11 Walley Street East

ARTICLE 80E-2 – SMALL PROJECT REVIEW APPLICATION & PROJECT NOTIFICATION FORM

MG2 Group, LLC 50 , SUITE 400 – BOSTON, MA 02110 Contents

Project Summary Project Team 03 Project Summary 04 Community Benefits 04 Detailed Project Information Project Description 05 Proposed Program, Data and Dimensions 05 Design Approach 05 Traffic, Parking and Access 05 Anticipated Permits and Approvals 06 Boston Zoning Code Data Zoning District Requirements 07 Proposed Design 07 Zoning Relief Required 08 Building Code Analysis 08 Development Proposal – Exhibits 09

MG2 Group, LLC Embarc Studio Law Office of Richard C. Lynds 11 Walley Street,

Project Summary

Project Team Developer and Applicant MG2 Group, LLC Joseph Donovan, Manager 50 Franklin Street, Suite 400 Boston, MA 02110 Email: [email protected]

Legal Counsel: Law Office of Richard C. Lynds Richard C. Lynds, Esq. 245 Sumner Street, Suite 110 East Boston, MA 02128 Tel. 617-207-1190 Email: [email protected]

Architecture: Dartagnan Brown, AIA Embarc Studio, LLC 60 K Street Boston, MA 02127 Tel. 617-766-8330 Email: [email protected]

Surveyor Greater Boston Survey and Engineering 19 Fredith Road Weymouth, MA 02189 781-331-6128

MG2 Group, LLC 3 Embarc Studio Law Office of Richard C. Lynds 11 Walley Street, East Boston

Project Summary

Project Summary

The Proposed Project consists of the re-development of a 14,993 square-foot industrial site situated at 11-19 Walley Street in East Boston, by construction of a new four story building containing thirty eight (38) residential units, and twenty five (25) accessory off-street parking spaces located in the building’s at/below grade garage. The garage will be entered and exited via Walley Street, which has access to Bennington Street to the South and McLellan Highway via Waldemar Avenue via the West.

The Proposed Project would create a residential development combining market-rate and affordable housing opportunities in an aesthetic appropriate in scale, massing and design to the Neighborhood, in addition to the area’s emerging redevelopment. Further, with its adjacent proximity to the MBTA’s Blue Line station, the Proposed Project will provide a unique high density housing, transit oriented development opportunity.

In planning the building, great care was given to respecting the abutting properties which share boundaries with the Site as well as modifications made during the community outreach process to preserve views. As a result, the proposed building has been designed and scaled to compliment Walley Street and the surrounding streets including Orient Avenue and Waldemar Avenue, the area’s ongoing multi-family residential developments, the surrounding commercial and retail uses, and the proximity to public transportation.

Community Benefits The Proposed Project will offer many public benefits to the neighborhood and to the City of Boston, including the following:

• The creation of thirty eight (38) new residential units, including upto five (5) units subject to the City of Boston Inclusionary Development Policy (“IDP”); • Improvements to the property boundaries including landscape buffering and associated streetscape improvements; • Future generation of hundreds of thousands of dollars in new property tax revenue annually to the City of Boston; • The expected creation of more than fifty (50) construction jobs over the length of the project; and • A unique opportunity to create transit oriented housing adjacent to public transportation.

MG2 Group, LLC 4 Embarc Studio Law Office of Richard C. Lynds 11 Walley Street, East Boston

Detailed Project Information Cont.

Project Description The Project Site includes 14,993 Ft2 of land area, comprising the parcel situated at 11-19 Walley Street. The City of Boston Assessor’s Parcel Number is 01-01577000.

The Parcel is the site of an existing garage, storage lot and auto repair.

Proposed Program, Data and Dimensions 2 Lot Area: 14,993 Ft Maximum Building Height/Stories: 43.75 feet (4 stories) Number of Residential Units Proposed: 38 Total Building Square Footage: 47,330 Ft2 Floor Area Ratio: 3.16:1 Parking Spaces: 25 (4 compact, 1 Handicap, 20 full size; 0 tandem and 0 stackers)

Design Approach The Proposed Project would consist of a new four story building. The at/slightly below-grade floor will contain 10,005 +/- square feet of an enclosed parking intending to accommodate the needs of the building’s residents through the provision of 25 parking spaces. Floors one through four will contain 38 total residential units, with a mix of twelve (12) one bedroom (701 s.f. average), eight (8) two bedroom (1,085 s,f, average), fifteen (15) three bedroom (1,168 s.f. average), amd three (3) four bedroom (1,349 s.f. average) units. There will be bicycle parking within the garage, in addition to trash handling and recycling facilities, storage.

The building’s massing is derived from an assessment of it’s site context and urban conditions. A mix of hardi board, metal panels and other design elements which are consistent with the design standards set forth by the BPDA will provide a strong identity along Walley Street, and serve to have the building become a focal point. The design will present a unique appearance as it relates to it’s immediate context and will serve as a compelling precedent for the area’s future development.

Traffic, Parking and Access The project’s 25 on-site parking spaces will be accessed via the end of Walley Street, which is bi- directional leading to Bennington Street to the South and McCLellan Highway (Route C1) via Waldemar Avenue to the West. Vehicles will both enter and discharge from the garage on the left side of the building, to an area which has been designed to minimize the building’s impact on adjoining neighboring properties. The garage and lobby will have direct elevator access provided to all floors in the building. Ample secure space for bicycle racks will be provided within the building’s garage.

MG2 Group, LLC 5 Embarc Studio Law Office of Richard C. Lynds 11 Walley Street, East Boston

Detailed Project Information Cont.

