Executive Committee Meeting Agenda

#10/17 December 15, 2017 9:30 A.M. Waterfront Room, Head Office Members:

Chair Maria Augimeri Vice Chair Jack Heath Jack Ballinger Vincent Crisanti Glenn De Baeremaeker Chris Fonseca Brenda Hogg Jennifer Innis Colleen Jordan Mike Mattos Jennifer McKelvie Anthony Perruzza

Pages

1. MINUTES OF MEETING #9/17, HELD ON NOVEMBER 17, 2017 Link to Minutes

2. BUSINESS ARISING FROM THE MINUTES

3. DISCLOSURE OF PECUNIARY INTEREST AND THE GENERAL NATURE THEREOF 4. DELEGATIONS

4.1 A delegation by Mr. James Thompson, CEO, Water Arts Inc. and J. Garfield Thompson Landscape Ltd. , in regard to item 7.2 - Request for Disposal of and Region Conservation Authority Land, 4156 West, Etobicoke.

5. PRESENTATIONS

6. CORRESPONDENCE

7. SECTION I - ITEMS FOR AUTHORITY ACTION

7.1 REQUEST FOR DISPOSAL OF TORONTO AND REGION CONSERVATION 8 AUTHORITY LAND 14 Pickering/Scarborough Townline, City of Toronto, Rouge River Watershed CFN 33517

7.2 REQUEST FOR DISPOSAL OF TORONTO AND REGION CONSERVATION 15 AUTHORITY LAND 4156 Dundas Street West, Etobicoke, City of Toronto, Watershed CFN 45819

7.3 GREENLANDS ACQUISITION PROJECT FOR 2016-2020 23 Flood Plain and Conservation Component, Humber River Watershed Build Toronto Inc. CFN 55477

7.4 GREENLANDS ACQUISITION PROJECT FOR 2016-2020 26 Flood Plain and Conservation Component, Humber River Watershed Pine Valley (FGH) Inc. CFN 58765

7.5 GREENLANDS ACQUISITION PROJECT FOR 2016-2020 29 Flood Plain and Conservation Component, Humber River Watershed 4208-4214 Dundas Street West (VI) Ltd. CFN 58842

7.6 ROOF AND EAVES TROUGH REPLACEMENTS FOR ROUGE PARK 32 RESIDENTIAL RENTAL PORTFOLIO

7.7 LAKE WILCOX SPECIAL POLICY AREA 35 Comprehensive Policy and Boundary Update, Town of Richmond Hill

7.8 EAST DON TRAIL CONSTRUCTION PROJECT – PHASE 1 AND PHASE 2 42 Design-Build Request for Proposal #10005933 – Phase 1 and Design-Build Request for Proposal #10006438 – Phase 2

7.9 KORTRIGHT VISITOR’S CENTRE RENOVATION PROJECT 48 Contracted Construction Services for Renovations to Washrooms and Classrooms

2 8. SECTION II - ITEMS FOR EXECUTIVE COMMITTEE ACTION

8.1 SUSTAINABILITY CONSULTING SERVICES 51 Preferred Source Contract #10006760

8.2 LAB SERVICES 53 Contract #10006541 – Water Quality Samples for Tributary Monitoring Program

9. SECTION III - ITEMS FOR THE INFORMATION OF THE BOARD

10. SECTION IV - REGULATION 166/06, AS AMENDED PERMIT APPLICATIONS 10.1 - 10.5 ARE MAJOR APPLICATIONS - REGULAR

Applications that involved a more complex suite of technical studies to demonstrate consistency with policies; applications that cover a significant geographic area (e.g. subdivisions, stormwater management ponds), extensive modifications to the landscape, major infrastructure projects, emergency infrastructure works, resolution of violations/after the fact permits, trail construction.

10.1 CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA) 55 16 NORDALE CRESCENT To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 215, Plan A-01, (16 Nordale Crescent), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to construct a pool, pool decking and retaining wall to the rear of the existing single family dwelling at 16 Nordale Crescent in the City of Toronto (Etobicoke York Community Council Area). The proposal also includes minor landscaping. A portion of the works were constructed without TRCA or Municipal permits. As such, the applicant has paid double the application fee as required for a permit "after-the-fact" in association with the violation of Ontario Regulation 166/06.

10.2 CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA) 58 TORONTO TRANSIT COMMISSION To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on, (225 and 230 Milliken Boulevard (formerly 2080 McNicoll Avenue)), in the City of Toronto (Scarborough Community Council Area), Highland Creek Watershed as located on the property owned by Toronto Transit Commission. The purpose is to develop a slab-on-grade single storey bus garage facility approximately 28,000m3 at 2080 McNicoll Avenue, Scarborough. No in-water works associated with this project.

