FINAL ENVIRONMENT IMPACT ASSESSMENT REPORT ENVIRONMENT MANAGEMENT PLAN OF EXPANSION OF ANIALI LIMESTONE MINING PROJECT PROJECT CATEGORY: A (EXPANSION) LOCATION: NEAR VILLAGE: ANIALI TALUKA: RANAVAV, DISTRICT: , STATE:

TOTAL LEASE AREA-21.04 (Ha) PROPOSED PRODUCTION: 1,75,000 TONS PER ANNUM

BASELINE MONITORING PERIOD DECEMBER 2018- JANUARY 2019- FEBRUARY 2019 PROJECT PROPONENT

M/s TATA CHEMICALS LIMITED Reg office: Bombay House, 24 Homi Mody Street, Mumbai-400001, Site office: P.O.-Mithapur, Tehsil- Okhamandal, District-Devbhoomi Dwarka, Gujarat

EIA CONSULTANT IN SITU ENVIRO CARE PVT. LTD. QCI/NABET Accredited & ISO 9001:2008 Certified Company NABET Certificate No. NABET/EIA/1821/RA0070

To, Date 09.06.2021

The Member Secretary Expert Appraisal Committee Ministry of Environment Forest and Climate Change Indira Paryavaran Bhawan, Jor Bagh Road New Delhi-110003

Sub: Submission of final EIA/EMP report for grant of Environmental Clearance for Expansion of Aniali Limestone Mining Project over an area of 21.04 Ha. near village-Aniali, Tehsil- Ranavav, District- Porbandar, State- Gujarat.

Ref: Terms of Reference (ToR) by the Ministry of Environment, Forest and Climate Change, with vide letter no. J-11015/42/2020-IA.II (M) dated 13thNovember 2020

Dear Sir,

This is with above reference and mentioned subject that the Final EIA/EMP report has been prepared as per the generic structure prescribed in MoEF&CC notification S.O.1533(E) dated 14th September 2006.

The report is submitted for your kind perusal and onwards needful action for grant of Environment Clearance.

Thanking you,

Paresh C. Tank General Manager-Corporate Affairs TATA Chemicals Limited Gujarat c TI'^-\ Trn

Date 1110912017

Authority Letter

This is to state that Sh. Paresh Tank will be the official correspondent from our side for carrying our Environmental clearance work of Limestone Mines.

He also holds the authority to present himself before the appraisal committee at the time of presentations.

He may sign the documents on behalf of Tata Chemicals Limited. Name - Sh. Paresh Tank Designation- General Manager- Corporate Affairs Phone number- 079-614061 05 Fax- 02892-223361 E, Mail - [email protected]

Authorised by /7* (B B Kathpalia) VP- Manufacturing Tata Chemicals Limited Mithapur (Gujarat)

IATA CHEMICALS UM]TED Mhhapur :16I :l4S Disrrid Devbhoomi Dwarka Gujarat Tel + 9l (02892) 665991 t 2I I I 4 Fax + 9l (028921 223361 www.ratachemica*com nrgirrctld Ofhcc Eomby tloure 24 tlomi Mody Stre€r Forr Mumbai lloo oor CtN : Uta2i9MHt939ptCOO2B93 tu I Scanned by CamScanner

UNDERTAKING

This EIA/EMP Report is prepared for obtaining Environment Clearance (EC) of Expansion of AnialiLimestone Mining Project near village-Aniali, Tehsil- Ranavav, District- Porbandar, State- Gujarat with a mine lease area of 21.04 Ha for mining of Limestone mineral has been prepared as per the conditions laid down in Terms of Reference (ToR) prescribed by Ministry of Environment, Forest and Climate Change, vide letter no. J-11015/42/2020-IA.II (M) dated 13th November 2020. I, Paresh C. Tank, authorised signatory for M/s TATA Chemicals Limited, affirm that all the data submitted and the information presented in this report are factually correct to the best of my knowledge.

Thanking You,

Paresh C. Tank General Manager-Corporate Affairs TATA Chemicals Limited Gujarat

Expansion of Aniali Limestone Mining Project Final EIA/EMP

INDEX  Cover Letter  Table of Contents  List of Tables  List of Figures  List of Annexure  List of Abbreviations  Executive Summary in English  Questionnaire

S NO TABLE OF CONTENTS PAGE NO

CHAPTER-1: INTRODUCTION 1.1 Preamble 1 1.2 General Information on Mining of Minerals 1 1.3 Description of lease area 1 1.4 Identification of Project & Project Proponent 2 1.4.1 Name of the Project 2 1.4.2 Identification of Project Proponents 2 1.4.3 Location of mine lease and study area 3 1.5 Brief Description of the Project 7 1.6 Mine Connectivity 8 1.7 Importance of Project 9 1.8 Scope of the Study 11 1.9 Compliance of TOR 11 CHAPTER-2: DESCRIPTION OF THE PROJECT 2.0 General 28 2.1 Description of the project 28 2.1.1 Lease hold area 29 2.1.2 Location details 32

M/s TATA CHEMICALS LIMITED Expansion of Aniali Limestone Mining Project Final EIA/EMP

2.1.3 Need for the Project 39 2.1.4 Salient features of the project 39 2.1.5 Size/Magnitude of Operation 42 2.2 Geology 42 2.2.1 Topography 42 2.2.2 Regional Geology 43 2.2.3 Local Geology 44 2.2.4 Description of the rocks units within the lease area 44 2.3 General Features 45 2.3.1 Surface Drainage Pattern 45 2.3.2 Vegetation 46 2.3.3 Climate 46 2.3.4 Rainfall 46 2.4 Quality of Reserves 49 2.4.1 Method of Estimation of Reserve 49 2.5 Method of Mining 49 2.5.1 Existing method of mining 49 2.5.2 Proposed Method of Mining 49 2.5.3 Mining Equipment 51 2.5.4 Sorting of limestone 58 2.5.5 Proposed Rate of Production 58 2.6 Life of Mine 58 2.7 Details of Mining Process 58 2.7.1 Conceptual Mining Plan 58 2.7.2 Ultimate Pit Depth Limit 59 2.8 Waste Management 59 2.8.1 Overburden/Waste Management 60 2.9 Beneficiation/Processing 60 2.10 Site Facility 62 2.10.1 Mining Office 62

M/s TATA CHEMICALS LIMITED Expansion of Aniali Limestone Mining Project Final EIA/EMP

2.10.2 Rest Shelter 62 2.10.3 Blasting Shelter 62 2.11 Utilities required 62 2.11.1 Power Supply 62 2.11.2 Workshop and Stores 62 2.11.3 Fuel Detail 62 2.11.4 Water Requirement 62 2.12 Waste Water generation 63 2.13 Mine Drainage 63 2.14 Storm Water 64 2.15 Employment Generation 64 2.16 Land Use Pattern (Present Vs Conceptual) 65 2.17 Break-up of areas in the mining lease 66 2.18 Reclamation and Rehabilitation of mined out area 70 CHAPTER-3: DESCRIPTION OF THE ENVIRONMENT 3.0 General 71 3.1 Study Area & Study period 71 3.1.1 Methodology 71 3.2 Land Environment of the Study area 74 3.2.1 Land Use in Core Zone 74 3.2.2 Land Use in Buffer Zone 75 3.2.3 Seismicity of the area 78 3.2.4 Major environmental features in Study Area 78 3.3 Water Environment 79 3.3.1 Sampling frequency 79 3.3.2 Ground water 80 3.3.2.1 Ground water quality results and conclusion 84 3.3.3 Surface water 85 3.3.3.1 Surface water results and conclusion 88 3.4 Air Environment 88

M/s TATA CHEMICALS LIMITED Expansion of Aniali Limestone Mining Project Final EIA/EMP

3.4.1 Site specific meteorological data 88 3.4.2 Secondary Data Collected from IMD 90 3.4.3 Wind Pattern 90 3.4.4 Temperature 94 3.4.5 Relative Humidity 95 3.4.6 Ambient Air Quality 96 3.4.6.1 Selection Criteria for Monitoring Location 96 3.4.6.2 Baseline Scenario 105

3.4.6.3 Mineralogical composition of PM10 109 3.5 Noise Environment 110 3.5.1 Noise Level in the Study Area 110 3.5.2 Sources of Noise 110 3.5.3 Ambient Noise Standards 113 3.5.4 Baseline Scenario 113 3.6 Soil Characteristics 114 3.6.1 Methodology 116 3.6.2 Results of analysis of the soil 118 3.7 Biological Environment 119 3.7.1 Objectives of Ecological Studies 119 3.7.2 Biogeography and Physiographic of the study area 119 3.7.3 Sampling Methodology of Study 119 3.7.4 Terrestrial Environment 120 3.7.4.1 Core Zone 120 3.7.4.2 Buffer Zone 120 3.7.5 Aquatic Environment 123 3.7.6 Rare, endangered and threatened species (RET) of the Study Area 125 3.7.7 Ecologically Sensitive Areas 125 3.7.8 Biological Environment of Barda Wildlife Sanctuary 126 3.7.8.0 General 126 3.7.8.1 Location of Barda Wildlife Sanctuary 126

M/s TATA CHEMICALS LIMITED Expansion of Aniali Limestone Mining Project Final EIA/EMP

3.7.8.2 Physiography 126 3.7.8.3 Forest type of this sanctuary 126 3.7.8.4 Floral species in the Barda Wildlife Sanctuary 127 3.7.8.5 Medicinal Plants found in the sanctuary 127 3.7.8.6 Faunal species present in the Barda Wildlife Sanctuary 128 3.7.8.7 Importance of Barda Wildlife Sanctuary 135 3.8 Socio-Economic Environment 135 3.8.1 Objectives 136 3.8.2 Methodology adopted for the study 136 3.8.3 Concepts & Definition 136 3.8.4(a) Description of the District 137 3.8.4(b) Description of the Study Area 138 3.8.4.1 Core Zone 138 3.8.4.2 Buffer Zone 138 3.8.5 Demographic Profile of the study area based on 2011 Census data 140 3.8.5.1 Population of the study area 141 3.8.5.2 Social Structure 141 3.8.5.3 Literacy 142 3.8.5.4 Illiteracy 143 3.8.6 Occupational structure 147 3.8.6.1 Total workers 147 3.8.6.1.1 Cultivators 147 3.8.6.1.2 Agricultural Laborers 147 3.8.6.1.3 Household Industry Laborers 147 3.8.6.1.4 Other Workers 148 3.8.6.2 Non workers 148 3.8.7 Infrastructural Facilities and Amenities in the Study Area 153 3.8.8 Conclusion 160 3.8.9 Measures adopted by M/s TATA Chemicals Limited for the development of 160 the social structure CHAPTER-4: ANTICIPATED IMPACTS & MITIGATION MEASURES

M/s TATA CHEMICALS LIMITED Expansion of Aniali Limestone Mining Project Final EIA/EMP

4.0 General 161 4.0.1 Impact Assessment Methodology 161 4.1 Land Environment 162 4.1.1 Change in Land use Pattern 162 4.1.2 Impact on Soil Environment 163 4.1.3 Conceptual Reclamation and Rehabilitation of the mined-out area 164 4.2 Water Environment 165 4.2.1 Wastewater Generation, Treatment & Disposal 165 4.2.2 Proposed Mitigation Measures for Water Resources 166 4.3 Impact on Air Quality 166 4.3.1 Emissions Details 167 4.3.2 Meteorological Data 167 4.3.3 Frame work of Computation & Model details 170 4.3.4 Model Results 170

4.3.4.1 Results of PM10GLC concentration 171

4.3.4.2 Result of PM2.5GLC concentration 173

4.3.4.3 Result of NO2GLC concentration 175

4.3.4.4 Result of SO2GLC concentration 177 4.3.4.5 Result of CO GLC concentration 179 4.3.5 Proposed Mitigation Measures For Dust Suppression 181 4.4 Noise Environment 181 4.4.1 Noise Impact on Working Environment 181 4.4.2 Noise Abatement and Control 181 4.4.3 Impact Due To Ground Vibrations and Abatement 182 4.5 Biological Environment 183 4.5.1 Impact on Biodiversity 183 4.5.2 Greenbelt development/ Plantation 184 4.6 Traffic Study and Transportation 193 4.6.1 Mitigation measures 194 4.7 Socio - Economic Environment 197

M/s TATA CHEMICALS LIMITED Expansion of Aniali Limestone Mining Project Final EIA/EMP

4.7.1 Anticipated Impacts 197 4.8 Mine Waste Management 199 4.9 Mine closure 199 CHAPTER-5: ANALYSIS OF ALTERNATIVES 5.0 General 200 5.1 Factors Behind the Selection of Project Site 200 5.2 Site Alternatives under Consideration 200 5.3 Analysis for Alternative Technology 200 5.3.1 Choice of Method of Mining 200 5.3.2 Impacts of Mining operations 201 CHAPTER-6: ENVIRONMENTAL MONITORING PROGRAM 6.1 General 202 6.1.1 Implementation Schedule of Mitigation Measures 203 6.1.2 Administrative Aspects & Environmental Monitoring Programme 203 6.1.3 Formation of Environment Management Cell 203 6.1.4 Responsibilities of EMC 204 6.2 Environmental Monitoring Programme 206 6.2.1 Water Quality Monitoring 206 6.2.2 Air Quality Monitoring 206 6.2.3 Noise Levels and Vibration 207 6.2.4 Soil Sampling 209 6.3 Occupational Health & Safety 212 6.3.1 Public Health Implication 212 6.4 Corporate Environmental Policy 213 CHAPTER-7: ADDITIONAL STUDIES 7.0 Additional Studies 214 7.1 Public Hearing 214 7.2 Public Hearing Notice for Limestone Mine published in Gujrati News Paper 215 (“Divya Bhaskar” dated 24/02/2021”) and National Daily English News Paper (“The Times of ” dated 24/02/2021) 7.3 Photographs of Public Hearing 216

M/s TATA CHEMICALS LIMITED Expansion of Aniali Limestone Mining Project Final EIA/EMP

7.4 Public Hearing Proceedings 217 7.5 Risk Assessment 232 7.5.1 Blasting 233 7.5.2 Overburden 234 7.5.3 Heavy Machinery 234 7.5.4 Storage and use of explosives 234 7.5.5 Water Logging 234 7.5.6 Natural resource conservation 234 7.5.7 Safety Measures 235 7.6 Disaster Management Plan 236 7.6.1 Objectives of Disaster Management Plan 236 7.6.2 Disaster Management and Risk assessment 236 7.6.3 On-Site Disaster Management Plan 238 CHAPTER-8: PROJECT BENEFITS 8.0 General 242 8.1 Improvement in Physical Infrastructure 243 8.2 Improvement in Social Infrastructure 243 8.3 Employment Potential 244 8.4 Socioeconomic benefits 244 8.5 Tangible Social Benefits 244 8.6 Other Benefits 245 CHAPTER-9: ENVIRONMENTAL MANAGEMENT PLAN 9.1 General 246 9.2 Environment Management System 246 9.2.1 Policy 246 9.2.2 Standard Operating Procedures 247 9.2.3 Environment Cell 247 9.2.4 Public Reporting 248 9.3 Proposed Environmental Management Plan 249 9.3.1 Air Quality Management and Control 249

M/s TATA CHEMICALS LIMITED Expansion of Aniali Limestone Mining Project Final EIA/EMP

9.3.1.1 Control of Fugitive Emissions 249 9.3.1.2 Prevention and control of Gaseous Pollution 249 9.3.2 Noise Pollution management and Control 251 9.3.2.1 Noise Abattement and Control 251 9.3.2.2 Control of Noise, Vibration and fly rock during blasting 252 9.3.3 Water Pollution Management and control 253 9.3.3.1 Surface water management 253 9.3.3.2 Ground water management 253 9.3.3.3 Details of water conservation measures proposed/Rain water harvesting 253 proposal 9.3.4 Land Reclamation and waste management 255 9.3.4.1 Land use planning and mine closure 255 9.4 Waste Management 255 9.5 Greenbelt Development 256 9.5.1 Afforestation programme 257 9.5.2 Post plantation care 258 9.6 Solid waste management 259 9.7 Biological Management Measures 260 9.7.1 Plan for reduction of impact on fauna 260 9.7.1.1 Wild Life Conservation Plan 260 9.8 Greenbelt Development Plan 261 9.9 Occupational Hazards and Safety 262 9.10 Socio-economic Conditions of the Region 262 9.10.1 Community Development Activities 263 9.10.2 Public health implication of the project and related activities for the 271 population 9.11 CER Project Details 272 9.11.1 Cost of Environment Control Measures/EMP Budget 272 9.12 Conclusion 274 CHAPTER-10: SUMMARY & CONCLUSIONS

M/s TATA CHEMICALS LIMITED Expansion of Aniali Limestone Mining Project Final EIA/EMP

10.1 Description of Project 275 10.2 Salient Features of the project 275 10.3 Reclamation and Rehabilitation of mined out area 277 10.4 Baseline Environmental Status 278 10.4.1 Landuse Pattern 278 10.4.2 Water Quality 278 10.4.3 Air Environment 279 10.4.4 Noise Levels 280 10.4.5 Soil Quality 280 10.4.6 Biological Environment 280 10.4.7 Socio Economic Environment 281 10.5 Anticipated Environmental Impacts and mitigation 281 10.5.1 Impact on Land Use Pattern 281 10.5.2 Impact on Water Resources 282 10.5.3 Impact on Air Quality 283 10.5.4 Impact on Noise Levels and Ground Vibrations 286 10.5.5 Impact on Biological Environment 287 10.5.6 Traffic Study and Transportation 288 10.5.7 Impact on Socio - Economic Environment 288 10.5.8 Mine Waste Management 289 10.6 Project benefits 289 10.7 Environmental Management Plan 289 10.8 Conclusions 289 CHAPTER-11: DISCLOSURE OF THE CONSULTANT 291-293

M/s TATA CHEMICALS LIMITED Expansion of Aniali Limestone Mining Project Final EIA/EMP

TABLE LIST OF TABLES PAGE NO NO 1.1 Pillar coordinates of the project site 3 1.2 Brief Description of the Project 7 2.1 Project Profile 28 2.2 Existing Land Use Pattern 29 2.3 Details of Existing pits inside the lease area 29 2.4 Type of limestone 31 2.5 Prior production details (Year wise) 32 2.6 Coordinates of the project site 33 2.7 Salient features of Project 39 2.8 Insitu Tentative Excavation 42 2.9 Regional Stratagraphic Sequence 43 2.10 Local Stratigraphic Sequence 44 2.11 Average depth of water table 45 2.12 Mineral Reserve& Resource as per approved scheme of mining 49 2.13 Salient features of proposed method of mining 50 2.14 List of Mining Machinery 51 2.15 Year-wise Production of Limestone (ROM: Chemical Grade) 58 2.16 Estimation of Life of mine 58 2.17 Year Wise Waste Generation (Top Soil, OB/Waste/Mineral reject) 59 2.18 Water Requirement 63 2.19 Manpower Requirement 65 2.20 Land Use Pattern (Present Vs Conceptual) 66 2.21 Existing vs. at the end of plan period land use pattern 66 2.22 Year-wise proposal for Plantation and fencing 70 3.1 Existing Vs At the end of Plan Period Land Use Pattern 74 3.2 Land use Details 75 3.3 Water Quality Criteria as per Central Pollution Control Board 79 3.4 Ground water sampling location 80

M/s TATA CHEMICALS LIMITED Expansion of Aniali Limestone Mining Project Final EIA/EMP

3.5 Ground water Monitoring Results 82 3.6 Surface water sampling location 85 3.7 Surface water result 87 3.8 Site specific meteorological data ( December 2018 to February 2019) 89 3.9 Climatological Data Station: IMD, Porbandar (1961-1990) 90 3.10 Location of Ambient Air Quality Monitoring Stations 96 3.11 Ambient Air Quality results 99 3.12 Mineralogical composition of PM10 (μg/m3) 109

3.13 Noise Level Monitoring Stations in the Study Area 110 3.14 Hourly Leq Noise Level in the Study Area 113 3.15 Ambient Quality Standards in respect of Noise 113 3.16 Soil Sample Collection Points 116 3.17 Physico-Chemical Properties of Soil 118 3.18 Flora Species in Buffer Zone 120 3.19 Fauna Species in Buffer Zone 121 3.20 List of crop species in the study area 122 3.21 List of Avifauna found within study area 124 The proportional availability of the Medicinal, Timber Forest Products 3.22 (TFP) and Non-Timber Forest Products (NTFP) of the Barda Wildlife 127 Sanctuary. 3.23 List of mammals with their Schedule in the Barda Wildlife Sanctuary 128 3.24 No. of Family and Species of Butterflies 129 3.25 List of Spiders from Barda Wildlife Sanctuary showing their status 129 3.26 List of Amphibians recorded at Barda Wildlife Sanctuary 130 3.27 List of Snakes found in Barda Wildlife Sanctuary 131 3.28 Density of Birds in Barda Wildlife Sanctuary 132 3.29 Details of the State Gujarat, District Porbandar and Study area 138 3.30 Total Geographical Area (in Hectares) of the Study Area 139 3.31 Demographic Structure of the Study Area 143 3.32 Occupational Pattern of the Study area 148

M/s TATA CHEMICALS LIMITED Expansion of Aniali Limestone Mining Project Final EIA/EMP

3.33 Occupation Structure of villages and Town in the Study Area 150 3.34 Amenities in the Study Area 155 3.35 Infrastructure facilities of the study area 158 4.1 Stage wise Change in Land use Pattern 162 4.2 Year Wise Waste Generation (Top Soil, OB/Waste/Mineral reject) 163 4.3 Year-wise proposal for Plantation and fencing 164 4.4 Average depth of water table 165 4.5 Water demand for the project 166 4.6(i) Incremental and predicted value of PM10concentration 170 4.6(ii) Incremental and predicted value of PM2.5 concentration 173 4.6(iii) Incremental and predicted value of NO2 concentration 175 4.6(iv) Incremental and predicted value of SO2concentration 177 4.6(v) Incremental and predicted value of CO concentration 179 4.7 Sources of Pollutants 181 4.8 Noise Exposure Levels & Its Effects 182 4.9 Year-wise proposal for Plantation and fencing 184 4.10 List of plants proposed for green belt development 186 4.11(i) Existing Traffic Scenario & LOS 193 4.11(ii) V/C Ratio & LOS 193 4.11(iii) Additional Traffic Scenario & LOS due to proposed project 194 6.1 Implementation Schedule 203 6.2 Composition of Environment Management Cell (EMC) 205 6.3 Water quality monitoring and control measures 206 6.4 Air quality monitoring and control measures 207 6.5 Noise quality monitoring and control measures 208 6.6 Post Project Monitoring Programme 209 7.1 Public Hearing 214 7.2 Public Hearing Proceeding and Action Plan 226 7.3 Community Environmental Responsibility plan 231 7.4 Items in First Aid Kit 238

M/s TATA CHEMICALS LIMITED Expansion of Aniali Limestone Mining Project Final EIA/EMP

9.1 Air Pollution Management and Control 250 9.2 Noise Pollution Management and Control 251 9.3 Stage wise changes in Land use pattern 255 9.4 Year Wise Waste Generation (Top Soil, OB/Waste/Mineral reject) 256 9.5 Year-wise proposal for Plantation and fencing 257 9.6 Solid Waste Pollution Management and Control 259 9.7 Year-wise proposal for Plantation and fencing 261 9.8 Community Environmental Responsibility plan 272 9.9 Proposed Cost of Environment Management 272 10.1 Salient Features of the project 275

M/s TATA CHEMICALS LIMITED Expansion of Aniali Limestone Mining Project Final EIA/EMP

FIGURE LIST OF FIGURES PAGE NO NO 1.1 10 km Buffer Map of the Area 4 1.2 Real time aerial footage-1 5 1.3 Real time aerial footage-2 6 1.4 Mine Connectivity Map as per Administrative Atlas of Porbandar 10 2.1 Location Map of the Project Site 30 2.2 Approved Mining plan letter 31 2.3 Site visit Photograph 33 2.4 Location of the Project 34 2.5 Location map of the project site with pillar coordinates 35 2.6 5 km Buffer map of the study area 36 2.7 10 km Buffer map of the study area 37 2.8 15 km Buffer map of the study area 38 2.9 Geological Sections 47 2.10 Drainage map of the study area 48 2.11 First Year Development Plan &Sections 53 2.12 Second Year Development Plan &Sections 54 2.13 Third Year Development Plan &Sections 55 2.14 Fourth Year Development Plan & Sections 56 2.15 Fifth Year Development Plan & Sections 57 Route map for transporting mineral from project site to Cement Plant 2.16 61 of M/s Tata Chemicals Limited at Mithapur 2.17 Water balance diagram 63 2.18 Working level through the life of mine 64 2.19 Land use Map of the study area 68 2.20 Conceptual Plan & Sections 69 3.1 10 km Buffer Map of the study area 73 3.2 Landuse map of the study area 76 3.3 False color composite map of the study area 77

M/s TATA CHEMICALS LIMITED Expansion of Aniali Limestone Mining Project Final EIA/EMP

3.4 Seismic Zone of study area 78 3.5 Ground water location map 81 3.6 Surface water Location Map 86 Normalized Wind Rose showing fractional contribution of different 3.7(a) 92 wind speed in different sectors. Wind Rose showing pre dominant wind direction North East to South 3.7(b) 93 West for December 2018- February 2019

3.8(a) Showing Daily Average Temperature (December 2018-February 94 2019) 3.8(b) Showing Diurnal Variation in Temperature (December 2018- 94 February 2019) 3.9(a) Showing Daily/ Average Relative Humidity (December 2018- 95 February 2019) 3.9(b) Showing Diurnal Variation in Relative Humidity (December 2018- 95 February 2019) 3.10 Air monitoring Location Map 98

3.11(a) Graph showing PM2.5 result 105

3.11(b) Graph showing PM10 result 106

3.11(c) Graph showing SO2 result 107

3.11(d) Graph showing NO2 result 108 3.11(e) Graph showing CO result 109 3.12 Noise Quality Location Map 112 3.13 Soil Quality Location Map 117 3.14 Graph Showing Demographic Structure of the Study Area 141 3.15 Pie Chart Showing Gender Structure of the Study Area 141 3.16 Pie chart showing Schedule Caste Structure of the Study Area 142 3.17 Pie chart showing Schedule Tribe Structure of the Study Area 142 3.18 Occupational Pattern in the Study area 149 3.19 Availability of Medical Facility in the Study area 153 3.20 Availability of Educational Facility in the Study area 154 4.1 Wind Rose Diagram 169

4.2 Iso-pleth of PM10 172

M/s TATA CHEMICALS LIMITED Expansion of Aniali Limestone Mining Project Final EIA/EMP

4.3 Iso-plethof PM2.5 174

4.4 Iso-pleth of NO2 176

4.5 Iso-pleth of SO2 178 4.6 Iso-pleth of CO 180 4.7 Photographs of the plants for greenbelt development 192 4.8 Traffic Route Map 195 Route map for transporting mineral from project site to Soda Ash and 4.9 196 Cement Plant of M/s TATA Chemicals Limited at Mithapur 4.10 Map showing nearest habitation from mine site 198 6.1 Organization Structure for Environment Management 204 Public Hearing Notice for Limestone Mine published in Gujrati News 7.1 215 Paper 7.2 Photographs of Public Hearing 216 7.3 Public Hearing Proceedings 217 9.1 Hierarchal System of TATA Chemicals Ltd, Mines 248 9.2 Dust suppression through water sprinkling on the haul road 251 9.3 Conceptual Plan & Sections 254 9.4 Existing Greenbelt 258 9.5 Medical checkup and medicine distribution camp in the villages 264 9.6 Cattle shed work and crematorium in Aniali village 265 9.7 Skill Development Program 266 9.8 Motivational Training at Mithapur and Ranabordi village 266 9.9 Technical Skill Training at Mithapur and Ranabordi village 267

9.10 Certificate received by candidates after successfully completing 268 Technical Skill Training 9.11 Road Construction & water Supply – 2017-18 268 9.12 Major initiatives taken under Dharti Ko Aarpan program 269 9.13 Major initiatives taken in existing mining areas of TCL 270

M/s TATA CHEMICALS LIMITED Expansion of Aniali Limestone Mining Project Final EIA/EMP

LIST OF ANNEXURES Page No. Annexure I Previous Environmental Clearence dated 27 July, 2015 1-10 Annexure II Terms of References 11-22 Annexure IIIA Lease Order 23-41 Annexure IIIB First lease renewal granted 42-45 Annexure IIIC Lease Extension Letter 46-47 Annexure IVA Approved Mining Plan 48-136 Annexure IVB Mine Plates 137-149 Annexure V Past production details 150-151 Annexure VI Blasting Permission 152-163 Annexure VII Authenticated location Map of Project Site for Barda 164-165 Wildlife Sanctuary Annexure VIII ESZ demarcation notification of Barda Wildlife 166-195 Sanctuary Annexure IX List of Critically Polluted Areas issued by CPCB 196-198 Annexure XA CGWA permission for groundwater withdrawal 199 Annexure XB NOC for withdrawal of water from nearby village 200 Annexure XI Traffic Survey Forms duly filled during traffic study 201-224 Annexure XII CER Notification dated 1st May, 2018 225-228 Annexure XIII Lab Reports 229-250 Annexure XIV Sampling Photographs 251 Annexure XV Certified Compliance Report 252-285

Annexure XVI Nearest Habitation Map duly authenticated by District 286 Geologist, Porbandar Annexure XVII 500m Periphery Map 287 Annexure XVIII Affidavit in compliance of Ministry’s Office 288-289 Memorandum No. F: 3-50/2017-IA.III (Pt.), dated 30.05.2018. Annexure XIX Questionnaire 290-354 Annexure XX Revenue Plan 255-256

M/s TATA CHEMICALS LIMITED Expansion of Aniali Limestone Mining Project Final EIA/EMP

Annexure XXI Consent to Establish 257-260 Annexure XXII Consent to Operate 261-263 Annexure XXIII Public Hearing Proceedings 264-318 Annexure XXIV Wildlife Conservation Plan 319-356

M/s TATA CHEMICALS LIMITED Expansion of Aniali Limestone Mining Project Final EIA/EMP

LIST OF ABBREVIATIONS

AAQM Ambient Air Quality Monitoring CER Corporate Environmental Responsibility Cm Centimeter CPCB Central Pollution Control Board dB Decibel DG Diesel Generator EIA Environmental Impact Assessment EMC Environmental Management Cell EMP Environment Management Plan EPA Environmental Protection Agencies FCC False Colour Composite GLC Ground Level Concentration IMD Indian Meteorological Department ISCST Industrial Source Complex, Short Terms ISO International Organisational Of Standardization KLD Kilo Litre Per Day Km Kilometer M bgl Meter Below Ground Level mg Milligram MoEF&CC Ministry of Environment, Forest and Climate Change mRL Mean Reference Level MT Million Tonne MTPA Million Tonns Per Annum N North NAAQS National Ambient Air Quality Standard NE North- East NH National Highway

NO2 Nitrogen Dioxide NTU Naphelo Turbidity Unit

M/s TATA CHEMICALS LIMITED Expansion of Aniali Limestone Mining Project Final EIA/EMP

NW North-West OB Overburden OM Office Memorandum PPE Personal Protective Equipment PPM Part per Million Pvt. Private QCI Quality Council Of India R&R Rehabilitation & Resettlement RSPM Respirable Suspended Particulate Matter RO Reverse Osmosis SE South-East SEAC State Expert Appraisal Committee SEIAA State Level Environmental Assessment Authority

SO2 Sulphur Di-Oxide SOI Survey Of India SPCB State Pollution Control Board SPM Suspended Particulate Matter TDS Total Dissolved Solid ToR Terms Of Reference TS Total Solid TSS Total Suspended Solids US EPA United State Environment Protection Agencies ug/m3 Micro Gram Per Cubic Meter

M/s TATA CHEMICALS LIMITED

EXECUTIVE SUMMARY IN ENGLISH Expansion of Aniali Limestone Mining Project Executive Summary

EXECUTIVE SUMMARY

1.1 Description of Project The proposed Expansion project of AnialiLimestone Mine is located nearVillage AnialiTaluka Ranavav&District Porbandar in Gujarat.It is a captive mine of TATA Chemicals Limited (TCL), which supplies limestone as raw material to Soda Ash &Cement Plant of TCL at Mithapur, DevbhoomiDwarka, Gujarat for manufacturing of soda ash and cement.

The proposed project is categorized as category A-Mining {1(a)- Mining of Minerals} as per EIA Notification 2006 and its subsequent amendments.

Environment Clearance has been granted for this project vide letter no. J-11015/309/2012-IA.II (M) Dated 27.07.2015 by MoEF&CC for the production of 0.043 million tons TPA (ROM). TCL hereby proposes to expand the existing production capacity of 0.043 MTper annum to 0.175MT per annum. TCL obtained Terms of Reference (ToR) with vide letter no. J- 11015/42/2020-IA.II (M) dated 13thNovember 2020.

The proposed lease is a Non-Forest Government waste land measuring 21.04 Ha, Survey No. 207/P with the highest proposed production target of 1,75000 TPA as per approved mine plan. The existing method of mining is Open Cast and the Category of Mine is ‘A’. Semi mechanized mining methodology is being adopted with occasional use of drilling and blasting for fragmentation of hard limestone strata.

1.2 Identification of Project & Project Proponent 1.2.1 Identification and location of Project:AnialiLimestone Mine is located near villageAniali, tehsil Ranavavand district Porbandarand state Gujarat. The mine lease area falls in survey no. 207/p. It is located at about 2.0 km to the South East of Aniali village. From Village Aniali the mine site is approached by motorable road.

1.2.2 Identification of Project proponent TATA Chemicals Limited (TCL) was founded in 1939. TATA Chemicals Ltd is a global company with interests in businesses that focus on LIFE - living industrial and farming essentials. TATA Chemicals currently is the world's third largest producer of soda ash with manufacturing facilities in Asia Europe Africa and North America.

TATA Chemicals Limited (TCL) is operating Soda Ash Plant since 1943 at Villages Mithapur&Surajkaradi, Tehsil- Dwarka, District- DevbhoomiDwarka, State-Gujarat. TCL products are key ingredients for some of the world's largest manufacturers of glass, detergents and other industrial products. The registered office of M/s TATA Chemicals Limited is situated

M/s TATA CHEMICALS LIMITED

Expansion of Aniali Limestone Mining Project Executive Summary

at Bombay House, 24 HomiMody Street, Mumbai-400001, andSite office address is PO.- Mithapur, Tehsil- Okhamandal, District-DevbhoomiDwarka, Gujarat. The mine lease of Aniali Limestone Mine belongs to M/s TATA Chemicals Ltd. TATA Chemicals Limited is a public limited company registered under Company’s Act.The proposed project is for mining of limestone only. The present capacity of the mine is 43,000 TPAand proposed capacity under expansion is 1, 75000 tons Per annum. For 43,000 TPA Environment Clearance is obtained in year 2015. The mining methodology will remain same for the expansion. Semi Mechanized Mining with manual sizing, sorting and blending will be carried out by raising and crushing through mechanical means. The under sized material generated during the production after manual sizing or mechanized sizing will be send to TCL's own cement plant at Mithapur.The company's Mithapur plant is awarded an ISO-14001 certification and also the Chemicals Division is awarded the ISO-9001-2015Quality Management System.This project will help in improvement of social, economic and environment structure, which will initiate sustainable development.

1.3 Brief Description of Project 1.3.1 Size of the Project Expansion of Aniali Limestone mining lease is present on a government waste land covering an area of 21.04 Ha. It is an existing mine with the production of 43,000 Tons per annum. Proposed rate of production is 1,75000 TPA for Limestone mineral.

1.4 Project Description 1.4.1 Salient Features of Mine Lease

Table 1: Salient Features of the project Sr . Details of project Description No. 1 Mine lease area Total lease area- 21.04 Ha 2 Existing Production 43,000 TPA 3 Proposed production 1,75000 TPA 4 Mine lease period 07.07.1966 - 1986 17.11.2005 - 2025 - 30.03.2030 5 Mine lease extension under Deemed extension up to 31.03.2030 as per MMDR 2015 MMDR 2015 6 Lessee M/s TATA Chemicals Limited 7 Type of land Non Forest - Government waste land

M/s TATA CHEMICALS LIMITED

Expansion of Aniali Limestone Mining Project Executive Summary

8 Use of Mineral This is a captive mine. The limestone produced from this mine will be transported to Soda Ash and Cement Plant located at Mithapur, Gujarat. 9 Mineral reserve/ resource details (Million tonne) Chemical Grade Cement Grade Limestone Limestone Proved Mineral Reserve (111) 0.231972 0.562400 Probable Mineral Reserve (122) 0.089 0.2186 Total Reserve 0.320972 0.781 Pre-Feasibility mineral Resource 0.004900 0.003600 (221&222) 0.00782 0.0164 Total Resource 0.01272 0.02 Total (Reserve + Resources ) 0.333692 0.80100 10 Project cost 1.0 Crores 11 Market value For Captive use 12 Mineral composition (source – Approved Mine plan) :

1. Chemical Grade (CaCO3 + MgCO3 ) % >= 92%, &SiO2< 4%

2. Marginal Grade (CaCO3 + MgCO3 ) % >= 92%, &SiO2< 4% to 5%

3. Cement Grade (CaCO3 + MgCO3 ) % >= 92%, , SiO2> 5%

13 Details of Environmental Settings

Ecological Sensitive Areas  Barda wildlife sanctuary is present at a (National Park, Wild Life distance of 4.205 Km in NW direction and 38 Sanctuary, Biosphere meters from ESZ. Reserve,Reserve/ Protected  Mokarsagar Bird Sanctuary is located app. Forest etc.) within 10 km 11.5Km in SW direction from the project site distance Forests  Naliyadhar Reserve Forest is approx. 0.55 Km in South West direction.  Jambuda Reserve Forest is approx. 2.70km in North direction.

M/s TATA CHEMICALS LIMITED

Expansion of Aniali Limestone Mining Project Executive Summary

 Khageshri Reserve Forest: approx. 7.27 km in East direction. Water bodies  Dhangva river is about 1.46 km in North direction.  Minsar river is about 4.30 Km in East direction.  Bileshwari river is about 4.64 Km in NE direction.  Khambhala reservoir is about 7.36km in NW direction.  Dai River is about 9.44 km NE direction.  Fodara reservoir is about 9.49km in NW direction.  Sorti River is about 11.09 km in NW direction.  Krishnapur Lake is about 12.25 Km in NW direction.  Gulab Sagar Lake is about 14.38 Km in North. Nearest Village Daulatgadh is about 0.77 Km NE direction. Nearest Town Ranavav is present at a distance of about 8.26 km in South West direction. Jam Sakhpur Railway Station is about 4.19 Km in Nearest Railway Station North direction and, Ranavav Railway Station is about 10.48 km in West direction from the project site. NH-8B is about 5.46 km in South direction. Nearest National Highway SH-27 is about 4.65 km in West direction. State Highway Nearest Airport Porbandar Airport is about 18.83 km in SW direction. Seismic Zone As per GSDMA map, Gujarat falls in Zone III, which is a moderate risk zone for earthquake. Other Industries Limestone Mine leases of Tata Chemicals and

other leases belongs to different owners.

M/s TATA CHEMICALS LIMITED

Expansion of Aniali Limestone Mining Project Executive Summary

Water Requirement and source Total water requirement is about 29.0 KLD =7.0 KLD (Drinking & Domestic Uses) + 5.0 KLD (Plantation) + 17 KLD (Dust Suppression). In which, 10 KLD will be sourced from ground water, for which CGWA Permission is already obtained in 2011. The rest 19 KLD water will be sourced from nearby village Aniali by water tanker for which No objection certificate is already obtained. (Source: Approved Mine Plan, dated 26.12.2019)

2.1 Method of Mining 2.1.1 Existing method of mining: -The existing method of mining is Open cast mining method. The category of mine is ‘A’ Open Pit Mine. The chemical grade of limestone is found at the shallow depth of maximum 5m, thus the Benches of maximum 4m height and more than 4m of width, ramp gradient of 1 in 16 is maintained. The 110mm dia deep hole drilling & blasting, excavation by diesel operated hydraulic excavator into tipper trucks transportation of mineral from mine site to destination through tipper trucks, Bench slope angles maintained at 800.

2.1.2 Proposed Method of Mining Open cast mining method will be used, drilling and blasting will be done occasionally in case of encounter of hard strata to provide the shattering effect. The deposit is having at a shallow depth with no overburden present on the chemical grade limestone bed, is suitable for open cast mining method. Drilling and blasting is used and proposed to be used for fragmentation. ROM will be loaded by shovel/backhoe into dumpers/HEMM for transporting to the proposed crushing/sizing site outside the lease area. Thus, no material or mineral rejects will be remained inside the lease area. The category of mine is ‘A’ Open Pit Mine (OTFM) by using the shovel-dumper combination for mining operations.

The salient features of proposed method of mining are as follows: 1) Bench height maximum 6.0 meter and bench width more than 6m. 2) Bench slope: 800 3) Ramp gradient: 1 in 16 4) Face length: 50m to 90m 5) Advancement of faces: Perpendicular to strike towards E and W direction. 6) Excavation: The deployment of Rock breaker for fragmentation is proposed with occasionally use of drilling and blasting to give the shattering effect to the hard strata and loading will be done by diesel operated hydraulic excavator. 7) Transportation: By tipper trucks of ROM from mine site to the crusher/private sizing plots (Approved by State Govt.) located within 3km from the lease area.

M/s TATA CHEMICALS LIMITED

Expansion of Aniali Limestone Mining Project Executive Summary

The sized (+50 to -100mm) limestone will be directly dispatched to Soda Ash Plant at Mithapur. No processing of ROM will be conducted inside the lease area. Water sprinkling is done for dust suppression, and the regular upkeep and maintenance of HEMM for taking care of the environment concern.

8) Drilling and Blasting: Diamond core drilling was done with a view to prove depth continuity of deposit and to ascertain quality and its variation. Vertical boreholes were drilled at 100m* 100 m grid interval keeping nature of deposit in view. Altogether 19 boreholes of NXM size were drilled from 1.75 m to 7.95 m depth with total meterage drilling of 63.75 m. Dry drilling was also adopted in highly fractured, weathered and clayey limestone zones to obtain maximum core recovery. The collar of boreholes varies in between 36m to 56m. Bench dimension will be as per the scheme of mining. Bench slope will be 800 from the horizontal. Width of the benches will not be less than the height. The drilling will be done with the help of 102 mm diameter DTH drill machine in combination with compressor. Blast holes will be drilled in square/rectangular pattern 3m*4m (burden*spacing) for a 3.0-6.0m bench height. Blasting will be done mainly with ANFO (manufactures at the site by BMD owned by TCL) as column charge and cap sensitive explosive as the base charge. TCL has already obtained necessary permissions for storage and usage of explosives.

Ultimate Pit Depth Limit: The TCL's prime requirement is to excavate the chemical grade limestone from the lease area for its Soda Ash plant. The inferior grade/ cement grade limestone will be left intact in the lease area. Therefore, the contact zone between chemical grade & cement grade limestone is taken as Ultimate Pit Limit (UPL) and the UPL will be restricted upto 55mRL with max. 6m depth. The average depth (m) of the water table based on observations from nearby village dug wells is given below:

Table 2: Average depth of water table Maximum Water Table(mRL) Minimum Water Table(mRL) 37 mRL 45mRL (Source: Approved Mine Plan, dated 26.12.2019)

2.2 Waste Management The lease area is devoid of overburden. Limestone is exposed on the surface itself. A very thin layer of soil exists at places and this is scrapped separately and used for plantation simultaneously. During the proposal period, it is proposed to excavate the Chemical grade of limestone which is above the cut-off grade of limestone. The inferior grade of the limestone found at the bottom of chemical grade limestone layer will not be mined out by TCL. Thus, no mineral rejects will be generated from excavated material.

M/s TATA CHEMICALS LIMITED

Expansion of Aniali Limestone Mining Project Executive Summary

The undersized mineral will be re-handled to utilize in cement manufacturing at Mithapur for captive use. Thus entire mineral rejects will be consumed and removed from the lease area. The proposed stacks/dumps are temporary in nature and material from dump is continuously being sent to TCL's Cement plant at Mithapur as per the requirement. The height of the dump will be kept less than 12m and for slope stability propose. This will be a dynamic natured stack , which will deplete and replenish with respect to the dispatch to cement plant located at Mithapur. Proposals for Protective measures around the dump / stack: The dump / stack in the lease area near the crushing unit, will have max. height of 12m. A stone wall will be formed around the dump of length of around 225m and 1.5m height. The dump will be also covered by tarpaulin cover for protection from wind erosion. As the dump / stack is temporary and dynamic in nature, thus no plantation is proposed near the dump/stack.

2.3 Employment Generation The proposed mining project is expected to provide direct and indirect employment opportunities to the local people of different skills and trades. It is a positive impact that needs to be encouraged. Due to expansion, additional 46 workers will be required to achieve the targeted production. Total manpower requirement for this mine is 153 personnel.

2.4 Water Requirement There is a deep tube well near mine office from which water will be supplied for drinking and domestic purpose as well as for dust suppression measures. Total water requirement is proposed to be 29.0 KLD, which includes 7.0 KLD for drinking & domestic uses, 5.0 KLD for plantation and 17.0 KLD for dust suppression.CGWA permission for ground water withdrawal is obtained for 10 m3/day in the year 2011. Enclosed as Annexure XA. The rest 19 KLD water will be sourced from nearby village Aniali by water tanker for which No objection certificate is already obtained which is Enclosed as Annexure XB.

2.5Reclamation and Rehabilitation of mined out area The area exhibits undulating to flat topography. The slope of benches will be suitable graded and plantation done over them, to match with the surrounding greenery. The top of the benches shall be properly fenced to prevent fall of cattle/person. Total 33% of the lease area will be developed as green Belt which would be around 6.9432 Ha. Greenbelt will be developed around the lease boundary, haul roads, undisturbed area, reclaimed area, workshop, mine office, etc. At the conceptual plan, green belt of suitable width should be developed all along the mining lease boundary. The row of plants facing mine should be of smaller species, and those facing outside should be of taller species. The post plantation care is proposed to maintain the growth of plantation. Plantation will reduce the land erosion possibility in the surrounding area. Wire fencing will be done around the green belt.

M/s TATA CHEMICALS LIMITED

Expansion of Aniali Limestone Mining Project Executive Summary

Local species like Siris, Neem, Kachnar, Kashid, Shisham, Gulmohar, Karanj, Pipal, Drumstick, Imli, Banyan tree, Bel patra etc. will be planted in consultation with the Forest Department as well as CPCB Guidelines for greenbelt development.

3. Baseline Environmental Status 3.1 Landuse Pattern Land Use in Core Zone The entire lease area of 21.04 Ha is the part of Govt. waste land. At the end of conceptual plan, the change to the landscape in the form of pit and road, about 14.9342 ha will be changed. As the deposit is an elevated ridge type and also not extended to deep ground level, thus no deep pits will be formed due to mining.

Land Use in Buffer Zone Land use of study area has been prepared from latest satellite imagery. Specialized land use data has been prepared by using GIS software. Land use and land cover has been analyzed for Expansion of Aniali Limestone Mining Project for the agricultural land, settlement, forest, open scrub, waste land and water body etc., which shows that around 58.06% of the land in the study area is an agricultural land, 12.50% land is a forest land, whereas 8.92% is comprise of open scrub. Water bodies constitute to 2.26%, settlement is around 2.02% and rest 16.23% is a waste/other land.

3.2 Water Quality To assess the physical and chemical properties of water in the region, water samples were collected from various water sources present in the 10km study area.Water quality was analyzed as per Indian standards (IS 30525 part 4-62).

Ground water Ground water samples were collected from three location: Aniali village, Bordi village, and Daulatgadh.Ground water samples were analyzed and results were found as pH 7.2 to 7.6, total hardness 156 to 197 mg/l, Chloride 46 to 51 mg/l, total dissolved solids 259 -296 mg/l, Sulphate 2.9 to 3.8 mg/l, nitrate 0.7-1.3 mg/l.

Surface water Surface water was collected from two locations which are Khambada Reservoir and Minsar nadi (Valotra village). Surface water samples were analyzed which showed Results for Khambada Reservoir : pH 7.72, electrical conductivity 446 µS/cm, total alkalinity 179 mg/l, total hardness 191 mg/l, Chloride 98 mg/l, Dissolved oxygen 6.9 mg/l, total dissolved solids were found 141 mg/l.

M/s TATA CHEMICALS LIMITED

Expansion of Aniali Limestone Mining Project Executive Summary

Results of Minsar nadi: pH 7.4, electrical conductivity 487 µS/cm, total alkalinity 142 mg/l, total hardness 136 mg/l, Chloride 81 mg/l, Dissolved oxygen 6.6 mg/l, total dissolved solids were found 176 mg/l.

3.3 Air Environment The meteorological data has been recorded from near project site. Secondary data also has been purchased from Denvilabs Technologies, New Delhi, which provided the climate information that helped in to find out the predominant present downwind direction to predict the incremental pollution load due to project activity.Primary site specific baseline and meteorological data was collected for winter season; December 2018 to February 2019.

Site specific meteorological data Ambient air quality monitoring was carried out in the winter season (December 2018 to February 2019) and site specific data was collected. Secondary Meteorological data has been purchased from Denvilabs Technologies, New Delhi, for the same period in order to complete the air modelling exercise and wind direction.Site specific meteorological data was collected by installing an automated weather station near Expansion of Aniali Limestone mining project site. The result has been obtained for temperature, rainfall, wind speed, humidity and wind direction.Secondary data was also collected from nearest IMD station and climatological table 1961-1990.From the wind rose it wasclearly observed that North-East is the predominant wind direction. Ambient Air Quality Total 7 ambient air quality monitoring stations were selected to assess baseline ambient air quality which is Near mine site, Daulatgadh village, Bhod village, Aniali village, Bordi village, Vadwala villageand Valotra village. Parameter wise 98th percentile maximum and minimum values were observed at all the seven monitoring locations.  The minimum and maximum level of PM2.5 recorded within the study area was in the range of 29.9 µg/m3 to 43.9 µg/m3 with the 98th percentile ranging between 31.8 µg/m3 to 43.9 µg/m3.

 The minimum and maximum level of PM10 recorded within the study area was in the range of 68.8 to 91.8 µg/m3with the 98th percentile ranging between 73.4 µg/m3 to 91.6 µg/m3.

3  The minimum concentration of SO2 recorded within the study area was 9.4 to 11.6µg/m ,the 3 maximum concentration of SO2 recorded within the study area was 11.3 to 13.9 µg/m ,with the 98th percentile ranging between 11.3 µg/m3 to 13.9 µg/m3.

 The minimum and maximum level of NO2 recorded within the study area was in the range of 11.5µg/m3to 22.9 µg/m3 with the 98th percentile ranging between 13.9µg/m3 to 22.9µg/m3.

M/s TATA CHEMICALS LIMITED

Expansion of Aniali Limestone Mining Project Executive Summary

 The minimum and maximum level of CO recorded within the study area was in the range of 605 µg/m3 to 878µg/m3 with the 98th percentile ranging between 713 µg/m3 to 878 µg/m3.

Mineralogical composition of PM10 Filter paper of PM10 sampler was used for mineralogical study from project site of Aniali Limestone mine. Whatman filter paper was used for mineralogical composition as per EPA method. Mineralogical composition for free silica and other minerals was analysed and this was

found that free silica is present at concentration of 0.10 µg/m3 in PM10.

3.4 Noise Levels Ambient noise levels were measured at 09 locations around the proposed mine site. The values of noise level observed in some of the areas are primarily owing to vehicular traffic. Assessment of hourly night time Leq (Ln) varies from 29.0 to 53.8 dB (A) and the hourly daytime Leq (Ld) varies from 35.6 to 61.9 dB (A) within the study area. The status of noise quality within the 10 km zone of the study area is therefore, within the prescribed standards.

3.5 Soil Quality Total 05 soil samples were collected in and around the mine lease area to assess the present soil quality of the region. In the study area, variations in the pH of the soil were found to be slightly basic (7.1 to 7.6). Electrical conductivity (EC) is a measure of the soluble salts and ionic activity in the soil. In the collected soil samples the conductivity ranged from 567-598 µmhos/cm. Bulk density of soil sample samples ranged from 1.38-1.42 gm/cc, moisture content was found 12.1- 15.8%, organic matter was present in the range of 0.51-0.86 % at all the soil quality monitoring locations.

3.6 Biological Environment Flora/fauna survey was done at core and buffer zone of the study area. This was observed that no floral species are present within mine lease area except some bushes. The wild plant species are anticipated in waste land only. Based on primary and secondary survey a total of 32 crop species were reported in the study area and based on their use value they have been grouped into four categories. Among these 8 species fall under grain crops, 10 species fruit crops, 11 vegetable crops and 3 commercial crops of the study area. The tree species which were found in waste land and along road side green belt are Neem(Azadirachta indica), Arduso (Ailanthus excelsa), Vad(Ficus benghalensis), Piplo(Ficus religiosa), Saragvo(Moringa oleifera), Awal(Alstonia scholaris) and herb species was found names as Gando baval vilayati(Prosopis Juliflora). The buffer zone of the study area is majorly agricultural land. The buffer zone includes Fodara reservoir and Khambada reservoir and Barda Wildlife Sanctuary of District Porbandar.There is no aquatic environment present in core zone of project area.

M/s TATA CHEMICALS LIMITED

Expansion of Aniali Limestone Mining Project Executive Summary

Ecologically Sensitive Areas From the mine lease boundary, Nadliyadhar Reserve forest is present at approx. 0.47km in South West direction, Khageshri reserve forest is at approx. 7.27km in East direction and Jambhuda reserve forest is present at 2.70km in North direction. Barda Wildlife Sanctuary is also present at a distance of 4.205 km in North West direction from the working mine lease.

3.7 Socio Economic Environment Core Zone: - There is no human settlement in the core zone of the Expansion of Aniali Limestone Mining Project.

Buffer Zone: - Area within 10km radius of the “Project Site” is considered as the “Study Area”. The study area of 10 Km radius area is spread over 28 villages and 2 towns (namely: Amardal and Ranavav) falling in three sub-districts namely Ranavav, Kutiyana of District Porbandar and Jamjhodpur in District Jamnagar as per census 2011.Out of these 28 villages 5 villages are present inside Barda Wildlife Sanctuary.

The salient features of the study area include: 1. Total population of study area is 107537. The percentages of male & female population are 51.00 % & 49.00 % respectively 2. Total household in the study area are 22828 with a family size of 4.71. 3. Total number of literates in the study area is 67531 (71.68%). 4. Sex ratio (number of Females per thousand Male) of the study area is 961 which shows that male population is higher in the study area as compared with the female population. 5. Out of the total population Scheduled Caste population in the study area is 10196 (9.48%) and Scheduled Tribe population is 4631 (4.30%). 6. The child population (0-6 years) in the study area is 13327 (12.39%) in which 6903 (6.41%) is the child boys population and 6324 (5.88%) which is child girls population. The child sex ratio in the study area is 916.

4.Anticipated Environmental Impacts and mitigation 4.1 Impact on Land Use Pattern Proposed project is an expansion project where Environment Clearance has been obtained in the year 2015 vide no. J-11015/309/2012-IA.II(M) for the annual production of 43,000 Tons of Limestone. The entire lease area of 21.04 Ha is the part of Govt. waste land. At the end of conceptual plan, the change to the landscape in the form of pit and road, about 14.9342 ha will be changed. As the deposit is an elevated ridge type and also not extended to deep ground level, thus no deep pits will be formed due to mining.

Change in Land use Pattern The entire lease area of 21.04 Ha is the part of Govt. waste land. At the end of conceptual plan, the change to the landscape in the form of pit and road, about 14.9342 ha will be changed. As

M/s TATA CHEMICALS LIMITED

Expansion of Aniali Limestone Mining Project Executive Summary

the deposit is an elevated ridge type and also not extended to deep ground level, thus no deep pits will be formed due to mining.The ultimate depth of the pit at the end of life of mine is expected to be max. at 55 mRL, Land use Pattern of the core zone of mining area will be changed due to proposed mining activity. Original topography of the core zone will be affected. The impact of mining on land environment is due to excavation of pits.

Impact on Soil Environment The lease area is devoid of overburden. Limestone is exposed on the surface itself. A very thin layer of soil exists at places and this is scrapped separately and used for plantation simultaneously. During the proposal period, it is proposed to excavate the Chemical grade of limestone which is above the cut-off grade of limestone. The inferior grade of the limestone found at the bottom of chemical grade limestone layer will not be mined out by TCL. Thus, no mineral rejects will be generated from excavated material.

Mitigation Measure: 1.The green belt will be developed along the non-mining zone boundary passing through the lease area. Precautionary measures will be taken for plantation made by regular watering. 2.Greenbelt will be developed on around 33% of the total mine lease area, i.e, 6.9432 Ha, on which a total of 3000 saplings per year will be planted till the conceptual stage, necessary maintenance shall be done as well. 3.Surface and ground water will not be affected due to mining activity. There is no perennial source of water within the leasehold area. 4.Frequent dust suppression will be done to minimize the risk of long term buildup of pollutants in the environment. 5.Advanced technology of blasting will be used for control of noise and ground vibration. Adopting suitable, site-specific mitigation measures can reduce the degree of impact of mining on land. Present land use pattern of the lease area is waste land and at the conceptual stage the land use pattern will remain the same, hence will not be changed as there is no overburden generated from the mining activity.

4.2 Impact on Water Resources Water Environment Mining and its associated activities not only use a lot of water but also likely to affect the hydrological regime of the area. The major impact of deep and large mines (both underground andopen cast) is of natural groundwater table. Lowering of water table may result in reducedgroundwater availability. Extraction of different minerals is known to lead to water pollution due to heavy metals, acid discharges and increased suspended solids. Deep underground mines directlyaffect the water table of the area. However, the impact of mining projects on

M/s TATA CHEMICALS LIMITED

Expansion of Aniali Limestone Mining Project Executive Summary

groundwaterhydrology and surface water regime are site specific and depends upon the characteristics of themineral, hydrogeology and requirement of groundwater for other uses.

Anticipated impacts on water sources Ground Water The existing maximum and minimum working depth are 2m and 6m from surface respectively. The maximum depth in the present pit is at 58mRL and at conceptual stage, it will go further till 55mRL. Thus, the mining will not intersect with the water table.

Surface water No prominent water course or nalla is present. The mine floor is kept slightly sloppy for natural drainage. The waste water generation in the mining process is not envisaged. The deposit does not contain any harmful contents; hence it is not going to affect the quality of water in surrounding area. As there is no beneficiation involved with the use of water, discharge effluents does not happen. There is a natural drainage pattern within the lease area. Major part of the rain water from the lease area runoff is along the slope.

Wastewater Generation, Treatment & Disposal The waste water generation in the mining process is not envisaged. The total water consumption in the Expansion of Aniali Limestone Mine is about 29 KLD, which includes 7.0 KLD for drinking & domestic uses, 5.0 KLD for plantation and 17.0 KLD for dust suppression.CGWA permission for ground water withdrawal is obtained for 10 m3/day in the year 2011. Enclosed as Annexure XA. The rest 19 KLD water will be sourced from nearby village Aniali by water tanker for which No objection certificate is already obtained which is Enclosed as Annexure XB. The waste water generation from the above consumption is mainly from domestic consumption i.e. from toilets. This water will be treated in septic tanks followed by soak pits.

Proposed Mitigation Measures for Water Resources a) Overall drainage planning has been done in such a manner that the existing pre- mining drainage conditions will be maintained to the extent possible so that run off distribution is not affected. b) Waste water generated from labor domestic uses will be treated in septic tank followed by soaking pits. c) At conceptual stage the maximum depth of working will be 55mRL m from the surface. Therefore, the groundwater table will not likely to get affected. d) Regular monitoring of surface water and ground water will be done to ensure that there is no adverse impact due to Limestone mining project. e) No washing of equipment will be done inside the mining lease area.

M/s TATA CHEMICALS LIMITED

Expansion of Aniali Limestone Mining Project Executive Summary

4.3 Impact on Air Quality The proposed project includes various activities like development of benches, approach roads, haul roads, excavation and transportation of limestone and waste materials. These operations generally result in generation of dust and thereby pose health hazards. However, it is proposed that adequate control measures will be provided at every stage of operation such as, water sprinkling at loading, unloading points and on haul roads before transportation to reduce the fugitive dust emissions. Mining is proposed to be carried out by opencast semi mechanized method. The air borne particulate matter (PM10) generated by ore and waste handling operations, transportation and screening of ore is the main respirable air pollutant. The emissions of Sulphur Dioxide (SO2), Nitrogen Dioxide (NO2) released by vehicles plying on haul roads will be marginal. Prediction of impacts on air environment has been carried out taking into consideration of proposed production and net increase in emissions.

Emissions Details Details of emission during loading/unloading and transportation on the haul road, wind erosion of the exposed area and road maintenance were discussed and combined impact was predicted in the worst-case scenario under worst meteorological condition given as follows:

Loading and Unloading - US EPA, 2008, revision of emission factor for AP-42 was used to calculate emission of particulate matter released into the atmosphere during loading and unloading separately. It is assumed that moisture content in limestone ore was 10% and further

moisture content will be increased to 10-20% to reduce emission of PM10 during unloading and average wind speed was 3.03 m/s as observed with site data with calm conditions 43.64 % as shown in wind rose and discussion of local meteorology of the area.

Haul Road - US EPA, 2006, revision of emission factor for AP-42 was used to calculate emission of particulate matter released into the atmosphere during transportation of ore by 5 trucks operated per hour on haul road of 0.572 km. Truck will be fully covered with tarpaulin

material and emission of PM10 during transportation on the haul road will be insignificant. US EPA based AERMOD model was used for prediction of impact with 1-h meteorological data of the study period for the assessment of GLC.

Meteorological Data The meteorological data recorded at hourly interval during the month of December 2018 to February 2019 on wind speed 3.03 m/s,wind direction, dry & wet bulb temperature, humidity, cloud cover and rainfall was processed to extract hourly mean meteorological data as per the guidelines of CPCB/MoEF&CC for prediction of impacts from the area source. Stability was computed by Turner’s method and mixing height was obtained from publication of IMD “Atlas of Hourly Mixing Height in India, 2008.