Anticipated Permits and Approvals Boston Redevelopment Authority • Article 80 Small Project Review Certificate of Approval • Affordable Housing Rental Agreement • Final Design Review Approval

Boston Water and Sewer Commission • Local Sewer and Water Tie-in and Site Plan Approval

Boston Inspectional Services Department Committee on Licenses • Parking Garage Related Permits, if required

Boston Inspectional Services Department • Demolition Permit • Building Permit • Certificate of Occupancy

Boston Zoning Board of Appeal • Variances from the Boston Zoning Code

Boston Landmarks Commission • Approval for demolition of existing structure under Article 85

Boston Parks Commission • Approval for construction within 100 feet of City Park (if applicable)

Boston Conservation Commission • Order of Conditions concerning construction within Flood Zone (if required)

Boston Public Improvement Commission (PIC) • Approval for Specific Repairs

Boston Transportation Department (BTD) • Construction Management Plan

MG2 Group, LLC 6 Embarc Studio Law Office of Richard C. Lynds 11 Walley Street, East Boston

Boston Zoning Code Data

Zoning District Requirements The site is situated within an Economic Development Area (EDA) zoning district under the Boston Zoning Code. The site does not lie within a Neighborhood Design Overlay District (NDOD). The applicable zoning requirements and anticipated as-built zoning characteristics of the Proposed Project are as follows:

Maximum Floor Area Ratio: 2.0 Maximum Building Height: 35 Feet Minimum Lot Size: None Minimum Lot Area / Add’l Unit: None Minimum Usable Open Space Per Dwelling Unit: None Minimum Lot Width: None Minimum Lot Frontage: None Minimum Front Yard Setback: Modal Minimum Side Yard Setback: None Minimum Rear Yard Setback: 20’ Parking: 2.0 Spaces Per Unit

Proposed Design Use: Multifamily Units: 38 2 Lot Area: 14,993Ft Lot Width: 175.66 Ft Lot Frontage: 175.66 Ft Floor Area Ratio: 3.16:1 Maximum Building Height: Building Height (stories): 43’ 8” (50’ 8” to top of elevator head house) Usable Open Space: 1,900+/- Ft2 (including balconies & roofdeck) Front Yard Setback: Varies Side Yard Setback: Varies; 5.75 Ft (Right); 5.78 Ft (Left) Rear Yard Setback: 5-8 Ft

Off-Street Parking Requirements: 25 Spaces Total 25 Spaces (4 Compact, 1 HP, 20 Full)

Off-Street Loading: No Loading Bay Required

MG2 Group, LLC 7 Embarc Studio Law Office of Richard C. Lynds 11 Walley Street, East Boston

Boston Zoning Code Data Cont.

Zoning Relief Required Article 53, Section 8: Multifamily Use – Forbidden Article 53, Section 9: Floor Area Ratio Excessive Article 53, Section 9: Building Height Excessive Article 53, Section 9: Rear Yard Insufficient Article 53, Section 56: Off Street Parking/Maneuverability Insufficient

Anticipated Building Code Analysis

The construction of the building is expected to be Type 1A for the basement/ground floor and 3A for the 1st to 4th floor.

The building will be fully sprinklered in conformance with NFPA 13.

The building will be a residential building with interior garage:

• Residential: R-2 • Parking Garage: S-2

As defined by Table 508.4, fire separation requirements are as follows:

• R-2 requires 1-hour separation • B, A-3 and M require 1-hour separation • S-2 requires 1-hour separation

MG2 Group, LLC 8 Embarc Studio Law Office of Richard C. Lynds

Development Proposal - Exhibits

Exhibit 1: Assessor’s Map – Parcel Exhibit 2: Zoning Code Refusal Exhibit 3: Surrounding Urban Context Exhibit 4: Neighboring Transit Locations Exhibit 6: Existing Walley Street Perspective Exhibit 7: Unit Schedule Exhibit 8: Existing Conditions Survey & Site Plan Exhibit 9: Ground/Garage Plan Exhibit 10: 1st Floor Plan Exhibit 11: 2nd & 3rd Floor Plan Exhibit 12: 4th Floor Plan Exhibit 15: Front Elevation Exhibit 16: Rear Elevation Exhibit 17: Left and Right Side Elevation Exhibit 18: Rendering – Walley Street Perspective Exhibit 19: Proposed View in Context Exhibit 20: Examples of Building Materials and Design Exhibit 21: Accessible Path of Travel (Entrance and 1st Level) Exhibit 22: Site Fencing and Planting Exhibit 23: Streetscape Exhibit 24: Exterior Bicycle Racks Exhibit 25: BPDA Accessibility Checklist

MG2 Group, LLC 9 Embarc Studio Law Office of Richard C. Lynds 11 Walley Street, East Boston 19 walley September 20, 2017

Parcel ID: 0101577000 Address: 19 WALLEY ST Zipcode: 02128 Owner: TODES CO MICHAEL J Land Use: Industrial Lot Size: 14,906.00 sq ft Living Area: 5,272.00 sq ft Total Value: $375,000.00 Land Value: $245,700.00 Building Value: $129,300.00 Gross Tax: $9,513.75

MAP FOR REFERENCE ONLY NOT A LEGAL DOCUMENT

The City of Boston makes no claims, no representations, and no warranties, expressed or implied, concerning the validity (expressed or implied), the reliability, or the accuracy of the GIS data and GIS data products furnished by the City, including the implied validity of any uses of such data. The use of this data, in any such manner, shall not supercede any federal, state or local laws or regulations.

Charlestown East Boston

Boston Allston/Brighton Harbor Islands South End /Kenmore South Boston Mission Hill

Jamaica PlainRoxbury Dorchester Roslindale West Roxbury Mattapan Sources: Esri, HERE, DeLo5rm0 e, 2In5term0ap, increm5e0nFt ePe Ct orp., GEBCO, USGS, FAO, NPS , NRCAN, GeoBase, IGN, Kadaster Hyde Park NL, Ordnance Survey, E sri Japan, METI, Esri China (Hong Kong), swisstopo, MapmyIndia, © OpenStreetMap contributors, and the GIS User Community

VIEW 3 LOOKING NORTH FROM ORIENT AVENUE

VIEW 1 LOOKING SOUTH UP WALLEY STREET

VIEW 2 NORTHWEST CORNER OF SITE FROM WALLEY STREET VIEW 4 LOOKING EAST FROM WALDEMAR AVENUE

SITE VIEWS TOWARD SITE 11-19 WALLEY STREET EX3 EAST BOSTON, MA 02128

copyright: EMBARC Studio, llc. 10/5/2017 11:03:54 AM C:\Users\tloranger\Documents\15128_19 Walley_052317_tloranger.rvt OCTOBER 6, 2017 EMBARC VIEW 3 LOOKING NORTHEAST TOWARD SUFFOLK DOWNS MBTA STATION

