1 Plan: a DC/04/01230/OUT Ward: Thames

Total Page:16

File Type:pdf, Size:1020Kb

1 Plan: a DC/04/01230/OUT Ward: Thames Plan: A DC/04/01230/OUT Ward: Thames ( A ) Address: Land at Barking Riverside, Barking Reach, south of A13 and north of the river Thames, Barking Development: Development comprising or to provide a mixed use development for up to 10,800 residential dwellings and up to 65,600 sq.m. of built floorspace – see below for full description of development Applicant: Barking Riverside Limited (BRL) Summary: This report considers the planning issues raised by the planning application submitted by Barking Riverside Limited proposing comprehensive development of the Barking Riverside site. This substantial site occupies a large area of brownfield land in the south-western part of the Borough with a 2km frontage to the River Thames. The application proposes a residential- led, mixed use development of the site on a phased basis over a period of some 20 years. The application has been submitted in outline form though limited elements of the proposals are submitted for full consideration at this stage. The application raises a number of complex planning issues related to topics including transport, provision of social infrastructure, sustainability, energy, flood risk etc which are considered in the main report. The application was accompanied by an Environmental Impact Assessment which has been the subject of extensive consultation. Given the long timescale for build-out of the site the application seeks to establish a number of strategies and targets which will inform future applications. These strategies will be written into planning conditions and a Section 106 agreement to ensure consistency and compliance over the lifetime of the development which will assist in the creation of a sustainable community providing a wider choice of housing and contributing to strengthening the economy of Barking and Dagenham. The Barking Riverside site forms one of the largest regeneration sites in London. At some 179 hectares in size the site occupies a large part of the Borough south of the A13 and adjacent to the River Thames. The impact of the development of the site would affect the whole of the Borough but the site is also important in strategic terms for east London and the Thames Gateway area. Development proposals for the site have been subject to extensive consultation both in the pre-application stage and also when the current planning application was formally lodged for consideration. The planning application which is the subject of this report proposes a residential-led redevelopment of the site with up to 10,800 residential units. A range of supporting infrastructure is required to support this new community and therefore the proposals make provision for retail facilities, healthcare, schools, community uses and both formal and informal open space. A full description of the development proposals is provided on page 5 of the report. 1 Given the large scale of the proposals the build-out of the entire site would take some 20 years. This long timescale forms one of a number of risks involved in the development of the site alongside site remediation, provision of services, infrastructure and public realm. A degree of flexibility is therefore required in order to accommodate the way in which the site will be built out. At the same time any grant of planning permission must give sufficient certainty that the approved development is capable of implementation within an agreed policy framework with acceptable levels of impact on the delivery of the required benefits and quality of the area. Members will be aware that recent Government guidance on planning and development has stressed the importance of building sustainable communities. The overriding objective for the Council in approaching this development opportunity has been to achieve a high quality sustainable community on a large and strategically important site with a mix and range of housing opportunities, leisure, community and cultural facilities within an exemplary public realm and taking into account the need to minimise the impact on the environment. It has always been important that the development is not self contained but integrates into the existing communities at Barking Reach, Thames View and the wider Barking area and contributes to