. Nadda’s first task will be to galvanise the party to take on oft-spoken, affable and low- Kejriwal-led AAP Government Skey, the newly elected BJP ! in the next month’s Delhi president Jagat Prasad Nadda is Assembly polls. The AAP is a quintessential organisation seen as a clear favourite and man who is expected to con- Nadda would require all his solidate the rapid gains the iting differences on skills to make it an even con- party has made under his pre- CCitizenship Amendment intact and remain in the test. His other challenges are decessor Amit Shah. Act (CAA) and National National Democratic Alliance Assembly elections of Bihar, He takes over at a time Register of Citizen (NRC), (NDA). West Bengal, Assam, Kerala when the BJP is witnessing vig- BJP’s old ally Shiromani Akali Incidentally, SAD leader and Tamil Nadu, all scheduled orous challenge from a united Dal (SAD) Badal, on Monday Manjinder Singh Sirsa, the sit- within one year or so. opposition in assembly elec- announced that the party will ting MLA from Rajouri Garden The reverses faced by the tions amid signs that it needs not contest Delhi Assembly Assembly constituency who party in Jharkhand and loss of to rejig its electoral strategy fol- polls. However, well placed had won on BJP symbol said, power in a big State, like lowing a string of losses in state sources in the BJP said that the “SAD and BJP have an old rela- Maharashtra, have made polls.
    [Show full text]
  • Lokaratna Volume VIII 2015 ISSN: 2347-6427
    Folklore Foundation Lokaratna Volume VIII 2015 ISSN: 2347-6427 Lokaratna Vol-VIII ff Journal of Folklore Foundation, India 1 Folklore Foundation Lokaratna Volume VIII 2015 ISSN: 2347-6427 Lokaratna Volume -VIII April, 2015 Lokaratna is a refereed e-journal of the Folklore Foundation, Bhubaneswar, Odisha in India. The purpose of the journal is to explore the rich cultural tradition of Odisha for a wider readership as well as to explore the global cultural understanding through this effort. Any scholar across the globe interested in contributing on any aspect of cultural expression, language and learning is welcome. The present volume (VIII) deals with issues related to Literature, Culture, Language and Pedagogy. The views expressed in this journal are that of the authors‘ and do not represent those of the Journal. Cover Page : Origin of the Earth from the great Cosmic Egg in Kalevala , the national epic of Finland as narrated by poet Ellias Lonnrot Inside symbols and photos: www.google.com and photo album of MKMishra Folklore Foundation Managing Trustees Dr MK Mishra, Director Trustees Sri Sukant Mishra Sri Sapan K Prusty Sri Durga Prasanna Layak Editor in Chief: Dr Mahendra K Mishra Editorial Board Dr.Anand Mahanand, English and Foreign Language University, Hyderabad, India (Executive Editor) Professor Ranjan K. Panda, Developmental Sociologist in IIT, Bombay Dr Umarani Puttuswamy, Dept of Linguistics, North Eastern Hill University, Shillong Dr.Subhendu Mund, A noted Critic and Writer on Anglo Indian literature Former Professor of English in Odisha, India Provost, (T) M C L Indigenous Professional, and Writer New York, Dr.Harekrishna Meher, Eminent Professional in Sanskrit, Formerly, G.M.