VIEW 1 LOOKING NORTH TOWARD WALDEMAR AVENUE

VIEW 2 LOOKING SOUTHWEST UP WALLEY STREET VIEW 4 LOOKING WEST UP ORIENT AVENUE

SITE VIEWS FROM SITE 11-19 WALLEY STREET EX4 EAST BOSTON, MA 02128

copyright: EMBARC Studio, llc. 10/5/2017 11:03:55 AM C:\Users\tloranger\Documents\15128_19 Walley_052317_tloranger.rvt OCTOBER 6, 2017 EMBARC BELLE ISLE MARSH RESERVATION

B SUFFOLK DOWNS EN NI STATION M NG B T TA O B N LU ST E RE LI E NE T SUFFOLK DOWNS

W AL LEY ST RE ET

E U N E V A R A M E LD A E W U N E V A T N IE R O

AERIAL VIEW 11-19 WALLEY STREET EX2 EAST BOSTON, MA 02128 copyright: EMBARC Studio, llc. 10/5/2017 11:03:54 AM C:\Users\tloranger\Documents\15128_19 Walley_052317_tloranger.rvt OCTOBER 6, 2017 EMBARC SUFFOLK DOWNS

W AL DE MA R AV EN UE SUFFOLK DOWNS STATION

FA YW O O D AV EN UE

BELLE ISLE MARSH RESERVATION ORIENT AVENUE

T E E R T S

Y E L L A W

NE LI E BLU T E GLADSTONE STREET BTA TRE M S N O

INGT NN BE

SITE CONTEXT 11-19 WALLEY STREET EX1 EAST BOSTON, MA 02128 copyright: EMBARC Studio, llc. 10/5/2017 11:03:54 AM C:\Users\tloranger\Documents\15128_19 Walley_052317_tloranger.rvt OCTOBER 6, 2017 EMBARC 11-19 WALLEY STREET, EAST BOSTON GSF AND UNIT SUMMARY October 6, 2017 GROSS SQUARE FEET (GSF)

SELLABLE | RENTABLE (GSF) COMMON (GSF) GSF GSF PARKING LEVEL LOBBY | STAIRS | UTILITIES 1,767 PARKING 10,005

FLOOR SUBTOTAL 0 11,772 FIRST FLOOR RESIDENTIAL 9,719 LOBBY | HALL | STAIRS 1,757 UNIT 101 1,311 3 BR+ UNIT 102 779 1 BR UNIT 103 985 2 BR UNIT 104 696 1 BR UNIT 105 1,147 3 BR UNIT 106 616 1 BR UNIT 107 1,017 2 BR UNIT 108 830 1 BR+ UNIT 109 1,178 2 BR+ UNIT 110 1,160 3 BR

FLOOR SUBTOTAL 9,719 1,757 SECOND FLOOR RESIDENTIAL 10,234 HALL | STAIRS 1,202 UNIT 201 1,349 4 BR UNIT 202 776 1 BR UNIT 203 985 2 BR UNIT 204 696 1 BR UNIT 205 1,147 3 BR UNIT 206 616 1 BR UNIT 207 1,183 3 BR UNIT 208 1,146 3 BR UNIT 209 1,176 2 BR+ UNIT 210 1,160 3 BR

FLOOR SUBTOTAL 10,234 1,202 THIRD FLOOR RESIDENTIAL 10,234 HALL | STAIRS 1,202 UNIT 301 1,349 4 BR UNIT 302 776 1 BR UNIT 303 985 2 BR UNIT 304 696 1 BR UNIT 305 1,147 3 BR UNIT 306 616 1 BR UNIT 307 1,183 3 BR UNIT 308 1,146 3 BR UNIT 309 1,176 2 BR+ UNIT 310 1,160 3 BR

FLOOR SUBTOTAL 10,234 1,202 FOURTH FLOOR RESIDENTIAL 8,474 HALL | STAIRS 1,202 UNIT 401 1,350 4 BR COMMON ROOM 952 UNIT 402 696 1 BR FITNESS CENTER 587 UNIT 403 1,147 3 BR UNIT 404 616 1 BR UNIT 405 1,183 3 BR UNIT 406 1,146 3 BR UNIT 407 1,176 2 BR+ UNIT 408 1,160 3 BR

FLOOR SUBTOTAL 8,474 2,741 RETAIL RENTABLE GSF 0 COMMON AREA (EXCLUDE PARKING) 8,669 RESIDENTIAL RENTABLE GSF 38,661

BUILDING GSF UNITS PROPOSED 38 PARKING LEVEL (NO PARKING) 1,767 PARKING SPACES PROPOSED 25 FIRST FLOOR 11,476 PARKING/UNIT RATIO 0.66 SECOND FLOOR 11,436 THIRD FLOOR 11,436 FOURTH FLOOR 11,215 TOTAL BUILDING GSF (NO PARKING) 47,330 UNIT MIX TOTAL PERCENT AVERAGE AREA 1 BR 12 32% 701 SITE 14,993 2 BR 8 21% 1,085 FAR 3.16 3 BR 15 39% 1,168 4 BR 3 8% 1,349 GROUND FLOOR PARKING 10,005 TOTAL UNIT COUNT 38 1,017 TOTAL GSF (PARKING) 57,335

GSF: measured to outside face of exterior walls, centerline of party walls and demising walls Measurements are based on intial field visit, subject to full set of measurements

P:\15128_19 Walley Street\documents\program\100617_15128_19 Walley St_unit summary

0

2

.

0

0

' 6 .1 9 3 2 =

' L

0

0

'

2

"

W

2

Z ONE

A E 7 .

2 2 2

7

.

. 4 2

1

2 Z ONE

3 X

( U NS H D A E D )

2 . 4 2

6 . 4 5

2 2

5

2

0

. 4 2

2

7

. 3 2

1

0 . 9 2

2 .

4

2

0

.

0

W

6 B 2

.

1 2

5 3 2

0 5 . . 6 4

2 2 0

6 2

0

3

.

2 7

3 .

5 2

2 6

3

9

.

8

2

7

2

2

W B

4

.

3 6

2

W 2 T 4 4 . 1

3 7 2

6

.

7

2 7 2 7

0 1

8 . 2 .

5 3

3

3

3

7 .

. 4 9 W

5 3 . T

3 6

2 2 .

8

2

4

.

9

2

8 . 8 B 2

9

. 5

2

] '

5 . 5

5

4

K [

6 3 .

3

3

2

'

9 .

7 O 4

3

7

. .

6 3

6 2

1

0 = L 3

5 3

5 .

