Offering Summary

Total Page:16

File Type:pdf, Size:1020Kb

Offering Summary OFFERING SUMMARY DISTANCE TO: TRANSACTION OVERVIEW Day Square Restaurants: 200 feet, 1 minute walk Wood Island T Stop: 800 feet, 2 minute walk Holliday Fenoglio Fowler, L.P. (“HFF”) is pleased to offer, on an Logan Aiport: 0.8 miles, 2 minute drive exclusive basis, the opportunity to lease or acquire a 1.17 acre Downtown Boston: 2.9 miles, 5 minute drive parcel of land located at 413-419 Bremen Street in Boston, Massachusetts (the “Site” or “Property”). The current owners will also consider joint venture proposals for the Site. Subject to government approvals and permits, the Site is ideally suited for hotel development and a preliminary development program calls for a seven-story, select-service hotel with 180 guest rooms and 90 parking spaces. The Site is located in Boston’s East Boston neighborhood, less than one mile from Boston Logan International Airport and less than three miles to Downtown Boston. The Site is also within walking distance of numerous restaurants and the Wood Island blue line subway stop which provides easy access to Downtown Boston. Further, the Site benefits from excellent access and visibility for north and southbound travelers on Route 1A. The City of Boston benefits from a diverse and thriving economy focused on the following key industries: healthcare, higher- education, tourism, finance, professional and business services, biotechnology, information technology and government. Boston Logan International Airport is New England’s largest transportation center, generating $7 billion in economic activity each year. In 2016, Boston Logan International Airport served 36.3 million total passengers, an 8.5% increase over the prior year. The Site at 413-419 Bremen Street offers investors the opportunity to lease, acquire or form a joint venture for the best hotel development site at Boston Logan International Airport and to build a hotel in the high-barrier-to-entry Boston lodging market. The Site is being offered unencumbered by brand and management, allowing a new owner complete flexibility to design, build and operate the hotel of their choosing. 2 PROPOSED SITE PLAN SITE OVERVIEW 413 - 419 Bremen Street / 355 Bennington Street Address: Boston, MA 02128 Parcel ID: 0104196100 Property Type: Commercial Classification Code: 317 (Commercial Property / OLD WHSE, GARAGE) Lot Size: 50,932 SF Owner: 413-419 Brement Street LLC 3 INVESTMENT HIGHLIGHTS • STRATEGICALLY LOCATED, HIGHLY VISIBLE HOTEL DEVELOPMENT SITE. The Site benefits from a strategic location in East Boston’s Day Square, less than 100 yards from multiple great restaurants, less than one mile from Boston Logan International Airport and less than three miles to Downtown Boston. The 1.17 acre Site is located at the corner of Bremen Street and Bennington Street. The Site is highly visible from Route 1A and easily accessible for north and southbound travelers. Further, the Site is located within walking distance of the Wood Island blue line subway stop which provides easy access to Downtown Boston in less than 10 minutes. • COMPETITIVELY SUPERIOR ACCESS TO BOSTON LOGAN INTERNATIONAL AIRPORT. Most of the hotels in the airport market are located at least one mile northeast on Route 1A in the Town of Revere or across the Chelsea River in the Town of Chelsea. As a result, the proposed hotel will enjoy competitively superior access to the airport which is reachable in less than two minutes by car. • BOSTON LOGAN INTERNATIONAL AIRPORT: NEW ENGLAND’S LARGEST TRANSPORTATION CENTER. More than 40 airlines fly nonstop to more than 100 domestic and international destinations from Boston Logan International Airport. There are currently 54 international destinations that are reachable via nonstop flights – a number that has steadily increased in recent years. The airport served 36.3 million total passengers in 2016 which is an 8.5% increase over the prior year. The proposed hotel will benefit from its close proximity to one of the Boston market’s largest and fastest growing lodging demand generators. • PRELIMINARY HOTEL PROGRAM, 180-ROOM SELECT-SERVICE