APPENDIX I

FORM 1

Basic Information

Sr Item Details No. 1. 1 Name of the project/s Proposed hill station type area development “The Green Butterfly” project at villages Telbaila, Majgaon and Saltar at of Maval region, District , State . 2. S. No. in the schedule Survey no. enclosed as Annexure -1. 3. Proposed Total proposed FSI area:1,896,829 m2 capacity/area/length/tonnage Total proposed Non FSI area: 1,99,992 m 2 handled/command area/lease Total proposed BUA (FSI+ Non area/number wells to be drilled FSI):20,96,820 m2 4. New/Expansion/Modernization New Hill Station Type Area Development project 5. Existing Capacity/Area etc. Not Applicable 6. Category of Project. e.' A' or 'B' Project category B1; Activity under Item project 8 (b) “Townships and Area Development projects”, 8 (b) of the EIA Notification dated 14 th September 2006 as amended on 1 st December , 2009 does not require scoping and public consultation. 7. Does it attract general conditions? If Not Applicable yes, please Specify 8. Does it attract specific condition:? If Not Applicable 'yes, please Specify 9. Location Villages Telbaila, Majgaon and Saltar at Mulshi Taluka of Maval region, District Pune, State Maharashtra.

Latitude & Longitude of the Project Site: 1.18 033’31.31”N and 73 019’25.67”E 2.18 033’40.89”N and 73 021’16.36”E 3.18 034’13.15”N and 73 021’38.78”E 4.18 035’03.22”N and 73 020’01.92”E 5.18 035’58.10”N and 73 020’47.24”E 6.18 035’01.09”N and 73 021’44.94”E 7.18 035’55.08”N and 73 021’34.45”E 8.18 036’14.90”N and 73 022’14.91”E Please refer: Appendix 1_Location Map Appendix2_Survey number

The Green Butterfly Proposed Hill Station Development 1 Sr Item Details No. Plot/Survey/Khasra No. Villages Telbaila, Majgaon and Saltar at Mulshi Taluka of Maval region, District Pune, State Maharashtra. Please refer Appendix 2_Survey number Vi llage Tailbaila, Saltar and Maajgaon Tehsil Mulshi Taluka of Maval region District Pune

State Maharashtra 10. Nearest railway station/airport along Lonavala Railway Station (approximate Arial with distance in km. distance of 17.23 km)

Pune International Airport (approximate Arial distance of 60.30 km)

Chhatrapati Shivaji International Airport, Mumbai (approximate Arial distance of 75 km)

Please refer Appendix _1 Location Map. 11. Nearest Town, city, District Lonavala (approx. Distance – 33 km) Headquarters along with distance in Pune City (approx. Distance – 92 km) kms. Mumbai City (approx. Distance – 109 km)

12. Village Panchayats, Zilla Parishad Lonawala Municipal council (approx. Distance – Municipal Corporation, Local body 33 km) (complete postal addresses with telephone nos. to be given) 13. Name of the applicant Mrs Taranjit Anand 14. Registered Address Mrs Taranjit Anand M/S. Satind Infrastructures Pvt. Ltd. Anand-105, 6th Floor, Dr. Ambedkar Road, Pali Hill, Bandra (W)Mumbai -400050 15. Address of correspondence M/S. Satind Infrastructures Pvt. Ltd. Anand-105, 6th Floor, Dr. Ambedkar Road, Pali Hill, Bandra (W)Mumbai -400050

Name Mrs Taranjit Anand Designation(Owner/Partner/CEO) Director Address M/s. Satind Infrastructure Pvt. Ltd. Anand-105, 6th Floor, Dr. Ambedkar Road, Pali Hill, Bandra (W)Mumbai -400050

Pin Code 400050

E-mail [email protected] , [email protected]

