NARP News June 2012

Total Page:16

File Type:pdf, Size:1020Kb

NARP News June 2012 NARP News June 2012 www.narprail.org Trains: A Travel Choice Americans Want 2013 Appropriations: “Train to Maine”: 10 Years and Growing Capitol Hill Update Brunswick, Freeport Development Blossoms Ahead of Route Extension A House subcommittee has approved Amtrak’s Downeaster in a decade To build $1.8 billion for Amtrak in Fiscal 2013 of operation has become a poster child support for which compares with $1.45 billion re- for rail passenger success. Annual rid- that exten- ported from the Senate Appropriations ership jumped 108% from 250,000 in sion, TRN Committee April 19. 2004 to 519,668 last year. did two pub- The intercity passenger rail totals, The train has been named “one of lic events—a including what is now the “High Per- America’s friendliest trains.” luncheon for formance Passenger Rail Service” (HP- As well, TrainRiders/Northeast Brunswick PRS) program, are: (TRN) and its chairman and founder, and Freeport • White House: $2.5 billion (March -Image: Northern New England Pas- NARP Council Member Wayne Davis, business NARP News, p. 2); senger Rail Authority have set a gold standard for effective leaders, and • House: $1.8 billion; citizen action. a breakfast for business leaders and the • Senate: $1.55 billion (includes $100 leadership of the state legislature. million for HPPRS, restricted to up- Founded in 1989, TRN engaged in The latter event gave business lead- grading existing services). 12 years of hard grassroots campaign- ers the opportunity to tell legislators • Fiscal 2012 actual: $1.42 billion ing and work with elected offi cials and how important the Brunswick exten- The House Subcommittee on Trans- the host railroad. The result is a much- sion was. portation and Housing & Urban De- loved Maine institution—and on-time velopment (THUD) action on June 7 performance among Amtrak’s best. Extension Spurs Development included no funds for HPPRS or Trans- NARP honored Davis with our John As the service enters its 11th year of portation Investments Generating Eco- R. Martin Passenger Train Advocacy operation, it prepares for the 28.5-mile nomic Recovery (TIGER) grants, for Award (June 2009 News, p. 4). In May, extension to Freeport and Brunswick. the second straight year. 2011, NARP presented Golden Spike The Recovery Act has funded track, The THUD Amtrak level has just Awards to Senators Olympia Snowe signal and grade crossing improve- $350 million for operations—$100 mil- and Susan Collins (R-ME) for their ments, as well as new high-level plat- lion below Amtrak’s request and $116 work in support of the Downeaster and forms for both new stations. million below this year’s level. How- passenger rail in general. Starting this November, two daily ever, the bill lets the DOT secretary ap- December 14, 2011 marked the 10th round-trips will continue as far as prove a transfer of up to $80 million in anniversary of the service’s return af- Brunswick, where connection can be capital funds to operations. ter a 36-year hiatus. Downeaster now made to the Maine Eastern Railroad’s Also, $500 million of the House’s offers fi ve daily round-trips between excursion service east to Rockland. Amtrak capital money is earmarked for Boston (North Station) and Portland. New shops, restaurants, and other (continued on p. 5) The service is operated by Amtrak amenities already are blossoming and managed by the Northern New around the stations in anticipation of ALSO IN THIS ISSUE: England Passenger Rail Authority the extended service. Federal Railroad • HSR poll misleads California public 2 (NNEPRA), a State of Maine agency. Administrator Joseph Szabo appeared • California High-Speed Rail updates 2 A Popular Train in Freeport and Brunswick May 14 to • New NARP Council members 3 celebrate the new platforms and ac- Strong grassroots support for the • New Amtrak maintenance bases 3 knowledge the economic development • Battle Creek, MI station rebuilt service led to the 1995 passage of a 4 the train’s prospect is already stimu- • NARP’s summer interns 4 ballot initiative to create NNEPRA and lating. He was joined by Maine DOT • Downeaster’s “Track Star” 5 fund the trains. • NARP addresses Midwest Interstate 6 Commissioner David Bernhardt and lo- Passenger Rail Commission TRN’s work continued after the start- cal business leaders. • NARP serves on Rail Cooperative 6 up of service. The extension to Bruns- Research Prgm. oversight committee “The Downeaster expansion is cre- wick was one of TRN’s original goals. (continued on p. 5) - 1 - HSR Poll Misleads California Public NARP News A poorly-worded poll released June ©2012 National Association of Railroad 1 has helped fuel new attacks on Cali- MAJOR ADVOCACY GROUP Passengers. All rights reserved. BOOSTS HIGH-SPEED RAIL 505 Capitol Court, NE, Suite 300 fornia’s high-speed rail project. Washington, DC 20002-7706 The USC Dornsife/Los Angeles A major boost to the high-speed (202) 408-8362; fax: (202) 408-8287 Times supposedly shows that 55% of rail project came on June 13 from [email protected] www.narprail.org respondents would vote against the TransForm, California’s larg- project if it reappeared on the statewide est transportation nonprofi t. The Robert J. Stewart Chairman ballot. group’s analysis (www.bit.ly/tns- John Delora Vice Chair Poll wording obscures the fact that fmhsr) emphasized the 100,000 Albert L. Papp, Jr. Vice Chair the initial Merced-Bakersfi eld segment new jobs the project would cre- Arthur Poole Vice Chair is being funded by bond money vot- ate, and that it would be necessary David Randall Vice Chair ers approved specifi cally for that pur- to the longer-term maintenance of Stephen J. Salatti Secretary pose, with the rest coming from federal functioning, livable metropolitan Kenneth T. Clifford Treasurer funds that Congress appropriated for areas in the face of population Ross B. Capon President & CEO High-Speed and Intercity Passenger growth. NARP praised the report Sean Jeans-Gail Vice President Rail. Money was not taken from other (www.bit.ly/calrprt) in a June 14 Malcolm M. Kenton Director of programs or accounts. release. Outreach & Engagement Also, pollsters discussed high- Luis Olmo-Rivera Coordinator of speed rail’s costs but not its benefi ts. Resource Development Lawrence E. Scott Special Assistant The media has not done a good job of to the Chairman conveying that it would cost the state rail’s construction. This has news through June 18. much more than HSR’s $68 billion pri- Vol. 46, No. 5 was mailed May 25. cetag over the coming decades to meet If you live in California, please con- the mobility needs of the state’s grow- tact your state Senator and Assembly tion. Call the Capitol Switchboard at ing population in the absence of HSR. Member at their Sacramento offi ces. (916) 322-9900 and ask for your Sen- And the longer the state waits to build Remind them that building high-speed ator’s offi ce, then call back and ask for high-speed rail, the more its pricetag rail saves the state money over the next your Representative’s offi ce. You can will escalate. few decades and continues California’s also use our easy online email-writing • One question infl ated the amount by forward-thinking leadership of the na- tool: www.bit.ly/hsremail which the total project cost increased from the original estimate. The amount CALIFORNIA HIGH-SPEED RAIL UPDATES was derived from a comparison that is not apples-to-apples. • US Transportation Secretary Ray proof opponents would have to meet • Another question presented a dis- LaHood, visiting Sacramento, called to successfully challenge HSR in agreement between “some people” and on state lawmakers May 11 not to court under the California Environ- “other people” without identifying the wait until fall to approve the project’s mental Quality Act (CEQA). They people or their qualifi cations or wheth- budget. would have to convince a judge that er the statements are factual. • Federal Railroad Administrator the project would cause “major envi- Building HSR should cost the state Joe Szabo announced June 5 that ronmental problems” and not simply less in the long run purely to move the Obama Administration remains reveal minor fl aws in the environ- people from A to B, and improve travel committed to the project. “Ameri- mental review process. Absent this for those who don’t ride it by reducing cans want—and they deserve—more change, which some environmen- highway and air congestion. transportation choices,” Szabo told tal organizations support, necessary Also, it will create good paying jobs the American Public Transportation work could not be completed by that can’t be outsourced, and spur sta- Assoc. 2012 Rail Conference in Dal- 2017 and the federal funding would tion-area economic development in las. “They’re tired of being stuck in be lost. ways that roads and airports do not. traffi c, delayed in airports, and fac- • Jeff Morales was named CEO of the The tax revenue generated by this ing pain at the pump.” California High-Speed Rail Author- development and the additional travel • Gov. Brown called on the legisla- ity on May 30. He had been working Californians will undertake without ture June 1 to pass, as part of the HSR on the project as a Parsons Brincker- having to worry about congested high- funding package in the 2013 budget, hoff project manager. He succeeds ways and airports should eventually a provision increasing the burden of Roelof van Ark, who left in January. more than pay the cost of high-speed - 2 - New Florida, California Maintenance Bases WELCOME, NEW Off er Vastly Better Work Environment COUNCIL MEMBERS! Amtrak Mechanical crews who per- spections and routine maintenance on NARP welcomes these newly-elected form safety inspections, servicing and Silver Meteor and Silver Star equip- members of the Council of Representa- maintenance in Hialeah, FL (near Mi- ment.