M/s TATA CHEMICALS LIMITED

Expansion of Aniali Limestone Mining Project Executive Summary

Data recorded from authorized sourceDenvilabs Technologies, New Delhi were used as meteorological input for Dispersion Model which was stored in the computer for further analysis and interpretation to study the local meteorology of the study area. It was observed that pre- dominant wind during winter season is North East to South West, with low wind speed and 43.64 % calm condition was observed during study period at the site which was very much close and cumbersome with long term meteorological data of IMD, Porbandar. Average wind speed was 3.03 m/s. Impact of the pollutants was anticipated in south west direction under influence of pre- dominant wind direction.

The Air Quality Impact Prediction has been done by using AERMOD. Impact was predicted in the worst-case scenario due to combined impact of loading and unloading and emission due to transportation of vehicles on Limestone mine, haul road and other mining activities. The secondary meteorological data for the period December 2018-February 2019 was fed in the AERMOD software to obtain isopleths.

Results of PM10GLC concentration: Iso-pleth of PM10ranges from 0.4 to 2.79 µg/m3.Maximum predicted GLC is observed at near mine site at 0.49km distance with incremental value of 2.79 µg/m3 . For the calculation of the total predicted GLC of 24 hours near mine site, the baseline value of (98th percentile) 91.6 µg/m3was added to the incremental value of 2.79µg/m3, resulting into 94.39 µg/m3. The total predicted value calculated near mine site including the incremental load due to proposed mining activities like loading/unloading and transportation at haul road which are the responsible factors for dust emissions are found satisfactory and below the permissible limit of PM10 as prescribed by NAAQS limit. The results may allow the mining project in the vicinity.

Result of PM2.5GLC concentration: The maximum predicted GLC concentration (24 hours) of PM2.5calculated near mine site is 3 3 45.12 µg/m , which is below the prescribed permissible limit of PM2.5 (60 µg/m for industrial 3 zones). The isopleths showing the concentration of PM2.5ranges from 0.50 to 1.22 µg/m .

Result of NO2GLC concentration: The maximum predicted GLC concentration (24 hours) of NO2 calculated near mine site is 3 3 22.95 µg/m , which is below the prescribed permissible limit of NO2 (80 µg/m ) . The isopleths 3 showing the concentration of NO2 ranges from 0.05 to 1µg/m .

Result of SO2GLC concentration: The maximum predicted GLC concentration (24 hours) of SO2 calculated near mine site is 3 3 13.93µg/m , which is below the prescribed permissible limit of SO2 (80 µg/m for industrial 3 zones). The isopleths showing the concentration of SO2 ranges from 0.03 to 0.50µg/m .

M/s TATA CHEMICALS LIMITED

Expansion of Aniali Limestone Mining Project Executive Summary

Result of CO GLC concentration: The maximum predicted GLC concentration (8 hours) of CO calculated near mine site is 881µg/m3 or 0.881 milligram/m3, which is below the prescribed permissible limit of CO (2 mg/m3 for industrial zones). The isopleths showing the concentration of CO ranges from 3 to 80 µg/m3or 0.003 to 0.08 mg/m3 .

Proposed Mitigation Measures For Dust Suppression  As per Approved Mine Plan drilling and basting is proposed for Expansion of Aniali Limestone mining project but occasionally for giving the shattering effect to hard strata.  Particulate matter emission from haul road will be reduced by water sprinkling.  Vehicle used for excavation and haulage will be of latest Indian norms.  High speed diesel will be used for mining equipment operation  Green belt will be developed as per approved mining plan. Although green belt is already practiced at project site as it is an existing mine.  Personal protecting equipment (PPE) like dust mask, ear plugs etc will be used by mine workers.  Ambient air quality monitoring will be carried out periodically to know the implementation of environmental management plan.

4.4 Impact on Noise Levels and Ground Vibrations Noise Impact on Working Environment Noise generated at the mine site is due to semi-mechanized mining operations and transportation. Noise generated due to mining activities dissipates within the mine. There is no major impact of mining activity on the nearby villages. However, pronounced effect of above noise level is felt only near the active working area. Impact of noise on the villages is negligible as the villages are far located from the mine workings.

Noise Abattement and Control • Proper maintenance, oiling and greasing of machines at regular intervals to reduce the noise level up to an extent. • Adequate silencers and enclosures will be provided in all the diesel engines. • Plantation along both the sides of approach road, around mine office building and mine area to minimize the propagation of noise. • Personal Protective Equipment (PPE) like earmuffs/earplugs will be provided to all operators and employees working near mining machineries or at higher noise zone. • Periodical noise level monitoring will be done.

M/s TATA CHEMICALS LIMITED

Expansion of Aniali Limestone Mining Project Executive Summary

Impact Due To Ground Vibrations and Abatement Blasting is proposed in Expansion of Aniali Limestone Mining project but occasionally. Drilling and blasting will be used only for giving shattering effect to the hard strata of limestone horizons. Blasting will be done mainly with ANFO as the column charge and slurry explosive as the base charge. The under sized material generated after manual sizing or mechanized sizing will be temporarily stored in the registered plot or near to the crushing unit before it is sent to TCL's Cement and Soda Ash Plant at Mithapur. Measures that will be followed for abatement of ground vibration, air blast and fly rocks are detailed below – a) Controlled Blasting will be performed strictly as per the guidelines specified under MMR, 1961; b) Proper design of blast with correct spacing, burden and optimum charge/delay will be performed; c) Supervision of drilling and blasting operations to ensure blast design geometry as per planning will be ensured; d) Sub-drilling will be kept adequate to eliminate toe formation. e) Blasting operations will be carried out only during day time as per DGMS guidelines; the blasting permission is attached as Annexure VI. f) Proper warning signals will be used; g) Adequate safe distance from habitation as per standards from centre of blasting will be maintained; h) Drilling parameters like burden, depth, diameter and spacing will be properly designed to ensure proper blast; i) Effective stemming of the explosives will be done in the drill holes.

4.5 Impact on Biological Environment Primary and secondary baseline data for flora and fauna was collected within core zone and buffer zone of the project. Barda wild life sanctuary is present within the study area of the project at a distance of 4.205 km from the mine site.

Impact on Biodiversity Mining activities generally result in the deforestation, land degradation, water, air and noise pollution which directly or indirectly affect the faunal and floral status of the project area. However, occurrence and magnitude of these impacts are entirely dependent upon the project location, mode of operation and technology involved. Impact prediction is the main footstep in impact evaluation and identifies project actions that are likely to bring significant changes in the project environment.

M/s TATA CHEMICALS LIMITED

Expansion of Aniali Limestone Mining Project Executive Summary

The present study was carried out to predict the likely impacts of the proposed Expansion of Aniali limestone mining project at village Aniali in the surrounding environment with special reference to biological attributes covering habitats/ecosystems and associated biodiversity. Although impacts on key habitat elements will occur on a local scale, but on a regional scale they would not be critical for the life cycle needs of the species observed or expected. Moreover the successive reclamation of mined out areas, following completion of mining activities, will replace habitat resources for faunal species in this locality over a longer time. Wild life is not commonly found in the plains because of lack of vegetal cover and surface water except domestic animals. Dust generated due to haulage vehicles can have adverse impact on crops and other plant species of nearby areas. Sprinkling with 17.0KLD of water will be done to reduce fugitive emission up to an extent.

Expansion of Aniali Limestone mining project doesn’t include any forest land or diversion of forest land. The total mine lease area 21.04 Ha is a non- forest government waste land. Mitigation measures a) Regular water sprinkling on haul road will be done to reduce the emission of suspended particulate matter which causes the blockage of the stomata of plants and interrupting the photosynthesis process. b) Thick green belt development will be done as per approved mining plan of mine lease. c) Green belt development reduces noise level, reduces gaseous pollution and particulate matter pollution. d) Pollution tolerant plant with consultation to state forest department has been proposed for plantation.

4.6Traffic Study and Transportation Vehicular Traffic Density Traffic study was carried out as primary data to know the existing traffic density. Traffic survey forms are attached as Annexure XI. Incremental pollution load as per IRC 64 has been calculated to estimate the level of services (LOS). Traffic study was conducted for SH-27 and nearby intersection passes through the project site. Then depending on the capacity of the mine, the number of trucks that will be added to the present scenario will be compared to the carrying capacity as recommended by Indian Road Congress (IRC).

Existing traffic scenario: LI-Near village intersection the PCU/day is 203 and V/C ratio is 0.034, the LOS is 'A'. L2-- At SH-27, the PCU/day is 4100 and V/C ratio is 0.27, LOS is 'B' After the proposed activity: LI-Near village intersection the PCU/day is 383 and V/C ratio is 0.06, the LOS is 'A'. L2-- At SH-27, the PCU/day is 4280 and V/C ratio is 0.28, LOS is 'B'

M/s TATA CHEMICALS LIMITED

Expansion of Aniali Limestone Mining Project Executive Summary

From the above analysis it can be seen that the V/C ratio will change to 0.06 and 0.28 with LOS being “A” which is “Excellent” near village intersection and “B” which is “Very good” at State highway as per classification. So the additional load on the carrying capacity of the concerned roads is not likely getting affected.

4.7 Impact on Socio - Economic Environment Impacts of a mining project may be positive or negative. The adverse impacts attribute to physical displacement due to land acquisition, which is followed by loss of livelihood, mental agony, changes in social structure, and risk to food security etc. People are also directly affected due to pollution. However, in Expansion of Aniali Limestone Mining Project, there is no displacement of people due to mining operations. Study on Socio-economic status of the project has already been carried out using primary socio-economic survey for generating the baseline data of socio- economic status. Anticipated Impacts From the primary socio-economic survey & through secondary data available from established literature and census data 2011, it is found that there would be positive impact on socio- economic condition of the nearby area. The nearest habitation is present in the village Daulatgadh situated at a distance of about 0.77 km from the project site in North East direction. The mining activity does not involve any displacement of human settlement. No public buildings, places, monuments etc. exist within the lease area or in the vicinity. The mining operation will not disturb/ relocate any village or need resettlement. Thus no adverse impact is anticipated. The impact of mining activity in the area is positive on the socio-economic environment of the region. Expansion of Aniali Limestone Mining project will be providing employment to the local population and preference will always be given to local people whenever there is a requirement of man power for mining related work.

4.8 Mine Waste Management As per approved mining plan there is practically no solid waste and overburden in present mining area. The mining area lies on hilly land having rocky exposure and has no soil cover; therefore storage of soil is not required so far no patches of soil were encountered during mining. The sized limestone will be transported after sizing and undersized material will be dispatched to Soda Ash and Cement Plant at Mithapur.

5. Alternative technology and site analysis No alternative has been proposed for project site reason being mining project. Mining will be semi-mechanized and blasting and drilling proposed. Only excavator will be used to fill tippers.

M/s TATA CHEMICALS LIMITED

Expansion of Aniali Limestone Mining Project Executive Summary

6. Environmental monitoring Programmers To ensure proper implementation of environmental management plan. Environmental monitoring program has been planned.Air quality, water quality, ambient noise, will be conducted six monthly to ensure compliance conditions in environmental clearance. Health checkup is proposed for all villagers nearby resident to project site.

7. Additional studies The Public hearing of M/s Aniali Limestone mine (Mine Lease Area: 21.04 Ha) of M/s Tata Chemicals Limited for Proposed Expansion of Limestone mining -43,000 TPA to 1,75,000 TPA, at Survey No- 207, Village. Aniali, Ta. Ranavav, Dist: Porbandar was conducted on 26thMarch, 2021 at 10:30 hrs at M/s Aniali Rana Bordi Limestone mine, (M/s Tata Chemicals Limited), Crusher Area, Opp. Office of Tata Chemicals, Survey No. 207/P, Village. Aniali, Ta. Ranavav, Dist: Porbandar.

7.2 In order to take care of hazard/disaster during mining period. Below mentioned precautions will be taken.  All safety precautions and provisions of Mine Act 1952, Metalliferrous Mines Regulations 1961 and Mines Rules1955 will be strictly followed during all mining operations;  Entry of unauthorized persons in the mining area will be prohibited;  Fire fighting and first-aid provisions in the mines office complex and mining area;  Provisions of all the safety appliances such as safety boots, helmets, goggles etc. will be made available to the employees free of cost for their use;  Training programmes for all the employees working in hazardous premises; under Mines Vocational Training Rules all employees of mines shall have to undergo the training at a regular interval;  Working of mine, as per approved plans and regularly updating the mine plans;  Cleaning of mine faces will be regularly done;  Handling of explosives, charging and blasting will be carried out by competent persons only;  Provision of magazine at a safe place with fencing and necessary security arrangement;  Regular maintenance and testing of all mining equipment as per manufacturer’s guidelines;  Suppression of dust on the haulage roads and loading & unloading points ;  Adequate safety equipment will be provided at explosive magazine; and  Increasing the awareness of safety and disaster through competitions, posters and other similar drives.

7.3 Blasting is proposed in proposed mining activity. Measures to prevent accident due to trucks and tippers will be managed in following ways-  All transportation within the main working area should be carried out under the direct supervision and control of the management;

M/s TATA CHEMICALS LIMITED

Expansion of Aniali Limestone Mining Project Executive Summary

 The vehicles must be maintained in good repairs and checked thoroughly at least once a week by a competent person authorized for this purpose by the management;  Broad signs should be provided at each and every turning point especially for the guidance of the drivers of vehicles.  To avoid dangers while reversing the trackless vehicles, especially at the embankment and tripping points, all areas for reversing of lorries should, as far as possible, be made man free, and there should be a light and sound device to indicate reversing of trucks; and  A statutory provision of the fence, constant education, training etc. will go a long way in reducing the incidence of such accidents.

8. Project benefits The proposed Expansion of Aniali Limestone Mining project will generate various benefits as the employment of local people in primary and secondary sectors of project will upgrade the prosperity of the region. These will in-turn improves the socio-economic conditions of the area. In addition to the above, contractual labors and indirect employment opportunities will also be getting benefited after installation of mining project.

9. Environmental Management Plan 9.1 CER Project Details As per the MOEF&CC's office memo no. F NO 22-65/2017-IA-III dated 01/05/2018.(Attached as Annexure XII), Expansion of Aniali Limestone Mining Project is a brownfield project and total project coast is Rs. 1crore which is less than Rs. 100 Crores. As per above notification, 1% of the project cost is applicable for CER budget for brownfield projects. In the same context it has proposed to provide financial assistance of Rs. 1,00,000 per year for the development of social infrastructure of the area.

9.2 Cost of Environment Control Measures/EMP Budget As a part of its responsibility towards protection of environment, TCL has allocated budget for Environment protection measures. Total capital cost for EMP is Rs. 8.5 lakh and recurring cost per year is Rs. 7.0 lakh.

10 Conclusion The mining operations will meet the compliance requirements of MoEF&CC.Community impacts will be beneficial, as the project will generate significant economic benefits for the region; Adoption of best available technology and best management practices with more environmental friendly process; and with the effective implementation of the Environment Management Plan (EMP) during the mining activities, the proposed project can proceed without any significant negative impact on environment.

***********

M/s TATA CHEMICALS LIMITED

CHAPTER-1

INTRODUCTION Expansion of Aniali Limestone Mining Project Final EIA/EMP

CHAPTER 1-INTRODUCTION

1.1 Preamble Environment Impact Assessment (EIA) is a process to identify the environmental, social & economic impacts of a project prior to decision making. It is a decision-making tool, which guides the decision makers in taking appropriate decisions for proposed projects. EIA aims predicting environmental impacts at an early stage of project planning and design, find ways and means to reduce adverse impacts, shape projects to suit the local environment and present the predictions and options to decision makers. By using EIA, both environmental & economic benefits can be achieved. By considering environmental effects prediction & mitigation, early benefits in project planning, protection of environment, optimum utilization of resources, thus saving overall time & cost of the project.This Environmental Impact Assessment (EIA) report is prepared for obtaining Environmental Clearance (EC) from EAC Non-Coal Mining, MoEF&CC, New Delhi for the proposed Productivity Expansion of Aniali Limestone Mine, Gujarat, by M/s TATA Chemicals Limited of mine lease area 21.04 Ha. The proposed project is an expansion project and categorized as category A-Mining (1A- Mining of Minerals) as per the EIA Notification 2006 and its subsequent amendments. Environment Clearance has been granted for this project vide letter no. J-11015/309/2012-IA.II (M) Dated 27.07.2015 by MoEF&CC for the production of 0.043 Million TPA (ROM) (EC letter attached as Annexure I) TCL hereby proposes to expand the existing production capacity of 0.043 Million TPA to 0.175 Million TPA. For the said reason, TCL obtained Terms of Reference (ToR) with vide letter no. J- 11015/42/2020-IA.II (M) dated 13th November 2020. The present report is being prepared as per the compliance of the given ToR. (ToR letter is attached as Annexure II).

1.2 General Information on Mining of Minerals Geologically, Gujarat is a treasure trove of various mineral-bearing rocks ranging in age from Pre-Cambrian, Jurassic, Cretaceous, Tertiary and Quaternary Formations. Gujarat is endowed with rich minerals like petroleum & natural gas, granite, lignite, bauxite, limestone, bentonite, fire-clay, china-clay, fluorspar, marble, agate, chalk, gypsum and decorative &dimension stones with which, the State possesses a prominent place in mineral production in India. Mineral production has been a major factor in providing employment especially in backward areas, earning valuable royalty and foreign exchange. The existence of high-class infrastructure facilities and business environment, further add to the prospect of mineral development and mineral based industries in the state.

1.3 Description of lease area The proposed Expansion project of Aniali Limestone Mine is located near Village Aniali Taluka Ranavav & District Porbandar in Gujarat. It is a captive mine of TATA Chemicals Limited (TCL), which supplies limestone as raw material to Soda Ash &Cement Plant of TCL at Mithapur, Devbhoomi Dwarka, Gujarat for manufacturing of soda ash and cement. The proposed lease is a Non-Forest Government waste land measuring 21.04 Ha, Survey No. 207/P with the highest proposed production target of 1,75000 TPA as per approved mine plan. The existing method of mining is Open Cast and the Category of Mine is ‘A’. Semi mechanized

M/s TATA CHEMICALS LIMITED Page 1 Expansion of Aniali Limestone Mining Project Final EIA/EMP mining methodology is being adopted with occasional use of drilling and blasting for fragmentation of hard limestone strata.

The mining lease for Limestone over 21.04 hectares was granted in name of M/s TATA Chemicals Limited vide order no MCR/1565/13877/CHH issued by Government of Gujarat, Industries, Mines &Power Department, Gandhinagar on 07.07.1966 on survey no. 207/P(Annexure II1A). The lease deed expired on 22.12.1986. TCL has applied for 1st renewal on 09.09.1985. 1st renewal was granted vide order No. MCR-1585 - (T-44)-4267-CHH, dated 28.12.2004.(Annexure II1B) Thereafter, TCL applied for 2nd renewal vide letter No. A/WG/L408/2005, dated 17.11.2005. Due to amendment in Section 8A(5) of the MMDR Amendment Act 2015, lease period of captive leases are deemed to be extended for fifty years from the initial grant or up to 30 March 2030 vide letter no. MCR/1565-13877-CHH dated 03.04.2018(Annexure II1C), issued by Industries and Mines Department, Government of Gujarat.

Approved Mine Plan: The mine plan of Expansion of Aniali Limestone Mine (21.04 Ha), Porbandar, Gujarat has been approved vide letter no. 684(4)(1)/ MP-259/2019-20-GNR/2600 dated 26.12.2019. Copy of the mine plan is attached as Annexure IVA.

1.4 Identification of Project & Project Proponent 1.4.1 Name of the Project: Expansion of Aniali Limestone Mine is located near village Aniali, taluka Ranavav and district Porbandar and state Gujarat. The existing capacity of the mine for which EC was granted is 43,000 TPA. The annual proposed production capacity under expansion is 1,75,000 tonnes per annum.

1.4.2 Identification of Project proponent TATA Chemicals Limited (TCL) was founded in 1939. TATA Chemicals Ltd is a global company with interests in businesses that focus on LIFE - living industrial and farming essentials. TATA Chemicals currently is the world's third largest producer of soda ash with manufacturing facilities in Asia Europe Africa and North America.

TATA Chemicals Limited (TCL) is operating Soda Ash Plant since 1943 at Villages Mithapur & Surajkaradi, Tehsil- Dwarka, District- Devbhoomi Dwarka, State-Gujarat. TCL products are key ingredients for some of the world's largest manufacturers of glass, detergents and other industrial products. The registered office of M/s TATA Chemicals Limited is situated at Bombay House, 24 HomiMody Street, Mumbai-400001, and Site office address is PO.-Mithapur, Tehsil- Okhamandal, District-Devbhoomi Dwarka, Gujarat.

The mine lease of Aniali Limestone Mine belongs to M/s TATA Chemicals Ltd. TATA Chemicals Limited is a public limited company registered under Company’s Act. The proposed project is for mining of limestone only. The present capacity of the mine is 43,000 tons per annum and proposed capacity under expansion is 1,75,000 tons Per annum. For 43,000 TPA Environment Clearance is obtained in year 2015. The mining methodology will remain same for the expansion. Semi Mechanized Mining with manual sizing, sorting and blending will be carried out by raising and crushing through mechanical means. The under sized material generated during

M/s TATA CHEMICALS LIMITED Page 2 Expansion of Aniali Limestone Mining Project Final EIA/EMP the production after manual sizing or mechanized sizing will be send to TCL's own cement plant at Mithapur. The company's Mithapur plant is awarded an ISO-14001 certification and also the Chemicals Division is awarded the ISO-9001-2015 Quality Management System. This project will help in improvement of social, economic and environment structure, which will initiate sustainable development.

1.4.3 Location of mine lease and study area The Expansion of Aniali Limestone Mining project is situated near Village Aniali, Taluka Ranavav and District Porbandar, State Gujarat.The area falls in Survey of India topo sheet no. F42P14, (old no. 41G/14) geographically the ML area extends from:

Table 1.1: Pillar coordinates of the project site Pillars Longitude Latitude Pillar A 69° 49' 33.75" 21° 42' 31.17" Pillar B 69° 49' 53.95" 21° 42' 40.05" Pillar C 69° 49' 58.84" 21° 42' 30.66" Pillar D 69° 49' 38.92" 21° 42' 21.36" (Source: Approved Mine Plan, dated 26.12.2016)

The aerial image or location of Expansion of Aniali Limestone Mining project is presented in Figure 1.1. The mine area exhibits gently undulating to flat topography. Shape of the lease is rectangular. The general elevation within the lease area varies from around 58mRL to high of around 76mRL showing relief of about 18 meter. No permanent nalla is present within the lease area. The surface run off water follows the natural slope. The core zone of the project is the mine area and buffer zone of 10 Km radius from the lease periphery is the study area. The study area is spread over 28 villages and 2 towns (namely: Amradal and Ranavav) falling in three sub-districts namely Ranavav, Kutiyana of District Porbandar and Jamjhodpur in District Jamnagar as per census 2011. Out of these 28 villages, 5 villages are present inside Barda Wildlife Sanctuary.

M/s TATA CHEMICALS LIMITED Page 3 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Figure 1.1: 10 km Buffer Map of the Area/Study Area

M/s TATA CHEMICALS LIMITED Page 4 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Figure 1.2: Real time aerial footage-1

M/s TATA CHEMICALS LIMITED Page 5 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Figure 1.3: Real time aerial footage-2

M/s TATA CHEMICALS LIMITED Page 6 Expansion of Aniali Limestone Mining Project Final EIA/EMP

1.5 Brief Description of the Project Salient features of the project is presented in Table 1.2 Table 1.2: Brief Description of the Project Sr . Details of project Description No. 1 Project Expansion of Aniali Limestone Mining Project 2 Survey No. 207/P 3 Village/ Taluka Aniali/ Ranavav 4 District/ State Porbandar / Gujarat 5 Toposheet number F42P14, (old no. 41G/14) 6 Mine lease area Total lease area- 21.04 Ha 7 Existing Production 43,000 TPA 8 Proposed production 1,75000 TPA 9 Mine lease period 07.07.1966 - 1986 17.11.2005 - 2025 - 30.03.2030 10 Mine lease extension under Deemed extension up to 31.03.2030 as per MMDR 2015 MMDR 2015 11 Lessee M/s TATA Chemicals Limited 12 Type of land Non Forest - Government waste land 13 Mineral reserve/ resource details (Million tonne) Chemical Grade Cement Grade Limestone Limestone Proved Mineral Reserve (111) 0.231972 0.562400 Probable Mineral Reserve (122) 0.089 0.2186 Total Reserve 0.320972 0.781 Pre-Feasibility mineral Resource 0.004900 0.003600 (221&222) 0.00782 0.0164 Total Resource 0.01272 0.02 Total (Reserve + Resources ) 0.333692 0.80100 14 Project cost 1.0 Crores 15 Market value For Captive use 16 Mineral composition (source – Approved Mine plan): 1. Chemical Grade (CaCO3 + MgCO3 ) % >= 92%, &SiO2 < 4% 2. Marginal Grade (CaCO3 + MgCO3 ) % >= 92%, &SiO2 < 4% to 5% 3. Cement Grade (CaCO3 + MgCO3 ) % >= 92%, , SiO2 > 5% 17 Details of Environmental Settings Ecological Sensitive Areas  Barda wildlife sanctuary is present at a (National Park, Wild Life distance of 4.205 Km in NW direction and 38 Sanctuary, Biosphere meters from ESZ. Reserve,Reserve/ Protected  Mokarsagar Bird Sanctuary is located app. Forest etc.) within 10 km 11.5Km in SW direction from the project site distance Forests  Naliyadhar Reserve Forest is approx. 0.55 Km in South West direction.  Jambuda Reserve Forest is approx. 2.70km in North direction.

M/s TATA CHEMICALS LIMITED Page 7 Expansion of Aniali Limestone Mining Project Final EIA/EMP

 Khageshri Reserve Forest: approx. 7.27 km in East direction. Water bodies  Dhangva river is about 1.46 km in North direction.  Minsar river is about 4.30 Km in East direction.  Bileshwari river is about 4.64 Km in NE direction.  Khambhala reservoir is about 7.36km in NW direction.  Dai River is about 9.44 km NE direction.  Fodara reservoir is about 9.49km in NW direction. Nearest Village Daulatgadh is about 0.77 Km NE direction. Nearest Town Ranavav is present at a distance of about 8.26 km in South West direction. Jam Sakhpur Railway Station is about 4.19 Km in Nearest Railway Station North direction and, Ranavav Railway Station is about 10.48 km in West direction from the project site. NH-8B is about 5.46 km in South direction. Nearest National Highway SH-27 is about 4.65 km in West direction. State Highway Nearest Airport Porbandar Airport is about 18.83 km in SW direction. Seismic Zone As per GSDMA map, Gujarat falls in Zone III, which is a moderate risk zone for earthquake. Other Industries Limestone Mine leases of Tata Chemicals and other leases belongs to different owners. Water Requirement and source Total water requirement is about 29.0 KLD =7.0 KLD (Drinking & Domestic Uses) + 5.0 KLD (Plantation) + 17 KLD (Dust Suppression). In which, 10 KLD will be sourced from ground water, for which CGWA Permission is already obtained in 2011. The rest 19 KLD water will be sourced from nearby village Aniali by water tanker for which No objection certificate is already obtained. (Source: Approved Mine Plan, dated 26.12.2019)

1.6 Mine Connectivity Expansion of Aniali Limestone Mine is present in village Aniali which is approx. 2.0 km from mine site in SE direction. State highway SH 27 connects with the mine at 4.65 Km in west direction of the mine site. Site is also connected with the National highway NH 8B which is about 5.46 Km in South direction of mine. Rail connectivity is also meets with the mine site of Aniali,

M/s TATA CHEMICALS LIMITED Page 8 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Jam Sakhpur railway station is at 4.19 Km in North direction as well as Ranavav railway station is also located at 10.48 Km from site in West direction. Besides it, the air connectivity Porbandar Airport is also present in the approachability of Aniali Limestone Mine at about 18.83 Km in the South West direction.

1.7 Importance of Project Limestone Mining is a very important economic activity in Saurashtra region of Gujarat. Chemical Grade Limestone is mainly found in this region, is essential for Soda Ash Manufacturing. This region practically supplies limestone for all Soda Ash production of India. The Soda Ash based limestone mining industry contributes significantly to the State Gross Domestic Product and provides direct employment to about 7500 laborers. Additional jobs are created by way of transportation and related jobs, ancillary to mining. Subject mine lease aims to augment the limestone supply to TCL, Mithapur. The products of TCL’s Mithapur plant, especially soda ash, are a vital input for a number of basic industries such as glass, pulp and paper, chemicals and detergents, besides others. Consequently, this project aims at keeping many of the key industries within the country well supplied with an essential raw material. Cement, another product of TCL, also dependent on limestone inputs, is a key input to the infrastructure development of India.

M/s TATA CHEMICALS LIMITED Page 9 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Figure 1.4: Mine Connectivity Map as per Administrative Atlas of Porbandar

M/s TATA CHEMICALS LIMITED Page 10 Expansion of Aniali Limestone Mining Project Final EIA/EMP

1.8 Scope of the Study The scope of the study is as per Terms of Reference (TOR) prescribed by EAC Non Coal Mining MoEF&CC, New Delhi, vide letter no. J-11015/42/2020-IA.II (M) dated 13th November 2020. (attached as Annexure-II) as per the generic structure of EIA given in Appendix III in the EIA notification 2006. The EIA study broadly covered:  Literature review and collection of primary and secondary data relevant to the study area;  Establish the baseline environmental aspects of buffer zone of the study area;  Estimation of incremental pollution load due to mining and activity and mineral transportation  Provide mitigation measures to control environmental pollution.  Prepare an Environment Management Plan (EMP) outlining the measures for improving the environmental quality; and  Identify critical environmental attributes that are required to be monitored in the post-project scenario. This Final EIA report of Expansion of Aniali Limestone Mine covers the below mentioned chapters; 1. Introduction 2. Project Description 3. Description of the Environment 4. Anticipated Environmental Impacts and Mitigation Measures 5. Analysis of Alternative (Technology & Site) 6. Environmental Monitoring Program 7. Additional Studies 8. Project Benefits 9. Environmental Management Plan 10. Summary and Conclusion 11. Disclosure of Consultant Engaged

1.9 Compliance of TOR Terms of Reference for conducting Environment Impact Assessment is compiled in tabular format (point wise compliance) Conditions Reply Specific Conditions a. A fresh independent study needs to Wildlife conservation plan of schedule -1 species Indian be carried out by the renowned Peafowl is prepared and attached with the final EIA conservation institute of the country report as Annexure XXIV at Page 319. Fresh illustrating the impacts of the independent study from renowned conservation institute mining activities on the native flora is in process. and fauna along with remedial/management plan. b. Project proponent needs to submit The detailed traffic study has been incorporated in the detailed traffic study. section 4.6 of Chapter 4 at page 193. Traffic survey was also conducted near village intersection and SH 27, survey forms are given as Annexure XI at page 201.

M/s TATA CHEMICALS LIMITED Page 11 Expansion of Aniali Limestone Mining Project Final EIA/EMP c. Project proponent needs to submit Ambient air quality modeling has been carried out to the air quality modeling/source predict the impact of project on air quality of the study modeling in the EIA/EMP report. area by using AERMOD model. The details of model input parameters for modeling studies has been provided in section 4.3 chapter 4 at page 166. It includes the impact of movement of vehicles for transportation of mineral. The air quality contours with location map has been given as Figure 4.2 at page 172, Figure 4.3 at page 174, Figure 4.4 at page 176, Figure 4.5 at 178 and Figure 4.6 at page 180 of chapter 4 indicating the location of the site, location of sensitive receptors etc. d. Project proponent needs to submit The latest compliance report is attached as Annexure the latest compliance report from XV at page 252. Ministry's regional office. A. ADDITIONAL ToR I The Project proponent should The revenue map showing the demarcation of the submit the revenue plan for mining government land, private land and agricultural land etc. lease, revenue plan should be is given as Annexure XX at page 255. superimposed on the satellite imagery clearly demarcate the Govt. Land, private land and agriculture land etc. II The Project proponent should Video showing the detailed year wise afforestation and submit the real-time aerial footage greenbelt plan will be displayed at the time of final EIA & video of the detailed plan in presentation. The real time aerial footage is attached as tabular format (year-wise for the Figure 1.2 and 1.3 at Page 5 and 6 of Chapter 1. life of mine) for afforestation and greenbelt, location of plantation, The survival rate of the saplings is considered as 80%. target for survival rate and budget The surface plan is attached as Annexure IVB at page earmarked for the afforestation & 137. green belt development. In addition The budget for the greenbelt development including the to this PP should show on a surface recurring and capital expenditure is given in Table 9.8 of plan (5-year interval for life of chapter 9 at page 271. mine) of suitable scale the area to Year Number of saplings to be covered under afforestation & be planted green belt clearly mentioning the I 3000 latitude and longitude of the area II 3000 covered during each 5 years. The capital and recurring expenditure to III 3000 be incurred needs to be submitted. IV 3000 Presently in India there are many V 3000 agencies which are developing forest in short interval of time. Local species like Siris, Neem, Kachnar, Kashid, Shisham, Gulmohar, Karanj, Pipal, Drumstick, Imli,

M/s TATA CHEMICALS LIMITED Page 12 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Thus, for the plantation activities Banyan tree, Bel patra etc. will be planted in consultation details of the experts/ agencies to with the Forest Department as well as CPCB Guidelines be engaged needs to be provided for greenbelt development. with budgetary provisions. III The Project proponent should Total water requirement is proposed to be 29.0 KLD, submit the quantity of surface or which includes 7.0 KLD for domestic uses, 5.0 KLD for ground water to be used for this plantation and 17.0 KLD for dust suppression. CGWA project. The complete water permission for ground water withdrawal is obtained for balance cycle need to be submitted. 10 m3/day in the year 2011. Enclosed as Annexure XA In addition to this Project at page 199. The rest 19 KLD water will be sourced proponent should submit a detailed from nearby village Aniali by water tanker for which No plan for rainwater harvesting objection certificate is already obtained which is measures to be taken. The Project Enclosed as Annexure XB at page 200. Details of water proponent should submit the year requirement are given under section 2.11.4 of chapter 2 wise target for reduction in at page 62. consumption of ground/surface The mine management will install Roof top harvesting water by developing alternative structures in the school or public buildings in nearby source of water through rain water villages with prior consent from local gram panchayats harvesting measures. The capital to collect rain water and charge to ground through and recurring expenditure to be available dug well/ tube well. As the region lacking incurred needs to be submitted. adequate ground water source, thus the groundwater resources will be conserved for sustainable availability. The budget including recurring and capital cost for the rainwater harvesting system to be constructed at nearby village is given in Table 9.8 under section of chapter 9 at page 271. IV PP should clearly brings out the The details of the manpower to be engaged for with their details of the manpower to be roles/responsibilities/designations is given under section engaged for this project with their 2.15 of chapter 2 at page 64. roles/ responsibilities/ designations. The capital and recurring expenditure to be incurred for In addition to this Project occupational heath and safety is given under in Table proponent should mention the 9.8 of chapter 9 at page 271. Total capital cost for EMP number and designations of person is Rs. 8.5 lakh and recurring cost per year is Rs. 7.0 lakh. to be engaged for implementation of environmental management plan (EMP). The capital and recurring expenditure to be incurred needs to be submitted. V The Project proponent should The capital and recurring expenditure to be incurred for submit the year-wise, activity wise EMP and as well as for occupational Health surveillance and time bound budget earmarked is given in Table 9.8 of chapter 9 at page 271. for EMP, occupational Health As per the MOEF&CC's office memo no. F NO 22- surveillance & Corporate 65/2017-IA-III dated 01/05/2018 CER budget is Environmental Responsibility. The calculated and the details for the same is provided under capital and recurring expenditure to Table 9.7 of chapter 9 at page 271.

M/s TATA CHEMICALS LIMITED Page 13 Expansion of Aniali Limestone Mining Project Final EIA/EMP

be incurred needs to be submitted.

VI The Project proponent should The method of mining proposed for Expansion of Aniali submit the measures/technology to Limestone Mine is semi mechanized open cast mining be adopted for prevention of illegal method with adoption of drilling and blasting. mining and pilferage of mineral. The details of mineralogical and chemical composition The Project proponent should of the mineral with percentage of free silica is given submit the detailed mineralogical under section 3.4.6.3 of chapter 3 at page 109. and chemical composition of the The collection & analysis of data was carried out by an mineral and percentage of free environment laboratory accredited by NABL. silica from a NABL/MoEF&CC accredited laboratory. VI The Project proponent Should The transport route map is given as Figure 4.8 and 4.9 I clearly show the transport route of of chapter 4 at page 195 and 196. the mineral and protection and The mitigation measures proposed while transportation mitigative measure to be adopted of the mineral is discussed under section 4.6.1 of while transportation of the mineral. chapter 4 from page 194. The impact from the center line of Ambient air quality modeling has been carried out to the road on either side should be predict the impact of project on air quality of the study clearly brought out supported with area by using AERMOD model. The details of model the line source modelling and input parameters for modeling studies has been provided isopleth. Further, frequency of in section 4.3 chapter 4 at page 166. It includes the testing of Poly Achromatic impact of movement of vehicles for transportation of Hydrocarbon needs to be submitted mineral. The air quality contours with location map has along with budget. Based on the been given as Figure 4.2 at page 172, Figure 4.3 at above study the compensation to be page 174, Figure 4.4 at page 176, Figure 4.5 at 178 paid in the event of damage to the and Figure 4.6 at page 180 of chapter 4 indicating the crop and land on the either side of location of the site, location of sensitive receptors etc. the road needs to be mentioned. The entire mine lease is a non-forest government waste The Project proponent should land, same can be seen in the land use map given as provide the source of equations Figure 3.2 of chapter 3 at Page 76. No damage to the used and complete calculations for crop land is anticipated. computing the emission rate from the various sources. VI The Project proponent should Diesel will not be purchased or stored at mine site by II clearly bring out that what is the Project Proponent as vehicles used for mining purpose specific diesel consumption and will be hired only. steps to be taken for reduction of the same. Year-wise target for reduction in the specific diesel consumption needs to be submitted. IX The Project proponent should bring M/s TATA Chemicals Limited has taken many initiative out the awareness campaign to be in the past year for carrying out awareness, practical carried out on various training, organizing free medical camps, skill environmental issues, practical development etc., the same can be seen under section

M/s TATA CHEMICALS LIMITED Page 14 Expansion of Aniali Limestone Mining Project Final EIA/EMP

training facility to be provided to 9.10 of chapter 9 from page 262-271. the environmental engineer/ M/s TATA Chemicals Limited will continue to do all diploma holders, mining these for the betterment of the society. A separate engineer/diploma holders, environmental awareness budget is also included in the geologists and other traders related CER budget given under section 9.7 of chapter 9 at to mining operations. Target for the page 260. same needs to be submitted. X The budget to be earmarked for the Noted and will be compiled. various activities shall be decided after perusal of the Standard EC conditions published by the Ministry. After perusal of Standard EC conditions if agreed Project proponent should also submit an undertaking by the way of affidavit for compliance of Standard EC condition already prescribed by the Ministry vide O.M. No and specific condition if prescribed by the EAC/MoEF&CC. XI The Project proponent should NABET accredited consultant is engaged for the ensure that only NABET accredited preparation of EIA/EMP report of Expansion of Aniali consultant shall be engaged for the Limestone Mining Project. The details of the consultants preparation of EIA/EMP reports. engaged is given in Chapter 11 at page 291. PP shall ensure that accreditation of The accreditation letter is also attached with EIA/EMP consultant shall be valid during the report which clearly proof the validity of the engaged collection of baseline date, consultant. preparation of EIA/EMP report and during the appraisal process. The Undertaking by the M/s TATA Chemicals Limited and Project proponent and consultant the consultant for the information and data provided in should submit an undertaking the the EIA report are factually correct with full information and data provided in accountability for the same are included in the final EIA the EIA report and submitted to the report. Ministry are factually correct and project proponent and consultant are fully accountable for the same. XI The Project proponent should The photographs of samples collected from respective I submit the photograph of locations bearing time, date, and latitude & longitude is monitoring stations & sampling provided as Annexure XIV at page 251. locations. The photograph should Lab reports prepared by MoEF&CC/NABL accredited bear the date, time, latitude & laboratory are attached as Annexure XIII at page 229. longitude of the monitoring station/ All the original analysis/testing reports will be available sampling. In addition to this PP during appraisal of the Project. should submit the original test reports and certificates of the labs

M/s TATA CHEMICALS LIMITED Page 15 Expansion of Aniali Limestone Mining Project Final EIA/EMP

which will analyze the samples.

B. Standard Terms of References (ToR) 1. Year-wise production details since Aniali Limestone Mine is an existing mine, where EC 1993-1994 should be given, clearly was obtained in year 2015 for the annual production of stating the highest production 43,000 Tons of limestone. After obtaining the EC, mine achieved in any one year prior to become operational in year 2017-2018. However, the 1993-1994. It may also be past production details are available from the date of categorically informed whether mining operation in the past (since 1985-86). About there had been any increase in 28.400 thousand Tonnes of mineral has been mined out production after the EIA in the years 2017-2018. During the production period Notification 1994 came into force, environmental management measures were taken care w.r.t. the highest production like green belt development etc. by TCL. The details of achieved prior to 1994. year wise production from the start of mining operation duly validated by district geologist, Porbandar is attached as Annexure V at page 150. 2. A copy of the document in support The mining lease for Limestone over 21.04 hectares was of the fact that the Proponent is the granted in name of M/s TATA Chemicals Limited vide rightful lessee of the mine should order no MCR/1565/13877/CHH issued by Government be given. of Gujarat, Industries, Mines &Power Department, Gandhinagar on 07.07.1966 on survey no. 207/P(Annexure IIIA at page 23). The lease deed expired on 22.12.1986. TCL has applied for 1st renewal on 09.09.1985. 1st renewal was granted vide order No. MCR-1585 - (T-44)-4267-CHH, dated 28.12.2004.(Annexure IIIB at page 42) Thereafter, TCL applied for 2nd renewal vide letter No. A/WG/L408/2005, dated 17.11.2005. Due to amendment in Section 8A(5) of the MMDR Amendment Act 2015, lease period of captive leases are deemed to be extended for fifty years from the initial grant or up to 30 March 2030 vide letter no.MCR/1565-13877-CHH dated 03.04.2018(Annexure IIIC at page 46), issued by Industries and Mines Department, Government of Gujarat. 3. All documents including approved The mine plan of Expansion of Aniali Limestone Mine mine plan, EIA and Public hearing (21.04 Ha), Porbandar, Gujarat has been approved vide should be compatible with one letter no. 684(4)(1)/ MP-259/2019-20-GNR/2600 dated another in terms of the mine lease 26.12.2019. (The mine approval letter is shown in area, production levels, waste Figure 2.2 of chapter 2 at page 31) in the name of M/s generation and its management, TATA Chemicals Limited for 21.04 Ha area. mining technology etc. and should be in the name of lessee. EIA report is prepared on the basis of information given in the approved mine plan and supportive documents like lease deed, khasra etc. Approved mine plan attached as Annexure IVA at page 48. Waste generation & its management are given in under Section 2.8 of Chapter 2 at page 59.

The Public hearing details is included in Chapter 7 at Page no. 214 of Final EIA report. Public hearing

M/s TATA CHEMICALS LIMITED Page 16 Expansion of Aniali Limestone Mining Project Final EIA/EMP

proceeding is attached as Annexure XXIII at Page 264. 4. All corner coordinates of the mine The corner co-ordinates of the mine lease area lease area, superimposed on High superimposed on High Resolution Imagery provided in Resolution imagery/ Topo-sheet, Figure 2.5 of chapter 2 at page 35. topographic sheet, geomorphology The land use, ecological features of the study area are and geology of the area should be shown in the 10 Km buffer map given in Figure 2.7 of provided. Such an Imagery of the chapter 2 at page 37 and land use map given in Figure proposed area should clearly show 2.19 of chapter 2 at page 68. the land use and other ecological features of the study area (core and buffer zone). 5. Information should be provided in Information has been provided in Survey of India Survey of India Toposheet in Toposheet in 1:50,000 scale indicating geological 1:50,000 scale indicating geological features, geomorphology of land forms, important water map of the area, geomorphology of bodies and rivers, soil etc. in the 10 Km buffer map in land forms of the area, existing Figure 2.7 at of chapter 2 at page 37. minerals and mining history of the area, important water bodies, streams and rivers and soil characteristics. 6. Details about the land proposed for Details of land proposed for mining activities has been mining activities should be given given under section 3.2 of chapter 3 at page 74. Present with information as to whether mining conforms to the land use policy of the State. No mining conforms to the land use land diversion has been proposed. Lease deed and policy of the State; land diversion sanction order attached as Annexure IIIA at page 23, for mining should have approval Annexure IIIB at page 42 and Annexure IIIC at page from State land use board or the 46. concerned authority. 7. It should be clearly stated whether The Environment policy prescribed for standard the proponent Company has a well operating process to bring into focus any laid down Environment Policy violation/deviation of the environment and forest approved by its Board of Directors? norms/conditions that the company operations will If so, it may be spelt out in the EIA implement operational and risk management practices Report with description of the that provide for maximum protection of people and the prescribed operating environment. The hierarchical system or administrative process/procedures to bring into order of the Company to deal with the environmental focus any infringement/deviation/ issues and for ensuring compliance with the EC violation of the environmental or conditions is given in Section 9.2.3 of Chapter 9 at forest norms/ conditions? The page 247. hierarchical system or administrative order of the Company to deal with the environmental issues and for ensuring compliance with the EC conditions may also be given. The system of reporting of non- compliances / violations of environmental norms to the Board of Directors of the Company and/or shareholders or stakeholders at large, may also be detailed in the

M/s TATA CHEMICALS LIMITED Page 17 Expansion of Aniali Limestone Mining Project Final EIA/EMP

proposed safeguard measures in each case should also be provided. 8. Issues relating to Mine Safety, Opencast semi-mechanized mining method is proposed including subsidence study in case for the excavation of limestone mineral. of underground mining and slope study in case of open cast mining, Issues related to mine safety has been given in approved blasting study etc. should be mine plan and provided in EIA report under section detailed. The proposed safeguard 7.5.7 of Chapter 7 at page 235. Permissions for blasting measures in each case should also is also attached as Annexure VI at page 152. be provided. 9. The study area will comprise of 10 The EIA study has been carried out in the study area of km zone around the mine lease 10 km radius zone from the periphery of the mine lease. from lease periphery and the data Details of Waste generation have been given in Table contained in the EIA such as waste 2.17 of Chapter 2 at page 59 and life of mine is given generation etc. should be for the under section 2.6 of chapter 2 at page 58. life of the mine / lease period. 10. Land use of the study area Land use of the study area delineating forest area, delineating forest area, agricultural agricultural land, grazing land, water bodies, human land, grazing land, wildlife settlements, and other ecological features etc. are shown sanctuary, national park, migratory in Figure 3.2 of Chapter 3 at page 76 and is supported routes of fauna, water bodies, by area breakup of the land use within 10 km radius from human settlements and other the mine site in Table 3.2 of Chapter 3 at page 75. ecological features should be indicated. Land use plan of the Bard wildlife sanctuary is present at a distance of 4.205 mine lease area should be prepared km from the working mining lease area. The map duly to encompass preoperational, authenticated by District Conservator of Forest, operational and post operational Porbandar Division showing distance of Barda WLS phases and submitted. Impact, if from the mine lease boundary is attached as Annexure any, of change of land use should VII at page 164. be given. 11. Details of the land for any Over There is no overburden dumps outside the mine lease Burden Dumps outside the mine area as per the approved mine plan, also there is no lease, such as extent of land area, project affected family hence no R&R issue exists. distance from mine lease, its land use, R&R issues, if any, should be given. 12. A Certificate from the Competent Forest land is not involved in the ML area as per Authority in the State Forest approved mine plan and land use map of the project site. Department should be provided, (Land Use Map is attached as Figure 3.2 in Chapter 3 confirming the involvement of at page 76.) forest land, if any, in the project The map duly authenticated by District Conservator of area. In the event of any contrary Forest, Porbandar Division claim by the Project Proponent confirms that Aniali limestone mine does not involve regarding the status of forests, the forest land is attached as Annexure VII at page 164, site may be inspected by the State also the lease deed of mine shows that it is a non- forest Forest Department along with the government waste land. Regional Office of the Ministry to ascertain the status of forests, based on which, the Certificate in this regard as mentioned above be issued. In all such cases, it would

M/s TATA CHEMICALS LIMITED Page 18 Expansion of Aniali Limestone Mining Project Final EIA/EMP

be desirable for representative of the State Forest Department to assist the Expert Appraisal Committees. 13. Status of forestry clearance for the There is no forest land involved within the mine lease broken up area and virgin area hence no forestry clearance is applicable to this forestland involved in the Project project. including deposition of net present value (NPV) and compensatory afforestation (CA) should be indicated. A copy of the forestry clearance should also be furnished. 14. Implementation status of As forest land is not involve to this project, recognition recognition of forest rights under of forest rights under scheduled tribes and other the Scheduled Tribes and other traditional forest dwellers under the Act of 2006, Traditional Forest Dwellers (Recognition of Forest Rights) is not applicable. (Recognition of Forest Rights) Act, 2006 should be indicated. 15. The vegetation in the RF / PF areas There are three Reserve forest present in the study area in the study area, with necessary as well as Barda wildlife sanctuary is also present within details, should be given. the study area. Details of same are incorporated under section 3.7.7 and 3.7.8 of chapter 3 from page 125 to 135. 16. A study shall be got done to A detailed study of biological environment including ascertain the impact of the Mining flora/fauna of 10 Km buffer area and separate study of Project on wildlife of the study area Barda Wildlife Sanctuary is done which is given under and details furnished. Impact of the section 3.7 of chapter 3 from page 119 to 135. The project on the wildlife in the impact of mining operations on the biological surrounding and any other environment including flora and fauna of the study area protected area and accordingly, along with mitigation measures is discussed under detailed mitigative measures section 4.5 of chapter 4 at page 183. required, should be worked out with cost implications and submitted. 17. Location of National Parks, Barda wild life sanctuary is present at a distance of 4.205 Sanctuaries, Biosphere Reserves, km from the working mining lease area. The map duly Wildlife Corridors, Ramsar site, authenticated by District Conservator of Forest, Tiger/ Elephant Reserves/(existing Porbandar Division showing distance of Barda WLS as well as proposed), if any, within from the mine lease boundary is attached as Annexure 10 km of the mine lease should be VII at page 164. clearly indicated, supported by a location map duly authenticated by The 10 km map of the study area showing the presence Chief Wildlife Warden. Necessary of Barda WLS is provided as Figure 2.7 of chapter 2 at clearance, as may be applicable to page 37. Barda WLS is a notified sanctuary from such projects due to proximity of MoEF&CC and its ESZ demarcation is also declared in the ecologically sensitive areas as 28th April 2017 hence NBWL clearance is not mentioned above, should be applicable to this project; the Final notification is also obtained from the Standing attached as Annexure VIII at page 166. Committee of National Board of Wildlife and copy furnished. 18. A detailed biological study of the A detailed study of biological environment covering 10

M/s TATA CHEMICALS LIMITED Page 19 Expansion of Aniali Limestone Mining Project Final EIA/EMP

study area [core zone and buffer Km study area (Core and Buffer zone) is done and zone (10 km radius of the periphery details are given in section 3.7 of chapter 3 from page of the mine lease)] shall be carried 119 to 135. out. Details of flora and fauna, endangered, endemic and RET Species duly authenticated, separately for core and buffer zone should be furnished based on such primary field survey, clearly indicating the Schedule of the fauna present. In case of any scheduled- I fauna found in the study area, the necessary plan along with budgetary provisions for their conservation should be prepared in consultation with State Forest and Wildlife Department and details furnished. Necessary allocation of funds for implementing the same should be made as part of the project cost. 19. Proximity to Areas declared as The mine lease area is not in the proximity to areas ‘Critically Polluted’ or the Project declared as "Critically Polluted" and list is attached as areas likely to come under the Annexure IX at page 196. And also does not fall in the ‘Aravali Range', (attracting court Aravali Range. restrictions for mining operations), should also be indicated and where so required, clearance certifications from the prescribed Authorities, such as the SPCB or State Mining Department should be secured and furnished to the effect that the proposed mining activities could be considered. 20. R&R Plan/compensation details for There are no project affected persons due to this project. the Project Affected People (PAP) Hence R&R plan is not applicable to this project. should be furnished. While preparing the R&R Plan, the relevant State/National Rehabilitation & Resettlement Policy should be kept in view. In respect of SCs /STs and other weaker sections of the society in the study area, a need based sample survey, family-wise, should be undertaken to assess their requirements, and action programmes prepared and submitted accordingly, integrating the sectoral programmes of line departments of the State

M/s TATA CHEMICALS LIMITED Page 20 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Government. It may be clearly brought out whether the village(s) located in the mine lease area will be shifted or not. The issues relating to shifting of village(s) including their R&R and socio- economic aspects should be discussed in the Report. 21. One season (non-monsoon) [i.e. One season non-monsoon data for December 2018 – March-May (Summer Season); February 2019 (winter) has been collected by October-December (post monsoon QCI/NABL accredited laboratory for ambient air, season) ; December-February surface and ground water quality, noise level and soil (winter season)]primary baseline quality near Aniali village and in the 10 Km study area. data on ambient air quality as per Three months baseline data has been given date-wise in CPCB Notification of 2009, water Chapter 3 in the EIA report including air, water, soil, quality, noise level, soil and flora and noise quality along with the flora fauna of the study and fauna shall be collected and the area. Site- specific meteorological data was also AAQ and other data so compiled collected by installing an automated weather station at presented date-wise in the EIA and site. EMP Report. Site- specific The data received from micro meteorological station is meteorological data should also be given in Table 3.8 of chapter 3 at page 89. collected. The location of the monitoring stations should be such Three months meteorological data from Denvilabs as to represent whole of the study Technologies, New Delhi (December 2018- February area and justified keeping in view 2019) was purchased for the preparation of Wind Rose. the pre-dominant downwind Predominant wind direction was found to be North East. direction and location of sensitive receptors. There should be at least Monitoring stations were selected on the basis of pre- one monitoring station within 500 dominant wind direction (North East), selection of m of the mine lease in the pre- sensitive receptors and their locations representing the dominant downwind direction. The whole of the study area including upwind, downwind mineralogical composition of and crosswind directions. The wind rose is given as PM10, particularly for free silica, Figure 3.7(b) of chapter 3 at page 93. should be given. One monitoring station, AAQ1 is fixed within 500 meter distance from mine lease boundary as shown in Figure 3.10 of chapter 3 at page 98.

The mineralogical composition of PM10 including free silica has been given in Table 3.12 of Chapter 3 at page 109. 22. Air quality modeling should be Ambient air quality modeling has been carried out to carried out for prediction of impact predict the impact of project on air quality of the study of the project on the air quality of area by using AERMOD model. the area. It should also take into Three months meteorological data from Denvilabs account the impact of movement of Technologies, New Delhi (December 2018- February vehicles for transportation of 2019) was purchased for the preparation of Wind Rose. mineral. The details of the model Predominant wind direction was found to be North East. used and input parameters used for The details of model input parameters for modeling modeling should be provided. The studies has been provided in section 4.3 chapter 4 at air quality contours may be shown page 166. It includes the impact of movement of

M/s TATA CHEMICALS LIMITED Page 21 Expansion of Aniali Limestone Mining Project Final EIA/EMP

on a location map clearly indicating vehicles for transportation of mineral. The air quality the location of the site, location of contours with location map has been given as Figure 4.2 sensitive receptors, if any, and the at page 172, Figure 4.3 at page 174, Figure 4.4 at page habitation. The wind roses showing 176, Figure 4.5 at 178 and Figure 4.6 at page 180 of pre-dominant wind direction may chapter 4 indicating the location of the site, location of also be indicated on the map. sensitive receptors etc. The wind rose diagram showing the pre-dominant wind direction is given in Figure 4.1 of chapter 4 at page 169. 23. The water requirement for the Total water requirement is proposed to be 29.0 KLD, Project, its availability and source which includes 7.0 KLD for drinking & domestic should be furnished. A detailed uses, 5.0 KLD for plantation and 17.0 KLD for dust water balance should also be suppression. CGWA permission for ground water provided. Fresh water requirement withdrawal is obtained for 10 m3/day in the year 2011. for the Project should be indicated. Enclosed as Annexure XA at page 199. The rest 19 KLD water will be sourced from nearby village Aniali by water tanker for which No objection certificate is already obtained which is Enclosed as Annexure XB at page 200. Details of water requirement are given under section 2.11.4 of chapter 2 at page 62. The detailed water diagram is given as Figure 2.17 of chapter 2 at page 63. 24. Necessary clearance from the CGWA permission for ground water withdrawal is Competent Authority for drawl of obtained for 10 m3/day in the year 2011. Enclosed as requisite quantity of water for the Annexure XA at page 199. Project should be provided. The rest 19 KLD water will be sourced from nearby village Aniali by water tanker for which No objection certificate is already obtained. Enclosed as Annexure XB at page 200. 25. Description of water conservation The water conservation measures are discussed under measures proposed to be adopted in section 9.3.3 of chapter 9 at page 253.The proposal for the Project should be given. Details rainwater harvesting is discussed under section 9.3.3.3 of rainwater harvesting proposed in of chapter 9 at page 253. The budget including the Project, if any, should be recurring and capital cost for the rainwater harvesting provided. system to be constructed at nearby village is given in Table 9.9 under section of chapter 9 at page 272. 26. Impact of the Project on the water The proposed mining will not intersect the existing quality, both surface and ground water table. The test results of both surface and groundwater, should be assessed ground water are not showing adverse impact on the and necessary safeguard measures, water quality of the study area. The detailed impacts and if any required, should be provided. mitigation measures w.r.t the quality of water (surface and ground) in the surrounding area is discussed under section 4.2 of Chapter 4 at page 165. 27. Based on actual monitored data, it Based on actual monitored data, mining will not intersect may clearly be shown whether ground water table hence no hydrological study is working will intersect groundwater. required. The detailed impact and mitigation measures Necessary data and documentation w.r.t the quality of water in the surrounding area is in this regard may be provided. In discussed under Section 4.2 of Chapter 4 at page 165. case the working will intersect No mining or working is proposed below ground water

M/s TATA CHEMICALS LIMITED Page 22 Expansion of Aniali Limestone Mining Project Final EIA/EMP

groundwater table, a detailed level. However for mining operations, pumping of Hydro Geological Study should be ground water is proposed but when required, for which undertaken and Report furnished. permission is already obtained from the CGWA. Copy The Report inter-alia, shall include attached as Annexure XA at page 199. details of the aquifers present and impact of mining activities on these aquifers. Necessary permission from Central Ground Water Authority for working below ground water and for pumping of ground water should also be obtained and copy furnished. 28. Details of any stream, seasonal or There is no stream or seasonal water is passing through otherwise, passing through the ML area hence no diversion or modification is proposed. lease area and modification / diversion proposed, if any, and the impact of the same on the hydrology should be brought out. 29. Information on site elevation, Information on site elevation has been provided in working depth, groundwater table Figure 2.9 Geological plan of Chapter 2 at page 47. etc. should be provided both in The general elevation within the lease area varies from AMSL and bgl. A schematic around 58mRL to high of around 76mRL showing relief diagram may also be provided for of about 18 meter. The existing maximum and minimum the same. working depth are 2m and 6m from surface respectively. The maximum depth in the present pit is at 58mRL and at conceptual stage, it will go further till 55mRL. Thus, the mining will not intersect with the water table. 30. A time bound Progressive Total 33% of the lease area will be developed as green Greenbelt Development Plan shall Belt which would be around 6.9432 Ha. Greenbelt will be prepared in a tabular form be developed around the lease boundary, haul roads, (indicating the linear and undisturbed area, reclaimed area, workshop, mine office, quantitative coverage, plant species etc. and time frame) and submitted, In the approved mine plan also, the proposal for keeping in mind, the same will plantation of 3000 plants per annum and fencing are have to be executed up front on proposed in the following phased manner. commencement of the Project. Year Number of Fencing Phase-wise plan of plantation and saplings to around compensatory afforestation should be planted Plantation be charted clearly indicating the (m)* area to be covered under plantation I 3000 90 and the species to be planted. The II 3000 90 details of plantation already done III 3000 90 should be given. The plant species selected for green IV 3000 90 belt should have greater ecological V 3000 90 value and should be of good utility *Plant species like Thor (Cactus) etc. value to the local population with will be used for natural fencing. emphasis on local and native Plant species for green belt development is given at species and the species which are Table 4.10 chapter 4 at page 186. which is based on tolerant to pollution. CPCB guidelines for Green Belt Development, March 2000.Plant species selected for green belt will be of

M/s TATA CHEMICALS LIMITED Page 23 Expansion of Aniali Limestone Mining Project Final EIA/EMP

greater ecological value and of good utility value to the local population. Native and pollution tolerant species will be planted. 31. Impact on local transport Impact on local transport infrastructure due to proposed infrastructure due to the Project project has been given in section 4.6 of Chapter 4 at should be indicated. Projected page 193. increase in truck traffic as a result Existing traffic scenario: of the Project in the present road LI-Near village intersection the PCU/day is 203 and V/C network (including those outside ratio is 0.034, the LOS is 'A'. the Project area) should be worked L2-- At SH-27, the PCU/day is 4100 and V/C ratio is out, indicating whether it is capable 0.27, LOS is 'B' of handling the incremental load. After the proposed activity: Arrangement for improving the LI-Near village intersection the PCU/day is 383 and V/C infrastructure, if contemplated ratio is 0.06, the LOS is 'A'. (including action to be taken by L2-- At SH-27, the PCU/day is 4280 and V/C ratio is other agencies such as State 0.28, LOS is 'B' Government) should be covered. From the traffic survey analysis it can be seen that the Project Proponent shall conduct V/C ratio will change to 0.06 with LOS being “A” which Impact of Transportation study as is “Excellent” and 0.28 near village intersection with per Indian Road Congress LOS being “B” which is “Very good” at SH 27 as per Guidelines. classification. Hence the additional load on the carrying capacity of the concerned roads is not much significant and it is capable of handling the incremental load. The present road infrastructure is good enough however regular maintenance is required. Traffic survey was also conducted near village intersection and SH 27, survey forms are given as Annexure XI at page 201. 32 Details of the onsite shelter and Infrastructure facilities to be provided for mine workers facilities to be provided to the mine are rest shelter/ rest room, separate facility for female workers should be included in the and male workers, first aid space, provision of drinking EIA Report. water etc. The details are given under section 2.10 of chapter 2 at page 62. 33 Conceptual post mining land use As per MOEF&CC Office Memorandum F.No. 22- and Reclamation and Restoration of 34/2018-IA-III dated 16 January, 2020, "the mining mined out areas (with plans and lease holder shall, after ceasing mining operations, with adequate number of sections) undertake re-grassing the mining area and any other should be given in the EIA report. area which may have been disturbed due to their mining activities and restore the land to a condition which is fit for growth of fodder, flora, fauna etc" Therefore at the conceptual stage of the proposed mine the excavated area will be re-grassed for growth of fodder, flora, fauna etc. Conceptual plans and sections are given in Figure 2.20 of Chapter 2 at page 69. 34 Occupational Health impacts of the Occupational health impacts of the project are Project should be anticipated and anticipated and preventive measures have been discussed the proposed preventive measures under section 9.9 of chapter 9 at page 262. Pre- spelt out in detail. Details of pre- placement medical examination and periodical medical placement medical examination and examination schedules are incorporated in the EMP. The periodical medical examination project specific occupational health mitigation measures schedules should be incorporated in with required facilities are proposed in the mining area is

M/s TATA CHEMICALS LIMITED Page 24 Expansion of Aniali Limestone Mining Project Final EIA/EMP

the EMP. The project specific discussed under section 9.9 of chapter 9 at page 262. occupational health mitigation measures with required facilities proposed in the mining area may be detailed. 35 Public health implications of the Public health implications of the project and related Project and related activities for the activities for the population in the impact zone population in the impact zone systematically evaluated and proposed remedial should be systematically evaluated measures are provided in section 9.10.2 of Chapter 9 at and the proposed remedial page 271 and budgetary provision has been given in measures should be detailed along Table 9.8 of chapter 9 at page 272. with budgetary allocations. 36 Measures of socio economic TCL has identified measures of socio-economic significance and influence to the significance and influence to the local community which local community proposed to be is enlisted in EMP at chapter 9 under the head of provided by the Project Proponent Corporate Environmental Responsibility. The time should be indicated. As far as bound implementation plan along with the budget is at possible, quantitative dimensions Table 9.9 of chapter 9 at page 272. may be given with time frames for implementation. 37 Detailed environmental Detailed environmental management plan is prepared as management plan (EMP) to chapter 9 in the EIA report with necessary mitigation mitigate the environmental impacts measures. which should inter-alia include the Measures for the environmental impacts due to project impacts of change of land use, loss are presented in Chapter 9 at page 262 with budgetary of agricultural and grazing land, if allocation. any, occupational health impacts Occupational health impacts are discussed with the besides other impacts specific to preventive measures are given in the same chapter under the proposed Project. section 9.9 of chapter 9 at page 262. 38 Public Hearing points raised and The Public hearing details is included in Chapter 7 at commitment of the Project Page no. 214 of Final EIA report. Public hearing Proponent on the same along with proceeding is attached as Annexure XXIII at Page 264. time bound Action Plan with budgetary provisions to implement the same should be provided and also incorporated in the final EIA/EMP Report of the Project. 39 Details of litigation pending against No litigation is pending against the project. the project, if any, with direction /order passed by any Court of Law against the Project should be given. 40 The cost of the Project (capital cost The cost of the project is Rs. 1 crore. Budget for and recurring cost) as well as the environment protection towards implementation of EMP cost towards implementation of is given in Table 9.9 of Chapter 9 at page 272. EMP should be clearly spelt out. 41 A Disaster management Plan shall A disaster management plan has been prepared and be prepared and included in the given in section 7.6 of chapter 7 at page 236. EIA/EMP Report. 42 Benefits of the Project if the Project Details of project benefits including environmental, is implemented should be spelt out. social, economic, employment potential etc. have been The benefits of the Project shall discussed in chapter 8 at page 242.