The Green Butterfly Proposed Hill Station Development 2 Sr Item Details No. Telephone No. 022 42234200 Fax No. 16. Details of Alternative Sites examined No alternative options have been examined. if any. Location of these sites should be shown on a toposheet. 17. Interlinked Projects Not Applicable 18. Whether separate application of Not Applicable interlinked project has been submitted 19. If yes, date of submission Not Applicable 20. If no, reason ------21. Whether the proposal involves approval/ clearance under: if yes, details of the same and their status to be given: (a) The Forest (Conservation) Act – a) Not Applicable 1980? b) Not Applicable (b) The Wildlife (Protection) act – 1972? c) Not Applicable (c) The C.R.Z. Notification, 1991? 22. Whether there is any government Yes, The Hill station Policy order/ policy relevant/ relating to the site? 23. Forest land involved (hectare) No forest Land involved 24. Whether there is any litigation pending against the project and /or the land in which the project is proposed to be set up? Yes One Litigation is pending in (a)Name of the Court Pune civil court (b)Case No. (c) Orders/directions of the Court, if No Orders any and its relevance with the proposed project

The Green Butterfly Proposed Hill Station Development 3 Activity

1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S.No Information/Checklist Yes/ Details thereof (with approximate quantities confirmation No /rates, wherever possible) with source of information data 1.1 Permanent or temporary The proposed site is consist s of three villages - Saltar, change in land use, land NO Tel baila and Majgaon. Land use will be changed. cover or topography Barren land will be converted into hill station. including increase in intensity of land use (with respect to local land use plan)

1.2 Clearance of existing land, YES There are no existing buildings. Only shrubs will be vegetation and buildings? removed and trees will be transplanted. 1.3 Creation of new land uses? NO The proposed project is hill station type area development. The existing landuse was afforestation zone as per RP. Now converted into hill station type area development 1.4 Pre -construction NO Soil testing has been done. investigations e.g. bore houses, soil testing? 1.5 Construction works? YES Proposed development involves construction of : Project majorly comprises of Hospitality, Public – Semipublic area, Residential area, Commercial and Service Industries • Public – Semi: 2 Universities, 3 Schools, Cultu ral centre, Craft centre, Auditorium, Convention centre, Cineplex, Multi-specialty 200 bed Hospital and City club all these components will be of Ground +2 floors. • Residential area: 2000 numbers of small villas plot, 1300 medium villas plot and 800 luxury villas plot having area of 525 sqm, 800 sqm and 1000 sq.m respectively and Ground +1 floor. 3 Service quarters area are also proposed of Stilt+7 floors. • Hotel area : 4 five star luxury hotels and 5 three star hotels of 2297 rooms of Ground + 4 and G+3 floors respectively. Golf club has been proposed for 5-star hotel at southern side of the project. • Commercial area: AVGC Park, 2 Office complex, Hill street shops and City office of Ground + 2 floors. Provisions made under Service industries: Bank, Office, Fire station, Petrol Pump, Police station and 2 service industries of Ground + 2 floors. Proposed construction will be conducted in four

The Green Butterfly Proposed Hill Station Development 4 S.No Information/Checklist Yes/ Details thereof (with approximate quantities confirmation No /rates, wherever possible) with source of information data phases. The details of population are as follows: S. Type Population no Service Permanent Floating /Suppo rt

1 Public-Semi- public 3,522 4,596 2,259 2 Hotels 0 3,220 1,610 3.1 Residential 20,500 0 0 Service 3.2 quarters 9,739 0 0 Service 4 Industry 15 6,188 70 5 Commercial 0 18,142 812 Type of Construction = RCC work & Brick work Duration of Construction activity = 15 years

Please refer to Appendix 2 Area Statement 1.6 Demolition works? NO No demolition works involved.

1.7 Temporary sites used for YES Total No. of temporary workers = 5000 No.s construction works or housing of construction Temporary labour camps shall be provided for the workers? construction workers. 1.8 Above ground b uildings, YES Proposed development involves construction of : structures or earthworks Project majorly comprises of Hospitality, Public – including linear structures, Semipublic area, Residential area, Commercial and cut and fill or excavations Service Industries The project will be executed in four phases. • Public – Semi: 2 Universities, 3 Schools, Cultural centre, Craft centre, Auditorium, Convention centre, Cineplex, Multi-specialty 200 bed Hospital and City club all these components will be of Ground +2 floors. • Residential area: 2000 numbers of small villas plot, 1300 medium villas plot and 800 luxury villas plot having area of 525 sqm, 800 sqm and 1000 sq.m respectively and Ground +1 floor. 3 Service quarters area are also proposed of Stilt+7 floors. • Hotel area : 4 five star luxury hotels and 5

