Trophy Hunting and Conservation in Mongolia Lucy Page SIT Study Abroad
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
J. Bombay Nat. Hist. Be. Vol. 104(2), May-August, 200"
- - 4;. J. Bombay Nat. Hist. be. Vol. 104(2), May-August, 200" POPULATION STATUS OF MONGOLIAN ARGALI OVIS AMMON FERENCE TO SUSTAINABLE USE MANAGEMENT Margaret Michael R. Frisina, Yondon Onon- and R. Frisina Journal of the Bombay Natural History Society, 104 (2), May-Aug 2007 140-144 POPULATION STATUS OF MONGOLIAN ARGALI OVIS AMMON WITH REFERENCE TO SUSTAINABLE USE MANAGEMENT1 MICHAELR. FRISINA',YONDON ON0N3 AND R. MARGARETFRISINA~ 'Accepted December 2005 'Montana Department of Fish, Wildlife & Parks, 1330 West Gold Street, Butte, MT 59701. Email: [email protected] "~nstitute of Biology, Mongolian Academy of Sciences, Ulaanbaatar, Mongolia. Email: [email protected] "Member, Rocky Mountain Outdoor Writers and Photographers, 1330 West Gold Street, Butte, MT 59701. Email: [email protected] Using repeatable protocols, a survey ofArgali sheep (Ovis nnimon) in Mongolia was conducted across their range during November 2002. A country-wide population of 20,226 was estimated. Approximately 7% of Mongolia's 34,873 sq. km Agali range was surveyed. This was Mongolia's first repeatable survey for monitoring purposes. Other population estimates have been made, but the survey protocols were not given, making them unrepeatable and unusable for monitoring population trend. Population trend was established for a number of specific survey sites by comparing data collected during this survey with those done earlier in which the protocols were described. Population levels in some areas were depressed while in other areas population trend was stable or increasing. If the Mongolian Government implements a country-wide and site-specific Argali sustainable use management plan, potentially between 202-404 trophy rams could be harvested annually. -
Infrastructure Strategy Review Making Choices in Provision of Infrastructure Services
MONGOLIA Infrastructure Strategy Review Making Choices in Provision of Infrastructure Services S. Rivera East Asia & Pacific The World Bank Government of Mongolia: Working Group Technical Donors Meeting October, 2006. 1 Mongolia: Infrastructure Strategy The Process and Outputs Factors Shaping Infrastructure Strategy Demand Key Choices to discuss this morning 2 Process and Outcome The Process – An interactive process, bringing together international practices: Meeting in Washington, March 2005. Field work in the late 2005. Preparation of about 12 background notes in sector and themes, discussed in Washington on June 2006. Submission of final draft report in November, 2006 Launching of Infrastructure Strategy report in a two day meeting in early 2007. Outcome A live document that can shape and form policy discussions on PIP, National Development Plan, and Regional Development Strategy….it has been difficult for the team to assess choices as well. 3 Factors Shaping the IS • Urban led Size and Growth of Ulaanbaatar and Selected Aimag (Pillar) Centers Size of the Circle=Total Population ('000) Infrastructure 6% 5% 869.9 Investments ) l 4% ua nn 3% a Ulaanbaatar (%, 2% h t Darkhan w Erdenet o 1% r G n 0% o i -10 0 10 20 30 40 50 60 70 80 at l -1% Choibalsan Kharkhorin opu Ondorkhaan P -2% Khovd Uliastai -3% Zuunmod -4% Share of Total Urban Population (%) 4 Factors Shaping the IS: Connectivity, with the World and in Mongolia Khankh Khandgait Ulaanbaishint Ereentsav Khatgal Altanbulag ULAANGOM Nogoonnuur UVS KHUVSGUL Tsagaannuur ÒýñTes -
The Magic of the Mongolian West
