On 14 January 2019 the Council made the above-named Order under Section 14(1) of the Road Traffic Regulation Act 1984, as amended by Schedule 1 of the Road Traffic (Temporary Restrictions) Act 1991, and in exercise of all other enabling powers, which makes it unlawful for any person to drive or cause or permit to be driven any motor vehicle (with the exception of vehicles engaged on Scottish Water Infrastructure works) on Swinstie Road, Cleland from the extended eastern kerb line of High Road eastwards to the extended western kerb line of the Sewage Works Access Road or thereby by reason of works being executed on or near that location.

Alternative routes: Vehicles on the east side of the closure wishing to access to the west side of the closure should travel north-eastwards on Swinstie Road, north-westwards on Spindleside Road, westwards on Bellside Road (B7029) south-westwards on Main Street (B7029), south-westwards on Main Street and south-eastwards on Wishaw High Road to the west side of the closure.

Vehicles on the west side of the closure wishing to access the east side of the closure should travel vice versa.

Pedestrian access will be maintained at all times.

Vehicular access to adjacent premises / roads will be maintained, where possible, by arrangement with the contractor during the closure.

The Order will come into operation at 0800 hours on Monday, 28 January 2019 and will remain in operation until 1700 hours on Tuesday, 30 April 2019.

ARCHIE AITKEN HEAD OF LEGAL AND DEMOCRATIC SOLUTIONS

Civic Centre, Windmillhill Street, , ML1 1AB ------

North Lanarkshire Council

Swinstie Road, Cleland

(Temporary Road Closure) Order 2019

The North Lanarkshire Council, in exercise of the powers conferred on them by Section 14(1) of the Road Traffic Regulation Act 1984, as amended by Schedule 1 of the Road Traffic (Temporary Restrictions) Act 1991, and of all other enabling powers, hereby make the following Order:-

1. This Order may be cited as “The North Lanarkshire Council (Swinstie Road, Cleland) (Temporary Road Closure) Order 2019” and shall be effective during the period from 0800 hours on Monday, the twenty eighth day of January, Two thousand and nineteen until 1700 hours on Tuesday, the thirtieth day of April, Two thousand and nineteen.

2. No person shall drive or cause or permit to be driven any motor vehicle (with the exception of vehicles engaged on Scottish Water Infrastructure works) on Swinstie Road, Cleland from the extended eastern kerb line of Wishaw High Road eastwards to the extended western kerb line of the Sewage Works Access Road or thereby by reason of works being executed on or near that location.

Alternative routes: Vehicles on the east side of the closure wishing to access to the west side of the closure should travel north-eastwards on Swinstie Road, north-westwards on Spindleside Road, westwards on Bellside Road (B7029) south-westwards on Main Street (B7029), south-westwards on Main Street and south-eastwards on Wishaw High Road to the west side of the closure.

Vehicles on the west side of the closure wishing to access the east side of the closure should travel vice versa.

Pedestrian access will be maintained at all times.

Vehicular access to adjacent premises / roads will be maintained, where possible, by arrangement with the contractor during the closure.