The Green Butterfly Proposed Hill Station Development 5 S.No Information/Checklist Yes/ Details thereof (with approximate quantities confirmation No /rates, wherever possible) with source of information data three star hotels of 2297 rooms of Ground + 4 and G+3 floors respectively. • Commercial area: AVGC Park, 2 Office complex, Hill street shops and City office of Ground + 2 floors. Provisions made under Service industri es: Bank, Office, Fire station, Petrol Pump, Police station and 2 service industries of Ground + 2 floors. Proposed construction will be conducted in four phases. The details of population are as follows: S. Type Population no Service Permanent Floating /Suppo rt

1 Public-Semi- public 3,522 4,596 2,259 2 Hotels 0 3,220 1,610 3.1 Residential 20,500 0 0 Service 3.2 quarters 9,739 0 0 Service 4 Industry 15 6,188 70 5 Commercial 0 18,142 812

Total Ground Coverage will not exceed 12% of total plot area.

The top soil layer shall be recovered during excavation work and shall be used for landscaping.

Excavated material shall be used for back filling, road leveling, and filling during site development.

Please refer: Please refer to Appendix 3- Master Layout

1.9 Underground works NO The proposed Project work does not include any including mining or mining or tunneling. tunneling? 1.10 Reclamation works? NO Not applicable

The Green Butterfly Proposed Hill Station Development 6 S.No Information/Checklist Yes/ Details thereof (with approximate quantities confirmation No /rates, wherever possible) with source of information data 1.11 Dredging? NO Not applicable

1.12 Offshore structures? NO Not applicable

1.13 Production and NO Not applicable manufacturing processes? 1.14 Facilities for storage of YES During construction the building materials will be goods or materials? temporarily stored within site premises.

Covered storage shall be provided for materials susceptible to fugitive dust emissions. 1.16 Facilities for long term YES The proposed development shall have temporary housing of operational workforce only during construction phase. workers? 1.17 New road, rail or sea traffic YES All the traffic related to the construction will make during const ruction or use of Proposed road operation? During Operational phase we have proposed Internal Road • Arterial Roads – 36m ROW (3-Lane + 3-Lane) • Sub Arterial Roads – 24m & 18m ROW (2-Lane + 2-Lane) • Tertiary Roads – 12m ROW (2-Lane)

1.18 New road, rail, air YES There will be construction of following roads waterborne or other During Operational phase we have proposed Internal transport infrastructure Road including new or altered routes and stations, ports, • Arterial Roads – 36m ROW (3-Lane + 3-Lane) airports etc? • Sub Arterial Roads – 24m & 18m ROW (2-Lane + 2-Lane) • Tertiary Roads – 12m ROW (2-Lane) 1.19 Closure or diversion of NO Not Applicable. existing transport routes or infrastructure leading to cha nges in traffic movements? 1.20 New or diverted NO Not Applicable transmission lines or pipelines? 1.21 Impoundment, damming, NO Not Applicable culverting, realignment or other changes to the hydrology of watercourses or aquifers?

The Green Butterfly Proposed Hill Station Development 7 S.No Information/Checklist Yes/ Details thereof (with approximate quantities confirmation No /rates, wherever possible) with source of information data 1.22 Stream crossings? NO

1.23 Abstraction or transfers of NO Source of water for construction and labour camp – water form ground or Propose reservoirs surface waters? Total water required per day for construction = 58 m3/ day

Labour water requirement = 450 m3/ day

Source of water for occupants during operational phase: From Proposed water reservoirs (Rain water) 1.24 Changes in water bodies or NO No change in existing water bodies. Due to site the land surface affecting development and hard areas, runoff will increase. The drainage or run -off? storm water management plan and rain water harvesting system has been designed accordingly. 1.25 Transport of personnel or YES Road traffic of the area will increase temporary materials for construction, during construction and permanently during operation or operation phase decommissioning? Construction Phase:

Transportation of material will be undertaken within the site through lorries/dumpers