9 9 . 2

V 0

. 3

.

4 W 3

3

.

5

3

2 . 8 0 2

3

9

'

9

2 2

.

. ' 6 . 2 6

3

8 5

2 .

2 = R

8 .

1 3 3

2 . 7

' 3

5

.

6

2 3

8 8 . .

5 5 3

7 3

3

6

.

2 7

.

2 1

.

7

6 3

8 . 5

9 3 9 . 9

7

2

4 . 6 2

2 2

.

.

1

3

3

9

9

9

I

=

B 3 2

6 6

6 3 . 9 4 .

7 4 2 = . W O T [ .

8 6

0

. 3

.

3

T

S

2

. 2 0 4

2

= 8 S 9

O B .

T 6 S 3

2

) N I S

A B 3 5 2 7 .

8 T

2 S

.

S

0

G N I

H

C

A

E

L

(

8 8 . 7 ' 2

= R ]

3

6

.

6

T 0 3 6 9 . 2 . 6 3 3 7 0

H

2

1 . 8

2 2 3 6

= . 2 3

9 2 8

7

9

3

8

0

0

. 0

6

7

. 5

1

0

8 6 1 0

3

4 6

. D 6

I

. 4

0

L

E

C

1

4

. 3 8

'

3 3

6

.

6 . 7

2

.

6 8

5

3

6

5 . 4

3 9

2 . 0 3

. 7

8

8

2

S

4 E G

( C N C O

A ) .

P

, 9 [ 7 2 3

3 1

.

4

8 7 ' 5 ]

9 K

7

6 3 2 9 .

(

4 C O

7 N

C .

3 .

)

1 '

O

. I 3 R

3 4 . O

8 S

2 )

O

0 . .

M

E

5 . 8 3 6 L

L

E I

3

6

.

9

4 0

8 8

0 2

8

.

3

3

0

0

0 R

7 ) ' 7

5

1

0

1 3 0

D

I

L E

C

R

A

( D (

0 P

N

A

3

° O

I

[ R

O

S

O

'

7 . 0

.

F

8 2

1

1 N

C

C

1

4 1

.

E G

A

P

, 9

0

6 8

0

4 9

0

K

O

O (

B .

3

[

(

C 9 O

N

C

.

) ' )

y

8 l r e

A 0

0 m

C r

o

S

F

E

r

D

' o

O

T

. .

J

6 . 9 . 1 3 7 L ] ' E A 3 6 H . 9 6 C

9 I

M 3

'

6

. 8

3

0 8

4

.

8 9 2

6

4

' .

2

8

4 . 3 3 ] 8 y

l

8 r

e 9 m 7

r

o 3 F

7 r

o

.

. w o N

9 . 3 6 2

7 1 2

. . 6

7 '

7 "

.

7

7 D I

L

E

C 1

R

A E P

[ 2

. 5 ' ]

2 8

. 4

. 8 T 2

8 F

. 7

' Q

S

O

P ( S

N A

R

T

2 T

B

3

R

M

9 9

-

2 . 7 3 8

. D ) ±

H C

3

C A 9

S 0 S 9 A 0 ,

M

H 4 1

1 = 7 W A 1

E 4 . 2 3 9 R A .

[

"

1 1

F

r o

w 4

o

N 9

4

2 ( C N C O )

. .

3 . 9 9

8

2 C

T

O

L

8 2 2 9 . ' 2

] 8

4 3

. 8

2 ' 4 .

0

2 . 5 3 9

1 3

.

2

T

H

= 2 3 9

(C . 1 8

O 7 3 N C

.

7 )

9

4 4

. 0 3 7

. . 1

5 9

1 3

3

4

° 4

9 3

.

4

1

9

0 3 .

9

'

6 7

3

1

B . [ 5 9 1 1

2 B . 1 '

2

] .

T B

M -

A C

2

3

9

. 7 6

5 9

3 2 4 3

K 3

K 4

. .

3

3 4 3 0

0 . 9

3 2

9 3 8

. 3

. 1

3

8 7

3 8

3

3 3

B 7

LOT AREA = 14,993 SF .

0 7

. 5 .

7

9

4

7

.

5 9

.

7

9 . .

8

2 . T H 9

= . 7

3 . 4 5 7 6 . 9 4

8 K 3 3 3

5 2

. .

8 .

5 2 4 8 [ . 2

0

. 7

3

3 9

4 2 N

9 . . 6 (

8 2

2 6

8

9

3 H

E

3 4

4

.

8

2 3

0 L

'

. .

' D '

4

)

4

G 6

P (

0 . 5 4

( '

.

8 2

4

2 [

9 G 2 . 1 ) '

2 ]

.

P 3

8 5

C D

4

R L

.

E

9

' 1

H

7

9

(

L

' =

] '

3

5

9 9

.

7

) .

7 2

) 7 3

' 6

3

.

0

. 6 4 0 9

. 6 2

3 3

2 4

4

'

. .

5

4 3 2 . 3

3 3

3

0 . 8

9

. 2 1 9

3

3

3

8

.

1

7

8

. 8 2 0

4 37 .

1 .

5 3

4

3 6

.

6

R 5

4 =

0 3

4 5

. .

7

9 4

5

5

0

.

0 8 . 6 7 2

0

' 1

1

8

. 0

7

'

4

1

4

3

0 9 .

.

6

.

4

3

4

2 8

N

5

3

1 9

T ° 8 5

9 . 0

8 .

' 2 C

3

2

4

"

E

4

2

0

8

1

.

T

3 7 3 2

. C

.

0

3

3

3

5 4 1 8

1

7 3

. . 3

7 3 1 B 0 2 6 . 0 9 ( ' 4 D

) . .

1 1 C

8

7 2

B

5

. C

9

2

3

7

. 9

6

3

7

.

1

8

T

C

2 3 9 .

3

1 3 3 .

4

3

. 3

9 2 8 9

4 . C T 1

3

6 . 9

3

3

B 2 7 . 5 4 T C . 5

6 0

2 7 . 5 5 T C C T C

4

2

4 2 1 ° 4 S

5 . 5

1

8

3 4 . 3

8 C B

0 3 4 . 7 T T = 3 0 3 9 . 5 . 4

9 C B 2 7 . 5 3 B C

2 7 . 0 1 B C

4

.