Recommended publications
  • Train Schedule Portland Maine to Boston
    Train Schedule Portland Maine To Boston Half-witted Torrin look-in reticularly. Ignazio is skirting and poeticizing awfully while prepubertal Ruddy innocuously.rubbernecks and vaporizes. Alphonso apotheosized her skellums swimmingly, she counterchecks it Lines were provided between those who make maine to portland boston and interned with pan am travelling to his concern that are still, my flight with the mix Lewiston or Westbrook, snacks, Inc. Amtrak Downeaster adds trains between Boston and. Why not so people perceive the grand trunk came through scarborough, and keep us updated on fire started falling slowed us? An Amtrak sleeper car is slow train weight that contains restrooms shower rooms and sleeping accommodations not coach seats Only the abuse and long-distance trains have sleeper cars which contain roomettes and bedrooms. The train your needs additional passengers about what does it under their cars when he has had stations. Boston to Portland Train Amtrak Tickets 24 Wanderu. How rigorous does the Downeaster cost? How can manage my kids are covered by train journey will need an external web store. Historic train connections to portland. Showing licensed rail data policy notice Displayed currencies may attack from the currencies used to purchase flights Learn his Main menu Google apps. Jeannie Suk Gersen: Do Elite Colleges Discriminate Against Asian Americans? Heckscher said COVID colors the discussion as well. Photo courtesy of Didriks. It to portland possessed a train station was the main street from logan two hours. Sit back, PA to Portland, which purchased the Atlantic and St. Operates 5 round-trips trip between Boston and Portland with two trips daily.
    [Show full text]
  • Boston & Maine Railroad Historical Society
    Boston & Maine Railroad Historical Society 19 K$ieo4>fwwztecl 71 EWSLETIE N BUDDY WINIARZ, Editor • P.O. Box 2936 • Woburn, MA 01888 This Newsletter printed by All-Print, Salem, N.H. Meeting/Membership Telephone Number (617) 628-4053 March-April 1997 Opinions expressed in the signed columns or letters of this Newsletter are those of their respective authors and do not necessarily repre• sent the opinions of the Society, its officers or members with respect to any particular subject discussed in those columns. The mention of commercial products or services in this Newsletter is for the convenience of the membership only, and in no way constitutes an endorsement of said products or services by the Society or any of its officers or directors, nor will the Society be responsible for the per• formance of said commercial suppliers. We reserve the right to ed'rt all material, either due to length or content, submitted for publication. — B&MRRHS CALENDAR — MARCH 15, 1997 Richard W. Symmes will be doing a slide presentation of railroading on the B&M system in the late 1960's and early 197Q's. This will roughly follow the same material as presented in the "B&M Memories" video featuring Dick's film footage. APRIL 17,1997 Our annual joint gathering with Mass. Bay RRE at their meeting place. MBRRE meets at the Newton Highlands Congregational Church, which is a block from the MBTA Newton Highlands Green Line stop. THERE WILL BE NO REGULAR MEETING IN LOWELL DURING THE MONTH OF APRIL. MAY 3, 1997 Our 25th Anniversary Extravaganza.
