100000 Sq Ft

Total Page:16

File Type:pdf, Size:1020Kb

100000 Sq Ft INDUSTRIAL/WAREHOUSE DESIGN AND BUILD OPPORTUNITIES FROM 5,000 – 100,000 SQ FT FREEHOLD/LEASEHOLD OPTIONS AVAILABLE SEGRO.com/PARKDAGENHAM SEGRO PARK DAGENHAM OFFERS A RARE DESIGN AND BUILD OPPORTUNITY OF UNITS RANGING FROM 5,000 - 100,000 SQ FT IN EAST LONDON WITH FREEHOLD OR LEASEHOLD TERMS AVAILABLE (PLOT DEPENDENT) Targeting BREEAM ‘Very Good’ and EPC Rating ‘A’ High quality transport infrastructure with local access roads to be upgraded Top specification barrel vaulted warehouses CENTRAL LONDON TRANSPORT INFRASTRUCTURE SEGRO Park Dagenham offers excellent transport connections with easy access to Junction 31 of the M25 in CANARY WHARF just 11 minutes and the A13 in two minutes. Additionally, the Port of Tilbury and London Gateway Docks are a short distance away, as is Barking Intermodal Terminal which links to the country’s intercity rail network and HS1 to Europe. There is fast access to London City Airport and Central London from Rainham C2C and the proposed new Beam Park Station will be in close proximity to the site. LET TO PLOT 65 RIVER THAMES CAPITAL DAIRIES PLOT 62 PLOT 64 UNDER OFFER PLOT 70 PLOT 63 CHOATS ROAD PLOT 67 HINDMANS WAY BARKING POWER STATION CHEQUERS LANE DAGENHAM DOCK STATION A13 DAGENHAM BREACH 7.8 MILES TO M25 JUNCTION 31 FREEHOLD / LEASEHOLD PLOT 62 4.95 ACRES CAPACITY: 30,000 – 100,000 SQ FT HALYARD STREET PARKING – 37 CARS 52M 2 DOCK LEVELLERS 2 LEVEL ACCESS DOORS 4 DOCK LEVELLERS 50M 2 LEVEL ACCESS DOORS EXAMPLE SITE LAYOUT: 94,280 SQ FT PARKING – 43 CARS FIRST FLOOR FIRST FLOOR OFFICES ACCOMMODATION OFFICES UNIT 11: SQ M SQ FT Warehouse 3,287 35,380 UNIT 11 First floor offices 267 2,870 UNIT 12 TOTAL 3,554 38,250 UNIT 12: SQ M SQ FT Warehouse 4,816 51,830 First floor offices 391 4,200 TOTAL 5,207 56,030 All areas are approximate and calculated on a Gross External basis. Car Parking Level Access Dock Levellers Yard Depth Target BREEAM Target EPC Roof Type Doors Rating Rating Unit 11 37 2 2 52m Very Good A Barrel Vaulted Unit 12 43 2 4 50m Very Good A Barrel Vaulted FREEHOLD - UNDER OFFER PLOT 63 2 ACRES CAPACITY: 24,000 SQ FT 50M 5 LEVEL ACCESS DOORS 33M PARKING – 27 CARS UNIT 9 FIRSTOFFICES FLOOR EXAMPLE SITE LAYOUT: 23,890 SQ FT ACCOMMODATION 32M UNIT 9: SQ M SQ FT Warehouse 2,034 21,890 First floor offices 186 2,000 TOTAL 2,200 23,890 All areas are approximate and calculated on a Gross External basis. HINDMANS WAY Car Parking Level Access Dock Levellers Yard Depth Target BREEAM Target EPC Roof Type Doors Rating Rating Unit 9 27 5 - 32m Very Good A Barrel Vaulted LEASEHOLD PLOT 65 4.1 ACRES CAPACITY: 20,000 - 60,000 SQ FT CHOATS ROAD REEF STREET PARKING – 21 CARS FIRST FLOOR 35M OFFICES LEVEL ACCESS LEVEL ACCESS UNIT 3 37M LEVEL ACCESS LEVEL ACCESS LEVEL ACCESS EXAMPLE SITE LAYOUT: 59,840 SQ FT PARKING – 23 CARS UNIT 4 ACCOMMODATION FIRST FLOOR UNIT 3: SQ M SQ FT OFFICES Warehouse 2,297 24,720 First floor offices 187 2,010 TOTAL 2,484 26,730 UNIT 4: SQ M SQ FT Warehouse 2,846 30,630 HALYARDS STREET First floor offices 231 2,480 TOTAL 