. R 3 = 4 . 1 8

4

2 3 1

3 1

3

3

9

7

2

2

0

3

4

0

6

.

2

0

' 4 3 2

4 .

' 7

2 8

9

( ( 3

2

9 . 8

7 7

R

C)

2

6 . 1 2

3

7

.

8

3

5 3 8 . 1

W

A 4 (

L L -

T

R 4

L A

C 2 K 6

S

) E 8

4 Y

)

.

8 7

9

4

3

4

. 3

( 6

P

R

A

U L I R

O 2 A

B D

S L

I

C T

R

-

E

5 0

E W '

A T

L

W

L

E

I

D Y

E

)

S

T

R

E E

T 7 ( ( P R I V A T ( E ) N

P P 4

R 1 3 U

I 4 B V

A

L 1/16" = 1'-0"

T

I

C

E

)

) EXISTING CONDITIONS SITE SURVEY 11-19 WALLEY STREET EX5 EAST BOSTON, MA 02128

copyright: EMBARC Studio, llc. 10/6/2017 12:13:52 PM C:\Users\tloranger\Documents\15128_19 Walley_052317_tloranger.rvt OCTOBER 6, 2017 EMBARC Dense Ground Cover Planting Fence Ends Dense Ground Cover Planting Fence Ends

Perimeter Planting

Fence Starts

Fence Starts Perimeter Planting Bike Racks

Bike Racks Concrete Sidewalk Built-In Streetscape Planters

SITE PLAN 11 - 19 WALLEY STREET L1 EAST BOSTON, MA 02128

OCTOBER 2017 MBTA RIGHT OF WAY

PROPERTY LINE RETAINING WALL

TRASH

C C

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

PARKING MBTA PARK 25 SPACES 1 HANDICAP VAN

4 COMPACT 20' 0" - 10,005 SF

16 17 18 19 20 21 22 23 24 25 TWO WAY HANDICAP RAMP VAN 10% C C

LOBBY

UP 16' - 0" BIKE STORAGE ELEV MACH UTILITIES

GARAGE BIKE RACKS ENTRY

NEW CURB CUT EDGE OF SIDEWALK

WALLEY STREET

N

1/16" = 1'-0"

PARKING LEVEL PLAN 11-19 WALLEY STREET A1 EAST BOSTON, MA 02128 copyright: EMBARC Studio, llc. 10/6/2017 11:03:29 AM C:\Users\tloranger\Documents\15128_19 Walley_052317_tloranger.rvt OCTOBER 6, 2017 EMBARC 5' - 10" 16' - 3" 11' - 1" 45' - 3" 9' - 6" 70' - 11" 5' - 9"

PROPERTY LINE 8' 10" -

DECK DECK 5' 8" -

3 BR+ 1 BR 1,311 SF 779 SF 2 BR 1 BR 3 BR 985 SF 696 SF 1,147 SF

STAIR #2

CORRIDOR 1 BR 616 SF 80' 0" -

72' 6" - 7 WALLEY STREET

STAIR #1

3 BR 2 BR+ 1 BR+ 1,160 SF 1,178 SF 830 SF 2 BR 1,017 LOBBY

DECK DECK MAIL

BIKE RACKS 5' 3" - 1' 0" -

RESIDENTIAL 3' 0" - ENTRY

12' - 1" 16' - 3" 13' - 8" 44' - 10" 11' - 7" 29' - 10" 36' - 10" 10' - 2"

WALLEY STREET

N

1/16" = 1'-0"

FIRST FLOOR PLAN 11-19 WALLEY STREET A2 EAST BOSTON, MA 02128 copyright: EMBARC Studio, llc. 10/6/2017 11:03:36 AM C:\Users\tloranger\Documents\15128_19 Walley_052317_tloranger.rvt OCTOBER 6, 2017 EMBARC 16' - 3" 11' - 1" 45' - 3" 9' - 6" 70' - 11"

PROPERTY LINE

DECK DECK

4 BR 1 BR 1,349 SF 776 SF 2 BR 1 BR 3 BR 985 SF 696 SF 1,147 SF

STAIR #2

CORRIDOR 1 BR 616 SF 80' 0" - 72' 6" -

STAIR #1

3 BR 2 BR+ 3 BR 3 BR 1,160 SF 1,176 SF 1,146 SF 1,183 SF

DECK DECK 1' 6" - 16' - 3" 13' - 8" 44' - 10" 11' - 7" 66' - 8"

N

1/16" = 1'-0"

SECOND AND THIRD FLOOR PLAN 11-19 WALLEY STREET A3 EAST BOSTON, MA 02128 copyright: EMBARC Studio, llc. 10/6/2017 11:03:41 AM C:\Users\tloranger\Documents\15128_19 Walley_052317_tloranger.rvt OCTOBER 6, 2017 EMBARC 16' - 3" 11' - 1" 11' - 3" 34' - 0" 9' - 6" 70' - 11"

PROPERTY LINE

DECK 301 SF DECK

4 BR 1,350 SF COMMON ROOM FITNESS CENTER 1 BR 3 BR 952 SF 587 SF 696 SF 1,147 SF

STAIR #2

CORRIDOR 1 BR 616 SF 80' 0" - 72' 6" -

STAIR #1

3 BR 2 BR+ 3 BR 3 BR 1,160 SF 1,176 SF 1,146 SF 1,183 SF

DECK DECK 1' 6" -

16' - 3" 13' - 8" 44' - 10" 11' - 7" 66' - 8"

N

1/16" = 1'-0"

FOURTH FLOOR PLAN 11-19 WALLEY STREET A4 EAST BOSTON, MA 02128 copyright: EMBARC Studio, llc. 10/6/2017 4:24:56 PM C:\Users\tloranger\Documents\15128_19 Walley_052317_tloranger.rvt OCTOBER 6, 2017 EMBARC T.0. ELEV. OVERRIDE VINYL PATIO DOOR FIBER CEMENT CLAPBOARD METAL FRAME VINYL CASEMENT WINDOW 6" EXPOSURE GLASS RAILING FIBER CEMENT PANEL METAL COPING 7'0" - T.O. ROOF 11' - 8" 11'- FOURTH FLOOR 10' - 8" 10'- 50' - 8" 50'- THIRD FLOOR 10' - 8" 10'- SECOND FLOOR 10' - 8" 10'- FIRST FLOOR (40.4) LOBBY 3'4" -