community cohesion. If planning permission is forthcoming the scheme would provide significant employment opportunities and the benefits of the regeneration should be spread to benefit the whole of the Borough. Sustainability issues are also highly relevant to the proposals and the achievement of high specifications on buildings, energy consumption, recycling and transportation is a key objective for the Council. Recommendation(s) That the Development Control Board is minded to grant planning permission, subject to no direction to the contrary from the Mayor of London and the Secretary of State, the conditions listed and following the completion of a Section 106 legal agreement. The legal agreement covers the heads of terms referred to in this report. That the Director of Regeneration be authorised to negotiate such an agreement and upon completion to grant planning permission on the basis of the heads of terms in this report and subject to the conditions listed. Contact Title: Contact Details: Officer(s) Jeremy Grint Head of Spatial Tel: 020 8227 2443 Regeneration E-mail: [email protected] 2 Tim Lewis Group Manager Tel: 020 8227 3706 Development & Building E-mail: [email protected] Control Matthew Team Leader Tel: 020 8227 3552 Gallagher Development Control E-mail: [email protected] Contents Page Introduction 5 1.0 Site Description 6 2.0 Description of Proposals 9 3.0 Background 18 4.0 Consultations 21 5.0 Planning Policy 50 6.0 Procedure 58 7.0 Environmental Impact Assessment 62 8.0 Key Issues 65 9.0 Housing, Economic Impact and Social Infrastructure, Education and Community Development Trust 67 10.0 Urban Design 75 11.0 Access Issues 81 12.0 Play, Sport and Recreation Issues 84 13.0 Transport Issues 89 14.0 Energy and Sustainability 99 15.0 Waste 104 16.0 Ecology and Biodiversity 104 17.0 Ground Contamination and Remediation 110 18.0 Flood Risk Issues, Drainage and Water Quality 113 19.0 Archaeology and Buildings Assessment 119 20.0 Visual Impact 123 21.0 Noise and Vibration 127 3 22.0 Air Quality 131 Conclusion 135 Recommendation 136 Reason for Approval 136 S.106 Agreement Heads of Terms: Access 137 Affordable Housing and Housing 139 Community Development Trust 142 Design 149 Education 151 Energy and Sustainability 163 Local Employment 167 Neighbourhood Centres 171 Open Space and Play Space 177 Transport 183 Waste 196 Conditions 197 Informatives 215 List of Abbreviations 218 Appendices: (i) Letter from the Mayor of London to the Leader of the Council; 220 (ii) Summary of Community Development Trust 222 (iii) Spatial Stages drawing 13647 / 102A (iv) Development Zones drawing 108F030.C 4 Introduction Purpose of the Report The purpose of this report is to determine an outline planning application for the comprehensive development of the site. Any resolution to grant planning permission will be referred to the Mayor of London and the Secretary of State. Such a resolution would also be subject to conditions and a satisfactory Section 106 legal agreement. Structure of the Report The report fully considers the application in relation to the main policy frameworks of the London Plan, the adopted Unitary Development Plan and other policy and guidance documents. The report considers the likely impact of the scheme and considers the views and representations of statutory bodies and individuals. The report comprises sections dealing with policy, transport, housing etc. Each topic has its own introduction and description of the proposals in so far as it relates to the individual topic. The sections on policy and consultation are descriptive summaries. There is an overall conclusion at the end of the report and appendices including a set of heads of terms covering access, affordable housing and housing, community development trust, design, education, energy and sustainability, local employment, neighbourhood centres, open space and play space, transport and waste and a set of conditions. Full Description of Development The full description of development as set out in the application submitted to the Council in December 2004 is as follows: “Development comprising or to provide a mixed use development for up to 10,800 residential dwellings and in addition up to 65,600 sq.m. of built floorspace for retail uses (Classes A1 to A3), business premises (Class B1), hotel (Class C1), communal care home and other residential