Magie de l'ouest Mongol Jours: 14 Prix: 1550 EUR Vol international non inclus Confort: Difficulté: Aventure, exploration et expédition Hors des sentiers battus Randonnée Minorité ethnique Aux confins de l'Asie Centrale, des peuplades Kazakhs vivent en harmonie avec leurs coutumes ancestrales. Sommets enneigés, glaciers, lacs cristallins et vallées luxuriantes, l'Altai Mongol est une des régions les plus reculées du Monde. Un circuit alternant découverte en jeep et journées de randonnée, pour les personnes souhaitant découvrir l'ouest du pays à un rythme modéré. Jour 1. Oulan-Bator, arrivée et visite de la ville Accueil par notre chauffeur à votre sortie de l'aéroport. Transfert à votre hôtel, installation et repos. Rendez-vous à midi à votre hôtel avec votre guide, qui vous amènera déjeuner dans le restaurant de votre choix. Plongeons au coeur de l'histoire mongole, au superbe musée d'histoire nationale. Trois étages d'un passé riche et glorieux, violent et noble, depuis la préhistoire jusqu'à la période soviétique, en passant bien sûr par la création du grand empire mongol par Gengis Khan. Oulan Bator Balade dans le centre ville d'Oulan-Bator. Découverte de la place centrale Gengis Khan, et du Parlement. À 18h00, spectacle traditionnel mongol au Tumen Ekh : danses folkloriques, contorsion et bien sûr khoomi, le chant diphonique. Hébergement Hôtel Nine Jour 2. Vol pour le far west mongol Oulan Bator - Khovd Nous quittons la trépidante capitale mongole pour embarquer sur un vol domestique à destination de Khovd. Khovd fut un centre commercial important situé au nord de la route de la soie, qui avait tissé des liens avec la Russie et la Chine. -
REPORT on TRANSBOUNDARY CONSERVATION HOTSPOTS for the CENTRAL ASIAN MAMMALS INITIATIVE (Prepared by the Secretariat)
CONVENTION ON UNEP/CMS/COP13/Inf.27 MIGRATORY 8 January 2020 SPECIES Original: English 13th MEETING OF THE CONFERENCE OF THE PARTIES Gandhinagar, India, 17 - 22 February 2020 Agenda Item 26.3 REPORT ON TRANSBOUNDARY CONSERVATION HOTSPOTS FOR THE CENTRAL ASIAN MAMMALS INITIATIVE (Prepared by the Secretariat) Summary: This report was developed with funding from the Government of Switzerland within the frame of the Central Asian Mammals Initiative (CAMI) (Doc. 26.3.5) to identify transboundary conservation hotspots and develop recommendations for their conservation. The report builds on existing projects, in particular, the CAMI Linear Infrastructure and Migration Atlas (see Inf.Doc.19) and focusses on the same species and geographical area. The study was discussed during the CAMI Range State Meeting held from 25-28 September 2019 in Ulaanbaatar, Mongolia where participants reviewed the pre-identified areas. Their comments are incorporated in this report. Participants also provided new information about important transboundary sites from Bhutan, India, Nepal and Pakistan and recommended to send the report for final review to Range States and experts. It was also recommended that the final report covers all CAMI species as adopted at COP13. This report is therefore a final draft with the last step to expand the geographical and species scope and finalize the report to be undertaken after COP13. Mapping Transboundary Conservation Hotspots for the Central Asian Mammals Initiative Photo credit: Viktor Lukarevsky Report – Draft 5 incorporating comments made during the CAMI Range States Meeting on 25-28 September 2019 in Ulaanbaatar, Mongolia. The report does not yet consider the Urial, Persian leopard and Gobi bear as CAMI species pending decision at the CMS COP13, as well as the proposed expansion of the geographic and species scope to include the entire CAMI region in this study. -
Wildlife Protection in Mongolia by R
196 Oryx Wildlife Protection in Mongolia By R. A. Hibbert CMG Although the Mongolian People's Republic, last refuge of the Przewalski wild horse, is one of the most thinly populated countries in the world, the wildlife decreased considerably in the 30's and 40's. There has been some improvement in recent years, and the Game Law now gives protection to nearly all mammals—the few exceptions include the wolf, understandably in a country with vast herds of domestic animals. Mr. Hibbert, who was British Charge d'Affaires at Ulan Bator from 1964 to 1966, and has since spent a year at Leeds University working on Mongolian materials, assesses the status of the major species of mammals, birds and fish, and describes the game laws. HE Mongolian People's Republic is a huge country with a very T small population. Its area is just over H million square kilometres, its population just over 1,100,000. This gives an average population density of 0-7 per square kilometre or allowing for the concentration of nearly a quarter of the population in the capital at Ulan Bator, a density in rural areas of 0-5 per square kilometre. This seems to be a record low density for a sovereign state. The density of domestic animals—sheep, goats, cows and yaks, horses, camels—is much higher. There are some 24 million domestic animals in the herds, which gives an average density of 15 per square kilometre. Even so, the figures suggest that there is still plenty of room for wild life. -