HOTEL. Subject to government approvals and permits, the Site is ideally suited for hotel development. A preliminary development program for the Site calls for a seven-story, select-service hotel with 180 guest rooms and 90 parking spaces. The public spaces can accommodate typical select-service hotel amenities including food & beverage, a gift shop, a pool and a fitness center. • BOSTON: A THRIVING, HIGH-BARRIER-TO-ENTRY LODGING MARKET. Greater Boston is one of the top performing lodging markets in the U.S., trailing only New York, San Francisco, Oahu and Miami in RevPAR. In 2016, the competitive set hotels in the airport market achieved an 86.4% occupancy, a $203.27 average daily rate and a $175.69 RevPAR. Boston is also considered a high-barrier-to-entry lodging market primarily due to the lack of developable land. The market is forecasted to achieve continued growth in the years ahead due to solid supply and demand fundamentals. • UNENCUMBERED BY BRAND AND MANAGEMENT. The Site is being offered unencumbered by brand and management, allowing a new owner complete flexibility in designing, building and operating the hotel. Depending on a new owner’s business plan, a multitude of select-service and extended-stay hotel brands remain available in the market. 4 LOCATIONMEDFORD MAP MALDEN 1 Everett REVERE CHELSEA SOMERVILLE 1 Charlestown 93 East Boston CAMBRIDGE 90 Boston Logan International BOSTON Airport Downtown 90 Boston CHARLES RIVER Back Bay Seaport District 90 South End South Boston PLEASURE 93 BAY BROOKLINE 5 Dudley Square JAMAICA POND Roxbury Jamaica Plain 1 Dorchester FRANKLIN PARK ARNOLD ARBORETUM FOREST HILLS CEMETERY Roslindale Mattapan CONTACT INFORMATION hfflp.com DENNY MEIKLEHAM ALAN SUZUKI MATTHEW ENRIGHT Managing Director Director Associate 617.848.1560 617.848.1575 617.848.1851 [email protected] [email protected] [email protected] ©2017 Holliday Fenoglio Fowler, L.P. (“HFF”), HFF Securities L.P. and HFF Securities Limited (collectively, “HFFS”) are owned by HFF, Inc. (NYSE: HF). HFF operates out of 24 offices and is a leading provider of commercial real estate and capital markets services to the global commercial real estate industry. HFF, together with its affiliates, offers clients a fully integrated capital markets platform including debt placement, investment sales, equity placement, advisory services, loan sales and commercial loan servicing. For more information, please visit hfflp.com or follow HFF on Twitter @HFF..
Recommended publications
  • Suffolk Downs Redevelopment
    SUFFOLK DOWN S REDEVELOPMENT Additional Information Document SEPTEMBER 16, 2019 PREPARED BY SUBMITTED TO IN ASSOCIATION WITH Boston Planning & DLA Piper Development Agency CBT Architects Beals and Thomas, Inc. Stoss Landscape Urbanism PROPONENT ARUP The McClellan Highway AKF Development Company, LLC SourceOne c/o The HYM Investment Group, LLC Vertex Haley & Aldrich Boston, MA 02114 Additional Information Document Suffolk Downs Redevelopment Boston, Massachusetts SUBMITTED TO Boston Redevelopment Authority, d/b/a Boston Planning and Development Agency One City Hall Square, 9th Floor Boston, MA 02201 PROPONENT The McClellan Highway Development Company, LLC c/o The HYM Investment Group, LLC One Congress Street, 11th floor Boston, MA 02114 PREPARED BY VHB 99 High Street, 10th Floor Boston, MA 02110 In association with: DLA Piper ARUP CBT Architects SourceOne Beals and Thomas, Inc. Vertex Stoss Landscape Urbanism Haley & Aldrich AKF September 16, 2019 Suffolk Downs Redevelopment Additional Information Document Table of Contents Additional Information Document 1.1 Summary of BPDA Review Process .............................................................................................................. 1 1.2 Master Plan Project Refinements Since Previous Filings ..................................................................... 2 1.3 PDA Master Plan Document Structure ....................................................................................................... 3 1.3.1 Proposed Development Framework ...............................................................................................