M/s TATA CHEMICALS LIMITED Page 25 Expansion of Aniali Limestone Mining Project Final EIA/EMP

clearly indicate environmental, social, economic, employment potential, etc. 44. Besides the above, the below mentioned general points are also to be followed: (a) All documents to be properly All documents are properly referenced with index and referenced with index and continuous page numbering. continuous page numbering. (b) Where data are presented in the The data in the EIA Report which is presented in tabular report especially in Tables, the forms are annexed as ‘list of tables’ in the Index and the period in which the data collected period in which the data was collected and their sources and the sources should be indicated. are indicated in the tables. (c) Project Proponent shall enclose all Lab reports prepared by MoEF&CC/NABL accredited the analysis/testing reports of laboratory are attached as Annexure XIII at page 229. water, air, soil, noise etc. using the All the original analysis/testing reports will be available MoEF&CC/NABL accredited during appraisal of the Project. laboratories. All the original analysis/testing reports should be available during appraisal of the Project. (d) Where the documents provided are English version of all the documents has been provided. in a language other than English, an English translation should be provided. (e) The Questionnaire for Questionnaire for environmental appraisal is filled and environmental appraisal of mining attached as Annexure XIX at page 290. projects as devised earlier by the Ministry shall also be filled and submitted. (f) While preparing the EIA report, the The MoEF&CC vide O.M. No. J-11013/41/2006- IA.II instructions for the Proponents and (I) dated 4th August, 2009 is being followed in the instructions for the Consultants preparation of EIA Report. issued by MoEF&CC vide O.M. No. J-11013/41/2006- IA.II (I) dated 4th August, 2009, which are available on the website of this Ministry, should be followed. (g) Changes, if any made in the basic No such changes have been made in the submitted Form- scope and project parameters (as 1, PFR for securing Terms of Reference. submitted in Form-I and the PFR for securing the TOR) should be The Public hearing details is included in Chapter 7 at brought to the attention of Page no. 214 of Final EIA report. Public hearing MoEF&CC with reasons for such proceeding is attached as Annexure XXIII at Page 264. changes and permission should be sought, as the TOR may also have to be altered. Post Public Hearing changes in structure and content of the draft EIA/EMP (other than modifications arising out of the P.H. process) will entail conducting the PH again with the revised documentation

M/s TATA CHEMICALS LIMITED Page 26 Expansion of Aniali Limestone Mining Project Final EIA/EMP

(h) As per the circular no. J- The proposed project is a expansion project for which 11011/618/2010-IA. II (I) dated the EC was granted in the year 2015. The Certified 30.5.2012, certified report of the Compliance report is attached Annexure XV at page status of compliance of the 252. conditions stipulated in the environment clearance for the existing operations of the project, should be obtained from the Regional Office of Ministry of Environment, Forest and Climate Change, as may be applicable. (i) The EIA report should include i) The contours and drainage pattern is shown in Figure Surface plan of the area indicating 2.10 of Chapter 2 at page 48. Geological sections are contours of main topographic shown in Figure 2.9 of Chapter 2 at page 47. All the features, drainage and mining area. mine plates are attached as Annexure IVB at page 137. ii) Geological maps and sections iii) sections of the mine pit and external dumps, if any, clearly showing the land features of the adjoining area.

*******************

M/s TATA CHEMICALS LIMITED Page 27 CHAPTER-2

PROJECT DESCRIPTION Expansion of Aniali Limestone Mining Project Final EIA/EMP

CHAPTER 2- PROJECT DESCRIPTION

2.0 General The proposed Expansion of Aniali Limestone Mining project is located near Village Aniali, Taluka Ranavav, and District Porbandar in Gujarat. It is a captive mine of TATA Chemicals Limited (TCL), which supplies limestone as raw material to Soda Ash & Cement Plant of TCL at Mithapur, Devbhoomi Dwarka, Gujarat for manufacturing of soda ash and cement. The proposed lease is a Non-Forest Government waste land measuring 21.04 Ha, with the highest production target of 1,75,000 TPA as per approved mine plan. The existing method of mining is Open Cast and the Category of Mine is ‘A’. Semi mechanized mining methodology is being adopted with occasional use of drilling and blasting for fragmentation of hard limestone strata. The proposed project is categorized as category A-Mining {1(a)- Mining of Minerals} as per EIA Notification 2006 and its subsequent amendments.

2.1 Description of Project The mining lease for Limestone over 21.04 hectares was granted in name of M/s TATA Chemicals Limited vide order no MCR/1565/13877/CHH issued by Government of Gujarat, Industries, Mines & Power Department, Gandhinagar on 07.07.1966 on survey no. 207/P. (Annexure III A). The proposed project is for capacity expansion of mine from 43,000 TPA to 1,75000 TPA by open cast semi mechanized method. The total lease area is 21.04 ha which comprises totally of Govt. waste land. Proposed Project is located near village – Aniali, Taluka – Ranavav, District- Porbandar, Gujarat. Limestone produced will be transported to the Mithapur chemical complex by road. Table 2.1: Project Profile 1. Project Expansion of Aniali Limestone mine 2. Name of Leasse M/s TATA Chemicals Limited 3. Lease Area 21.04 ha 4. Survey No. 207/P 5. Village/ Taluka Aniali/ Ranavav 6. District/ State Porbandar / Gujarat 7. Mining Method Semi Mechanized open cast mining method; Drilling and Blasting will also be carried out. 8. Life of Mine Approx. 6.2 years as per approved mine plan 9. Ultimate Pit Depth 55 mRL 10. Existing Production 43,000 Tons Per Annum 11. Proposed Production 1,75000 Tons per Annum 12. Water Requirement 29 KLD 13. Manpower Requirement 153 (after expansion)

M/s TATA CHEMICALS LIMITED Page 28 Expansion of Aniali Limestone Mining Project Final EIA/EMP

2.1.1 Leasehold Area As per Approved Scheme of mining the lease area is a government wasteland and part of Survey No. 207/P, which falls under the revenue limit of Aniali village. There is no reserve forest or protected forestland within the lease area. Existing land use pattern is given in Table 2.2. Table 2.2– Existing Land Use Pattern Particulars Present position of the area in Ha 1. Area under mining 4.4160 2. Storage for top soil 0 3. Waste dump site 0 4. Mineral storage 0 5. Infrastructure- workshop, administrative building etc. 0.6000 6. Roads 0.7565 7. Railways 0 8. Tailing Pond 0 9. Effluent Treatment Plant 0 10. Mineral Separation Plant 0 11. Township area 0 12. Others (to specify) 0 Total 5.7725 Remaining area 15.2675 Total area 21.04 (Source: As per Approved Mine Plan, 26.12.2019) As per IBM approved mine plan, the total lease area 21.04 Ha is a Govt. waste land. No forest land is involved in the mine lease area. The general elevation within the lease area varies from around 58mRL to high of around 76mRL showing relief of about 18 meter. There are five existing pits within the lease area, it covers 4.4160 hectare of the lease area.

Table 2.3 : Details of existing pits inside the lease Pit No Length Width Depth Lithology

1 186 157 4 Chemical Grade 2. 86 33 2 Cement Grade 3. 30 18 1 Cement Grade 4. 126 73 2 Cement Grade 5. 145 104 2 Chemical Grade (Source: As per Approved Mine Plan, 26.12.2019)

M/s TATA CHEMICALS LIMITED Page 29 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Figure 2.1: Location Map of the Project Site

M/s TATA CHEMICALS LIMITED Page 30 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Limestone: Based on the physical characteristics and chemical composition of the limestone, as revealed from drilling investigation, there are three types of limestone.

Table 2.4: Type of limestone

1 Chemical Grade (CaCO3 + MgCO3 ) % >= 92%, &SiO2 < 4%

2 Marginal Grade (CaCO3 + MgCO3 ) % >= 92%, &SiO2 < 4% to 5%

3 Cement Grade (CaCO3 + MgCO3 ) % >= 92%, , SiO2 > 5%

Approved Mine Plan: The mine plan of Expansion of Aniali Limestone Mine (21.04 Ha), Porbandar, Gujarat has been approved vide letter no. 684(4)(1)/ MP-259/2019-20-GNR/2600 dated 26.12.2019. Approved Mining Plan letter is shown as Figure 2.2. Copy of the mine plan is attached as Annexure IVA.

Figure 2.2: Approved Mining plan letter Past Production Details: This is an existing mine, where EC was obtained in year 2015 for the annual production of 43,000 Tons of limestone. After obtaining the EC, mine become operational in year 2017- 2018. However the past production details are available from the date of mining operation in the past. About 28.400 thousand Tonnes of mineral has been mined out in the years 2017- 2018. During the production period environmental management measures were taken care like green belt development etc. by TCL. The details of year wise production from the start of mining operation duly validated by district geologist, Porbandar is presented in the below mentioned Table 2.5.

M/s TATA CHEMICALS LIMITED Page 31 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Table 2.5 Past Production Details (Year wise) Sr. No. Year Production (in thousand T.) 1. 1985-86 13.322 2. 1986-87 00 3. 1987-88 712 4. 1988-89 00 5. 1989-90 00 6. 1990-91 00 7. 1991-92 00 8. 1992-93 00 9. 1993-94 00 10. 1994-95 00 11. 1995-96 00 12. 1996-97 00 13. 1997-98 00 14. 1998-99 00 15. 1999-2000 00 16. 2000-01 00 17. 2001-02 00 18. 2002-03 00 19. 2003-04 00 20. 2004-05 00 21. 2005-06 00 22. 2006-07 00 23. 2007-08 00 24. 2008-09 00 25. 2009-10 00 26. 2010-11 00 27. 2011-12 00 28. 2012-13 00 29. 2013-14 00 30. 2014-15 00 31. 2015-16 00 32. 2016-17 00 33. 2017-18 28.400 Source: Authenticated by Geologist, Geology and Mining department, Govt. of Gujarat, Porbandar.

2.1.2 Location Details: The mine lease area falls in survey no. 207/p of the village Aniali, Taluka- Ranavav, Dist- Porbandar, Gujarat. It is located at about 2.0 km to the South East of Aniali village. From

M/s TATA CHEMICALS LIMITED Page 32 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Village Aniali the mine site is approached by motorable road. The geographical location of the lease area is as under:- Table 2.6: Co-ordinates of the project site Pillars Longitude Latitude Pillar A 69° 49' 33.75" 21° 42' 31.17" Pillar B 69° 49' 53.95" 21° 42' 40.05" Pillar C 69° 49' 58.84" 21° 42' 30.66" Pillar D 69° 49' 38.92" 21° 42' 21.36"

Figure 2.3: Site visit Photograph

M/s TATA CHEMICALS LIMITED Page 33 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Figure 2.4: Location of the Project

M/s TATA CHEMICALS LIMITED Page 34 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Figure 2.5: Location map of the project site with pillar coordinates

M/s TATA CHEMICALS LIMITED Page 35 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Figure 2.6: 5 Km Buffer Map of the Study Area

M/s TATA CHEMICALS LIMITED Page 36 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Figure 2.7: 10 Km Buffer Map of the Study Area

M/s TATA CHEMICALS LIMITED Page 37 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Figure 2.8: 15 Km Buffer Map of the Study Area

M/s TATA CHEMICALS LIMITED Page 38 Expansion of Aniali Limestone Mining Project Final EIA/EMP

2.1.3 Need of the Project TCL had put their first Soda Ash Plant at Mithapur in 1939 with 50 TPD capacity and have gradually expanded their capacity and widened their product line over the years to become one of the most important national center for integrated production of basic chemicals in the country. The company has installed a cement plant in 1993 at its Mithapur Complex, mainly to consume the solid waste generated during soda ash manufacturing process. The cement plant has an installed capacity of 2,500 Tonnes per day and it manufactures two varieties of cement under the brand name of Tata Shudh. 1. Ordinary Portland cement (Grade 53) 2. Masonry cement

TCL has existing capacity of 10,91,000 TPA Soda Ash (Gross) in Mithapur chemical plant , which is about 34 % of the country capacity. The company has also established a cement plant with an annual rated capacity of 8,25,000 MTPA Clinker production with a view to utilize the fines(-50 mm) left behind after screening the RoM to obtain sized material for soda ash plant along with the other subgrade limestone obtained as overburden or inter-burden during mining of chemical grade limestone.

TCL now propose to expand the capacity of the soda ash plant to 13,16,000 TPA and the cement plant to 9,00,000 TPA in future.

The annual requirement of Chemical grade limestone for its soda ash plant is around 16.0 Lakhs MT, however to cater the limestone requirement for the soda ash plant, company is importing chemical grade limestone from the Gulf countries in the range of 6.0 to 7 lakhs tones per annum.

The need of the project is to meet the demand of the Soda ash plant and cement plant from the increased capacity of Aniali Limestone Mine to reduce the dependency on the import and generation of the employment at local level.

2.1.4 Salient features of the project The description of the project with its salient features is as following.

Table 2.7 Salient features of Project Sr . Details of project Description No. 1 Mine lease area Total lease area- 21.04 Ha 2 Existing Production 43,000 TPA 3 Proposed production 1,75000 TPA 4 Mine lease period 07.07.1966 - 1986 17.11.2005 - 2025 - 30.03.2030

M/s TATA CHEMICALS LIMITED Page 39 Expansion of Aniali Limestone Mining Project Final EIA/EMP

5 Mine lease extension under Deemed extension up to 31.03.2030 as per MMDR 2015 MMDR 2015 6 Lessee M/s TATA Chemicals Limited 7 Type of land Non Forest - Government waste land 8 Use of Mineral This is a captive mine. The limestone produced from this mine will be transported to Soda Ash and Cement Plant located at Mithapur, Gujarat. 9 Mineral reserve/ resource details (Million tonne) Chemical Grade Cement Grade Limestone Limestone Proved Mineral Reserve (111) 0.231972 0.562400 Probable Mineral Reserve (122) 0.089 0.2186 Total Reserve 0.320972 0.781 Pre-Feasibility mineral 0.004900 0.003600 Resource (221&222) 0.00782 0.0164 Total Resource 0.01272 0.02 Total (Reserve + Resources ) 0.333692 0.80100 10 Project cost 1.0 Crores 11 Market value For Captive use 12 Mineral composition (source – Approved Mine plan):

1. Chemical Grade (CaCO3 + MgCO3 ) % >= 92%, &SiO2 < 4%

2. Marginal Grade (CaCO3 + MgCO3 ) % >= 92%, &SiO2 < 4% to 5%

3. Cement Grade (CaCO3 + MgCO3 ) % >= 92%, , SiO2 > 5%

13 Details of Environmental Settings

Ecological Sensitive Areas  Barda wildlife sanctuary is present at a (National Park, Wild Life distance of 4.205 Km in NW direction and Sanctuary, Biosphere Reserve, 38 meters from ESZ. Reserve/ Protected Forest etc.)  Mokarsagar Bird Sanctuary is located app. within 10 km distance 11.5Km in SW direction from the project site Forests  Naliyadhar Reserve Forest is approx. 0.55

M/s TATA CHEMICALS LIMITED Page 40 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Km in South West direction.  Jambuda Reserve Forest is approx. 2.70km in North direction.  Khageshri Reserve Forest: approx. 7.27 km in East direction. Water bodies  Dhangva river is about 1.46 km in North direction.  Minsar river is about 4.30 Km in East direction.  Bileshwari river is about 4.64 Km in NE direction.  Khambhala reservoir is about 7.36km in NW direction.  Dai River is about 9.44 km NE direction.  Fodara reservoir is about 9.49km in NW direction.  Sorti River is about 11.09 km in NW direction.  Krishnapur Lake is about 12.25 Km in NW direction.  Gulab Sagar Lake is about 14.38 Km in North. Nearest Village Daulatgadh is about 0.77 Km NE direction. Nearest Town Ranavav is present at a distance of about 8.26 km in South West direction. Jam Sakhpur Railway Station is about 4.19 Km Nearest Railway Station in North direction and, Ranavav Railway Station is about 10.48 km in West direction from the project site. NH-8B is about 5.46 km in South direction. Nearest National Highway SH-27 is about 4.65 km in West direction. State Highway Nearest Airport Porbandar Airport is about 18.83 km in SW direction. Seismic Zone As per GSDMA map, Gujarat falls in Zone III, which is a moderate risk zone for earthquake. Other Industries Limestone Mine leases of Tata Chemicals and other leases belongs to different owners.

M/s TATA CHEMICALS LIMITED Page 41 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Water Requirement and Total water requirement is about 29.0 KLD source =7.0 KLD (Drinking & Domestic Uses) + 5.0 KLD (Plantation) + 17 KLD (Dust Suppression). In which, 10 KLD will be sourced from ground water, for which CGWA Permission is already obtained in 2011. The rest 19 KLD water will be sourced from nearby village Aniali by water tanker for which No objection certificate is already obtained. (Source: Approved Mine Plan, dated 26.12.2019)

2.1.5 Size/Magnitude of Operation Aniali Limestone mine lease is present on a government waste land covering an area of 21.04 Ha. It is an existing mine with the production of 43,000 Tons per annum. Proposed rate of production is 1,75000 TPA for Limestone mineral. Details of mineral and waste generation as per approved mine plan provided in Table 2.8.

Table 2.8 Insitu Tentative Excavation Year Pit no. Total Top IB ROM Miner ROM/ tentative Soil (tonne) (Chemical& al Waste Excavatio (tonne) Cement grade) reject Ratio n (tonne) (tonne (tonne) limestone (tonne)- ) 100% 1 2 3 4 5 6 7 8 I 1& 2 1,75,000 -- -- 1,75,000 -- 1:0.0 II 3&4 1,75,000 -- -- 1,75,000 -- 1:0.0 III Virgin 1,75,000 -- -- 1,75,000 -- 1:0.0 land IV 4 1,75,000 -- -- 1,75,000 -- 1:0.0 V 5 1,75,000 -- -- 1,75,000 -- 1:0.0 (Source: Approved Mine Plan, dated 26.12.2019)

2.2 Geology 2.2.1 Topography: - The allotted lease area is 21.04 ha falling under survey no. 207/P in the revenue village Aniali. The area exhibits gently undulating to flat topography. The lease area is irregular polygon in shape and bounded by four boundary pillars. Pillar Coordinates are given in Table 2.6. The length of the area measured East to West is about 640m maximum and width of the area measured North to South is about 342m maximum. The general elevation within the lease area varies from around 58mRl to high of around 76mRL showing relief of about 18 meter. There are five existing pits within the lease area, it covers 4.4160 hectare of the lease area. The depth of pits varying from 1.5m to 5.0m from the surface level.

M/s TATA CHEMICALS LIMITED Page 42 Expansion of Aniali Limestone Mining Project Final EIA/EMP

The list of existing pit due to previous mining inside the lease area is given in Table 2.3. There is no prominent stream or nalla within the lease area.

2.2.2 Regional Geology The regional geology of the area comprises igneous rock and their derivatives, calcareous, argillaceous sedimentary rocks and alluvium/blown sand. The outcrops are very scanty because of alluvium cover. The limestone usually occurs as cap-rock of mounds and knolls. The regional stratigraphic sequence is shown in Table 2.9.

The rock formation belonging to Late Pleistocene to Early Holocene age and designated as Miliolite Formation occupies the Saurashtra coastal plain extending from northwest of Porbandar to near Gopnath Point in Bhavnagar district. This formation overlaps the Pliocene and Miocene rocks and occurs directly over the Deccan Trap Formation of Upper Cretaceous to Paleocene age towards the north and east.

Table 2.9: Regional Stratagraphic Sequence AGE FORMATION ROCK TYPE Recent (Holocene) Alluvium/ Recent Alluvial soil, black-brown soil, Limestone coastal limestone Pleistocene Chaya Formation Calcinidite, Shell Limestone coral reef, Oyster bed etc. Miliolite Formation Pelleoid and fine grained limestone and conglomerate ------Unconformity ------Middle Miocene to lower Dwarka formation Marl, Marly limestone shelly Pliocene limestone, clay Gaj formation Form inifera limestone, marl variegated clays ------Unconformity ------Paleocene to upper Deccan Trap Basalt and its derivatives including cretaceous the intermediate and acidic rock types like, dacites, granophyre etc. (Source: Approved Mine Plan, dated 26.12.2019)

The rocks of the Miliolite Formation along the coast have the appearance of dirty white, friable, ooliticcalcarinite. Further inland but still along the coastal plains, these are somewhat purer, well consolidated, white oolitic limestone. The rocks occur in beds which show a gentle seaward dip of 5°to 14°. The rocks are extensively cross-laminated showing dune type current bedding. Alternating coarse-and fine-grained lamination are common. They occur at various levels, in the coastal plains, along the foothills and high up in their glens. The name "miliolite" has been derived from the Miliolidae, belonging to the common foraminifera present in profusion in the rock. Composition-wise, the rocks are extremely variable ranging from near pure limestone devoid of sand to calcareous sandstone and clays limestone.

M/s TATA CHEMICALS LIMITED Page 43 Expansion of Aniali Limestone Mining Project Final EIA/EMP

The rock formations originated as beach sediments formed in warm and very shallow waters. They were subsequently cemented by calcspar precipitate from seawater saturated with

CaCO3. The warm, shallow, circulating waters were favorable living areas for marine organisms which have left their in shells and fecal pellets.

The occurrence of the Pleistocene beach limestone all over Tertiary coastal plains fringing the Deccan Trap plateau and deep in the interior of the Deccan Trap country at high elevations, tends to lead to the conclusion that during Pleistocene at high elevations, tends to lead to the conclusion that during Pleistocene period the sea level stood much higher that at present. This may be true in respect of the areas of the coastal plain and the foothill regions. But the occurrence of the Miliolite rocks at higher elevation in the interior areas also point to an Aeolian origin indicating that the windblown particles from the fragmented beach sediments might have been deposited in the valleys of the high hills which acted as natural wind barrier and the sea need not have transgressed to such great heights in order to form the thinner layers of the Miliolite rocks at such higher altitudes.

2.2.3 Local geology Geological mapping of the lease area was done with a Total station surveying. Contacts of alluvium and milliolitic Limestone were mapped on a Scale 1:2000. Almost 70% of the lease area has been subjected to mining activity removing the upper part of the limestone formation by shallow pitting. The depth of pits is limited to the extent of chemical, cement & marginal grade limestone after which the downward progress has been ceased.

The mined-out area is now entirely covered by the lower layers of the limestone formation followed downwards by a thin layer of clay resting unconformably over the basement granophyre. The local stratigraphic sequence as could be deciphered from the exploratory drilling data is presented in the Table 2.10.

Table 2.10: Local Stratigraphic Sequence Age Formation Rock Type Dark grey to brownish, thin, impersistent Recent Soil (0.5 m-Max.) layer of topsoil. Coarse to medium grained, light gray to Miliolite Formation- grayish white high-grade limestone with Pleistocene 6m(Max) occasional bands and lenses of impure limestone and calcareous clay. Pliocene to Upper Deccan Trap Granophyre Cretaceous (Source: Approved Mine Plan, dated 26.12.2019)

2.2.4 Description of the rocks units within the lease area Limestone: The limestone shows alternating layers, band and lenses of chemical and inferior grade varieties. The Chemical grade of limestone is the prime requirement of the lessee for its

M/s TATA CHEMICALS LIMITED Page 44 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Soda Ash Plant located at Mithapur (Gujarat), Thus, lessee will extract only chemical grade of the limestone from the lease area. The maximum thickness of the limestone horizon within the lease is around 7.75 meters. This is a coarse medium grained, light grey to grayish white limestone of a generally consistent high carbonate and low silica content, but occasionally it shows development of thin inter- bands and lenses of impure varieties of lime tone intermixed with calcareous clay. It is a porous rock containing minute empty space and is also severely affected by the solution effect of percolating water resulting in innumerable minute cavities and voids as also larger potholes of various shape and size. Based on the quality variations three separate bands have been identified. Classification of Limestone S. No. Type of Limestone Description/Criteria

1 Chemical Grade (CaCO3 + MgCO3 ) % >= 92%, &SiO2 < 4%

2 Marginal Grade (CaCO3 + MgCO3 )% >= 92%, &SiO2 < 4% to 5%

3 Cement Grade (CaCO3 + MgCO3 ) % >= 92%, , SiO2 > 5% (Source: Approved Mine Plan, dated 26.12.2019)

However, their distribution does not follow any regularity and thin lenses of inferior grade occur within the chemical grade hand and vice versa The upper hand is comparatively thin with lensoidal occurrence having a thickness varying from 3 meters to 8 meters in some sections.

Gaj Beds: These are represented by thin layer of brownish clay underlying the limestone and resting over the basement granophyres. This consists of predominantly brown colored clay and calcareous clay.

Trap Rock/Granophyre: Unconformity lying below the limestone is the basement volcanics of the Deccan trap formation. However, trap rock is not exposed during the mining and also has not been encountered in drilling in bore holes drilled.

2.3 General Features 2.3.1 Surface Drainage Pattern The surface runoff water follows the natural slope. There is no prominent nalla present within the lease area.The average depth (m) of the water table based on observations from nearby village dug wells is given below: Table 2.11: Average depth of water table Maximum Water Table(mRL) Minimum Water Table(mRL) 37 mRL 45mRL (Source: Approved Mine Plan, dated 26.12.2019)

The existing maximum and minimum working depth are 2m and 6m from surface respectively. The maximum depth in the present pit is at 58mRL and at conceptual stage, it will go further till 55mRL. Thus, the mining will not intersect with the water table.

M/s TATA CHEMICALS LIMITED Page 45 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Drainage of water may not be much problem in this area as annual rainfall is only about 400 mm to 500 mm. The mine is situated at higher altitude from surrounding level so during rainy season water drain out from nearby areas into nalla. The entire lease boundary will be provided with green barrier by formation of barrier of 1.5m height within the boundary restricted zone of 7.5 m thus there will be no surfaces wash off from mine surface during the monsoon season. The contour map of the study area is given in Figure 2.10.

2.3.2 Vegetation: The area is scanty of vegetation with scattered babul (Prosopis juliflora) and bushes. No other prominent tree species exist. The common tree found in the plain area is Gogad, Bawal, Khair, Rayan, Ber, Limbo, Neem, Awala etc.

2.3.3 Climate: The climate of the area as a whole is dry, generally hot and humid. The maximum and minimum temperature in the area ranges from 42oC to 12oC. The relative humidity ranges 70 to 80% during post monsoon, 40 to 50% during winter whereas during pre-monsoon it ranges 60-70%.

2.3.4 Rainfall: The average rainfall ranging 400 to 500 mm per annum between June to September months.

M/s TATA CHEMICALS LIMITED Page 46 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Figure 2.9 Geological Sections

M/s TATA CHEMICALS LIMITED Page 47 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Figure 2.10- Drainage map of the study area

M/s TATA CHEMICALS LIMITED Page 48 Expansion of Aniali Limestone Mining Project Final EIA/EMP

2.4 Quality of Reserve 2.4.1 Method of estimation of reserve The reserve is calculated based cross-sectional area method. The bulk density of limestone is considered as 2.000 tonnes/cum. Recovery of limestone is 100% of total in-situ rocks.

Table-2.12 Mineral Reserve & Resource as per approved scheme of mining United Nations Frame-work UNFC Quantity in Million Tonnes Classification (UNFC) code Chemical Grade Cement Grade Limestone Limestone Proved Mineral Reserve 111 0.231972 0.562400 Probable Mineral Reserve 121 0 0 122 0.089 0.2186 Pre-Feasibility mineral 221 0.004900 0.003600 Resource 222 0.00782 0.0164 Total Reserves + Resources 0.333692 0.80100 (Source: Approved Mine Plan, dated 26.12.2019)

TCL will also utilize the undersized chemical grade limestone & cement grade limestone for its cement manufacturing unit. Thus it will improve the life of mine in the mineral conservation and nation's interest.

2.5 Method of Mining 2.5.1 Existing method for mining: - The existing method of mining is Open cast mining method. The category of mine is ‘A’ Open Pit Mine. The chemical grade of limestone is found at the shallow depth of maximum 5m, thus the Benches of maximum 4m height and more than 4m of width, ramp gradient of 1 in 16 is maintained. The 110mm dia deep hole drilling & blasting, excavation by diesel operated hydraulic excavator into tipper trucks transportation of mineral from mine site to destination through tipper trucks, Bench slope angles maintained at 800.

2.5.2 Proposed Method of Mining Open cast mining method will be used, drilling and blasting will be done occasionally in case of encounter of hard strata to provide the shattering effect. The deposit is having at a shallow depth with no overburden present on the chemical grade limestone bed, is suitable for open cast mining method. Drilling and blasting is used and proposed to be used for fragmentation. ROM will be loaded by shovel/backhoe into dumpers/HEMM for transporting to the proposed crushing/sizing site outside the lease area. Thus, no material or mineral rejects will be remained inside the lease area. The category of mine is ‘A’ Open Pit Mine (OTFM) by using the shovel-dumper combination for mining operations.

The salient features of proposed method of mining are as follows: 1) Bench height maximum 6.0 meter and bench width more than 6m.

M/s TATA CHEMICALS LIMITED Page 49 Expansion of Aniali Limestone Mining Project Final EIA/EMP

2) Bench slope: 800 3) Ramp gradient: 1 in 16 4) Face length: 50m to 90m 5) Advancement of faces: Perpendicular to strike towards E and W direction. 6) Excavation: The deployment of Rock breaker for fragmentation is proposed with occasionally use of drilling and blasting to give the shattering effect to the hard strata and loading will be done by diesel operated hydraulic excavator. 7) Transportation:By tipper trucks of ROM from mine site to the crusher/private sizing plots (Approved by State Govt.) located within 3km from the lease area.

The sized (+50 to -100mm) limestone will be directly dispatched to Soda Ash Plant at Mithapur. No processing of ROM will be conducted inside the lease area. Water sprinkling is done for dust suppression, and the regular upkeep and maintenance of HEMM for taking care of the environment concern.

8) Drilling and Blasting: Diamond core drilling was done with a view to prove depth continuity of deposit and to ascertain quality and its variation. Vertical boreholes were drilled at 100m* 100 m grid interval keeping nature of deposit in view. Altogether 19 boreholes of NXM size were drilled from 1.75 m to 7.95 m depth with total meterage drilling of 63.75 m. Dry drilling was also adopted in highly fractured, weathered and clayey limestone zones to obtain maximum core recovery. The collar of boreholes varies in between 36m to 56m. TCL has necessary permissions from DGMS for use of drilling and blasting system, enclosed as Annexure VI. Bench dimension will be as per the scheme of mining. Bench slope will be 800 from the horizontal. Width of the benches will not be less than the height. The drilling will be done with the help of 102 mm diameter DTH drill machine in combination with compressor. Blast holes will be drilled in square/rectangular pattern 3m*4m (burden*spacing) for a 3.0- 6.0m bench height. Blasting will be done mainly with ANFO (manufactures at the site by BMD owned by TCL) as column charge and cap sensitive explosive as the base charge. TCL has already obtained necessary permissions for storage and usage of explosives.

Table 2.13: Salient features of proposed method of mining Category of Mine Category A Method of Mining By Open cast method (using drilling and blasting) Targeted Production Proposed Production under expansion is 1,75000 TPA Bench height and width Bench height maximum 6.0 meter and bench width more than 6m. Drilling and blasting Occasional adoption of drilling and blasting to give shattering effect to hard strata (TCL already has necessary permission from the DGMS for use of drilling and blasting system) Pit slope The edge of excavation shall be adequately sloped and secured so as to prevent danger of sliding as per the

M/s TATA CHEMICALS LIMITED Page 50 Expansion of Aniali Limestone Mining Project Final EIA/EMP

regulation 106 of the Metalliferous Mines Regulation, 1961. The face slope will be kept at 800 and overall bench slope will be maintain at 450. Excavation and Loading Hydraulic excavator of 0.9 cum bucket capacity Transportation within mine Tippers/Dumpers Transportation outside Contractual Trucks/ dumpers mine Drilling machine requirement Particulars Dimensions Maximum height of mine bench (m) 6 Hole depth including 10% sub-grade - m 6.6 Burden (m) 3 Spacing (m) 4 Bulk Density of Limestone (tonne/ m3) 2 Yield of Limestone mineral/hole (tonne) 144 Yield of limestone per meter 22 Daily requirement of limestone 583 Meters of drilling required per day 27 Considering 10%-hole clogging and re-drilling 3 Actual Meter of Drilling required per day 29 Average Drill Rate of machine m/Hr 20 No of Hours required for drilling 1 *No. of drill machines required for drilling 29m 0.23 or Say 1 during 6.5 hours work per shift (Source: Approved Mine Plan dated 26.12.2019)

2.5.3 Mining Equipment The mine will be developed and operated using the following machines are given in Table 2.14. Table-2.14: List of Mining Machinery Capacity Units Used in of (in which Electrical/ No. of Opencast/ Type of each capacity non Owned/ Machine undergro Machinery type of is Electrical Hired ry und machine reported (specify) (Specify) ry ) Air Compressor Non- 400 cfm 125 1 Opencast Owned XA 190 electrical Wagon Drill - 110 mm. - 1 " " Owned BVB 25 BackHoe EX - 0.90 M3 125 1 " " Owned 200 Tipper/ Hyva- 17 MT 112 2 " " Hired

M/s TATA CHEMICALS LIMITED Page 51 Expansion of Aniali Limestone Mining Project Final EIA/EMP

2518 Water Tanker 8000 Ltr 80 1 " " Owned Payloader HM 1.53 M3 110 1 " " Owned 2021 Tata Hitachi - EX 70/ Rock- 0.3 M3 65 1 " " Owned Breaker

M/s TATA CHEMICALS LIMITED Page 52 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Figure 2.11: First Year Development Plan &Sections

M/s TATA CHEMICALS LIMITED Page 53 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Figure 2.12: Second Year Development Plan &Sections

M/s TATA CHEMICALS LIMITED Page 54 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Figure 2.13: Third Year Development Plan &Sections

M/s TATA CHEMICALS LIMITED Page 55 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Figure 2.14: Fourth Year Development Plan & Sections

M/s TATA CHEMICALS LIMITED Page 56 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Figure 2.15: Fifth Year Development Plan & Sections

M/s TATA CHEMICALS LIMITED Page 57 Expansion of Aniali Limestone Mining Project Final EIA/EMP

2.5.4 Sorting of Limestone No processing of ROM will be conducted inside the lease area. The ROM will be sent to the proposed automated crushing/screening unit outside the lease area on non-mineralized zone. The sized material (+50 to -100mm) generated will be directly sent to TCL's own Soda Ash Plant at Mithapur. The under sized material will be temporarily stored near to the crushing unit before it is sent to Cement Plant. Route map for transporting mineral from project site to Cement and Soda Ash Plant of M/s TATA Chemicals Limited at Mithapur is shown in Figure 2.16. Water sprinkling is done for dust suppression and the regular upkeep and maintenance of HEMM for taking care of the environment concern.

2.5.5 Proposed Rate of Production The proposed rate of production for three years as per approved mine plan is given below: Table 2.15: Year-wise Production of Limestone Year Total Tentative Excavation ( In Tonne) I 175000 II 175000 III 175000 IV 175000 V 175000 (Source: Approved Mine Plan, dated 26.12.2019)

2.6 Life of mine The life of mine is given in following table:-

Table 2.16: Estimation of Life of mine Total Mineable Reserve (Chemical & cement grade) 1084722 Tonne Proposed production 175000 Tonne/Year Expected Life of Mine 6.2 Year (Source: Approved Mine Plan, dated 26.12.2019)

2.7 Details of Mining Process 2.7.1 Conceptual Mining Plan The Lease area has been fully explored and reserves have been established. The mining scheme has been conceived on the basis that the chemical grade limestone deposit, proved within the lease area would be sized after crushing/screening at registered plot outside the lease area. The ultimate depth of the pit at the end of life of mine is expected to be at 55 mRL. Wire fencing is proposed surrounding the pits for safety purpose. The plantation is proposed in the non-mineralized zone along with green belt in SBZ area. Conceptual Plan is shown as Figure 2.20.

M/s TATA CHEMICALS LIMITED Page 58 Expansion of Aniali Limestone Mining Project Final EIA/EMP

2.7.2 Ultimate Pit Depth Limit: The TCL's prime requirement is to excavate the chemical grade limestone from the lease area for its Soda Ash plant. The inferior grade/ cement grade limestone will be left intact in the lease area. Therefore, the contact zone between chemical grade & cement grade limestone is taken as Ultimate Pit Limit (UPL) and the UPL will be restricted upto 55mRL with max. 6m depth.

2.8 Waste Management The lease area is devoid of overburden. Limestone is exposed on the surface itself. A very thin layer of soil exists at places and this is scrapped separately and used for plantation simultaneously. During the proposal period, it is proposed to excavate the Chemical grade of limestone which is above the cut-off grade of limestone. The inferior grade of the limestone found at the bottom of chemical grade limestone layer will not be mined out by TCL. Thus, no mineral rejects will be generated from excavated material. The undersized mineral will be re-handled to utilize in cement manufacturing at Mithapur for captive use. Thus entire mineral rejects will be consumed and removed from the lease area. The proposed stacks/dumps are temporary in nature and material from dump is continuously being sent to TCL's Cement plant at Mithapur as per the requirement. The height of the dump will be kept less than 12m and for slope stability propose. This will be a dynamic natured stack, which will deplete and replenish with respect to the dispatch to cement plant located at Mithapur. Proposals for Protective measures around the dump / stack: The dump / stack in the lease area near the crushing unit, will have max. height of 12m. A stone wall will be formed around the dump of length of around 225m and 1.5m height. The dump will be also covered by tarpaulin cover for protection from wind erosion. As the dump / stack is temporary and dynamic in nature, thus no plantation is proposed near the dump/stack. The year wise waste generation is tabulated under Table 2.17. Table 2.17 Year Wise Waste Generation (Top Soil, OB/Waste/Mineral reject) Year Top soil (cum) Mineral Rejects (cum) Reuse/Spreading Storage Backfilling Storage* Blending Beneficiation

I Nil Nil Nil 67,870 Nil Nil II Nil Nil Nil 67,870 Nil Nil III Nil Nil Nil 67,870 Nil Nil IV Nil Nil Nil 67,870 Nil Nil V Nil Nil Nil 67,870 Nil Nil Total Nil Nil Nil 3,39,350 Nil Nil *The Mineral Reject. (Undersized of Chemical/Cement Grade) generated from the proposed crushing unit (1500 TPD) will be temporarily stored inside the lease area before using in cement manufacturing. (Source: Approved Mine Plan, dated 26.12.2019)

M/s TATA CHEMICALS LIMITED Page 59 Expansion of Aniali Limestone Mining Project Final EIA/EMP

2.8.1 Overburden/waste Management There will be no overburden or waste removal in course of mining and therefore no land needed to be demarcated for such surface dumps and disposal. The under sized limestone will be stored temporarily, to be supplied to the cement plant at regular interval.

2.9 Beneficiation/ Processing No beneficiation/ processing will be done in the mining lease area, screening/sizing of ROM will be done at plot near mine site from which it will be transported to TCL Soda Ash/ Cement Plant located at Mithapur, Gujarat.

M/s TATA CHEMICALS LIMITED Page 60 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Figure 2.16: Route map for transporting mineral from project site to Cement Plant of M/s TATA Chemicals Limited at Mithapur

M/s TATA CHEMICALS LIMITED Page 61 Expansion of Aniali Limestone Mining Project Final EIA/EMP

2.10 Site Facility The Expansion of Aniali Limestone Mine would be captive source of supply of limestone to the Soda Ash Plant and the Cement plant at Mithapur. Normally in such case, the mine site services are an integral part of the plants. A mine office is already established inside the lease area for providing the site services. As regards to others mine site service requirements, the position is as follows:

2.10.1 Mining Office: An office cum store with maintenance shed is available inside the lease area. A first-aid box with all necessary medical facilities will be made available and maintained at mine office.

2.10.2 Rest Shelter: Rest shelter along with first aid station complying with all the provisions of Mines Rules is constructed in the lease area itself.

2.10.3 Blasting Shelter: A portable blasting shelter will be provided for the mine employees to take shelter during blasting operations. Blasting will be usually carried out during lunch hours.

2.11 Utilities Required: 2.11.1 Power Supply The mining equipment will be operated by DG sets using diesel. Mine will work in day time only. Therefore, no electric power supply is required for mining operations. The use of electricity will be limited to lighting/illumination of the project site at night. The electric supply will be made available by GEB. Electricity/DG power will also be provided at the site office. The crushing & screening operation will require electricity, which for, due permission will be obtained from State Electricity Department. DG sets (500 KVA, 30 l/hr.) shall act as a standby or in case of short supply.

2.11.2 Workshop and Stores Infrastructure for repair and maintenance is already available at TCL’s nearby mines, so no need of additional facilities to be installed.

2.11.3 Fuel Detail: High Speed Diesel (HSD) is used for running of mining equipment and vehicles at the mine site

2.11.4 Water Requirement There is a deep tube well near mine office from which water will be supplied for drinking and domestic purpose as well as for dust suppression measures. Total water requirement is proposed to be 29.0 KLD, which includes 7.0 KLD for drinking & domestic uses, 5.0 KLD for plantation and 17.0 KLD for dust suppression. CGWA permission for ground water withdrawal is obtained for 10 m3/day in the year 2011. Enclosed as Annexure XA.

The rest 19 KLD water will be sourced from nearby village Aniali by water tanker for which No objection certificate is already obtained which is Enclosed as Annexure XB.

M/s TATA CHEMICALS LIMITED Page 62 Expansion of Aniali Limestone Mining Project Final EIA/EMP

The break-up of total water requirement of the mines is given in Table-2.18.

Table-2.18: Water Requirement Activity Water requirement, KLD Dust suppression /allied mining activity 17.0 Plantation 5.0 Drinking & Domestic 7.0 Total 29.0

Ground water (10 KLD) Total purchased water (19 KLD)

Human consumption Dust suppression Greenbelt development (7.0 KLD) (17 KLD) (5.0KLD)

Residual Quantity into Soak pit

Figure 2.17: Water balance diagram

Several water conservation methods will be adopted as follows: 1. Rain water harvesting in mined out pits 2. Truck mounted sprinkler system 3. Development of drip irrigation for watering the plants

2.12 Waste Water generation There will be no waste water generation form mine or mining operations. Small quantity of domestic waster will be generated which will be disposed in septic tanks followed by soak pits.

2.13 Mine Drainage The lime stone deposit in this lease is elevated from the ground hence mining excavation will not go deeper down the ground level, hence will never touch the ground water table. The details of site levels and ground water table are given as below in Figure 2.18. Hence the proposed mining will not intersect the ground water table.

M/s TATA CHEMICALS LIMITED Page 63 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Present working level- 58 mRL

Working at conceptual stage- 55mRL

Ultimate Pit Limit - 55mRL

Ground water Level Post-Monsoon - 45mRL

Ground water level Pre-monsoon - 37 m RL

Figure 2.18: Working level through the life of mine

2.14 Storm Water: The regional drainage show radial pattern and nearest major river Minsar River finally merge into Arabian Sea. Minsar river is approximately present at 5.30 Km away from mine site in South East direction. Draining of water may not be much problem in this area as annual rain fall is only about 400mm to 500 mm. Further it is observed that due to porous nature of the exposed formation the rain water gets percolated quickly by ground seepage. The rain water dries up quickly whenever there is substantial rain fall. During the past years no significant accumulation of water has been observed in the small working pits of earlier quarrying operation of the area. There is no mine out stone is present within the lease area hence the situation of rolling of stone during rainy season does not arise.

2.15 Employment Generation Due to expansion, additional 46 workers will be required to achieve the targeted production. Total manpower requirement for this mine is 153 personnel. The employment of the mine is as below:  General management and mines office.  Time keeping, Personal welfare, Training and mines safety.  Mining operations  Stores, minor repairs and garage. The manpower requirement is given below in Table 2.19

M/s TATA CHEMICALS LIMITED Page 64 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Table 2.19 Manpower Requirement Highly Skilled: 12 Agent (Mines) 1No. Mine Manager (Mines) 1 No. Asstt. Manager (Mines) 1 No. (in shifts) Mining Engineer (B.E.) 1 under Rule 55(1)(c)of MCDR 2017 Geologist 1. under Rule 55(1)(c) of MCDR 2017 Asst. Maintenance Engineer 1 No. Asst. Electrical Engineer 1 No. Asst. Officer 1 No. Medical Officer 1 No. Mines Foreman 2 Nos Mechanical Foreman 1 No. Skilled and Unskilled Manpower:34 7 Nos (2 for excavator and 3 for dumper, 2 for roack Operator breaker) Mechanic 2 Nos. Fitter 3 Nos. Auto Electrician 2 Nos. Electrician 2 Nos. Helpers 4 Nos. H.V. Cum L.V. driver 3 Nos. Pump Attendant 2 Nos. Blaster 1 No. Khalasi 2 Nos. Storekeeper 2 Nos. Steno Typist 1 No. Timekeeper-Cum-register Clerk 1 No. Officer Clerk/ Assistant 1 No. Peon 1 No. (Source: Approved Mine Plan, dated 26.12.2019)

2.16 Land Use Pattern (Present Vs Conceptual) The entire lease area of 21.04 Ha is the part of Govt. waste land. At the end of conceptual plan, the change to the landscape in the form of pit and road, about 14.9342 ha will be changed. As the deposit is an elevated ridge type and also not extended to deep ground level, thus no deep pits will be formed due to mining. The existing vs. at the end of plan period land use pattern is given the following Table 2.20.

M/s TATA CHEMICALS LIMITED Page 65 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Table 2.20: Land Use Pattern (Present Vs Conceptual) Particulars Present position Position at the of the area in Ha end of plan period in Ha 1. Area under mining 4.4160 14.9342 2. Storage for top soil 0 0 3. Waste dump site 0 0 4. Mineral storage 0 0 5. Infrastructure- workshop, administrative 0.6000 0.6000 building etc. 6. Roads 0.7565 0.7595 7. Railways 0 0 8. Tailing Pond 0 0 9. Effluent Treatment Plant 0 0 10. Mineral Separation Plant 0 0 11. Township area 0 0 12. Others (to specify) 0 0 Total 5.7725 16.2907 Remaining area 15.2675 4.7493 Total area 21.04 21.04 (Source: As per Approved Mine Plan, 26.12.2019)

2.17 Break-up of areas in the mining lease Out of total lease area of 21.04 ha., around 17.8778 hectare will be utilized for mining activity at the end of conceptual plan. The pits developed for mining of mineral limestone will change the land of around 14.9342 hectare. The excavation of limestone at the rate of 1,75,000 Tonnes/ Annum during next five years will require additional area of 10.5182 ha to be broken. Table 2.21: Existing vs. at the end of plan period land use pattern S. No. Head Area put on Area put on Area put on use at start of use at the use at the ed Mining Plan end of plan of life of period (Ha) mine (Ha) (ha) 1 Area under mining 4.4160 14.9342 17.8778 2 Storage for top soil 0 0 0 3 Waste dump site 0 0 0 4 Mineral storage 0 0 0 Infrastructure – workshop, 0.6000 0.6000 0 5 administrative building etc. 6 Roads 0.7565 0.7595 0 7 Railways 0 0 0 8 Tailing pond 0 0 0 9 Effluent Treatment Plant 0 0 0

M/s TATA CHEMICALS LIMITED Page 66 Expansion of Aniali Limestone Mining Project Final EIA/EMP

10 Mineral Separation Plant 0 0 0 11 Township area 0 0 0 12 Others (Green Belt) 0 0 0 13 Total 5.7725 16.2907 17.8778 14 Total Remaining area 15.2675 4.7493 3.1622 Grand Total 21.04 21.04 21.04 (Source: Approved Mine Plan, dated 26.12.2019)

M/s TATA CHEMICALS LIMITED Page 67 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Figure 2.19- Land use Map of the Study area

M/s TATA CHEMICALS LIMITED Page 68 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Figure 2.20- Conceptual Plan & Sections

M/s TATA CHEMICALS LIMITED Page 69 Expansion of Aniali Limestone Mining Project Final EIA/EMP

2.18 Reclamation and Rehabilitation The area exhibits undulating to flat topography. The slope of benches will be suitable graded and plantation done over them, to match with the surrounding greenery. The top of the benches shall be properly fenced to prevent fall of cattle/person. Total 33% of the lease area will be developed as green Belt which would be around 6.9432 Ha. Greenbelt will be developed around the lease boundary, haul roads, undisturbed area, reclaimed area, workshop, mine office, etc. At the conceptual plan, green belt of suitable width should be developed all along the mining lease boundary. The row of plants facing mine should be of smaller species, and those facing outside should be of taller species. The post plantation care is proposed to maintain the growth of plantation. Plantation will reduce the land erosion possibility in the surrounding area. Wire fencing will be done around the green belt. Local species like Siris, Neem, Kachnar, Kashid, Shisham, Gulmohar, Karanj, Pipal, Drumstick, Imli, Banyan tree, Bel patra etc. will be planted in consultation with the Forest Department as well as CPCB Guidelines for greenbelt development. Precautionary measures will be taken for plantation by means of fencing and regular watering to protect from grazing animals and nurture. At the end of the mining lease period, as per MOEF&CC Office Memorandum F. No. 22-34/2018-IA-III dated 16 January, 2020, "the mining lease holder shall, after ceasing mining operations, undertake re-grassing the mining area and any other area which may have been disturbed due to their mining activities and restore the land to a condition which is fit for growth of fodder, flora, fauna etc" Table 2.22: Year-wise proposal for Plantation and fencing Year Number of saplings to be Fencing around Plantation planted (m)* I 3000 90 II 3000 90 III 3000 90 IV 3000 90 V 3000 90 *Plant species like Thor (Cactus) etc. will be used for natural fencing.

***************

M/s TATA CHEMICALS LIMITED Page 70 CHAPTER-3

DESCRIPTION OF THE ENVIRONMENT Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

CHAPTER 3-DESCRIPTION OF THE ENVIRONMENT

3.0 General The baseline environment conditions are important factor to study while preparing the EIA Report. We can compare the predicted anticipated environmental impacts due to project and can prepare mitigation plan to manage the harmful effects. The main objective of describing the environment which may be potentially affected, are i) To assess present environmental quality and the environmental impacts and ii) to identify environmentally significant factors that could preclude mine development. Mining activities affect the existing status of environment at site. In order to maintain the existing environmental status at mining site it is an essential study of existing environmental status and assesses the impact of upcoming project on various environmental components. This Chapter gives an idea of description of environment status of the study area and this will be helpful for assessment of impacts on the environment due to proposed mining activities.

Baseline environmental status in and around proposed mining lease area describes the existing conditions of air, noise, water, soil, biological and socio-economic environment. The proposed project as a centre, a radial distance of 10 km is considered as study area for baseline data collection and environmental monitoring. The data was collected by an accredited NABL laboratory for various environmental attributes so as to compute the impacts that are likely to be arise due to proposed development activity.

3.1 Study Area & Study period The baseline environment quality was carried out over a radial distance of 10 km around the mining lease area during winter season covering the months of December 2018-January 2019- February 2019. Laboratory reports are attached as Annexure XIII. The monitoring or sampling photographs are attached as Annexure XIV.

3.1.1 Methodology Base line attributes like Ambient Air, Water, Meteorology, Noise, Soil, Ecology and Biodiversity & Socio Economic condition were collected as per approved Terms of Reference issued by MoEF&CC. Secondary data was also collected from various government departments as well as through consultation with local people. Methodology adopted in this study is as follows.

 By setting up meteorological station near project site.  Collection of ecological data at the mine site.

 Installation of air monitoring dust samplers (for PM10, PM2.5) at 07 locations in the study area for the collection of primary air pollutants.  Carrying out a detailed biological study for the core and buffer Zone.

M/s TATA CHEMICALS LIMITED Page 71 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

 Soil sample were collected from 05 locations in the study area to analyse physical and chemical characteristics of soil quality.  Surface water samples were also collected from the Khambada Reservoir and Minsar nadi (Valotra village). Ground water samples were collected from three locations, Aniali village, Bordi village and Dualtagadh village within study area to analyse the existing water quality in the study area.  Noise measurement has been done in core zone as well as buffer zone to analyse the existing situation in the study area.  Literature review that includes identification of relevant data and articles from various publications, various government agencies and other sources for socio-economic, demography has been done with primary data collection in 10 km of the study area.  Accordingly, field studies were carried out during the study period (December 2018 to February 2019) to establish the existing baseline conditions.

M/s TATA CHEMICALS LIMITED Page 72 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

Figure 3.1: 10 km Buffer Map of the study area

M/s TATA CHEMICALS LIMITED Page 73 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

3.2 Land Environment of the Study area (i) Land use Land-use involves the management and modification of natural environment or wilderness into built environment such as settlements and semi-natural habitats such as arable fields, pastures, and managed woods. It also has been defined as "the total of arrangements, activities, and inputs that people undertake in a certain land cover type.

(ii) Land cover Land cover is the physical material at the surface of the earth. Land covers include grass, asphalt, trees, bare ground, water, etc. Earth cover is the expression used by ecologist Frederick Edward Clements that has its closest modern equivalent being vegetation. The expression continues to be used by the Bureau of Land Management.

Land Environment Since open-cast method has been adopted for this mining project, studies of land use and terrain information is required.. The main objective of land baseline data is to take remedial measures for any change in land use due to proposed mining project. In this section both core and buffer zone areas have been considered for land use study.

3.2.1 Land Use in Core Zone The entire lease area of 21.04 Ha is the part of Govt. waste land. At the end of conceptual plan, the change to the landscape in the form of pit and road, about 14.9342 ha will be changed. As the deposit is an elevated ridge type and also not extended to deep ground level, thus no deep pits will be formed due to mining. The existing vs at the end of plan period land use pattern is given the following Table 3.1.

Table 3.1– Existing Vs At the end of Plan Period Land Use Pattern Particulars Present position Position at the ofthe area inHa end of plan period in Ha 1. Area under mining 4.4160 14.9342

2. Storage for top soil 0 0

3. Waste dump site 0 0

4. Mineral storage 0 0

5. Infrastructure- workshop, administrative 0.6000 0.6000 building etc.

6. Roads 0.7565 0.7595

7. Railways 0 0

M/s TATA CHEMICALS LIMITED Page 74 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

8. Tailing Pond 0 0

9. Effluent Treatment Plant 0 0

10. Mineral Separation Plant 0 0

11. Township area 0 0

12. Others (to specify) 0 0

Total 5.7725 16.2907

Remaining area 15.2675 4.7493

Total area 21.04 21.04

(Source: As per Approved Mine Plan, 26.12.2019)

3.2.2 Land Use in Buffer Zone Land use of study area has been prepared from latest satellite imagery. Specialised land use data has been prepared by using GIS software. Different components are provided in this section. Land use and land cover has been analysed for Expansion of Aniali Limestone Mining Project for the agricultural land, settlement, forest, open scrub, waste land and water body etc.

To assess the land use pattern, a detailed study was carried out. Land use pattern study reveals that the 10 km radius area is predominantly an agricultural land. Details are given in Table 3.2and Fig. 3.2 along with the false colour composite map in Fig. 3.3.

Table 3.2 Land use Details SI. No Description Area (ha) Area% 1 Agricultural land 18231.16 58.06 2 Forest 3925.92 12.50 3 Open Scrub 2801.48 8.92 4 Settlement 634.22 2.02 5 Waste/other land 5096.91 16.23 6 Water-body/River/Canal 710.85 2.26 Total 31400.54 100

M/s TATA CHEMICALS LIMITED Page 75 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

Figure 3.2: Land use map of the study area

M/s TATA CHEMICALS LIMITED Page 76 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

Figure 3.3: False colour composite map of the study area

M/s TATA CHEMICALS LIMITED Page 77 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

3.2.3 Seismicity of the area The Bureau of Indian Standards publishes seismicity map and codes in India. Aniali Limestone mine is present in a govt. waste land near Porbandar coastal area and falls under seismic zone III. India has been divided into four seismic zones from zone II to zone V where zone II is lease vulnerable and zone V is most variable. In Gujarat, zone III has been classified as moderate risk of earth quake by Gujarat Disaster Management Authority. Seismic zone showing the study area in the figure below:

Figure 3.4: Seismic Zone Map of Study Area

3.2.4 Major environmental features in Study Area Barda wildlife sanctuary is present at a distance of 4.205 Km in NW direction and 38 meters from ESZ. Naliyadhar Reserve Forest is approx. 0.55 Km in South West direction. Jambuda Reserve Forest is approx. 2.70km in North direction. Khageshri Reserve Forest is approx. 7.27 km in East direction. The main environmental features are surface water bodies which includes Bileshwari river, Minsar river, Khambhala reservoir, Fodara reservoir, Dai river, Dhangva Nadi. There is no tiger and elephant corridors present in the study area.

M/s TATA CHEMICALS LIMITED Page 78 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

3.3 Water Environment Water quality assessment is one of the essential components of EIA study. Such assessment helps in evaluating the existing health of water body and suggesting appropriate mitigation measures to minimize the potential impact from mining project. Water quality of ground water has been studied in order to assess proposed water-uses in construction, drinking, cooling and horticulture purpose.

The water quality at the site and other locations within the 10 km impact zone was monitored during months of December 2018-Febraury 2019.

3.3.1 Sampling frequency

Parameters for analysis of water quality were selected based on the utility of the particular source of water as per CPCB guidelines. Surface water quality was monitored for parameters as per Methods of Monitoring & Analysis published by CPCB and it was rated according to the CPCB Water Quality Criteria against A, B, C, D & E class of water. Water samples were collected from sampling location for complete physico-chemical and bacteriological tests respectively. The samples were analyzed as per standard procedure / method given in IS: 10500.

The surface water quality is compared with CPCB water quality criteria mentioned in Table 3.3 below:

Table 3.3 Water Quality Criteria as per Central Pollution Control Board Designated-Best- Class of Criteria Use water Drinking Total Coliforms Organism MPN/100ml shall be Water Source without 50 or less A conventional pH between 6.5 and 8.5 treatment but after Dissolved Oxygen 6mg/l or more Biochemical disinfection Oxygen Demand 5 days 20°C 2mg/l or less Outdoor bathing Total Coliforms Organism MPN/100ml shall be (Organized) 500 or less; B pH between 6.5 and 8.5; Dissolved Oxygen 5mg/l or more Biochemical Oxygen Demand 5 days 20°C 3mg/l or less Drinking water source Total Coliforms Organism MPN/100ml shall be after conventional 5000 or less; C treatment and pH between 6 to 9; disinfection Dissolved Oxygen 4mg/l or more Biochemical Oxygen Demand 5 days 20°C 3mg/l or less Propagation of Wild D pH between 6.5 to 8.5 life and Fisheries Dissolved Oxygen 4mg/l or more Free

M/s TATA CHEMICALS LIMITED Page 79 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

Ammonia (as N) 1.2 mg/l or less Irrigation, Industrial pH between 6.0 to 8.5 Cooling, Controlled Electrical Conductivity at 25°C micro mhos/cm E Waste disposal Max.2250 Sodium absorption Ratio Max. 26 Boron Max. 2mg/l Below-E Not Meeting A, B, C, D & E Criteria

As per the standard practice, one sample from each station was taken each month in the study period. Sampling was done by standard sampling technique as per the Standard Methods. Necessary precautions were taken for preservation of samples.