Mongolia: Severe Winter
Emergency Plan of Action (EPoA) Mongolia: Severe Winter Emergency Appeal n° MDRMN006 Glide n° CW-2017-000001 Date of issue: 10 February 2017 Operation manager: Point of contact: Gwendolyn Pang Bolormaa Nordov, Head of IFRC Country Cluster Support Team in Beijing Secretary General of Mongolian Red Cross Society Operation start date: 2 January 2017 Expected timeframe: 10 months (to 2 November 2017) Operation budget: CHF 655,512 DREF allocation: CHF 177,349 Total number of people affected: Number of people to be assisted: 157,0001 people 11,264 people (2,740 families) Host National Society presence (n° of volunteers, staff, branches): Mongolian Red Cross Society (MRCS) has 33 mid-level and 703 primary level branches working in all provinces of Mongolia, it has 7,000 volunteers and 128,827 members including 75,000 junior and youth members. MRCS has six established regional disaster preparedness centres with 240 emergency response team members. Red Cross Red Crescent Movement partners actively involved in the operation: The National Society works with International Federation of Red Cross and Red Crescent Societies (IFRC) in this operation as well as current Partner National Societies: Australian Red Cross, British Red Cross, Japanese Red Cross Society, Finnish Red Cross, and the Republic of Korea National Red Cross. Other partner organizations actively involved in the operation: Mongolia National Emergency Management Agency (NEMA), local governments, USAID, UN and its agencies, World Vision International, Save the Children, Caritas Czech, People in Need, G-Mobile, World Animal Protection Organization. A. Situation analysis Description of the disaster Dzud (Mongolian term for a severe winter), which is a slow onset winter condition has now been affecting some 157,000 people (37,000 herder households) across 17 out of 21 provinces in Mongolia. -
MONGOLIA: Systematic Country Diagnostic Public Disclosure Authorized
MONGOLIA: Systematic Country Diagnostic Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Acknowledgements This Mongolia Strategic Country Diagnostic was led by Samuel Freije-Rodríguez (lead economist, GPV02) and Tuyen Nguyen (resident representative, IFC Mongolia). The following World Bank Group experts participated in different stages of the production of this diagnostics by providing data, analytical briefs, revisions to several versions of the document, as well as participating in several internal and external seminars: Rabia Ali (senior economist, GED02), Anar Aliyev (corporate governance officer, CESEA), Indra Baatarkhuu (communications associate, EAPEC), Erdene Badarch (operations officer, GSU02), Julie M. Bayking (investment officer, CASPE), Davaadalai Batsuuri (economist, GMTP1), Batmunkh Batbold (senior financial sector specialist, GFCP1), Eileen Burke (senior water resources management specialist, GWA02), Burmaa Chadraaval (investment officer, CM4P4), Yang Chen (urban transport specialist, GTD10), Tungalag Chuluun (senior social protection specialist, GSP02), Badamchimeg Dondog (public sector specialist, GGOEA), Jigjidmaa Dugeree (senior private sector specialist, GMTIP), Bolormaa Enkhbat (WBG analyst, GCCSO), Nicolaus von der Goltz (senior country officer, EACCF), Peter Johansen (senior energy specialist, GEE09), Julian Latimer (senior economist, GMTP1), Ulle Lohmus (senior financial sector specialist, GFCPN), Sitaramachandra Machiraju (senior agribusiness specialist, -
Desertification Information Extraction Based on Feature Space