ALUMINUM AND GLASS STOREFRONT 12' - 0" 12'- 8'8" - CEDAR LAP SIDING PARKING LEVEL (28.4) GARAGE DOOR CMU BLOCK PERFORATED METAL SCREEN

1/16" = 1'-0"

WALLEY STREET ELEVATION 11-19 WALLEY STREET A7 EAST BOSTON, MA 02128 copyright: EMBARC Studio, llc. 10/6/2017 11:01:22 AM C:\Users\tloranger\Documents\15128_19 Walley_052317_tloranger.rvt OCTOBER 6, 2017 EMBARC CEDAR LAP SIDING

VINYL CASEMENT WINDOWS METAL FRAME FIBER CEMENT CLAPBOARD ALUMINUM AND GLASS VINYL PATIO DOOR T.0. ELEV. OVERRIDE 6" EXPOSURE STOREFRONT METAL COPING FIBER CEMENT PANEL GLASS RAILING T.O. ROOF

FOURTH FLOOR 50' - 8" 50'- THIRD FLOOR

SECOND FLOOR

FIRST FLOOR (40.4) LOBBY

OPEN TO PARKING BEYOND 0" 12'- 8'8"- 3'4"- 8" 10'- 8" 10'- 8" 10'- 8" 11'- 7'0" - PARKING LEVEL (28.4)

CMU WALL

1/16" = 1'-0"

REAR ELEVATION 11-19 WALLEY STREET A8 EAST BOSTON, MA 02128 copyright: EMBARC Studio, llc. 10/6/2017 11:08:30 AM C:\Users\tloranger\Documents\15128_19 Walley_052317_tloranger.rvt OCTOBER 6, 2017 EMBARC VINYL CASEMENT METAL FRAME WINDOWS METAL FRAME FIBER CEMENT CLAPBOARD VINYL CASEMENT WINDOWS T.0. ELEV. OVERRIDE FIBER CEMENT CLAPBOARD FIBER CEMENT 4" EXPOSURE METAL COPING FIBER CEMENT PANEL 6" EXPOSURE PANEL METAL COPING 7'0" - T.O. ROOF 11' - 8" 11'- FOURTH FLOOR 50' - 8" 50'- 10' - 8" 10'- THIRD FLOOR 10' - 8" 10'- SECOND FLOOR 10' - 8" 10'- FIRST FLOOR (40.4) LOBBY 3'4" - 12' - 0" 12'- 8'8" - PARKING LEVEL (28.4)

CMU WALL PERFORATED CMU BLOCK METAL SCREEN

1/16" = 1'-0"

SIDE ELEVATIONS 11-19 WALLEY STREET A9 EAST BOSTON, MA 02128 copyright: EMBARC Studio, llc. 10/6/2017 11:01:42 AM C:\Users\tloranger\Documents\15128_19 Walley_052317_tloranger.rvt OCTOBER 6, 2017 EMBARC LOOKING ACROSS WALLEY STREET AT ENTRY

RENDERING 11-19 WALLEY STREET A5 EAST BOSTON, MA 02128 copyright: EMBARC Studio, llc. 10/6/2017 11:26:01 AM C:\Users\tloranger\Documents\15128_19 Walley_052317_tloranger.rvt OCTOBER 6, 2017 EMBARC VIEW 1 LOOKING NORTHEAST UP BENNINGTON STREET VIEW 2 LOOKING WEST ACROSS BENNINGTON STREET

VIEW 3 LOOKING SOUTHWEST UP WALLEY STREET FROM SUFFOLK DOWNS MBTA STATION VIEW IN CONTEXT 11-19 WALLEY STREET A11 EAST BOSTON, MA 02128 copyright: EMBARC Studio, llc. 10/5/2017 12:04:04 PM C:\Users\tloranger\Documents\15128_19 Walley_052317_tloranger.rvt OCTOBER 6, 2017 EMBARC PRECEDENT IMAGES 11-19 WALLEY STREET A10 EAST BOSTON, MA 02128 copyright: EMBARC Studio, llc. 10/5/2017 10:46:51 AM C:\Users\tloranger\Documents\15128_19 Walley_052317_tloranger.rvt OCTOBER 6, 2017 EMBARC MBTA RIGHT OF WAY

PROPERTY LINE RETAINING WALL

TRASH

C C

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

MBTA PARK PARKING

36" WIDE PATH 20' 0" - OF TRAVEL

16 17 18 19 20 21 22 23 24 25 TWO WAY HANDICAP RAMP VAN 10%

LOBBY

16' - 0" BIKE STORAGE ELEV MACH UTILITIES

GARAGE BIKE RACKS ENTRY

NEW CURB CUT EDGE OF SIDEWALK

WALLEY STREET

N

1/16" = 1'-0"

ACCESSIBLE PATH OF TRAVEL DIAGRAM 11-19 WALLEY STREET AC1 EAST BOSTON, MA 02128 copyright: EMBARC Studio, llc. 10/10/2017 2:19:48 PM C:\Users\tloranger\Documents\15128_19 Walley_052317_tloranger.rvt OCTOBER 6, 2017 EMBARC 5' - 10" 16' - 3" 11' - 1" 45' - 3" 9' - 6" 70' - 11" 5' - 9"

PROPERTY LINE 8' 10" -

DECK DECK 5' 8" -

3 BR+ 1 BR

2 BR 1 BR 3 BR

STAIR #2

CORRIDOR 1 BR 80' 0" -

72' 6" - 7 WALLEY STREET

STAIR #1

3 BR 2 BR+ 1 BR+

2 BR LOBBY 36" WIDE PATH OF TRAVEL DECK DECK MAIL

BIKE RACKS 5' 3" - 1' 0" -

RESIDENTIAL 3' 0" - ENTRY

12' - 1" 16' - 3" 13' - 8" 44' - 10" 11' - 7" 29' - 10" 36' - 10" 10' - 2"

WALLEY STREET

N

1/16" = 1'-0"

ACCESSIBLE PATH OF TRAVEL DIAGRAM 11-19 WALLEY STREET AC2 EAST BOSTON, MA 02128 copyright: EMBARC Studio, llc. 10/10/2017 2:19:53 PM C:\Users\tloranger\Documents\15128_19 Walley_052317_tloranger.rvt OCTOBER 6, 2017 EMBARC Biodiversity At MBTA Abutter SITE FENCE Wildlife friendly plantings Horizontal board fence at & practices at MBTA Abutters for screening and Abutter with a range of privacy. groundcovers, that can help support biodiversity in the neighborhood FASTIGIATE URBAN TREES FASTIGIATE At Abutters Columnar Trees CONCEPT Narrow Trees for Narrow Site providing a soft screen for neighboring properties

SITE FENCING + PLANTING 11 - 19 WALLEY STREET L2 EAST BOSTON, MA 02128

OCTOBER 2017 Built-in Steel Streetscape Planters The planters are planted with ornamental grass- es and sculptural evergreens plants for year- round appeal.