    [Show full text]
  • Managing Distress Migration and Enhancing Resilience Through Climate Appropriate Interventions Under MGNREGS in Odisha Centurion University, Bhubaneswar January 2019
    Managing Distress Migration and Enhancing Resilience through climate appropriate interventions under MGNREGS in Odisha Centurion University, Bhubaneswar January 2019 Infrastructure for Climate Resilient Growth in India (ICRG) Programme Submitted By: IPE GLOBAL LIMITED IPE Global House, B - 84, Defence Colony, New Delhi - 110 024, India www.ipeglobal.com In association with 1 Evidence Papers Bihar, Chhattisgarh, Odisha January 2019 – March 2019 Infrastructure for Climate Resilient Growth in India (ICRG) Programme Submitted By: IPE GLOBAL LIMITED IPE Global House, B - 84, Defence Colony, New Delhi - 110 024, India www.ipeglobal.com In association with 1 The Context The ICRG project has commissioned three separate studies in the project states to explore specific critical issues that have a direct/indirect link to benefits accruing from MGNREGA. The purpose is to generate evidence through primary survey and contribute to improved targeting of benefits under MGNREGA. The topics for the studies were identified in discussion with the State Governments. The study in Bihar titled “Business Modelling for Livelihoods Value Chain of Beneficiaries under ICRG programme” seeks to develop at least two value chains for livelihood strengthening of beneficiaries of the ICRG programme. These beneficiaries are those linked to the climate resilient work planning that ICRG has completed and to be implemented with funding from MGNERGA. The current study will actively explore links with the JEEVIKA (Bihar Rural Livelihoods Programme) and has been undertaken following discussions with them. JEEVIKA is supporting the study through their networks in the field. The study in Chhattisgarh titled “Impact of MGNERGA assets on Livelihoods of Vulnerable Groups – Particularly Vulnerable Tribal Groups (PVTG); Women Headed Households; Disabled; Landless and Forest Right Act Beneficiaries (FRA); in the ICRG districts” seeks to define the impact and reach of MGNREGA to the vulnerable groups.
    [Show full text]
  • Rural Connectivity
    Report of the Concurrent Evaluation study of RLTAP in KBK Districts RURAL CONNECTIVITY NABCONS Orissa Regional Office 2/1, Civic Centre, Nayapalli Bhubaneswar – 751 015 Acknowledgments NABARD Consultancy Services (NABCONS) express its sincere thanks to the Senior Officials of the Department of Planning and Coordination, Govt. of Orissa for assigning the study to NABCONS and extending necessary assistance for timely conduct of the study. The Study Team like to express their sincere thanks to all the District Collectors of KBK Districts and Departmental Heads of various Road Implementing Projects and their colleagues for sharing their valuable time and views for the successful conduct of the field studies. The team also expresses its sincere thanks to the Block Development Officers and village functionaries and the Respondents who have shared rich Information/ Data for successful completion of the study. NABCONS ORISSA Abbreviation ADAPT : Area Development Approach for Poverty Termination AIBP : Accelerated Irrigation Benefit Programme BPL : Below Poverty Line CDB : Community Development Block CSP : Centrally Sponsored Plan FR : Forest Roads GC : General Caste GoO : Government of Orissa GPR : Gram Panchayat Road GP : Gram Panchayat HPVC : High Power vented Causeway KBK : Kalahandi Bolangir Koraput LTAP : Long Term Action Plan MDR : Major District Roads NTFP : Non-Timber Forest Produce NGO : Non-Government Organisation NH : National Highway OBC : Other Backward Class ODR : Other District Roads PTG : Primitive Tribal Groups PSR : Panchayat Samiti Roads RR : Rural Roads RW : Rural Works R & B : Roads and Bridges RSVY : Rastriya Sam Vikas Yojana RLTAP : Revised Long Term Action Plan SC : Scheduled Caste ST : Scheduled Tribe SHG : Self Help Group SH : State Highway ToR : Terms of References TSP : Tribal Sub Plan VSS : Vana Samrakshana Samiti CONTENTS Page No.
    [Show full text]
  • Microcredit and Women's Empowerment: the Lokadrusti Case
    Micro Credit and Women’s Empowerment The Lokadrusti case A UNDP study February 2002 Report by Shashi Rajagopalan Contents of Report Section Subject Page PART I – INFORMATION A brief introduction 1 1 Nuapada district 1 2 Lokadrusti 2 3 Methodology 3 4 Savings and credit groups 5 5 Lokadrusti interventions supportive of SHGs 8 6 The meetings 10 PART II – ANALYSES OF INFORMATION 7 Changes in the lives of individual women 19 8 The status of SHGs within the community 25 9 Changes in the larger socio-economic environment 28 PART III – RECOMMENDATIONS 10 Increasing impact 34 PART IV – FINDINGS 11 The findings in brief 37 12 In conclusion 38 Annex 1 Format for use with individual women 39 Annex 2 Format for use at village/cluster meeting 40 Annex 3 Additional format for use at cluster meeting 41 Annex 4 Schedule of visits 41 Annex 5 Table 1: Financial overview of SHGs as on 31.03.01 42 Table 2: Loan summary of SHGs as on 31.03.01 43 Micro Credit and Women’s Empowerment The Lokadrusti case In mid 2001, the United Nations Development Programme commissioned a multi-location research study to explore the linkages between micro credit and women’s empowerment. The study was expected to explore the space available to women and used by them in their individual capacity, as a group engaged in savings and credit, and in the larger socio- economic environment. The research aimed at looking closely at 5-6 voluntary development organisations (VDOs, also known as NGOs) that had a strong micro credit programme for/with women.