institutions (Class C2), sui generis live work units, community and social facilities (Classes D1 and D2) (for uses such as libraries, primary health care facilities, places of worship, community facilities, crèche and pre-school facilities, care facilities for the young, old and/or infirm, sport and leisure development). In addition, development will also provide: one secondary school of up to 8 forms of entry (with maximum gross site area of 44,585 sq.m.) including ancillary accommodation and facilities plus a sports field up to 14,313 sq.m. (gross site area); up to 2no.; up to 3-form entry primary schools (with a maximum gross site area of 15,000 sq.m. each). Additional educational accommodation (Class D1) is also to be provided in the form of an ecology centre of up to 250 sq.m., and in addition, a maximum of two multi-storey car parks to provide for 1000 spaces in total. Such development to include the remediation of
Recommended publications
  • The London Rivers Action Plan
    The london rivers action plan A tool to help restore rivers for people and nature January 2009 www.therrc.co.uk/lrap.php acknowledgements 1 Steering Group Joanna Heisse, Environment Agency Jan Hewlett, Greater London Authority Liane Jarman,WWF-UK Renata Kowalik, London Wildlife Trust Jenny Mant,The River Restoration Centre Peter Massini, Natural England Robert Oates,Thames Rivers Restoration Trust Kevin Reid, Greater London Authority Sarah Scott, Environment Agency Dave Webb, Environment Agency Support We would also like to thank the following for their support and contributions to the programme: • The Underwood Trust for their support to the Thames Rivers Restoration Trust • Valerie Selby (Wandsworth Borough Council) • Ian Tomes (Environment Agency) • HSBC's support of the WWF Thames programme through the global HSBC Climate Partnership • Thames21 • Rob and Rhoda Burns/Drawing Attention for design and graphics work Photo acknowledgements We are very grateful for the use of photographs throughout this document which are annotated as follows: 1 Environment Agency 2 The River Restoration Centre 3 Andy Pepper (ATPEC Ltd) HOW TO USE THIS GUIDE This booklet is to be used in conjunction with an interactive website administered by the The River Restoration Centre (www.therrc.co.uk/lrap.php).Whilst it provides an overview of the aspirations of a range of organisations including those mentioned above, the main value of this document is to use it as a tool to find out about river restoration opportunities so that they can be flagged up early in the planning process.The website provides a forum for keeping such information up to date.
    [Show full text]
  • At Barking Riverside
    PARKLANDS 1–3 BEDROOM APARTMENTS 3–4 BEDROOM HOUSES BARKING RIVERSIDE WILL DELIVER 10,800 HOMES AND 65,000 SQ. M. OF COMMERCIAL SPACE OVER 178 HECTARES Computer generated image. BARKINGRIVERSIDE.LONDON #AGIANTLEAPFORLONDON 1 2KM OF SOUTH-FACING RIVER THAMES FRONTAGE Computer generated image. 2 BARKINGRIVERSIDE.LONDON #AGIANTLEAPFORLONDON 3 WELCOME TO PARKLANDS AT BARKING RIVERSIDE. A brand new neighbourhood for Parklands, the first phase of new London, Barking Riverside is a vibrant homes to launch on site with L&Q, COME HOME new district, sitting alongside 2km of is a collection of one to four bedroom majestic River Thames frontage. contemporary houses and apartments. Once completed, the pioneering Each home will bring together a perfect TO A BRAND NEW development will offer 10,800 new blend of comfort, architecture, design homes, alongside shops, restaurants and impeccable eco-credentials, where and leisure and sports facilities. There you can live the life you want to live, will be public parks and river walkways, and live it in style. ADVENTURE excellent new schools with state-of- the-art facilities, and a new London Overground station, all in close proximity of central London. 4 BARKINGRIVERSIDE.LONDON #AGIANTLEAPFORLONDON 5 A VIBRANT COMMUNITY Be part of a brand new, thriving community at Barking Riverside. Set to be one of the most dynamic new destinations in the capital, once completed, Barking Riverside’s District Centre will include an impressive 65,000 square metres of commercial floorspace – home to shopping outlets, restaurants, bars and cafés. A growing number of businesses are already making their mark on the East London development.