3.3.2 Ground water Samples were collected & tested from different sites. The quality of ground water was studied by collecting 03 water samples from representative open dug wells and tube wells. Water sampling stations are shown in Table 3.4 and Figure no. 3.5. Table 3.4: Ground water sampling location

Station Monitoring Distance Direction Longitude Latitude Code Location from Mine from mine lease (km) lease GW1 Aniali 2.44 SE 69° 51' 2.900"E 21° 41' 38.502"N Village GW2 Bordi 2.41 N 69° 49' 5.697"E 21° 43' 45.344" N Village GW3 Daulatgarh 1.50 NE 69° 50' 44.877" 21° 42' 53.876"N Village E

M/s TATA CHEMICALS LIMITED Page 80 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

Figure 3.5: Ground water location map

M/s TATA CHEMICALS LIMITED Page 81 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

Table 3.5 Ground Water Monitoring Results S. Parameters Units Limits (as per Test Method December-18 No. IS:10500-2012) Desira Permiss Aniali Bordi Daulatgarh ble ible Village Village Village Limit Limit GW1 GW2 GW3 1 Color Hazen 5 15 IS : 3025 (Pt-4) <5 <5 <5 1983, RA 2017 2 Odour - Agreea Agreeab IS : 3025 (Pt-5) Agreea Agreeab Agreeable ble le 1983, RA 2017 ble le 3 Taste - Agreea Agreeab IS : 3025 (Pt-8)- Agreea Agreeab Agreeable ble le 1984, RA 2017 ble le 4 Turbidity NTU 1 5 IS: 3025 (Pt- <1.0 <1.0 <1.0 10)-1984,RA 2017 5 pH Value - 6.5-8.5 No IS : 3025 (Pt- 7.2 7.6 7.3 Relaxati 11)1983, RA on 2017 6 Total mg/l 200 600 IS : 3025 (Pt- 197 167 156 Hardness (as 21)1983, RA

CaCO3) 2014 7 Calcium mg/l 75 200 IS : 3025 (Pt- 58 41 47 (as Ca2+) 40)1991, RA 2014 8 Magnesium mg/l 30 100 IS 3025 (Pt-21) 9.1 6.2 7.7 (as Mg2+) 9 *Iron (as mg/l 0.3 No 3111B (AAS), 0.13 0.11 0.14 Fe) Relaxati APHA 23nd Ed. on 2017 10 Chlorides mg/l 250 1000 IS : 3025 (Pt- 48 46 51 (as Cl) 32)1988, RA 2014 11 Fluoride (as mg/l 1 1.5 4500F(D), ˂0.2 ˂0.2 ˂0.2 F) APHA 23nd Ed. 2017 12 Total mg/l 500 2000 IS: 3025(Pt- 296 276 259 Dissolved 16)1984, RA Solids 2017 (TDS) 13 *Copper (as mg/l 0.05 1.5 3111B (AAS), <0.05 <0.05 <0.05 Cu) APHA 23nd Ed. 2017 14 *Manganese mg/l 0.1 0.3 3111B (AAS), <0.1 <0.1 <0.1

M/s TATA CHEMICALS LIMITED Page 82 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

(as Mn) APHA 23nd Ed. 2017 15 Sulphate mg/l 200 400 IS : 3025(Pt- 3.8 2.9 3.1

(as SO4) 24)1986, RA 2014 16 Nitrate(as mg/l 45 No IS : 3025(Pt- 0.7 0.9 1.3

NO3) Relaxati 34)1988, RA on 2014 17 *Cadmium mg/l 0.003 No 3111B (AAS), <0.01 <0.01 <0.01 (as Cd) Relaxati APHA 23nd Ed. on 2017 18 Lead (as Pb) mg/l 0.01 No 3111B (AAS), <0.01 <0.01 <0.01 Relaxati APHA 23nd Ed. on 2017 19 Zinc (as Zn) mg/l 5 15 3111B (AAS), <0.5 <0.5 <0.5 APHA 23nd Ed. 2017 20 *Chromium mg/l 0.05 No IS : 3025(Pt- <0.05 <0.05 <0.05 (as Cr6+) Relaxati 52)-2003 RA on 2014 21 Alkalinity mg/l 200 600 IS: 3025(Pt- 141 167 154

(as CaCO3) 23)1986, RA 2014 22 Aluminum mg/l 0.03 0.2 3111B (AAS), <0.03 <0.03 <0.03 (as Al) APHA 23nd Ed. 2017 23 Boron (as mg/l 0.5 1 3111B (AAS), <0.1 <0.1 <0.1 B) APHA 23nd Ed. 2017 24 Special µm/cm - - IS : 3025(Pt-14) 458 487 369 Electrical Conductivit y 25 Total mg/l - - 4500-PD, <0.2 <0.2 <0.2 Phosphorus APHA 23rd Ed. (as P) 26 Phenolic mg/l 0.001 0.002 IS : 3025(Pt- <0.001 <0.001 <0.001 Compounds 43)1992, RA 2014 27 Mercury mg/l 0.001 No 3114 (AAS), <0.001 <0.001 <0.001 Relaxati APHA 23nd Ed. on 2017 28 Selenium mg/l 0.01 No 3114 (AAS), <0.01 <0.01 <0.01

M/s TATA CHEMICALS LIMITED Page 83 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

(as Se ) Relaxati APHA 23nd Ed. on 2017 29 Arsenic (as mg/l 0.01 0.05 3114 (AAS), <0.01 <0.01 <0.01 As) APHA 23nd Ed. 2017 30 Cyanide mg/l 0.05 No IS : 3025(Pt- <0.01 <0.01 <0.01 Relaxati 27)1986, RA on 2014 31 Anionic mg/l 0.2 1 IS : 13428, <0.01 <0.01 <0.01 Detergents 2005, RA 2014 32 Mineral Oil mg/l 0.5 No IS : 7299, 2017 <0.1 <0.1 <0.1 Relaxati on

3.3.2.1 Ground water quality results and conclusion Interpretation Ground Water: The physico-chemical characteristics of ground water in the study area are presented in the Tables 3.5 and is compared with the standards (IS 10500: 2012 Indian Standards/Specifications for Drinking Water) reference values.

 Colour: The colour of ground water samples was found <5 hazen unit and meets the acceptable limit for drinking water standard.  Odour: The odour of ground water samples was found agreeable and meets the acceptable limit for drinking water standard.  pH: The pH value of ground water samples was found 7.2 to 7.6 and meets the drinking water acceptable standard.  Turbidity: The Turbidity of ground water samples was found between BDL to < 1 NTU and meets the permissible limit for drinking water standard.  Total Dissolved Solids (TDS): TDS in ground water samples was found 259 to 296 mg/l and meets the acceptable limit of 500 mg/l in some samples.  Total Hardness: Total hardness value of ground water samples was found 156 to 197 mg/l. Hardness value meets the acceptable limit of 200 mg/l in some samples.  Iron: The iron content in ground water samples was found BDL 0.11 mg/l to 0.14 mg/l.  Chloride: Chloride content of ground water samples was found 46 to 51 mg/l and meets the acceptable limit of 250 mg/l.  Calcium: Calcium content in ground water samples was found 41 to 58 mg/l and meets the acceptable limit of 75 mg/l in water samples.  Magnesium: Magnesium content in ground water samples was found 6.2 to 9.1 mg/l and meets the acceptable limit of 30 mg/l in water samples

M/s TATA CHEMICALS LIMITED Page 84 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

 Sulphate: Sulphate content in ground water samples was found 2.9 to 3.8 mg/l and meets the acceptable limit of 200 mg/l for potable water.  Nitrate: Nitrate content in ground waters samples was found 0.7 to 1.3 mg/l and meets the acceptable limit of 45 mg/l for potable water.  Fluoride: Fluoride content of water samples was found <0.2 mg/l.  Zinc: Zinc content of ground water sample was found <5 mg/l. Conclusions: The results of ground water were compared to Indian Standard Specification of drinking water IS: 10500:2012 and found fit for drinking purpose.

3.3.3 Surface Water Sampling of surface water was conducted as per Indian Standards. Surface water quality has been analyzed from the Khambada Reservoir and Minsar Nadi (Valotra village) Surface water analysis results are tabulated below.

Table 3.6: Surface water sampling location Station Monitoring Location Distance Direction Longitude Latitude Code from from Mine mine lease lease (km) SW1 Khambada Reservoir 7.47 NW 69° 45' 50.098" E 21° 44' 33.746" N SW2 Minsar Nadi (Valotra 5.57 SE 69° 53' 3.393"E 21° 41' 37.227" Village) N

M/s TATA CHEMICALS LIMITED Page 85 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

Figure 3.6: Surface Water Location Map

M/s TATA CHEMICALS LIMITED Page 86 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

Table 3.7: Surface water result S. No. Parameter Units Limits as Test Method Khambada Minsar Nadi per Reservoir (Valotra Village) IS:2296/Clas SW1 SW2 s C 1 Colour Haze 5 IS:3025 (Pt 4) <5 <5 n 1983, RA 2017 2. Odour - Agreeable IS : 3025 (Pt-5) Agreeable Agreeable 1983, RA 2017 3. Temperature 0C IS 3025 (Pt-9) 21 24 4 Turbidity NTU 5 IS: 3025(Pt-10) 3 1 1984, RA 2017 5 pH Value - 6.9 – 9.0 IS : 3025 (Pt-11) 7.72 7.4 1983, RA 2017 6 Conductivity µmoh - IS : 3025 (Pt-14) 446 487 s/cm 1984, RA 2013 7 Alkalinity mg/l 200 IS : 3025 (Pt-23) 179 142 (as CaCO3) 1986, RA 2014 8 Total mg/l 300 IS : 3025 (Pt-21) 191 136 Hardness 1983, RA 2014 (as CaCO3) 9 Calcium (as mg/l 75 IS : 3025 (Pt-40) 58 67 Ca2+) 1991, RA 2014 10 Magnesium mg/l 30 IS : 3025 (Pt-21) 5.9 5.1 (as Mg2+) 11 Chlorides (as mg/l 600 IS : 3025 (Pt-32) 98 81 Cl) 1988, RA 2014 12 Fluoride (as mg/l 1.5 4500F(D), APHA ˂0.2 ˂0.2 F) 23nd Ed. 2017 13 Dissolved mg/l - IS : 3025 (Pt-38) 6.9 6.6 Oxygen as 1989, RA 2014 O2 14 Nitrate as mg/l 50 IS : 3025 (Pt-34) 3.9 3.3 NO3 1988, RA 2003 15 Biological mg/l 30 IS : 3025 (Pt-44) 8.1 8.9 Oxygen 1993, RA 2009 Demand (BOD) 16 Chemical mg/l - IS : 3025 (Pt-58) 26 30 Oxygen 2006 Demand (COD) 17 Lead (Pb) mg/l 0.1 3110, APHA 23rd ˂0.01 ˂0.01 Ed. 2017 AAS 18 Cadmium mg/l 0.01 3110, APHA 23rd ˂0.01 ˂0.01 (Cd) Ed. 2017 AAS 19 Copper (Cu) mg/l 1.5 3110, APHA 23rd ˂0.05 ˂0.05 Ed. 2017 AAS 20 Zinc (Zn) mg/l 1.5 3110, APHA 23rd ˂0.5 ˂0.5 Ed. 2017 AAS 21 Iron (Fe) mg/l 1 3110, APHA 23rd 0.17 0.12 Ed. 2017 AAS 22 Total mg/l - IS: 3025(Pt-17) 37 31 Suspended 1984, RA 2012 Solids (TSS) 23 Total mg/l 1500 IS: 3025(Pt-16) 141 176 Dissolved 1984, RA 2017 Solids (TDS)

M/s TATA CHEMICALS LIMITED Page 87 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

24 Sodium (as mg/l -- IS: 3025(Pt-45) 6.3 7.4 Na) 1993, RA 2014 25 Potassium mg/l -- IS: 3025(Pt-45) 8.3 6.1 (as K) 1993, RA 2014 26 Sulphate (as mg/l 400 IS: 3025(Pt-24) 6.7 5.2 SO4) 1986, RA 2014 27 Phosphorus mg/l -- 4500 P(D), APHA <0.2 <0.2 as P 23nd Ed.

3.3.3.1 Surface water results and conclusion Interpretation Results for Khambada Reservoir : pH 7.72, electrical conductivity 446 µS/cm, total alkalinity 179 mg/l, total hardness 191 mg/l, Chloride 98 mg/l, Dissolved oxygen 6.9 mg/l, total dissolved solids were found 141 mg/l.

Results of Minsar nadi: pH 7.4, electrical conductivity 487 µS/cm, total alkalinity 142 mg/l, total hardness 136 mg/l, Chloride 81 mg/l, Dissolved oxygen 6.6 mg/l, total dissolved solids were found 176 mg/l.

3.4 Air Environment Assessment of impact on air environment due to the proposed developmental project for preparation of Environment Management Plan (EMP) requires information on existing ambient air quality status in and around the project site. They include reconnaissance study, identification of the air pollutants and measuring their existing level in ambient air with in the study area prior to implementation of the project. The data required to access the status is collected analysed and evaluated through a designed air quality monitoring network. The study area was defined as area within 10 Km distance from the project site.

Air quality monitoring network was formulated based on the following parameters

 Population and sensitive area  Topography of the study area  Representation of regional background  Representation of valid cross sectional distribution in downwind direction. Ambient air quality monitoring was carried out in the winter season (December 2018 to February 2019) and site specific data was collected.

Secondary Metrological data has been purchased from Denvilabs Technologies, New Delhi, for the same period in order to complete the air modelling exercise and wind direction.

3.4.1 Site specific meteorological data Site specific meteorological data was collected by installing automated weather station near Expansion of Aniali Limestone mine project site. The result has been obtained for

M/s TATA CHEMICALS LIMITED Page 88 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

temperature, rainfall, wind speed, humidity and wind direction. It has been summarised in the following table:

Table-3.8 Site specific meteorological data ( December 2018 to February 2019)

Hour Temperature Rainfall Wind speed Wind Relative Direction Humidity % Degree Celsius (mm) Meter/Second Degree 100 20.9 0 2 350 42

200 20.2 0 2.1 24 44

300 19.8 0 2.3 20 45

400 18.7 0 2 24 45

500 18.5 0 1.8 23 45

600 17.8 0 1.8 18 46

700 17.6 0 2.1 40 48

800 17.9 0.16 2.2 30 47

900 23.1 0 2.4 40 38

1000 22.2 0 3.8 20 27

1100 24.1 0 5.2 145 25

1200 26.2 0 4 220 25

1300 28.1 0 3.6 255 25

1400 29.7 0 3.6 310 25

1500 30.2 0 5.5 340 25

1600 29.1 0 5.8 335 26

1700 28.4 0 6.2 330 26

1800 27.8 0.33 5 305 34

1900 26.3 0 3.8 308 37

2000 24.2 0 2 280 38

2100 23.7 0 1.6 290 39

2200 22.8 0 1.4 295 40

2300 21.6 0 0.5 340 41

M/s TATA CHEMICALS LIMITED Page 89 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

2400 20.8 0 2.2 345 41

Average – Total – Average – Average – 23.32oC 0.49mm 3.0375 m/s 36.41 %

3.4.2 Secondary Data Collected from IMD Table Secondary data was also collected from nearest IMD station and climatological table 1961- 1990. Significant parameters are summarized in Table 3.9

Table-3.9 Climatological Data Station: IMD, Porbandar (1961-1990) Month Temperature Relative humidity (%) Rainfall (mm) Cloud oktas (°C) Max Min 8:30 Hrs 17:30 Hr Monthly Total 8:30Hr 17:30Hr January 28.8 13.9 60 42 0.9 1.0 0.9 February 30.0 15.4 65 46 1.7 1.0 0.7 March 32.4 19.0 70 51 2.3 1.3 0.9 April 33.2 22.3 77 60 0.2 1.7 1.1 May 33.0 25.8 78 70 1.7 2.1 1.5 June 32.6 27.6 80 75 140.7 4.0 4.1 July 31.0 26.7 83 79 222.4 6.0 5.8 August 30.0 25.7 85 80 140.4 6.1 5.7 September 31.0 24.7 82 73 63.6 3.7 3.4 October 34.2 22.2 74 55 20.3 1.3 1.5 November 33.4 19.1 60 47 15.8 1.1 1.3 December 30.4 15.7 57 43 1.5 1.0 1.1

3.4.3 Wind Pattern Wind plays a significant role in pollutant dispersion. Wind speed and wind direction of the can be represented simultaneously with the help of a special diagram called Windrose. The wind rose is a very useful way of summarizing meteorological data. It is particularly useful for showing how wind speed and wind direction conditions vary over a certain period of time. Wind rose for the current project has been shown in Figure 3.7(a).

Wind directions (Blowing From) have been divided into 12 sectors at an interval of 30 degree. Different wind speeds (m/s) are represented according to the colour scale in the bottom of the figure. Grey circles represent percentage frequency counts of different wind sectors. From the wind rose it can be clearly observed that north-east is the predominant wind direction as shown in Figure 3.7(b).Statistics shows that average wind speed of the study period (1 Dec 2018 to 29 Feb 2019) was 3.75 m/s and frequency count of calm wind was 4.8 %. In order to find out the detailed fractional contribution of different wind speeds in each direction (i.e. 12 Sectors) a separate normalized Windrose has been plotted, as shown in Figure 3.7(a).

M/s TATA CHEMICALS LIMITED Page 90 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

Normalization is done in such a way that cumulative sum of different wind classes of any particular wind sector is always 1. Normalized Windrose shows that higher wind speed classes are associated with NE and SE directions however we have seen in Figure 3.7(a) that percentage frequency count of SE direction is very low as compared to NE direction hence wind blowing from NE will be most dominant.

M/s TATA CHEMICALS LIMITED Page 91 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

Figure 3.7(a): Normalized Wind Rose showing fractional contribution of different wind speed in different sectors.

M/s TATA CHEMICALS LIMITED Page 92 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

Figure 3.7 (b): Wind Rose showing pre dominant wind direction North East to South West for December 2018- February 2019

M/s TATA CHEMICALS LIMITED Page 93 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

3.4.4 Temperature: Temperature is one the most important parameter in meteorology as it play a significant role in atmospheric stability. Daily averaged temperature of the project location during winter season has been shown in Figure 3.8(a). From figure it can be observed that daily average temperature varies from 289 to 298 kelvin. As mining operation will be done in day time, so it becomes very important to study the diurnal pattern of temperature. Considering this fact detailed statistical analysis of diurnal variation in temperature has done and results are presented in the form of box-whisker plot in Figure 3.8(b). Mean values at different hours are represented by black lines in the red boxes. Bottom of the red box represents 25 percentile and the top is 75 percentile. Whiskers shows 95 % confidence interval. From figure it is clear that temperature during day hour are than night hours. Higher temperature during day time are favourable for dispersion and hence it will be good to carry out air modelling.

Figure 3.8 (a) Showing Daily Average Temperature (December 2018-February 2019)

Figure 3.8(b) Showing Diurnal Variation in Temperature (December 2018-February 2019)

M/s TATA CHEMICALS LIMITED Page 94 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

3.4.5 Relative Humidity Humidity is defined as the moisture contained in the atmosphere. Humidity was measured on hourly basis and it can be observed that the value ranges from 25 %to 48 %. It is also observed that the value of humidity between 10 am to 5 pm ranges between 24 to 27 per cent. The graph of humidity increases as we approach towards the late evening and onward night, wherein the variation records the low value as 34 per cent and highest value is recorded as 48 per cent.

Figure 3.9 (a) Showing Daily/ Average Relative Humidity (December 2018-February 2019)

Figure 3.9 (b) Showing Diurnal Variation in Relative Humidity (December 2018- February 2019)

M/s TATA CHEMICALS LIMITED Page 95 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

3.4.6 Ambient Air Quality The study area represents rural environment and occurrence of established industries like Saurashtra Cement and several lease of limestone. The prime objective of the baseline air quality study was to assess the ambient air quality of the mining lease area.

3.4.6.1 Selection Criteria for Monitoring Location Ambient air quality monitoring stations for Expansion of Aniali Limestone Mining Project was selected on the basis of nearest anticipated receptors with reference to the predominant wind direction. As per ToR condition, one sample location was selected within 500 meter of mine lease in the predominant downwind direction. One location was selected in upwind direction and one station on downwind direction. Four locations record the air data at crosswind directions.

Monitoring has been carried out by using calibrated instruments for five ambient air quality parameters PM10,PM2.5, NO2, CO and SO2. Instrument was operated 3 meter above ground surface to ignore any fugitive temporary emissions. Monitoring has been carried out as per standard operating procedure.

Respirable dust sampler (make Envirotech) was used for particulate matter sampling by using fibre filter of Whatman. Sulphur dioxide was sampled by scrubbing in Tetrachloromerchurate solution (IS 5182 (Part 2)). Nitrogen oxides were measured by bubbling oxides of nitrogen in sodium hydroxide and sodium arsenate mixture (IS 5182 (Part 6)). Locations marked on high imagery satellite are presented in Figure 3.10.

The winter season (December 2018 –February 2019) was selected for ambient air quality study. The baseline values of the air pollutants of concern statistical parameters like minimum, maximum, average and 98th percentiles for all 07 locations have been computed from the observed field data are also given in Table-3.11.These are compared with the standards prescribed by Central Pollution Control Board (CPCB) for industrial, residential and rural zone. One monitoring location is situated in the upwind direction, one in the downwind direction.

Table-3.10 Location of Ambient Air Quality Monitoring Stations Station Monitoring Distance Direction Reason for site Longitude Latitude Code Locations from from selection mine mine (Predominant NE to lease lease SW) (Km) AAQ1 Near Mine 0.49 SW Within 500 m in the 69° 49' 21° 42' Site predominant 35.910" E 4.464"N downwind direction AAQ2 Daulatgarh 1.52 NE Upwind direction 69° 50' 21° 42' village 44.877" E 53.876" N AAQ3 Bhod 4.33 SW Downwind direction 69° 47' 21° 40' village 59.116" E 36.183" N AAQ4 Aniali 2.44 SE Crosswind direction 69° 51' 21° 41' village 2.900" E 38.502" N

M/s TATA CHEMICALS LIMITED Page 96 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

AAQ5 Bordi 2.41 N Crosswind direction 69° 49' 21° 43' village 5.697" E 45.344" N AAQ6 Vadwala 5.67 S Crosswind Direction. 69° 50' 21° 39' village 14.401" E 20.307" N AAQ7 Valotra 5.57 SE Crosswind Direction. 69° 53' 21° 41' village 3.393" E 37.227" N

M/s TATA CHEMICALS LIMITED Page 97 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

Figure 3.10: Air Monitoring Location Map

M/s TATA CHEMICALS LIMITED Page 98 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

Table-3.11 Ambient Air Quality Results (At AAQ1, Near Mine Site)

PM2.5,µg/m3 PM10,µg/m3 SO2 µg/m3 , NO2 ,µg/m3 CO, µg/m3 Date GEL/LAB/SOP/AIR IS:5182:Pt- IS:5182:Pt-23 IS:5182:Pt-2 IS:5182:Pt-6 /03 10 03.12.2018 39.8 88.3 11.9 20.6 835 06.12.2018 40.8 87.6 11.8 21.7 824 10.12.2018 41.3 88.2 12.7 20.9 839 13.12.2018 40.5 87.3 12.1 21.3 824 17.12.2018 42.7 89.1 12.5 20.8 832 20.12.2018 43.9 89.7 13.7 22.7 878 24.12.2018 42 87.8 13.1 22.2 807 27.12.2018 43.8 90.5 13.9 22.9 813 01.01.2019 42.6 90.1 12.8 21.7 825 04.01.2019 41.8 89.7 11.6 21.1 845 08.01.2019 42.3 90.3 12.7 22.0 832 11.01.2019 39.7 87.8 12.4 21.2 817 15.01.2019 43.2 91.3 13.8 22.3 845 18.01.2019 42.8 88.4 12.6 21.6 829 22.01.2019 42.5 89.6 12.1 20.9 833 25.01.2019 41.8 90.8 11.9 20.3 835 01.02.2019 42.6 90.1 12.4 20.8 846 05.02.2019 42.7 89.2 12.1 21.5 877 08.02.2019 41.2 88.7 11.8 22.1 838 12.02.2019 41.7 89.3 11.9 21.8 832 15.02.2019 42 90.4 12.3 22.3 847 19.02.2019 43.7 91.8 12.9 22.8 868 22.02.2019 42.5 90.6 12.5 21.8 857 26.02.2019 41.6 89.7 11.8 21.6 851 Min 39.7 87.3 11.6 20.3 807.0 Max 43.9 91.8 13.9 22.9 878.0 Average 41.8 89.6 12.8 21.6 842.5 98th %le 43.9 91.6 13.9 22.9 877.5 Location AAQ2, Dualatgadh village

PM2.5,µg/m3 PM10,µg/m3 SO2 µg/m3 , NO2 ,µg/m3 CO, µg/m3 Date GEL/LAB/SOP/AIR IS:5182:Pt- IS:5182:Pt-23 IS:5182:Pt-2 IS:5182:Pt-6 /03 10 04.12.2018 33.2 71.2 10.2 14.8 710 07.12.2018 34.5 72.3 10.4 15.4 675 11.12.2018 32.9 72.9 10.1 16.5 685

M/s TATA CHEMICALS LIMITED Page 99 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

14.12.2018 32.7 71.1 9.9 15.3 705 18.12.2018 36.9 74.2 10.8 16.2 678 21.12.2018 37.8 77.9 11.5 13.5 755 25.12.2018 32.6 76.8 11.2 14.9 730 28.12.2018 35.2 77.1 11.7 15.4 718 02.01.2019 34.7 78.2 12.6 14.9 671 05.01.2019 33.6 76.2 10.7 14.6 665 09.01.2019 34.2 75.8 10.1 13.8 695 12.01.2019 34.8 75.1 9.9 14.4 655 16.01.2019 33.2 74.6 10.7 15.1 645 19.01.2019 35.5 76.2 10.5 14.9 678 23.01.2019 35.9 73.1 11.3 16.7 644 26.01.2019 37.1 74.2 11.1 15.9 640 02.02.2019 34.8 73.1 10.8 13.9 676 06.02.2019 37.4 77 10.3 14.3 646 09.02.2019 36.8 76.1 11.7 13.8 678 13.02.2019 36.1 75.9 11.4 14.3 645 16.02.2019 36.9 75.8 12.2 15.2 678 20.02.2019 37.1 74.2 11.9 14.9 656 26.02.2019 37.3 74.8 11.6 16.9 675 27.02.2019 35.1 76.3 10.8 16.1 731 Min 32.6 71.1 9.9 13.5 640.0 Max 37.8 78.2 12.6 16.9 755.0 Average 35.2 74.7 11.3 15.2 697.5 98th %le 37.6 78.1 12.4 16.8 744.0 Location AAQ3 Bhod village

PM2.5,µg/m3 PM10,µg/m3 SO2 µg/m3 , NO2 ,µg/m3 CO, µg/m3 Date GEL/LAB/SOP/AIR IS:5182:Pt- IS:5182:Pt-23 IS:5182:Pt-2 IS:5182:Pt-6 /03 10 05.12.2018 31.9 73.1 11.6 13.9 610 08.12.2018 31.7 73.4 11.1 13.4 608 12.12.2018 31.0 72.7 10.1 12.5 640 15.12.2018 30.6 71.9 10.5 12.7 628 19.12.2018 30.8 72.7 10.2 12.3 605 22.12.2018 30.1 72.3 10 12.1 678 26.12.2018 30.7 73.4 10.3 12.5 710 29.12.2018 30.9 70.7 9.9 11.7 685 03.01.2019 30.1 70.1 10.2 12.9 705 07.01.2019 29.9 69.9 9.8 11.8 715

M/s TATA CHEMICALS LIMITED Page 100 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

10.01.2019 30.1 70.2 10.1 12.6 665 14.01.2019 31.5 72.6 9.7 11.9 649 17.01.2019 30.2 72.1 9.9 12.2 640 21.01.2019 31.6 73.3 10.8 12.8 633 24.01.2019 30.3 72.6 10.1 11.9 644 24.01.2019 30.2 70.7 9.7 11.5 625 28.01.2019 30.1 70.1 10.2 12.6 635 04.02.2019 30.2 70.2 10.5 11.7 620 07.02.2019 31 73.3 10.7 11.5 670 11.02.2019 30.6 73.1 10.9 13.5 645 14.02.2019 30.2 72.8 10.4 12.3 645 18.02.2019 30.3 72.6 10.1 12.7 628 21.02.2019 31.4 72.9 11.3 13.2 665 25.02.2019 30.8 73.1 11.5 13.8 670 Min 29.9 69.9 9.7 11.5 605.0 Max 31.9 73.4 11.6 13.9 715.0 Average 30.9 71.7 10.7 12.7 660.0 98th %le 31.8 73.4 11.6 13.9 712.7 Location AAQ4, Aniali village

PM2.5,µg/m3 PM10,µg/m3 SO2 µg/m3 , NO2 ,µg/m3 CO, µg/m3 Date GEL/LAB/SOP/AIR IS:5182:Pt- IS:5182:Pt-23 IS:5182:Pt-2 IS:5182:Pt-6 /03 10 03.12.2018 36.9 75.2 11.1 18.7 716 06.12.2018 36.5 73.8 10.8 17.7 728 10.12.2018 34.8 79.3 11.3 18.1 707 13.12.2018 36.4 76.4 10.9 17.9 703 17.12.2018 35.7 78.3 10.6 17.1 745 20.12.2018 37.6 74.5 10.9 16.2 719 24.12.2018 35.8 80.5 11.5 16.8 734 27.12.2018 34.1 76.3 10.1 17.3 744 01.01.2019 33.5 73.4 10.5 18.1 756 04.01.2019 35.9 79.3 10.2 17.6 709 08.01.2019 37.7 81.4 12.9 17.2 718 11.01.2019 34.6 75.4 10.2 16.6 733 15.01.2019 35.7 76.6 10.4 16.2 739 18.01.2019 36.5 72.6 10.7 17.8 741 22.01.2019 37.4 72.7 10.1 17.3 729 25.01.2019 35.2 74.5 10.5 16.7 731 01.02.2019 33.4 73.8 10.6 15.3 743

M/s TATA CHEMICALS LIMITED Page 101 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

05.02.2019 35.3 79.3 10.3 17.8 752 08.02.2019 33.9 76.4 10.9 18.1 717 12.02.2019 34.3 78.3 10.2 16.6 719 15.02.2019 33.7 74.5 11.1 17.2 708 19.02.2019 36.6 80.5 10.9 16.9 749 22.02.2019 37.2 76.3 10.1 18.2 726 26.02.2019 34.9 74.5 11.7 16.1 731 Min 33.4 72.6 10.1 15.3 703.0 Max 37.7 81.4 12.9 18.7 756.0 Average 35.6 77.0 11.5 17.0 729.5 98th %le 37.7 81.0 12.3 18.5 754.2 Location AAQ5, Bordi village

PM2.5,µg/m3 PM10,µg/m3 SO2 µg/m3 , NO2 ,µg/m3 CO, µg/m3 Date GEL/LAB/SOP/AIR IS:5182:Pt- IS:5182:Pt-23 IS:5182:Pt-2 IS:5182:Pt-6 /03 10 04.12.2018 33.2 71.6 10.1 11.9 719 07.12.2018 33.8 72.5 9.9 12.3 729 11.12.2018 32.5 72.9 10.4 15.3 736 14.12.2018 31.7 73.1 10.2 13.4 741 18.12.2018 32.8 74.6 10.8 14.5 747 21.12.2018 33.9 77.7 11.3 14.9 743 25.12.2018 32.2 76.9 11.1 15.2 690 28.12.2018 31.9 75.9 10.6 17.6 689 02.01.2019 33.5 72.3 9.8 16.7 677 05.01.2019 30.9 69.7 9.9 17.9 669 09.01.2019 30.7 70.3 10.2 14.5 661 12.01.2019 31.2 73.6 10.4 12.6 655 16.01.2019 31.8 72.7 9.9 14.8 679 19.01.2019 33.7 73.8 10.1 13.6 645 23.01.2019 31.4 74.2 10.2 17.5 650 26.01.2019 33.1 72.5 9.8 16.7 644 02.02.2019 32.4 74.8 10.8 14.9 641 06.02.2019 31.8 73.6 9.9 15.1 655 09.02.2019 33.8 75.5 11.1 15.3 670 13.02.2019 31.7 72.9 10.5 14.5 667 16.02.2019 30.8 74.8 9.8 16.1 690 20.02.2019 31.8 75.2 11.1 14.2 641 26.02.2019 31.2 68.8 11.8 17.1 678 27.02.2019 30.1 71.3 10.2 18.1 654

M/s TATA CHEMICALS LIMITED Page 102 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

Min 30.1 68.8 9.8 11.9 641.0 Max 33.9 77.7 11.8 18.1 747.0 Average 32.0 73.3 10.8 15.0 694.0 98th %le 33.9 77.3 11.6 18.0 745.2 Location at AAQ6, Vadwala village

PM2.5,µg/m3 PM10,µg/m3 SO2 µg/m3 , NO2 ,µg/m3 CO, µg/m3 Date GEL/LAB/SOP/AIR IS:5182:Pt- IS:5182:Pt-23 IS:5182:Pt-2 IS:5182:Pt-6 /03 10 05.12.2018 35.1 75.2 9.9 16.1 655 08.12.2018 35.8 75.7 10.6 16.7 638 12.12.2018 35.2 74.6 10.7 15.6 645 15.12.2018 34.5 69.8 9.6 14.5 650 19.12.2018 32.1 73.8 9.5 13.8 644 22.12.2018 32.8 69.1 9.7 13.1 641 26.12.2018 33.7 69.5 9.8 12.8 655 29.12.2018 34.1 69.2 9.7 14.2 680 03.01.2019 34.2 71.6 9.6 13.9 699 07.01.2019 35.6 70.4 9.9 13.1 701 10.01.2019 33.7 70.1 10.2 14.3 727 14.01.2019 35.8 72.6 10.7 14.5 731 17.01.2019 34.2 73.8 10.3 14.2 677 21.01.2019 34.8 76.8 11.6 15.4 669 24.01.2019 33.5 75.8 11.8 15.1 690 24.01.2019 34.7 74.3 10.7 14.8 712 28.01.2019 33.9 70.2 10.8 16.9 695 04.02.2019 32.6 72.1 9.6 15.2 675 07.02.2019 35.2 75.2 11.3 17.0 670 11.02.2019 35.6 73.2 10.9 16.6 645 14.02.2019 33.8 73.7 11.9 17.5 635 18.02.2019 33.2 75.5 10.9 16.4 716 21.02.2019 34.7 74.6 11.7 17.1 655 25.02.2019 32.8 73.2 11.1 16.8 670 Min 32.1 69.1 9.5 12.8 635.0 Max 35.8 76.8 11.9 17.5 731.0 Average 34.0 73.0 10.7 15.2 683.0 98th %le 35.8 76.3 11.9 17.3 729.2 Location AAQ7, Valotra village PM ,µg/m3 PM ,µg/m3 SO µg/m3 NO µg/m3 CO, µg/m3 Date 2.5 10 2 , 2 , GEL/LAB/SOP/AIR IS:5182:Pt-23 IS:5182:Pt-2 IS:5182:Pt-6 IS:5182:Pt-

M/s TATA CHEMICALS LIMITED Page 103 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

/03 10 03.12.2018 33.2 74.1 9.8 13.9 643 06.12.2018 32.8 75.3 9.6 13.2 635 10.12.2018 32.5 72.7 9.9 13.4 641 13.12.2018 31.7 71.9 9.4 12.5 623 17.12.2018 31.4 71.2 10.2 14.8 665 20.12.2018 32.9 72.6 10.7 15.1 656 24.12.2018 34.8 73.8 11.2 15.8 658 27.12.2018 35.1 74.6 9.6 13.0 689 01.01.2019 34.9 74.5 10.3 14.5 695 04.01.2019 34.2 73.4 9.7 13.1 675 08.01.2019 34.8 74.8 10.1 13.8 670 11.01.2019 34.1 74.6 10.3 14.1 676 15.01.2019 33.7 75.1 11.1 15.1 715 18.01.2019 32.9 73.9 10.7 14.7 709 22.01.2019 32.5 73.2 10.6 14.5 710 25.01.2019 32.1 72.8 10.2 14.1 703 01.02.2019 31.3 70.7 9.7 13.2 698 05.02.2019 30.7 68.9 9.6 13.1 681 08.02.2019 31.9 69.7 9.8 13.5 691 12.02.2019 32.3 70.2 10.1 14.9 718 15.02.2019 32.9 70.8 10.3 15.1 721 19.02.2019 34.9 72.9 11.1 15.5 731 22.02.2019 35.3 73.2 11.3 15.8 746 26.02.2019 34.8 72.8 10.9 15.3 735 Min 30.7 68.9 9.4 12.5 623.0 Max 35.3 75.3 11.3 15.8 746.0 Average 33.0 72.1 10.4 14.2 684.5 98th %le 35.2 75.2 11.3 15.8 740.9 NAAQ Standards, 60 100 80 80 4000 EPA,1986 IS 5182 (Part IS 5182 (Part IS 5182 (Part IS 5182 (Part GEL/LAB/SOP/AIR Protocol 23): 2006, RA 2): 2001, RA 6): 2006, RA 10): 1999, /03 2017 2017 2017 RA 2014

M/s TATA CHEMICALS LIMITED Page 104 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

3.4.6.2 Baseline Scenario Based on the statistical analysis graphical representation has been done for all the parameters at each location. All the measured parameters were found below the standards prescribed by Central Pollution Control Board (CPCB New Delhi).

a) Suspended Particulate Matter (PM2.5)

70.0 PM 2.5 60.0

r 50.0 43.9 e t e 37.6 37.7 m 40.0 33.9 35.8 35.2 c

i 31.8 Min b

u 30.0 c Max r e

p 20.0 98th Percentile m a

r NAAQS

g 10.0 o r c i 0.0 m AAQ1 AAQ2 AAQ3 AAQ4 AAQ5 AAQ6 AAQ7

Ambient Air Quality Locations

Figure 3.11(a): Graph showing PM2.5 result

Suspended particulate matter in general terms is the particulate matter in suspension remains in ambient air. PM2.5 refers to particles with a diameter of less than 2.5 microns. These are usually called fine particles and contain secondary aerosols, combustion particles and re-condensed organic metallic vapour, and acid components. Fine particles can reach all the way down to the alveoli in the lungs.

The minimum and maximum level of PM2.5 recorded within the study area was in the range of 29.9 µg/m3 to 43.9 µg/m3 with the 98th percentile ranging between 31.8 µg/m3 to 43.9 µg/m3.

The 24 hourly average values of PM2.5 were compared with the National Ambient Air Quality Standards (NAAQS) and found that all sampling stations recorded in the study area are within the 3 applicable limits i.e., 60 µg/m for PM2.5 in rural areas.

M/s TATA CHEMICALS LIMITED Page 105 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

b) Suspended Particulate Matter ( PM10)

120.0 PM 10 r e

t 100.0 91.6 e

m 81.0 78.1 c 77.3 76.3 i 80.0 73.4 75.2 b u c Min r

e 60.0 p Max m a r 40.0 98th Percentile g o r

c NAAQS i 20.0 m

0.0 AAQ1 AAQ2 AAQ3 AAQ4 AAQ5 AAQ6 AAQ7 Ambient Air Quality Locations

Figure 3.11(b): Graph showing PM10 result

PM10 refers to particles with a diameter less than 10 microns. These are commonly called coarse particles - they contain dust from roads and industries as well as particles formed under combustion. Depending on their size, coarse particles can lodge in the trachea (upper throat) or in the bronchi.

The minimum and maximum level of PM10 recorded within the study area was in the range of 68.8 to 91.8 µg/m3with the 98th percentile ranging between 73.4 µg/m3 to 91.6 µg/m3.The 24 hourly average values of PM10 were compared with the National Ambient Air Quality Standards (NAAQS) and found that all sampling stations recorded in the study area are within the applicable 3 limits i.e., 100 µg/m for PM10 in rural areas.

M/s TATA CHEMICALS LIMITED Page 106 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

c) Sulphur Dioxide (SO2)

90.0 r SOx e t 80.0 e

m 70.0 c i b

u 60.0 c

r Min

e 50.0 p 40.0 Max m a r

g 30.0 98th Percentile o r

c 20.0 13.9 i 12.4 11.6 12.3 11.6 11.9 11.3 NAAQS m 10.0 0.0 AAQ1 AAQ2 AAQ3 AAQ4 AAQ5 AAQ6 AAQ7 Ambient Air Quality Locations

Figure 3.11(c): Graph showing SO2 result

Sulphur dioxide gas is an inorganic gaseous pollutant. Sulphur dioxide emissions are expected to be emitted wherever combustion of any fuel containing Sulphur takes place. The Sulphur present in the fuel will combine with oxygen and form Sulphur dioxide. The following sources of Sulphur dioxide in the study area are identified: Emissions from domestic/consumption of fuel (coal, diesel, etc) Sulphur dioxide in atmosphere is significant because of its toxicity; Sulphur dioxide is capable of causing illness and lung injury. Further it can combine with water in the air to form toxic acid aerosols that can corrode metal surfaces, fabrics and the leaves of plants. Sulphur dioxide is an irritant to the eyes and respiratory system. Excessive exposure to Sulphur dioxide causes breathing related diseases as it affects the lungs. 3 The minimum concentration of SO2 recorded within the study area was 9.4 to 11.6µg/m ,the 3 maximum concentration of SO2 recorded within the study area was 11.3 to 13.9 µg/m ,with the 98th percentile ranging between 11.3 µg/m3 to 13.9 µg/m3.

The 24 hourly average values of SO2 were compared with the National Ambient Air Quality Standards (NAAQS) and it was found that all sampling stations recorded values are below the applicable limits 80 µg/m3 for rural areas.

M/s TATA CHEMICALS LIMITED Page 107 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

d) Oxides of Nitrogen (NO2)

90.0

r NOx e t 80.0 e

m 70.0 c i b

u 60.0 c

r Min

e 50.0 p 40.0 Max m a r

g 30.0 22.9 98th Percentile

o 18.5 18.0 r 16.8 17.3 15.8 c 20.0 13.9

i NAAQS

m 10.0 0.0 AAQ1 AAQ2 AAQ3 AAQ4 AAQ5 AAQ6 AAQ7 Ambient Air Quality Locations

Figure 3.11(d): Graph showing NO2 result

The important sources of oxides of Nitrogen are from utilities and auto exhaust due to vehicular movement in mine lease area. The following sources of oxides of nitrogen in the study area are identified.

Emissions from vehicular movements in the study area Oxides of Nitrogen in the presence of sunlight will undergo reactions with a number of organic compounds to produce all the effects associated with photochemical smog. NO2 has inherent ability to produce deleterious effects by themselves like toxicity. It causes asphyxiation when its concentration is great enough to reduce the normal oxygen supply from the air.

The minimum and maximum level of NO2 recorded within the study area was in the range of 11.5µg/m3to 22.9 µg/m3 with the 98th percentile ranging between 13.9µg/m3 to 22.9µg/m3.

The 24-hourly average values of NO2 were compared with the National Ambient Air Quality Standards (NAAQS) and it was found that all sampling stations recorded values are below the applicable limits 80 µg/m3 for rural areas.

M/s TATA CHEMICALS LIMITED Page 108 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

e) Carbon Monoxide (CO)

r CO

e 1000 t e

m 900 c i 800 878 b u c 700 754 r 744 745 729 741 e 600 713 p

m 500

a Min r

g 400 o

r Max

c 300 i

m 200 98th Percentile 100 0 AAQ1 AAQ2 AAQ3 AAQ4 AAQ5 AAQ6 AAQ7 Ambient Air Quality Locations Figure 3.11(e): Graph showing CO result

Carbon monoxide is a colourless, odorless, and tasteless gas that is slightly dense than air. It is toxic to haemoglobic animals when encountered in concentrations above 35ppm. In the atmosphere, it is spatially variable and short lived, having a role in the formation of ground-level ozone.

The minimum and maximum level of CO recorded within the study area was in the range of 605 µg/m3 to 878µg/m3 with the 98th percentile ranging between 713 µg/m3 to 878 µg/m3.

The 1 hourly average values of CO were compared with the National Ambient Air Quality Standards (NAAQS) and it was found that all sampling stations recorded values are below the applicable limits 4000 µg/m3 for rural areas.

3.4.6.3 Mineralogical composition of PM10 Filter paper of PM10 sampler was used to mineralogical study from project site of Aniali Limestone mining. Whatman filter paper was used for mineralogical composition as per EPA method. Composition of PM10 along with free silica presented in below Table 3.12.

Table 3.12 Mineralogical composition of PM10 (μg/m3) Location Ca Mg Na K Cl Pb Fe Silica Project site 1.20 0.22 0.40 0.41 1.3 0.03 0.45 0.10

Mineralogical composition for free silica and other minerals was analysed and this was found that free silica is present at concentration of 0.10 µg/m3 in PM10.

M/s TATA CHEMICALS LIMITED Page 109 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

3.5 Noise Environment Noise can be defined as an unpleasant and unwanted sound. Noise is a physical form of pollution and is not directly harmful to the life supporting systems namely air, soil and water. Noise pollution is the result of modern industrialized urban life and congestion due to over population.

3.5.1 Noise Level in the Study Area The baseline noise levels have been monitored at 09 locations within the study zone. Locations were identified for assessment of existing noise level status, keeping in view the land use pattern, industrial area, silence zone, residential areas in villages etc., if available within 10 km radius of the study area.

Sound was measured in dB (A) at all the receptors. Baseline noise quality monitoring was carried out with calibrated Sound Level Meter (make Envirotech) instrument as per CPCB procedure.

24 hourly noise monitoring was conducted at all locations and divided in two parts. One is day time from 6 am to 10 pm and second is night time from 10 pm to 6 am as per CPCB guidelines to compare the baseline from the prescribed standards.

3.5.2 Sources of Noise The main sources of noise in the study area were domestic activities, industrial activities and vehicular traffic movement. The main occupation of the villagers in the study area is agriculture.

The noise monitoring stations are shown in Figure 3.12 and detailed out in Table 3.13. Results are presented in Table 3.14.

Table 3.13 Noise Level Monitoring Stations in the Study Area Station Monitoring Category Distance Direction Longitude Latitude Code Locations from from mine mine lease lease (Km)

NQ1 Near Mine Commerc 0.50 NE 69° 50' 3.138"E 21° 42' Site ial 54.102"N NQ2 Valotra Residenti 5.57 SE 69° 53' 3.393" E 21° 41' al 37.227" N NQ3 Aniali Residenti 2.44 SE 69° 51' 2.900" E 21° 41' al 38.502" N NQ4 Vadvala Commerc 5.67 S 69° 50' 14.401"E 21° 39' ial 20.307" N NQ5 Near Barda Silence 4.31 NW 69° 49' 44.930"E 21° 42' WLS 33.318" N

M/s TATA CHEMICALS LIMITED Page 110 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

NQ6 Jam Commerc 4.16 N 69° 50' 2.802" E 21° 44' Sakhpur ial 54.886" N Railway Station NQ7 Khirsara Residenti 4.20 E 69° 52' 18.667"E 21° 43' 9.335" al N NQ8 Near Silence 0.69 NW 69° 49' 10.173"E 21° 42' Naliadhar 26.364" N RF NQ9 Kondorna Commerc 8.67 SE 69° 53' 0.586" E 21° 38' ial 46.658" N

M/s TATA CHEMICALS LIMITED Page 111 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

Figure 3.12: Noise Quality Location Map

M/s TATA CHEMICALS LIMITED Page 112 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

Table 3.14 Hourly Leq Noise Level in the Study Area S. Locations Equivalent Noise Level, dB (A) No. Limit (as per CPCB Observed value Guidelines),Leq, Leq, dB(A) dB(A) DAY* NIGHT** DAY* NIGHT** 1 Near Mine Site Commercial 65 55 58.9 44.3 2 Valotra Residential 55 45 47.6 35.5 3 Aniali Residential 55 45 48.4 37.6 4 Vadvala Commercial 65 55 53.8 46.5 5 Near Barda WLS Silence 50 40 35.6 29.0 6 Jam Sakhpur Commercial 65 55 61.9 53.8 Railway Station 7 Khirsara Residential 55 45 46.4 38.2 8 Near Naliadhar Silence 50 40 37.3 28.7 RF 9 Kondorna Commercial 65 55 57.5 43.2 *Day values considered from 6 am to 10 pm * Night values considered form 10 pm to 6 am

3.5.3 Ambient Noise Standards Ministry of Environment Forests and Climate Change (MoEF&CC) has notified the noise standards vide gazette notification dated February 14, 2000 for different zones under the Environment Protection Act (1986). These standards are given in Table-3.15

Table 3.15: Ambient Quality Standards in respect of Noise Noise dB (A) Leq Area Code Category of Area Daytime* Night time* A Industrial Area 75 70 B Commercial Area 65 55 C Residential Area 55 45 D Silence Zone 50 40

Note: Daytime is from 6.00 am to 10.00 pm and Night time is from 10.00 pm to 6.00 am. Silence zone is defined as area up to 100 meters around premises of hospitals, educational institutions and courts. Vehicle horns, loud speakers and bursting of crackers are usually banned in these zones.

3.5.4 Baseline Scenario The values of noise level observed in some of the areas are primarily owing to vehicular traffic. Assessment of hourly night time Leq (Ln) varies from 29.0 to 53.8 dB (A) and the hourly daytime

M/s TATA CHEMICALS LIMITED Page 113 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

Leq (Ld) varies from 35.6 to 61.9 dB (A) within the study area. The status of noise quality within the 10 km zone of the study area is therefore, within the prescribed standards.

3.6 Soil Characteristics Soil can be defined as upper horizon of soil layers. Soil serves as a natural medium to plant growth. Soil physical and chemical parameter has been analysed at seven locations including near project site. Secondary data of soil has also been collected to know the different soil types present in Gujarat.

Soil types in Gujarat The state is having with a wide range of macro and microclimates, physiography, landforms, geology and vegetation that have an influence on the genesis of soil. Soil systems have developed over many millions of years. The soil characteristics in a given area at a given point of time are a function of both natural influences and human activities. This section deals with the different types of soils found in Gujarat.

A) Black Soil is the most dominant soil type of Gujarat. Three major variations recorded are: i) Shallow black soils: Shallow black soils have been developed from the basaltic trap in Saurashtra and the Deccan trap in extreme eastern part while the remaining strips in Chhotaudepur and Saurashtra districts have been developed from granite and gneiss parent material. The depth of soil ranges from a few cm to 30 cm. (Gujarat State Agricultural Marketing Board (GSAMB) 2007). Shallow black soils are light grey in colour and mainly sandy clay loam in texture. The soil is poor in fertility. ii) Medium black soil: Medium black soils have a basaltic trap parent material. Such soils in some parts of Sabarkantha and Panchmahals have been also developed from the granite and gneiss parent material. These soils vary in depth from 30 to 60 cm. They are calcareous in nature except in the Panchmahals and Sabarkantha districts. A layer of murum (unconsolidated material of decomposed trap and limestone) is found below a depth of about 40 cm, especially in the Saurashtra region (GSAMB 2007). The soils are silt loam to clay in texture and neutral to alkaline in reaction. These soils are adequately supplied with potassium and poorly supplied with phosphorous and nitrogen. iii) Deep black soils: The districts of Bharuch, Surat, Valsad and southern part of Vadodara, and the Bhal region have deep black soils. Similarly, in the Ghed tract of Junagadh districts mostly covering the talukas of Porbandar, Kutiyana, and Manavadar and part of the Mangrol taluka, the deep black soils have been formed due to the deposition of basaltic trap materials transported by the rivers Bhadar, Minsar, Osat Madhuvanti etc. They have faced the problem of salinity and alkalinity. They are also impregnated with a fairly high amount of free lime. The soils are dark brown to very dark greyish brown in colour. They contain 40 to 70 percent clay minerals. The

M/s TATA CHEMICALS LIMITED Page 114 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

deep black soils, in general, are clay-like in texture, poor in drainage, and neutral to alkaline in reaction. These soils are most fertile soil in Black soils.

B) Mixed red and black soils: The mixed red and black soils are shallow in depth with reddish brown colour at higher and greyish brown colour at lower elevations. Texturally, they are clay loam to clay and skeletal in nature, with stony material as high as 50 percent in subsurface layer. This provides an ideal drainage conditions for these soils. The soils are highly calcareous in nature and alkaline in reaction. The soils are low in available nitrogen, medium in phosphorus, and high in potassium (GSAMB 2007).

C) Laterite soil: True laterites in the real sense of the term don't occur in Gujarat. However, in the Dangs district, which has an abundant forest vegetation and high annual precipitation of about 250 cm, lateritic soils have developed. They support good forests. Clayey in texture they become hard within hours of receiving irrigation and rainfall.

D) Alluvial soils: These soils are very deep. These soils are further divided into alluvial sandy to sandy loam soils, alluvial sandy loam to sandy clay loam, and coastal alluvial soil.

E) Alluvial sandy to sandy loam soils: These soils cover all the northern districts, namely, Banaskantha and Mehsana except the southern part and the area of Sabarkantha bordering the Kheralu and Vijapur talukas of Mehsana district. The original alluvial material in Banaskantha and some parts of the Mehsana district has been overlaid by sandy material brought in by the winds blowing through the desert of Kutch. From a fertility point of view, these soils are low in available nutrients.

F) Alluvial sandy loam to sandy clay loam: Alluvial sandy loam to sandy clay soils are found in the Kheda, Gandhinagar, Ahmadabad and Mehsana district and the western part of the Vadodara district. These soils are the most productive soils in the state and contains fairly good amount of potassium.

G) Coastal alluvial soils: The coastal alluvial soils are sandy clay loam to clay in texture. The fertility of this type of soil is of medium class.

H) Hill soils: This type of soil occurs in the hilly areas and eastern strip of the mainland Gujarat. The soil profile is not well developed due to steep slope and erosion. Soil is shallow in depth formed by under composed rock and poor in fertility. Hill soils have been developed from parent materials existing in the respective areas. Shallow and composed of under composed rock fragments, they are poor in fertility.

I) Desert Soils: Desert soil is generally found in the little and greater desert of Kutch. The soil is deep and light grey in colour with no definite structure. It is sandy to sandy loam with silt clay

M/s TATA CHEMICALS LIMITED Page 115 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

loam in structure. This type of salt has high salt content and sufficient amount of gypsum in the soil profile.

3.6.1 Methodology The composite soil samples were collected from site and the study area and were analysed for characterization. The locations of the monitoring sites are depicted in Figure 3.13 and given in Table 3.16 showing Soil Sample Collection Points marked within the Study Area.

The soil samples were collected in the month of December 2018. Soil samples were collected from 05 locations. The samples were filled in polythene bags, labelled in the field with number and site name and sent to laboratory for analysis. The test results are given inTable-3.17.

Table 3.16: Soil Sample Collection Points Station Monitoring Distance Direction Longitude Latitude Code Locations from mine from lease (Km) mine lease SQ1 Near Mine Site 0.50 NE 69° 50' 3.138"E 21° 42' 54.102" N SQ2 Valotra village 5.57 SE 69° 53' 3.393" E 21° 41' 37.227" N SQ3 Aniali village 2.44 SE 69° 51' 2.900" E 21° 41' 38.502" N SQ4 Vadvala village 5.89 S 69° 50' 14.401" 21° 39' 20.307" E N SQ5 Near Barda 4.31 NW 69° 49' 44.930" 21° 42' 33.318" WLS E N

M/s TATA CHEMICALS LIMITED Page 116 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

Figure 3.13: Soil Quality Location Map

M/s TATA CHEMICALS LIMITED Page 117 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

Table 3.17 Physico-Chemical Properties of Soil SQ1 SQ2 SQ3 SQ4 SQ5 S. Parameters Units Test Method Near Valotra Aniali Vadvala Near No. Mine village village village Barda Site WLS 1 Texture - GEL/LAB/SOP/SOIL/22 Sandy Sandy Sandy Sandy Sandy Clay Clay Clay Clay Loam Loam Loam Loam Loam Sand % 45 42 44 43 60 Silt % 20 22 27 26 23 Clay % 35 36 29 31 17 2 Color - GEL/LAB/SOP/SOIL/07 Brown Yellowis Yellowis Greyish Yellowis h Brown h Brown Brown h Brown 3 pH (1:2 - IS 2720 (P-26): 1987, 7.3 7.1 7.5 7.6 7.4 Suspension) RA 2011 4 Specific µmhos IS 14767: 2000, RA 598 581 572 567 589 Conductivit /cm 2016 y 5 Moisture % IS 2720(Part-2): 1973, 13.6 14.5 15.8 12.1 14.3 RA 2015 6 Exchangeab mg/kg GEL/LAB/SOP/SOIL/07 11.2 11.8 12.3 12.1 13.8 le Potassium 7 Exchangeab mg/kg GEL/LAB/SOP/SOIL/06 31.2 33.6 28.5 25.3 24.1 le Sodium 8 Exchangeab mg/kg GEL/LAB/SOP/SOIL/08 276 301 289 313 401 le Calcium

9 Exchangeab mg/kg GEL/LAB/SOP/SOIL/08 76.2 79.5 75.9 78.7 82.4 le Magnesium 10 Porosity % GEL/LAB/SOP/SOIL/20 18.5 21.6 22.7 20.3 21.2

11 Organic % IS 2720 (P-22) : 1972, 0.51 0.55 0.56 0.61 0.86 Matter RA 2010 12 Phosphorou mg/kg GEL/LAB/SOP/SOIL/10 7.8 7.4 7.9 6.9 8.2 s 13 Nitrogen mg/kg GEL/LAB/SOP/SOIL/09 120 119 126 133 141

14 Chloride mg/kg GEL/LAB/SOP/SOIL/14 71 68 69 63 74

15 Bulk gm/cc IS 2720 (P-28) : 1974, 1.42 1.40 1.38 1.39 1.4 Density RA 2010

3.6.2 Results of Analysis of the Soil Physical characteristics of soil were characterized through specific parameters viz bulk density, porosity, water holding capacity, pH, electrical conductivity and texture. Soil pH plays an

M/s TATA CHEMICALS LIMITED Page 118 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

important role in the availability of nutrients. Soil microbial activity as well as solubility of metal ions is also dependent on pH. In the study area, variations in the pH of the soil were found to be slightly basic (7.1 to 7.6). Electrical conductivity (EC) is a measure of the soluble salts and ionic activity in the soil. In the collected soil samples the conductivity ranged from 567-598 µmhos/cm. Bulk density of soil sample samples ranged from 1.38-1.42 gm/cc, moisture content was found 12.1-15.8%, organic matter was present in the range of 0.51-0.86 % at all the soil quality monitoring locations.

3.7 Biological Environment Baseline biological environment has been considered for Environment Impact Assessment study because mining of limestone mineral may affect the flora and fauna of the surroundings due to mining activities and its mineral transportation. There are two types of biological environment found in the study area of Expansion of Aniali Limestone mining project. One is terrestrial flora and fauna and other is aquatic flora and fauna. Secondary data also has been collected from State Forest Department to know the variability of species of flora and fauna residing in the study area.

Barda Wildlife Sanctuary is present within the study area of the project site. Barda Wildlife Sanctuary is notified as per the final notification published by MOEF & CC with notification no. S.O. 1365(E) dated 28th April, 2017. Due to its presence in the study area, its biological environment is also studied and also incorporated in our EIA report.

3.7.1 Objectives of Ecological Studies The objectives of ecological study are as follows: 1. To characterize the environmental components like land, water, flora and fauna; 2. To understand their present status; 3. To assess present biodiversity; 4. To understand carrying capacity of the ecosystem; 5. To identify susceptible and sensitive areas.

3.7.2 Biogeography and Physiographic of the study area The proposed project is situated near Village Aniali of Taluka Ranavav and District Porbandar in the State Gujarat. As per the bio-geographical classification by Rodgers and Panwar, 1988 the project area comes under Bio-geographic province (4B) Semi-Arid Gujarat Rajputana region. However, as per Champion & Seth, 1968 vegetation types of the area can be grouped as Dry tropical thorn forest. Most of the western part is arid where average rainfall is varying from 600- 800mm. Soil of the area varies from Black soil to gray brown soil. Winter is severe and the summer is harsh, because the Tropic of Cancer passes through the northern borders of Gujarat.

3.7.3 Sampling Methodology of Study Core zone has been considered within mine lease area and buffer zone has been considered outside mine lease area up to 10 km from lease boundary. Study period for ecological study has

M/s TATA CHEMICALS LIMITED Page 119 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

been considered winter season from December 2018 – January 2019. To know the baseline flora and fauna species composition primary and secondary survey was conducted by Functional Area Expert with Forest Department Officials.

The proposed site is a non-forest government waste land, hence very less species was found in core zone and buffer zone except crop species. Mostly area outside the mine lease is agricultural land. Separate survey was conducted for wild flora fauna and agricultural species. Within study area two types of environment found where species diversity is present.

1. Terrestrial environment

2. Aquatic environment

3.7.4. Terrestrial Environment The project site is a government waste land. The study area comprised of two types of terrestrial environment. One is waste land or small shrubs and other is agricultural land throughout the study area.

3.7.4.1 Core Zone- There is no vegetation within mine lease except some seasonal grasses. General fauna was observed like squirrel and field rat etc. Common local bird species were also found flying above the mine lease as blue rock pigeon, house crow, koel and dove.

3.7.4.2 Buffer zone- There is two types of terrestrial environments were found for flora and fauna. One is waste land and other is agricultural land. The flora and fauna species found in waste land terrestrial environment are presented in Table 3.18 and Table 3.19.