    [Show full text]
  • Early Voting Location (Octubre 21-25, (Octubre 31 – (Octubre 26, 2019) (Octubre 27, 2019) (Octubre
    RESOLUTION NO. 2019-71 CALLING A SPECIAL ELECTION TO BE HELD ON TUESDAY, NOVEMBER 5, 2019 A RESOLUTION CALLING A SPECIAL ELECTION TO BE HELD ON TUESDAY, NOVEMBER 5, 2019, FOR THE PURPOSE OF SUBMITTING TO THE QUALIFIED ELECTORS OF THE METROPOLITAN TRANSIT AUTHORITY OF HARRIS COUNTY, TEXAS (“METRO”) A PROPOSITION TO AUTHORIZE METRO TO ISSUE BONDS, NOTES AND OTHER OBLIGATIONS PAYABLE, IN WHOLE OR IN PART, FROM SEVENTY-FIVE PERCENT (75%) OF METRO’S SALES AND USE TAX REVENUES, WITH NO RESULTING INCREASE IN THE CURRENT RATE OF METRO’S SALES AND USE TAX, FOR THE ACQUISITION, CONSTRUCTION, REPAIR, EQUIPPING, IMPROVEMENT AND/OR EXTENSION OF METRO’S TRANSIT AUTHORITY SYSTEM (AS DESCRIBED IN THE METRONEXT TRANSIT SYSTEM PLAN), TO APPROVE SUCH PLAN AND THE CONSTRUCTION OF A PHASE III OF METRO’S RAIL SYSTEM KNOWN AS “METRORAIL” FOR PURPOSES OF THE CITY CHARTER OF THE CITY OF HOUSTON, AND TO CONTINUE TO DEDICATE UP TO TWENTY-FIVE PERCENT (25%) OF METRO’S SALES AND USE TAX REVENUES THROUGH SEPTEMBER 30, 2040, FOR STREET IMPROVEMENTS, MOBILITY PROJECTS AND OTHER FACILITIES AND SERVICES; AND MAKING OTHER PROVISIONS RELATED TO THE SUBJECT STATE OF TEXAS § METROPOLITAN TRANSIT AUTHORITY OF HARRIS COUNTY, TEXAS § WHEREAS, the Metropolitan Transit Authority of Harris County, Texas (“METRO”) was created pursuant to Chapter 141, Acts of the 63rd Legislature of the State of Texas, Regular Session, 1973 (Article 1118x, Vernon’s Texas Civil Statutes, as amended, now codified as Chapter 451, Texas Transportation Code, as amended (the “METRO Act”)), and was confirmed
    [Show full text]
  • The Residences at 245 Sumner Street East Boston
    The Residences at 245 Sumner Street East Boston Application for Article 80 Small Project Review Boston Redevelopment Authority April 14, 2014 Developer/Proponent: Velkor Realty Trust / Brian J. Hosker Architect: Clinton Design Architects Counsel: The Law Offices of Richard C. Lynds 1216 Bennington Street Boston, Massachusetts 02128 Tel. 617-207-1190 The Residences at 245 Sumner Street East Boston Table of Contents Letter of Transmittal and Project Notification Form P.3 Project Team P.5 Project Description / Unit Mix P.6 Neighborhood Context P.8 Public Benefits: Job Creation and Affordable Housing P.8 Traffic, Parking and Vehicular and Pedestrian Access P.8 Neighborhood Site Maps P.9 Existing and Proposed Site Plans P.11-12 Historic Context P.13 Neighborhood Photographs P.14-16 Zoning Analysis P.17 Anticipated Permits and Further Public Review P.18 Appendix D: Architectural Plans and Elevations Appendix A: Existing Site Plan Appendix C: Permitting Applications and Appeals Appendix D: Notice of Intent to File PNF and Preliminary Traffic Impact Assessment (Engagement) 2 Law Offices of Richard C. Lynds _________________________ 1216 BENNINGTON STREET E. BOSTON, MASSACHUSETTS 02128 TEL: 617.207.1190 FAX: 617.207.1195 ______________________ EMAIL: [email protected] April 14, 2014 VIA IN HAND DELIVERY Mr. Brian Golden, Acting Director Boston Redevelopment Authority One City Hall Square Boston, MA 02201-1007 Re: Project Notification Form Article 80 Small Project Review Application 245 Sumner Street, East Boston Dear Director Golden: This office represents the interests of Velkor Realty Trust and Brian J. Hosker (the “Proponent”) with respect to the real property located at 245 Sumner Street, East Boston (Ward 1).