Transportation of labour will be undertaken on the site through transport vehicles. 1.26 Long -term dismantling or NO Not Applicable decommissioning or restoration works? 1.27 Ongoing activity during NO Not applicable decommissioning which could have an impact on the environment? 1.28 Influx of people to an are a YES Temporary influx to the area due to labours. in either temporarily or permanently? Expected no. of temporary workers = 5000 Nos

The estimated permanent influx due to residential units = 33,776people

The estimated floating population due to proposed Hill station = 32,146 people

The estimated Service / Support e due to proposed Hill station = 4,750 people

1.29 Introduction of alien NO Proposed landscape plan includes native & local trees species? only.

The Green Butterfly Proposed Hill Station Development 8 S.No Information/Checklist Yes/ Details thereof (with approximate quantities confirmation No /rates, wherever possible) with source of information data

1.30 Loss of native species or NO Proposed landscape includes native and local flora- genetic diversity? that will enhance local biodiversity

1.31 Any other actions? NO No other activities / actions regarding construction are involved.

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):

Details there of (with approximate quantities S.No. Information/checklist Yes/No /rates, wherever possible) with source of confirmation information data

2.1 Land especially NO Proposed site does not fall under Agriculture or undeveloped or Non-Development Zone. agricultural land (ha) Site area of the project is 97,94,100 sq.m

Building footprint will not exceed 12% of total plot area.

2.2 Water (expected source Construction Phase & competing users) unit: KLD During construction phase: Source: Proposed water reservoirs Total water requirement by labors:450 m 3/day Total water requirement for construction activity: 58 m 3/day

During operation phase: Source : Proposed Water reservoirs( Rain water) ( 12 nos) Total water requirement-11015 KLD Total Fresh Water Demand: 4728 KLD

Fresh water required for the project will be sourced through proposed water reservoirs ( 12 no) Flushing water requirement:

Flushing water requirement for project = 2625

Total water required by the project including landscaping and site maintenance : 11015 KLD

Treated waste water from STP shall be used for

The Green Butterfly Proposed Hill Station Development 9 Details there of (with approximate quantities S.No. Information/checklist Yes/No /rates, wherever possible) with source of confirmation information data

landscaping & flushing.

Appendix No 4– Water Balance Chart 2.3 Minerals (MT) NO No minerals will be used for the construction purpose.

2.4 YES All the construction materials will be ordered from Construction material – the authorized vendors. stone, aggregates, sand / soil (expected source It has been planned to reuse the available harvested – MT) topsoil for landscaping. Top soil cover is very less.

2.5 Forests and timber NO No use of forest timber. (source – MT) 2.6 Energy including YES Construction phase: electricity and fuels Total 37 DG sets have been proposed during (source, competing users) Unit: fuel (MT), construction Phase of following capacities energy (MW) 1000 kVA-11 nos. 750 kVA-3 nos., 600 kVA-13 nos. 500 kVA3 nos. 400 kVA-3 nos., 320 kVA-2 nos. 250 kVA-2 nos .

Operational Phase

Connected Load – 223 MW

• Maximum Demand = 166 MVA

35-40% load will be catered through renewable energy No. of DG setsCapacity of No of DG Set DG set in kVA 1000 96 750 4 600 23 500 8 400 3 320 4

The Green Butterfly Proposed Hill Station Development 10 Details there of (with approximate quantities S.No. Information/checklist Yes/No /rates, wherever possible) with source of confirmation information data

250 6

Source of electricity - Maharashtra State Electricity Distribution Company Ltd / Tata Power

All the DG sets shall comply CPCB norms for air emissions and noise levels

2.7 Any other natural Yes Renewable natural resources like solar and w ind resources (use will be used for power generation. appropriate standard No other natural resources will be used for the units) construction purpose.

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.

S. No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data 3.1 Use of substances or NO Other than D.G. Set fuels (Diesel) there will not be materials, which are use of any other Hazardous material for the hazardous (as per construction purpose. MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence NO All the waste generated will be managed properly of disease or affect and no conditions will prevail to affect disease vectors (e.g. epidemiology. insect or water borne diseases) 3.3 Affect the welfare of NO The project will have positive impact on human people e.g. by changing welfare. living conditions? 3.4 Vulnerable groups of NO No vulnerable groups have been identified in close people who could be proximity of the project. affected by the project e.g. hospital patients, children, the elderly etc., 3.5 Any other causes NO No such activity or use of material will be done which will affect the environment or human health.