Table 3.18: Flora Species in Buffer Zone

Sr. No. Species Botanical Name Family Tree 1 Bawal (Dashi) Acacia arabica Mimoseae 2 Limdo or Neem Azadirachta indica Meliaceae 3 Arduso Ailanthus excelsa Simarubaceae 4 Vad, Vadio Ficus benghalensis Moraceae 5 Piplo Ficus religiosa Moraceae 6 Saragvo Moringa oleifera Moringaceae 7 Awal Cassia auriculata L Cassalpiniaceae Herbs and shrub 1 Gando baval vilayati Prosopis juliflora Mimoseae

M/s TATA CHEMICALS LIMITED Page 120 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

Table 3.19: Fauna Species in Buffer Zone

Wildlife Protection S. No Local name English name Scientific name Act 1972 Schedule Mammals 1 Jarakh Hyena Hyaena hyaena III 2 Shiyal Jackal Canis aureus II 3 Lamad Fox Vulpus bengalensis II 4 Jungli Biladi Jungle cat Felis chaus II 5 Noliyo Mongoose Herpestes edwarsi IV Funambulus 6 Khiskoli Squirrel IV palmarum 7 Ghorkhodiyu Indian Ratel Molivora capensis I 8 Sasaja Hare Lepus ruficaudatus IV Boselaphus 9 Nil Gai Blue Bull III tragacamelus 10 Jungle Suwar Wild boar Sus scrofa III 11 Bhediya Wolf Canis Lupus I 12. Tendua Leopard Panthera pardus I 13 Chhipkali Pangolin Manis Cassicaudata I Reptiles Common 1 Gho or patla gho indian Varranus bengalensis I monitor lizard Chandan Gho or Spiny Tailed Uromastyx 2 II Sandho Lizard hardwickil Common 3 Kakido Calotes versocolor II garden lizard Indian Champaceion 4 Kakido II Chameleon Zylanicus Common 5 Sapni Mashi Mabuya carinata II Skink Fan Throated 6 Kakido Sitana Ponticereana II Lizard Checkered Xenochrophis 7 Dedu II Keelback piscator 8 Dhaman Rat Snake Ptyas mucosus II 9 Cobra Elapidai Naja naja (linn.) II Birds

M/s TATA CHEMICALS LIMITED Page 121 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

Indian 1 Peacock Pavo Cristatus I Peafowl

The floral species found in agricultural environment are presented in this section.

The buffer zone of the study area is majorly agricultural land. The buffer zone contains the agricultural, non-cultivated land, Fodara reservoir, Khambada reservoir, Bileshwari nadi, Minsar nadi, Dhangya Nadi, Naliadhar Reserve forest, Jambhuda Reserve forest, Khageshri Reserve Forest and Barda Wildlife Sanctuary.

Based on primary and secondary survey a total of 32 crop species were reported in the study area of Aniali Limestone mine lease area and based on their use value they have been grouped into four categories. Among the species list, 8 species fall under grain crops, 10 species fruit crops, 11 vegetable crops and 3 commercial crops of the study area. Within the grain crops, Bajra, Juwar, Makai and Arenda were cultivated extensively. Though, 10 fruit yielding species were reported, they grown in small extent of areas along the agricultural hedges and mainly for local use and marketing. Three commercial crops are cultivated extensively for major income of the local agriculturalists (Table 3.20.)

Table 3.20: List of crop species in the study area S. Botanical Name Family Local Name Habit No. Grain crops 1 Pennisetum typhoides A. Rich. Poaceae Bajri, Bajaro Herb 2 Sorghum bicolor (L.) Moench. Poaceae Jawar, Baru Grass 3 Cajanus cajan (L.) Millsp. Fabaceae Tuver Herb 4 Triticumaes tibvum L. Poaceae Wheat, Grass Gahu 5 Vigna radiate (L.)wilczek.Var. radiate Fabaceae Udad Herb 6 Ricinus communis L. Euphorbiaceae Arando, Shrub Divel 7 Vigna trilobata (L.) Verdcourt Fabaceae Mung, Math Herb 8 Zea mays L. Poaceae Makai Grass Fruit crops 1 Annona squamosa L. Annonaceae Sitafal Small Tree 2 Annona reticulate L. Annonaceae Ramphal Small Tree 3 Psidium guajava L. Myrtaceae Jamphal Tree

M/s TATA CHEMICALS LIMITED Page 122 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

4 Citrus aurantifolia (Chr.) Swingle Rutaceae Kag Ji Small Limbu Tree 5 Limonia elephantum (Correa) Rutaceae Kotha Tree Panigrahi 6 Citrus limon (L.) Burm. f. Rutaceae Limbu Shrub 7 Musa paradisiacal L. Musaceae Kela, Kelu Small Tree 8 Punica granatum L. Punicaceae Dadam Small Tree 9 Phyllantus embelica Euphorbiaceae Amala Small tree 10 Morus alba L. Moraceae Shetur Tree Vegetable Crops 1 Abelmoschus esculentus (L.) Moench Malvaceae Bhinda, Under Bhindo Shrub 2 Capsicum annuum L. var acuminatum Solanaceae Marchi Herb Fingerh. 3 Cucumis sativus L. Cucurbitaceae Kakadi Climber 4 Lageneria leucantha (Duch.) Rusby. Cucurbitaceae Dudhi Herb 5 Cicer arietinum L. Fabaceae Chana Herb 6 Momordica charantia L. Cucurbitaceae Karela Climber 7 Allium sativum vineale Liliaceae Lasun Herb 8 Moringa oleifera Lam. Moringaceae Mitho Tree Saragvo 9 Lycopersicon lycopersicum (L.) Karst. Solanaceae Tamata, Herb 10 Solanum melongena L. Solanaceae Ringana, Under Shrub 11 Daucus carota L. var.sativa Apiaceae Gajar Under Shrub Cash/Commercial crops 1 Saccharum officinarum L. Poaceae Sherdi, Grass 2 Gossypium herbaceum auct. Non Malvaceae Kapas, Desi Shrub L. var. acerifolium (Guill. & Perr.) Kapas Chevalier 3 Arachis hypogea L. Fabaceae Magphali Herb

3.7.5 Aquatic Environment There is no aquatic environment present in core zone of project area. Within study area of 10 km radius from mine lease boundary, the aquatic environments which is present in the study area are- Fodara reservoir, Khambada reservoir area, Bileshwari river, Minsar river, Dai river and Dhangya Nadi.

M/s TATA CHEMICALS LIMITED Page 123 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

Khambhada reservoir

The Khambhada reservoir is naturally formed in the interior of the Barda hills. It is about 12km. North-West of Ranavav. The surrounding natural scenery on account of forest and the Barda hills attractsmany avifaunas as well as it’s a tourist spot.

Fodara Reservoir

Fodara Reservoir mainly known for its migratory birds. Various bird species found flying within study area of project site (in total 20 species). The water fowl species are found within Fodara Reservoir. The Bird species present in Fodara Reservoir are given in the table below, (Source: https://ebird.org/india/hotspot).

Table 3.21: List of Avifauna found within study area S.No Species Scientific name Waterfowl 1 Knob-billed Duck Sarkidiornis melanotos 2 Ruddy Shelduck Tadorna ferruginea 3 Indian Spot-billed Duck Anas poecilorhyncha 4 Green-winged Teal Anas crecca Cranes 5 Demoiselle Crane Anthropoides virgo Shorebirds 6 Great Thick-knee Esacus recurvirostris 7 Black-winged Stilt Himantopus himantopus Gulls, Terns, and Skimmers 8 Caspian Tern Hydroprogne caspia 9 River Tern Sterna aurantia Storks 10 Black Stork Ciconia nigra 11 Painted Stork Mycteria leucocephala Cormorants and Anhingas 12 Oriental Darter Anhinga melanogaster 13 Little Cormorant Microcarbo niger Herons, Ibis, and Allies 14 Gray Heron Ardea cinerea 15 Great Egret Ardea alba 16 Glossy Ibis Plegadis falcinellus 17 Red-naped Ibis Pseudibis papillosa

M/s TATA CHEMICALS LIMITED Page 124 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

18 Eurasian Spoonbill Platalea leucorodia Vultures, Hawks, and Allies 19 Osprey Pandion haliaetus

Indian Sarus Local name is Sarus. There are two species of the migratory cranes viz. common crane (kunj) and demoiselle crane (Karkara). Indian sarus is an endangered species has a global population of about 8000-10000 birds, all in India. There are about 1400 to 1600 sarus in Gujarat. Over 80% of Sarus population of Gujarat found in Ahmedabad, Anand and Kheda districts.

Indian Spot-billed Duck, also known as Spot-billed Duck, is a resident in India. The Spotbill Duck is classified in to three subspecies – the Indian Spot-billed Duck, Eastern Spot-billed Duck and Burmese Spot-billed Duck. The name comes from the red spots at the base of their yellow- tipped black bills, which the females of the species lack. These ducks are “dabbling ducks” meaning that they do not dive for their meals but instead stick their heads underwater with their tails in the air to forage.

Painted Stork is a large wading bird in the stork family. Painted Storks are predominately non- migratory and most make only local movements. It is found in the Asian continent, covering the area from India and Sri Lanka to Southeast Asia. Their distinctive pink tertian feathers are what give them their name. They are voiceless and the only sounds they make are weak moans or those produced by their bills clattering. The Painted Stork is classified as Near Threatened and unfortunately is close to qualify for threatened category in the near future.

Herons and Egrets are the group of birds is most commonly found in Gujarat wet land. Most of these are resident birds.

Osprey It is a pure fish eating migratory raptor of Gujarat. It is fairly common and usually found throughout the waterbodies. It is one of those birds with single species in the family & genus.

3.7.6 Rare, endangered and threatened species (RET) of the Study Area Important endemic and RET species have been assessed in this EIA study from primary and secondary survey from forest department. To verify scheduled species all the species available in Aniali Limestone mining project, data was checked with updated Red data book published by Botanical survey of India. Information of scheduled species within study area has also been collected from office of state forest department and respected divisional forest offices. No such Rare, endangered and threatened species (RET) are present in the core zone of the study area.

3.7.7 Ecologically Sensitive Areas From the mine lease boundary, Nadliyadhar Reserve forest is present at approx. 0.55 km in South West direction, Khageshri reserve forest is at approx. 7.27km in East direction and Jambhuda

M/s TATA CHEMICALS LIMITED Page 125 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

reserve forest is present at 2.70km in North direction. Barda Wildlife Sanctuary is also present at a distance of 4.205 km in North West direction from the working mine lease.

3.7.8 Biological Environment of Barda Wildlife Sanctuary 3.7.8.0 General Barda Wildlife Sanctuary is present within the study area of the project site. It is also popularly known as Rana Barda and Jam Barda. Barda Wildlife Sanctuary is notified as per the final notification published by MOEF & CC with notification no. S.O. 1365(E) dated 28th April, 2017. Due to its presence in the study area, its biological environment is studied and incorporated in the EIA report.

3.7.8.1 Location of Barda Wildlife Sanctuary The Barda Wildlife Sanctuary located in Porbandar, Jamnagar and Devbhoomi Dwarka Districts in the State of Gujarat and lying between latitudes 21o 40'N and 210 55'N and longitudes between 690 40'E and 690 55'E is spread over an area of 192.31 square kilometres.

3.7.8.2 Physiography The Sanctuary is distributed in two districts i.e. Porbandar and Jamnagar. The hilly terrain with patches of flat plains at places, the crisscrossing of numerous rivulets and streams and existing dams impart a divine look to the forest. The Sanctuary hardly has 192.31 sq. km area, but has one of the most diverse floral compositions and therefore a potential source of remedies of many ailments, and therefore deserves to be safeguarded. The terrain of Barda is almost hilly and undulating with an altitude ranging from 79.2 m to 617.8 m. above sea level. At places, there are gentle slopes with exposed rocks. The two main ephemeral rivers are Bileshwary and Joghri. Khambala and Fodara are important dams in the Sanctuary.

3.7.8.3 Forest type of this sanctuary The forest sub-types found in the Sanctuary are: Type: 5A-Southern tropical forests (5A/C3- Southern dry mixed deciduous forests; 5D/S3-Euphorbia scrub; 5/DS1 -Dry deciduous scrub; 5/E3-A. nilotica; 5/E9-Dry bamboo brakes in small areas; 5/E1-Anogeissu scrub) and Type 6B- Northern tropical thorn forest (6B/DS1-Zizyphus scrub; 6/E2-Acacia Senegal). Having canopy density ranging between 0.1 and 0.4, with dense forest in scattered patches near Kileshwar (Jambarda), the area is largely degraded. As per the remote sensing study carried out by the GEER Foundation, 16.3% of the area was under dense forest, 29.9% under open forest and the rest was under degraded forest. Although the forest cover has increased from 24.6% in 1986 to 46.2% in 1997, a large area is still under degraded category. (Source: https://forests.gujarat.gov.in/barda-sanctuary.htm)

M/s TATA CHEMICALS LIMITED Page 126 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

3.7.8.4 Floral species in the Barda Wildlife Sanctuary The Barda Wildlife Sanctuary is one of the richest and compact bio-diversity patches covered on all sides by good quality dry deciduous miscellaneous forests, dry thorn forest, shrub lands and wetland forests along with bamboo patches dotted in between and it maintains rich bio-diversity comprising 759 species of 430 genera of tree, herbs, shrubs and climber species. There are main flora's in the sanctuary Sitaphal (Annona squamosa), Umda (Miliusa tomentosa), Ashok (Polyalthia longifolia), Venivel (Cissampelos pareira linn), Vevdi, Vadhi (Cocculus hirsutus), Orap, Parwat (Cocculus pendulus), Karipat (Cyclea peltata), Galo vel (Tinospora glabra), Poyanu, kama (Nymphaea pubescens), Darudi (Argemone mexicana lonn), Halim, Ashal (Lepidium sativum linn), Khordu (Cadaba fruticosa), Ghuti,Thikar (Capparis grandis linn.), Kantharo (Cpparis sepiaria linn.), Tanmani (Cleome gynandra.), Bethi Talvan (Cleome simplicfolia), Pili Talvan (Cleome viscosa linn.), Varno,Vayvar (Crateva tapia), Dolo Katkiya (Maerua oblongifolia), Lodri (Lflacourtia indica), Pili Bhoysan (Polygala chinensis linn.). (Source: Final notification published by MOEF & CC with notification no. S.O. 1365(E) dated 28th April, 2017)

3.7.8.5 Medicinal Plants found in the sanctuary In the Barda Hills and its surrounding the local inhabitants have been using the indigenous plant species in a crude form or as syrup. Around 466 plant species present in the sanctuary have medicinal properties, out of which 92 plants are used as astringent, 69 species as febrifuge, 68 species as tonic, 57 species for dysentery, 56 species to treat skin diseases, 55 species for diuretic, 51 species for rheumatism and 50 species used as purgative, also represented in table below. These plants are presently receiving an enormous amount of attention.

Table-3.22 The proportional availability of the Medicinal, Timber Forest Products (TFP) and Non-Timber Forest Products (NTFP) of the Barda Wildlife Sanctuary. Sr. No Bio-resoures No. of % of State of Species Species Availability 1 Medicinal 466 53.4 Very Good Timber Forest Products 2 Timber 35 4.0 Poor Non-Timber Forest Product 3 Fuel wood 23 2.6 Poor 4 Paper & Pulp 3 0.3 Exiguous 5 Fodder 98 11.2 Good 6 Fibers 34 3.9 Poor 7 Fruits 28 3.2 Poor 8 Beverages 7 0.8 Very Good 9 Narcotics 8 0.9 Poor 10 Omamental 42 4.8 Good

M/s TATA CHEMICALS LIMITED Page 127 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

11 Cereals & Millets 12 1.4 Fair 12 Condiments/Spices 6 0.7 Fair 13 Pulses 8 0.9 Fair 14 Dyes 8 0.9 Fair 15 Gums 13 1.5 Poor 16 Tannins 12 1.4 Poor 17 Resins 5 0.6 Poor 18 Oils 28 3.2 Fair 19 Vegetables 37 3.2 Fair (Source: Ecological and Socio- Economic Study of Barda Wildlife Sanctuary, Gujarat Ecological and Research GEER Foundation, Gandhinagar, Gujarat Forest Department, Gandhinagar)

3.7.8.6 Faunal species present in the Barda Wildlife Sanctuary Barda Wildlife Sanctuary has varied habitats like thorn forest, dry deciduous scrubs, riverine forest, mixed dry thorn vegetation, rocky area, wetlands as well as flatlands. Habitat structure and food availability are ultimate factors, which affect the population and abundance of the fauna. Isolation of forest and degradation has results into negative impacts on the wildlife. As a result, some of the large mammals like Lion, Chinkara, Sambar, Spotted Deer and other species are now exterminated from Barda. Except some species left have very low population. The table shown below gives a broad view of the fauna which are present in the sanctuary.

Table 3.23: List of mammals with their Schedule in the Barda Wildlife Sanctuary Sr No English name Scientific name Sighting in the Wildlife Sanctuary Protection Act 1972 Schedule 1 Nilgai Boselaphus Abundant II tragocamelus 2 Wild boar Sus scrofa Abundant III 3 Small Indian Viverricula indica Rare II Civet 4 Common Herpestes edwarsi Abundant IV Mongoose 5 Striped Hyena Hyaena hyaena Common III 6 Wolf Canis Lupus Rare I 7 Jackal Canis aureus Abundant II 8 Indian Fox Rare II 9 Ratel Molivora capensis Rare I 10 Leopard Panthera pardus Uncommon I

M/s TATA CHEMICALS LIMITED Page 128 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

11 Jungle Cat Felis chaus II 12 Indian Hare Lepus ruficaudatus Abundant IV 13 Five striped Funambulus Abundant IV Palm squirrel pennantii 14 Porcupine Hystrix indica Common IV 15 Spiny Field Mus platythrix Common Mouse 16 House Rat Rattus Rattus Abundant V 17 Pangolin Manis Cassicaudata I 18 Grey Musk Suncus murinus Uncommon Shrew 19 Pale Hedgehog Paraechinus micropus Rare IV 20 Indian Flying Pteropus giganteus Common Fox 21 Common Presbytis entellus Rare II Languar

Table-3.24 No. of Family and Species of Butterflies

Sr. No Family No. of Genus No. of Species % of Species 1 Danaidae 1 3 5.367 2 Satyridea 2 2 3.57 3 Nymphalidea 9 13 23.21 4 Lycaenidae 11 14 25.00 5 Papilionidea 3 4 7.14 6 Pieridea 8 16 28.57 7 Hesperiidea 4 4 7.14 Total 38 56 100.00

Table-3.25 List of Spiders from Barda Wildlife Sanctuary showing their status

Sr. No Family Name of the species Status I Filistatidea Pritha sp. Sahastata sp. C II Oecobiidea Occobious putus C III Dictynidea Dictyna sp. C

M/s TATA CHEMICALS LIMITED Page 129 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

IV Eresidea Spegodyplius CCUC srarsinorunS.SocialisS.pacificus V Uloboridea Uloborius khasiensis C VI Pholcidea Pholcus phallangiodes Crossopriza layoni CCUC VII Thendiidea Argyrodes dipaliA. Sp. CCUC VIII Araneidea Argeope anasuja Neoscona mukerjeiN. CCCCCUCUCUC pavidaN. theisN. rumfiN. ellipticaN. CCCUCUCRCUC nauticaN. Sp. Cyclosa insulanaC. MoonduensisC. Sp. Cyrtophora citricola Laiania chlorisPoltys sp. Nov. Zygilla indicaZ. Sp. IX Tetragnathide Tertagnatha mendibulataT. Sp. CC a X Harsiliidea Harsilia savignyi C XI Pisauridea Pisaura sp. UC XII Clubionidea Clubiona sp. Cheiracanthium saraswatii CC XIII Gnaphosidea Gnaphosa sp. Phaeocedus sp. Drassodes CUCC XIV Thomisidea Thomisus projectusT. ShivajiensisT. Sp. UCRCR Bomis sp. nov. XV Selenopidea Selenops sp. UC XVI Heteropodide Heteropoda bhaikakai C a XVII Oxyopidea Oxyopes wroughtoniO. Sp. CC XVIII Lycosidea Hippasa pisaurinaPordosa birmanicaP. CCCCUCUCCC SumatranaP. AnnandaleiP. PusiolaP. CUCC timidaP. Sp.P. sp. Evippas sp. E. sp. Lycosa sp. L. sp. XIX Salticidea Plexypus payakuliP. Sp. Phidippus sp. CCUCUC Marpissa sp. Salticus sp.

Table-3.26 List of Amphibians recorded at Barda Wildlife Sanctuary

Name of species Sr. No (Common & Scientific) Family: Bufonidea 1 Common Asia toad (Bufo melanostictus) 2 Marbled toad (Bufo stomaticus) Family: Microhylidea

M/s TATA CHEMICALS LIMITED Page 130 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

3 Omate narrow-mouthed frog (Microhylaomata) Family: Bufonidea Indian skipping frog 4 (Euphlyctis cyanophlyctis) 5 Indian bull frog (Hoplobatrachus tigerinus) 6 Cricket frog (Limnonectes limnocharis) 7 Unidentified frog (Limnonectes sp.) Family: Rhacophoridea 8 Indian tree frog (Polypedates sp.)

Table-3.27 List of Snakes found in Barda Wildlife Sanctuary

Sr. No Common Name Scientific Name Habits IUCN Category Typhlopidea 1 Brahminy worm snake Ramphotyphlops Fossorial LR-nt braminus 2 Beaked worm snake Rhinotyphlops acutus Boidea 3 Common sand boa Erix conicus Fossorial LR-nt 4 Red sand boa Erix johnii Fossorial LR-lc Colubridea 5 Indian trinket snake Elaphe helena Terrestrial LR-nt 6 Common bronze-back Dendrelaphis tristis tree snake 7 Common wolf snake Lycodon aulicus Terrestrial LR-nt 8 Western rat snake Ptyas mucosus Arboreal LR-nt 9 Chekered Keelback Xenochrophis piscator Aquatic LR-nt water snake 10 Dumerils black-headed Sibynophis subpunctatus snake Elapidea 11 Spectacled cobra Naja naja Terrestrial LR-nt Viperidea 12 Indian saw-scaled viper Echis carinatus Terrestrial LR-nt 13 Russell's viper Daboia russelii Terrestrial LR-nt Abbreviation: VU: Vulnerable; LR-nt: Lower Risk-near threatened;LR-lc: Lower Risk-

M/s TATA CHEMICALS LIMITED Page 131 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

least concern

Table-3.28 Density of Birds in Barda Wildlife Sanctuary

Density/km2 Sr. No Common Name Monsoon Summer Winter 1 2 3 4 5 PHALACROCORACIDEA 1 Little Corinorant 3 4.29 ARDEIDEA 2 Pond Heron 7 4.29 3 Cattle Egret 11 2.86 4 Median Egret 1.43 ACCIPITRIDEA 5 Crested Hawk-Eagle 1.43 6 Spotted Eagle 1.43 7 Crested Serpent Eagle 2.86 PHASIANIDEA 8 Grey Patridge 5 14.29 13 9 Jungle Bush Quail 1 10 Common Peafowl 12 11.43 11 TURNICIDEA 11 Little Bustard-Quail 1.43 12 Common Bustard-Quial 6 2.86 2 RALLIDEA 13 White-breasted Waterhen 1.43 CHARADRIDEA 14 Red-wattled Lapwing 8 2.86 4 15 Yellow-wattled Lapwing 5 1.43 1 16 Marsh Sandpiper 1.43 17 Common Sandpiper 1 4.29 18 Temminck's Stint 2.86 PTEROCLIDIDEA 19 Painted Sandgrouse 2 4.29 2 COLUMBIDEA 20 Blue Rock Pigeon 2 1.43 1 21 Ring Dove 3 4.29 4 22 Red Turtle Dove 1 1

M/s TATA CHEMICALS LIMITED Page 132 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

23 Spotted Dove 6 1.43 1 24 Little Brown Dove 14 4.29 7 PSITTACIDEA 25 Rose-ringed Parakeet 7 10 5 CUCULIDEA 26 Pied Crested Cuckoo 10 27 Koel 6 1.43 2 28 Sirkeer Cuckoo 1 29 Crow-Pheasant or Caucal 1 1 STRIGIDEA 30 Spotted Owlet 2 ALCEDINIDEA 31 Pied Kingfisher 2 32 Small Bule Kingfisher 4.29 33 White-breasted Kingfisher 4 1.43 1 MEROPIDEA 34 Small Green Bee-eater 1 1.43 1 CORACIIDEA 35 Roller or Blue Jay 1.43 UPUPIDEA 36 Hoopoe 3 2.86 2 PICIDEA 37 Yelllow-fronted pied Woodpecker 1 1.43 1 PITTIDEA 38 Indian Pitta 1 ALAUDIDEA 39 Red-winged Bush Lark 3 4.29 40 Black-bellied Finch-Lark 7 7.14 2 41 Short-toed-Lark 4.29 2 42 Crested Lark 2.86 2 43 Sykes's Crested Lark 3 HIRUNDIDEA 44 Dusky Crag Martin 4 45 Swallow 1 46 Red-rumped swallow 3 DANIDEA 47 Grey Shrike 2 48 Bay-backed Shrike 1 2.86 1 49 Red-backed Shrike 1

M/s TATA CHEMICALS LIMITED Page 133 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

50 Pale Brown Shrike 2 51 Rufousbacked Shrike 6 1.43 DICRURIDEA 52 Black Drongo 4 1.43 2 STURNIDEA 53 Brahminy Myna 9 1.43 8 54 Rosy Pastor 22 55 Common Myna 2 4.29 8 CORVIDEA 56 Treepie 5 10 3 57 House Crow 4 2 IRENIDEA 58 Iora 6 10 5 PYCNONOTIDEA 59 Red-vanted Bulbul 115 108.57 69 MUSCICAPIDEA 60 Common Babbler 14 8.57 3 61 Striated Babbler 2 8.57 3 62 Jungle Babbler 40 20 32 63 Spotted Flycatcher 4 4.29 64 Tickell's Blue Flycatcher 1 5.71 65 White-browed Fantail Flycatcher 2.86 66 Paradise Flycatcher 12.86 67 Franklin's Wren-Warbler 18 1.43 1 68 Rufous-fronted Wren-Warbler 1 4.29 69 Streaked Wren-Warbler 1.43 70 Plain Wren-Warbler 7 1 71 Ashy Wren-Warbler 3 10 3 72 Tailobird 1 1.43 1 73 Lesser White-throat 10 74 Magpie-Robin 2.86 3 75 Balck Redstart 12.86 76 Indian Robin 23 45.71 28 PARIDEA 77 Grey Tit 2 2.86 3 MOTACILLIDEA 78 Grey Wagtail 1.43 79 White Wagtail 3 NECTARINIDEA

M/s TATA CHEMICALS LIMITED Page 134 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

80 Purple Sunbird 13 2.86 ZOSTEROPIDEA 81 White-eye 11 2.86 2 PLOCEIDEA 82 House Sparrow 2.86 2 83 Yellow-throated sparrow 4.29 1 84 Baya Weaver Bird 15 1.43 1 85 White-throated Munia 14 15.71 9 EMBERIZIDEA 86 Grey-necked Bunting 3 1.43 87 Rock Bunting 9 88 Striolated Bunting 2 4.29 (Source: Ecological and Socio- Economic Study of Barda Wildlife Sanctuary, Gujarat Ecological and Research GEER Foundation, Gandhinagar, Gujarat Forest Department, Gandhinagar)

3.7.8.7 Importance of Barda Wildlife Sanctuary The area supports about 750 'maldhari' families (4000 people) in 68 'nesses'. The agriculture fields and wasteland, where acute water scarcity is experienced during the summer months, surround the forest area. However, this green patch of forest provides ecological security and environmental stability, since it improves the water regime of the area by recharging the ground water and forming catchment for the minor dams in the sanctuary. Located barely at distance of 15 km from the Arabian Sea, the forest is standing as the guard against the salinity ingress in the region. The forest is endowed with very rich floral composition. Kileshwar, a temple and camping site developed by 'Jamsaheb' of Jamnagar, is a beautiful site in the heart of the forest.

3.8 Socio-Economic Environment Socio Economic is a study to identify, evaluate and determine the potential of socio economics and cultural impacts of a proposed development project on the lives of current or future residents of a community or geographic area. Socio economics study includes the demographic structure of the study area, social group present, livelihood profile of the community, literacy & Illiteracy structure, Occupational structure including total worker, main worker, marginal worker and non- worker, basic amenities like Education facilities, medical facilities etc.

The proposed Expansion of Aniali Limestone mining project is located near village Aniali, Taluka Ranavav, District Porbandar and State Gujarat. The various attributes have been taken into account to conduct socio economic study which includes population composition, employment generation, occupational shift, household income, consumption pattern, ethnic issue and law & order problem.

M/s TATA CHEMICALS LIMITED Page 135 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

3.8.1 Objectives The objectives of the socio-economic study are as follows:  To study the socio-economic status of the people living in the study area of the proposed mining project.  To assess the impact of the project on socio-economic environment in the study area.  To assess the impact of the project on Quality of life of the people in the study area.  To evaluate the community development measures proposed to be taken up by the project proponent, if any.  To recommend Community Development measures needs to be taken up in the study area 3.8.2 Methodology adopted for the study a. The study has been conducted based on primary and secondary data. b. The secondary data has been collected from the administrative records of the Government of Gujarat, Census 2011. c. The primary data is collected through a sample survey of selected villages & town present in the study area. The photographs of the socio economic survey are attached as Annexure XIV. d. The details regarding population composition, number of literates, workers etc. have been collected from secondary sources and analyzed. Also, village /city/town wise details regarding amenities available in the study area have been collected from secondary sources. e. Based on the above data, impacts due to mining operation on the community have been assessed and recommendations for improvement have been made.

3.8.3 Concepts & Definition (a) Study Area: “Study Area”, also known as “Impact Area” has been defined as the sum total of “Core Area and Buffer Area” within a radius of 10 Kilometres from the periphery of the Core Area. The study area includes all the land marks both natural and manmade, falling therein.

(b) Household: A group of persons who normally live together and take their meals from a common kitchen are called a household. Persons living in a household may be related or unrelated ora mix ofboth.

(c) Sex Ratio: “Sex Ratio” is the ratio of Females to Males in a given population. It is expressed as 'number of Females per 1000 Males’.

(d) Literates: All persons aged 7 years and above who can both read and write with understanding in any language are taken as literate. It is not necessary for a person to have received any formal education or passed any minimum educational standard for being treated as literate. People who are blind but can read in Braille are also treated as literates.

(e) Literacy Rate: “Literacy Rate” of population is defined as the percentage of literates to the total population aged 7 years and above.

M/s TATA CHEMICALS LIMITED Page 136 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

(f) Labor Force: “Labor Force” is the number of people employed and unemployed in a geographical entity. The size of the “Labor Force” is the sum total of persons employed and unemployed. An unemployed person is defined as a person not employed but actively seeking work.

(g) Work: “Work” is defined as participation in any economically productive activity with or without compensation, wages or profit, it can part time, full time, or unpaid work in a farm, family enterprise or in any other economic activity. Such participation may be physical and/or mental in nature. Work involves not only actual work but also includes effective supervision and direction of work.

(h)Worker: All persons engaged in 'work' are defined as “workers”. Persons who are engaged in cultivation or milk production even solely for domestic consumption are also treated as workers.

Work participation rate: the percentage of total workers (main and marginal) to total population.

 Main Workers: Those workers, who had worked for the major part of the reference period (i.e. 6 months or more in the case of a year), are termed as “Main Workers”.

 Marginal Workers: Those workers, who did not work for the major part of the reference period (i.e. less than 6 months), are termed as “Marginal Workers”.

3.8.4 (a) Description of the District Porbandar forms a part of the erstwhile Kathiawar peninsula located in the western part of Gujarat. The district headquarter is Porbandar. The is situated between the parallels of latitude 21º 20' and 22º 10’ and the meridians of longitude 69º 40’ and 70º 10’. The length from north to south of this territory is about 83.6 km and from east to west about 80.2 km. It is bounded in the north and west by Jamnagar district and in east by Junagadh district and in the south by the Arabian Sea. For administrative convenience, the district has been divided into 3 talukas, with total 179 villages and 6 towns. The area covered by this district is 2,316.00 sq. km and density is 253 population per sq.km against the density of the Gujarat is 308 and ranks 23rd in comparison to other districts of the state. Porbandar district is situated in Saurashtra region. (Source: Part-XII-A, Series-25, District Census Handbook, Porbandar, Gujarat, Census of India 2011).

(i) History of Porbandar District Porbandar was known by the name of Paur Velakul in the tenth century. From the day of Gandhi Jayanti, on 2nd October 1997, Government of Gujarat formed Porbandar as a new district from the Junagadh district. Porbandar district has three Talukas, which are Porbandar, Ranavav and Kutiyana. Porbandar is well known throughout India and abroad as the Birthplace of the Father of the Nation, Mahatma Gandhi. It is mentioned in the Hindu sculptures as Sudamapuri. Every year in the Porbandar district the festival for birth of Lord Krishna, “Janmastami” is celebrated.

M/s TATA CHEMICALS LIMITED Page 137 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

Porbandar has been on the world map, mainly because it is the birthplace of ‘Mohandas Karamchand Gandhi’Besides Sudama Temple, Porbandar is also famous for potteries, cement factories, mills and of course, its sea-shore. (Source: Part-XII-A, Series-25, District Census Handbook, Porbandar, Gujarat, Census of India 2011). (ii) Cropping Pattern Being agriculture oriented district, large portion of population is engaged in agriculture and animal rearing. Most of clayey to clayey loam soil predominant in the district is derived from basalt, lime stone and alluvium material. In Kutiyana taluka, clay to clay loam type soil is found while in Ranavav taluka sandy clay to sandy clay loam type of soils are also found in some parts of taluka. Medium black type and medium red type of soil is present in some of the part of district. The main crops in the district is wheat, cereals, bajra, gram, pulses, jowar, sesame and maize. (Source: Part-XII-A, Series-25, District Census Handbook, Porbandar, Gujarat, Census of India 2011).

(iii) Fisheries The fisheries sector has played an important role in the national economy through food supply, employment generation and income. The major part of Porbandar district is located on the coastal area of Arabian Sea. This coastal area is blessing for the small fishermen. Fish is also exported. The main fishes are cear, dhol hilcia, ribban, crukar and rok ked. This coastal way is more useful for fishing activity. There is long sea coast from Mayan to Madhupur on Arabian Sea and rich qualities of species. Hence fisheries and fish based industries like manufacturing fishing nets is there. Fishing industry is a prominent activity in Porbandar with Silver Sea Foods emerging as one of the major sea food processing companies in the district. Fish processing industry is a major sector in Porbandar. Processed fishes from Porbandar are exported to Singapore, China, Hong Kong, Japan, Dubai and other parts of the world. (Source: Part-XII-A, Series-25, District Census Handbook, Porbandar, Gujarat, Census of India 2011).

3.8.4 (b) Description of the Study Area 3.8.4.1 Core Zone: -There is no human settlement in the core zone of the Aniali Limestone Mining project.

3.8.4.2 Buffer Zone: - Area within 10km radius of the “Project Site” is considered as the “Study Area”. The study area of 10 Km radius area is spread over 28 villages and 2 towns (namely: Amardal and Ranavav) falling in three sub-districts namely Ranavav, Kutiyana of District Porbandar and Jamjhodpur in District Jamnagar as per census 2011. List of villages along with the sub-district is given in Table 3.30:

Table 3.29: Details of the State Gujarat, District Porbandar and Study area S.N PARTICULAR DETAILS OF DETAILS STUDY O. STATE OF AREA GUJARAT DISTRIC DETAILS T

M/s TATA CHEMICALS LIMITED Page 138 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

PORBAN DAR 1. Area (in sq.km) 1,96,024 2316 458.5127 2. No. of households 12,248,428 124117 22828 3. Density(sq.km) 308 253 234.53 4. Total Population 60,439,692 585449 107537 5. Male Population 31,491,260 300209 54848 6. Female Population 28,948,432 285240 52689 7. Sex Ratio (Females per 1000 Males) 919 950 961 8. Total Child Population (0-6 Age) 77,77,262 65926 13327 9. Male child population (0-6 Age) 4,115,384 34648 6903 10. Female child population (0-6 Age) 3,661,878 31278 6324 11. Child Sex Ratio (Girls per 1000 Boys) 890 902 916 12. Schedule Caste Population 89,17,174 51830 10196 13. Schedule Tribe Population 4,074,447 13039 4631 14. Literate Population 41,093,358 393678 67531 15. Male Literates 23,474,873 221621 38375 16. Female Literates 1,76,18,485 172057 29156

Table 3.30: Total Geographical Area (in Hectares) of the Study Area S.No. Name Sub-district Total Geographical Area (in Hectares) 1 Amar Kutiyana 1451.67 2 Amardal Ranavav 504 3 Aniali Ranavav 1358.79 4 Ashiyapat Ranavav 1113.94 5 Bapodar Ranavav 1757.32 6 Bhod Ranavav 2218.68 7 Bileshwar Ranavav 522 8 Bordi Ranavav 1211.47 9 Daiyar Ranavav 627.2 10 Devda Kutiyana 3005.85 11 Dolatgadh Ranavav 419.98 12 Hanumangadh Ranavav 548.02 13 Jarera Nes Ranavav 5 14 Kandorna-Rana Ranavav 2702.83

M/s TATA CHEMICALS LIMITED Page 139 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

15 Khambhala Ranavav 1300 16 Khijdad Ranavav 635.14 17 Khirsara Ranavav 1427.48 18 Mokar Ranavav 7537.8 19 Ramgadh Ranavav 806.58 20 Ramnagar Kutiyana 1421.33 21 Ranavav Ranavav 7966 22 Sukhpur Jamjodhpur 1459.98 23 Tarsai Jamjodhpur 2246.92 24 Vadwala-Rana Ranavav 2652.74 25 Valotra Ranavav 943.5

Villages Present inside Barda Wildlife Sanctuary 26 Dhoria Nes Ranavav 1 27 Kharavira Khunano Nes Ranavav 0.25 28 Kharavira Nes Ranavav 3 29 Morivirda Nes Ranavav 0.8 30 Shermlanki Khunano Nes Ranavav 2 Total 45851.27

3.8.5 Demographic Profile of the study area based on 2011 Census data The proposed project’s study area covers 28 Villages & 2 Towns of Porbandar & Jamnagar District in Gujarat State. Out of these 28 villages, 5 villages are present inside Barda Wildlife Sanctuary. Study has been undertaken with respect to demography, occupational pattern, literacy rate and other important socio-economic indicators of these villages/town to reveal the socio- economic structure of the entire project area.

The salient features of the study area include: 1. Total population of study area is 107537. The percentages of male & female population are 51.00 % & 49.00 % respectively 2. Total household in the study area are 22828 with a family size of 4.71. 3. Total number of literates in the study area is 67531 (71.68%). 4. Sex ratio (number of Females per thousand Male) ofthe studyarea is 961 which shows that male population is higher in the studyarea as compared with the female population. 5. Out of the total population Scheduled Caste population in the study area is 10196 (9.48%) and Scheduled Tribe population is 4631 (4.30%). 6. The child population (0-6 years) in the study area is 13327 (12.39%) in which 6903 (6.41%) is the child boys population and 6324 (5.88%) which is child girls population. The child sex ratio in the study area is 916.

M/s TATA CHEMICALS LIMITED Page 140 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

3.8.5.1 Population of the study area Total population of study area is 107537. The percentages of male & female population are 51.00 % & 49.00 % respectively. Sex ratio (number of Females per thousand Male) ofthe study area is 961 which shows that male population is higher in the study area as compared with the female population. Breakup of the population for male and female is given in the following consisting of gender-wise details of population as per census data 2011.

DEMOGRAPHIC STRUCTURE OF THE STUDY AREA 120000

100000 107537

80000

60000 54848 52689 40000

20000

0 TOTAL POPULATION MALE POPULATION FEMALE POPULATION Figure 3.14: Graph Showing Demographic Structure of the Study Area

GENDERSTRUCTUREOFTHESTUDYAREA

Male Population Female population

49% 51%

Figure 3.15: Pie Chart Showing Gender Structure of the Study Area

3.8.5.2 Social Structure (a) The Schedule Caste (SC) population within the study area is 10196 (9.48%) of the total population with 5273 (4.90%) Male and 4923 (4.58%) are female.

M/s TATA CHEMICALS LIMITED Page 141 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

Schedule Caste Structure of the Study Area

10%

Total Population

Total Schedule Caste Population

90%

Figure 3.16: Pie chart showing Schedule Caste Structure of the Study Area

(b) The Schedule Tribe (ST) population within the Study Area is 4631 (4.30%) of the total population with 2369 (2.20%) Male and 2262 (2.10%) Female. Detailed status of social structure is given below in Table 3.31.

Schedule Tribe Structure of the Study Area

4%

Total Population Total Schedule Tribe Population

96%

Figure 3.17: Pie Chart showing Schedule Tribe structure of the Study area

3.8.5.3 Literacy The total number of literates within the study area is approximately 67531 which are 71.68% of total population. Male literacy rate of the study area is 80.04% and female literacy rate is 62.88%. Detailed status of literacy is given below in Table 3.31.

M/s TATA CHEMICALS LIMITED Page 142 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

3.8.5.4 Illiteracy The total number of illiterates within the study area is approximately 40006 which are 37.20% of total population. Male Illiteracy rate ofthe study area is 30.03% and female Illiteracy rate is 44.66 %. Detailed status of Illiteracy is given below in Table 3.31.

M/s TATA CHEMICALS LIMITED Page 143 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

Table 3.31: Demographic Structure of the Study Area Child Total Househ Total Population Sex Child population (0-6 years) Schedule Caste S.N Sex NAME House old Ratio o Ratio holds Size Total Male Female Total Male Female Total Male Female 1 Amar 463 4.58 2122 1093 1029 941 240 129 111 860 160 86 74 2 Amardal 1263 4.65 5872 3014 2858 948 671 345 326 945 1265 653 612 3 Aniali 373 4.75 1771 916 855 933 218 117 101 863 240 131 109 4 Ashiyapat 96 4.46 428 218 210 963 64 22 42 1909 36 17 19 5 Bapodar 387 4.54 1757 856 901 1053 240 114 126 1105 60 27 33 6 Bhod 947 4.79 4540 2260 2280 1009 654 299 355 1187 384 195 189 7 Bileshwar 364 4.80 1748 911 837 919 200 101 99 980 141 70 71 8 Bordi 431 4.59 1979 990 989 999 334 179 155 866 63 30 33 9 Daiyar 266 4.83 1285 657 628 956 152 80 72 900 127 65 62 10 Devda 773 4.94 3821 1980 1841 930 484 254 230 906 340 177 163 11 Dolatgadh 327 5.21 1703 847 856 1011 274 140 134 957 32 14 18 Hanumanga 12 326 4.53 1476 732 744 1016 167 91 76 835 0 0 0 dh 13 Jarera Nes 101 4.16 420 228 192 842 38 25 13 520 0 0 0 Kandorna- 14 1850 4.70 8690 4453 4237 951 976 527 449 852 432 217 215 Rana 15 Khambhala 270 5.33 1438 747 691 925 217 131 86 656 60 33 27 16 Khijdad 311 5.09 1584 800 784 980 191 96 95 990 173 93 80 17 Khirsara 571 4.09 2335 1172 1163 992 254 146 108 740 324 163 161 18 Mokar 820 3.93 3224 1556 1668 1072 358 187 171 914 419 212 207 19 Ramgadh 300 4.98 1494 763 731 958 236 141 95 674 5 3 2 20 Ramnagar 301 5.20 1564 821 743 905 171 97 74 763 97 53 44 21 Ranavav 9635 4.78 46018 23550 22468 954 5682 2870 2712 945 4792 2509 2283 22 Sukhpur 383 4.34 1663 829 834 1006 185 100 85 850 78 36 42 23 Tarsai 1026 4.53 4644 2371 2273 959 543 283 260 919 226 111 115 Vadwala- 24 784 4.60 3608 1848 1760 952 463 255 208 816 447 223 224 Rana

M/s TATA CHEMICALS LIMITED Page 144 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

25 Valotra 393 5.09 2001 1050 951 906 253 141 112 794 295 155 140 Villages Present inside Barda Wildlife Sanctuary 26 Dhoria Nes 6 5.67 34 21 13 619 12 8 4 500 0 0 0 Kharavira 27 Khunano 8 4.88 39 22 17 773 3 1 2 2000 0 0 0 Nes Kharavira 28 20 5.45 109 53 56 1057 18 10 8 800 0 0 0 Nes Morivirda 29 5 5.40 27 15 12 800 6 1 5 5000 0 0 0 Nes Shermlanki 30 Khunano 28 5.11 143 75 68 907 23 13 10 769 0 0 0 Nes TOTAL 22828 4.71 107537 54848 52689 961 13327 6903 6324 916 10196 5273 4923

Schedule Tribe Population Literacy Population Illiteracy Population S.No NAME Total Male Female Total Male Female Total Male Female 1 Amar 0 0 0 1227 708 519 895 385 510 2 Amardal 214 102 112 3876 2294 1582 1996 720 1276 3 Aniali 434 221 213 1138 661 477 633 255 378 4 Ashiyapat 119 51 68 213 129 84 215 89 126 5 Bapodar 137 68 69 1025 576 449 732 280 452 6 Bhod 116 57 59 2372 1369 1003 2168 891 1277 7 Bileshwar 297 158 139 991 580 411 757 331 426 8 Bordi 465 249 216 1144 648 496 835 342 493 9 Daiyar 118 56 62 818 463 355 467 194 273 10 Devda 4 3 1 2469 1450 1019 1352 530 822 11 Dolatgadh 55 33 22 936 524 412 767 323 444 12 Hanumangadh 154 79 75 856 488 368 620 244 376 13 Jarera Nes 46 26 20 41 25 16 379 203 176 14 Kandorna-Rana 678 345 333 5727 3263 2464 2963 1190 1773 15 Khambhala 157 83 74 784 451 333 654 296 358 16 Khijdad 3 1 2 1068 610 458 516 190 326

M/s TATA CHEMICALS LIMITED Page 145 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

17 Khirsara 126 62 64 1555 854 701 780 318 462 18 Mokar 0 0 0 2120 1150 970 1104 406 698 19 Ramgadh 447 218 229 866 488 378 628 275 353 20 Ramnagar 6 3 3 959 573 386 605 248 357 21 Ranavav 772 405 367 29946 16894 13052 16072 6656 9416 22 Sukhpur 32 17 15 1061 565 496 602 264 338 23 Tarsai 48 29 19 2930 1656 1274 1714 715 999 24 Vadwala-Rana 55 28 27 2142 1226 916 1466 622 844 25 Valotra 0 0 0 1244 716 528 757 334 423 Villages Present inside Barda Wildlife Sanctuary 26 Dhoria Nes 0 0 0 0 0 0 34 21 13 Kharavira 27 39 22 17 0 0 0 39 22 17 Khunano Nes 28 Kharavira Nes 109 53 56 0 0 0 109 53 56 29 Morivirda Nes 0 0 0 3 0 3 24 15 9 Shermlanki 30 0 0 0 20 14 6 123 61 62 Khunano Nes Total 4631 2369 2262 67531 38375 29156 40006 16473 23533 (Source: As per Census Data, 2011)

M/s TATA CHEMICALS LIMITED Page 146 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

3.8.6. Occupational structure “Occupational Structure” of the population in the ‘Study Area’ has been studied with reference to the total workers and non-workers. Further total workers grouped into two categories “main workers” and “marginal workers”. Main workers and marginal workers have been grouped into four categories namely: Cultivators, Agricultural Labourers, Household Workers and Other Workers.

3.8.6.1 Total workers Work” is defined as participation in any economically productive activity with or without compensation, wages or profit; such participation may be physical and/or mental in nature. The number of total workers in the study area is approximately 43717 (40.65%). Out of which 29.42% is male and 11.22% is female.

Total workers further divided into main workers and marginal workers: -

(i) Main workers The workers who had worked for the major part of the reference period (i.e. 6 months or more) are termed as “Main Workers”. Total number of main workers in the Study Area is approximately 38117 persons, which is 87.19% of total workers and 35.44% of total population.

(ii) Marginal Workers Marginal Workers are those workers, who are engaged in some work for a period of less than six months, during the reference year prior to the census survey. Total number of marginal workers in the Study Area is approximately 5600 persons which is 12.80 % of the total workers and 5.20% of total population.

3.8.6.1.1 Cultivators: A person is classified as ‘Cultivators’ if he or she is engaged in cultivation of land own or from government or held from private persons or institutions for payment in money, kind or share. A person working on another person’s land for wages in cash or kind or combination of both is not treated as “Cultivator”. Total Cultivators in the “Study Area” is approximately 11072 persons which is 25.32% of total working population and 10.29% of total population.

3.8.6.1.2 Agricultural Laborers Persons working on the land of others for wages and employment, or person who do not have their own land to do agricultural practices (also known as 'Landless Labour') or have share in the yield are all classified under as Agricultural laborers. Total workers of this category in the “Study Area” are approximately 14458 persons which are 33.07% of total working population and 13.44% of total population.

3.8.6.1.3 Household Industry Laborers Household Industry is defined as an industry conducted by one or more members of the household at home or within the village in rural areas and only within the precincts of the house

M/s TATA CHEMICALS LIMITED Page 147 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

where the household lives in urban areas. The main criterion of a Household industry even in urban areas is the participation of one or more members of a household. Total Household Industry Laborers of this category in the “Study Area” is approximately 275 persons which are 0.62% of total working population and 0.25% of total population

3.8.6.1.4 Other Workers All workers except “Cultivators” or “Agricultural labour” or “Household Industry” Workers are Other Workers. Total other workers of this category in the “Study Area” is approximately 17912 persons which are 40.97% of total working population and 16.65% of total population

3.8.6.2 Non workers The non-workers include those engaged in unpaid household duties, students, retired persons, dependents, beggars etc. The total number of non-workers population is approximately 63820 which is 59.34% of the total population. Out of which 21.57% is male and 37.77% is female. The percent distribution of Occupational pattern within the study area is given in Table 3.32.

Table 3.32: Occupational Pattern of the Study area

Number of Workers in the Study Area S.No. Particulars Male Female Total Male Female worker % worker % 1 Total Workers 43717 31647 72.39 12070 27.61 2 Non-Workers 63820 23201 36.35 40619 63.65 3 Main Workers 38117 29978 78.65 8139 21.35 4 Marginal Workers 5600 1669 29.80 3931 70.20 Cultivators (Main 5 11072 8201 74.07 2871 25.93 +Marginal) Agricultural Labour 6 14458 8267 57.18 6191 42.82 (Main +Marginal) Household Industry 7 275 200 72.73 75 27.27 (Main +Marginal) Other workers (Main 8 17912 14979 83.63 2933 16.37 +Marginal) (Source: As Per Census Data, 2011)

M/s TATA CHEMICALS LIMITED Page 148 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

Occupational Structure of the Study Area 70000

60000

50000

40000

30000

20000

10000

0 Agricultur Household Other Cultivator al Labour Industry workers Total Non- Main Marginal s (Main (Main (Main (Main Workers Workers Workers Workers +Marginal +Marginal +Marginal +Marginal ) ) ) ) TOTAL 43717 63820 38117 5600 11072 14458 275 17912 MALE 31647 23201 29978 1669 8201 8267 200 14979 FEMALE 12070 40619 8139 3931 2871 6191 75 2933

Figure 3.18: Occupational Pattern in the Study area

M/s TATA CHEMICALS LIMITED Page 149 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

Table 3.33: Occupation Structure of villages and Town in the Study Area S.N Total worker Non worker Main worker Marginal worker NAME o Total Male Female Total Male Female Total Male Female Total Male Female 1 Amar 932 708 224 1190 385 805 929 707 222 3 1 2 2 Amardal 2311 1693 618 3561 1321 2240 1806 1514 292 505 179 326 3 Aniali 768 535 233 1003 381 622 550 498 52 218 37 181 4 Ashiyapat 237 133 104 191 85 106 58 56 2 179 77 102 5 Bapodar 704 516 188 1053 340 713 700 514 186 4 2 2 6 Bhod 1859 1232 627 2681 1028 1653 1347 1147 200 512 85 427 7 Bileshwar 759 540 219 989 371 618 538 399 139 221 141 80 8 Bordi 808 567 241 1171 423 748 747 558 189 61 9 52 9 Daiyar 506 418 88 779 239 540 465 413 52 41 5 36 10 Devda 1585 1062 523 2236 918 1318 1574 1057 517 11 5 6 11 Dolatgadh 885 514 371 818 333 485 610 482 128 275 32 243 Hanumanga 12 493 419 74 983 313 670 342 311 31 151 108 43 dh 13 Jarera Nes 261 141 120 159 87 72 253 134 119 8 7 1 Kandorna- 14 3854 2613 1241 4836 1840 2996 3385 2494 891 469 119 350 Rana 15 Khambhala 748 431 317 690 316 374 416 393 23 332 38 294 16 Khijdad 532 502 30 1052 298 754 507 486 21 25 16 9 17 Khirsara 1046 685 361 1289 487 802 788 648 140 258 37 221 18 Mokar 1225 843 382 1999 713 1286 1036 822 214 189 21 168 19 Ramgadh 621 459 162 873 304 569 449 398 51 172 61 111 20 Ramnagar 492 475 17 1072 346 726 487 470 17 5 5 0 21 Ranavav 17175 13351 3824 28843 10199 18644 16103 12794 3309 1072 557 515 22 Sukhpur 712 503 209 951 326 625 698 496 202 14 7 7 23 Tarsai 2169 1451 718 2475 920 1555 2117 1436 681 52 15 37 Vadwala- 24 1578 1080 498 2030 768 1262 1443 1049 394 135 31 104 Rana 25 Valotra 1224 651 573 777 399 378 600 582 18 624 69 555

M/s TATA CHEMICALS LIMITED Page 150 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

Villages Present inside Barda Wildlife Sanctuary 26 Dhoria Nes 16 8 8 18 13 5 15 7 8 1 1 0 Kharavira 27 Khunano 31 18 13 8 4 4 18 18 0 13 0 13 Nes Kharavira 28 85 42 43 24 11 13 42 42 0 43 0 43 Nes Morivirda 29 11 7 4 16 8 8 11 7 4 0 0 0 Nes Shermlanki 30 Khunano 90 50 40 53 25 28 83 46 37 7 4 3 Nes TOTAL 43717 31647 12070 63820 23201 40619 38117 29978 8139 5600 1669 3931

(MAIN WORKER+MARGINAL WORKER) Agriculture Cultivators Household Industry Others workers S.No NAME laborers Total Male Female Total Male Female Total Male Female Total Male Female 1 Amar 443 372 71 376 241 135 0 0 0 113 95 18 2 Amardal 189 139 50 912 484 428 28 18 10 1182 1052 130 3 Aniali 436 273 163 219 161 58 0 0 0 113 101 12 4 Ashiyapat 58 56 2 91 49 42 1 0 1 87 28 59 5 Bapodar 570 439 131 113 62 51 0 0 0 21 15 6 6 Bhod 746 468 278 432 282 150 1 0 1 680 482 198 7 Bileshwar 149 111 38 472 308 164 0 0 0 138 121 17 8 Bordi 286 216 70 304 161 143 0 0 0 218 190 28 9 Daiyar 264 241 23 165 106 59 1 1 0 76 70 6 10 Devda 390 298 92 1007 616 391 7 6 1 181 142 39 11 Dolatgadh 360 216 144 322 167 155 0 0 0 203 131 72 Hanumanga 12 256 241 15 145 103 42 31 24 7 61 51 10 dh 13 Jarera Nes 5 2 3 10 5 5 0 0 0 246 134 112

M/s TATA CHEMICALS LIMITED Page 151 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

Kandorna- 14 1078 699 379 1639 934 705 62 40 22 1075 940 135 Rana 15 Khambhala 372 209 163 256 117 139 0 0 0 120 105 15 16 Khijdad 373 362 11 111 96 15 2 2 0 46 42 4 17 Khirsara 350 264 86 485 272 213 0 0 0 211 149 62 18 Mokar 366 334 32 604 281 323 0 0 0 255 228 27 19 Ramgadh 254 253 1 266 120 146 2 1 1 99 85 14 20 Ramnagar 245 244 1 197 186 11 1 1 0 49 44 5 21 Ranavav 2054 1456 598 3116 1689 1427 69 39 30 11936 10167 1769 22 Sukhpur 233 201 32 404 242 162 7 7 0 68 53 15 23 Tarsai 571 420 151 1344 817 527 6 5 1 248 209 39 Vadwala- 24 562 371 191 806 524 282 46 46 0 164 139 25 Rana 25 Valotra 461 316 145 660 242 418 11 10 1 92 83 9 Villages Present inside Barda Wildlife Sanctuary 26 Dhoria Nes 0 0 0 0 0 0 0 0 0 16 8 8 Kharavira 27 Khunano 0 0 0 0 0 0 0 0 0 31 18 13 Nes Kharavira 28 0 0 0 0 0 0 0 0 0 85 42 43 Nes Morivirda 29 0 0 0 2 2 0 0 0 0 9 5 4 Nes Shermlanki 30 Khunano 1 0 1 0 0 0 0 0 0 89 50 39 Nes TOTAL 11072 8201 2871 14458 8267 6191 275 200 75 17912 14979 2933 (Source: Census Data, 2011)

M/s TATA CHEMICALS LIMITED Page 152 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

3.8.7 Infrastructural Facilities and Amenities in the Study Area: Information on amenities has been provided based on information available in 2011 Census. The Infrastructural facilities and amenities like Education, Health, Drinking Water, Electricity, Transport and Communication Network. The information is provided in subsequent paragraphs of this section.

(a)Medical Facilities: According to the Census-2011, there are 3 primary Health Centre, 13 Primary Health Sub Centre, 5 Dispensary/Health Centre, 4 Veterinary Hospital,1 Family Welfare Centre, 1 Nursing Home, 1 Hospital Allopathic, 1 Maternity & Child Welfare, 2 Maternity Home centre present in the study area. The data for the medical facilities of the study area demonstrate the not too good condition of basic health facilities in the Study Area. The statistical data representing the type and number of medical facilities available within the study area is given in Table 3.34.

Medical Facilities present in the Study Area 13

5 4 3 2 1 1 1 1

Primary Primary Hospital Dispensary/ Maternity & Maternity Nursing Veterinary Family Health Health Sub Allopathic Health Child Home Home Hospital Welfare Centre Centre Centre Welfare Centre Centre Figure 3.19: Availability of Medical Facility in the Study area

(b) Educational Facilities: In the study area, the number of Primary schools include 70 Govt. and 10 Private, Secondary School includes 50 Govt. and 3 private and Senior secondary School includes 5 Govt., 1 Government degree College of Art & Commerce. The data shows that Primary schools, Secondary schools / Senior Secondary Schools and College are not good enough in the ‘Study Area’. The educational facilities within the study area are given in Table 3.34.

M/s TATA CHEMICALS LIMITED Page 153 Expansion of Aniali Ranabordi Limestone Mining Project Final EIA/EMP

Educational Facilities Present in the Study Area

Government Private

70

50

10 5 3 1 1

Primary School Secondary School Senior Secondary School Degree College Are & Commerce Figure 3.20: Availability of Educational Facility in the Study area

M/s TATA CHEMICALS LIMITED Page 154 Expansion of Aniali Limestone Mining Project Draft EIA/EMP

Table 3.34: Amenities in the Study Area Educational Facilities Health Facilities Senior Govt. Primary Secondary Secondary Govt. Degre Prima Matern S. Dispe Mat Name Degree e ry Primary ity Fam Veter No Hospital nsary/ Nursi ernit College Colle Healt health &child ily inary pri Allopat Healt ng y Gov Govt Priva Priva (Art & ge(Ar h Sub Welfar Wel Hospi vat Govt. hic h Home Ho t. . te te Comme t & Centr Centre e fare tal e centre me rce) Scien e centre ce) 1 Amar 2 0 2 0 0 0 0 0 0 1 0 0 0 0 0 0 0

2 Amardal 2 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0

3 Aniali 2 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 Ashiyapat 1 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 Bapodar 3 0 1 0 0 0 0 0 0 1 0 0 0 0 0 0 1 6 Bhod 3 0 2 0 0 0 0 0 0 1 0 0 0 0 0 0 0

7 Bileshwar 3 0 1 0 0 0 0 0 1 1 0 0 0 0 0 0 0

8 Bordi 2 0 2 0 0 0 0 0 0 1 0 0 0 0 0 1 0 9 Daiyar 1 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0

10 Devda 4 0 1 0 1 0 0 0 1 1 0 1 0 0 0 0 0

11 Dolatgadh 2 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Hanumanga 12 1 0 2 0 0 0 0 0 0 1 0 0 0 0 0 0 0 dh 13 Jarera Nes 2 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Kandorna- 14 6 1 1 1 1 1 0 0 1 2 0 0 0 0 0 0 1 Rana 15 Khambhala 3 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0

M/s TATA CHEMICALS LIMITED Page 155 Expansion of Aniali Limestone Mining Project Draft EIA/EMP

16 Khijdad 1 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0

17 Khirsara 2 0 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 18 Mokar 1 0 1 0 0 0 0 0 0 0 0 1 0 0 0 0 0 19 Ramgadh 2 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 20 Ramnagar 1 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 21 Ranavav 16 8 3 2 3 0 1 0 0 0 1 1 1 1 2 0 1

22 Sukhpur 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0

23 Tarsai 2 1 1 0 0 0 0 0 0 2 0 1 0 0 0 0 1 Vadwala- 24 5 0 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 Rana 25 Valotra 1 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Villages Present inside Barda Wildlife Sanctuary 26 Dhoria Nes 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Kharavira 27 Khunano 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Nes Kharavira 28 1 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Nes Morivirda 29 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Nes Shermlanki 30 Khunano 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Nes TOTAL 70 10 50 3 5 1 1 0 3 13 1 5 1 1 2 1 4 (Source: As Per Census Data, 2011)

M/s TATA CHEMICALS LIMITED Page 156 Expansion of Aniali Limestone Mining Project Draft EIA/EMP

(c) Drinking Water: The main source of drinking water in the study area is through hand pump, tap water, local water reservoirs constructed by district administration /land owners for storage of water. Hand Pump Functioning are available for all-round the year, around 63% settlement present in our study area has this facility.

(d) Power Supply All villages and town in the study area have power supply for domestic agriculture and for all other purposes. The power supply details are given in the Table 3.35.

(e) Transport: Modes of transport in the ‘Study Area’ are Camel Carts, Tractor and Jeeps. Private Bus Services facilities is prominent and is an important mode of transport for daily routine, in our study area around 83% of the villages has this facilities, same can be seen in Table 3.35.

(f) Post office The Town present in the study area has the facilities of post office. Post office facilities are not available in the any villages in the study area, same can be seen in the Table 3.34.

(g) Community Toilet Complex (excluding Bath) for General Public Toilets are an integral part for daily health and hygiene maintenance, its importance lies in an effort to prevent diseases which can be transmitted through human waste. Community toilet may be constructed and maintained by Gram Panchayats or private NGOs like Sulabh Sauchalaya etc. In our study area only 30% of the settlements have these facilities, which constitute to a very poor sanitation factor.