    [Show full text]
  • Project Report 2020
    PROJECT REPORT 2020 REGISTERED CHARITY: 1189743 www.twcp.org.uk Contents Local context 4 TWCP is a resident-led Mission statement 7 project in one of the Timeline 10 TWCP in numbers 16 most deprived areas TWCP 20 achievements for 2020 18 in the country. UEL evaluation interim report 20 Interim Report Concluding Statement 22 Interim Report Analysis of results 23 This report document Final Report 26 Interview person 1 27 tells its story going Interview person 2 28 forward… Interview person 3 29 Interview person 4 30 Interview Analysis 32 Covid-19 response 36 Trustees, steering group & staff 37 Appendix 1 (interview questions) 38 2 TWCP PROJECT REPORT 2020 | CONTENTS 3 Local Context Thames Ward is the site of one of the THAMES WARD largest housing developments in Europe. Thames Ward Area Its population has doubled in recent years LONDON and will will continue to increase thereafter. Yet poverty levels are high with half of the children in the ward living in poverty. Thames Ward Community Project (TWCP) was a response to CASTLE GREEN SCRATTONS FARM ORION PARK this upheaval and the very real divisions (physical, economic and social) that may be exacerbated without a community-led response that brings people together across the entire area. THAMES VIEW TWCP has been funded by the Big Lottery for three years (2017- 2020) to enable positive community-led change across the whole of Thames Ward. The funding focuses on four themes: cohesion, health, employability and the environment. The project is hosted by Riverside School which employs two full time staff, a Director of Community Engagement (Matt Scott: start date October 2017) and a Community Organiser (Jamie Kesten: start date November 2017).
    [Show full text]
  • Barking Riverside Extension – Factsheet 1 Project Overview
    Barking Riverside Extension – factsheet 1 Project overview Introduction Barking Riverside is the largest housing development in east London, with planning permission for up to 10,800 new homes, as well as healthcare, shopping, community and leisure facilities. However, the London Riverside Opportunity Area Planning Framework (OAPF), a spatial planning document covering this area including Barking Riverside1, identifies that a package of transport measures are required to facilitate the development of Barking Riverside, and the wider London Riverside Opportunity Area. The Barking Riverside Extension, a 4km extension (1.5km of new track) of the existing London Overground Gospel Oak to Barking line, is the primary component of a package of transport measures to unlock development at Barking Riverside. Without a new operational rail link in place, the development potential of the Barking Riverside site cannot not be fully realised, as no more than 4,000 homes can be occupied. This project aims to deliver the Barking Riverside Extension of the London Overground Gospel Oak to Barking line. The project will be complemented by a series of transport improvements measures led by Barking Riverside Limited and Transport for London, including bus network enhancements and the creation of a street network that promotes walking and cycling. Further information about the London Riverside Opportunity Area and the Barking Riverside development proposals, is presented in Barking Riverside Extension factsheet 3. The Barking Riverside Extension is proposed to be funded and financed by a variety of sources, including through money allocated in the TfL Business Plan and contributions from the developers of the Barking Riverside site.
    [Show full text]
  • A13 Riverside Tunnel Road to Regeneration the Tunnel Is Essential to East London and Thames Gateway’S Economic Success the A13 Riverside Tunnel Road to Regeneration
    The A13 Riverside Tunnel Road to Regeneration The tunnel is essential to East London and Thames Gateway’s economic success The A13 Riverside Tunnel Road to Regeneration Thank you for taking the trouble to find out more about the proposed A13 Riverside Tunnel. The tunnelling of a 1.3km stretch of the A13 will not only improve traffic flow along this key route, mitigating the two notorious bottlenecks at the Lodge Avenue and Renwick Road junctions, but will also transform a severely blighted area. As well as creating a new neighbourhood of over 5,000 homes called Castle Green, the tunnel will act as a catalyst for the building of another 28,300 homes in London Riverside, while creating over 1,200 jobs and unlocking significant business and commercial growth in the surrounding area. The tunnel is essential to east London and the Thames Gateway’s economic success and will stimulate growth along its route as well as easing congestion. It also signifies a new way of working in this country adapted from successful models from other European cities. A large proportion of the scheme could be self-financing, with the majority of the funding being generated by the tunnel itself, through the land value uplift and sale of the homes, the community infrastructure levy and new homes bonus. If the government also supports our proposal for stamp duty devolution in Castle Green, then this would mean further significant funding for the scheme could be secured. Cllr Darren Rodwell Cllr Roger Ramsey Leader of Barking and Dagenham Council Leader of Havering Council Road to Regeneration 03 About the A13 The A13 is one of the busiest arterial routes into the capital, connecting the county of Essex with central London.