3,077 33,110 All areas are approximate and calculated on a Gross External basis. Car Parking Level Access Dock Levellers Yard Depth Target BREEAM Target EPC Roof Type Doors Rating Rating Unit 3 21 2 - 35m Very Good A Barrel Vaulted Unit 4 23 3 - 37m Very Good A Barrel Vaulted LEASEHOLD PLOT 67 60M 5 ACRES CAPACITY: 40,000 - 100,000 SQ FT HGV PARKING 4 DOCK LEVELLERS 2 LEVEL ACCESS DOORS UNIT 1 OFFICES FIRST FLOOR PARKING – 42 CARS HGV PARKING 5 DOCK LEVELLERS 2 LEVEL ACCESS DOORS 58M UNIT 2 CHOATS MANOR WAY EXAMPLE SITE LAYOUT: 86,680 SQ FT PARKING – 48 CARS ACCOMMODATION OFFICES FIRST FLOOR UNIT 1: SQ M SQ FT Warehouse 3,592 38,660 First floor offices 292 3,140 TOTAL 3,884 41,800 UNIT 2: SQ M SQ FT Warehouse 3,858 41,520 CHOATS ROAD First floor offices 313 3,360 TOTAL 4,171 44,880 All areas are approximate and calculated on a Gross External basis. Car Parking Level Access Dock Levellers Yard Depth Target BREEAM Target EPC Roof Type Doors Rating Rating Unit 1 42 2 4 60m Very Good A Barrel Vaulted Unit 2 48 2 5 58m Very Good A Barrel Vaulted FREEHOLD PLOT 70 2 ACRES CAPACITY: 5,000 - 25,000 SQ FT UNIT 8 PARKING 14 CARS UNIT 7 20M PARKING 14 CARS EXAMPLE SITE LAYOUT: 31,120 SQ FT UNIT 6 ACCOMMODATION PARKING 7 CARS UNIT 5: SQ M SQ FT Warehouse 694 7,470 UNIT 5 20M TOTAL 694 7,470 PARKING 12 CARS UNIT 6: SQ M SQ FT Warehouse 547 5,880 TOTAL 547 5,880 UNIT 7: SQ M SQ FT Warehouse 802 8,630 TOTAL 802 8,630 Car Parking Level Access Dock Levellers Yard Depth Target BREEAM Target EPC Roof Type Doors Rating Rating UNIT 8: SQ M SQ FT Unit 5 12 1 - 20m Very Good A Pitched Warehouse 850 9,140 Unit 6 7 1 - 20m Very Good A Pitched TOTAL 850 9,140 Unit 7 14 1 - 20m Very Good A Pitched All areas are approximate and calculated on a Gross External basis. Unit 8 14 1 - 20m Very Good A Pitched REEF STREET 7 7 1 B A1153 D A O R M A H N I A R R E P P U ELM PARK P E AR ABOUT SEGRO U S LO TO CENTRAL LONDON 13.3 MILES N E S E A V VE A N U E DAGENHAM EAST E G A1153 SEGRO is a UK Real Estate Investment Trust (REIT), and D A D O R O L DAGENHAM R E E D E HEATHWAY a leading owner, manager and developer of modern BECONTREE warehouses and light industrial property. It owns D A ROA D E M A NS O H E DG A R 1 or manages 6.9 million square metres of space (74 2 ROAD M 4 ODWA RD A1 A O 0 1 W 12 H D I N R H A G A A million square feet) valued at over £10 billion serving O I N R E H A R A A M L S RD 5 T S 2 E D O 1 PPLE ROAD H R U 123 RI A customers from a wide range of industry sectors. Its A S A T W L H T L R A A D B A E Y O R E 8 properties are located in and around major cities and T 7 1 D B N E A13 H T at key transportation hubs in the UK and in nine other A13 U 06 O N S A406 E W BARKING RAIL European countries. RO A FREIGHT TERMINAL D A13 DAGENHAM A1 DOCK 306 D N E W A RO O AD R R PLOT 70 I DRIVE TIMES TH V A ME S ROAD K E Y R C A I PLOT 67 BEAM PARK R W W O A13 H N (2020) A E S D PLOT 65 R R A A13 1.0 miles 3 mins A1306 NEW M RO AD J21 STANSTED PLOT 62 AIRPORT D SOU T H ROA M25 J25 PLOT 63 T E R J27 INS D PM OA U R Dagenham Dock Station (C2C) 1.0 miles 21 mins ER