M/s TATA CHEMICALS LIMITED Page 157 Expansion of Aniali Limestone Mining Project Draft EIA/EMP

Table 3.35: Infrastructure facilities of the study area Uncover Tube Tap Water ed Well Community Toilet Hand Pump Wells/Boreh Untreated Public Power Function Complex (excluding S.N Functioning ole Post Name Functioning Bus Supply for ing All Bath) for General o. All-round the Functioning Office All-round the Service All Users round Public year All-round year the year the year 1 Amar A N/A N/A N/A A A A N/A 2 Amardal A A A A A A A A 3 Aniali A A A N/A A A A N/A 4 Ashiyapat A N/A N/A N/A A A N/A N/A 5 Bapodar A N/A N/A N/A A A N/A N/A 6 Bhod A A A N/A A A A A 7 Bileshwar A A N/A N/A A A A N/A 8 Bordi A N/A N/A N/A A A N/A A 9 Daiyar A A N/A N/A A A A A 10 Devda A N/A N/A N/A A A A A 11 Dolatgadh A N/A A N/A A A A N/A 12 Hanumangadh A N/A N/A N/A A A A N/A 13 Jarera Nes N/A A A N/A A A A N/A 14 Kandorna-Rana A A N/A N/A A A A A 15 Khambhala A N/A N/A N/A A A A N/A 16 Khijdad A A N/A N/A A A N/A A 17 Khirsara A A A N/A A A A N/A 18 Mokar A A N/A N/A A A A N/A 19 Ramgadh A N/A N/A N/A A A N/A N/A 20 Ramnagar A N/A A N/A A A N/A A 21 Ranavav A A A A A A A A 22 Sukhpur A A A N/A A A A N/A 23 Tarsai A A A N/A A A A N/A 24 Vadwala-Rana A A N/A N/A A A N/A N/A 25 Valotra A N/A N/A N/A A A A N/A Villages Present inside Barda Wildlife Sanctuary 26 Dhoria Nes N/A A N/A N/A N/A A A N/A

M/s TATA CHEMICALS LIMITED Page 158 Expansion of Aniali Limestone Mining Project Draft EIA/EMP

Kharavira 27 N/A A N/A N/A N/A A A N/A Khunano Nes 28 Kharavira Nes N/A A N/A N/A N/A A A N/A 29 Morivirda Nes N/A A A N/A N/A A A N/A Shermlanki 30 N/A A N/A N/A N/A A A N/A Khunano Nes A: AVAILABLE; N/A : NOT AVAILABLE

(Source: As Per Census Data, 2011)

M/s TATA CHEMICALS LIMITED Page 159 Expansion of Aniali Limestone Mining Project Draft EIA/EMP

3.8.8 Conclusion “Socio-Economic Study” of the Study Area gives a clear picture of its population, average household size, literacy rate, and sex ratio etc. A part of population is suffering from the lack of permanent job to run their day to day life and get basic facilities. The infrastructure and amenities available in the area denote the economic wellbeing of the region. The study area as a whole possesses average of infrastructural facilities. However, in comparison with the facilities available in other parts of the district this area lacks higher level of amenities like higher education, health, drinking water. This area needs more medical and educational facilities. The area is well connected with road transport and communication facilities.

3.8.9 Measures adopted by M/s TATA Chemicals Limited for the development of the social structure:-

Expansion of Aniali Limestone Mining Project will employ approx 153 workers. Almost all these workers belong to the nearby villages. Mine has played significant role in socio-economic development of the region. TCL engages and support key communities through its established non-profit organisations:

1. TATA Chemicals Society for Rural Development: Established in 1980 by TCL to promote development and foster welfare activities in communities of community development.

2. Uday Foundation: Uday Foundation has set up rural BPO at Mithapur that offer rural youth an opportunity to enhance their skills and also get a chance at employment and improvement.

3. Okhai- Centre for Empowerment: Further, Expansion of Aniali Limestone Mining Project (Survey No. 207/P) will generate direct or indirect employment to the tune of semi-skilled and unskilled labourers, who will be mostly from the nearby villages. Employment to the local people has greatly benefited in the upliftment of the income level of the locality.

*********************

M/s TATA CHEMICALS LIMITED Page 160 CHAPTER-4

ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION MEASURES Expansion of Aniali Rana Bordi Limestone Mining Project Final EIA/EMP

CHAPTER 4 - ANTICIPATED IMPACTS AND MITIGATION MEASURES

4.0 General Environmental impacts both direct and indirect on various environmental attributes due to proposed mining activity will be created in the surrounding environment, during the preoperational, operational and post–operational phases. The occurrence of mineral deposits, being site specific, their exploitation, often, does not allow for any choice except adoption of eco-friendly operation. The methods are required to be selected in such a manner, so as to maintain environmental equilibrium ensuring sustainable development. The impacts due to mining operations commence from the exploration activities, extend through extraction and processing of minerals, may continue up to post closure of the operation, with the nature and extent of impacts varying throughout the stages of project development. In order to maintain the environmental commensuration with the mining operation, it is essential to undertake studies on the existing environmental scenario and assess the impact on different environmental components. This would help in formulating suitable management plans and sustainable resource extraction. Several scientific techniques and methodologies are available to predict impacts of physical environment. Mathematical models are the best tools to quantitatively describe the cause and effect relationships between sources of pollution and different components of environment. In cases, where it is not possible to identify and validate a model for a particular situation, predictions have been arrived based on logical reasoning / consultation / extrapolation. The following parameters are of significance in the Environmental Impact Assessment and are being discussed in detail – 1. Land Environment 2. Water Environment 3. Air Environment 4. Noise Environment 5. Biological Environment 6. Socio-Economic Environment

4.0.1 Impact Assessment Methodology Environmental impacts are defined as change in the environment due to any factor either adverse or beneficial. Environment Impact assessment is the most important tool for identifying the possible impacts on environment generated due to possible upcoming project. Baseline data has been collected through well designed scientific network. It shows the existing environmental condition in the study area. Following methodology has been adopted for impact assessment for Expansion of Aniali Limestone mining project:

M/s TATA CHEMICALS LIMITED Page 161 Expansion of Aniali Rana Bordi Limestone Mining Project Final EIA/EMP

A) Listing of possible activities during the operational phase due to which environmental degradation may occur. B) Identifying applicable components on which the possible activities can cause the possible impacts. Various environmental impacts, which have been identified due to the mining activities, are discussed in the following sections and mitigation measures are suggested.

4.1 Land Environment Anticipated Impact Proposed project is an expansion project where Environment Clearance has been obtained in the year 2015 vide no.J-11015/309/2012-IA.II(M) for the annual production of 43,000 Tons of Limestone. The entire lease area of 21.04 Ha is the part of Govt. waste land. At the end of conceptual plan, the change to the landscape in the form of pit and road, about 14.9342 ha will be changed. As the deposit is an elevated ridge type and also not extended to deep ground level, thus no deep pits will be formed due to mining.

4.1.1 Change in Land use Pattern The entire lease area of 21.04 Ha is the part of Govt. waste land. At the end of conceptual plan, the change to the landscape in the form of pit and road, about 14.9342 ha will be changed. As the deposit is an elevated ridge type and also not extended to deep ground level, thus no deep pits will be formed due to mining. The ultimate depth of the pit at the end of life of mine is expected to be at 55 mRL. Land use Pattern of the core zone of mining area will be changed due to proposed mining activity. Original topography of the core zone will be affected. The impact of mining on land environment is due to excavation of pits. Stage wise change in land use pattern has been given below. Table 4.1 Stage wise Change in Land use Pattern S. No. Head Area put on Area put on Area put on use at start of use at the use at the ed Mining Plan end of plan of life of mine (ha) period (Ha) (Ha) 1 Area under mining 4.4160 14.9342 17.8778 2 Storage for top soil 0 0 0 3 Waste dump site 0 0 0 4 Mineral storage 0 0 0 Infrastructure – workshop, 0.6000 0.6000 0 5 administrative building etc. 6 Roads 0.7565 0.7595 0 7 Railways 0 0 0 8 Tailing pond 0 0 0 9 Effluent Treatment Plant 0 0 0

M/s TATA CHEMICALS LIMITED Page 162 Expansion of Aniali Rana Bordi Limestone Mining Project Final EIA/EMP

10 Mineral Separation Plant 0 0 0 11 Township area 0 0 0 12 Others (Green Belt) 0 0 0 13 Total 5.7725 16.2907 17.8778 14 Total Remaining area 15.2675 4.7493 3.1622 Grand Total 21.04 21.04 21.04 (Source: Approved Mine Plan, dated 26.12.2019)

Mitigation Measure: 1.The green belt will be developed along the non-mining zone boundary passing through the lease area. Precautionary measures will be taken for plantation made by regular watering. 2.Greenbelt will be developed on around 33% of the total mine lease area, i.e, 6.9432 Ha, on which a total of 3000 saplings per year will be planted till the conceptual stage, necessary maintenance shall be done as well. 3.Surface and ground water will not be affected due to mining activity. There is no perennial source of water within the leasehold area. 4.Frequent dust suppression will be done to minimize the risk of long term buildup of pollutants in the environment. 5.Advanced technology of blasting will be used for control of noise and ground vibration. Adopting suitable, site-specific mitigation measures can reduce the degree of impact of mining on land. Present land use pattern of the lease area is waste land and at the conceptual stage the land use pattern will remain the same, hence will not be changed as there is no overburden generated from the mining activity.

4.1.2 Impact on Soil Environment The lease area is devoid of overburden. Limestone is exposed on the surface itself. A very thin layer of soil exists at places and this is scrapped separately and used for plantation simultaneously. During the proposal period, it is proposed to excavate the Chemical grade of limestone which is above the cut-off grade of limestone. The inferior grade of the limestone found at the bottom of chemical grade limestone layer will not be mined out by TCL. Thus, no mineral rejects will be generated from excavated material. Table 4.2: Year Wise Waste Generation (Top Soil, OB/Waste/Mineral reject) Year Top soil (cum) Mineral Rejects (cum) Reuse/Spreading Storage Backfilling Storage* Blending Beneficiation

I Nil Nil Nil 67,870 Nil Nil II Nil Nil Nil 67,870 Nil Nil III Nil Nil Nil 67,870 Nil Nil IV Nil Nil Nil 67,870 Nil Nil

M/s TATA CHEMICALS LIMITED Page 163 Expansion of Aniali Rana Bordi Limestone Mining Project Final EIA/EMP

V Nil Nil Nil 67,870 Nil Nil Total Nil Nil Nil 3,39,350 Nil Nil *The Mineral Reject. (Undersized of Chemical/Cement Grade) generated from the proposed crushing unit (1500 TPD) will be temporarily stored inside the lease area before using in cement manufacturing. (Source: Approved Mine Plan, Dated 26.12.2019)

4.1.3 Conceptual Reclamation and Rehabilitation of the mined-out area The area exhibits undulating to flat topography. The slope of benches will be suitable graded and plantation done over them, to match with the surrounding greenery. The top of the benches shall be properly fenced to prevent fall of cattle/person. Total 33% of the lease area will be developed as green Belt which would be around 6.9432 Ha. Greenbelt will be developed around the lease boundary, haul roads, undisturbed area, reclaimed area, workshop, mine office, etc. At the conceptual plan, green belt of suitable width should be developed all along the mining lease boundary. The row of plants facing mine should be of smaller species, and those facing outside should be of taller species. The post plantation care is proposed to maintain the growth of plantation. Plantation will reduce the land erosion possibility in the surrounding area. Wire fencing will be done around the green belt. Precautionary measures will be taken for plantation by means of fencing and regular watering to protect from grazing animals and nurture. At the end of the mining lease period, as per MOEF&CC Office Memorandum F. No. 22-34/2018-IA-III dated 16 January, 2020, "the mining lease holder shall, after ceasing mining operations, undertake re-grassing the mining area and any other area which may have been disturbed due to their mining activities and restore the land to a condition which is fit for growth of fodder, flora, fauna etc" Therefore at the conceptual stage of the proposed mine the excavated area will be re-grassed for growth of fodder, flora, fauna etc. Mitigation Measures 1. No siltation on the agricultural land will be allowed. 2. Plantation will be done which will help to minimize the propagation of air born dust. It will also help to increase the soil holding capacity which in turn reduce the soil erosion and prevent run-off. Table 4.3: Year-wise proposal for Plantation and fencing Year Number of saplings to be Fencing around Plantation planted (m)* I 3000 90 II 3000 90 III 3000 90 IV 3000 90 V 3000 90

M/s TATA CHEMICALS LIMITED Page 164 Expansion of Aniali Rana Bordi Limestone Mining Project Final EIA/EMP

*Plant species like Thor (Cactus) etc. will be used for natural fencing.

The post plantation care is proposed to maintain the growth of plants. Plantation will reduce the land erosion possibility in the surrounding area. Barbed – wire fencing will be done around the green belt.

4.2 Water Environment Mining and its associated activities not only use a lot of water but also likely to affect the hydrological regime of the area. The major impact of deep and large mines (both underground and open cast) is of natural groundwater table. Lowering of water table may result in reduced groundwater availability. Extraction of different minerals is known to lead to water pollution due to heavy metals, acid discharges and increased suspended solids. Deep underground mines directly affect the water table of the area. However, the impact of mining projects on groundwater hydrology and surface water regime are site specific and depends upon the characteristics of the mineral, hydrogeology and requirement of groundwater for other uses. Anticipated impacts on water sources Ground Water The average depth(m) of the water table based on the observations from nearby wells is given below: Table 4.4: Average depth of water table Max. Water Table(mRL) Min. Water Table(mRL) 37 mRL 45mRL (Source: Approved Mine Plan, dated 26.12.2019) The existing maximum and minimum working depth are 2m and 6m from surface respectively. The maximum depth in the present pit is at 58mRL and at conceptual stage, it will go further till 55mRL. Thus, the mining will not intersect with the water table.

Surface water No prominent water course or nalla is present. The mine floor is kept slightly sloppy for natural drainage. The waste water generation in the mining process is not envisaged. The deposit does not contain any harmful contents; hence it is not going to affect the quality of water in surrounding area. As there is no beneficiation involved with the use of water, discharge effluents does not happen. There is a natural drainage pattern within the lease area. Major part of the rain water from the lease area runoff is along the slope.

4.2.1 Wastewater Generation, Treatment & Disposal The waste water generation in the mining process is not envisaged. The total water consumption in the Expansion of Aniali Limestone Mine is about 29 KLD. The water will be used in the following manner.  For dust suppression

M/s TATA CHEMICALS LIMITED Page 165 Expansion of Aniali Rana Bordi Limestone Mining Project Final EIA/EMP

 For domestic consumption  For greenbelt development

Table 4.5: Water demand for the project Activity Water requirement, KLD Dust suppression /allied mining activity 17.0 Plantation 5.0 Drinking & Domestic 7.0 Total 29.0

Total water requirement is proposed to be 29.0 KLD, which includes 7.0 KLD for drinking & domestic uses, 5.0 KLD for plantation and 17.0 KLD for dust suppression. CGWA permission for ground water withdrawal is obtained for 10 m3/day in the year 2011. Enclosed as Annexure XA. The rest 19 KLD water will be sourced from nearby village Aniali by water tanker for which No objection certificate is already obtained which is Enclosed as Annexure XB.

The waste water generation from the above consumption is mainly from domestic consumption i.e. from toilets. This water will be treated in septic tanks followed by soak pits.

4.2.2 Proposed Mitigation Measures for Water Resources a) Overall drainage planning has been done in such a manner that the existing pre- mining drainage conditions will be maintained to the extent possible so that run off distribution is not affected. b) Waste water generated from labor domestic uses will be treated in septic tank followed by soaking pits. c) At conceptual stage the maximum depth of working will be 55 mRL m from the surface. Therefore, the groundwater table will not likely to get affected. d) Regular monitoring of surface water and ground water will be done to ensure that there is no adverse impact due to Limestone mining project. e) No washing of equipment will be done inside the mining lease area.

4.3 Impact on Air Quality The proposed Expansion project includes various activities like development of benches, approach roads, haul roads, excavation and transportation of limestone. These operations generally result in generation of dust and thereby pose health hazards. However, it is proposed that adequate control measures will be provided at every stage of operation such as, water sprinkling at loading, unloading points and on haul roads before transportation to reduce the fugitive dust emissions. Mining is proposed to be carried out by opencast semi mechanized method. The air borne

M/s TATA CHEMICALS LIMITED Page 166 Expansion of Aniali Rana Bordi Limestone Mining Project Final EIA/EMP

particulate matter (PM10) generated by mining operations, transportation and screening of ore is the main respirable air pollutant. The emissions of Sulphur Dioxide (SO2), Nitrogen Dioxide (NO2) released by vehicles plying on haul roads will be marginal. Prediction of impacts on air environment has been carried out taking into consideration of proposed production and net increase in emissions.

4.3.1 Emissions Details Loading - unloading and transportation of ores, wind erosion of the exposed area and movement of vehicles will be the main polluting source in the proposed mining activities releasing

Particulate Matter (PM10) which affects the ambient air of the area. Emission during loading and unloading was calculated by the area sources. Transportation of the Limestone ore by 30 nos. of trucks operated per day on the haul road was calculated by the area source which was combination of line sources with each truck loaded with ore transported over the haul road of the mining area. It was assumed that one truck will carry 20 Tons of ore/over burden. Details of emission during loading/unloading and transportation on the haul road, wind erosion of the exposed area and road maintenance were discussed and combined impact was predicted in the worst-case scenario under worst meteorological condition given as follows:

Loading and Unloading - US EPA, 2008, revision of emission factor for AP-42 was used to calculate emission of particulate matter released into the atmosphere during loading and unloading separately. It is assumed that moisture content in limestone ore was 10% and further moisture content will be increased to 10-20% to reduce emission of PM10 during unloading and average wind speed was 3.03 m/s as observed with site data with calm conditions 43.64 % as shown in wind rose and discussion of local meteorology of the area.

Haul Road - US EPA, 2006, revision of emission factor for AP-42 was used to calculate emission of particulate matter released into the atmosphere during transportation of ore by 5 trucks operated per hour on haul road of 0.572 km. Truck will be fully covered with tarpaulin material and emission of PM10 during transportation on the haul road will be insignificant. US EPA based AERMOD model was used for prediction of impact with 1-h meteorological data of the study period for the assessment of GLC.

4.3.2 Meteorological Data The meteorological data recorded at hourly interval during the month of December 2018 to February 2019 on wind speed 3.03 m/s,wind direction, dry & wet bulb temperature, humidity, cloud cover and rainfall was processed to extract hourly mean meteorological data as per the guidelines of CPCB/MoEF&CC for prediction of impacts from the area source. Stability was computed by Turner’s method and mixing height was obtained from publication of IMD “Atlas of Hourly Mixing Height in India, 2008.

Data recorded from authorized source Denvilabs Technologies, New Delhi were used as

M/s TATA CHEMICALS LIMITED Page 167 Expansion of Aniali Rana Bordi Limestone Mining Project Final EIA/EMP

meteorological input for Dispersion Model which was stored in the computer for further analysis and interpretation to study the local meteorology of the study area. It was observed that pre- dominant wind during winter season is North East to South West as shown in wind rose (Figure 4.1), with low wind speed and 43.64 % calm condition was observed during study period at the site which was very much close and cumbersome with long term meteorological data of IMD, Porbandar. Average wind speed was 3.03 m/s. Impact of the pollutants was anticipated in south west direction under influence of pre-dominant wind direction. Ambient air quality locations were selected based on the long term wind rose pattern of the area. Seven ambient air quality sampling locations were finalized to study the baseline status around the proposed site and to study impact at various locations. 24-h maximum impact of PM10 was envisaged in south direction at very short distance from the site due to moderate to low wind speed.

Stable atmospheric condition E & F dominates in early morning and night hoursandB,C&Din day hours were observed. Pollutants were dispersed from the proposed source under influence of local meteorology and dispersed on the ground in downwind direction close to the source under influence of moderate to low wind speed. High temperature and low humidity were observed at site with high temperature in day hours and low during night. There was no significant rain fall received and sky was clear of clouds in most of the days.

M/s TATA CHEMICALS LIMITED Page 168 Expansion of Aniali Rana Bordi Limestone Mining Project Final EIA/EMP

Figure 4.1: Wind Rose Diagram

M/s TATA CHEMICALS LIMITED Page 169 Expansion of Aniali Rana Bordi Limestone Mining Project Final EIA/EMP

4.3.3 Frame work of Computation & Model details By using the above-mentioned inputs, ground level concentrations due to the mining activities have been estimated to know the incremental rise in ambient air quality and impact in the study area. The effect of air pollutants upon receptors are influenced by concentration of pollutants and their dispersion in the atmosphere. Loading / unloading and transportation of vehicles on the haul road (length 0.572 km) are the major source of particulate matter.

Air quality modeling is an important tool for prediction, planning and evaluation of air pollution control activities besides identifying the requirements for emission control to meet the regulatory standards and to apply mitigation measures to reduce impact caused by mining activities.

4.3.4 Model Results The Air Quality Impact Prediction has been done by using AERMOD. Impact was predicted in the worst-case scenario due to combined impact of loading and unloading and emission due to transportation of vehicles on Limestone mine, haul road and other mining activities.

PM10 data of three months were collected from all seven sampling locations and enlisted. To address frequency, 98th percentile value was calculated using statistical method. The secondary meteorological data for the period December 2018-February 2019 was fed in the AERMOD software to obtain isopleths. The same was superimposed on monitoring location of the study area to identify the approximate incremental value. Meteorological data under worst case scenario providing 24-h maximum average GLC was discussed and given in following table

Table-4.6(i) Incremental and predicted value of PM10concentration Background Locations Code Total value (98th IncrementalGLC Locations & Distance PredictedGLC percentile) in in µg/m3 w.r.t. site. in µg/m3 µg/m3 AQ1 Near Mine Site 91.6 2.79 94.39 0.49 km, SW Daulatgarh AQ2 78.1 0.80 78.9 village 1.52 km, NE AQ3 Bhod village 73.4 0.80 74.2 4.33 km, SW AQ4 Aniali village 81.0 2.0 83 2.44 Km, SE AQ5 Bordi village 77.3 0.90 78.2 2.41 Km, N Vadwala AQ6 76.3 0.80 77.1 village 5.67 Km, S AQ7 Valotra village 75.2 0.40 75.6 5.57 km, SE

M/s TATA CHEMICALS LIMITED Page 170 Expansion of Aniali Rana Bordi Limestone Mining Project Final EIA/EMP

4.3.4.1 Results of PM10GLC concentration: Iso-pleth of PM10ranges from 0.4 to 2.79 µg/m3 as shown in the Figure 4.2.Maximum predicted GLC is observed at near mine site at 0.49 km distance with incremental value of 2.79 µg/m3 . For the calculation of the total predicted GLC of 24 hours near mine site, the baseline value of (98th percentile) 91.6 µg/m3was added to the incremental value of 2.79µg/m3, resulting into 94.39 µg/m3. The total predicted value calculated near mine site including the incremental load due to proposed mining activities like loading/unloading and transportation at haul road which are the responsible factors for dust emissions are found satisfactory and below the permissible limit of PM10 as prescribed by NAAQS. The results may allow the mining project in the vicinity.

M/s TATA CHEMICALS LIMITED Page 171 Expansion of Aniali Rana Bordi Limestone Mining Project Final EIA/EMP

Figure – 4.2 Iso-pleth of PM10

M/s TATA CHEMICALS LIMITED Page 172 Expansion of Aniali Rana Bordi Limestone Mining Project Final EIA/EMP

Table-4.6(ii) Incremental and predicted value of PM2.5 concentration Locations Code Background value Incremental Total Predicted Locations & Distance w.r.t. (98 percentile) in GLC in GLC in µg/m3 site. µg/m3 µg/m3 AQ1 Near Mine Site 43.9 1.22 45.12 0.49 km, SW Daulatgarh AQ2 37.6 0.50 38.1 village 1.52 km, NE AQ3 Bhod village 31.8 0.60 32.4 4.33 km, SW AQ4 Aniali village 37.7 0.60 38.3 2.44 Km, SE AQ5 Bordi village 33.9 0.50 34.4 2.41 Km, N AQ6 Vadwala village 35.8 0.50 36.3 5.67 Km, S AQ7 Valotra village 35.2 0.50 35.7 5.57 km, SE

4.3.4.2 Result of PM2.5GLC concentration: The maximum predicted GLC concentration (24 hours) of PM2.5calculated near mine site is 3 3 45.12 µg/m , which is below the prescribed permissible limit of PM2.5 (60 µg/m for industrial 3 zones). The isopleths showing the concentration of PM2.5ranges from 0.50 to 1.22 µg/m , in Figure 4.3.

M/s TATA CHEMICALS LIMITED Page 173 Expansion of Aniali Rana Bordi Limestone Mining Project Final EIA/EMP

Figure – 4.3 Iso-pleth of PM2.5

M/s TATA CHEMICALS LIMITED Page 174 Expansion of Aniali Rana Bordi Limestone Mining Project Final EIA/EMP

Table-4.6(iii) Incremental and predicted value of NO2 concentration Background Incrementa Locations Code & value l Total Predicted Locations Distance w.r.t. (98 percentile) in GLC in GLC in µg/m3 site. µg/m3 µg/m3 AQ1 Near Mine Site 22.9 0.05 22.95 0.49 km, SW Daulatgarh AQ2 16.8 0.20 17 village 1.52 km, NE AQ3 Bhod village 13.9 0.60 14.5 4.33 km, SW AQ4 Aniali village 18.5 0.50 19 2.44 Km, SE AQ5 Bordi village 18.0 0.05 18.05 2.41 Km, N AQ6 Vadwala village 17.3 1.0 18.3 5.67 Km, S AQ7 Valotra village 15.8 0.20 16 5.57 km, SE

4.3.4.3 Result of NO2GLC concentration: The maximum predicted GLC concentration (24 hours) of NO2 calculated near mine site is 3 3 22.95 µg/m , which is below the prescribed permissible limit of NO2 (80 µg/m ) . The isopleths 3 showing the concentration of NO2 ranges from 0.05 to 1µg/m , in Figure 4.4.

M/s TATA CHEMICALS LIMITED Page 175 Expansion of Aniali Rana Bordi Limestone Mining Project Final EIA/EMP

Figure – 4.4 Iso-pleth of NO2

M/s TATA CHEMICALS LIMITED Page 176 Expansion of Aniali Rana Bordi Limestone Mining Project Final EIA/EMP

Table-4.6 (iv)Incremental and predicted value of SO2concentration Background Incrementa Locations Code & value l Total Predicted Locations Distance w.r.t. (98 percentile) in GLC in GLC in µg/m3 site. µg/m3 µg/m3 AQ1 Near Mine Site 13.9 0.03 13.93 0.49 km, SW Daulatgarh AQ2 12.4 0.08 12.48 village 1.52 km, NE AQ3 Bhod village 11.6 0.30 11.9 4.33 km, SW AQ4 Aniali village 12.3 0.50 12.8 2.44 Km, SE AQ5 Bordi village 11.6 0.03 11.63 2.41 Km, N AQ6 Vadwala village 11.9 0.50 12.4 5.67 Km, S AQ7 Valotra village 11.3 0.08 11.38 5.57 km, SE

4.3.4.4 Result of SO2GLC concentration: The maximum predicted GLC concentration (24 hours) of SO2 calculated near mine site is 3 3 13.93µg/m , which is below the prescribed permissible limit of SO2 (80 µg/m for industrial 3 zones). The isopleths showing the concentration of SO2 ranges from 0.03 to 0.50µg/m in Figure 4.5.

M/s TATA CHEMICALS LIMITED Page 177 Expansion of Aniali Rana Bordi Limestone Mining Project Final EIA/EMP

Figure – 4.5 Iso-pleth of SO2

M/s TATA CHEMICALS LIMITED Page 178 Expansion of Aniali Rana Bordi Limestone Mining Project Final EIA/EMP

Table-4.6 (v)Incremental and predicted value of CO concentration Background Incrementa Locations Code & value l Total Predicted Locations Distance w.r.t. site. (98 percentile) in GLC in GLC in µg/m3 µg/m3 µg/m3 Near Mine AQ1 878 3 881 Site 0.49 km, SW Daulatgarh AQ2 744 10 754 village 1.52 km, NE AQ3 Bhod village 713 80 793 4.33 km, SW AQ4 Aniali village 754 50 804 2.44 Km, SE AQ5 Bordi village 745 3 748 2.41 Km, N Vadwala AQ6 729 50 779 village 5.67 Km, S AQ7 Valotra village 741 10 751 5.57 km, SE

4.3.4.5 Result of CO GLC concentration: The maximum predicted GLC concentration (8 hours) of CO calculated near mine site is 881µg/m3 or 0.881 milligram/m3, which is below the prescribed permissible limit of CO (2 mg/m3 for industrial zones). The isopleths showing the concentration of CO ranges from 3 to 80 µg/m3or 0.003 to 0.08 mg/m3 in Figure 4.6.

M/s TATA CHEMICALS LIMITED Page 179 Expansion of Aniali Rana Bordi Limestone Mining Project Final EIA/EMP

Figure – 4.6 Iso-pleth of CO

M/s TATA CHEMICALS LIMITED Page 180 Expansion of Aniali Rana Bordi Limestone Mining Project Final EIA/EMP

4.3.5 Proposed Mitigation Measures For Dust Suppression  As per Approved Mine Plan drilling and basting is proposed for Expansion of Aniali Limestone mining project but occasionally for giving the shattering effect to hard strata.  Particulate matter emission from haul road will be reduced by water sprinkling.  Vehicle used for excavation and haulage will be of latest Indian norms.  High speed diesel will be used for mining equipment operation  Green belt will be developed as per approved mine plan. Although green belt is already practiced at project site as it is an existing mine.  Personal protecting equipment (PPE) like dust mask, ear plugs etc will be used by mine workers.  Ambient air quality monitoring will be carried out periodically to know the implementation of environmental management plan. The sources of pollutants from mining activities are given in Table-4.7

Table-4.7: Sources of Pollutants Sr. No. Source Type of Pollutant 1 Mining activity (loading) SPM, NOx 2 Unloading of ore SPM 3 Transportation of ore SPM, NOx

4.4 Noise Environment 4.4.1 Noise Impact on Working Environment Noise generated at the mine site is due to semi-mechanized mining operations and transportation. Noise generated due to mining activities dissipates within the mine. There is no major impact of mining activity on the nearby villages. However, pronounced effect of above noise level is felt only near the active working area. Impact of noise on the villages is negligible as the villages are far located from the mine workings.

4.4.2 Noise Abattement and Control  Proper maintenance, oiling and greasing of machines at regular intervals to reduce the noise level up to an extent.  Adequate silencers and enclosures will be provided in all the diesel engines.  Plantation along both the sides of approach road, around mine office building and mine area to minimize the propagation of noise.  Personal Protective Equipment (PPE) like earmuffs/earplugs will be provided to all operators and employees working near mining machineries or at higher noise zone.  Periodical noise level monitoring will be done. Frequency levels and associated mental and physical response of humans are given in Table-4.8

M/s TATA CHEMICALS LIMITED Page 181 Expansion of Aniali Rana Bordi Limestone Mining Project Final EIA/EMP

Table-4.8 Noise Exposure Levels & Its Effects

Noise Levels dB(A) Exposure Time Effects 85 Continuous Safe Annoyance and irritation 85-90 Continuous Temporary shift in hearing threshold, generally with complete recovery 90-100 Short term Continuous Permanent loss of hearing Above 100 Permanent hearing loss can be avoided Short term 100-110 Several years Permanent deafness Permanent deafness 110-120 Few months Extreme discomfort 120 Short term 140 Short term Discomfort with actual pain 150 and above Single exposure Mechanical damage to the ear (Source: Hand Book of EIA, Rao& Wooten)

4.4.3 Impact Due To Ground Vibrations and Abatement Blasting is proposed in Aniali Limestone Mine but occasionally. Drilling and blasting will be used only for giving shattering effect to the hard strata of limestone horizons. Blasting will be done mainly with ANFO as the column charge and slurry explosive as the base charge. The under sized material generated after manual sizing or mechanized sizing will be temporarily stored in the registered plot or near to the crushing unit before it is sent to TCL's Cement and Soda Ash Plant at Mithapur. Measures that will be followed for abatement of ground vibration, air blast and fly rocks are detailed below – a) Controlled Blasting with shocktube technology will be performed strictly as per the guidelines specified under MMR, 1961; b) Proper design of blast with correct spacing, burden and optimum charge/delay will be performed; c) Supervision of drilling and blasting operations to ensure blast design geometry as per planning will be ensured; d) Sub-drilling will be kept adequate to eliminate toe formation. e) Blasting operations will be carried out only during day time as per DGMS guidelines; the blasting permission is attached as Annexure VI. f) Proper warning signals will be used;

M/s TATA CHEMICALS LIMITED Page 182 Expansion of Aniali Rana Bordi Limestone Mining Project Final EIA/EMP

g) Adequate safe distance from habitation as per standards from centre of blasting will be maintained; h) Drilling parameters like burden, depth, diameter and spacing will be properly designed to ensure proper blast; i) Effective stemming of the explosives will be done in the drill holes.

4.5 Biological Environment Primary and secondary baseline data for flora and fauna was collected within core zone and buffer zone of the project. Barda wild life sanctuary is present within the study area of the project at a distance of 4.205 km from the mine site.

4.5.1 Impact on Biodiversity Mining activities generally result in the deforestation, land degradation, water, air and noise pollution which directly or indirectly affect the faunal and floral status of the project area. However, occurrence and magnitude of these impacts are entirely dependent upon the project location, mode of operation and technology involved. Impact prediction is the main footstep in impact evaluation and identifies project actions that are likely to bring significant changes in the project environment.

The present study was carried out to predict the likely impacts of the proposed Expansion of Aniali limestone mining project at village Aniali in the surrounding environment with special reference to biological attributes covering habitats/ecosystems and associated biodiversity.

Although impacts on key habitat elements will occur on a local scale, but on a regional scale they would not be critical for the life cycle needs of the species observed or expected. Wild life is not commonly found in the plains because of lack of vegetal cover and surface water except domestic animals.

Dust generated due to haulage vehicles can have adverse impact to crop and other plant species of nearby areas. Sprinkling with 17.0 KLD of water will be done to reduce fugitive emission up to an extent. Expansion of Aniali Limestone mining project doesn’t include any forest land or diversion of forest land. The total mine lease area 21.04 Ha is a non-forest government waste land.

Mitigation measures a) Regular water sprinkling on haul road will be done to reduce the emission of suspended particulate matter which causes the blockage of the stomata of plants and interrupting the photosynthesis process. b) Thick green belt development will be done as per approved mining plan. The plants proposed in green belt development are presented in Table 4.10.

M/s TATA CHEMICALS LIMITED Page 183 Expansion of Aniali Rana Bordi Limestone Mining Project Final EIA/EMP

c) Green belt development reduces noise level, reduces gaseous pollution and particulate matter pollution. d) Pollution tolerant plant with consultation to state forest department has been proposed for plantation.

4.5.2 Greenbelt Development/Plantation The area exhibits undulating to flat topography. The slope of benches will be suitable graded and plantation done over them, to match with the surrounding greenery. The top of the benches shall be properly fenced to prevent fall of cattle/person. Total 33% of the lease area will be developed as green Belt which would be around 6.9432 Ha. Greenbelt will be developed around the lease boundary, haul roads, undisturbed area, reclaimed area, workshop, mine office, etc. At the conceptual plan, green belt of suitable width should be developed all along the mining lease boundary. The row of plants facing mine should be of smaller species, and those facing outside should be of taller species. The post plantation care is proposed to maintain the growth of plantation. Plantation will reduce the land erosion possibility in the surrounding area. Wire fencing will be done around the green belt.

Local species like Siris, Neem, Kachnar, Kashid, Shisham, Gulmohar, Karanj, Pipal, Drumstick, Imli, Banyan tree, Bel patra etc. will be planted in consultation with the Forest Department as well as CPCB Guidelines for greenbelt development.

Precautionary measures will be taken for plantation by means of fencing and regular watering to protect from grazing animals and nurture. At the end of the mining lease period, as per MOEF&CC Office Memorandum F. No. 22-34/2018-IA-III dated 16 January, 2020, "the mining lease holder shall, after ceasing mining operations, undertake re-grassing the mining area and any other area which may have been disturbed due to their mining activities and restore the land to a condition which is fit for growth of fodder, flora, fauna etc"

The breakup of the proposed afforestation programme with reclamation in progressive manner is given in Table-4.9.

Table-4.9 Year-wise proposal for Plantation and fencing Year Number of saplings to be Fencing around Plantation planted (m)* I 3000 90 II 3000 90 III 3000 90 IV 3000 90 V 3000 90 *Plant species like Thor (Cactus) etc. will be used for natural fencing. Source: Approved Mine Plan, Dated 26.12.2019

M/s TATA CHEMICALS LIMITED Page 184 Expansion of Aniali Rana Bordi Limestone Mining Project Final EIA/EMP

Plantation Species The plants recommended for Green Belt Development/Plantation as per Guidelines for Developing Greenbelts, CPCB, March 2000 and listed in Table 4.10 are as follows:

M/s TATA CHEMICALS LIMITED Page 185 Expansion of Aniali Rana Bordi Limestone Mining Project Final EIA/EMP

Table 4.10 – List of plant species proposed for green belt development Common Name Sensitive/ Regenerati Evergreen/ S. No. Scientific Name (Gujarati, Hindi, Family Habitat Growth Rate Tolerant on Deciduous English) 1 Abutilon indicum Khapat Malvaceae T Shrub Quick Growing Seeds Deciduous 2 Acacia catechu Cutch tree Mimoseae T Shrub Quick Growing Seeds Evergreen 3 Acacia dealbata Silver wattle Mimoseae T Shrub Quick Growing Seeds Evergreen 4 Acacia nilotica Baubra Mimoseae T Shrub Quick Growing Seeds Evergreen 5 Acacia Pennata Biswal Mimoseae T Shrub Quick growing Seeds Evergreen 6 Acacia Senegal Kumta Mimoseae T Tree Quick Growing Seeds Deciduous 7 Acacia sinuata Kochi Mimoseae T Tree Quick Growing Seeds Deciduous The umbrella thorn 8 Acacia tortolis Mimoseae T Tree Quick Growing Seeds Evergreen tree Adenantherapavoni 9 Girit Fabaceae T Tree Quick Growing Seeds Deciduous na Seeds, Root 10 Aeglemarmelos Belo Rutaceae T Tree Slow Growing Evergreen Cuttings Seeds, Shoot, 11 Ailanthus excels Mahala Simarubaceae T Tree Quick Growing Deciduous Roots Cuttings Seeds, Root 12 Albiziaamara Sirisha Mimoseae T Tree Quick Growing Deciduous suckers 13 Albizialebbeck Sirish Mimoseae T Tree Quick Growing Seeds Deciduous 14 Albiziamoluccano Rajokosundori Mimoseae T Tree Quick Growing Seeds Evergreen 15 Albiziaodoratissimo Kala sirish Mimoseae T Tree Quick Growing Seeds Evergreen 16 Albiziaprocera White sirish Mimoseae T Tree Quick Growing Seeds Deciduous 17 Alstoniascholaris Devil tree Aposynaceae T Tree Quick Growing Seeds Evergreen Seeds, 18 Anonasquamosa Seethaapholo Anomaceae T Smaal tree Fast Growing Grafting, Evergreen Budding 19 Anona reticulate Raamaphala Anomaceae T Tree Fast Growing Seeds Evergreen Seeds, Root 20 Anogeissuslatifolia Dohu Combretaceae T Tree Slow Growing Evergreen Suckers 21 Anthocephaluschine Kadam Rubiaceae T Tree Quick growing Seeds Deciduous

M/s TATA CHEMICALS LIMITED Page 186 Expansion of Aniali Rana Bordi Limestone Mining Project Final EIA/EMP

nsis Aphanamixispolysta 22 Rohituka Meliaceae T Tree Slow growing Seeds Evergreen chya Artocarpusheteroph 23 Jackfruit Urticaceae T Tree Slowgrowing Seeds Evergreen yllus 24 Artocarpuslacucha Monkey jack Urticaceae T Tree Quick growing Seeds Deciduous Quick growth after 25 Azadirachtaindica Nimb Meliaceae T Tree Seeds Evergreen 1st season 26 Balanitesroxburghii Ingoriyo Balanitaceae T Tree Quick growing Seeds Evergreen 27 ButeaMonosperma Khakharo Fabaceae T Tree Slow growing Seeds Deciduous 28 Bauhinia acuminate Kanchan Caesalpinaceae T Shrub Quick growing Seeds Deciduous 29 Bauhinia purpurea Butterfly tree Caesalpinaceae T Tree Quick growing Seeds Deciduous Seeds, Semi- 30 Bischofiajavanica Paniala Bischofiaceae T Tree Quick growing cutting Deciduous Bougainvillea 31 Bougainvillea Nyctaginaceae T Shrub Quick growing Cutting Evergreen spectabilis Seeds, Root 32 Brideliasquamosa Khaja Euphorbiaceae T Tree Quick growing Deciduous Suckers Seeds, 33 Callistemon citrinus Bottle brush Myrtaceae T Small tree Slow growing Evergreen cutting Cealophylluninophy 34 Paanang Clusiaceae T Tree Slow growing Seeds Evergreen llum Calotropis Seeds, 35 Akada Asclepiadaceae T Shrub Quick growing Evergreen gigantean cuttings Seeds, Root 36 Carissa spinarun Anka Apocynaceae T Shrub Quick growing Evergreen suckers Seeds, Root 37 Cassia fistula Sunari Caesalpinaceae T Tree Quick growing Deciduous suckers 38 Cassia siamea Kaishid Caesalpinaceae T Tree Fast growing Seeds Evergreen Cutting, 39 Citrus aurantium Nimbu Rutaceae T Tree Quick growing Evergreen Grafting Clerodendruminfort Seeds, 40 Bhantaka Verbenaceae T Shrub Quick growing Evergreen unatum cutting Quick growing after Seeds, stem 41 Cordiadichotoma Sebespan fruit tree Cardiaceae T Tree Evergreen 1st year cutting Moderate during 1st Seeds, Root 42 Dalbergiasisoo Sissu Fabaceae T Tree Evergreen year and rapid & stem

M/s TATA CHEMICALS LIMITED Page 187 Expansion of Aniali Rana Bordi Limestone Mining Project Final EIA/EMP

afterwards cutting Seeds, 43 Delonixregia Gulmohur Caesalpinaceae S Tree Quick growing Deciduous cutting Seeds, stem, Dendrocalamusstric Shrub/Tall rhizome 44 Saliabanso Poaceae T Quick growing Deciduous tus perennial grass cutting, layering 45 Derris indica Karanjo Fabaceae T Tree Quick growing Seeds Evergreen Diospyrosmelanoxy Seeds, root 46 Kendu Ebenaceae T Tree Slow growing Deciduous lon suckers 47 Dryptesroxburghii Putronjiva Euphorbiaceae T Tree Slow growing Seeds Evergreen 48 Durantarepens - Verbenaceae T Shrub Quick growing Seeds Evergreen Seeds, Cutting, 49 Emblicaofficinalis Amala Euphorbiaceae T Tree Quick growing Deciduous Budding, Inarching Embryopterisperegr 50 - Ebenaceae T Tree Quick growing Seeds Deciduous ina Seeds, Stem 51 Erythrinavariegata Bangoro Fabacea T Tree Quick growing Deciduous cutting Eucalyptus 52 Lemon scented gum Myrtaceae T Tree Quick growing Seeds Evergreen citriodora Seeds, 53 Ficusbenghalensis Banyan Tree Moraceae T Tree Quick growing Evergreen Cuttings Seeds, 54 Ficusbenjamina Pakur Moraceae T Tree Quick growing Evergreen Cuttings Seeds, 55 Ficusgibbosa Karatosani Moraceae T Tree Quick growing Evergreen Cuttings Grows slow in early Seeds, 56 Ficusreligiosa Pipal Moraceae T Tree stages, later grows Evergreen Cuttings fast Grows slow in early Seeds, 57 Ficusvirens Pilkhan Moraceae T Tree stages, later grows Evergreen Cuttings fast Gardenia Seeds, 58 Anant Rubiaceae T Tree Quick growing Evergreen jasminoides Cuttings Seeds, 59 Gardenia resinifera Dikamali Rubiaceae T Tree Quick growing Deciduous Cuttings

M/s TATA CHEMICALS LIMITED Page 188 Expansion of Aniali Rana Bordi Limestone Mining Project Final EIA/EMP

60 Grevillearobusta Silky aak Proteaseae T Tree Quick growing Seeds Evergreen 61 Grewiasubinequalis Pharasakoli Tiliaceae T Shrub Quick growing Seeds Evergreen 62 Guazmaulmifolia Rudraksha Sterculiaceae T Tree Quick growing Seeds Evergreen Seeds,Cutti 63 Hamelia patens Scarletdush Rubiaceae T Shrub Quick growing Evergreen ng Heterophragmarox 64 - Bignaniaceae T Tree Quick growing Seeds Evergreen burghii Hibiscus 65 Gurhal Malvaceae T Shrub Quick growing Cutting Evergreen rosasinensis Holopteliaintegrifio Seeds, Stem 66 Dauranja Ulmaceae T Tree Quick growing Deciduous lia cutting 67 Ixoraarborea - Rubiaceae T Tree Quick growing Cutting Evergreen 68 Juniperuscommunis Betar Pinaceae S Shrub Quick growing Seeds Evergreen 69 Kigeliaafricana Sausage tree Vignoniaceae T Small Tree Quick growing Seeds Evergreen Lagerstroemia 70 Patali Lythraceae T Tall tree Quick growing Seeds Deciduous parviflora 71 Lantana camara Lantana Verbenaceae T Shrub Quick growing Seeds Evergreen Seeds, 72 Lawsoniainermis Heena Lythraceae T Shrub Quick growing Evergreen cutting Mollotusphilippensi 73 Kamala Euphorbiaceae T Tree Slow growing Seeds Evergreen s 74 Madhucalongifolia Mahula Sopotaceae T Tree Quick growing Seeds Deciduous Seeds, Quick growing after 75 Mangiferaindica Aam Anacardiaceae S Tree transplantin Evergreen 1st year g, Millingtoniahortens Seeds, 76 Indian cork Bignoniaceae S Tree Quick growing Evergreen is cutting Seeds, 77 Murrayapaniculata Kamini Rutaceae T Shrub Quick growing Evergreen cutting 78 Neriumindicum Kaner Apocynaceae T Shrub Quick growing cutting Evergreen Nyctanthus arbor- Seeds, 79 Harsingar Oleaceae T Shrub Quick growing Deciduous tristis cutting Seeds, Root 80 Ouginiaoojeinensis Banjan Fabaceae T Tree Quick growing Deciduous cutting Peltophorumpteroc 81 Copper pod tree Caesalpinaceae T Tall Tree Quick growing Seeds Evergreen arpum

M/s TATA CHEMICALS LIMITED Page 189 Expansion of Aniali Rana Bordi Limestone Mining Project Final EIA/EMP

82 Phoenix sylvestris Khajuri Arecaceae T Tree Slow growing Seeds Evergreen Seeds,cuttin 83 Phyllanthusacidus Country gooseberry Euphorbiaceae T Tree Quick growing Deciduous g, budding 84 Pinusroxburghii Chilgoza Pinaceae S Tree Slow growing Seeds Evergreen Seeds, Pithecellobiumducl 85 Jungle jalebi Mimosaceae T Tree Quick growing Branch Evergreen e cutting 86 Polyalthialongifolin Ashok Anonaceae S Tree Quick growing Seeds Evergreen Seeds, stem, 87 Populusdeltoides Poplar Salicaceae S Tree Quick growing root cutting, Deciduous root sucker Seeds, root 88 Prosopischilensis Vilayati Babul Mimosaceae T Tree Quick growing Evergreen sucker Seeds, cutting, 89 Psidiumguayava Amrud Myrtaceae T Tree Quick growing Evergreen budding, grafting Seeds, Semi- 90 Pterygotaalata - Sterculioceae T Tree Quick growing cutting Deciduous 91 Ricinuscommunis Castar Euphorbiaceae T Shrub Quick growing Seeds Evergreen 92 Salix tetrasperma Baisi Solicaceae T Tree Quick growing cutting Deciduous Seeds, 93 Samaneosamom Rain tree Mimosaceae T Tree Quick growing Evergreen cutting Sapindusemarginat 94 Ritha Sapindaceae T Tree Quick growing Seeds Evergreen us 95 Sapiumsebiferum Makhan tree Euphorbiaceae T Tree Quick growing Seeds Deciduous 96 Saracaasoka Ashok Caesalpinaceae T Tree Quick growing Seeds Evergreen Sesbaniagrandiflor 97 Ogasti Fabaceae T Tree Quick growing Seeds Evergreen a 98 Soymidafebrifuga Sahan Meliaceae T Tree Quick growing Seeds Deciduous Quick growing after 99 Spondiaspinnata - Anacardiaceae T Tree Seeds Deciduous 1st year 100 Sterculiafoetida JangliBadam Sterculiaceae T Tree Quick growing Seeds Deciduous Seeds, cutting, 101 Syzygiumcumini Jamun Myrtaceae T Tree Quick growing Evergreen grafting, budding

M/s TATA CHEMICALS LIMITED Page 190 Expansion of Aniali Rana Bordi Limestone Mining Project Final EIA/EMP

Tabernaemantanedi 102 Tagar Apocynaceae T Shrub Quick growing cutting Evergreen varicata 103 Tamarindusindica Imli Caesalpinaceae T Tree Quick growing Seeds Evergreen Seeds, 104 Tecomastans - Bignaniaceae T Shrub Quick growing Evergreen cutting 105 Tectonagrandis Teak Verbenaceae T Tree Quick growing Seeds Deciduous Seeds, 106 Terminaliaarjuna Arjuno Combretacea T Tree Quick growing cutting, Deciduous layering Seeds, 107 Tremaorientalis Kharkas Ulmaceae T Tree Quick growing Evergreen stumps 108 Zizyphusmauritiana Bodori Rhamnaceae T Tree Quick growing Seeds Evergreen 109 Zizyphusrugosa Suran Rhamnaceae T Shrub Quick growing Seeds Evergreen 110 Zizyphusxylopyra Ber Rhamnaceae T Shrub Quick growing Seeds Evergreen

(Source:Guidelines for Developing Greenbelts by CPCB, March 2000)

M/s TATA CHEMICALS LIMITED Page 191 Expansion of Aniali Rana Bordi Limestone Mining Project Final EIA/EMP

Buteamonosperma Callistemon citrinus

Grewiasubinequalis Lawsoniainermis

Emblicaofficinalis Psidiumguayava

Holopteliaintegrifiolia Syzygiumcumini Figure 4.7: Photographs of the plants for greenbelt development

M/s TATA CHEMICALS LIMITED Page 192 Expansion of Aniali Rana Bordi Limestone Mining Project Final EIA/EMP

4.6 Traffic Study and Transportation Vehicular Traffic Density Traffic study was carried out as primary data to know the existing traffic density. Traffic survey forms are attached as Annexure XI. Incremental pollution load as per IRC 64 has been calculated to estimate the level of services (LOS). Traffic study was conducted for SH-27 and nearby intersection passes through the project site. Then depending on the capacity of the mine, the number of trucks that will be added to the present scenario will be compared to the carrying capacity as recommended by Indian Road Congress (IRC). The existing volume of traffic and, the Level of Service are given in Table-4.11 (i)

Table 4.11 (i) Existing Traffic Scenario & LOS Existing V/C Road V (PCU/day) C (PCU/day) LOS Ratio Near village intersection 203 6000 0.034 A At SH-27 4100 15000 0.27 B

V= Volume in PCU’s/day & C= Capacity in PCU’s/ day The existing Level of Service near Village intersection is “A” i.e. excellent and at state highway is “B” i.e. very good when compared with LOS recommended by IRC, as given in Table- 4.11(ii).

Table 4.11 (ii) V/C Ratio & LOS V/C LOS Performance 0.0 - 0.2 A Excellent 0.2 - 0.4 B Very Good 0.4 - 0.6 C Good / Average / Fair 0.6 - 0.8 D Poor 0.8 - 1.0 E Very Poor Note: Capacity as per IRC: 64-1990

During Mine operation Total Capacity of mine : 175000 TPA No. of working days : 300 days Total Capacity of mine/day : 175000/300 = 584 tonnes Truck Capacity : 20 tonnes (0.85% Efficiency) No. oftruck trips per day : 584/20 = 30 trucks per day No. of truck trips /day to and fro : 30 * 2 =60 trips 1 Truck= 3 PCU 30 Trucks= 30*3 PCU : 90 PCU To and Fro= 2 times : 90*2= 180 PCU/Day

M/s TATA CHEMICALS LIMITED Page 193 Expansion of Aniali Rana Bordi Limestone Mining Project Final EIA/EMP

Addition to traffic by the proposed project during its operation is given in Table-4.11 (iii). Table 4.11 (iii) Additional Traffic Scenario & LOS due to proposed project Modified V/C Road V C LOS Ratio Near village intersection 383 6000 0.06 A At SH-27 4280 15000 0.28 B From the above analysis it can be seen that the V/C ratio will change to 0.06 and 0.28 with LOS being “A” which is “Excellent” near village intersection and “B” which is “Very good” at State highway as per classification. So the additional load on the carrying capacity of the concerned roads is not likely getting affected.

Transportation of mineral The under sized material generated after manual sizing or mechanized sizing will be temporarily stored in the registered plot/stackyard or near to the crushing unit and will be sent TCL's Soda Ash and Cement plant at Mithapur. Route map for transporting mineral from project site to Mithapur Plant of M/s TATA Chemicals Limited is shown in Figure 4.9. Water sprinkling will be regularly practiced for dust suppression and maintenance of HEMM for taking care of the environment concern.

Impact on road development Movement of trucks and other vehicles to and from the quarry is expected to increase, when capacity expansion of mine will start. The existing roads connecting the quarry with the state highway are mostly narrow mud/ kuccha roads. These roads are needed to be widened and paved. There is an ample scope for road development in and around the mining area.

4.6.1 Mitigation measures: a)Regular water sprinkling on haul road will be done to reduce the emission of suspended particulate matter which causes the blockage of the stomata of plants and interrupting the photosynthesis process. b) Green belt development reduces noise level, reduces gaseous pollution and particulate matter pollution. c) Planting of trees all along main mine haul road and regular grading of haul roads will be practiced to prevent the generation of dust due to movement of dumpers/trucks. d) Vehicle used for excavation and haulage will be of latest Indian norms. e) High speed diesel will be used for mining equipment operation. f) The speed of dumpers/ trucks on haul road will be controlled as increased speed increases dust emissions. g) Overloading of transport vehicles will be avoided. The trucks/ tippers will have sufficient free board. h) Spillage of ore on public roads will be cleared immediately and vehicles will ply in safe speed.

M/s TATA CHEMICALS LIMITED Page 194 Expansion of Aniali Rana Bordi Limestone Mining Project Final EIA/EMP

Figure 4.8 Traffic Route Map

M/s TATA CHEMICALS LIMITED Page 195 Expansion of Aniali Rana Bordi Limestone Mining Project Final EIA/EMP

Figure 4.9: Route map for transporting mineral from project site to Soda Ash and Cement Plant of M/s TATA Chemicals Limited at Mithapur

M/s TATA CHEMICALS LIMITED Page 196 Expansion of Aniali Limestone Mining Project Final EIA/EMP

4.7 Socio - Economic Environment Impacts of a mining project may be positive or negative. The adverse impacts attribute to physical displacement due to land acquisition, which is followed by loss of livelihood, mental agony, changes in social structure, and risk to food security etc. People are also directly affected due to pollution. However, in Expansion of Aniali Limestone Mining Project, there is no displacement of people due to mining operations. Study on Socio-economic status of the project has already been carried out using primary socio-economic survey for generating the baseline data of socio- economic status.

4.7.1 Anticipated Impacts From the primary socio-economic survey & through secondary data available from established literature and census data 2011, it is found that there would be positive impact on socio- economic condition of the nearby area. The nearest habitation is present in the village Daulatgadh situated at a distance of about 0.77 km from the project site in North East direction as shown in Figure 4.10. The mining activity does not involve any displacement of human settlement. No public buildings, places, monuments etc. exist within the lease area or in the vicinity. The mining operation will not disturb/ relocate any village or need resettlement. Thus no adverse impact is anticipated. The impact of mining activity in the area is positive on the socio-economic environment of the region. Aniali Limestone Mine will be providing employment to the local population and preference will always be given to local people whenever there is a requirement of man power for mining related work.

Probable Impact Assessment Impact on population composition The impact of the proposed mining project on population composition will be marginal as there will be no major immigration of people from distant areas. Only few skilled and managerial staff will be recruited from outside and the rest will be recruited locally. Similarly, there is no scope for emigration of people and there will be no displacement of people due to land acquisition. TCL ensures that all the unskilled workers or labors deployed for mining activities are local people.

Impact on employment generation The proposed mining project is expected to provide direct and indirect employment opportunities to the local people of different skills and trades. It is a positive impact that needs to be encouraged. It has been estimated that about 153 workers of various categories will be employed directly to the expansion of mining project. The employment potentiality of the project is expected to ameliorate the economic condition of the families of those persons who will get employed in the proposed mining project.

M/s TATA CHEMICALS LIMITED Page 197 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Figure 4.10:Map showing nearest habitation from project site

M/s TATA CHEMICALS LIMITED Page 198 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Impact on consumption pattern The field survey has revealed that people in the study area are generally poverty ridden. Increased household income may slightly change and enhance the consumption pattern of few who are burdened with poverty.

Impact on law & order As local people will be employed to run the quarry, no law & order problem is envisaged. It is expected that the workers will attend their duties from their residence and return to their homes after the day’s work. There would have been law & order problem if the workers were migrants and lived in shanties closed to the mining area. However, to meet any untoward incident one police post may be set up closed to the project area.

4.8 Mine Waste Management

As per approved mining plan there is practically no solid waste and overburden in present mining area. The mining area lies on hilly land having rocky exposure and has no soil cover; therefore storage of soil is not required so far no patches of soil were encountered during mining. The sized limestone will be transported after sizing and undersized material will be dispatched to Soda Ash and Cement Plant at Mithapur.

4.9 Mine Closure Mine closure plan is the most important environmental requirement in mining projects. The mine closure plan should cover technical, environmental, social, legal and financial aspects dealing with progressive and post closure activities. The closure operation is a continuous series of activities starting from the decommissioning of the project. Therefore, progressive mine closure plan should be specifically dealt with in the mining plan and is to be reviewed every five years in the scheme of mining. As progressive mine closure is a continuous series of activities, it is obvious that the proposals of scientific mining have included most of the activities to be included in the closure plan. While formulating the closure objectives for the site, it is important to consider the existing or there-mining land use of the site; and how the operation will affect this activity. The primary aim is to ensure that the following broad objectives along with the abandonment of the mine can be successfully achieved:

1. To create a productive and sustainable after-use for the site, acceptable to mine owners, regulatory agencies and the public. 2. To protect public health and safety of the surrounding habitation. 3. To minimize environmental damage. 4. To conserve valuable attributes and aesthetics. 5. To overcome adverse socio-economic impacts.

************

M/s TATA CHEMICALS LIMITED Page 199 CHAPTER-5

ANALYSIS OF ALTERNATIVES Expansion of Aniali Limestone Mining Project Final EIA/EMP

CHAPTER 5- ANALYSIS OF ALTERNATIVES (TECHNOLOGY AND SITE)

5.0 General Consideration of alternatives to a project proposal is a requirement of EIA process. During the scoping process, alternatives to a proposal can be considered or refined, either directly or by reference to the key issues identified. A comparison of alternatives helps to determine the best method of achieving the project objectives with minimum environmental impacts or indicates the most environmental friendly and cost effective options.

5.1 Factors behind the selection of project site Expansion of Aniali Limestone mining near village Aniali is a mining project for excavation of Limestone deposits, which is mineral specific. The mining has following advantages: 1. There is no habitation within the lease area; hence no R & R issues exist. 2. There are no river, stream, nallas and other water bodies passing through the mine lease area. 3. Availability of skilled, semi-skilled and unskilled workers in the nearby region. 4. All the basic amenities such as medical, educational, transportation, communication and infrastructural facilities are accessible to the mine site and in the nearby region. 5. The mining operations do not intersect the ground water level. Hence, no impact on ground water environment.

5.2 Site alternatives under consideration Presence of limestone for commercial exploitation has been identified based on the result of geological investigations and exploration carried out by the Geological Survey of India (GSI). The mining project is site specific so alternate sites need not to be considered.

5.3 Analysis of Alternative Technology

5.3.1 Choice of Method of Mining Factors in the choice of an actual mining method for a given deposit are deposit characteristics, percentage recovery, requirement of health and safety and environmental concerns, production, scheduling scope of mechanization and automation, workforce requirements, wage rates, and land reclamation, operating and capital cost estimates. The selection of the mining method (development and extraction) is a key decision to be made in the opening up of a mine.

The open-pit or open cast mining method is the suitable choice for a property with wide area of mineralization exposed or exists in a close proximity to the surface and continues to a greater depth. Surface mining requires the removal and disposal of layers of top soil and underlying rock commonly called the overburden. Mining must be planned so that the combination of mining processing and reclaiming the land is taken up concurrently.

M/s TATA CHEMICALS LIMITED Page 200 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Open-cast mining method will be adopted because of the following reasons: 1. Open cast mining methodology ensures higher mineral conservation due to full visualization of exposed ore-body. 2. No need of artificial light in the day shift with natural ventilation round the clock.

5.3.2 Impacts of Mining operations (including Blasting) were predicted in environmental impact study of proposed mining operation with respect to Air, Noise and Vibration. It was concluded in the study that the impacts due to mining operations will be mostly within mine lease area and it will have negligible impacts in the surrounding agricultural lands. Mitigation measures like plantation of dense hedges on the boundary of lease area will further reduce the impacts.

After the implementation of the mitigation measures and Environmental Management Plan, mining activities during the mining phase would have negligible impact on the environment.

*************

M/s TATA CHEMICALS LIMITED Page 201 CHAPTER-6

ENVIRONMENTAL MONITORING PROGRAMME Expansion of Aniali Limestone Mining Project Final EIA/EMP

CHAPTER 6- ENVIRONMENT MONITORING PROGRAMME

6.1 General Regular monitoring of environmental parameters is of immense importance to assess the status of environment during project operation. With the knowledge of baseline conditions, the monitoring programme will serve as an indicator for any deterioration in environmental conditions due to operation of the project, to enable taking up suitable mitigation steps in time to safeguard the environment. Monitoring is important to measure the efficiency of control measures. An environmental impact assessment study is carried over for a specified period of time and the data cannot bring out all variations induced by the natural or human activities. Therefore, regular monitoring programme of the environmental parameters is essential to take into account the changes in the environmental quality. The objectives of monitoring are to:-  Verify effectiveness of planning decisions;  Measure effectiveness of operational procedures;  Conform statutory and corporate compliance; and  Identify unexpected changes.