    [Show full text]
  • District Journal for Jul 30, 2021 - Aug 02, 2021, District: ALL
    District Journal for Jul 30, 2021 - Aug 02, 2021, District: ALL Date: Reported Record Count: 689 Report Date & Time Complaint # Occurrence Date & Time Officer 7/30/2021 12:13:46 AM 212052583-00 7/29/2021 11:29:00 PM Location of Occurrence 100 STUART ST Nature of Incident ROBBERY Report Date & Time Complaint # Occurrence Date & Time Officer 7/30/2021 12:45:21 AM 212052585-00 7/30/2021 12:38:00 AM 144457 JOHN HOLLERBACH Location of Occurrence 40 NEW SUDBURY ST Nature of Incident VANDALISM Report Date & Time Complaint # Occurrence Date & Time Officer 7/30/2021 12:48:28 AM 212052587-00 7/29/2021 12:26:00 AM 011891 JAMES CLARK Location of Occurrence 15 RADNOR RD Nature of Incident INVESTIGATE PROPERTY Report Date & Time Complaint # Occurrence Date & Time Officer 7/30/2021 12:59:08 AM 212052588-00 7/29/2021 10:45:00 PM 009601 ANTHONY PLATT Location of Occurrence 1165 BLUE HILL AVE Nature of Incident VANDALISM Report Date & Time Complaint # Occurrence Date & Time Officer 8/2/2021 3:13:25 PM Boston Police Department 7/30/2021 1:26:30 AM 212052593-00 7/30/2021 12:44:00 AM 010145 DAVEY STEPHENS Location of Occurrence 677 CUMMINS HWY Nature of Incident M/V - LEAVING SCENE - PROPERTY DAMAGE Report Date & Time Complaint # Occurrence Date & Time Officer 7/30/2021 1:49:30 AM 212052595-00 7/30/2021 1:01:00 AM 148249 JOHN CANTY Location of Occurrence 198 IPSWICH ST Nature of Incident TOWED MOTOR VEHICLE Report Date & Time Complaint # Occurrence Date & Time Officer 7/30/2021 1:53:04 AM 212052591-00 7/30/2021 12:25:00 AM 102172 RORY COLEMAN Location of
    [Show full text]
  • The Lower Mystic River Corridor Strategy
    The Lower Mystic River Corridor Strategy: Working Together to Achieve the Full Potential of the Lower Mystic Boston Redevelopment Authority City of Chelsea City of Everett City of Malden City of Medford City of Somerville Metropolitan Area Planning Council June 2009 This project was funded under the District Local Technical Assistance program created by Chapter 205 of the Acts of 2006 and a contribution from the Massachusetts Water Resources Authority ACKNOWLEDGEMENTS AND CREDITS This plan was prepared for the cities of Boston, Chelsea, Everett, Malden, Medford and Somerville by the Metropolitan Area Planning Council (MAPC). The plan was funded under the District Local Technical Assistance Program created by Chapter 205 of the Acts of 2006 and a contribution from the Massachusetts Water Resources Authority. MAPC Officers President: Jay Ash Vice President: Michelle Ciccolo Secretary: Marilyn Contreas Treasurer: Grace S. Shepard Executive Director: Marc D. Draisen Credits Project Manager: Joan Blaustein Project Planner: Christine Wallace, P.E. Mapping/GIS Services: Allan Bishop, Susan Brunton Steering Committee City of Boston: John Read, Senior Planner, Boston Redevelopment Authority City of Chelsea: John DePriest, AICP, Director of Planning and Development. City of Everett: Marzie Galaska, Director of Planning and Community Development City of Malden: Deborah Burke, Project Director, Mayor’s Office City of Medford: Clodagh Stoker-Long, Economic Development Planner, Office of Community Development. City of Somerville: Stephen Winslow, Senior Planner TABLE OF CONTENTS Page I. Magic of the Mystic: A Vision for the Lower Mystic Valley 1 II. Executive Summary 3 III. Project Overview 5 IV. The Six Mystic River Corridor Strategies 19 1.