PLOT 64 M1 BARNET IV RAINHAM ENFIELD A10 M25 R B13 M11 35 WE N N IN M25 GT . ON R J28 D O A406 R RIVER THAMES A406 NorthA Circular 3.2 miles 7 mins A12 N D M40 O TOTTENHAM S M ROMFORD L A J16 A406 M25 A406 BARKING A40 DAGENHAM A12 4.9 miles 12 mins HEATHROW A13 AIRPORT LONDON A13 CITY A13 AIRPORT J15 M4 GREENWICH J31 London City Airport 6.6 miles 14 mins A2 M3 DARTFORD A20 J2 BROMLEY J12 A23 A24 J3 M25 (Junction 31) 7.8 miles 11 mins A326 M25 M20 CROYDON TO M25 JUNCTION 31 7.8 MILES M25 Central London 13.3 miles 30 mins J9 M26 J5 M25 J7 M11 (Junction 4) 14.0 miles 9 mins M23 GATWICK AIRPORT Paul Mussi John Bell Paul Fitch [email protected] [email protected] [email protected] Port of Tilbury 15.3 miles 20 mins 020 7629 8171 Alex Schofield Peter Higgins James Sanders [email protected] [email protected] [email protected] KnightFrank.co.uk Source: Google Maps SEGRO.com/PARKDAGENHAM The content of this document is believed to be correct at the date of publication, however the Company and its retained agents, accept no responsibility or liability for (or make any representation, statement or expression of opinion or warranty, express or implied, with respect to), the accuracy or completeness of the content of this document. If you would like to unsubscribe from future mailings, please contact [email protected]. 09/18.
Recommended publications
  • Decentralized Energy Master Planning
    Decentralized Energy Master Planning The London Borough of Brent An Interactive Qualifying Project Report submitted to the Faculty of WORCESTER POLYTECHNIC INSTITUTE in partial fulfilment of the requirements for the Degree of Bachelor of Science Submitted by Anthony Aldi Karen Anundson Andrew Bigelow Andrew Capulli Sponsoring Agency London Borough of Brent Planning Service Advisors Dominic Golding Ruth Smith Liaison Joyce Ip 29 April 2010 This report represents the work of four WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its web site without editorial or peer review. Abstract The London Borough of Brent aims to reduce its carbon emissions via implementation of decentralized energy schemes including combined heat and power systems. The objective of this project was to aid Brent in the early stages of its decentralized energy master planning. By examining policies of other boroughs and studying major development areas within Brent, the WPI project team has concluded that the council must actively facilitate the development of decentralized energy systems through the use of existing practices and development of well supported policies. i Authorship Page This report was developed through a collaborative effort by the project team: Anthony Aldi, Karen Anundson, Andrew Bigelow, and Andrew Capulli. All sections were developed as team with each member contributing equally. ii Acknowledgements The team would like to thank our advisors from Worcester Polytechnic Institute, Professor Dominic Golding and Professor Ruth Smith. The team would also like to thank the liaison Joyce Ip from the London Borough of Brent Planning Service and the entire Planning Service.