Environmental Monitoring & reporting Procedure Monitoring will conform that commitments are being met with. This will take the form of direct measurement and recording of quantitative information, such as quantity and concentrations of discharges, emissions and wastes, for measurement against corporate or statutory standards, consent limits or targets. It may also require measurement of ambient environmental quality in the vicinity of a site using ecological/ biological, physical and chemical indicators. Monitoring may include socioeconomic interaction, through local liaison activities or even assessment of complaints. The preventive approach by management may also require monitoring of process inputs, for example, type and method used, resource consumption, equipment and pollution control performance etc. The key aims of monitoring are, first to ensure that results/ conditions are as per prediction during the planning stage and where they are or not, to pinpoint the cause and implement action to remedy the situation. A second objective is to verify the evaluations made during the planning process, in particular with risk and impact assessments and standard & target setting and to measure operational and process efficiency. Monitoring will also be required to meet compliance with statutory and corporate requirements. Finally, monitoring results provide the basis for auditing.

Post Project Monitoring is considered as an essential part to check the impact of any project activities. Hence monitoring of various environmental parameters will be carried out on a regular basis to ascertain the followings:  To know the status of pollution within the mine site and in its vicinity.  To generate data for predictive or corrective purpose in respect of pollution.

M/s TATA CHEMICALS LIMITED Page 202 Expansion of Aniali Limestone Mining Project Final EIA/EMP

 Examine the efficiency of pollution control system adopted at the site.  To ascertain environmental impacts.

6.1.1 Implementation Schedule of Mitigation Measures The mitigation measures suggested in Chapter-4 will be implemented so as to reduce the impact on the environment due to the mining operations of the proposed project. Implementation schedule of mitigation measures is given in Table-6.1.

Table-6.1 Implementation Schedule Sr. No. Recommendations Time Requirement Schedule 1 Air pollution control Before commissioning of Immediate measures respective units 2 Water pollution control Before commissioning of the Immediate measures mine 3 Noise pollution control Along with the commissioning Immediate measures of the mine 4 Ecological preservation Stage-wise implementation Immediate & and upgradation Progressive

6.1.2 Administrative Aspects & Environmental Monitoring Programme As per the guidelines of Ministry of Environment Forests and Climate Change (MoEF&CC) regular monitoring of environmental parameters need to be submitted to SEIAA and Pollution Control Board to ensure the control of environmental pollution due to proposed project. With the knowledge of baseline conditions, the monitoring programme will serve as an indicator for any deterioration in environmental conditions due to operation of the project, to enable taking up suitable mitigation steps in time to safeguard the environment. Monitoring is as important as that of control of pollution since the efficiency of control measures can only be determined by monitoring.

Usually, as in the case of the study, an Impact Assessment Study is carried out over short period of time and the data cannot bring out all variations induced by the natural or human activities. Therefore, regular monitoring programme of the environmental parameters is essential to take into account the changes in the environmental quality.

6.1.3 Formation of Environment Management Cell In order to maintain the environmental quality within the standards, regular monitoring of various environmental components is necessary. TCL is having a full-fledged environmental management cell (EMC) which will report directly to Functional Head forenvironmental monitoring and control. The EMC team will take care of pollution monitoring aspects and implementation of control measures.

M/s TATA CHEMICALS LIMITED Page 203 Expansion of Aniali Limestone Mining Project Final EIA/EMP

A group of qualified and efficient engineers with technicians will be deputed for maintenance, up keep and monitoring the pollution control equipment to keep them in working at the best of their efficiencies.

6.1.4 Responsibilities of EMC The generalized responsibilities ofthe EMC will be as follows:  Conducting Environmental monitoring of the surrounding area.  Carrying out the Environmental Management Plan.  Organizing meetings of the Environmental Management Committee and reporting to the committee.  Ensuring that prescribed environmental standards are maintained.  Ensure that all different types of statutory returns / compliance report to be submitted to relevant regulatory bodies.  Commissioning of pollution control equipment/ measures.  Specification and regulation of maintenance schedules for pollution control equipment.  Developing the green belt.  Ensuring water use is minimized. .

Mine Agent

Mine Manager

Environmental Engineer

Liasioning with state Reclamation planning Pollution control and central statutory and management Management agency and committee Figure 6.1: Organizational Structure for Environment Management

The composition of the environment management cell along with the responsibilities of respective members are given in Table 6.2 as follows

M/s TATA CHEMICALS LIMITED Page 204 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Table 6.2: Composition of Environment Management Cell (EMC)

S.No. Designation Proposed responsibility

1. VP (Manufacturing) Environmental policy and directions 2. GM – Safety, Health Overall responsibility for environment management &Environment and decision making for all environmental issues

3. Manager – Environment Overall in-charge of operation of environment Management System management facilities; Ensuring legal compliance by properly undertaking activities as laid down by various regulatory agencies from time to time and interacting with the same

4. Assistance Manager – Secondary responsibility for environment Environment management and decision making for all Management System environmental issues & ensure environmental monitoring as per appropriate procedures.

Monitoring Method: Post project monitoring will be carried out as per conditions stipulated in Environmental Clearance Letter issued by MoEF&CC, Consent issued by SPCB as well as according to CPCB guidelines. The Mine site is considered as core zone and the area lying within 10 km radius from the mine site is considered as buffer zone.

Slope Failure: Mining will be carried out by opencast semi mechanized method as per mining plan approved by Indian Bureau of Mines. Subsidence/ Slope failures are not envisaged because there is practically no solid waste and overburden in present mining area. The mining area lies on hilly land having rocky exposure and has very less top soil cover which will use in plantation. The bench height opening and excavation will be taken as per Mine Act 1951, MMR 1961, Mines Rules 1955 and MCDR 1988. Side of excavation shall be adequately benches and sloped as per Regulation 106 of MMR 1961 to prevent fall of side. Moreover, all safety standards/ safeguards will be implemented as per guidelines prescribed by Director General of Mines and Safety.

Drainage: The general topography of the area surrounding the mine site represents the gently undulating to almost flat terrain intervening the prominent hill ranges of the high relief central area of the region. The maximum depth in the present pit is at 58mRL and at conceptual stage, it will go further till 55mRL. Thus, the mining will not intersect with the water table.

M/s TATA CHEMICALS LIMITED Page 205 Expansion of Aniali Limestone Mining Project Final EIA/EMP

There is no major water body or any other seasonal drainage channel or nallas existing in the lease area. During rainy season the surface runoff follows the natural contour and flows in the same direction. The rain water collected in the pits after spell of rain will be used for plantation and dust suppression. At the conceptual stage of the proposed mine the excavated area will be re-grassed for growth of fodder, flora, fauna etc.

Blasting Blasting is proposed but occasionally, for loosening the hard strata. Regular testing and inspection of blasting operations in work zone will be carried out with respect to noise, fly rock throw, vibration, dust and fume generation. These tests will be conducted regularly and whenever new patterns of blasting are adopted for rock fragmentation.

6.2 Environment Monitoring Programme The environmental monitoring will be conducted as follows:  Water quality;  Air quality;  Noise levels;  Soil Quality  Green Belt Development

6.2.1 Water quality Monitoring Water monitoring will be done on regular basis. The ground and surface water quality will be monitored in every season at selected locations. Ground water depth will also be monitored at regular interval.

Table 6.3: Water quality monitoring and control measures Potential Action Parameters for Timing Impact Monitoring Water During extraction of min- No discharge of During mining Quality eral proper care should waste water from operation be taken such that it does mining operation not disturb the ground water table. After extraction of min- Quantity of water During mining eral, rainwater will be used for green operation. stored in void generated. belt development

6.2.2 Air quality Monitoring

Ambient air quality will be monitored on monthly basis. PM10,PM2.5, SO2 NO2 and CO will be monitored on regular basis. Micro metrological data at site will also be maintained.

M/s TATA CHEMICALS LIMITED Page 206 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Table 6.4: Air quality monitoring and control measures Potential Action Parameters for Timing Impact Monitoring Air All equipment are operated Random checks of During site clearing Emissio within specified design equipment logs/ & Operation of Mine ns parameters. manuals Vehicle trips to be minimized Vehicle logs / During site clearing, to the extent possible Increase the capacity of & Operation of Mine vehicle Topsoil (if any) must be Absence of During site clearing removed from the entire area to stockpiles be mined and stored from where it can be recovered and utilized immediately in other areas. Ensure Regular Checks of Pollution under During Operation of vehicular pollution control certificate mine of vehicle Covering of Vehicles No of trucks with During operation of transporting the mined covering / Random mine mineral checks of trucks on roads Plantation of dense No of saplings per During each year. hedges on the boundary of year from operations till lease area, these will closure as per reduce dust and noise in approved mining the vicinity area. plan Use proper drills bits for Random check of During blast hole drilling holes and wet equipment used for drilling drilling method. drilling Regular water spraying Quantity of water During site clearing, shall be done requirement shall transportation etc. be monitored Ambient air quality within The ambient air As per GPCB the premises of the pro- quality will requirement. posed unit to be monitored. conform to the standards for SPM, SO2 and NO2

6.2.3 Noise Levels and Vibration Noise level in the work zone will be monitored on regular basis. Controlled Blasting will be practiced.

M/s TATA CHEMICALS LIMITED Page 207 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Table 6.5: Noise quality monitoring and control measures Potential Action Parameters Timing Impact for Monitoring Noise List of all noise generating Equipment During machinery onsite along with age logs, noise mining to be prepared. reading operation. Equipment to be maintained in good working order. Generation of vehicular noise Maintenance During trans- records of portation. vehicles Implement good working Site working During practices (equipment selection practices and blasting and siting) to minimize noise records and also reduce its impacts on human health (ear muffs, safe distances and enclosures). Adopt good blasting practices to reduce impact on flora and fauna. Muffling will be done at the time of blasting Noise to be monitored in Noise As per GPCB ambient air near blasting shelter reading requirement and at the lease boundaries. or quarterly whichever is lesser. The Noise level should not Noise reading As per GPCB exceed the permissible limit requirement both during day and night times. or quarterly whichever is lesser. All equipment operated within Random During specified design parameters. checks of mining equipment operation logs/ manuals Vehicle trips to be minimized to Vehicle logs During the extent possible mining operation Plantation of dense hedges on No of During each year from the boundary of lease area, these saplings per operations till closure as will reduce noise in the year per approved mining plan

M/s TATA CHEMICALS LIMITED Page 208 Expansion of Aniali Limestone Mining Project Final EIA/EMP

vicinity.

6.2.4 Soil Sampling Soil sampling will be done to check the soil quality before green belt development. The environmental monitoring plan will be implemented as follows:

Table-6.6 Post Project Monitoring Programme Sampling Measurement Attributes Test Procedure Network Frequency Method A. Air Environment Micro Regularly Meteorological Minimum in one Data 1 site season by Mechanical/automatic · Wind direction - in the project Weather weather station · Relative impact area Monitoring humidity Station · Rainfall Pollutants Gravimetric method -

PM2.5, PM10 Gravimetric method - Absorption in 7 locations in Potassium Tetra the project Chloromercurate impact area followed by (Minimum 1 Colorimetric locations in EPA Modified West & SO estimation using 2 upwind side, Once in a Geake method P-Rosaniline 2 sites in season. hydrochloride and downwind Formaldehyde side, 4 in (IS: crosswind site 5182 Part - II). / impact Absorption in dil. zone and in NaOH and then core zone) estimated colorimetrically Arsenite modified with NO 2 Jacob & Hochheiser sulphanilamide and N (I- Nepthyle) Ethylene diamine Dihydrochloride

M/s TATA CHEMICALS LIMITED Page 209 Expansion of Aniali Limestone Mining Project Final EIA/EMP

and Hydrogen Peroxide (CPCB Method).

B. Water Environment pH, Turbidity, Colour, Odour, Taste, Samples for water TDS, Total quality should be Hardness, collected and Calcium analyzed hardness, as per : Magnesium IS : 2488 (Part 1- Set of grab hardness, 5) samples Chloride, methods for during pre Fluoride, sampling and post- Sulphate, and testing of monsoon Diurnal and Nitrates, Industrial for Season As per IS 10500 Alkalinity, effluents ground and wise Iron, Copper, Standard methods surface Manganese, for water in the Mercury, examination of vicinity. Cadmium, water Selenium, and wastewater Arsenic, analysis published Cyanide, Lead, by Zinc, Chromium, American Public Aluminum, Health Boron, Association. Phenolic Compounds C. Noise Mine Boundary, Noise levels at Quarterly / high noise As per CPCB day & night time - Half As per CPCB norms generating norms Leq dB (A) yearly areas within the lease D. Soil pH, Bulk Density, 5 locations Yearly/half As per USDA As per USDA

M/s TATA CHEMICALS LIMITED Page 210 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Soil texture, in the project yearly Method Method Nitrogen, impact area Available Phosphorus, Potassium, Calcium, Magnesium, Sodium, Electrical Conductivity, Organic Matter, Chloride E. Socio-economic · Demographic structure Secondary data · Infrastructure Socioeconomic from census resource base survey is based records, statistical · Economic on Minimum hard books, topo Primary data collection resource base proportionate, for two sheets, health through · Health status: stratified and phases of records and Questionnaire Morbidity pattern random the project relevant official · Cultural and sampling records available Aesthetic method with Govt. attributes agencies · Education

Green Belt Development Plant species act as bio-monitoring agent to monitor the air environment as well as to keep and maintain the project environment healthy. Trees have substantial inter-specific as well as intra- specific variation in air pollution tolerance. Green Belt development / tree plantation in organized manner will be carried out around the existing mine site by the end of the mining activity. The species suggested are local tree species in the mine area and nearby villages, to reduce the impact of expansion activities in the surroundings of the existing mine site. The suggested plants are suitable for green belt development have characteristics like, fast growing, thick canopy cover, perennial and evergreen large leaf area, naturally growing, efficient in absorbing pollutants without major effects on natural growth. Species like Azadirachta indica, Ficus religiosa, Samanea saman,Tamarindus indica,Balanites roxburghii planch, Bougainvillea spectabilis wild etc. is proposed for greenbelt development as per CPCB Guidelines for Green Belt Development, 2000.

M/s TATA CHEMICALS LIMITED Page 211 Expansion of Aniali Limestone Mining Project Final EIA/EMP

6.3 Occupational Health and Safety The working conditions in the mines are governed by the enactments of the Director General of Mines &Safety (DGMS). As per the guidelines of the Mines Act, the management will take all necessary precautions. The management will carry out periodic health check-up of workers. Occupational hazards involved in mines are related to dust pollution, noise pollution, blasting and injuries from moving machineries & equipment and fall from high places. DGMS has given necessary guidelines for safety against these occupational hazards. The management will strictly follow these guidelines.All necessary first aid and medical facilities will be provided to the workers. The mine will be well equipped with proper fire protection and firefighting equipment. All operators and mechanics will be trained to handle fire-fighting equipment. Further all the necessary personal protective equipment such as safety helmets, safety goggles, earplugs, earmuffs, dust masks etc. will be provided to persons working in mines as per Mines Rules, 1955.

 Provision of rest shelters for mine workers with facilities of drinking water, toilets etc.  Safety measures like use of safety appliances by the mine workers, such as dust masks, helmets, shoes, conduction of safety awareness programs, awards, poster presentation, slogans etc.  Training of employees on regular basis.  Regular maintenance and testing of all equipment as per manufacturers guidelines.  Periodical Medical Examination (PME) of all workers  First Aid facility is provided at the mine site.  Close surveillance of the factors in working environment and work practices which may affect environment and worker’s health.  Working of mine as per approved mining plan and environmental plans.

Reporting of environmental performance with reference to the EMP will be undertaken. The Environmental Monitoring Cell will co-ordinate all monitoring programmes at site and data thus generated will be furnished as per statutory requirements. The frequency of reporting will be on six monthly bases to the State PCB and to Regional Office of MoEF&CC, New Delhi.

6.3.1 Public Health Implication With the mitigation measures in relation to air pollution, water pollution, soil contamination and noise pollution proposed to be adopted at the mine site along with the green belt development on the periphery of mine lease boundary, it is expected that there will be no impact of mining on the population in the impact zone. However, the following measures shall be adopted:

 Health check-up of all villagers in the immediate vicinity of the mine shall be carried out periodically.  In case any person or a group of persons is found to be suffering from any ailment, directly related to mining, their medical treatment will be carried out free of cost.

M/s TATA CHEMICALS LIMITED Page 212 Expansion of Aniali Limestone Mining Project Final EIA/EMP

 Surface water management shall be adopted to ensure that run-off from the mining are does not adversely affect natural water streams or other water bodies.  All water bodies e.g. wells and surface water sources in the vicinity of the mine, shall be periodically tested for any pollution related to mining operations and remedial action taken, if warranted. Operators of all transport vehicles shall be instructed not to honk unnecessarily while passing through villages or near schools.

6.4 Corporate Environmental Responsibility TATA Chemicals Limited is committed for contributing towards a clean and sustainable environment and continually enhancing the environmental performance as an integral part of the business philosophy and values.

******************

M/s TATA CHEMICALS LIMITED Page 213 CHAPTER-7

ADDITIONAL STUDIES Expansion of Aniali Limestone Mining Project Final EIA/EMP

CHAPTER 7- ADDITIONAL STUDIES

7.0 Additional Studies As per EIA Notification dated 14th September, 2006, as amended from time to time, the Expert Appraisal Committee has suggested various Terms of Reference (ToR) for the preparation of the Environmental Impact Assessment (EIA) Report and Environmental Management Plan (EMP) vide their letter no. J-11015/42/2020-IA.II(M) dated 13-11-2020. The following Additional Studies were carried out as per Terms of Reference: 1. Public Hearing 2. Risk Assessment and 3. Disaster Management Plan

7.1 Public Hearing The Public hearing of M/s Aniali Limestone mine (Mine Lease Area: 21.04 Ha) of M/s Tata Chemicals Limited for Proposed Expansion of Limestone mining -43,000 TPA to 1,75,000 TPA, at Survey No- 207, Village. Aniali, Ta. Ranavav, Dist: Porbandar was conducted on 26th March, 2021 at 10:30 hrs at M/s Aniali Rana Bordi Limestone mine, (M/s Tata Chemicals Limited), Crusher Area, Opp. Office of Tata Chemicals, Survey No. 207/P, Village. Aniali, Ta. Ranavav, Dist: Porbandar.

Table 7.1: Public Hearing Particular Description Advertisement for Public Hearing Public hearing advertisement in English was  Date of Advertisement in published in “Times of India” dated Newspapers 24/02/2021 and in Gujarati in “Divya  Name of Newspapers Bhaskar” dated 24/02/2021. Date/Time of Public Hearing 26th March, 2021 at 10:30 hrs Venue M/s Aniali Rana Bordi Limestone mine, (M/s Tata Chemicals Limited), Crusher Area, Opp. Office of Tata Chemicals, Survey No. 207/P, Village. Aniali, Ta. Ranavav, Dist: Porbandar.

Members Smt. K.N Parmer, Regional Officer, GPCB, Jamnagar as Representative of the Member Secretary, GPCB

Shri D.N Modi, IAS, District Collector & District Magistrate, Porbandar

M/s TATA CHEMICALS LIMITED Page 214 Expansion of Aniali Limestone Mining Project Final EIA/EMP

7.2 Public Hearing Notice for Limestone Mine published in Gujrati News Paper (“Divya Bhaskar” dated 24/02/2021”) and National Daily English News Paper (“The Times of India” dated 24/02/2021)

Figure7. 1: Public Hearing Notice for Limestone Mine published in Gujrati News Paper

M/s TATA CHEMICALS LIMITED Page 215 Expansion of Aniali Limestone Mining Project Final EIA/EMP

7.3 Photographs of Public Hearing

Figure 7.2: Photographs of Public Hearing

M/s TATA CHEMICALS LIMITED Page 216 Expansion of Aniali Limestone Mining Project Final EIA/EMP

7.4 Public Hearing Proceedings

Figure 7.3: Public Hearing Proceedings

M/s TATA CHEMICALS LIMITED Page 217 Expansion of Aniali Limestone Mining Project Final EIA/EMP

M/s TATA CHEMICALS LIMITED Page 218 Expansion of Aniali Limestone Mining Project Final EIA/EMP

M/s TATA CHEMICALS LIMITED Page 219 Expansion of Aniali Limestone Mining Project Final EIA/EMP

M/s TATA CHEMICALS LIMITED Page 220 Expansion of Aniali Limestone Mining Project Final EIA/EMP

M/s TATA CHEMICALS LIMITED Page 221 Expansion of Aniali Limestone Mining Project Final EIA/EMP

M/s TATA CHEMICALS LIMITED Page 222 Expansion of Aniali Limestone Mining Project Final EIA/EMP

M/s TATA CHEMICALS LIMITED Page 223 Expansion of Aniali Limestone Mining Project Final EIA/EMP

M/s TATA CHEMICALS LIMITED Page 224 Expansion of Aniali Limestone Mining Project Final EIA/EMP

M/s TATA CHEMICALS LIMITED Page 225 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Table7.2: Public Hearing Proceeding and Action Plan

Sr. Name and Points represented Reply from the Plan with budgetary allocation No. Address Project Proponent 1 Shri Raja Bhai My agriculture land is near to We are thankful for your Necessary action taken by the Gala Bhai the mine. We are 15-20 farmers, representation. We consider Project Proponent. Kodiyatar, together. We face three your request and we promise that Vill – Daulatgadh, approach road problems. First any village roads should not closed. Ta: Ranavav one is western way is joining As you have said after some Dis: Porbandar route for animals, second one is complains, the road is opened. We entry route of village aniyari to will work accordingly so local bordi, third one is closed road of peoples will not be affected and field area located in Sr.no. 207. will do so in future. As you have One illegal Plotting is Done said above, road is located outside which is now removed. Way to our lease area. This is not our the farm land was closed regular transportation road. As you illegally earlier. We request that said this road is still open. this should remain open, as it Was earlier. In this context one written application is to be submitted. Shri Daya Bhai After commencement of this Thank you Daya Bhai for your kind The support will be provided to the 2 Hun, project, water will be filled and support to the project. villagers in employment and skill Village – Aniyari employment will be generated in development as per CER plan. Ta: Ranavav this corona time. I support this Dis : Porbandar project because I believe people of Aniyari and surrounding villages will be benefited. 3 Shri Raja Bhai My farm is near to mine and due Thank you Raja Bhai, Full support will be provided to the Meraman Bhai to filling of mine pit with rain We have noted your concern. Last farmers. Vadi Area, water law lying area of my field year, due to heavy rain, mine pits Ta: Ranavav also filled with water and soil were water logged, therefore nearby Dis: Porbandar becomes watery. Since last 2 water sources were recharged.

M/s TATA CHEMICALS LIMITED Page 226 Expansion of Aniali Limestone Mining Project Final EIA/EMP

years no any crop is yielded. I As you told, we will try to help to demand that, Low lying area in give dust accordance within the my farm is filled by mining dust, guidelines of the mines and mineral which will help in improvement Department. of soil that is our demand. 4 Shri Sanga Bhai Particularly before the start of Thank you Sanga Bhai for your Jiva Bhai Mori, mining in 21.04 Ha area of Tata kind support to the project. Up Sarpanch, Chemical Ltd. Vill: Aniyari, the Vill-Ranabordi land was like forest. Earlier, the Ta: Ranavav area was covered by Ram- Dis: Porbandar bawalia (Thorns). As a matter of fact, unemployed people got employment, secondly we are happy that company is complying by rules and regulations. Simultaneously, company has developed green belt. Projects have come in nearby villages like Bordi, Aniali. Checkdams have been constructed. Boys and girls (nursing) were sent for skill development programmes which were organized in our area, which is a good service. Similarly, during the corona period, when people were jobless, company has kept continue some jobs by following the govt. guidelines and given employment. As a vigilant civilian, I support this project. Really, as the presenter said, this

M/s TATA CHEMICALS LIMITED Page 227 Expansion of Aniali Limestone Mining Project Final EIA/EMP

company is fulfilling all requirement by water sprinkling and other decided criteria so that, people are at ease. Therefore, I support the project for Environment Clearance. Jai Bharat.

Just I listened from the company officer that company is depositing big amount of money in District Mineral Fund. This fund is particularly under control of District Magistrate. Therefore, we request that the money from this fund may be granted to develop basic facility for the people of nearby village to really benefit from the same. There are possibilities of good work that can be done under the CSR scheme. Several people benefiting projects may be taken up through this fund and we have also submitted similar demand before you. If you give attention regarding this, then beneficial work for people can be done. 5 Shre Dharmesh Respected Sir, limestone mines Thank you Dharmesh Bhai for your -- Bhai Shardul of Tata Chemical Company have kind support to the project. Bhai Makwana, been operation for 4-5 year Village-Ranavav, which resulted in the Ta: Ranavav employment opportunity for the

M/s TATA CHEMICALS LIMITED Page 228 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Dis: Porbandar local people. In addition to mining sufficient rain water have been accumulated in scientifically mines out pit which resulted in the rise of the ground water and it has benefited to downstream farmers. During the course of mining activity, the company develops green belt and support in the required social activities. We hope that, this will continue in future. Therefore, I support the project for Environment Clearance. 6 Shri Jiva Bhai Ala Employment opportunity will Thank you Jiva Bhai for your kind - Bhai Kodiyatar develop on the onset of the support to the project. Vil- Bapodar, project. I support this project. Ta: Ranavav Thank you Dis: Porbandar 7 Shri Samir Bhai Company is executing the Thank you Samir Bhai for your Harendra Bhai periodical social work along with kind support to the project. Agrawat, the mining activities. Our village Vill- Daulatgadh people are getting employment. Ta: Ranavav We are getting good water Dis: Porbandar sources and we support the project. 8 Shri Bharat Devsi People are getting employment Thank you Bharat Bhai for your - Odedara, due to this mining activity is kind support to the project. Village- Ramgadh, good. Due to mining water is Ta: Ranavav accumulated in the mines out Dis: Porbandar pits which has led to the rise in the water table. This helps in agriculture to farmers also

M/s TATA CHEMICALS LIMITED Page 229 Expansion of Aniali Limestone Mining Project Final EIA/EMP

beneficial to us. Therefore, I support this project. 9 Shri Jagdish Bhai This project is beneficial to all Thank you Jagdish Bhai for your Village-Amardad, kind support to the project. Ta: Ranava Dis: Porbandar

M/s TATA CHEMICALS LIMITED Page 230 Expansion of Aniali Limestone Mining Project Final EIA/EMP

As per the MOEF&CC's office memo no. F NO 22-65/2017-IA-III dated 01/05/2018.(Attached as Annexure XII), Expansion of Aniali Limestone Mining Project is a brownfield project and total project cost is Rs. 1 crore which is less than Rs. 100 Crores. As per above notification, 1% of the project cost is applicable for CER budget for brownfield projects. In the same context it has proposed to provide financial assistance of Rs. 1,00,000 per year for the development of social infrastructure of the area.

Table 7.3 Community Environmental Responsibility plan Sr. No Activity Total budgetary provision (Rs.) 1 Environmental awareness programme 10,000 2 Environmental conservation display to improve water 20,000 conservation 3 Installation of Central R.O. System in nearby villages 25,000 and skill development of the local villagers 4 Construction of separate toilets for boys and girls in 45,000 village schools and installation of sanitary napkin vending machine in schools. Total 1,00,000

M/s TATA CHEMICALS LIMITED Page 231 Expansion of Aniali Limestone Mining Project Final EIA/EMP

7.5 Risk Assessment The complete mining operation will be carried out under the management control and direction of a qualified mine’s manager. The DGMS have been regularly issuing standing orders, model standing orders and circulars to be followed by the mine’s management in case of disaster, if any. Moreover, mining staff will be sent to refresher courses from time to time to keep them alert. However, following natural/industrial hazards may occur during normal operation.  Accident due to operation of heavy mining equipment; and  Accidents due to fires

In order to take care of above hazard/disasters, the following control measures will be adopted:  All safety precautions and provisions of Mine Act 1952, Metalliferrous Mines Regulations 1961 and Mines Rules 1955 will be strictly followed during all mining operations;  Entry of unauthorized persons in the mining area will be prohibited;  Firefighting and first-aid provisions in the mine’s office complex and mining area;  Provisions of all the safety appliances such as safety boots, helmets, goggles etc. will be made available to the employees free ofcost for their use;  Training programs for all the employees working in hazardous premises; under Mines Vocational Training Rules all employees of mines shall have to undergo the training at a regular interval;  Working of mine, as per approved plans and regularly updating the mine plans;  Cleaning of mine faces will be regularly done;  Regular maintenance and testing of all mining equipment as per manufacturer’s guidelines;  Suppression of dust on the haulage roads and loading & unloading points;  Increasing the awareness of safety and disaster through competitions, posters and other similar drives.

The methodology for the risk assessment is based on the specific risk assessment guidance issued by the Directorate General of Mine Safety (DGMS), Dhanbad, vide Circular No.13 of 2002, dated 31st December, 2002. The DGMS risk assessment process is intended to identify existing and probable hazards in the work environment and all operations and assess the risk levels of those hazards in order to prioritize those that need immediate attention. Further, mechanisms responsible for these hazards are identified and their control measures, set to timetable are recorded along with the pinpointed responsibilities. In the unlikely event that a consequence has occurred, disaster management kicks in. This includes instituting procedures pertaining to a number of issues such as communication, rescue, and rehabilitation. These are addressed in the disaster management plan. Both, the RA and DMP, are living documents and need to be updated whenever there are changes in operations, equipment, or procedures. Assessment is all about preventing accidents and taking necessary steps to prevent it from happening.

M/s TATA CHEMICALS LIMITED Page 232 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Key Definitions

Hazard: Source of potential harm, injury, or loss.

Consequence: Size of the loss or damage. In terms of health and safety, it is the degree of harm that could be caused to people exposed to the hazard, the potential severity of injuries or ill health and / or the number of people who could be potentially affected. Consequence of a hazard need not only be in terms of safety criteria but could also be in terms of a money loss, incurred costs, loss of production, environmental impacts as well as public outrage.

Risk: Combination of the likelihood of a specific unwanted event and the potential consequences if it should occur.

Risk Assessment: Is a process that involves measurement of risk to determine priorities and to enable identification of appropriate level of risk treatment (used also to describe the overall process of risk management).

Risk Management: Overall description of the steps taken to manage risk, by identifying hazards and implementing controls in the workplace.

Emergency: A situation of process deviation that, if uncontrolled, may lead to a major accident /disaster with potential short term and/or long term risk damage consequence to life and property in and/or around the workplace.

Disaster: A catastrophic consequence of a major emergency / accident that leads to not only extensive damage to life and property, but also disrupts all normal human activity for a significant period of time and requires a major national and / or international effort for rescue and rehabilitation of those affected.

Scope of Risk Assessment Study The scope of work for risk and safety studies in mine is as follows:

1. Hazard Identification It includes study of safety issues pertaining to the project 2. Identification of Hazard Scenarios Identification of scenarios that can cause damage to life & property is as follows:

7.5.1 Blasting Most of the accidents from blasting occur due to the projectiles, as they may sometimes go even beyond the danger zone, mainly due to overcharging of the shot-holes or as a result of certain special features of the local ground. Flying rocks are encountered during initial and final blasting

M/s TATA CHEMICALS LIMITED Page 233 Expansion of Aniali Limestone Mining Project Final EIA/EMP

operations. Vibrations also lead to displacement of adjoining areas. Dust and noise are also problems commonly encountered during blasting operations.

7.5.2 Overburden No overburden will be generated during the mine period.

7.5.3 Heavy Machinery Most of the accidents occur during transportation by tippers/ trucks. Operation of proclaims and ripper dozers and other heavy vehicles are often attributable to mechanical failures and human errors. This can be prevented by regular training of all vehicle/machinery drivers/operators, regular maintenance of equipment and ensuring safe operations.

7.5.4 Storage and use of explosives  Proper and safe storage of explosives in approved and Licensed Magazine.  Proper, safe and careful handling and use of explosives by competent blasters having Blaster’s Certificate of Competency issued by DGMS which is given as Annexure VI.  Proper security system to prevent theft/ pilferage, unauthorized entry into Magazine area and checking authorized persons to prevent carrying of match box, lights, mobile phones, cigarette or Bidi etc.  Conventional explosives shall be used in their original cartridge packing and such cartridge shall not be cut to remove explosive for making cartridge of different size.  Explosives shall be conveyed in special containers.  The holes which have been charged with explosives will not be left unattended till blasting is completed.  Before starting charging, clear audible warning signals by Sirens will be given so that people nearby can take shelter.

7.5.5 Water Logging Water logging in the mine site can be avoided by adopting following measures:  Due care will be taken to provide retaining wall around the pits.  Proper drainage will be maintained to eliminate inundation of working pits during rains from run-off water.  There is no danger of flood or inundation as the ground level is well below the mining depth, where mining of limestone will be carried out.

7.5.6 Natural resource conservation  A green belt will be developed so that minimum soil erosion takes place.  In any case the natural habitats of the existing flora and fauna will not be disturbed.  Use of traditional knowledge in all aspects of conservation shall be utilized.

M/s TATA CHEMICALS LIMITED Page 234 Expansion of Aniali Limestone Mining Project Final EIA/EMP

 Water conservation techniques will be employed.  Time to time analysis of the soil, water resources etc will be done in order to analyze the negative impacts of mining activities on the environment.  To prepare management plans for village landscapes, villages to be seen as landscapes of diverse elements such as forests, scrub, grassland, streams/river, ponds etc. The dynamics of the village as an ecosystem to be assessed, corridors to be devised between major natural landscape elements, so as to facilitate movement of species.

7.5.7 Safety Measures Safety Measures at the proposed Open Cast Mining Project  The opencast mines have been planned for working with excavator tipper system which requires proper benching not only for slope stability but also for movement of tippers and other heavy machinery.  A minimum safe distance of 100-m will be kept between the surface edge of the quarry and the nearest public building, roads etc.  All mining operations both within the quarry and outside will be conducted as per the conditions lay down by DGMS and under the strict supervision of competent persons appointed under Metalliferrous Mines Regulations, 1961.

 Measures Suggested to Avoid Accidents due to Blasting  Blasting will be done during the lunch interval, i.e. from 1.00 to 2.00 pm.  Blasting will be done by qualified blaster/mining mates under the supervision of mines manager.  Holes will be drilled in square/scattered pattern.  Shot firing will be usually done with the help of safety fuse & ordinary detonator/ electric shot firing with delay detonators as per requirement.  Adequate shelters or other protective structures shall be provided to the workers at all times;  The shot fired shall give sufficient warning by effective signal over the entire area falling within a radius of 500 m.  Blasting time is generally fixed after consultation with neighboring mines after the working shift-taking all required precautions, like marking the danger zone of 500 m with red flags, use of warning signals & providing blasting shelters etc.

Measures to Prevent Accidents due to Trucks and Tippers  All transportation within the main working area should be carried out under the direct supervision and control of the management;  The vehicles must be maintained in good repairs and checked thoroughly at least once a week by a competent person authorized for this purpose by the management;  Broad signs should be provided at each and every turning point especially for the guidance of the drivers of vehicles.

M/s TATA CHEMICALS LIMITED Page 235 Expansion of Aniali Limestone Mining Project Final EIA/EMP

 To avoid dangers while reversing the trackless vehicles, especially at the embankment and tripping points, all areas for reversing of lorries should, as far as possible, be made man free, and there should be a light and sound device to indicate reversing of trucks; and  A statutory provision of the fence, constant education, training etc. will go a long way in reducing the incidence of such accidents.

7.6 Disaster Management Plan 7.6.1 Objectives of Disaster Management Plan The Disaster Management Plan is aimed to ensure safety of life, protection of environment, protection of installation and restoration of production. For effective implementation of the Disaster Management Plan, it should be widely circulated and personnel training should be given. The objective of the Disaster Management Plan is to make use of the combined resources of the mine and the outside services to achieve the following:  Effect the rescue and medical treatment of casualties;  Safeguard other people;  Minimize damage to property and the environment;  Initially contain and ultimately bring the incident under control;  Secure the safe rehabilitation of affected area; and  Preserve relevant records and equipment for the subsequent inquiry into the cause and circumstances of the emergency. In effect, it is to optimize operational efficiency to rescue rehabilitation and render medical help and to restore normalcy.

7.6.2 Disaster Management and Risk assessment Risk assessment with respect to high accidents like landslides, subsidence, flood, inundation, fire seismic activities, tailing dam failure etc. are as follows:

Landslide The mining lease area belongs to undulating to flat topography. The nature of limestone deposit is almost flat type having no overburden which makes the chances of landslide/failure of slope insignificant. However, the bench slope angle will be maintained at 800 and width of benches will be kept more than the height to arrest the boulders failing from the bench slope.

Subsidence The mining will be done by opencast method by using HEMM and no underground working exists in the area. Detailed exploration work carried out which shows that rock types available in the area are compact and massive so chances of subsidence will be insignificant.

M/s TATA CHEMICALS LIMITED Page 236 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Seismic Activities: Many part of the Indian subcontinent have historically high seismicity. Seven catastrophic earthquakes of magnitude greater than 8 (Richter scale) have occurred in the western, northern, and eastern parts of India and adjacent countries in the past 100 years. By contrast, peninsular India is relatively less seismic, having suffered only infrequent earthquakes of moderate strength. The main seismogenic belts are associated with the collision plate boundary between the Indian and Eurasian plates. The project site as well as study area lies in Zone III of seismic Zoning map, and thus can be said to be located in an area of moderate seismic hazard by national standards. Hence, the risk of earthquake at the site persists through there has been no incident in the near past.

Tailing dam failure The limestone (ROM) for use in Soda-Ash Plant & Cement Plant does not require any beneficiation unlike the other materials. Thus no tailing will be generated and no tailing dam is requiring to be maintained.

Flood With the previous year's meteorological data, no flood situation was observed in the area. However, in unforeseen flood situation, workers will be shifted to highest elevation point for safety purpose.

Fire Fire is a likely/common hazard associated with working of diesel powered HEMM in mines. The sources of fire in mines could be source of ignition such as high temperature, electrical short circuiting, welding and cutting operations in vicinity of flammable material like diesel, hydraulic oil, transmission oil, lubricant & grease, poor quality maintenance of spares like hoses, electrical parts etc and poor housekeeping. Measures proposed to be taken for prevention of fire are as under:  Mining machines are being maintained leakage free to obviate occurrence of fire.  Due care will be taken in maintenance of electric wiring, non-inflammable material  Good housekeeping practices is being adopted in oil room and working area.  Auto and portable fire extinguishers is being provided on all equipment.  All the operators have been trained to use the extinguishers in case of emergency.

Sufficient fire extinguishers will be installed at selected locations such as mine office, garage, stores etc. Besides, sufficient water hydrants with sufficient length of hosepipes will be made available on the surface for fire protection.

M/s TATA CHEMICALS LIMITED Page 237 Expansion of Aniali Limestone Mining Project Final EIA/EMP

7.6.3 On-Site Disaster Management Plan The objective of on-site disaster management plan for the captive mine is to be in a state of perpetual readiness through training development to immediately control and arrest any emergency situation so as to avert a full-fledged disaster and the consequences of human and property damage and in the event of a disaster still occurring to manage the same so that the risk of the damage to life and property is minimized.

The contact person details in case of emergency:- 1.Shri C.M. Dwivedi (HOD Mines) M/s TATA Chemicals Limited Ranavav Quarries, P.O. Ranavav, Taluka- Ranavav District Porbandar, Gujarat-360550

2. Shri Balram Singh (Mining Manager) M/s TATA Chemicals Limited Ranavav Quarries, P.O. Ranavav, Taluka- Ranavav District Porbandar, Gujarat-360550

3. Shri Mayank Srivastava (Deputy Mining Manager) M/s TATA Chemicals Limited Ranavav Quarries, P.O. Ranavav, Taluka- Ranavav District Porbandar, Gujarat-360550

Emergency Medical Facilities An ambulance with driver availability in all the shifts, emergency shift vehicle would be ensured and maintained to transport injured or affected persons. Number of persons would be trained in first aid so that, in every shift first aid personnel would be available. First aid Basic items in a first aid kit consist of items listed in Table 7.4 will be available at the mine site. Table 7.4: Items in First Aid Kit S.No Description Quantity 1 First aid leaflet 1 copy 2 Sterilized finger dressing 1 0 nos. 3 Sterilized hand or foot dressing 10 nos. 4 Sterilized body or large dressing 6 nos. 5 Sterilized burns dressing - small 4 nos.

M/s TATA CHEMICALS LIMITED Page 238 Expansion of Aniali Limestone Mining Project Final EIA/EMP

6 Sterilized burns dressing - large 2 nos. 7 Sterilized burns dressing – extra large 6 nos. 8 Sterilized cotton wool (25 gm) 2 tubes 9 Cetavolon (28 gm) 2 tubes 10 Eye pads 6 nos. 11 Adhesive plaster 1 spool 12 Assorted roller bandage 6 nos. 13 Triangular bandages 6 nos. 14 Safety pins 6 nos. 15 Scissors, ordinary, 12.7cms, both sides sharp 1 pair 16 Savlon liquid, 150 ml, or equivalent 2 nos. 17 Cotton wool for padding, 100 gm 2 packets 18 Eye Ointment of sulphacetamide preparation 1 tube 19 Loose woven gauze 128"x8", compressed pack 1 packet 20 Aspirin, 300 mg (10 tablets) 5 strips 21 Scribbling Pad, 4"x 6" with a pencil in a plastic 1 no. 22 Adhesive dressing strips cover 10 strips 23 Field dressing of modified army pattern 3 nos. 24 Record cards in a plastic cover 1 set 25 Torch, medium size without cells 1 no. 26 Eye Wash 1 no. 27 Wooden splints, small 1 set 28 Wooden splints, big 1 set

Treatment of affected persons Injured / Affected persons shall be provided suitable first-aid treatment and sent to Co.'s Doctor for further treatment depending on injury. Patients requiring further treatment shall be sent in Ambulances to Hospitals in Porbandar. Patients suffering from minor problems shall be discharged and sent home after preliminary treatment.

Rehabilitation & Resettlement As there is no habitation within mine lease area no Rehabilitation & Resettlement required. However, Aniali limestone mine is committed towards development of the surrounding area.

Corporate Social Responsibility Central to the corporate philosophy of TATA Chemicals is its passionate commitment to the social development of the communities in which it operates. Improving the quality of life and fostering sustainable and integrated development in the communities where it operates is

M/s TATA CHEMICALS LIMITED Page 239 Expansion of Aniali Limestone Mining Project Final EIA/EMP

central to TATA Chemicals corporate philosophy. This objective of social responsibility is equally well-entrenched in the minds of its employees, who play an active part in providing financial support and empowering rural communities to chart their own development.

TATA Chemicals Limited (TCL) set up the TATA Chemicals Society for Rural Development (TCSRD) in 1980 to promote its social objectives for the communities in and around its facilities is located.

The Society works to protect and nurture the rural populations in and around TCL's facilities, and helps people achieve self-sufficiency in natural resource management, livelihood support and the building of health and education infrastructure.

TATA Chemicals Society for Rural Development (TCSRD) – that works towards holistic community development, including managing water, land and other natural resources, encouraging enterprise development, and promoting health and education. TCSRD is on track to achieve its goal of impacting the lives of a million of people by 2019.Broadly, the community development initiatives are divided into six thematic areas:

 Natural resource management (NRM): this includes program on integrated water management; agriculture development; land reclamation; animal husbandry program and pond management  Environmental care and conservation: this includes Dharti Ko Arpan program initiated by TCSRD  Empowerment: this includes formation of self-help groups,; saksham and volunteering program  Livelihood development: this includes vocational training; group based enterprise; rural entrepreneur development program and traditional handicraft promotion enterprise.  Health and Education: this includes Swasth Aangan project and other health awareness program. While in the education various initiatives are undertaken to enhance the education status in all the three locations.  Infrastructure development support: this includes various infrastructure support structure being provided to improve the standard of living of the rural communities in and around its mine site Company has well laid down policy for Community Development and Social Accountability. Policies are detailed as below:

Community Development Policy: TATA Chemicals Limited pledges itself to care for and serve the community by:

M/s TATA CHEMICALS LIMITED Page 240 Expansion of Aniali Limestone Mining Project Final EIA/EMP

 Designing, evolving and implementing sustainable, replicable and scalable development models, that leads to measurable socio-economic development of the community and ecological development in its area of influence,  Involving the community in all stages of the process, in the true spirit of participatory development.  Having focused and transparent processes, that provides for equal opportunity, while improving the quality of life.  Partnering and networking with government, development agencies, corporate bodies and NGOs to implement appropriate community development programs.  Creating knowledge resource centers to transfer and share information and help build capacities of partners and the community.  Involving the employees in volunteering for community development programs.

Social Accountability Policy: It is our policy to conduct our business in a socially responsible manner by complying with all the requirements of SA 8000 standard. To that end we are committed to:  Comply with applicable state, national and international legislations, ILO and UN conventions on ethical business.  Continual improvement in our performance through management reviews, open communications and providing a favorable employment environment.  Actively promote and encourage the pursuit of ethical excellence not only within the company but also amongst our suppliers and customers.

*****************

M/s TATA CHEMICALS LIMITED Page 241 CHAPTER-8

PROJECT BENEFITS Expasnion of Aniali Limestone Mining Project Final EIA/EMP

CHAPTER 8- PROJECT BENEFITS

8.0 General TATA Chemicals Limited (TCL) was founded in 1939. It is a global company with interests in businesses that focus on LIFE - living industrial and farming essentials. TATA Chemicals Limited currently is the world's third largest producer of soda ash with manufacturing facilities in Asia, Europe, Africa and North America.

Various benefits are envisaged while planning for the mining of Limestone at village Aniali. This chapter gives a comprehensive description of various advantages and benefits anticipated from the proposed project to the locality, neighborhood, region and nations a whole.

Lime stone is very important chemical mineral and is the principal raw material for the production of soda ash and clinker for cement, etc. The need for mining of the chemical grade limestone from the project (mine lease area) has arisen to meet the current situation of demand supply gap faced by company.

Limestone Mining is a very important economic activity in Saurashtra region of Gujarat. Chemical Grade Limestone is mainly found in this region. This high purity lime stone is essential for soda ash manufacturing. For soda ash industry to remain competitive, availability of chemical grade lime stone in nearby area is extremely important. The Soda Ash based limestone mining industry contributes significantly to the State Gross Domestic Product and provides direct employment to about 7500 laborers. Additional jobs are created by way of transportation and related jobs, ancillary to mining. Subject mine lease aims to augment the limestone supply to TCL, Mithapur.

The products of TCL's Mithapur plant, especially soda ash, are a vital input for a number of basic industries such as glass, pulp and paper, chemicals and detergents, besides others. Consequently, this project aims at keeping many of the key industries within the country well supplied with an essential raw material.At present, the company's annual requirement for chemical grade limestone is about 16.0lacsMT (ROM), of which, 1.30 million tones are sourced from captive mines and the balance from domestic and overseas merchants. To cater the limestone requirement for the soda ash plant, the company is importing chemical grade limestone from the Gulf countries in the range of 6.0 to 7.0 lacstonne per annum.The gap between the annual demand and the quantity of RoM received from captive mines is substantial and thus the company intends to bridge this gap by winning limestone from the proposed expansion project. The proposed expansion project is expected to bring down the imports.

Expansion of Aniali Limestone Mining Project is a mine lease holded by M/s TATA Chemicals Ltd. It is an existing mine. The existing production capacity of the mine is 43000 TPA. EC has

M/s TATA CHEMICALS LIMITED Page 242 Expasnion of Aniali Limestone Mining Project Final EIA/EMP

been granted for 43,000 TPA in the year 2015. Now TCL wants to expand the production of Aniali mine from 43,000 to 1, 75000 TPA of Limestone. The proposed expansion project is for mining of limestone; it shall have no major impact on surrounding environment. The under sized material generated during the production after manual sizing or mechanized sizing will be send to TCL's own cement plant at Mithapur. The company's Mithapur plant is awarded an ISO-14001 certification and also the Chemical Division is awarded the ISO-9001-2015 Quality Management System. This project will help in improvement of social, economic and environment structure, which will initiate sustainable development.

8.1 Improvement in the Physical Infrastructure As it is a captive limestone mine, it will have direct and indirect impacts to improve physical infrastructure in nearby community. The impact on the civic amenities after the commencement of mining activities is likely to be substantial. The basic requirements of the community needs will be strengthened by extending health care, educational facilities developed in the township for the community, providing drinking water to the villages, building/strengthening of existing roads in the area. TCL will initiate the above amenities either by providing or by improving the facilities in the area, which will help in uplifting the living standards of the local communities. Medical facilities will be provided in the form of first-aid facility at the mine site. These medical facilities will also be available to local people in the surroundings in case of emergencies.

The project will improve the physical infrastructure of the adjoining areas. This will include the following:-

 Improved road communication;  Strengthening of existing community facilities through the existing Community Development Programme;  Awareness program and community activities, like health camps, medical aids, family welfare programs, immunization camp, sports & cultural activities, plantation etc.  Mine pits will be re-grassed

8.2 Improvement in the Social Infrastructure The proposed expansion project is expected to provide employment to local people in different activities such as Mining, sizing, transportation and plantation activities. The project activity will not have any major impact on the environment. At Post mining stage of proposed project, the existing waste land shall be used for green belt development.

 Generation of employment and improved standard of living;  Increased revenue to the State by way of royalty, taxes and duties  Superior communication and transport facilities etc.  In addition to above, due to increase in purchasing power of local habitants:  There will be significant change in the socio-economic scenario of the area.

M/s TATA CHEMICALS LIMITED Page 243 Expasnion of Aniali Limestone Mining Project Final EIA/EMP

 The proposed expansion project will enhance the prospects of employment. Recruitment for the unskilled and semiskilled workers for the proposed project will be from nearby villages.  The development of the basic amenities viz. roads, transportation, electricity, drinking water, proper sanitation, educational institutions, medical facilities, entertainment, etc. will be developed as far as possible.  Overall the project will change living standards of the people and improve the socio- economic conditions of the area. Also the company's Corporate Social Responsibility initiatives will have a positive impact on socio economic fabric of the region.

8.3 Employment Potential Future production planning does not indicate some change from present, in the employment. Due to expansion, additional 46 workers will be required to achieve the targeted production. TCL will employ 153 miners for mining of ore, quarry cleaning & road repairing. The details of employment are given in Chapter-2 as well. The local labors shall be engaged for sizing of limestone and loading and handling of mineral in mining area, besides, watch and ward and plantation activity with proper maintenance. Beside this, TCL shall engage skilled and managerial staff to meet the statutory requirement under MMR 1961 and MCDR 1988. The employment of local people in primary and secondary sectors of project will upgrade the prosperity of the region. These will in-turn improves the socio-economic conditions of the area. In addition to the above, contractual labors and indirect employment opportunities will also be getting benefited after installation of mining project.

8.4 Socio-economic benefits The benefits of mining activity will be similar to any industrial set-up. There will be opportunities of direct and indirect employments to the locals. As mentioned earlier there will be around 153 personnel, most of them will be skilled or semi-skilled & unskilled workers. Total 90% staff will be employed from the local villages. The indirect employment will be far reaching. 8.5 Tangible Social Benefits There will be positive impact in socio-economic area due to increased economic activities, creation of new employment opportunities, infrastructural development and better educational and health facilities. a) Health Programs Company will undertake awareness program and community activities like health camps, medical aids, family welfare camps, AIDS awareness program etc.

M/s TATA CHEMICALS LIMITED Page 244 Expasnion of Aniali Limestone Mining Project Final EIA/EMP

Periodic medical checkups as per Mines Act/ Rules and other social development and promotional activities will be undertaken. All this, will assist to lift the general health status of the residents of the area around mine. b) Plantation Program Since this is an existing mine, a massive plantation has been done in the mine area so far and lot many are proposed to mitigate the ill-effects of mining and to improve the vicinity and environment of mine and its surrounding area. The management will give emphasis on plantation and will also motivate local persons for plantation during rainy season. This will also increase the consciousness in workers and near-by villagers for greenery. Fruit trees can contribute towards their financial gains. 8.6 Other Benefits Apart from all the above mentioned benefits there will be other benefits to the region in terms of up gradation of lifestyle, overall area development etc.

*****************

M/s TATA CHEMICALS LIMITED Page 245 CHAPTER-9

ENVIRONMENT MANAGEMENT PLAN Expansion of Aniali Limestone Mining Project Final EIA/EMP

CHAPTER 9- ENVIRONMENT MANAGEMENT PLAN

9.1 General The Environment Management Plan (EMP) is required to ensure sustainable development in the study area. This chapter covers cause of pollution, main source of pollution, nature of pollution with proposed mitigation measures for that pollution. This chapter consists of the set of mitigation, management, monitoring and institutional measures to be taken during the implementation and operation of the project, to eliminate adverse environmental impacts or reduce them to acceptable levels. Overall objective of Environment Management Plan is as following:  To reduce generation of pollutants due to various mining activity  Overall conservation of environment  Proper use of natural resources  Minimization of waste generation and pollution  Safety, welfare and good health of the work force and populace  Ensure effective operation of all control measures  Monitoring of cumulative and longtime impacts  Ensure effective operation of all control measures

9.2 Environment Management System 9.2.1 Policy Company has a well laid down Safety Health and Environment Policy approved by its Board of Directors. The Policy prescribes for comply with all applicable safety, health and environment laws and regulations.

Safety,Health and Environment Policy Tata Chemicals is upholding its position as a leader in the industry by conducting all its activities in a manner that is protective of the environment and in ensuring the health and safety of its employees, contractors, visitors and the community around which it operates. These include all manufacturing locations, offices, research laboratories, sales and distribution points and warehouses. To fulfill this commitment, continuing effort is maintained to:-  Achieve ZERO HARM by following world class standards of SHE Management Systems, Responsible Care initiatives, Process Safety Management, good maintenance practices,. enhancement strategies for the environment and prevention of pollution  Enhance Safety, Health and Environment (SHE) awareness, competency and responsibility among our employees and associated stakeholders including contractor / transport personnel, valued customers through effective communication. training and demonstrated performance to achieve ZERO HARM - Zero Harm to People, Zero Harm to Assets and Zero Harm to Environment

M/s TATA CHEMICALS LIMITED Page 246 Expansion of Aniali Limestone Mining Project Final EIA/EMP

 Comply and endeavor to exceed with all applicable safety, health and environmental laws and regulations to set highest standards  Integrate SHE considerations into business planning and decision making without compromise in pursuit of commercial advantage  Embody principles of product stewardship by enhancing health, safety, environmental and social impacts of products and services across their lifecycles  Proactively reduce our risks through risk assessment, process improvements, periodic SHE audits the investigation of all workplace and process safety incidents and illnesses and closure of findings to promptly correct any unsafe conditions and / or practices  Make SHE performance an important parameter that would govern key decisions around employee life cycle or continued business relations as applicable  Increase shareholder value through SHE excellence This policy shall be periodically reviewed in order to ensure its alignment to the business and all applicable regulatory requirements and shall be communicated to all concerned and on request be made available to the public as well.

9.2.2 Standard Operating Procedures M/s TATA Chemicals Ltd. conforms to the standard operating procedures for legal and quality system. All sites in India are certified to ISO 9001 (Quality Management System), ISO 14001 (Environment Management System) & OSHAS 18001 (Occupational Safety &Health Assessment System).

9.2.3 Environment Cell Company has well established Environmental Management System which is headed by General Manager- Safety, Health & Environment. Company has implemented online Legal Compliance Management System with well-defined compliance owners. The system generates email alerts for meeting compliances and has inbuilt escalation mechanism to keep the senior management informed on compliance updates.

Hierarchical System for environmental compliance TCL has instituted a system of periodic compliance reviews at all levels in the organization (from MD to the Geologist-in-charge & Assistant Manager Environment). Compliance with EC Conditions will be part of the compliance reviews. As per the Figure 9.1, the Managing Director is responsible for day to day management of the company. The Vice President Manufacturing at Mithapur reports to Chief Operating Officer India Chemical Business who intern reports to Managing Director. The VP Manufacturing conducts a quarterly review of all environmental matters including related compliances. The General Manager Mines and General Manager Safety, Health & Environment and report to the VP Manufacturing and are responsible for mining and environmental related compliances respectively.

M/s TATA CHEMICALS LIMITED Page 247 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Managing Director

Chief Operating Officer-Indian Chemical Business

Vice President- Mithapur

General Manger-Safety, Health & General Manager-Mines Environment

Sr. Manager Mines Manager Environment

Manager / Deputy Manager Dy. Manager/Asst. Manager Mines Environment

Figure 9.1: Hierarchal System of TATA Chemicals Ltd, Mines

9.2.4 Public Reporting Company publishes Corporate Governance Report as part of Annual Financial Reporting. The corporate governance philosophy of the Company has been strengthened with the adoption of the TATA Code of Conduct, TATA Business Excellence Model, and Code of Corporate Disclosure Policies. The Company, through its Board and Committees, endeavors to strike and deliver the highest governing standards for the benefit of its stakeholders. Audit committee of Board of Directors ensures Company's compliance with the legal and regulatory requirements and the TATA Code of Conduct (TCoC).

M/s TATA CHEMICALS LIMITED Page 248 Expansion of Aniali Limestone Mining Project Final EIA/EMP

9.3 Proposed Environmental Management Plan The environment management plan is prepared with a view to facilitate effective environmental management of the project, in general and implementation of the mitigation measures in particular. The EMP provides a delivery mechanism to address potential adverse impacts and to introduce standards of good practice to be adopted for all project works. For each stage of the programme, the EMP lists all the requirements to ensure effective mitigation of every potential biophysical and socio-economic impact identified in the EIA. For each impact or operation, which could otherwise give rise to impact, the following information is presented:

A comprehensive listing of the mitigation measures (actions);  The parameters that will be monitored to ensure effective implementation of the action;  The timing for implementation of action to ensure the objectives of mitigation is fully met.  In order to minimize impacts of mining on different environmental parameters and to keep air and water quality within prescribed limits of CPCB, an Environmental Management Plan (EMP) has been prepared. This will help in resolving all environmental and ecological issues due to mining in the area. The environmental management plan includes all preventive as well as mitigation measures to minimize impact on environment along-with reclamation and rehabilitation measures form in and out land.

9.3.1 Air Pollution Management and Control Overall Air quality of the lease area in the buffer zone is well within permissible limit. Dust emissions due to mineral handling, during mining operations are not much and restricted to the lease area only. Air pollution is caused mainly due to dust generation added with gaseous emission from transportation activities along with mining operations like, loading, unloading haulage etc.

9.3.1.1 Control of Fugitive Emissions  Drilling and blasting is occasional and wet drilling is proposed along with controlled blasting.  Use of Personal Protection Equipment (PPE) like dust masks, ear plugs etc. by the mine workers.  Regular water sprinkling on haul roads & loading points will be carried out.  Development of green belt/plantation around the lease boundary, roads, etc.  Ambient Air Quality Monitoring will be conducted on regularly basis to assess the quality of ambient air.

9.3.1.2 Prevention and control of Gaseous Pollution In mining activities, the sources of gaseous emissions would be vehicular movement, loading & unloading of mineral etc.

M/s TATA CHEMICALS LIMITED Page 249 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Proper maintenance of machines improves combustion process and makes reduction in the pollution. Good maintenance and monitoring of fuel and oil will not allow significant addition in the gaseous emission.

Table 9.1: Air Pollution Management and Control Potential Action Parameters for Timing Impact Monitoring Air All equipment are operated Random checks of During site clearing Emissions within specified design equipment logs/ &Operation of mine parameters. manuals

Vehicle trips to be minimized Vehicle logs / Increase During site clearing, to the extent possible the capacity of vehicle &Operation of mine

Topsoil (if any) must be Absence of stockpiles During site clearing removed from the entire area to be mined and stored from where it can be recovered and utilized immediately in other areas. Ensure regular checks of Pollution under control During operation of vehicular pollution certificate of vehicle mine. Covering of Vehicles No of Trucks with During operation of transporting the mined mineral covering / Random mine. checks of trucks on roads Plantation of dense hedges on No ofSaplings per year During each year the boundary of lease area, from operations till these will reduce dust and closure as per noise in the vicinity area. approved mining plan Use proper drill bits for Random check of During blast hole drilling holes and wet drilling equipment used for drilling method. drilling Regular water spraying shall Quantity of water During site clearing, be done requirement shall be transportation etc. monitored

M/s TATA CHEMICALS LIMITED Page 250 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Ambient air quality within the The ambient air quality As per GPCB premises of the pro- posed unit will conform to the requirement. to be monitored. standards for SPM, SO2and NOX

Figure 9.2: Dust suppression through water sprinkling on the haul road

9.3. 2 Noise Pollution Management and Control 9.3.2.1 Noise Abattement and Control Following measures like proper maintenance, oiling and greasing of machines at regular intervals will be practiced to reduce the generation of noise. Adequate silencers will be provided in all the diesel engines. Plantation along the sides of approach roads and mine area will be followed to minimize the propagation of noise. Personal Protective Equipment (PPE) like earmuffs/earplugs will be provided to all operators and employees working near mining machineries or at higher noise zone. Periodical noise level monitoring will be done. Table 9.2: Noise Pollution Management and Control Potential Action Parameters for Timing Impact Monitoring Noise List of all noise generating Equipment logs, During mining machinery onsite along with age noise reading operation. to be prepared. Equipment to be maintained in good working order. Generation of vehicular noise Maintenance During transportation. records of vehicles Implement good working Site working During blasting practices (equipment selection and practices siting) to minimize noise and also records, noise reduce its impacts on human reading

M/s TATA CHEMICALS LIMITED Page 251 Expansion of Aniali Limestone Mining Project Final EIA/EMP

health (ear muffs, safe distances and enclosures).Adopt good blasting practices to reduce impact on flora and fauna. Muffling will be done at the time of blasting Noise to be monitored in ambient Noise reading As per GPCB air near blasting shelter and at the requirement or lease boundaries. quarterly whichever is The Noise level should not exceed earlier. the permissible limit both during day and night time. All equipment operated within Random checks During mining specified design parameters. of equipment operation logs/ manuals Vehicle trips to be minimized to the Vehicle logs During mining extent possible operation

Plantation of dense hedges on the No of Saplings During Each year from boundary of lease area, these will per Year operations till closure as reduce dust and noise in the vicinity per approved mining area. plan Ground Good blasting layout must be Vibrations to be At the time of blasting Vibrations adopted. Adopting less number of modeled or based on the blasting due to holes per delay data

9.3.2.2 Control of Noise, Vibration and fly rock during blasting Following control measures shall be taken to reduce noise pollution due to mining activity.  Drilling will be done with sharp drill bits, which reduces generation of noise during drilling.  Controlled Blasting will be carried out to minimize noise generation.  Hydraulic Rock breaker will be used to avoid secondary blasting.  Blasting with optimum charge per hole and use of milli-second delay detonators reduces generation of noise.  In order to reduce the effect of noise pollution, earmuffs will be provided to all operators and employees working at mining site as a safety measure.  Proper maintenance, oiling and greasing of machines at regular intervals will be done to reduce generation of noise.  Periodical monitoring of noise level near vicinity of operating mining machines and at some locations in the surrounding area of mine working will be done with the help of sound level meter & records will be maintained.