    [Show full text]
  • Commonwealth of Massachusetts
    Attachment B Page 34 of 63 266-268 BENN INGTON EAST 622 ROBERTO RITA M ST EAST BOSTON MA 282 BENNINGTON ST BOSTON MA 02128 100 093 100093000 0 .05 RECINOS 411 SARATOGA EAST 623 GERARDO ST EAST BOSTON MA 411 SARATOGA ST BOSTON MA 02128 100 065 100065000 0.06 DASILVA JACQUELINE BARBOSA C/O JACQUELINE 409 SARATOGA 624 DASILVA ST EAST BOSTON MA 21 JANVRIN AV REVERE MA 02151 100 064 100064000 0.06 MEJIA 414 SARATOGA EAST 625 FRANCISCO ST EAST BOSTON MA 414 SARATOGA ST BOSTON MA 02128 100 143 100143000 0.06 412 SARATOGA 626 NGUYEN LY ST EAST BOSTON MA 10 STURTEVANT ROAD QUINCY MA 02169 100 144 100144000 0.05 TWO65 PRINCETON LLC C/O BROOK PROPERTY 265 PRINCETON BROOKLIN 627 MANAGEMENT ST EAST BOSTON MA 193 HARVARD STREET E MA 02115 100 101 100101000 0.07 263 PRINCETON EAST 628 LOBO MIRNA E ST EAST BOSTON MA 263 PRINCETON ST BOSTON MA 02128 100 100 100100000 0.07 SILLARI JEAN M TS C/O GINA L 272 PRINCETON EAST 629 TIERNO ST EAST BOSTON MA 272 PRINCETON ST BOSTON MA 02128 100 198 100198000 0.06 TWO67 LEXINGTON ST C/O NANCY F 267 LEXINGTON 630 CHERAZIE ST EAST BOSTON MA 234 OLD MARLBORO RD CONCORD MA 1742 100 154 100154000 0.04 BOWEN EDWARD 267 LEXINGTON 267 LEXINGTON ST, APT EAST 630.01 J ST, APT 1 EAST BOSTON MA 1 BOSTON MA 02128 100 154 100154002 0.04 267 LEXINGTON 267 LEXINGTON ST, APT EAST 630.02 KLEIN LEAH A ST, APT 2 EAST BOSTON MA 2 BOSTON MA 02128 100 154 100154004 0.04 267 LEXINGTON 267 LEXINGTON ST, APT EAST 630.03 BAKER MICHAEL ST, APT 3 EAST BOSTON MA 3 BOSTON MA 02128 100 154 100154006 0.04 HODGES LECLAIRE 267 LEXINGTON 267 LEXINGTON
    [Show full text]
  • 2020 Public Records Request
    MWRA Public Information Requests 2020 Nature of request The date on The date on Petitions submitted under The date on The number of The number of Fees charged to Requests The time The final which the which a clause (iv) of subsection (d) which a public hours required hours required to the person appealed required to adjudication of request was response is of section 10 (Yes/No) record is to fulfill the fulfill the request making the under section comply with any court received provided to provided to the request (hours) (minutes) request, if any 10A (Yes/No) supervisor of proceedings the requestor requestor records under subsection orders under (d) of said said section section 10A 10A 1 Record Plan: Section 111 1/2/2020 1/3/2010 1/3/2010 1 0 $0.00 No Oakdale Avenue and Fairview Street, Dedham 1 Record Plan: Section 77 1/2/2020 1/3/2020 1/3/2020 1 0 $0.00 No Lagrange Street, West Roxbury Sewer plans for Maple Street, 1/6/2020 1/6/2020 1/6/2020 1 30 $0.00 No Chilton Road and Avalon Road in Boston 5 Detail Records: Section 4 and 1/6/2020 01/06/20 01/06/20 1 0 $0.00 No Mystic 30" Main, Pearl Street, Somerville Sewer plans for an existing 1/7/2020 1/7/2020 1/7/2020 1 30 $0.00 No culvert beneath railroad tracks in Everett Remote Headworks Final 1/6/2020 1/6/2020 1/8/2020 0 45 $0.00 No Concept Design Report for Remote Headworks (August 19, 2009); Remote Headworks Final Concept Design Report on Solids Handling Systems (August 11, 2009); and Remote Headworks Upgrade PDR (September 2011) Engineering plans for Revere 1/7/2020 1/8/2020 1/8/2020 3
    [Show full text]
  • Section 7 Analysis of Needs
    Exhibit GR-10 Open Space Plan 2008-2014 Section 7 Analysis of Needs Section 7.2.6 Community Open Space & Recreation EAST BOSTON Section 7 Needs Analysis Section 7.2.6: Community Open Space & Recreation EAST BOSTON THE SETTING History Originally a five-island group, East Boston was connected to Boston with the establishment of the first ferry in 1637. In the 1833, William Sumner established the East Boston Company to develop this area as one of the first planned communities in Boston. From 1840 to 1865, East Boston began to expand rapidly, becoming a major site for the construction of world-famous clipper ships by well known builders such as Donald McKay and Samuel Hall. Thus, East Boston became a significant transportation center and shipping port. Attracting a large number of immigrants seeking employment in the shipbuilding industry, its population began to grow dramatically. With the Cunard Line establishing a port of entry in the Maverick Square area by 1839, East Boston became the Ellis Island of New England. In 1905, the first subway tunnel to downtown was opened. The development of Logan Airport in 1923, the Sumner Tunnel in 1934, and other transportation related projects severely impacted the neighborhood. Local industrial facilities began to decline in favor of airport related development and many families left for the suburbs. Today, despite such pressures, East Boston has stabilized as a neighborhood and in the recent years has had many new investments geared toward public facilities. The third harbor tunnel (aka Ted Williams Tunnel) has helped reduce airport bound traffic on residential streets.