3 10.3 CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA) 63 To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 1, 2, 3, 4, 5, 6, 7, 8, Plan 3, 4, (361A Old ), in the City of Toronto (Scarborough Community Council Area), Rouge River Watershed as located on the property owned by Toronto Zoo. The purpose is to construct a zipline, a treetop walk, a challenge course, and an ecological educational center at the Toronto Zoo.

10.4 CITY OF VAUGHAN 68 1352579 ONTARIO INC. To construct, reconstruct, erect or place a building or structure on West Half Lot 30, Concession 6, (4251 Kirby Road), in the City of Vaughan, Humber River Watershed as located on the property owned by 1352579 Ontario Inc. The purpose is to recognize the construction of a 177.5 sq. m. (1910.6 sq. ft.) ground floor and 290.2 sq. m. (3123.7 sq. ft.) second floor addition to an existing single family dwelling as well as a 55.2 sq. m. ( 594.2 sq. ft.) deck located at the side/rear of the dwelling. The described additions to the dwelling and replacement deck were constructed without TRCA or municipal permits. As such, the applicant has paid double the application fee as required for voluntary compliance related to resolution of a violation of Ontario Regulation 166/06.

10.5 TOWN OF CALEDON 71 255 EAST To construct, reconstruct, erect or place a building or structure on Part Lot 1, Plan 43R-8908, 255 King Street East, in the Town of Caledon, Humber River Watershed. The purpose is to recognize the construction of a 5.5 m by 6.8 m (18 ft by 22.3 ft) wood deck located at the west side of an existing residential dwelling located within TRCA's Regulated Area of the Humber River Watershed. The described works were initiated without the issuance of a TRCA or municipal building permit. As such, an additional permit application fee of 100% was charged for this "after-the-fact" permit.

4 10.6 STANDARD DELEGATED PERMITS 73 Standard Permits, including Emergency Infrastructure Works permissions, are implemented by Planning and Development Division staff and are received monthly by the Executive Committee. Standard Permits , including Emergency Infrastructure Works permissions, are subject to the authorization of designated staff appointed as Enforcement Officers, as per Authority Res.#A198/13, #A199/13 and #A103/15, respectively. All standard and emergency infrastructure works are non-complex permissions consistent with TRCA approved policies and procedures and issued for a time period of two years of less.

ADDED ITEMS

PERMIT APPLICATIONS 10.7 – 10.12 ARE MAJOR APPLICATIONS - REGULAR

Applications that involved a more complex suite of technical studies to demonstrate consistency with policies; applications that cover a significant geographic area (e.g. subdivisions, stormwater management ponds), extensive modifications to the landscape, major infrastructure projects, emergency infrastructure works, resolution of violations/after the fact permits, trail construction.

10.7 CITY OF MARKHAM 104 29 GLENBOURNE PARK DRIVE To construct, reconstruct, erect or place a building or structure on , (29 Glenbourne Park Drive), in the City of Markham, Rouge River Watershed. The purpose is to undertake works within the Rouge River Watershed to facilitate the restoration of an area disturbed by unauthorized site alteration and grading works within a TRCA Regulated Area. The proposed works will resolve the outstanding TRCA violation (No. V3044) on the subject property. In addition, the works also includes the construction of a deck (approximately 270 square feet in size) at the rear of the existing dwelling.

10.8 CITY OF VAUGHAN 107 75 VALLEY ROAD To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 2, Plan 3755, (75 Valley Road), in the City of Vaughan, Humber River Watershed. The purpose is to facilitate, within TRCA's Regulated Area of the Humber River Watershed, the continued development of a partially completed 541.86 sq. m. (5,832 sq. ft.) 2 storey dwelling and new septic system on lands known municipally as 75 Valley Road, in the City of Vaughan. The described works were started without TRCA or municipal permits. As such, the Owner has paid double the application fee as required for voluntary compliance related to resolution of a violation of Ontario Regulation 166/06.

5 10.9 CITY OF VAUGHAN 110 NASHVILLE (NORTH) DEVELOPMENTS INC. To site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Part Lot 24, Concession 9, (10533 Huntington Road), in the City of Vaughan, Humber River Watershed as located on the property owned by Nashville (North) Developments Inc. The purpose is to allow development and the alteration of a watercourse within a Regulated Area of the Humber River Watershed to facilitate topsoil stripping and the installation of sediment and erosion control measures in Phase 1 of a draft approved plan of subdivision (19T-16V010) also known as the Mizuno lands within Block 61 West, northeast of Major Mackenzie Drive and Huntington Road, in the City of Vaughan.