M/s TATA CHEMICALS LIMITED Page 252 Expansion of Aniali Limestone Mining Project Final EIA/EMP

 Silencers and mufflers on mining equipment, wherever required, will be properly fitted and maintained.  Drilling &blasting parameters shall be optimized so as to cause the minimal vibration and fly rock. Secondary blasting shall be avoided.

9.3.3 Water Pollution Management and Control 9.3.3.1 Surface water management There is no river stream, nallas or any other water body passing through the lease area. During rains some natural drains may flow in the area. Moreover the possibility of surface water contamination due to erosion and runoff from the mine is already stroked out as there is practically no soil and no waste will be produced from the mine. The surface run off during the rainy season will be prevented from entering into the active pits.

9.3.3.2 Ground water management The maximum depth in the present pit is at 58mRL and at conceptual stage, it will go further till 55mRL. Thus, the mining will not intersect with the water table. Therefore, the groundwater table will not likely to get affected.

Max. Water Table(mRL) Min. Water Table(mRL) 37 mRL 45mRL (Source: Approved Mine Plan, dated 26.12.2019)

9.3.3.3 Details of water conservation measures proposed/Rain water harvesting proposal The quality of ground water near Aniali Limestone Mining Project is less likely to be degraded as there are no toxic elements present in limestone mineral which can contaminate the groundwater. However, following measures are proposed to be taken continuously to reduce the adverse impact on water quality – 1. Mining will be done on surface area only and should not go beyond water table. 2. Regular testing of water samples will be carried out. 3. No washing of equipment will be done inside the mining lease areas. As per recent MoEF&CC Office Memorandum F.No. 22-34/2018-IA-III issued on 16 January, 2020, it is stated that the excavated area should be re-grassed by the lessee at the conceptual stage of the mine. Moreover, in the approved Mine Plan(dated 26.12.2019), there is a provision mentioned about rainwater harvesting structure in the conceptual stage/ mine closure. The same is also represented in the mine plate shown in Figure 9.3. The mine management will install Roof top harvesting structures in the school or public buildings in nearby villages with prior consent from local gram panchayats to collect rain water and charge to ground through available dug well/ tube well. As the region lacking adequate ground water source, thus the groundwater resources will be conserved for sustainable availability.

M/s TATA CHEMICALS LIMITED Page 253 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Figure 9.3- Conceptual Plan & Sections

M/s TATA CHEMICALS LIMITED Page 254 Expansion of Aniali Limestone Mining Project Final EIA/EMP

9.3.4 Land Reclamation and waste management 9.3.4.1 Land use planning and mine closure The reclamation plan, post mine land use and progressive greenbelt development plan as per Approved Mine plan, land use pattern for Pre-operational, Operational and Post- operational phases are given in Table 9.3. Table 9.3: Stage wise changes in Land use pattern S. No. Head Area put on Area put on Area put on use at start of use at the use at the ed Mining Plan end of plan of life of mine (ha) period (Ha) (Ha) 1 Area under mining 4.4160 14.9342 17.8778

2 Storage for top soil 0 0 0

3 Waste dump site 0 0 0

4 Mineral storage 0 0 0 Infrastructure – workshop, 0.6000 0.6000 0 5 administrative building etc. 6 Roads 0.7565 0.7595 0

7 Railways 0 0 0

8 Tailing pond 0 0 0

9 Effluent Treatment Plant 0 0 0

10 Mineral Separation Plant 0 0 0

11 Township area 0 0 0

12 Others (Green Belt) 0 0 0

13 Total 5.7725 16.2907 17.8778

14 Total Remaining area 15.2675 4.7493 3.1622 Grand Total 21.04 21.04 21.04 (Source: Approved Mine Plan, dated 26.12.2019)

9.4 Waste Management Top Soil Management The lease area is devoid of overburden. Limestone is exposed on the surface itself. A very thin layer of soil exists at places and this is scrapped separately and used for plantation

M/s TATA CHEMICALS LIMITED Page 255 Expansion of Aniali Limestone Mining Project Final EIA/EMP

simultaneously. During the proposal period, it is proposed to excavate the Chemical grade of limestone which is above the cut-off grade of limestone. The inferior grade of the limestone found at the bottom of chemical grade limestone layer will not be mined out by TCL. Thus, no mineral rejects will be generated from excavated material. Table 9.4: Year Wise Waste Generation (Top Soil, OB/Waste/Mineral reject) Year Top soil (cum) Mineral Rejects (cum) Reuse/Spreading Storage Backfilling Storage* Blending Beneficiation

I Nil Nil Nil 67,870 Nil Nil

II Nil Nil Nil 67,870 Nil Nil

III Nil Nil Nil 67,870 Nil Nil

IV Nil Nil Nil 67,870 Nil Nil

V Nil Nil Nil 67,870 Nil Nil Total Nil Nil Nil 3,39,350 Nil Nil *The Mineral Reject. (Undersized of Chemical/Cement Grade) generated from the proposed crushing unit (1500 TPD) will be temporarily stored inside the lease area before using in cement manufacturing. (Source: Approved Mine Plan, dated 26.12.2019)

Overburden/waste Management There will be no overburden or waste removal in course of mining and therefore no land needed to be demarcated for such surface dumps and disposal. The inferior grade limestone removes from the inter-bands will be stored temporarily on one side of the quarry to be removed to the cement plant at regular interval.

9.5 Green belt development Greenbelt development programme will be designed within the natural constraints of the site and in particular species selection reflects flora known to be resistant to the local conditions. Greenbelt development is necessary for:  Landscaping and providing shelter  Improvement in site conditions  Surface air purification by providing oxygen and letting SPM to settle on the leaves.  To attenuate noise generation by movement of vehicles and other machinery.  To check soil erosion.

The following characteristics will be taken into consideration while selecting plant species for green belt development and tree plantation.

1. They should be local indigenous and drought resistant species.

M/s TATA CHEMICALS LIMITED Page 256 Expansion of Aniali Limestone Mining Project Final EIA/EMP

2. They should be fast growing and tall trees. 3. They should be perennial and evergreen. 4. They should have thick canopy cover. 5. The planting should be in appropriate alternate rows around the site to prevent lateral pollution dispersion. 6. The trees should maintain regional ecological balance and conform to soil and hydrological conditions. Indigenous species should be preferred. 7. Species will be planted as per CPCB guidelines and native species.

9.5.1 Afforestation programme The area exhibits undulating to flat topography. The slope of benches will be suitable graded and plantation done over them, to match with the surrounding greenery. The top of the benches shall be properly fenced to prevent fall of cattle/person. Greenbelt will be developed as per the approved mine plan. Since it is an existing mine, about 1380 plants already planted on 1.20 Ha. Further, remaining 5.74 Ha area will be developed for greenbelt around the lease boundary, haul roads, undisturbed area, reclaimed area, workshop, mine office, etc. At the conceptual plan, green belt of suitable width should be developed all along the mining lease boundary. The row of plants facing mine should be of smaller species, and those facing outside should be of taller species. The post plantation care is proposed to maintain the growth of plantation. Plantation will reduce the land erosion possibility in the surrounding area. Wire fencing will be done around the green belt. Local species like Siris, Neem, Kachnar, Kashid, Shisham, Gulmohar, Karanj, Pipal, Drumstick, Imli, Banyan tree, Bel patra etc. will be planted in consultation with the Forest Department as well as CPCB Guidelines for greenbelt development. Precautionary measures will be taken for plantation by means of fencing and regular watering to protect from grazing animals and nurture. At the end of the mining lease period, as per MOEF&CC Office Memorandum F. No. 22-34/2018-IA-III dated 16 January, 2020, "the mining lease holder shall, after ceasing mining operations, undertake re-grassing the mining area and any other area which may have been disturbed due to their mining activities and restore the land to a condition which is fit for growth of fodder, flora, fauna etc" The breakup of the proposed afforestation programme with reclamation in progressive manner is given in Table 9.5.

Table-9.5 Year-wise proposal for Plantation and fencing Year Number of saplings to be Fencing around Plantation planted (m)*

I 3000 90

II 3000 90

M/s TATA CHEMICALS LIMITED Page 257 Expansion of Aniali Limestone Mining Project Final EIA/EMP

III 3000 90

IV 3000 90

V 3000 90

*Plant species like Thor (Cactus) etc. will be used for natural fencing.

Figure 9.4: Existing Greenbelt

9.5.2 Post Plantation Care The post plantation care will be an important aspect to be taken care of for better survival rate of plantation. The following care will be taken:-

Protection from grazing and fire Barbed- wire fencing will be provided around the area where mass plantation has been proposed. This will help in preventing cattle from entering in to such area and will protect unauthorized entry of out-side person. Due care will be taken to protect plantation aswell as the fencing by the guards.

M/s TATA CHEMICALS LIMITED Page 258 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Watering during dry spell During dry spell, water will be sprinkled using water tanker provided with hose pipes.

Manuring Initially fertilizer/ manure will be given to the plants before and after plantation. Thereafter, manuring will be continued on reduced scale till the plant attains growth of 2 to 3 m height. Provision of utilizing bio-manure will also be made within the lease area.

Weeding and soil working Man power will be engaged in mulching the soil frequently along with removal of weeds.

9.6 Solid waste management The mining area lies on hilly land having rocky exposure and has little soil cover which will be used in plantation. No overburden is present.

Table 9.6: Solid Waste Pollution Management and Control Potential Action Parameters for Timing Impact Monitoring Undersize Undersized mineral sent to Quantity of limestone During limestone cement plant at Mithapur. extracted. Quantity of Transportation Management limestone used for soda operation ash plant. Quantity of limestone used for cement plant. Hazardous Hazardous waste (Used oil Quantity of oil used During waste and oil containers) will be operation management managed as per Hazardous Wastes (Management and Handling) Rules 2008, as amended till date Batteries of Batteries will be managed Quantity of batteries used During vehicles as per Battery (Management operation &Handling) Rules; 2000. Non-routine Plan to be drawn up, con- Mock drills and re- cords of During blasting events and sidering likely emergencies the same operation accidental and steps required to releases prevent/limit consequences.

M/s TATA CHEMICALS LIMITED Page 259 Expansion of Aniali Limestone Mining Project Final EIA/EMP

9.7 Biological Management Measures There is a requirement to establish a stable ecosystem with both ecological and economic returns. To achieve this, it is planned to increase plantation activities. The basic objectives of plantation are as follows:-  Improvement of soil quality  Quick vegetative cover to check soil erosion  Improvement in mining site stability  Conservation of biological diversity  As dust receptor which likely to produce during mining

9.7.1 Plan for reduction of impact on fauna The impact on faunal species in the mining area is mostly due to noise vibration and loss of vegetation cover. The measures proposed to reduce the impact are discussed below and will be strictly followed.  Blasting is to be carried out during day time only.  The migrating routes of wild animals will not be disturbed and action should be taken as per the guideline of State Forest Department. This is also regulated under the Wildlife (Protection) Act, 1972.  Mining operation will be restricted to day time only.

9.7.1.1 Wild Life Conservation Plan: The subject mine lease area is an existing mine lease and it falls under the land use of Government waste land. Further, Barda Wildlife Sanctuary is present at a distance of 4.205 Km from the mine lease area.

 The proposed mine lease area is a waste land, located in the eastern side of Barda Wildlife sanctuary.  The sanctuary is predominated by hilly terrain and isolated by agriculture and human habitations not connected with any other protected area and large extent of reserved forest through forest corridor.  The nearest reserved forests to the Barda Wildlife Sanctuary are located only in the eastern side and far from the sanctuary and they were also isolated by agriculture habitats, villages, roads and ephemerals rivers.  Only common species were found outside the sanctuary specifically in the agricultural habitats and waste lands with scrub vegetation.  These common species also do not show any specific spatial and temporal movement pattern with larger herds, due to wider availability of agriculture habitat around the sanctuary which they preferred to use.

It can be concluded that due to the above discussed ecological and environmental setup of the Barda Sanctuary and the area in and around, the proposed mining activity will not have any

M/s TATA CHEMICALS LIMITED Page 260 Expansion of Aniali Limestone Mining Project Final EIA/EMP

adverse impact on the wildlife of the sanctuary. At Post mining stage of proposed project, the existing waste land shall be re- grassed and green belts will be developed.

9.8 Greenbelt Development Plan Green belt is termed as plantation of trees for reducing the pollution as they absorb both gaseous and particulate pollutants, thus removing them from atmosphere. Green plants form a surface capable of absorbing air pollutants and forming sinks for pollutants. It improves the aesthetic value of local environment. Green belt has been planned with emphasis on creating biodiversity; to enhance natural surroundings and mitigating pollution. The greenbelt development plan aims to overall improvement in the environmental conditions of the region. The plan with a five-fold objective addresses issues such as providing sink for air pollutants likely to emitted from the project; enhancing the forest cover for increasing the biodiversity of the region; providing aesthetic value to the project area enhancing the ecological equilibrium of the area; and to a large proportion in combating soil erosion.

The mining area has a topography of undulating to flat, due to absence of OB & mineral reject land reclamation by the way of backfilling is not proposed. However, the slope of benches will be suitably graded and plantation done over them, to match with the surrounding greenery. The green belt will be developed along the non-mining zone boundary passing through the lease area. Precautionary measures will be taken for care of the forestation made by regular watering in the afforested area and fencing to protect from grazing animals. Man will be deployed for protecting & doing the above. Most of the area recommended for mining will be used for afforestation/greenbelt as per the “Forest (Conservation) Amendment Rule, 2004”

Table 9.7: Year-wise proposal for Plantation and fencing Year Number of saplings to be Fencing around Plantation planted (m)*

I 3000 90

II 3000 90

III 3000 90

IV 3000 90

V 3000 90

*Plant species like Thor (Cactus) etc. will be used for natural fencing.

Post mining reclamation proposed The post plantation care is proposed to maintain the growth of plants. Plantation will reduce the land erosion to the extent possibility in the surrounding area. Barbed – wire fencing will be done around the green belt.

M/s TATA CHEMICALS LIMITED Page 261 Expansion of Aniali Limestone Mining Project Final EIA/EMP

9.9 Occupational Hazards and Safety Occupational hazards involved in mines are related to dust pollution, noise pollution, blasting and injuries from equipment and fall from high places. DGMS has given necessary guidelines for safety against these occupational hazards. The management strictly follows these guidelines.

All necessary first aid and medical facilities is provided to the workers. The mine is well equipped with proper fire protection and firefighting equipment. All operators and mechanics are trained to handle fire-fighting equipment. Further all the necessary protective equipment such as helmets, safety goggles, earplugs, earmuffs, etc. is provided to persons working in mines as per Mines Rules, 1955.

Initial and Periodical examination is conducted as prescribed in "FORM – O" for every employee as per rule 29B of Mines Rule – 1955. Initial medical examination is carried out prior to employment of every person and periodical medical examination is carried out of persons employed in the mine once in a two years. Provided that in case any dust related disease need to be confirmed, the pertaining tests may be conducted more frequently as the examining authority deems necessary.

To avoid any adverse effect on the health of workers due to various pollutants, sufficient measures relating to safety and health is practiced:  Provision of rest shelters for mine workers with amenities like drinking water, portable toilets etc.  All safety measures like use of safety appliances, such as dust masks, helmets, shoes, non-breakable goggles, knee pads, as the case may be, shall be ensured. Safety awareness programs, awards, posters, slogans related to safety etc. will be encouraged.  Training of employees for use of safety appliances and first aid in vocational training center.  Regular maintenance and testing of all equipment as per manufacturers 'guidelines.  Periodical Medical Examination (PME) of all workers by a Medical Officer  First Aid facility will be provided at the mine site.  Close surveillance of the factors in working environment and work practices which may affect environment and worker’s health.  Working of mine as per approved mining plan and environmental plans.

9.10 Socio-economic Conditions of the Region Implementation of the Expansion of Aniali Limestone Mine project will generate both direct and indirect employment. Besides, it will provide a check on existing system of mining operation. Mining operation will be legally valid and it will bring income to the state exchequer. The project will also provide impetus to industrialization of the area. At present agriculture is the main occupation of the people as more than half of the population depends

M/s TATA CHEMICALS LIMITED Page 262 Expansion of Aniali Limestone Mining Project Final EIA/EMP

on it. With the implementation of the proposed mining project the occupational pattern of the people in the area will change making more people engaged in mining based activities rather in agriculture. Thus, there will be a gradual shifting of population from agriculture to mining and related activities.

9.10.1 Community Development Activities TATA Chemicals has set up a non-governmental organization – TATA Chemicals Society for Rural Development (TCSRD) – that works towards holistic community development, including managing water, land and other natural resources, encouraging enterprise development, and promoting health and education. TCSRD is on track to achieve its goal of impacting the lives of a million people by 2019 .Broadly, the community development initiatives are divided into six thematic areas:  Natural resource management (NRM): this includes program on integrated water management; Agriculture development; land reclamation; animal husbandry program and pond management  Environmental care and conservation: this includes Dharti Ko Arpan program initiated by TCSRD  Empowerment: this includes formation of self-help groups,; Saksham and volunteering program  Livelihood development: this includes vocational training; group based enterprise; rural entrepreneur development program and traditional handicraft promotion enterprise.  Health and Education: this includes Swasth Aangan project and other health awareness program. While in the education various initiatives are undertaken to enhance the education status in all the three locations.  Infrastructure development support: this includes various infrastructure support structure being provided to improve the standard of living of the rural communities in and around its plant sites

Company has well laid down policy for Community Development and Social Accountability. Policies are detailed as below:

Community Development Policy  TATA Chemicals pledges itself to care for and serve the community by:  Designing, evolving and implementing sustainable, replicable and scalable development models, that leads to measurable socio-economic development of the community and ecological development in its area of influence  Involving the community in all stages of the process, in the true spirit of participatory development  Having focused and transparent processes, that provides for equal opportunity, while improving the quality of life

M/s TATA CHEMICALS LIMITED Page 263 Expansion of Aniali Limestone Mining Project Final EIA/EMP

 Partnering and networking with government, development agencies, corporate bodies and NGOs to implement appropriate community development programs  Creating knowledge resource centers to transfer and share information and help build capacities of partners and the community  Involving the employees in volunteering for community development programs

Medical camps At medical camps TCL provided basic treatment and general check up with overall physical examination to help people be aware of their health status. TCL worked vigorously to see that every patient is attended. Free medicines were distributed to all concerned patients.

M/s TATA CHEMICALS LIMITED Page 264 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Figure 9.5: Medical checkup and medicine distribution camp in the villages

Figure 9.6: Cattle shed work and crematorium in Aniali village

Skill Development Programme For Local Youths of Nearby Villages Awareness of Skill development program was given to the local youths of 5 Villages namely: Bordi, Devda, Anyari, Daulatgadh and Iswariya. Candidates were awarded for 5 different trades i.e Welder, Fitter, Wireman, Electrician & Motor mechanic.

M/s TATA CHEMICALS LIMITED Page 265 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Figure 9.7: Skill Development Program Motivational Training Motivational training was given to the candidates who were selected for the training at Mithapur village as well as at Ranabordi village. Total 39 was given motivational training at both the location. At motivational session brief account of two or three experience that candidate encountered in the past 3 years and in which you were successful/ Unsuccessful is taken. Also includes Micro lab, Thematic Apperception Test, Test of Imagination, “Who am I” (Test for personal efficacy which indicates the potential effectiveness present in the person), Simulation tools used for mapping the factors like risk taking/tolerance to ambiguity. Importance of goal it is helpful for setting their Goals & Self-development.

Figure 9.8: Motivational Training at Mithapur and Ranabordi village

Technical Training After motivational training candidates were outsourced to Dhanakshi academy of inspired learning an institute under Vatva industrial association Ahmedabad. Candidates were outsourced in 2 different batches for motor mechanic and electrician. The duration of the

M/s TATA CHEMICALS LIMITED Page 266 Expansion of Aniali Limestone Mining Project Final EIA/EMP

training was of 30 days. Candidates were given facility like training fees. Lodging boarding and transportation charges by Tata Chemicals Society for Rural Development. After successfully completing the training an examination is conducted for the weight age of 50 marks of theory and 50 marks weight age for practical sessions. After examinations students were certified according to their grades obtained. Interviews were conducted of the candidates by Bhavani industries ltd at Sanand location. Total 22 candidates are selected for the joining with starting salary Rs. 12000/- per month. Further few females candidates will be trained under Nursing Assistant and Electronics training from Ranavav CSR location.

Figure 9.9: Technical Skill Training at Mithapur and Ranabordi village

M/s TATA CHEMICALS LIMITED Page 267 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Figure 9.10: Certificate received by candidates after successfully completing Technical Skill Training

Figure 9.11: Road Construction & water Supply – 2017-18

Social Accountability Policy It is our policy to conduct our business in a socially responsible manner by complying with all the requirements of SA 8000 standard. To that end we are committed to:

 Comply with applicable state, national and international legislations, ILO and UN conventions on ethical business.  Continual improvement in our performance through management reviews, open communications and providing a favorable employment environment.

 Actively promote and encourage the pursuit of ethical excellence not only within the company but also amongst our suppliers and customers.

M/s TATA CHEMICALS LIMITED Page 268 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Coral Reef Restoration Project Save the Whale Shark Project

Biodiversity Reserve Plantation Conservation of Lion Project

Nesting site for waterfowl Regeneration of mangroves

M/s TATA CHEMICALS LIMITED Page 269 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Greening of Alkaline solids-Sedimentation Basins

Figure 9.12: Major initiatives taken under Dharti Ko Aarpan program

Award received during Environment Week Regeneration of mangroves

Award received during Environment Water reservoir in TCL Adityana mined Week Regeneration of mangroves our area

M/s TATA CHEMICALS LIMITED Page 270 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Medical Camp activities

Figure 9.13: Major initiatives taken in existing mining areas of TCL

9.10.2 Public health implication of the project and related activities for the population As already indicated earlier, there is no habitation within the mining lease area as well as in the 500 m radius of the project site. Mining activities will be far away and will not progress closure to the nearest human habitation. However following remedial measures are proposed to be undertaken:  Regular water sprays  Scheduled maintenance of machineries  Covered transportation of vehicles  Green belt / plantation as a green barrier will be carried out to protect the village habitation from the dust pollution  Regular medical checkup / eye-camps will be organized for the villagers. Allocation of funds towards public health has been indicated in the CSR activities.  No site specific ailments have been detected so far affecting the health of persons/ public

Measures of socio economic significance and influence to the local community proposed  Total 153 local workers directly employed for mining work earning wages as per the minimum wages act applicable for un-skilled, semi-skilled and highly skilled categories.  Training of employed workers to improve their skills for safe workings.  Free medical camp will be organized for the villagers.  TCL will always co-operate with the Govt. for the development of the area, nearby schools and basic amenities.

M/s TATA CHEMICALS LIMITED Page 271 Expansion of Aniali Limestone Mining Project Final EIA/EMP

9.11 CER Project Details As per the MOEF&CC's office memo no. F NO 22-65/2017-IA-III dated 01/05/2018.(Attached as Annexure XII), Expansion of Aniali Limestone Mining Project is a brownfield project and total project cost is Rs. 1 crore which is less than Rs. 100 Crores. As per above notification, 1% of the project cost is applicable for CER budget for brownfield projects. In the same context it has proposed to provide financial assistance of Rs. 1,00,000 per year for the development of social infrastructure of the area.

Table 9.8: Community Environmental Responsibility plan Sr. No Activity Total budgetary provision (Rs.) 1 Environmental awareness programme 10,000 2 Environmental conservation display to improve water 20,000 conservation 3 Installation of Central R.O. System in nearby villages 25,000 and skill development of the local villagers 4 Construction of separate toilets for boys and girls in 45,000 village schools and installation of sanitary napkin vending machine in schools. Total 1,00,000

9.11.1 Cost of Environment Control Measures/EMP Budget As a part of its responsibility towards protection of environment, TCL has allocated budget for Environment protection measures. The same is detailed in Table 9.9.

Table 9.9: Proposed Cost of Environment Management Particulars Approximate Approximate Basis for cost estimates recurring cost Capital cost per annum (Rs. In lacs) (Rs. in lacs)

Air quality 0.5 - As in mining lease there are no any monitoring stacks hence capital cost is nil. Recurring cost would include cost of monitoring of ambient air quality in the mining lease season wise

M/s TATA CHEMICALS LIMITED Page 272 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Water quality 0.5 - There are no treatment plants so control capital cost for water pollution control is nil. While TCL will be monitoring tube well samples of 3 villages in each season. Noise level 0.25 - Recurring cost includes monitoring abatement cost of noise measurement at different locations.

Green belt 3.0 1.5 Capital cost includes a plant cost development @100 Rs. and wire fencing of about 90 m recurring cost includes cost of post plantation care.

Dust 1.25 2.5 Capital cost include the cost of Suppression/water tanker and recurring cost include the spray purchase of water Occupational 1.0 0.5 Providing safety measures to the Health and safety labours and Conducting periodic medical camps to examine the health of the employees and also organizing free medical check-up in nearby villages once a year. Rainwater 0.5 4.0 Construction of rainwater harvesting harvesting system system in the nearby Aniali village with gram panchayat consultation (in school or public building) to help in water conservation and in recharging of the groundwater table. Total 7.0 8.5 Total capital cost for EMP is Rs. 8.5 lakh and recurring cost per year is Rs. 7.0 lakh.

M/s TATA CHEMICALS LIMITED Page 273 Expansion of Aniali Limestone Mining Project Final EIA/EMP

9.12 Conclusion As discussed, it is safe to say that the project is not likely to cause any significant impact on the ecology of the area, as adequate preventive measures will be adopted to contain the various pollutants within permissible limits. Green belt development around the area will also be taken up as an effective pollution mitigation technique, as well as to control the pollutants released from the premises of the Expansion of Aniali Limestone Mining Project.

**************

M/s TATA CHEMICALS LIMITED Page 274 CHAPTER-10

SUMMARY & CONCLUSION Expansion of Aniali Limestone Mining Project Final EIA/EMP

CHAPTER 10- SUMMARY AND CONCLUSION

10.1 Description of Project The proposed Expansion project of Aniali Limestone Mine is located near Village Aniali Taluka Ranavav &District Porbandar in Gujarat. It is a captive mine of TATA Chemicals Limited (TCL), which supplies limestone as raw material to Soda Ash &Cement Plant of TCL at Mithapur, Devbhoomi Dwarka, Gujarat for manufacturing of soda ash and cement.

The proposed project is an expansion project and categorized as category A-Mining (1(a)- Mining of Minerals) as per the EIA Notification 2006 and its subsequent amendments.

Environment Clearance has been granted for this project vide letter no. J-11015/309/2012-IA.II (M) Dated 27.07.2015 by MoEF&CC for the production of 0.043 million tons TPA (ROM). TCL hereby proposes to expand the existing production capacity of 0.043 MT per annum to 0.175MT per annum. TCL has obtained Terms of Reference (ToR) with vide letter no. J- 11015/42/2020-IA.II (M) dated 13th November 2020.

The proposed lease is a Non-Forest Government waste land measuring 21.04 Ha, Survey No. 207/P with the highest proposed production target of 1,75000 TPA as per approved mine plan. The existing method of mining is Open Cast and the Category of Mine is ‘A’. Semi mechanized mining methodology is being adopted with occasional use of drilling and blasting for fragmentation of hard limestone strata.

10.2 Salient Features of the project

Table 10.1: Salient Features of the project Sr . Details of project Description No. 1 Project Expansion of Aniali Limestone Mining Project 2 Survey No. 207/P 3 Village/ Taluka Aniali/ Ranavav 4 District/ State Porbandar / Gujarat 5 Toposheet number F42P14, (old no. 41G/14) 6 Mine lease area Total lease area- 21.04 Ha 7 Existing Production 43,000 TPA 8 Proposed production 1,75000 TPA 9 Mine lease period 07.07.1966 - 1986 17.11.2005 - 2025 - 30.03.2030 10 Mine lease extension under Deemed extension up to 31.03.2030 as per MMDR 2015 MMDR 2015 11 Lessee M/s TATA Chemicals Limited

M/s TATA CHEMICALS LIMITED Page 275 Expansion of Aniali Limestone Mining Project Final EIA/EMP

12 Type of land Non Forest - Government waste land 13 Mineral reserve/ resource details (Million tonne) Chemical Grade Cement Grade Limestone Limestone Proved Mineral Reserve (111) 0.231972 0.562400 Probable Mineral Reserve (122) 0.089 0.2186 Total Reserve 0.320972 0.781 Pre-Feasibility mineral Resource 0.004900 0.003600 (221&222) 0.00782 0.0164 Total Resource 0.01272 0.02 Total (Reserve + Resources ) 0.333692 0.80100 14 Project cost 1.0 Crores 15 Market value For Captive use 16 Mineral composition (source – Approved Mine plan): 1. Chemical Grade (CaCO3 + MgCO3 ) % >= 92%, &SiO2 < 4%

2. Marginal Grade (CaCO3 + MgCO3 ) % >= 92%, &SiO2 < 4% to 5%

3. Cement Grade (CaCO3 + MgCO3 ) % >= 92%, , SiO2 > 5% 17 Details of Environmental Settings Ecological Sensitive Areas  Barda wildlife sanctuary is present at a (National Park, Wild Life distance of 4.205 Km in NW direction and 38 Sanctuary, Biosphere meters from ESZ. Reserve,Reserve/ Protected  Mokarsagar Bird Sanctuary is located app. Forest etc.) within 10 km 11.5Km in SW direction from the project site distance Forests  Naliyadhar Reserve Forest is approx. 0.55 Km in South West direction.  Jambuda Reserve Forest is approx. 2.70km in North direction.  Khageshri Reserve Forest: approx. 7.27 km in East direction. Water bodies  Dhangva river is about 1.46 km in North direction.  Minsar river is about 4.30 Km in East direction.  Bileshwari river is about 4.64 Km in NE direction.  Khambhala reservoir is about 7.36km in NW direction.  Dai River is about 9.44 km NE direction.  Fodara reservoir is about 9.49km in NW direction. Nearest Village Daulatgadh is about 0.77 Km NE direction.

M/s TATA CHEMICALS LIMITED Page 276 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Nearest Town Ranavav is present at a distance of about 8.26 km in South West direction. Jam Sakhpur Railway Station is about 4.19 Km in Nearest Railway Station North direction and, Ranavav Railway Station is about 10.48 km in West direction from the project site. NH-8B is about 5.46 km in South direction. Nearest National Highway SH-27 is about 4.65 km in West direction. State Highway Nearest Airport Porbandar Airport is about 18.83 km in SW direction. Seismic Zone As per GSDMA map, Gujarat falls in Zone III, which is a moderate risk zone for earthquake. Other Industries Limestone Mine leases of Tata Chemicals and other leases belongs to different owners. Water Requirement and source Total water requirement is about 29.0 KLD =7.0 KLD (Drinking & Domestic Uses) + 5.0 KLD (Plantation) + 17 KLD (Dust Suppression). In which, 10 KLD will be sourced from ground water, for which CGWA Permission is already obtained in 2011. The rest 19 KLD water will be sourced from nearby village Aniali by water tanker for which No objection certificate is already obtained. (Source: Approved Mine Plan, dated 26.12.2019)

10.3 Reclamation and Rehabilitation of mined out area The area exhibits undulating to flat topography. The slope of benches will be suitable graded and plantation done over them, to match with the surrounding greenery. The top of the benches shall be properly fenced to prevent fall of cattle/person. Total 33% of the lease area will be developed as green Belt which would be around 6.9432 Ha. Greenbelt will be developed around the lease boundary, haul roads, undisturbed area, reclaimed area, workshop, mine office, etc. At the conceptual plan, green belt of suitable width should be developed all along the mining lease boundary. The row of plants facing mine should be of smaller species, and those facing outside should be of taller species. The post plantation care is proposed to maintain the growth of plantation. Plantation will reduce the land erosion possibility in the surrounding area. Wire fencing will be done around the green belt. Local species like Siris, Neem, Kachnar, Kashid, Shisham, Gulmohar, Karanj, Pipal, Drumstick, Imli, Banyan tree, Bel patra etc. will be planted in consultation with the Forest Department as well as CPCB Guidelines for greenbelt development.

M/s TATA CHEMICALS LIMITED Page 277 Expansion of Aniali Limestone Mining Project Final EIA/EMP

10.4 Baseline Environmental Status 10.4.1 Landuse Pattern Land Use in Core Zone The entire lease area of 21.04 Ha is the part of Govt. waste land. At the end of conceptual plan, the change to the landscape in the form of pit and road, about 14.9342 ha will be changed. As the deposit is an elevated ridge type and also not extended to deep ground level, thus no deep pits will be formed due to mining.

Land Use in Buffer Zone Land use of study area has been prepared from latest satellite imagery. Specialized land use data has been prepared by using GIS software. Land use and land cover has been analyzed for Expansion of Aniali Limestone Mining Project for the agricultural land, settlement, forest, open scrub, waste land and water body etc., which shows that around 58.06% of the land in the study area is an agricultural land, 12.50% land is a forest land, whereas 8.92% is comprise of open scrub. Water bodies constitute to 2.26%, settlement is around 2.02% and rest 16.23% is a waste/other land.

10.4.2 Water Quality To assess the physical and chemical properties of water in the region, water samples were collected from various water sources present in the 10km study area. Water quality was analyzed as per Indian standards (IS 30525 part 4-62).

Ground water Ground water samples were collected from three location: Aniali village, Bordi village, and Daulatgadh. Ground water samples were analyzed and results were found as pH 7.2 to 7.6, total hardness 156 to 197 mg/l, Chloride 46 to 51 mg/l, total dissolved solids 259 -296 mg/l, Sulphate 2.9 to 3.8 mg/l, nitrate 0.7-1.3 mg/l.

Surface water Surface water was collected from two locations which are Khambada Reservoir and Minsar nadi (Valotra village). Surface water samples were analyzed which showed Results for Khambada Reservoir : pH 7.72, electrical conductivity 446 µS/cm, total alkalinity 179 mg/l, total hardness 191 mg/l, Chloride 98 mg/l, Dissolved oxygen 6.9 mg/l, total dissolved solids were found 141 mg/l.

Results of Minsar nadi: pH 7.4, electrical conductivity 487 µS/cm, total alkalinity 142 mg/l, total hardness 136 mg/l, Chloride 81 mg/l, Dissolved oxygen 6.6 mg/l, total dissolved solids were found 176 mg/l.

M/s TATA CHEMICALS LIMITED Page 278 Expansion of Aniali Limestone Mining Project Final EIA/EMP

10.4.3 Air Environment The meteorological data has been recorded from near project site. Secondary data also has been purchased from Denvilabs Technologies, New Delhi, which provided the climate information that helped in to find out the predominant present downwind direction to predict the incremental pollution load due to project activity. Primary site specific baseline and meteorological data was collected for winter season; December 2018 to February 2019.

Site specific meteorological data Ambient air quality monitoring was carried out in the winter season (December 2018 to February 2019) and site specific data was collected. Secondary Meteorological data has been purchased from Denvilabs Technologies, New Delhi, for the same period in order to complete the air modelling exercise and wind direction.Site specific meteorological data was collected by installing an automated weather station near Expansion of Aniali Limestone mining project site. The result has been obtained for temperature, rainfall, wind speed, humidity and wind direction. Secondary data was also collected from nearest IMD station and climatological table 1961- 1990.From the wind rose it was clearly observed that North-East is the predominant wind direction. Ambient Air Quality Total 7 ambient air quality monitoring stations were selected to assess baseline ambient air quality which is Near mine site, Daulatgadh village, Bhod village, Aniali village, Bordi village, Vadwala village and Valotra village. Parameter wise 98th percentile maximum and minimum values were observed at all the seven monitoring locations.

 The minimum and maximum level of PM2.5 recorded within the study area was in the range of 29.9 µg/m3 to 43.9 µg/m3 with the 98th percentile ranging between 31.8 µg/m3 to 43.9 µg/m3.

 The minimum and maximum level of PM10 recorded within the study area was in the range of 68.8 to 91.8 µg/m3with the 98th percentile ranging between 73.4 µg/m3 to 91.6 µg/m3.

3  The minimum concentration of SO2 recorded within the study area was 9.4 to 11.6µg/m ,the 3 maximum concentration of SO2 recorded within the study area was 11.3 to 13.9 µg/m ,with the 98th percentile ranging between 11.3 µg/m3 to 13.9 µg/m3.

 The minimum and maximum level of NO2 recorded within the study area was in the range of 11.5µg/m3to 22.9 µg/m3 with the 98th percentile ranging between 13.9µg/m3 to 22.9µg/m3.

 The minimum and maximum level of CO recorded within the study area was in the range of 605 µg/m3 to 878µg/m3 with the 98th percentile ranging between 713 µg/m3 to 878 µg/m3.

M/s TATA CHEMICALS LIMITED Page 279 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Mineralogical composition of PM10 Filter paper of PM10 sampler was used for mineralogical study from project site of Aniali Limestone mine. Whatman filter paper was used for mineralogical composition as per EPA method. Mineralogical composition for free silica and other minerals was analysed and this was found that free silica is present at concentration of 0.10 µg/m3 in PM10.

10.4.4 Noise Levels Ambient noise levels were measured at 09 locations around the proposed mine site. The values of noise level observed in some of the areas are primarily owing to vehicular traffic. Assessment of hourly night time Leq (Ln) varies from 29.0 to 53.8 dB (A) and the hourly daytime Leq (Ld) varies from 35.6 to 61.9 dB (A) within the study area. The status of noise quality within the 10 km zone of the study area is therefore, within the prescribed standards.

10.4.5 Soil Quality Total 05 soil samples were collected in and around the mine lease area to assess the present soil quality of the region. In the study area, variations in the pH of the soil were found to be slightly basic (7.1 to 7.6). Electrical conductivity (EC) is a measure of the soluble salts and ionic activity in the soil. In the collected soil samples the conductivity ranged from 567-598 µmhos/cm. Bulk density of soil sample samples ranged from 1.38-1.42 gm/cc, moisture content was found 12.1- 15.8%, organic matter was present in the range of 0.51-0.86 % at all the soil quality monitoring locations.

10.4.6 Biological Environment Flora/fauna survey was done at core and buffer zone of the study area. This was observed that no floral species are present within mine lease area except some bushes. The wild plant species are anticipated in waste land only. Based on primary and secondary survey a total of 32 crop species were reported in the study area and based on their use value they have been grouped into four categories. Among these 8 species fall under grain crops, 10 species fruit crops, 11 vegetable crops and 3 commercial crops of the study area. The tree species which were found in waste land and along road side green belt are Neem (Azadirachta indica), Arduso (Ailanthus excelsa), Vad (Ficus benghalensis), Piplo (Ficus religiosa), Saragvo (Moringa oleifera), Awal (Alstonia scholaris) and herb species was found names as Gando baval vilayati (Prosopis Juliflora). The buffer zone of the study area is majorly agricultural land. The buffer zone includes Fodara reservoir and Khambada reservoir and Barda Wildlife Sanctuary of District Porbandar. There is no aquatic environment present in core zone of project area. Within study area of 10 km radius from mine lease boundary, there are thrwo aquatic environments which are present;

M/s TATA CHEMICALS LIMITED Page 280 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Fodara Reservoir Fodara Reservoir mainly known for its migratory birds. Various bird species found flying within study area of project site (in total 20 species). The water fowl species are found within Fodara Reservoir .

Ecologically Sensitive Areas From the mine lease boundary, Nadliyadhar Reserve forest is present at approx. 0.55 km in South West direction, Khageshri reserve forest is at approx. 7.27km in East direction and Jambhuda reserve forest is present at 2.70km in North direction. Barda Wildlife Sanctuary is also present at a distance of 4.205 km in North West direction from the working mine lease.

10.4.7 Socio Economic Environment Core Zone: - There is no human settlement in the core zone of the Expansion of Aniali Limestone Mining Project.

Buffer Zone: - Area within 10km radius of the “Project Site” is considered as the “Study Area”. The study area of 10 Km radius area is spread over 28 villages and 2 towns (namely: Amradal and Ranavav) falling in three sub-districts namely Ranavav, Kutiyana of District Porbandar and Jamjhodpur in District Jamnagar as per census 2011. Out of these 28 villages 5 villages are present inside Barda Wildlife Sanctuary.

The salient features of the study area include: 1. Total population of study area is 107537. The percentages of male & female population are 51.00 % & 49.00 % respectively 2. Total household in the study area are 22828 with a family size of 4.71. 3. Total number of literates in the study area is 67531 (71.68%). 4. Sex ratio (number of Females per thousand Male) of the study area is 961 which shows that male population is higher in the study area as compared with the female population. 5. Out of the total population Scheduled Caste population in the study area is 10196 (9.48%) and Scheduled Tribe population is 4631 (4.30%). 6. The child population (0-6 years) in the study area is 13327 (12.39%) in which 6903 (6.41%) is the child boys population and 6324 (5.88%) which is child girls population. The child sex ratio in the study area is 916.

10.5 Anticipated Environmental Impacts and mitigation 10.5.1 Impact on Land Use Pattern Proposed project is an expansion project where Environment Clearance has been obtained in the year 2015 vide no. J-11015/309/2012-IA.II(M) for the annual production of 43,000 Tons of Limestone. The entire lease area of 21.04 Ha is the part of Govt. waste land. At the end of conceptual plan, the change to the landscape in the form of pit and road, about 14.9342 ha will

M/s TATA CHEMICALS LIMITED Page 281 Expansion of Aniali Limestone Mining Project Final EIA/EMP

be changed. As the deposit is an elevated ridge type and also not extended to deep ground level, thus no deep pits will be formed due to mining.

Mitigation Measure: 1.The green belt will be developed along the non-mining zone boundary passing through the lease area. Precautionary measures will be taken for plantation made by regular watering. 2.Greenbelt will be developed on around 33% of the total mine lease area, i.e, 6.9432 Ha, on which a total of 3000 saplings per year will be planted till the conceptual stage, necessary maintenance shall be done as well. 3.Surface and ground water will not be affected due to mining activity. There is no perennial source of water within the leasehold area. 4.Frequent dust suppression will be done to minimize the risk of long term buildup of pollutants in the environment. Adopting suitable, site-specific mitigation measures can reduce the degree of impact of mining on land. Present land use pattern of the lease area is waste land and at the conceptual stage the land use pattern will remain the same, hence will not be changed as there is no overburden generated from the mining activity.

10.5.2 Impact on Water Resources Water Environment Mining and its associated activities not only use a lot of water but also likely to affect the hydrological regime of the area. The major impact of deep and large mines (both underground and open cast) is of natural groundwater table. Lowering of water table may result in reduced groundwater availability. Extraction of different minerals is known to lead to water pollution due to heavy metals, acid discharges and increased suspended solids. Deep underground mines directly affect the water table of the area. However, the impact of mining projects on groundwater hydrology and surface water regime are site specific and depends upon the characteristics of the mineral, hydrogeology and requirement of groundwater for other uses.

Anticipated impacts on water sources Ground Water The existing maximum and minimum working depth are 2m and 6m from surface respectively. The maximum depth in the present pit is at 58mRL and at conceptual stage, it will go further till 55mRL. Thus, the mining will not intersect with the water table. Surface water No prominent water course or nalla is present. The mine floor is kept slightly sloppy for natural drainage. The waste water generation in the mining process is not envisaged. The deposit does not contain any harmful contents; hence it is not going to affect the quality of water in surrounding area. As there is no beneficiation involved with the use of water, discharge effluents

M/s TATA CHEMICALS LIMITED Page 282 Expansion of Aniali Limestone Mining Project Final EIA/EMP

does not happen. There is a natural drainage pattern within the lease area. Major part of the rain water from the lease area runoff is along the slope.

Wastewater Generation, Treatment & Disposal The waste water generation in the mining process is not envisaged. The total water consumption in the Expansion of Aniali Limestone Mine is about 29 KLD, which includes 7.0 KLD for drinking & domestic uses, 5.0 KLD for plantation and 17.0 KLD for dust suppression. CGWA permission for ground water withdrawal is obtained for 10 m3/day in the year 2011. Enclosed as Annexure XA. The rest 19 KLD water will be sourced from nearby village Aniali by water tanker for which No objection certificate is already obtained which is Enclosed as Annexure XB. The waste water generation from the above consumption is mainly from domestic consumption i.e. from toilets. This water will be treated in septic tanks followed by soak pits. Proposed Mitigation Measures for Water Resources a) Overall drainage planning has been done in such a manner that the existing pre- mining drainage conditions will be maintained to the extent possible so that run off distribution is not affected. b) Waste water generated from labor domestic uses will be treated in septic tank followed by soaking pits. c) At conceptual stage the maximum depth of working will be 55 mRL m from the surface. Therefore, the groundwater table will not likely to get affected. d) Regular monitoring of surface water and ground water will be done to ensure that there is no adverse impact due to Limestone mining project. e) No washing of equipment will be done inside the mining lease area.

10.5.3 Impact on Air Quality The proposed project includes various activities like development of benches, approach roads, haul roads, excavation and transportation of limestone and waste materials. These operations generally result in generation of dust and thereby pose health hazards. However, it is proposed that adequate control measures will be provided at every stage of operation such as, water sprinkling at loading, unloading points and on haul roads before transportation to reduce the fugitive dust emissions. Mining is proposed to be carried out by opencast semi mechanized method. The air borne particulate matter (PM10) generated by ore and waste handling operations, transportation and screening of ore is the main respirable air pollutant. The emissions of Sulphur Dioxide (SO2), Nitrogen Dioxide (NO2) released by vehicles plying on haul roads will be marginal. Prediction of impacts on air environment has been carried out taking into consideration of proposed production and net increase in emissions.

M/s TATA CHEMICALS LIMITED Page 283 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Emissions Details Details of emission during loading/unloading and transportation on the haul road, wind erosion of the exposed area and road maintenance were discussed and combined impact was predicted in the worst-case scenario under worst meteorological condition given as follows:

Loading and Unloading - US EPA, 2008, revision of emission factor for AP-42 was used to calculate emission of particulate matter released into the atmosphere during loading and unloading separately. It is assumed that moisture content in limestone ore was 10% and further moisture content will be increased to 10-20% to reduce emission of PM10 during unloading and average wind speed was 3.03 m/s as observed with site data with calm conditions 43.64 % as shown in wind rose and discussion of local meteorology of the area.

Haul Road - US EPA, 2006, revision of emission factor for AP-42 was used to calculate emission of particulate matter released into the atmosphere during transportation of ore by 5 trucks operated per hour on haul road of 0.572 km. Truck will be fully covered with tarpaulin material and emission of PM10 during transportation on the haul road will be insignificant. US EPA based AERMOD model was used for prediction of impact with 1-h meteorological data of the study period for the assessment of GLC.

Meteorological Data The meteorological data recorded at hourly interval during the month of December 2018 to February 2019 on wind speed 3.03 m/s, wind direction, dry & wet bulb temperature, humidity, cloud cover and rainfall was processed to extract hourly mean meteorological data as per the guidelines of CPCB/MoEF&CC for prediction of impacts from the area source. Stability was computed by Turner’s method and mixing height was obtained from publication of IMD “Atlas of Hourly Mixing Height in India, 2008.

Data recorded from authorized source Denvilabs Technologies, New Delhi were used as meteorological input for Dispersion Model which was stored in the computer for further analysis and interpretation to study the local meteorology of the study area. It was observed that pre- dominant wind during winter season is North East to South West, with low wind speed and 43.64 % calm condition was observed during study period at the site which was very much close and cumbersome with long term meteorological data of IMD, Porbandar. Average wind speed was 3.03 m/s. Impact of the pollutants was anticipated in south west direction under influence of pre- dominant wind direction.

The Air Quality Impact Prediction has been done by using AERMOD. Impact was predicted in the worst-case scenario due to combined impact of loading and unloading and emission due to transportation of vehicles on Limestone mine, haul road and other mining activities. The secondary meteorological data for the period December 2018-February 2019 was fed in the

M/s TATA CHEMICALS LIMITED Page 284 Expansion of Aniali Limestone Mining Project Final EIA/EMP

AERMOD software to obtain isopleths.

Results of PM10GLC concentration: Iso-pleth of PM10 ranges from 0.4 to 2.79 µg/m3.Maximum predicted GLC is observed at near mine site at 0.49 km distance with incremental value of 2.79 µg/m3 . For the calculation of the total predicted GLC of 24 hours near mine site, the baseline value of (98th percentile) 91.6 µg/m3was added to the incremental value of 2.79µg/m3, resulting into 94.39 µg/m3. The total predicted value calculated near mine site including the incremental load due to proposed mining activities like loading/unloading and transportation at haul road which are the responsible factors for dust emissions are found satisfactory and below the permissible limit of PM10 as prescribed by NAAQS limit. The results may allow the mining project in the vicinity.

Result of PM2.5GLC concentration: The maximum predicted GLC concentration (24 hours) of PM2.5 calculated near mine site is 3 3 45.12 µg/m , which is below the prescribed permissible limit of PM2.5 (60 µg/m for industrial 3 zones). The isopleths showing the concentration of PM2.5ranges from 0.50 to 1.22 µg/m .

Result of NO2GLC concentration: The maximum predicted GLC concentration (24 hours) of NO2 calculated near mine site is 3 3 22.95 µg/m , which is below the prescribed permissible limit of NO2 (80 µg/m ) . The isopleths 3 showing the concentration of NO2 ranges from 0.05 to 1µg/m .

Result of SO2GLC concentration: The maximum predicted GLC concentration (24 hours) of SO2 calculated near mine site is 3 3 13.93µg/m , which is below the prescribed permissible limit of SO2 (80 µg/m for industrial 3 zones). The isopleths showing the concentration of SO2 ranges from 0.03 to 0.50µg/m .

Result of CO GLC concentration: The maximum predicted GLC concentration (8 hours) of CO calculated near mine site is 881µg/m3 or 0.881 milligram/m3, which is below the prescribed permissible limit of CO (2 mg/m3 for industrial zones). The isopleths showing the concentration of CO ranges from 3 to 80 µg/m3or 0.003 to 0.08 mg/m3 .

Isopleths maps of PM10 , PM2.5 , SO2, NO2, CO is given in chapter-4.

Proposed Mitigation Measures For Dust Suppression  As per Approved Mine Plan drilling and basting is proposed for Expansion of Aniali Limestone mining project but occasionally for giving the shattering effect to hard strata.  Particulate matter emission from haul road will be reduced by water sprinkling.  Vehicle used for excavation and haulage will be of latest Indian norms.  High speed diesel will be used for mining equipment operation

M/s TATA CHEMICALS LIMITED Page 285 Expansion of Aniali Limestone Mining Project Final EIA/EMP

 Green belt will be developed as per approved mining plan. Although green belt is already practiced at project site as it is an existing mine.  Personal protecting equipment (PPE) like dust mask, ear plugs etc will be used by mine workers.  Ambient air quality monitoring will be carried out periodically to know the implementation of environmental management plan.

10.5.4 Impact on Noise Levels and Ground Vibrations Noise Impact on Working Environment Noise generated at the mine site is due to semi-mechanized mining operations and transportation. Noise generated due to mining activities dissipates within the mine. There is no major impact of mining activity on the nearby villages. However, pronounced effect of above noise level is felt only near the active working area. Impact of noise on the villages is negligible as the villages are far located from the mine workings. Noise Abattement and Control  Proper maintenance, oiling and greasing of machines at regular intervals to reduce the noise level up to an extent.  Adequate silencers and enclosures will be provided in all the diesel engines.  Plantation along both the sides of approach road, around mine office building and mine area to minimize the propagation of noise.  Personal Protective Equipment (PPE) like earmuffs/earplugs will be provided to all operators and employees working near mining machineries or at higher noise zone.  Periodical noise level monitoring will be done.

Impact Due To Ground Vibrations and Abatement Blasting is proposed in Expansion of Aniali Limestone Mining project but occasionally. Drilling and blasting will be used only for giving shattering effect to the hard strata of limestone horizons. Blasting will be done mainly with ANFO as the column charge and slurry explosive as the base charge. The under sized material generated after manual sizing or mechanized sizing will be temporarily stored in the registered plot or near to the crushing unit before it is sent to TCL's Cement and Soda Ash Plant at Mithapur. Measures that will be followed for abatement of ground vibration, air blast and fly rocks are detailed below – a) Controlled Blasting will be performed strictly as per the guidelines specified under MMR, 1961; b) Proper design of blast with correct spacing, burden and optimum charge/delay will be performed; c) Supervision of drilling and blasting operations to ensure blast design geometry as per planning will be ensured;

M/s TATA CHEMICALS LIMITED Page 286 Expansion of Aniali Limestone Mining Project Final EIA/EMP

d) Sub-drilling will be kept adequate to eliminate toe formation. e) Blasting operations will be carried out only during day time as per DGMS guidelines; the blasting permission is attached as Annexure VI. f) Proper warning signals will be used; g) Adequate safe distance from habitation as per standards from centre of blasting will be maintained; h) Drilling parameters like burden, depth, diameter and spacing will be properly designed to ensure proper blast; i) Effective stemming of the explosives will be done in the drill holes.

10.5.5 Impact on Biological Environment Impact on Biodiversity Mining activities generally result in the deforestation, land degradation, water, air and noise pollution which directly or indirectly affect the faunal and floral status of the project area. However, occurrence and magnitude of these impacts are entirely dependent upon the project location, mode of operation and technology involved. Impact prediction is the main footstep in impact evaluation and identifies project actions that are likely to bring significant changes in the project environment.

The present study was carried out to predict the likely impacts of the proposed Expansion of Aniali limestone mining project at village Aniali in the surrounding environment with special reference to biological attributes covering habitats/ecosystems and associated biodiversity.

Although impacts on key habitat elements will occur on a local scale, but on a regional scale they would not be critical for the life cycle needs of the species observed or expected. Moreover the successive reclamation of mined out areas, following completion of mining activities, will replace habitat resources for faunal species in this locality over a longer time. Wild life is not commonly found in the plains because of lack of vegetal cover and surface water except domestic animals. Dust generated due to haulage vehicles can have adverse impact on crops and other plant species of nearby areas. Sprinkling with 17.0 KLD of water will be done to reduce fugitive emission up to an extent. Expansion of Aniali Limestone mining project doesn’t include any forest land or diversion of forest land. The total mine lease area 21.04 Ha is a non- forest government waste land.

Mitigation measures a) Regular water sprinkling on haul road will be done to reduce the emission of suspended particulate matter which causes the blockage of the stomata of plants and interrupting the photosynthesis process. b) Thick green belt development will be done as per approved mining plan of mine lease.

M/s TATA CHEMICALS LIMITED Page 287 Expansion of Aniali Limestone Mining Project Final EIA/EMP

c) Green belt development reduces noise level, reduces gaseous pollution and particulate matter pollution. d) Pollution tolerant plant with consultation to state forest department has been proposed for plantation.

10.5.6 Traffic Study and Transportation Vehicular Traffic Density Traffic study was carried out as primary data to know the existing traffic density. Traffic survey forms are attached as Annexure XI. Incremental pollution load as per IRC 64 has been calculated to estimate the level of services (LOS). Traffic study was conducted for SH-27 and nearby intersection passes through the project site. Then depending on the capacity of the mine, the number of trucks that will be added to the present scenario will be compared to the carrying capacity as recommended by Indian Road Congress (IRC).

Existing traffic scenario: LI-Near village intersection the PCU/day is 203 and V/C ratio is 0.034, the LOS is 'A'. L2-- At SH-27, the PCU/day is 4100 and V/C ratio is 0.27, LOS is 'B'

After the proposed activity: LI-Near village intersection the PCU/day is 383 and V/C ratio is 0.06, the LOS is 'A'. L2-- At SH-27, the PCU/day is 4280 and V/C ratio is 0.28, LOS is 'B'

From the above analysis it can be seen that the V/C ratio will change to 0.06 and 0.28 with LOS being “A” which is “Excellent” near village intersection and “B” which is “Very good” at State highway as per classification. So the additional load on the carrying capacity of the concerned roads is not likely getting affected.

10.5.7 Impact on Socio - Economic Environment Impacts of a mining project may be positive or negative. The adverse impacts attribute to physical displacement due to land acquisition, which is followed by loss of livelihood, mental agony, changes in social structure, and risk to food security etc. People are also directly affected due to pollution. However, in Expansion of Aniali Limestone Mining Project, there is no displacement of people due to mining operations. Study on Socio-economic status of the project has already been carried out using primary socio-economic survey for generating the baseline data of socio- economic status.

Anticipated Impacts From the primary socio-economic survey & through secondary data available from established literature and census data 2011, it is found that there would be positive impact on socio- economic condition of the nearby area. The nearest habitation is present in the village

M/s TATA CHEMICALS LIMITED Page 288 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Daulatgadh situated at a distance of about 0.77 km from the project site in North East direction. The mining activity does not involve any displacement of human settlement. No public buildings, places, monuments etc. exist within the lease area or in the vicinity. The mining operation will not disturb/ relocate any village or need resettlement. Thus no adverse impact is anticipated. The impact of mining activity in the area is positive on the socio-economic environment of the region. Expansion of Aniali Limestone Mining project will be providing employment to the local population and preference will always be given to local people whenever there is a requirement of man power for mining related work.

10.5.8 Mine Waste Management As per approved mining plan there is practically no solid waste and overburden in present mining area. The mining area lies on hilly land having rocky exposure and has no soil cover; therefore storage of soil is not required so far no patches of soil were encountered during mining. The sized limestone will be transported after sizing and undersized material will be dispatched to Soda Ash and Cement Plant at Mithapur.

10.6 Project benefits The proposed Expansion of Aniali Limestone Mining project will generate various benefits as the employment of local people in primary and secondary sectors of project will upgrade the prosperity of the region. These will in-turn improves the socio-economic conditions of the area. In addition to the above, contractual labors and indirect employment opportunities will also be getting benefited after installation of mining project.

10.7 Environmental Management Plan CER Project Details As per the MOEF&CC's office memo no. F NO 22-65/2017-IA-III dated 01/05/2018.(Attached as Annexure XII), Expansion of Aniali Limestone Mining Project is a brownfield project and total project coast is Rs. 1 crore which is less than Rs. 100 Crores. As per above notification, 1% of the project cost is applicable for CER budget for brownfield projects. In the same context it has proposed to provide financial assistance of Rs. 1,00,000 per year for the development of social infrastructure of the area.

Cost of Environment Control Measures/EMP Budget As a part of its responsibility towards protection of environment, TCL has allocated budget for Environment protection measures. Total capital cost for EMP is Rs. 8.5 lakh and recurring cost per year is Rs. 7.0 lakh.

10.8 Conclusions The mining operations will meet the compliance requirements of MoEF&CC. Community impacts will be beneficial, as the project will generate significant economic benefits for the

M/s TATA CHEMICALS LIMITED Page 289 Expansion of Aniali Limestone Mining Project Final EIA/EMP

region; Adoption of best available technology and best management practices with more environmental friendly process; and with the effective implementation of the Environment Management Plan (EMP) during the mining activities, the proposed project can proceed without any significant negative impact on environment.

***********

M/s TATA CHEMICALS LIMITED Page 290 CHAPTER-11

DISCLOSURE OF CONSULTANTS ENGAGED Expansion of Aniali Limestone Mining Project Final EIA/EMP

CHAPTER 11 - DISCLOSURE OF CONSULTANTS ENGAGED

11.1 General

Declaration by Experts contributing to the EIA Report of proposed Expansion of Aniali Limestone Mining Project, Area- 21.04 ha., Cat-A (1A- Mining of Minerals), Mineral- Limestone, near Village Aniali of Taluka- Ranavav, District- Porbandar, State- Gujarat. I, hereby, certify that I was a part of the EIA team in the following capacity that developed the above EIA.

EIA Consultant In Situ Enviro Care Name Ajay Mohan Signature

List of Functional Area Experts S. No. Functional Name of the expert/s Involvement Signature areas

1 LU Dr. R. M. Singh Land Use Assessment

2 AP Mr. P. S. Sharma Air Pollution Assessment

3 AQ Mr. Ravindra Kamath Air Quality Assessment (Modelling done by Outsourced Lab)

4 WP Dr. Nishi Naryani Water Pollution Assessment

5 EB Mr. Madan Prakash Ecology & Biodiversity Study

6 NV Mr. P S Sharma Noise Analysis

M/s TATA CHEMICALS LIMITED Page 291 Expansion of Aniali Limestone Mining Project Final EIA/EMP

7 SE Mrs. Asha Mathur Socio Economic Assessment

8 HG Mr. Ajay Mohan Hydro-Geological Study

9 GEO Dr. Manoj Kumar Geological Study

10 SC Dr. A. K. Mishra Soil Analysis Study

11 RH Mr. P S Sharma Risk & Hazard Assessment

12 SHW Mr. G.K. Mishra Solid & Hazardous Waste Assessment

11.2 Declaration by the Head of the Accredited Consultant Organization/ Authorized Person

I, Ajay Mohan, hereby, confirm that the above mentioned experts prepared the EIA of proposed Expansion of Aniali Limestone Mining Project, Area- 21.04 ha., Cat-A , Mineral- Limestone, near Village Aniali of Taluka- Ranavav, District- Porbandar, State- Gujarat.

I also confirm that EIA Coordinator (EC) has gone through the report, and the consultant organization shall be fully accountable for any misleading information. It is certified that no unethical practices, plagiarism involved in carrying out the work and external data / text has not been used without proper acknowledgement while preparing this EIA report.

Signature

Name Ajay Mohan Designation Mining Coordinator

M/s TATA CHEMICALS LIMITED Page 292 Expansion of Aniali Limestone Mining Project Final EIA/EMP

Name of the EIA Consultant In Situ Enviro Care Organisation NABET Certificate No. & Issue NABET/EIA/1821/RA0070 Date

**************

M/s TATA CHEMICALS LIMITED Page 293