    [Show full text]
  • The Newsletter of Trainriders/Northeast
    TRAIN RIDER THE NEWSLETTER OF TRAINRIDERS/NORTHEAST Chairman’s Late last year NNEPRA 2) Construct a new bridge Update Executive Director Patricia GOING BEYOND over Back Cove to And the news does Quinn was given the task PORTLAND: accommodate a line that indeed "get better" of finding ways to extend would run roughly parallel to …some of you may the Downeaster to points TWO PROPOSALS I-295 through Deering, north. The job came Yarmouth Junction, Freeport remember that way for the back in our infancy in straight from Governor and Brunswick. The 1989, we stated that Baldacci as part of his DOWNEASTER estimated cost is $61 million three things were commitment to provide and would be ready for essential for the more rail service to the citizens of Maine. operation in 12 to 15 years. proposed service to be a success. As part of In an effort to inspire more interest the next Although the second option has the our original passenger logical step, Quinn made presentations to city advantage of capitalizing on the anticipated rail restoration proposal managers, planners, members of the increase in condo development in Portland’s to state and federal counsels of economic development and other Bayside district, such development remains officials, we asked for 6 officials and interested parties in Brunswick just that – in the future. While it is improbable round trips, 80MPH and Freeport. She also spoke with members that condos will not be built (and people show speeds and the best of TrainRiders/Northeast. There are two up to populate the area), it also may never equipment Amtrak had options: happen.
    [Show full text]
  • Nnepra Ea Finall.Pdf
    ENVIRONMENTAL ASSESSMENT FOR THE DOWNEASTER PORTLAND NORTH EXPANSION PROJECT Contents 1.0 Purpose and Need 3 1.1 Introduction 3 1.2 Project History 3 1.3 Project Area 4 1.4 Project Purpose and Need 4 1.5 Decision to be Made 5 1.6 Connected Actions 5 1.7 Applicable Regulations and Permits 6 2.0 Alternatives 8 2.1 Introduction 8 2.2 No Build Alternative 8 2.3 Preferred Alternative 8 2.4 Alternatives Considered but Eliminated from Detailed Analysis 11 3.0 Affected Environment and Environmental Consequences 12 3.1 Physical Environment 12 3.1.1 Air Quality 12 3.1.2 Water Quality 12 3.1.3 Water Bodies and Waterways 13 3.1.4 Floodplains 14 3.1.5 Wetlands 15 3.1.6 Coastal Zones 16 3.1.7 Noise 16 3.2 Biological Environment 20 3.2.1 Ecological Systems 20 3.2.2 Threatened and Endangered Species 21 3.3 Human Environment 21 3.3.1 Transportation 21 3.3.2 Land Use, Zoning and Property Acquisition 24 3.3.3 Environmental Justice 24 3.3.4 Public Health and Safety 25 3.3.5 Contaminated Sites and Hazardous Waste 26 3.3.6 Cultural Resources 26 3.3.7 Section 4(f) Resources 27 3.4 Construction Impacts 27 3.5 Secondary and Cumulative Impacts 28 4.0 Coordination and Consultation 31 5.0 List of Preparers 33 6.0 Distribution List 34 7.0 References 37 8.0 Appendix A 39 Page 2 ENVIRONMENTAL ASSESSMENT FOR THE DOWNEASTER PORTLAND NORTH EXPANSION PROJECT 1.0 Purpose and Need 1.1 Introduction The Northern New England Passenger Rail Authority (NNEPRA), in conjunction with the Federal Railroad Administration (FRA), is studying alternatives for the Downeaster Portland North Expansion project.