Planters step with grade from 6” reveal to 18” reveal maximum

BUILT-IN STREETSCAPE PLANTERS

STREETSCAPE 11 - 19 WALLEY STREET L3 EAST BOSTON, MA 02128

OCTOBER 2017 CONCEPT Good bike parking design using permanently fixed racks, orderly appearance, secure and simple to use.

PROPOSED RACK

Proposed Rack Proposed Rack

BIKE PARKING 11 - 19 WALLEY STREET L4 EAST BOSTON, MA 02128

OCTOBER 2017 Article 80 | ACCESSIBILTY CHECKLIST

1. Project Information: If this is a multi-phased or multi-building project, fill out a separate Checklist for each phase/building.

Project Name: 11 Walley

Primary Project Address: 11-19 Walley Street, East Boston

Total Number of 1 phase / 1 building Phases/Buildings: Primary Contact Richard C. Lynds. Esq. (Name / Title / Company / Law Office of Richard C. Lynds Email / Phone): 245 Sumner Street Suite 110 East Boston, MA 02128 [email protected] 617-207-1190 Owner / Developer: MG2 Group

Architect: Embarc Studio 60 K Street, 3rd Floor Boston, MA 02127 617-766-8330 Civil Engineer: Columbia Design Group 14 Upham Ave. Dorchester, MA 02125 617-506-1474 Landscape Architect: TBD

Permitting: Richard C. Lynds. Esq.

Construction TBD Management: At what stage is the project at time of this questionnaire? Select below: PNF / Expanded PNF Draft / Final Project Impact BPDA Board Approved Submitted Report Submitted BPDA Design Under Construction Construction Completed: Approved

1 Article 80 | ACCESSIBILTY CHECKLIST

Do you anticipate filing for any variances No with the Architectural Access Board (MAAB)? If yes, identify and explain.

2. Building Classification and Description: This section identifies preliminary construction information about the project including size and uses.

What are the dimensions of the project? Site Area: 14,993 SF Building Area: 47, 330 GSF Building Height: 50 FT 8 IN Number of Stories: 4 Flrs. First Floor Elevation: 3.9 FT Is there below grade space: Yes What is the Construction Type? (Select most appropriate type) Wood Frame Masonry Steel Frame Concrete

What are the principal building uses? (IBC definitions are below – select all appropriate that apply) Residential – Residential - Institutional Educational One - Three Unit Multi-unit, Four + Business Mercantile Factory Hospitality Laboratory / Storage, Utility Medical and Other List street-level uses of the building: Retail, Residential Lobby, Garage Entry 3. Assessment of Existing Infrastructure for Accessibility: This section explores the proximity to accessible transit lines and institutions, such as (but not limited to) hospitals, elderly & disabled housing, and general neighborhood resources. Identify how the area surrounding the development is accessible for people with mobility impairments and analyze the existing condition of the accessible routes through sidewalk and pedestrian ramp reports.

Provide a description of the neighborhood Walley Street is part of the Orient Heights neighborhood. The project where this development is located and its site abuts MBTA railway in the rear. The topography slopes identifying topographical characteristics: approximately 13 ft from the westerly corner to the eastern corner of the lot.

List the surrounding accessible MBTA transit Suffolk Downs Station on the Blue Line is just under 400 ft or 1 lines and their proximity to development site: minutes’ walk from project site. Bus 120 stops at corner of Walley and commuter rail / subway stations, bus stops: Galdstone St and is 400 ft away.

2 Article 80 | ACCESSIBILTY CHECKLIST

List the surrounding institutions: hospitals, BHA Orient Heights, Manassah E Bradley School, Don Orione Home, public housing, elderly and disabled housing Curtis Guild Elementary School developments, educational facilities, others:

List the surrounding government buildings: BCYF Martin Pino Community Center, East Boston YMCA libraries, community centers, recreational facilities, and other related facilities: 4. Surrounding Site Conditions – Existing: This section identifies current condition of the sidewalks and pedestrian ramps at the development site.

Is the development site within a historic No district? If yes, identify which district:

Are there sidewalks and pedestrian ramps Existing sidewalk is 5’-0” in width from the southerly corner to about existing at the development site? If yes, list half point along Walley Street. The remainder of the frontage on the existing sidewalk and pedestrian ramp Walley Street has no sidewalk. dimensions, slopes, materials, and physical No existing pedestrian ramp. condition at the development site:

Are the sidewalks and pedestrian ramps Sidewalk in front of the property will be replaced. existing-to-remain? If yes, have they been verified as ADA / MAAB compliant (with yellow composite detectable warning surfaces, cast in concrete)? If yes, provide description and photos:

5. Surrounding Site Conditions – Proposed This section identifies the proposed condition of the walkways and pedestrian ramps around the development site. Sidewalk width contributes to the degree of comfort walking along a street. Narrow sidewalks do not support lively pedestrian activity, and may create dangerous conditions that force people to walk in the street. Wider sidewalks allow people to walk side by side and pass each other comfortably walking alone, walking in pairs, or using a wheelchair.

Are the proposed sidewalks consistent with Yes, Neighborhood residential the Boston Complete Street Guidelines? If yes, choose which Street Type was applied: Downtown Commercial, Downtown Mixed- use, Neighborhood Main, Connector,

3 Article 80 | ACCESSIBILTY CHECKLIST

Residential, Industrial, Shared Street, Parkway, or Boulevard. What are the total dimensions and slopes of Frontage zone width (setback) varies from 6 ft to 8 ft. the proposed sidewalks? List the widths of the Pedestrian zone width is 5’-0” proposed zones: Frontage, Pedestrian and Furnishing Zone:

List the proposed materials for each Zone. Frontage zone is on private property and proposed material is Will the proposed materials be on private concrete at the garage and pedestrian entrance and landscape area. property or will the proposed materials be on Pedestrian zone is existing concrete and new concrete to match. the City of Boston pedestrian right-of-way?