    [Show full text]
  • Barking and Dagenham Report 2021 Barking and Dagenham Report 2021
    Housing supply analysis Connectivity Development pipeline Focus on: Barking and knightfrank.com/research Dagenham Research 2021 BARKING AND DAGENHAM REPORT 2021 BARKING AND DAGENHAM REPORT 2021 50% below asking prices 1km around Average disposable income is expected developments coming forward including Poplar Station. to rise 51% over the next decade. Growth at urban village Abbey Quay which is WHAT DOES THE NEXT On the rental side, a similar story in GVA, a measure of goods and services adjacent to Barking town centre by the emerges with average asking rents produced in an area, is expected to climb River Roding, and as part of the 440-acre DECADE LOOK LIKE FOR for a two-bedroom flat in the vicinity around a fifth. Barking Riverside masterplan. of Barking Station currently £1,261 BARKING & DAGENHAM? per month and £975 per month for Buyer preferences Dagenham Dock. This is 10% lower than The pandemic has encouraged Fig 3. Housing delivery test: asking rents around Limehouse Station, homebuyers to seek more space both Barking & Dagenham inside and out, while the experience of 2,500 uu the past year has, for some individuals, The level of new highlighted the importance of having 2,000 Faster transport connections and a growing local economy are development in Barking better access to riverside locations or supporting extensive regeneration in the area. & Dagenham has not kept green space. 1,500 pace with housing need Our latest residential client survey confirmed this, with 66% of respondents 1,000 uu Freeport status and new film studios More homes are planned, with around over that same period and a 3% rise in now viewing having access to a garden Annual Housing Target combined with the imminent arrival of 13,500 units in the development pipeline, nearby Tower Hamlets, which includes or outdoor space as a higher priority 500 historic City of London markets, Crossrail according to Molior, whichwill be delivered Canary Wharf.
    [Show full text]
  • Barking Riverside: 1 Heritage and Ecology Combine to Create a Distinctive New Place
    Barking Riverside: 1 Heritage and ecology combine to create a distinctive new place LDA Design is helping to turn Barking Power Station in east London 2 3 into a distinctive new riverfront town, made special by its heritage, ecology and location. Stretching 2km along the northern banks of the River Thames, this ambitious new 180-hectare development is one of the UK’s largest regeneration projects. It will provide more than 10,000 homes, as well as new schools, and commercial and cultural spaces. LDA Design, in partnership with WSP, is delivering a Strategic Infrastructure Scheme (SIS), providing a framework for Barking Riverside’s parks, public realm and green spaces; its highways and streetscapes, flood defences, services, utilities and drainage. Starting with a clear vision based on extensive public consultation, our ‘First life’ approach aims to create a welcoming place where people belong. Client Barking Riverside Ltd. Services Masterplanning, Landscape Architecture Location Critical to its success is excellent connectivity. A new train station Barking, Barking & Dagenham and additional bus routes and cycle network will help to integrate Area Partners 180 ha Barking Riverside with its surroundings. The landscape strategy is key L&Q, WSP, Barton Willmore, Arcadis, Laing O’Rourke, Schedule to creating a safe, sociable, sustainable place to live. Proposals include Liftschutz Davidson Sandilands, DF Clark, Future City, 2016 - ongoing Temple, Jestico + Whiles, Tim O’Hare Associates, Envac, terraced seating with river views and a new park that moves into IESIS, XCo2 1 Barking Park 3D masterplan serene wetlands. New habitats will help boost biodiversity. 2 Community green 3 Terraced seating overlooking swales 1 1 Eastern Waterfront, looking west.