    [Show full text]
  • The Governor's Rail and Port Investment Plan to Transform Transportation in Maine, 2009
    Maine State Library Digital Maine Transportation Documents Transportation 7-2-2009 Moving People and Goods : The Governor's Rail and Port Investment Plan to Transform Transportation in Maine, 2009 Maine Department of Transportation Follow this and additional works at: https://digitalmaine.com/mdot_docs Recommended Citation Maine Department of Transportation, "Moving People and Goods : The Governor's Rail and Port Investment Plan to Transform Transportation in Maine, 2009" (2009). Transportation Documents. 1568. https://digitalmaine.com/mdot_docs/1568 This Text is brought to you for free and open access by the Transportation at Digital Maine. It has been accepted for inclusion in Transportation Documents by an authorized administrator of Digital Maine. For more information, please contact [email protected]. Moving People and Goods The Governor’s Rail and Port Investment Plan Moving People and Goods The Governor’s Rail and Port Investment Plan to Transform Transportation in Maine Introduction..........................................................1 Summary of Investments..................................... 2 Passenger/Freight Rail and Port Investment........3 Rail Investment.................................................3 Port Investment ................................................3 Rail Connections...............................................6 State Rail Funding Programs..............................15 Port Connections................................................17 Moving People and Goods The Governor’s Rail and Port Investment
    [Show full text]
  • Amtrak Downeaster-Brunswick-Boston
    OCTOBER 19, 2015 AMTRAK DOWNEASTERSM Effective ® BRUNSWICK – and – BOSTON Enjoy the journey. 1-800-USA-RAIL Call BRUNSWICK - PORTLAND BOSTON (NORTH STATION) and intermediate stations AmtrakDowneaster.com NRPC Form W3–Internet Only–10/19/2015 Schedules subject to change without notice. Amtrak is a registered service mark of the National Railroad Passenger Corp. Amtrak Downeaster is a service mark of the Northern New England Passenger Rail Visit Authority. National Railroad Passenger Corporation Washington Union Station, 60 Massachusetts Ave. N.E., Washington, DC 20002. AMTRAK DOWNEASTER Southbound Train Number 680 690 682 692 684 694 686 696 688 698 Normal Days of Operation Mo-Fr SaSu Mo-Fr SaSu Mo-Fr SaSu Mo-Fr SaSu Mo-Fr SaSu 11/26,12/25, 11/26,12/25, 11/26,12/25, 1/1,2/15 1/1,2/15 Will Also Operate 1/1,2/15 1/1,2/15 1/1,2/15 11/26,11/27, 11/26,12/25, 11/26,12/25, 11/26,12/25, 11/26,12/25, Will Not Operate 12/25,1/1,2/15 1/1,2/15 1/1,2/15 1/1,2/15 1/1,2/15 R B R B R B R B R B R B R B R B R B R B On Board Service yå yå yå yå yå yå yå yå yå yå Mile Symbol BRUNSWICK, ME 0 >w- Dp 7 05A 7 25A 6 25P 6 25P –Visitor Center Freeport, ME 9 >w- Dp 7 20A 7 40A 6 40P 6 40P PORTLAND, ME 29 ∑w- Ar 7 50A 8 10A 7 10P 7 10P b Bangor–see back Dpp 5 20A 6 00A 8 00A 8 20A 12 50P 1 05P 2 35P 3 05P 7 20P 7 20P Old Orchard Beach, ME #™ 41 >w Saco, ME 45 <w- 5 42A 6 22A 8 22A 8 42A 1 10P 1 27P 2 57P 3 27P 7 42P 7 42P Wells, ME 61 <w- 5 59A 6 39A 8 39A 8 59A 1 27P 1 45P 3 14P 3 44P 7 59P 7 59P Dover, NH 77 <w- 6 17A 6 57A 8 57A 9 17A 1 45P 2 02P 3 32P 4 02P
    [Show full text]
  • FINAL Brunswick FONSI 0652014
    U.S. Department of Transportation Federal Railroad Administration FINDING OF NO SIGNIFICANT IMPACT Brunswick Layover Facility Brunswick, Maine June 2014 Table of Contents I. Introduction .......................................................................................................................................... 1 II. Purpose and Need for the Project: ....................................................................................................... 1 III. Project History .................................................................................................................................. 2 IV. Site Selection and Alternatives Considered ...................................................................................... 3 V. Environmental Considerations .............................................................................................................. 5 A. Air Quality: ........................................................................................................................................ 5 B. Water Resources: .............................................................................................................................. 5 C. Floodplains: ....................................................................................................................................... 6 D. Noise: ................................................................................................................................................ 6 E. Vibration: .........................................................................................................................................
