OFFICE OF THE EXECUTIVE ENGINEER MINOR IRRIGATION DIVISION, KHARIAR No. 2607 /EEMIDKHR/15-16 Dt..30.10.2015 GOVERNMENT OF ODISHA e-PROCUREMENT NOTICE BID IDENTIFICATION No: Online/04/EE MIDKHR/2015-16 e-mail Id : [email protected] Name of work Construction of Check Dams for the year 2015 -16 in different Blocks of Nuapada District. No. of works 35(Thirty F ive Nos ). Estimated cost: Approximately Rs. 15.97 lakhs to Rs. 39.8 6 lakhs Tender paper cost Rs. 6000 /- with VAT 5% for different work s. (Non-refundable) Period of completion 03(Three) to 04 (Four ) calendar months . Date & Time of availability of bid From 07.11 .2015 at 10 .00 Hours To 18 .11.2015 documents in the portal. up to 17.00 Hours in website. (www.tendersodisha.gov.in ) Last Date /Time for receipt of bids in the 18 .11 .201 5 up to 17.00 Hours Portal. Date of Submission of Original documents 19.11.2015 at 10.00 AM to 21.11.2015 upto 17.00 hours at Office of the Executive Engineer,M.I.Division,Khariar & O/O the S.E.K.B.K.M.I.Circle-I,Bhawanipatna Date of opening of bid documents At 11 .00A.M of 23 .11 .2015 in the O/O E.E. M.I.Division, Khariar. Date of lottery If stipulation arises the tender will be decided through transparent lottery system to be conducted in the O/O the undersigned at 11.00A.M on 28.11.2015 as per codal provision. Digital signature certificat e of Bidder The bidder must possess compatible digital signature certificate (DSC) of Class-II or Class-III. The detail tender call notice can also be seen in the DOWR website- http://dowrodisha.gov.in Name & Address of the OIT: Executive Engineer, M.I.Division, Khariar, At/PO: Khariar Dist: Nuapada PIN-766107, Ph-06671-224284 Further details can be seen from the e-Procurement market place. http://tenderodisha.gov.in Sd/- Executive Engineer M.I.Division, Khariar. ANNEXURE TO BID NOTICE Date of Approx. Bid Cost of Bid Sl. Name of the project & online Sale Class of Time for Estd. cost security @ Document No. location & receipt of contractor completion . (in lakhs) 1% in Rs. s Tender 1 2 3 4 5 6 7 8 Construction of Check dam 01. over Darlipada nalla-I near 07.11.15 to village Darlipada of Rs 6000/- 04 (Four) 18.11.15 up calendar months Kendumunda G.P in 30.83 31000/- + VAT 5% “C” & “B” to 17.00hrs Sinapali Block of Nuapada District 2015-16 Construction of Check dam over Dhangrital nalla-I 04 (Four) 02. near village Dhangrital of Rs 6000/- 07.11.15 to calendar months Ghatmal G.P in Sinapali 29.19 29500/- + VAT 5% 18.11.15 up “C” & “B” Block of Nuapada District to 17.00hrs 2015-16 Construction of Check dam over Tileipalana Nalla-I 03. 07.11.15 to 04 (Four) near village Tileipalana of Rs 6000/- calendar months Ghatmal G.P in Sinapali 26.83 27000/- + VAT 5% 18.11.15 up “C” & “B” Block of Nuapada District to 17.00hrs 2015-16 Construction of Check dam over Jogbhata Nalla-Inear 04 (Four) 04. Rs 6000/- 07.11.15 to village Jogbhata of Ghatmal calendar months 33.39 34000/- + VAT 5% 18.11.15 up “C” & “B” G.P in Sinapali Block of Nuapada District 2015-16 to 17.00hrs Construction of Check dam over Modosiljore nalla-I 04 (Four) 05. near village Bairagipada of Rs 6000/- 07.11.15 to calendar months Nangalbod G.P in Sinapali 31.80 32000/- + VAT 5% 18.11.15 up “C” & “B” Block of Nuapada District to 17.00hrs 2015-16 Construction of Check dam over Gadiajore Nalla-I near 04 (Four) 06. village Dhangrital of Rs 6000/- 07.11.15 to calendar months Ghatmal G.P in Sinapali 29.14 29500/- + VAT 5% 18.11.15 up “C” & “B” Block of Nuapada District to 17.00hrs 2015-16 Construction of Check dam over Tukla Nalla-I near 04 (Four) 07. Rs 6000/- 07.11.15 to village Tukla of Tukla G.P calendar months 23.96 24000/- + VAT 5% 18.11.15 up “C” & “B” in Khariar Block of Nuapada District 2015-16 to 17.00hrs Construction of Check dam over Dhadapada Nalla-I 08. 07.11.15 to 04 (Four) near village Dhadapada of Rs 6000/- calendar months Ranimunda G.P in Khariar 22.12 22500/- + VAT 5% 18.11.15 up “C” & “B” Block of Nuapada District to 17.00hrs 2015-16 Construction of Check dam Rs 6000/- over Dhadapada Nalla-II + VAT 5% “C” & “B” 04 (Four) 09. near village Dhadapada of 07.11.15 to Ranimunda G.P in Khariar 22.1 3 22500 /- 18.11.15 up calendar months Block of Nuapada District to 17.00hrs 2015-16 Construction of Check dam over Palma Nalla-III near 10. 