    [Show full text]
  • Decentralized Energy Master Planning
    Decentralized Energy Master Planning The London Borough of Brent An Interactive Qualifying Project Report submitted to the Faculty of WORCESTER POLYTECHNIC INSTITUTE in partial fulfilment of the requirements for the Degree of Bachelor of Science Submitted by Anthony Aldi Karen Anundson Andrew Bigelow Andrew Capulli Sponsoring Agency London Borough of Brent Planning Service Advisors Dominic Golding Ruth Smith Liaison Joyce Ip 29 April 2010 This report represents the work of four WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its web site without editorial or peer review. Abstract The London Borough of Brent aims to reduce its carbon emissions via implementation of decentralized energy schemes including combined heat and power systems. The objective of this project was to aid Brent in the early stages of its decentralized energy master planning. By examining policies of other boroughs and studying major development areas within Brent, the WPI project team has concluded that the council must actively facilitate the development of decentralized energy systems through the use of existing practices and development of well supported policies. i Authorship Page This report was developed through a collaborative effort by the project team: Anthony Aldi, Karen Anundson, Andrew Bigelow, and Andrew Capulli. All sections were developed as team with each member contributing equally. ii Acknowledgements The team would like to thank our advisors from Worcester Polytechnic Institute, Professor Dominic Golding and Professor Ruth Smith. The team would also like to thank the liaison Joyce Ip from the London Borough of Brent Planning Service and the entire Planning Service.
    [Show full text]
  • Last Hour Logistics
    In cooperation with DO AMAZING THINGS WITH DATA Marketing Material* November 2019 Research Report LAST HOUR LOGISTICS The brand DWS represents DWS Group GmbH & Co. KGaA and any of its subsidiaries, such as DWS Distributors, Inc., which offers investment products, or DWS Investment Management Americas Inc. and RREEF America L.L.C., which offer advisory services. There may be references in this document which do not yet reflect the DWS Brand. Please note certain information in this presentation constitutes forward-looking statements. Due to various risks, uncertainties and assumptions made in our analysis, actual events or results or the actual performance of the markets covered by this presentation report may differ materially from those described. The information herein reflects our current views only, is subject to change, and is not intended to be promissory or relied upon by the reader. There can be no certainty that events will turn out as we have opined herein. For Professional Clients (MiFID Directive 2014/65/EU Annex II) only. For Qualified Investors (Art. 10 Para. 3 of the Swiss Federal Collective Investment Schemes Act (CISA)). For Qualified Clients (Israeli Regulation of Investment Advice, Investment Marketing and Portfolio Management Law 5755-1995). Outside the U.S. for Institutional investors only. In the United States and Canada, for institutional client and registered representative use only. Not for retail distribution. Further distribution of this material is strictly prohibited. In Australia, for professional investors only. *For investors in Bermuda: This is not an offering of securities or interests in any product. Such securities may be offered or sold in Bermuda only in compliance with the provisions of the Investment Business Act of 2003 of Bermuda which regulates the sale of securities in Bermuda.
    [Show full text]
  • Bankside Power Station: Planning, Politics and Pollution
    BANKSIDE POWER STATION: PLANNING, POLITICS AND POLLUTION Thesis submitted for the degree of Doctor of Philosophy at the University of Leicester by Stephen Andrew Murray Centre for Urban History University of Leicester 2014 Bankside Power Station ii Bankside Power Station: Planning, Politics and Pollution Stephen Andrew Murray Abstract Electricity has been a feature of the British urban landscape since the 1890s. Yet there are few accounts of urban electricity undertakings or their generating stations. This history of Bankside power station uses government and company records to analyse the supply, development and use of electricity in the City of London, and the political, economic and social contexts in which the power station was planned, designed and operated. The close-focus adopted reveals issues that are not identified in, or are qualifying or counter-examples to, the existing macro-scale accounts of the wider electricity industry. Contrary to the perceived backwardness of the industry in the inter-war period this study demonstrates that Bankside was part of an efficient and profitable private company which was increasingly subject to bureaucratic centralised control. Significant decision-making processes are examined including post-war urban planning by local and central government and technological decision-making in the electricity industry. The study contributes to the history of technology and the environment through an analysis of the technologies that were proposed or deployed at the post-war power station, including those intended to mitigate its impact, together with an examination of their long-term effectiveness. Bankside made a valuable contribution to electricity supplies in London until the 1973 Middle East oil crisis compromised its economic viability.