    [Show full text]
  • Last Hour Logistics
    In cooperation with DO AMAZING THINGS WITH DATA Marketing Material* November 2019 Research Report LAST HOUR LOGISTICS The brand DWS represents DWS Group GmbH & Co. KGaA and any of its subsidiaries, such as DWS Distributors, Inc., which offers investment products, or DWS Investment Management Americas Inc. and RREEF America L.L.C., which offer advisory services. There may be references in this document which do not yet reflect the DWS Brand. Please note certain information in this presentation constitutes forward-looking statements. Due to various risks, uncertainties and assumptions made in our analysis, actual events or results or the actual performance of the markets covered by this presentation report may differ materially from those described. The information herein reflects our current views only, is subject to change, and is not intended to be promissory or relied upon by the reader. There can be no certainty that events will turn out as we have opined herein. For Professional Clients (MiFID Directive 2014/65/EU Annex II) only. For Qualified Investors (Art. 10 Para. 3 of the Swiss Federal Collective Investment Schemes Act (CISA)). For Qualified Clients (Israeli Regulation of Investment Advice, Investment Marketing and Portfolio Management Law 5755-1995). Outside the U.S. for Institutional investors only. In the United States and Canada, for institutional client and registered representative use only. Not for retail distribution. Further distribution of this material is strictly prohibited. In Australia, for professional investors only. *For investors in Bermuda: This is not an offering of securities or interests in any product. Such securities may be offered or sold in Bermuda only in compliance with the provisions of the Investment Business Act of 2003 of Bermuda which regulates the sale of securities in Bermuda.
    [Show full text]
  • Bankside Power Station: Planning, Politics and Pollution
    BANKSIDE POWER STATION: PLANNING, POLITICS AND POLLUTION Thesis submitted for the degree of Doctor of Philosophy at the University of Leicester by Stephen Andrew Murray Centre for Urban History University of Leicester 2014 Bankside Power Station ii Bankside Power Station: Planning, Politics and Pollution Stephen Andrew Murray Abstract Electricity has been a feature of the British urban landscape since the 1890s. Yet there are few accounts of urban electricity undertakings or their generating stations. This history of Bankside power station uses government and company records to analyse the supply, development and use of electricity in the City of London, and the political, economic and social contexts in which the power station was planned, designed and operated. The close-focus adopted reveals issues that are not identified in, or are qualifying or counter-examples to, the existing macro-scale accounts of the wider electricity industry. Contrary to the perceived backwardness of the industry in the inter-war period this study demonstrates that Bankside was part of an efficient and profitable private company which was increasingly subject to bureaucratic centralised control. Significant decision-making processes are examined including post-war urban planning by local and central government and technological decision-making in the electricity industry. The study contributes to the history of technology and the environment through an analysis of the technologies that were proposed or deployed at the post-war power station, including those intended to mitigate its impact, together with an examination of their long-term effectiveness. Bankside made a valuable contribution to electricity supplies in London until the 1973 Middle East oil crisis compromised its economic viability.
    [Show full text]
  • 'Smart City' - Intelligent Energy Integration for London’S Decentralised Energy Projects
    'Smart City' - Intelligent energy integration for London’s decentralised energy projects Prepared by: ............................................................. Checked by: ........................................................................ Owen Anderson – AECOM Mary Livingstone - AECOM Miles Attenborough – AECOM Mary Livingstone – AECOM Ben Smith – AECOM Hugh Maguire – Poyry Colin Bateman - Wipro Ewan Cameron - Wipro Edward Cottle – Wipro Sacha Meckler – Wipro Approved by: ............................................................. Miles Attenborough – AECOM Rev No Comments Checked by Approved Date by 1 Public report final version ML MA 05,10,2012 2 Public report revised final version ML MA 19,10,2012 3 Public report revised final version with new front cover image DC MA 14.02.2013 MidCity Place, 71 High Holborn, London, WC1V 6QSTelephone: 020 7645 2000 Website: http://www.aecom.com Job No 60242095 Date Created July 2012 This document has been prepared by AECOM Limited for the sole use of our client (the “Client”) and in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between AECOM Limited and the Client. Any information provided by third parties and referred to herein has not been checked or verified by AECOM Limited, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AECOM Limited. Table of Contents Executive Summary ........................................................................................................................................................................