4. Production of solid wastes during construction or operation or decommissioning

The Green Butterfly Proposed Hill Station Development 11 S.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data 4.1 Spoil, overburden or NO No mine waste involved.. mine wastes Excavated material shall be reused for back filling purposes on site.

4.2 Muni cipal waste YES Construction Phase (domestic and or commercial wastes) Total expected labour = 5000 Nos.

Waste generation in the Pre-Construction and Construction phase:

• Waste generation : Total labour Solid Waste Generation :1000 Kg/day Wet waste generation: 600 kg/day Dry waste generation: 400 kg/day

• Disposal of the construction waste debris: The Construction waste generated during construction shall be segregated, reused on site and surplus shall be led to scrap dealers for recycling.

Waste generation in the Operation Phase

Total waste generated: 17.9 tonnes/day • Wet waste (tonnes /day : 9.76 tonnes/day • Dry waste (tonnes/day) : 8.08 tonnes / day • e-waste : 0.089 tonnes/day • Biomedical waste: 0.077tonnes/ day

Total STP Sludge (Dry sludge): The quantity of sludge generated from ETP-STP of hospital will be 115 kg/day.

Sludge generation from phytorid technology is very negligible

There will be provision for storage, collection and segregation of biodegradable, non-biodegradable within the premises. Biodegradable waste will be treated in Biogas plant and Organic Waste Converter. One biogas plant has been proposed to treat the biodegradable waste generating from Hotels, Universities, Residential schools, Restaurants etc. around 57%

The Green Butterfly Proposed Hill Station Development 12 S.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data of biodegradable waste will be get treated with Bio-methanation method. Around 43% of organic waste will be treated in organic waste convertor. Total 9 OWCs are proposed to treat the biodegradable waste generating from residential area, day school and city club.

All the Dry waste will be further segregated into recyclable and non-recyclable. Recyclable waste like plastic and PET will be compressed through a baler machine and will be stored on site for further handover to authorized recyclers. Other non recyclable material with high calorific value will be treated by the method of pulverization and the pellets will be used for firing in boilers of hotels. The non-recyclable like sanitary wastes will be incinerated on site through an incinerator. A baler machine and incinerator will be provided for each phase. Since, there are four phases in the project; there will be provision of four baler machines and four incinerators on site. Refer Solid waste management chart as annexure 5 4.3 Hazardous wastes (as NO No use of hazardous waste except fuels (for DG per Hazardous Waste sets) during construction / operational activities. Management Rules) 4.4 Other industrial process NO Not applicable as the proposed development is a wastes residential development. 4.5 Surplus prod uct NO Not Applicable

4.6 Sewage sludge or other YES Sludge generated from STP will be used as manure sludge from effluent on site. There will be minimum sludge generation treatment as maximum of Phytorid technology is used for STP.

The Green Butterfly Proposed Hill Station Development 13 S.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data 4.7 Construction or YES No waste shall be generated from demolition as no demolition wastes demolition work is involved. The construction

waste will around 400 tonnes per month.

4.8 Redundant machinery or NO No redundant machinery or equipment present on equipment the site 4.9 Contaminated soils or NO Not Applicable other materials 4.10 Agricultural wastes NO Not Applicable

4.11 Other solid wastes NO Not Applicable

5.Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

S. No Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data 5.1 Emissions from YES Ve hicular movement, DG sets will be point sources combustion of fossil of air pollution. fuels from stationary or mobile sources It will be managed properly during construction phase & operational phase.