Will sidewalk cafes or other furnishings be No. programmed for the pedestrian right-of-way? If yes, what are the proposed dimensions of the sidewalk café or furnishings and what will the remaining right-of-way clearance be?

If the pedestrian right-of-way is on private No. property, will the proponent seek a pedestrian easement with the Public Improvement Commission (PIC)?

Will any portion of the Project be going No. through the PIC? If yes, identify PIC actions and provide details.

6. Accessible Parking: See Massachusetts Architectural Access Board Rules and Regulations 521 CMR Section 23.00 regarding accessible parking requirement counts and the Massachusetts Office of Disability – Disabled Parking Regulations.

What is the total number of parking spaces 25 parking spaces, all in garage which is below sidewalk level. provided at the development site? Will these be in a parking lot or garage?

What is the total number of accessible spaces There is one van accessible parking space with 8 foot access aisle. provided at the development site? How many of these are “Van Accessible” spaces with an 8 foot access aisle?

4 Article 80 | ACCESSIBILTY CHECKLIST

Will any on-street accessible parking spaces TBD be required? If yes, has the proponent contacted the Commission for Persons with Disabilities regarding this need?

Where is the accessible visitor parking TBD located?

Has a drop-off area been identified? If yes, Not required. will it be accessible?

7. Circulation and Accessible Routes: The primary objective in designing smooth and continuous paths of travel is to create universal access to entryways and common spaces, which accommodates persons of all abilities and allows for visitability with neighbors.

Describe accessibility at each entryway: Entrance to residential lobby will be a flush condition with sidewalk. Example: Flush Condition, Stairs, Ramp, Lift Elevator threshold will be a flush condition on all floors. or Elevator:

Are the accessible entrances and standard Yes. Entrance to residential lobby are accessible and integrated. entrance integrated? If yes, describe. If no, what is the reason?

If project is subject to Large Project Review/Institutional Master Plan, describe the accessible routes way-finding / signage package.

8. Accessible Units (Group 2) and Guestrooms: (If applicable) In order to facilitate access to housing and hospitality, this section addresses the number of accessible units that are proposed for the development site that remove barriers to housing and hotel rooms.

What is the total number of proposed housing 38 dwelling units. units or hotel rooms for the development?

If a residential development, how many units All dwelling units are for rent. are for sale? How many are for rent? What is

5 Article 80 | ACCESSIBILTY CHECKLIST

the breakdown of market value units vs. IDP (Inclusionary Development Policy) units?

If a residential development, how many (35) units will meet Group 1 requirements and (3) units will meet accessible Group 2 units are being proposed? accessible Group 2 requirements.

If a residential development, how many TBD accessible Group 2 units will also be IDP units? If none, describe reason.

If a hospitality development, how many N/A accessible units will feature a wheel-in shower? Will accessible equipment be provided as well? If yes, provide amount and location of equipment.

Do standard units have architectural barriers No. that would prevent entry or use of common space for persons with mobility impairments? Example: stairs / thresholds at entry, step to balcony, others. If yes, provide reason.

Are there interior elevators, ramps or lifts Elevator provides access to all floors. There are no ramps or lifts in the located in the development for access around development. architectural barriers and/or to separate floors? If yes, describe:

9. Community Impact: Accessibility and inclusion extend past required compliance with building codes. Providing an overall scheme that allows full and equal participation of persons with disabilities makes the development an asset to the surrounding community.

Is this project providing any funding or The project will make a direct contribution to the Salesian improvements to the surrounding Boys and Girls Club ($5000.00) as well as a contribution neighborhood? Examples: adding extra street to the Friends of the Belle Isle Marsh ($2500.00). In addition, the trees, building or refurbishing a local park, or proponent proposes to adopt the island located at the intersection of Walley, Orient Ave, and Waldemar Avenue and provide ongoing supporting other community-based landscaping and seasonal maitnenace and planding for ten (10) years initiatives? with an annual estimated cost of upto $5,000.

6 Article 80 | ACCESSIBILTY CHECKLIST

What inclusion elements does this Common Room and Fitness Room are fully accessible. development provide for persons with disabilities in common social and open spaces? Example: Indoor seating and TVs in common rooms; outdoor seating and barbeque grills in yard. Will all of these spaces and features provide accessibility?

Are any restrooms planned in common public No. spaces? If yes, will any be single-stall, ADA compliant and designated as “Family”/ “Companion” restrooms? If no, explain why not.

Has the proponent reviewed the proposed TBD plan with the City of Boston Disability Commissioner or with their Architectural Access staff? If yes, did they approve? If no, what were their comments?

Has the proponent presented the proposed TBD plan to the Disability Advisory Board at one of their monthly meetings? Did the Advisory Board vote to support this project? If no, what recommendations did the Advisory Board give to make this project more accessible?

10. Attachments Include a list of all documents you are submitting with this Checklist. This may include drawings, diagrams, photos, or any other material that describes the accessible and inclusive elements of this project.

Provide a diagram of the accessible routes to and from the accessible parking lot/garage and drop-off areas to the development entry locations, including route distances.

Provide a diagram of the accessible route connections through the site, including distances.

Provide a diagram the accessible route to any roof decks or outdoor courtyard space? (if applicable)

Provide a plan and diagram of the accessible Group 2 units, including locations and route from accessible entry.

7 Article 80 | ACCESSIBILTY CHECKLIST

Provide any additional drawings, diagrams, photos, or any other material that describes the inclusive and accessible elements of this project. • • • •

This completes the Article 80 Accessibility Checklist required for your project. Prior to and during the review process, Commission staff are able to provide technical assistance and design review, in order to help achieve ideal accessibility and to ensure that all buildings, sidewalks, parks, and open spaces are usable and welcoming to Boston's diverse residents and visitors, including those with physical, sensory, and other disabilities.

For questions or comments about this checklist, or for more information on best practices for improving accessibility and inclusion, visit www.boston.gov/disability, or our office:

The Mayor’s Commission for Persons with Disabilities 1 City Hall Square, Room 967, Boston MA 02201.

Architectural Access staff can be reached at: [email protected] | [email protected] | [email protected] | 617-635-3682

8