    [Show full text]
  • London Electricity Companies Had Already Supply Co
    printed LONDON AREA POWER SUPPLY A Survey of London’s Electric Lighting and Powerbe Stations By M.A.C. Horne to - not Copyright M.A.C. Horne © 2012 (V3.0) London’s Power Supplies LONDON AREA POWER SUPPLY Background to break up streets and to raise money for electric lighting schemes. Ignoring a small number of experimental schemes that did not Alternatively the Board of Trade could authorise private companies to provide supplies to which the public might subscribe, the first station implement schemes and benefit from wayleave rights. They could that made electricity publicly available was the plant at the Grosvenor either do this by means of 7-year licences, with the support of the Art Gallery in New Bond Street early in 1883. The initial plant was local authority, or by means of a provisional order which required no temporary, provided from a large wooden hut next door, though a local authority consent. In either case the local authority had the right supply was soon made available to local shopkeepers. Demand soon to purchase the company concerned after 21 years (or at 7-year precipitated the building of permanent plant that was complete by intervals thereafter) and to regulate maximum prices. There was no December 1884. The boiler house was on the south side of the power to supply beyond local authority areas or to interconnect intervening passage called Bloomfield Street and was connected with systems. It is importantprinted to note that the act did not prevent the generating plant in the Gallery’s basement by means of an creation of supply companies which could generate and distribute underground passage.
    [Show full text]
  • The Natural Capital Account of Beam Parklands 2015 – Eftec
    BEAM PARKLANDS NATURAL CAPITAL ACCOUNT Final Report For the Greater London Authority November 2015 eftec 73-75 Mortimer Street London W1W 7SQ tel: 44(0)2075805383 fax: 44(0)2075805385 [email protected] www.eftec.co.uk Beam Parklands Natural Capital Account Final Report This document has been prepared for the Greater London Authority (GLA) by: Economics for the Environment Consultancy Ltd (eftec) 73-75 Mortimer Street London W1W 7SQ www.eftec.co.uk Study team: Adams Koshy Allan Provins Duncan Royle Reviewers Katharine Bolt (RSPB) Victoria Cox (PwC) Will Evison (PwC) Ece Ozdemiroglu (eftec) Acknowledgements The study team would like to thank Peter Massini (GLA), Simon Pile (Land Trust), Neil Monaghan, Dak Gor, and Nick Leishman (Environment Agency) for their input and contributions to this report. eftec offsets its carbon emissions through a biodiversity-friendly voluntary offset purchased from the World Land Trust (http://www.carbonbalanced.org) and only prints on 100% recycled paper. eftec i November 2015 Beam Parklands Natural Capital Account Final Report CONTENTS EXECUTIVE SUMMARY ................................................................................ IV 1 INTRODUCTION ................................................................................... 1 1.1 Purpose of report ........................................................................................ 1 1.2 Beam Parklands ........................................................................................... 1 1.3 Beam Parklands natural capital account ............................................................
    [Show full text]
  • Powering Ahead Delivering Low Carbon Energy for London
    October 20091 Powering ahead Delivering low carbon energy for London October 2009 Powering ahead: delivering low carbon energy for London This propectus has been prepared with the help and expertise of those listed in the working group below. Working group Argent - Robert Evans, Andre Gibbs Arup - John Miles Buro Happold - Rod Macdonald, Alasdair Young Climate Change Capital - Ingrid Holmes Department of Energy and Climate Change - Andy Cormie, Rita Wadey Greater London Authority - Syed Ahmed, Peter Daw Land Securities - Neil Pennell London Councils - Faraz Baber London Development Agency - Peter North, Robert Tudway London First - Judith Salomon Norton Rose - Nicholas Pincott PWC - Jon Williams, Richard Gledhill Transport for London - Padmesh Shukla Greater London Authority October 2009 ISBN 978 1 84781 302 2 Published by Greater London Authority, City Hall, The Queen’s Walk, More London, London SE1 2AA www.london.gov.uk enquiries 020 7983 4100 minicom 020 7983 4458 Contents 5 Foreword 7 1 The opportunity - London, the place for decentralised energy 11 2 Commercial models 15 3 Why is decentralised energy happening now, what is changing in the market? 25 4 Funding 29 5 Next steps 31 6 Pipeline of potential projects 33 References 43 6 Foreword 7 The Copenhagen Summit in December 2009 Combined with demand side measures, focuses the world’s attention once again on investment in decentralised energy is key to climate change. London government and underpin London’s ‘Low Carbon Capital’ status business continue to work together to address and to support its emergence as a global hub for the challenge. Energy and carbon reduction green industry, knowledge and finance.