5.2 Emissions from NO No. Proposed project is a hill station type of production processes development

5.3 Emi ssions from NO Not applicable. The material Transport, storage & materials handling handling will be undertaken in an appropriate including storage or manner; avoiding air, water and soil pollution. transport

5.4 Emissions from YES Dust will be generated from excavation and other construction activities construction activities. Measures will be taken to including plant and reduce/ control the emissions. equipment For further details please refer to Appendix_6 Environmental Management Plan. 5.5 Dust o r odours from YES Dust will be generated from excavation and other handling of materials construction activities. Measure will be taken to

The Green Butterfly Proposed Hill Station Development 14 S. No Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data including construction reduce/ control the emissions. materials, sewage and waste For further details please refer to Appendix_6 Environmental Management Plan. 5.6 Emissions from YES For Sanitary waste we are using incineration. incineration of waste 5.7 Emissions from burning NO No material will be b urnt within the project of waste in open air (e.g. premises. slash materials, construction debris) 5.8 Emissions from any NO No other activities apart from construction & other sources transportation are involved which would generate emissions.

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

S.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data with source of information data 6.1 From operation of YES Construction phase equipment e.g. engines, ventilation plant, The machinery, equipment's and vehicles used crushe rs during construction activities will generate noise.

Appropriate control measures will be undertaken to reduce the noise during construction phase.

Operation phase

This phase will involve noise generation due to the use of mechanical equipment, vehicular traffic and DG sets.

Appropriate control measures will be undertaken to reduce the noise during construction phase.

For details please refer Appendix_6 Environmental Management Plan. 6.2 From industrial or NO Not applicable similar process’s 6.3 From construction or YES No demolition activities involved. For Noise demolition generation during construction activity - Measures will be taken to minimize the impacts of the noise.

Please refer Appendix_6 Environmental Management Plan. 6.4 From blasting or piling NO NO blasting or piling activity has been proposed for this project 6.5 From construction or YES Temporary noise influx during construction p hase

The Green Butterfly Proposed Hill Station Development 15 S.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data with source of information data operational traffic due to vehicles like trucks, tractors, lorries etc and during construction activities.

Permanent noise disturbance due to traffic during operational stage 6.6 From lighting or cooling NO Not applicable systems 6.7 From any other sources NO Not ap plicable

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:

S.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data 7.1 From handling, storage, NO No hazardous material will be stored on site. use or spillage of Diesel will be used for DG sets. There will be hazardous materials handling, storage & use of fuels for the D.G. set. Measures to avoid spillage will be taken. \

7.2 From discharge of NO Sewage generation from proposed project: 6617 sewage or other m3/day effluents to water or the • Total Capacity of STP: 6618 m 3/day land (expected mode • STP Technology : Phytorid technology and place of discharge) Decentralize STPs are provided phase wise and zone wise as under:

STP AREA STP capacity required (KLD) (sq.mt) Zone 1 for 352 168.9 321 units Zone 2 for 384 units 233.3 350 Zone 3 for 205 units 124.5 187 Zone 4 for 152 units 92.3 139 Zone 5 for 366 units 222.3 334 Zone 6 for 325 units 197.4 296 Zone 7 for 295 units 179.2 269 Zone 8 for 185 units 112.4 169

The Green Butterfly Proposed Hill Station Development 16 S.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data Zone 9 for 262 units 159.2 239 Zone 10 for 265 161.0 241 units Zone 11 for 420 255.2 383 units Zone 12 for 364 221.1 332 units Zone 13 for 210 127.6 191 units Zone 14 for 205 124.5375 units 187 Zone 14a for 110 66.825 units 100 Residential school 1 148 222 Residential school 2 113 169 Service quarter 2 338 507 Petrol Pump/Bank/Offices 75 112 Service quarter 1 660 990 AVGC Park 462 385 5 star hotel, university, fire station 335 503 Hill street shopping, 5 star hotel 280 420 University 113 170 Office complex 57 85 Cultural center with cineplex 35 52 3 Star hotels 307 461 3 Star hotel (1 nos), shops and restaurants 190 285

The Green Butterfly Proposed Hill Station Development 17 S.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data Office complex, 5 star hotel, office bldg 434 651 City office 113 170 5 Star hotel 186 279 Service quarter 3 186 278 Primary + Secondary school 60 90 Hospital 83 150 Total Capacity 6618

Use of treated water for flushing purpose in proposed project = 2625 KLD

Use of treated water for landscaping purpose = 3295 KLD

Quantity of treated waste water to be disposed off to agriculture = 00 KLD 7.3 By deposition of NO No Surplus of the treated waste water will be pollutants emitted to air discharged anywhere during dry season. into the land or into Propose hill station type of project is zero water discharge projectduring dry season

7.4 From any other sources NO Not applicable 7.5 Is there a risk of long NO Not applicable term build up of pollutants in the environment from these sources?