07.11.15 to 04 (Four) village Palma of Rs 6000/- calendar months Ranimunda G.P in Khariar 28.34 28500/- + VAT 5% 18.11.15 up “C” & “B” Block of Nuapada District to 17.00hrs 2015-16 Construction of Check dam over Balipada Nalla-I near 11. 07.11.15 to 04 (Four) village Balipada of Rs 6000/- calendar months Ranimunda G.P in Khariar 25.20 25500/- + VAT 5% 18.11.15 up “C” & “B” Block of Nuapada District to 17.00hrs 2015-16 Construction of Check dam over Ghardhara Nalla-III 12. 07.11.15 to 04 (Four) near village Gardhara of Rs 6000/- calendar months Sanmaheswar G.P in 28.99 29000/- + VAT 5% 18.11.15 up “C” & “B” Khariar Block of Nuapada to 17.00hrs District 2015-16 Construction of Check dam over Rajamunda Nalla-I 04 (Four) 13. near village Rajamunda of Rs 6000/- 07.11.15 to calendar months Sanmaheswar G.P in 25.69 26000/- + VAT 5% 18.11.15 up “C” & “B” Khariar Block of Nuapada to 17.00hrs District 2015-16 Construction of Check dam over Dahimal Nalla-I near 14. 07.11.15 to 04 (Four) village Dhobei of Rs 6000/- calendar months Bhainsadhani G.P in Boden 34.96 35000/- + VAT 5% 18.11.15 up “C” & “B” Block of Nuapada District to 17.00hrs 2015-16 Construction of Check dam over Baharajore Nalla-II 15. 07.11.15 to 04 (Four) near village Sunamudi of Rs 6000/- calendar months Bairgaon G.P in Boden 30.42 31000/- + VAT 5% 18.11.15 up “C” & “B” Block of Nuapada District to 17.00hrs 2015-16 Construction of Check dam over Datoljore Nalla-II 16. 07.11.15 to 04 (Four) near village Margaon of Rs 6000/- calendar months Dumjhar G.P in Boden 37.74 38000/- + VAT 5% 18.11.15 up “C” & “B” Block of Nuapada District to 17.00hrs 2015-16 Construction of Check dam 07.11.15 to over Latiama Nalla-I near 18.11.15 up 17. village Sunamudi of Rs 6000/- 04 (Four) to 17.00hrs calendar months Bairgaon G.P in Boden 24.97 25000/- + VAT 5% “C” & “B” Block of Nuapada District 2015-16 Construction of Check dam 18. over Pilakachha Nalla-I 07.11.15 to 04 (Four) calendar months near village Analabhata of Rs 6000/- 18.11.15 up Litisargi G.P in Boden 29.96 30000/- + VAT 5% to 17.00hrs “C” & “B” Block of Nuapada District 2015-16 Construction of Check dam over Tentulikhunti Nalla-I 19. 07.11.15 to 04 (Four) near village Kotagaon of Rs 6000/- calendar months Bhainsadhani G.P in Boden 39.86 40000/- + VAT 5% 18.11.15 up “C” & “B” Block of Nuapada District to 17.00hrs 2015-16 Construction of Check dam over Katapada nalla-II near 20. 07.11.15 to 04 (Four) village Banjibahal of Rs 6000/- calendar months Khaira G.P in Boden Block 31.97 32000/- + VAT 5% 18.11.15 up “C” & “B” of Nuapada District 2015- to 17.00hrs 16 Construction of Check dam over Dhakadiadhar Nalla-I 21. 07.11.15 to 04 (Four) near village chikalchuan of Rs 6000/- calendar months Bairgaon G.P in Boden 32.97 33000/- + VAT 5% 18.11.15 up “C” & “B” Block of Nuapada District to 17.00hrs 2015-16 Construction of Check dam over Barpada Nalla near 04 (Four) 22. Rs 6000/- 07.11.15 to village Barpada of Tanwat calendar months 20.84 21000/- + VAT 5% 18.11.15 up “C” & “B” G.P in Nuapada Block of Nuapada District 2015-16 to 17.00hrs Construction of Check dam over Gidhini Nalla near 03 (Three) 23. Rs 6000/- 07.11.15 to village Gidhini of Tanwat calendar months 19.14 19500/- + VAT 5% 18.11.15 up “D” & “C” G.P in Nuapada Block of Nuapada District 2015-16 to 17.00hrs Construction of Check dam over Pandripani Nalla-II 24. 07.11.15 to 03 (Three) near village Pandripani of Rs 6000/- calendar months Chullabhat G.P in Nuapada 15.97 16000/- + VAT 5% 18.11.15 up “D” & “C” Block of Nuapada District to 17.00hrs 2015-16 Construction of Check dam over Kermeli Nalla near 03 (Three) 25. Rs 6000/- 07.11.15 to village Kermeli of Kermeli calendar months 18.64 19000/- + VAT 5% 18.11.15 up “D” & “C” G.P in Nuapada Block of Nuapada District 2015-16 to 17.00hrs Construction of Check dam over Junapada Nalla near 03 (Three) 26. Rs 6000/- 07.11.15 to village Junapada of Tanwat calendar months 19.92 20000/- + VAT 5% 18.11.15 up “D” & “C” G.P in Nuapada Block of Nuapada District 2015-16 to 17.00hrs Construction of Check dam over Malikmura Nalla near 04 (Four) 27.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages7 Page
-
File Size-