    [Show full text]
  • Coal and Gas Assumptions
    March 2014 Coal and Gas Assumptions DECC Job number: 286861A Final Coal and Gas Assumptions 286861A Report Title : Coal and Gas Assumptions Report Status : Final Job No : 286861A Date : March 2014 DOCUMENT HISTORY AND STATUS Document control George Atkinson Kirsten Foy Kirsten Foy Ignacio Garcia Checked by Prepared by Bill Hatfield David Lunn (technical) David Roberts David Roberts Paul Willson Pauline Evans David Horner Checked by Approved by Marie Roberts Paul Willson (quality assurance) Anne Nethercott Revision details Pages Version Date Comments affected 0.1 11/10/13 All IED Compliant Technologies section added 0.2 16/10/13 28-End Plant Life section added 0.3 22/10/13 Section 2, 3 Feasible Build Rates and Supply Curves sections added Final values, addressed comments, added draft SCR cost 0.4 22/11/13 All section 0.5 13/12/13 Various Added Executive Summary, addressed comments. 1.0 10/2/14 Various Addressed final comments, final draft for publication. 2.0 14/3/14 Various Addressed additional comments. 3.0 24/3/14 Various Corrected minor typos and formatting errors. CONTENTS Page List of Abbreviations 3 Executive Summary 5 1 INTRODUCTION 7 1.1 Structure of report 7 1.2 Scope of work 7 1.3 Acknowledgements 7 2 FEASIBLE BUILD RATES FOR CCGT AND OCGT 8 2.1 Introduction 8 2.2 Approach 8 2.3 Site Availability 9 2.4 Maximum rate for design and contracting 10 2.5 Maximum rate at which financial markets can fund CCGT or OCGT 11 2.6 Maximum build rates for CCGT and OCGT 11 2.7 Maximum rate for construction and commissioning 14 2.8 Discussion
    [Show full text]
  • EDF Final OC
    OFFERING CIRCULAR Dated 23 October 2009 EDF ENERGY PLC (incorporated and registered with limited liability in England and Wales under registration number 02366852) and EDF ENERGY NETWORKS (LPN) PLC (incorporated and registered with limited liability in England and Wales under registration number 03929195) and EDF ENERGY NETWORKS (EPN) PLC (incorporated and registered with limited liability in England and Wales under registration number 02366906) and EDF ENERGY NETWORKS (SPN) PLC (incorporated and registered with limited liability in England and Wales under registration number 03043097 £10,000,000,000 Euro Medium Term Note Programme Under this £10,000,000,000 Euro Medium Term Note Programme (the “Programme”), EDF Energy plc (“EDF Energy”), EDF Energy Networks (LPN) plc (“LPN”), EDF Energy Networks (EPN) plc (“EPN”) and EDF Energy Networks (SPN) plc (“SPN” and, together with EDF Energy, LPN and EPN, the “Issuers” and each, an “Issuer”) may from time to time issue notes (the “Notes”) denominated in any currency agreed between the Issuer of such Notes (the “relevant Issuer”) and the relevant Dealer (as defined below). The maximum aggregate nominal amount of all Notes from time to time outstanding under the Programme will not exceed £10,000,000,000 (or its equivalent in other currencies calculated as described in the Programme Agreement (as defined herein)), subject to increase as described in this Offering Circular. The Notes may be issued on a continuing basis to one or more of the Dealers specified under “Description of the Programme” and any additional Dealer appointed under the Programme from time to time by the Issuers (each a “Dealer” and together the “Dealers”), which appointment may be for a specific issue or on an ongoing basis.