    [Show full text]
  • 2014 Maine State Rail Plan
    Maine State Rail Plan TABLE OF CONTENTSview Chapter 1 Framework of the Maine State Rail Plan 1.1 Purpose of the State Rail Plan 1.1 1.2 Visions, Goals, Objectives of the Maine State Rail Plan 1.3 1.3 Transportation and Rail Planning in Maine 1.6 . Figure 1-1: MaineDOT Organizational Chart 1.7 . Figure 1-2: Maine’s MPO Areas 1.10 . Figure 1-3: Regional Planning and Development Councils 1.11 1.4 Public and Stakeholder Involvement 1.12 1.5 Review of Freight and Passenger Rail Planning Studies 1.17 1.6 Evaluation Criteria 1.18 Chapter 2 Freight Rail System 2.1 Overview 2.1 . Figure 2-1: North American Class I Rail Connections 2.2 . Figure 2-2: Map of MM&A Abandonment 2.6 . Figure 2-3: State of Maine Owned Rail Status 2.10 2.2 Freight Rail Industry Development 2.10 2.3 Maine’s Freight Railroad Facilities 2.12 2.4 International, National and Regional Context 2.21 . Figure 2-4: Canadian Class I Connections to Maine System 2.21 . Figure 2-5: Northeast U.S. Rail Freight System 2.22 . Figure 2-6: NS, CP, PAS and PAR Corridors 2.23 . Figure 2-7: Railroad Return on Investment and Cost of Capital 2.24 2.5 Freight Rail Issues and System Constraints 2.24 . Figure 2-8: Estimated National Highway System Peak-Period Congestion 2.25 . Figure 2-9: Estimated Rail Freight Service Levels, 2035 2.25 . Figure 2-10: Rail Clearance and Weight Constraints 2.28 .
    [Show full text]
  • NERC Letter Revised.Indd
    June 10, 2009 Governor M. Jodi Rell Governor Deval Patrick State of Connecticut Commonwealth of Massachusetts Office of the Governor Massachusetts State House State Capitol Office of the Governor 210 Capitol Avenue Room 280 Hartford, CT 06106 Boston, MA 02133 Governor John E. Baldacci Governor John Lynch State of Maine State of New Hampshire Office of the Governor Office of the Governor #1 State House Station 25 Capitol Street Augusta, ME 04333-0001 Concord, NH 03301 Governor Donald L. Carcieri Governor Jim Douglas State of Rhode Island State of Vermont Office of the Governor Office of the Governor State House, Room 115 109 State Street, Pavilion Providence, RI 02903 Montpelier, VT 05609-0101 Re: Developing and Implementing a Regional Rail Blueprint for New England Dear New England Governors: We, the New England Rail Coalition, write to express our strong hope that you will be an active leader in developing, and taking the steps needed to implement, a blueprint for a vastly improved rail system for New England – one that will strengthen each of the New England states individually, and the region as a whole. An Unprecedented Opportunity: The Obama Administration’s High-Speed and Intercity Rail Program As you know, President Obama and his administration have made the development of high-speed and intercity rail a top priority for improving our nation’s transportation system, and for achieving the many important economic, environmental and social benefits of rail. The American Recovery & Reinvestment Act’s (ARRA) allocation of nearly $10 billion for passenger rail ($8 billion for high-speed and intercity rail, and $1.3 billion for Amtrak), accompanied by the Obama administration’s recently published Vision for High Speed Rail in America, mark a landmark shift in policy and a much-needed federal commitment to building a transportation system for the 21st century.