    [Show full text]
  • 'Smart City' - Intelligent Energy Integration for London’S Decentralised Energy Projects
    'Smart City' - Intelligent energy integration for London’s decentralised energy projects Prepared by: ............................................................. Checked by: ........................................................................ Owen Anderson – AECOM Mary Livingstone - AECOM Miles Attenborough – AECOM Mary Livingstone – AECOM Ben Smith – AECOM Hugh Maguire – Poyry Colin Bateman - Wipro Ewan Cameron - Wipro Edward Cottle – Wipro Sacha Meckler – Wipro Approved by: ............................................................. Miles Attenborough – AECOM Rev No Comments Checked by Approved Date by 1 Public report final version ML MA 05,10,2012 2 Public report revised final version ML MA 19,10,2012 3 Public report revised final version with new front cover image DC MA 14.02.2013 MidCity Place, 71 High Holborn, London, WC1V 6QSTelephone: 020 7645 2000 Website: http://www.aecom.com Job No 60242095 Date Created July 2012 This document has been prepared by AECOM Limited for the sole use of our client (the “Client”) and in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between AECOM Limited and the Client. Any information provided by third parties and referred to herein has not been checked or verified by AECOM Limited, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AECOM Limited. Table of Contents Executive Summary ........................................................................................................................................................................
    [Show full text]
  • 9924 the London Gazette, I?Th August 1973 Parliamentary Notices Bank of England
    9924 THE LONDON GAZETTE, I?TH AUGUST 1973 (3) 18 Sunderland Street, Northampton, by D. F. Callow and H. E. Shepherd of that address. PARLIAMENTARY NOTICES (4) Part of 17 Heath Lane, Codicote, Herts, by G. D. MINISTRY OF AGRICULTURE, FISHERIES AND Fleming, 38 Lakeside Road, London, N13 4PR. FOOD AND DEPARTMENT OF TRADE AND (5) Land on N. side of Fairfield Avenue, Felixstowe, INDUSTRY Suffolk, by G. F. Allen and C. A. Clarke, 39 Wood- Au crust 1973. bridge Road East, Ipswich, Suffolk. (6) 153 Cavendish Drive and 345 Capworth Street, Lon- don, E.10, by H. Lemon, 27 Mayfield Gardens, THAMES BARRIER AND FLOOD PREVENTION London N.W.4, and S. Leaman, 25 Rostrevor Avenue, ACT 1972 London N.15. The Barking Creekmouth (Barrier) Order 1973 (7) 147 New North Road, Ilford, Essex, by A. E. Spencer, Notice is hereby given that the Essex River Authority are 752 Cranbrook Road, Ilford. applying to the Minister of Agriculture, Fisheries and Food (8) 16 Western Road, Romford, Essex, by Bradley House and the Secretary of State for Trade and Industry for an Investments Ltd. Order under section 56 of the Thames Barrier and Flood Prevention Act 1972. The local authorities whose areas are comprised wholly or partly in the area affected by the Order are: THE SWANSEA DISTRICT LAND REGISTRY, (1) Greater London Council ; 37 Kingsway, Swansea, Glam., SA1 5LF (2) Council of the London Borough of Barking ; FREEHOLD (3) Council of the London Borough of Newham. Part of Fforestfach Farm, Ammanford, Carms., by Castle A copy of the draft Order and the plan showing the New Homes Ltd.
    [Show full text]