remote sensing Article Desertification Information Extraction Based on Feature Space Combinations on the Mongolian Plateau Haishuo Wei 1,2 , Juanle Wang 1,3,4,* , Kai Cheng 1,5, Ge Li 1,2, Altansukh Ochir 6 , Davaadorj Davaasuren 7 and Sonomdagva Chonokhuu 6 1 State Key Laboratory of Resources and Environmental Information System, Institute of Geographic Sciences and Natural Resources Research, Chinese Academy of Sciences, Beijing 100101, China; [email protected] (H.W.); [email protected] (K.C.); [email protected] (G.L.) 2 School of Civil and Architectural Engineering, Shandong University of Technology, Zibo 255049, China 3 Jiangsu Center for Collaborative Innovation in Geographical Information Resource Development and Application, Nanjing 210023, China 4 Visiting professor at the School of Engineering and Applied Sciences, National University of Mongolia, Ulaanbaatar City 14201, Mongolia 5 University of Chinese Academy of Sciences, Beijing 100049, China 6 Department of Environment and Forest Engineering, National University of Mongolia, Ulaanbaatar City 210646, Mongolia; [email protected] (A.O.); [email protected] (S.C.) 7 Department of Geography, National University of Mongolia, Ulaanbaatar City 14201, Mongolia; [email protected] * Correspondence: [email protected]; Tel.: +86-139-1107-1839 Received: 22 August 2018; Accepted: 9 October 2018; Published: 11 October 2018 Abstract: The Mongolian plateau is a hotspot of global desertification because it is heavily affected by climate change, and has a large diversity of vegetation cover across various regions and seasons. Within this arid region, it is difficult to distinguish desertified land from other land cover types using low-quality vegetation information. -
SILENT STEPPE II: Mongolia’S Wildlife Trade Crisis, Ten Years Later
MONGOLIA SILENT STEPPE II: Mongolia’s Wildlife Trade Crisis, Ten Years Later MONGOLIA IRIM Independent Research Institute MONGOLIA SILENT STEPPE II: Mongolia’s Wildlife Trade Crisis, Ten Years Later MONGOLIA IRIM Independent Research Institute MONGOLIA SILENT STEPPE II: Mongolia’s Wildlife Trade Crisis, Ten Years Later September 2019 This study was prepared by The Zoological This report is a product of the staff of the Society of London (ZSL), Legal Atlas, and the Zoological Society of London, Legal Atlas, and Independent Research Institute of Mongolia IRIM, as well as the reviewers that provided (IRIM) with funding from the Illegal Wildlife valuable input to the final draft. In this regard, Trade Challenge Fund of Great Britain’s special thanks are due to Mr. Gombobaatar Department for Environment, Food and from the Ministry of Environment and Natural Rural Affairs (DEFRA). The UK government is Resources, who provided a review of the committed to tackling illegal wildlife trade, a critical chapters. The report’s findings do not criminal industry worth more than £6 billion necessarily reflect the views of the Directors of each year threatening both wildlife and people. these entities or the government of Mongolia. The Illegal Wildlife Trade (IWT) Challenge No entity involved in this study guarantees the Fund provides financial support to practical accuracy of the data included. Likewise, the projects around the world which: boundaries, colors, denominations, and other information shown on any map in this work • develop sustainable livelihoods for do not imply any judgment on the part of communities affected by illegal wildlife any entity named herein concerning the legal trade status of any territory or the endorsement or • strengthen law enforcement and the role acceptance of such boundaries. -
Influence of Trophy Harvest on the Population Age Structure of Argali Ovis Ammon in Mongolia