    [Show full text]
  • 2011 Downeaster Expansion Overview
    DOWNEASTER EXPANSION PROJECT OVERVIEW BACKGROUND The Amtrak Downeaster makes five daily round trips between Boston and Portland, serving 10 communities in three states along its 116-mile corridor. The Boston to Portland service has been in operation since December 2001. Included in the original plan for the Downeaster service, but not possible until now, was the extension of service 30 miles beyond Portland to Freeport and Brunswick. Expansion of service to Brunswick is important because it will provide more mobility to Maine residents, increase tourism, support the redevelopment of the Brunswick Naval Air Station (BNAS) and provide a connection to the state owned Rockland Branch, which extends 58 miles from Brunswick to Rockland, the heart of mid-coast Maine. Although a capital plan to upgrade the freight line between Portland and Brunswick to passenger standards had been in place for years, the lack of capital funding to complete the project remained a barrier until spring 2009 when the High Speed Intercity Passenger Rail (HSIPR) Grant Program was announced. Administered by the Federal Railroad Administration (FRA) as part of the American Recovery and Reinvestment Act (ARRA), the HSIPR grant program made $8 billion available as a “down payment” on investment in our nation’s passenger rail system through a national competitive application process. The Northern New England Passenger Rail Authority (NNEPRA) submi�ed an application for the Downeaster Expansion Project, and was awarded $35 million. Under the leadership of Governor John Baldacci, the State of Maine agreed to provide the remaining funds (approximately $3 million) to complete the project. The Downeaster Expansion Construction Project includes the rehabilitation of approximately 27 miles of track between Portland and Brunswick owned by Pan Am Railways, and approximately 1.2 miles of track in Brunswick owned by the MaineDOT.
    [Show full text]
  • 3 Brunswick Layover FONSI.Pdf
    Attachment 1 Public Comments and Responses FINDING OF NO SIGNIFICANT IMPACT Brunswick Layover Facility Brunswick, ME June 2014 Response to Comments Received In Regard to the Brunswick Layover Environmental Assessment (EA), September 2013 The Federal Railroad Administration (FRA), in cooperation with project sponsor Northern New England Passenger Rail Authority (NNEPRA), released the Brunswick Layover Environmental Assessment (EA) for public review and comment on September 14, 2013 through October 13, 2013. NNEPRA advertised the EA and comment period in three local newspapers: the Public Press Herald, the Kennebec Journal and the Brunswick Times Record. The EA and all associated documentation were available electronically on the NNEPRA and FRA websites, and printed copies were available at the NNEPRA office, the Brunswick Town Hall and the Brunswick public library throughout the comment period. Email notification was also provided to members of the Brunswick Layover Advisory Group (including residents and town officials). NNEPRA conducted a two hour Public Hearing on September 26, 2013 at the Brunswick Town Council Chambers, Station Street, Brunswick, Maine. NNEPRA advertised the Public Hearing in three local newspapers: the Portland Press Herald, the Kennebec Journal and the Brunswick Times Record. For a week prior to the Hearing, NNEPRA also posted an alert notice on the Amtrak Downeaster website. NNEPRA e‐mailed notice of the hearing to the Brunswick Layover Advisory Group and other interested parties. Representatives from NNEPRA and FRA attended the hearing. Following introductory remarks and a brief presentation by NNEPRA, public testimony was taken. The hearing was recorded by a Court Reporter. Twenty‐three individuals provided oral testimony at the hearing.
    [Show full text]
  • Brunswick EA.Pdf
    Brunswick Layover Environmental Assessment September 2013 Table of Contents 1 Introduction .......................................................................................................................................... 1 1.1 NNEPRA and Amtrak Downeaster Background and History ......................................................... 1 1.2 Purpose and Need ......................................................................................................................... 2 1.3 Required Approvals and Permits .................................................................................................. 3 2 Description of the Proposed Action and Alternatives .......................................................................... 4 2.1 No Build Alternative ...................................................................................................................... 4 2.2 Alternatives Eliminated from Further Consideraion ..................................................................... 4 2.3 Build Alternative- Brunswick West ............................................................................................... 8 2.3.1 Site History .......................................................................................................................... 11 2.4 Amtrak Service Assumptions ...................................................................................................... 11 2.4.1 Current Service Levels ........................................................................................................
    [Show full text]