    [Show full text]
  • Fluorosis and Socio-Economic Conditions of People In
    FLUOROSIS AND SOCIO-ECONOMIC CONDITIONS OF PEOPLE IN NUAPADA DISTRICT OF ODISHA, INDIA SUBHASHREE PRADHAN MAY 2013 A MASTER’S RESEARCH PAPER Submitted to the faculty of Clark University, Worcester, Massachusetts, in partial fulfillment of the requirements for the degree of Master of Science in the Department of International Development, Community and Environment And accepted on the recommendation of Barbara Goldoftas, Chief Instructor ABSTRACT FLUOROSIS AND SOCIO-ECONOMIC CONDITIONS OF PEOPLE IN NUAPADA DISTRICT OF ODISHA, INDIA SUBHASHREE PRADHAN The current study was conducted to figure out the relationship between the socio- economic conditions of respondents and fluorosis in nine fluorosis-identified villages of Nuapada district in Odisha. It was observed that 100 percent of the respondents were affected with various degree of skeletal fluorosis. Fluorosis has deteriorated the respondents’ health, thereby affecting their work productivity, income and quality of life. However, there are variations in the severity of fluorosis according to sex, age, weight, education and income and nutritional status of the respondents. It was observed that the number of fluorosis cases increased steeply with increase in age. The vulnerable age group of fluorosis was 41-50 years. Fluoride impact severity, however, negatively affected the body weight of the respondents. Similarly, in the lower income group and non-educated respondents, fluorosis was more vividly seen. It was interesting to note that educated and aware people were willing to pay for obtaining clean water. According to the respondents, fluorosis prevented them for performing strenuous physical activities such as farming and working as wage laborers. There is an urgency of provision of safe drinking water in the study area.
    [Show full text]
  • Pada in Odisha
    1 ! ! ! ! 2 ! ! Nfttbhf!gspn!uif!Fyfdvujwf!Ejsfdups! ! In the year 2019-20 we decided to focus on forest rights and its utilization. Having individual and community rights over the resources provides motivation and induces security. In this year we have facilitated 250 CR and CFR rights, and in the coming year we are working towards scaling the process up in 3000 villages. We have begun facilitating CFR management plans to enhance land use and promote livelihoods. This will help in conserving and maintaining the forests. The conservation of RET species, and watershed development initiatives are an indication. We have also renewed our focus on NTFP collection and trade, and seek to have community rights in this regard in all the tribal districts of Odisha. We initiated and created history with deregulation of Kendu leaves in Kalahandi district that has renewed interest and enhanced income of the villagers. On the sustainable livelihoods front we have demonstrated the power of agro-forestry in Rayagada, Kalahandi, Balangir and Nabarangpur districts. The tribal populations have realized the potential of their ancestral knowledge and are engaged in reviving their traditional organic methods. They have diversified their approach and produce and have started moving away from mono cropping and cash crops. Working with the Odisha Millets Mission, OTELP and the FADP has immensely helped RCDC fulfill its objectives at 3 promoting agricultural livelihoods and ensuring nutrition to the communities it serves. RCDC has since long been combating the fluoride menace in the fluoride affected district of Nuapada in Odisha. Advocacy in this regard has paid off and the State Government has introduced mega pipe water schemes in most of the affected villages.
    [Show full text]