    [Show full text]
  • Rumney Marshes ACEC Salt Marsh Restoration Plan 2
    RUMNEY MARSHES AREA OF CRITICAL ENVIRONMENTAL CONCERN Salt Marsh Restoration Plan Rumnit:y 1\1:ar~h, °t'IUf;U'.\-· Commonwealth of Massachusetts Executive Office of Environmental Affairs May 2002 Jane Swift Bob Durand Governor Secretary Wetland Restoration Program Department of Christy Foote-Smith Environmental Management Director Peter C. Webber Commissioner M 0Ho.ch1..-lt• \,\/c 1to.,d• R ~•toro~l,po, P""1J•Ct,.. RUMNEY MARSHES AREA OF CRITICAL ENVIRONMENTAL CONCERN Salt Marsh Restoration Plan May 2002 Prepared by: Massachusetts Wetland Restoration Program Executive Office of Environmental Affairs One Winter Street, 5th Floor Boston, MA 02108 Christy Foote-Smith, Director And: Massachusetts Department of Environmental Management Areas of Critical Environmental Concern Program 251 Causeway St., Suite 700 Boston, MA 02114-2104 Peter C. Webber, Commissioner On Behalf Of: The Rumney Marshes ACEC Salt Marsh Restoration Task Group For information about this plan please contact: Tim Smith Elizabeth Sorenson North Shore Salt Marsh Restoration Coastal Coordinator Coordinator OR ACEC Program, DEM Wetlands Restoration Program 617-626-1394 617-292-5808 [email protected] [email protected] TABLE OF CONTENTS INTRODUCTION 1 What are Salt Marshes? 1 Why Develop a Salt Marsh Restoration Plan? 2 The Rumney Marshes ACEC Salt Marsh Restoration Plan 2 ACEC Purpose and Designation 3 Rumney Marsh Salt Marsh Restoration Planning Process 4 ABOUT THE RUMNEY MARSHES ACEC 7 Watershed Characteristics 7 Wetlands of the ACEC 9 Resource Assessment
    [Show full text]
  • Report Concerning the Cocoanut Grove Fire, November 28, 1942
    REPORT CONCERNING THE COCOANUT GROVE FIRE NOVEMBER 28, 1942 WILLIAM ARTHUR REILLY, Fire Commissioner CITY OF BOSTON tt REPORT CONCERN ING THE COCOANUT GROVE FIRE NOVEMBER 28, 1942 WILLIAM ARTHUR REILLY, Fire Commissioner CITY OF BOSTON For additional observations coiieeniing I he Cocoanut Grove Fire, consult page (i of the Annual Report of the Fire Department to the Mavor for the vear 1042. CITY OF BOSTON FIRE DEPARTMENT BRISTOL STREET TELEPHONES WILLIAM ARTHUR REILLY FIRE COMMISSIONER BOSTON 18, MASS. HEADQUARTERS FIRE PREVENTION Div. LIBERTY 1171 j. WILLIAM D. SLATTERY MAINTENANCE Div EXECUTIVE SECRETARY FIRE ALARM DIVISION. KENMORE 1100 November 19, 1943. Stephen C. Garrity, Esq. , State Fire Marshal, 1010 Commonwealth Avenue, Brookline, Mass. Dear Sir: In accordance with section 3 of chapter 148 of the General Laws (Ter. Ed.) of the Commonwealth of Massachusetts, submit herewith a report of an investigation into the circumstances of the fire which occurred at the Cocoanut Grove, 17 Piedmont Street, Boston, Mass., on November 28, 1942, which fire resulted in 490 deaths and 166 injuries, as recorded by the Boston Committee on Public Safety. A report of this fire, upon the form prescribed by the Commissioner of Public Safety, was delivered to the State Fire Marshal within forty-eight hours of the fire, as required by G. L. Ed. c. s. (Ter. ) , 148, 2. I commenced the investigation of this fire on Sunday, November 29, 1942. The State Fire Marshal, the Mayor of Boston, military and naval authorities and representatives of the Federal Bureau of Investigation were there present. Hearings, open to representatives of the press, were held daily thereafter, except Sundays, at Fire Headquarters, 60 Bristol Street, Boston, Mass., until Wednesday, January 20, 1943.