Journal of the Bombay Natural History Society, 109(3), Sept-Dec 2012 173-176 INFLUENCE OF TROPHY HARVEST ON ARGALI POPULATION INFLUENCE OF TROPHY HARVEST ON THE POPULATION AGE STRUCTURE OF ARGALI OVIS AMMON IN MONGOLIA MICHAEL R. FRISINA1 AND R. MARGARET FRISINA2 1Montana State University Bozeman, Department of Animal and Range Sciences, Bozeman, MT. 59717 USA. Email: [email protected] 2August L. Hormay Wildlands Institute, PO Box 4712, Butte, MT. 59701 USA. To assess the influence of trophy hunting on Mongolian Argali Ovis ammon, we compared the ages of trophy rams (n=64) taken through Mongolia’s legal hunting programme with those of mature rams that died of natural causes (n=116). A two-sample Kolomogorov-Smirnov test indicated that the distributions of the two groups were different (P=0.001). A two-sample t-test indicated the distributional differences were due, at least in part, to differences in the mean ages between the natural deaths and hunter harvested samples (P=0.001); the distributions were not centered at the same value or the means in the two populations differ. Application of the Central Limit Theorem affirms that the distribution of the sample mean ages for natural death and hunter harvested populations will be approximately normal, making the t-test applicable. The mean age for the natural death sample was 8.7 years (range: 7.0–13.0) compared to 9.4 (range: 7.0–13) for the hunter harvested sample. At the 95% confidence level, the true difference in ages between the trophy kills and natural deaths is between 3 months and 1 year. -
Mongolia By: Ms.Gereltuya Bat-Ulzii Senior Officer, Barcode & Logistics Division Mongolian National Chamber of Commerce and Industry
Mongolia By: Ms.Gereltuya Bat-Ulzii Senior officer, Barcode & Logistics Division Mongolian National Chamber of Commerce and Industry Mongolia trade & transport sector In 2011 Economic growth rapidly increased up to 17.3 percent Transport, Storage & Comm Mining Construction Wholesale & Retail Trade Manufacturing Other Services Residual Agriculture GDP 20 GDP Growth accelerated to an 15 unprecedented 10 17.3 percent in 5 2011 0 -5 -10 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 Mongolia trade & transport sector Trade deficit reached record level (US $ 1.7 bn in December 2011) as imports of mining-related equipment and fuel imports have surged. 7,000 500 Exports Imports 6,000 Trade balance (right axis) 0 5,000 -500 4,000 3,000 -1000 2,000 -1500 1,000 0 -2000 Dec-05 Dec-06 Dec-07 Dec-08 Dec-09 Dec-10 Dec-11 Mongolia trade & transport sector Exports are grown as well, reaching Export grow supported almost US $4.8 bn in December 2011 entirely by coal shipments to December from US$ 2.9 bn a year China. ago 160% Other 190% Other Greasy cashmere China Coal Gold 120% Copper concentrate Total Russia 140% 80% Total 40% 90% 0% 40% -40% -80% -10% -60% 06-09 08-09 10-09 12-09 02-10 04-10 06-10 08-10 10-10 12-10 Dec-09 Jun-10 Dec-10 Jun-11 Dec-11 Mongolia trade & transport sector Total length of the country’s road network is 98.123 thousand km including international, state and local government roads. -
MONGOLIA Implementation Progress of the TTFS 2020 Projects
CAREC Corridor Implementation Progress and Priority Actions for 2020-2030 MONGOLIA Implementation Progress of the TTFS 2020 projects Planned Road Actual for Current Safety Project Target Completed (km) Completi Impleme Componen IP No. Corridor Sector Project Title Status Cost ($ Funding Source(s) Length on (km) ntation t (for Road million) (km) Cumulati Period projects)? ve up to 2019 2020 Yes/No 2018 Western Regional Road Development MON Government, 1995– (PRC Border at Complete 145 ADB & PRC 479.4 479.4 - - IP 1 4a Road 2018 Yarant–Khovd– Ulgii –Ulaanbaishint) ADB, MON Regional Road Government (31.5) Development ADB, MON Government (58.8) (Construction of 1995– Completed 126 Millenium 434 434 N/A N/A IP 2 4b Road 2014 Altanbulag- Challenge Ulaanbaatar- Corporation (65.8) Zamiin-Uud) ADB, MON Govenrment (24.1) Airport Construction of and New International 2008- IP 5 4b-c Completed 591 JICA/MON Gov N/A N/A N/A N/A N/A Civil Airport in 2018 AviationUlaanbaatar Implementation Progress of the TTFS 2020 projects Road Planned Safety Actual for Componen Completed (km) Completi Project Current Target t (for Road on (km) Project Title Cost ($ Funding Implement IP No. Corridor Sector Status Length projects)? million Source(s) ation (km) Yes/No Cumulati ) Period ve up to 2019 2020 2018 Access Road to the New China EXIM 2015- IP 10 4b Road International Airport in Completed 140 Bank soft 32 32 2018 Ulaanbaatar loan Western Regional Road Development Phase 2 2012- IP 11 4a Road MFF—Bayan Ulgii and Ongoing 120 ADB 189.7 103.9 60 25.8 2019 Khovd Aimags