    [Show full text]
  • Epn) Plc Edf Energy Networks (Spn
    OFFERING CIRCULAR Dated 24th May, 2004 EOFENERGY EDF ENERGY PLC (incorporateci and registered with limited liability in England and Wales under registration number 02366852) i and EDF ENERGY NETWORKS (LPN) PLC (incorporated and registered with limited liability in England and Wales under registration number 03929195) and EDF ENERGY NETWORKS (EPN) PLC (incorporated and registered with limited liability in England and Wales under registration number 02366906) and EDF ENERGY NETWORKS (SPN) PLC (incorporated and registered with limited liability in England and Wales under registration number 03043097) €4,000,000,000 Euro Medium Term Note Programme Under this €4.000,000,000 Euro Medium Term Note Programme (the "Programme",). EDF Energv pic. EDF Energv Networks (LPN) pic ("LPN";. EDF Energy Networks (EPN) pic ("EPN"; anil EDF Energy Networks (SPN) pic ("SPN" and. together with EDF Energy pic, LPN anil-EPN, tile "Issuers" anil each an "Issuer"; may from tinte lo time issue notes (the "Notes"; denominated in any currency agreed between the Issuer of such Notes (the "relevant Issuer"; anil the relevant Denier (as defined below). The maximum aggregate nominal amount of all Notes from time to time outstanding under the Programme will not exceed €4,000.000,000 (or its equivalent in other currencies calculated as described in the Programme Agreement), subject to increase as described in this Offering Circular. The Notes may be issued on a continuing basis to one or more of the Dealers specified under "Summary of the Programme" and any additional Dealer appointed under the Programme from time to time by the Issuers (each a "Dealer" and together the "Dealers";, which appointment may be for a specific issue or on an ongoing basis.
    [Show full text]
  • Barking Riverside
    London Borough of Barking and Dagenham Strategic Flood Risk Assessment (SFRA) Level 2 APPENDIX D BARKING RIVERSIDE Appendix D Barking Riverside Prepared by WSP Parsons Brinckerhoff August 2017 for London Borough of Barking & Dagenham London Borough of Barking and Dagenham Strategic Flood Risk Assessment (SFRA) Level 2 BARKING RIVERSIDE Area Name: Barking Riverside Location: Barking River Catchment: River Roding/River Thames NPPF Flood Zone (majority of area): Flood Zone 1 NPPF Flood Zone (worst case): Flood Zone 3a Introduction The Barking Riverside strategic development site is approximately 1.75km2 in area and is located in the south of Barking and Dagenham (refer to Appendix A). The site is bounded by the railway line and the Thames Road strategic development site to the north, Dagenham Dock strategic development site to the east, the River Thames to the south, and Creekmouth strategic development site, Trafalgar Business Centre and River Road Business Park to the west. Barking Reach Power Station is located in the centre of Barking Riverside but is not included in the strategic development site boundary. In addition, the housing estate at Galleons Drive and Marine Drive along with a number of other smaller areas to the west of the power station are also excluded from the site boundary. This area is currently being developed as part of the Barking Riverside Development which was granted planning permission in 2007. The Barking Riverside Development will provide more than 10,000 homes over the next 15 years with over 650 homes completed to date and a further 698 units due for completion in 2017.
    [Show full text]
  • Barking Town Centre Energy Action Area Implementation Plan
    Barking Town Centre Energy Action Area Implementation Plan www.barking-dagenham.gov.uk July 2006 A Route Map for Barking Town Centre Energy Action Area Executive Summary Introduction The London Energy Partnership’s Energy Action Area initiative was proposed in the Mayor’s Energy Strategy in January 2004 and launched by the Energy Minister, Malcolm Wicks, and Mayor of London, Ken Livingstone, in July 2005. Barking Town Centre is one of just four areas in London to be selected by the London Energy Partnership for this status. As a new initiative there is little experience of how the status might be translated into reality for an area of London. This report is intended to set out that information in detail and in effect it provides a route map for the implementation of an Energy Action Area in Barking Town Centre. Energy Action Areas are conceived in essence as “showcase low carbon communities”1. This report builds on work carried out in an options appraisal that set out some of the costs and options to Barking Town Centre becoming a low carbon community. It extends this work by examining the scope not just for new build areas but also existing housing/buildings which, without intervention, will be responsible for the majority of carbon emissions, once regeneration plans have been implemented. The Vision The Low Carbon Options Appraisal published in September 2005 illustrates that community heating and combined heat and power (CHP) provide the most cost effective way for Barking Town Centre to become a low carbon community. The vision set out in this report for Barking Town Centre Energy Action Area is therefore of an area wide heating system served by one or more CHP based heat sources.
    [Show full text]