    [Show full text]
  • East Boston Preservation Priority Report
    East Boston Preservation Priorities Report December 2011 In partnership with Historic Boston Incorporated and The National Trust for Historic Preservation East Boston: Places Worth Preserving, Stories Worth Telling A Historic Preservation Priorities Report by the Boston Preservation Alliance December 2011 Table of Contents 1.0 About Us 1 2.0 Historic Preservation Opportunities in East Boston: An Introduction 3 2.1 Historic Preservation Opportunities: Religious Properties 3 2.1a Religious Properties: Priority 4 2.1b Religious Properties: Additional Properties of Note 7 2.2 Historic Preservation Opportunities: Libraries 13 2.2a Libraries: Priority 13 2.2b Libraries: Additional Properties of Note 14 2.3 Historic Preservation Opportunities: Unique East Boston Places and Features 15 2.3a Unique East Boston Places and Features: Priority 15 2.3b Unique East Boston Places and Features: Additional Properties of Note 19 3.0 Next Steps for Neighborhood Historic Preservation: Additional Notes on Community Views, Interests, and Actions 38 4.0 Historic Preservation Success Stories in East Boston 39 5.0 References 50 1.0 About Us This report was prepared by the Boston Preservation Alliance from September 2010 through early March 2011. It grows out of a process led by the Neighborhood Preservation Partnership, a collaboration between two local historic preservation organizations, the Boston Preservation Alliance and Historic Boston Incorporated, in partnership with the National Trust for Historic Preservation and neighborhood organizations including East Boston Main Streets. Who We Are of Massachusetts, including the Boston Landmarks Commission, the Massachusetts Historical The Boston Preservation Alliance (the Alliance) Commission, and the City of Boston’s Department is the primary non-profi t historic preservation of Neighborhood Development, and will inform the advocacy and education organization serving the Alliance’s priorities regarding potential advocacy in city of Boston.
    [Show full text]
  • 4:00 P.M. Application # Time Applicant A-20-18 4:00 P.M
    City of Revere Zoning Board of Appeals Remote Participation Meeting Via Zoom Wednesday, September 23, 2020 4:00 P.M. Application # Time Applicant A-20-18 4:00 P.M. Gansett Ventures LLC, 51 Melcher Street, Boston, Massachusetts requesting a variance of Title 17, Chapter 17.24, 17.28, Section 17.24.010, 17.28.020 of the Revised Ordinances of the City of Revere minimum front yard, rear yard, maximum floor area ratio, maximum height and stories and minimum parking spaces to enable the appellant to construct a five story, 114 residential unit building with 114 parking spaces on Lots 224, 225, 226, 227, 228 and 229 at 83, 93 and 0 Bennington Street, Revere, MA. A-20-19 4:15 P.M. Gezehagn Alemu, 49 Union Street, Revere, Massachusetts requesting a variance of Title 17, Chapter 17.24, Section 17.24.070(A)(1), 17.24.070(A)(4), 17.24.080 of the Revised Ordinances of the City of Revere, parking in the front yard, to enable the appellant to park in the front yard on Lot – at 61 Gage Avenue, Revere, Massachusetts. A-20-20 4:30 P.M. Ari & Sivon Irvings, 185 Endicott Avenue, Revere, Massachusetts requesting a variance of Title 17, Chapter 17.28, Section 17.28.020 of the Revised Ordinances of the City of Revere, parking, to enable the appellant to convert a single family dwelling to a two family dwelling on Lot – at 185 Endicott Avenue, Revere, Ma. A-20-21 4:45 P.M. Peter V. DeCarlo, 40 Bateman Avenue, Revere Massachusetts appealing from the decision of the Inspector of Buildings of the City of Revere in accordance with the provisions of Title 17, Chapter 17.52, Section 17.52.020 of the Revised Ordinances of the City of Revere wherein the Building Inspector has denied the appellant validation of the property on Lot 314 at 40 Bateman Avenue, Revere, Massachusetts as a two-family dwelling.
    [Show full text]