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment

S.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data 8.1 From explosions, NO No use of explosives and hazardous material spillages, fires etc from during construction / operational phase. storage, handling, use or production of hazardous substances

The Green Butterfly Proposed Hill Station Development 18 S.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data 8.2 From any other causes NO Not applicable 8.3 Could the project be NO The project area falls under Zone III as per Map affected by natural showing Seismic Zones of . Zone III is of disasters causing moderate Seismic Intensity. The building design environmental damage has been planned accordingly. (e.g. floods, earthquakes, landslides, cloudburst etc)?

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality

S. Information/Checklist Yes/No Details thereof (with approximate No. confirmation quantities/rates, wherever possible) with source of information data 9.1 Lead to development of YES Proposed project is a residential development supporting utilities, conducive to the land use. ancillary development or development The project involves development of a sewage stimulated by the Treatment Plant (STP), Organic waste convertor project which could (OWC), Effluent treatment Plant , Water treatment have impact on the Plant , rainwater recharge pits, Check dams, environment e.g.: Biogas.

• Supporting The proposed supporting infrastructure would lead infrastructure (roads, to development of sustainable habitat. power supply, waste or waste water treatment, etc.) • Housing development • Extractive industries • Supply industries • Other 9.2 Lead to after -use of the NO Not applicable site, which could have an impact on the environment 9.3 Set a precedent for later YES The proposed development will set a precedent of developments sustainable site planning for other up -coming developments. 9.4 Have cumulative NO No major cumulative impacts have been identified effects due to proximity to other existing or planned projects with similar effects

The Green Butterfly Proposed Hill Station Development 19

Environmental Sensitivity S.No. Areas Name/ Aerial distance (within 15 km.) Identity Proposed project location boundary

1 Areas protected under YES 1) Reserve Forest near Saltar Site adjacent international 2) Reserve Forest near Kewani Pathar 5 conventions, national km - S or local legislation for 3) Reserve Forest near Navghar 5 km - W their ecological, 4) Reserved Forest near Kadva Dongar landscape, cultural or 9.30 km - NE other related value 5) Reserved Forest near Morgiri 13 km - NE 6) Reserve Forest near Ponda 14 km- SE

FORT 2 Korigad Fort 7.15 km - NE

2 Areas which are YES Existing Village area of three villages comes important or sensitive for under western ghat as per draft notification dated ecological reasons - 10 th March 2014. Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests 3 Areas used by protected, YES Nesting of giant squirrel in study area of 15 km. important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 4 Inland, coastal, marine or NO Not applicable underground waters

5 State, National boundaries NO Not applicable

6 Routes or facilities used NO Three gaothans are including in the project, by the public for access to appropriate right of way and 200 m buffer zone recreation or other tourist, has been proposed in the project. pilgrim areas 7 Defense instal lations NO Not applicable 8 Densely populated or NO The site is not located in densely populated or built -up area built-up area.

9 Areas occupied by NO No sensitive man-made landuse identified sensitive man -made land around the site. Primary school and temple is uses (hospitals, schools, in each village of project area, which will be places of worship, maintained as it is. community facilities)

The Green Butterfly Proposed Hill Station Development 20 S.No. Areas Name/ Aerial distance (within 15 km.) Identity Proposed project location boundary

10 Areas containing YES Saltar lake is the source of surface water in the important, high quality or project area, will conserved as it is. scarce resources Forest within study area of 15 km. (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11 Areas already subjected to NO Not applicable pollution or environmental damage. (those whe re existing legal environmental standards are exceeded) 12 Areas susceptible to NO Earth Quake Zone III natural hazard which could cause the project Therefore, all relevant design parameters as per to present environmental zone III have been considered for RCC design of problems ( earthquakes, the buildings. subsidence, landslides, erosion, flooding or extreme or a dverse climatic conditions )

The Green Butterfly Proposed Hill Station Development 21