10.10 TOWN OF CALEDON 112 CASTLES OF CALEDON CORPORATION To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 4, Concession 6, (89 Walker Road West), in the Town of Caledon, Humber River Watershed as located on the property owned by Castles of Caledon Corporation. The purpose is to grade, place fill and construct interim servicing within a Regulated Area of the Humber River watershed to facilitate the development of a new residential subdivision.

10.11 TOWN OF RICHMOND HILL 115 MATTAMY (ELGIN MILLS) LIMITED To site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and interfere with a wetland on Part Lot 27, 28, Concession 2, (Leslie Street and Elgin Mills Road East), in the Town of Richmond Hill, Rouge River Watershed as located on the property owned by Mattamy (Elgin Mills) Limited. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed to facilitate the grading and servicing of a municipally approved draft plan of subdivision. These works include the installation of revised sediment and erosion control measures, the construction of an outfall and permanent stormwater management pond (Pond D1) which outlets to a pocket wetland and infiltration swale, prior to discharging to the natural heritage system and Tributary 2-2 within the North Leslie Secondary Plan Area.

10.12 TOWN OF RICHMOND HILL 119 MATTAMY (ELGIN MILLS) LIMITED To site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and interfere with a wetland on Part Lot 27, 28, Concession 2, (Leslie Street and Elgin Mills Road East), in the Town of Richmond Hill, Rouge River Watershed as located on the property owned by Mattamy (Elgin Mills) Limited. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed to facilitate the grading and servicing of a municipally approved draft plan of subdivision. These works include the installation of revised sediment and erosion control measures, the construction of an outfall and permanent stormwater management pond (Pond D2) which outlets to a pocket wetland and infiltration swale, prior to discharging to the natural heritage system and Tributary 2-1 within the North Leslie Secondary Plan Area.

6 11. NEW BUSINESS

NEXT MEETING OF THE EXECUTIVE COMMITTEE #10/17, TO BE HELD ON JANUARY 5, 2018 AT 9:30 A.M. AT HEAD OFFICE, 101 EXCHANGE AVENUE, VAUGHAN

John Mackenzie, Chief Executive Officer

/jr

7 Item 7.1

Section I – Items for Authority Action

TO: Chair and Members of the Executive Committee Meeting #10/17, Friday, December 15, 2017

FROM: Mike Fenning, Associate Director, Property and Risk Management

RE: REQUEST FOR DISPOSAL OF TORONTO AND REGION CONSERVATION AUTHORITY LAND 14 Pickering/Scarborough Townline, City of Toronto, Rouge River Watershed CFN 33517 ______KEY ISSUE Receipt of a request from Melissa Preston and Laura Alderson, Co-Executors of Joyce Scott’s Estate, (former tenant of Toronto and Region Conservation Authority) to consider the sale of a portion of Toronto and Region Conservation Authority owned land located at 14 Pickering/Scarborough Townline, City of Toronto, Rouge River watershed.

RECOMMENDATION

THE EXECUTIVE COMMITTEE RECOMMENDS THAT Toronto and Region Conservation Authority (TRCA) owned property at 14 Pickering/Scarborough Townline, in the City of Toronto, be retained in TRCA ownership until such time as it is conveyed to Parks Canada for the Rouge Urban National Park.

BACKGROUND In July 2017, TRCA was approached by Melissa Preston and Laura Alderson, Co-Executors of Joyce Scott’s Estate, (former tenant of TRCA) to consider the sale of a portion of TRCA land located at 14 Pickering/Scarborough Townline, City of Toronto, Rouge River watershed.

At Executive Committee Meeting #6/17, held on August 11, 2017, Resolution #B68/17 was approved as follows:

THAT the potential disposal of a portion of Toronto and Region Conservation Authority (TRCA) owned property located at 14 Pickering/Scarborough Townline, City of Toronto, be referred to TRCA staff for review and discussion in accordance with established TRCA policies.

AND FURTHER THAT a report be brought forward to the Executive Committee at a future date recommending further action.

This request was circulated to staff at Parks Canada, Ministry of Infrastructure, Infrastructure Ontario, City of Toronto, TRCA Planning and Development staff, and TRCA legal counsel for review and comment in accordance with TRCA’s Disposal Policy. The following comments have been received:

Parks Canada Parks Canada welcomed the opportunity to provide input on the request to purchase the 14 Pickering Townline property. While Parks Canada mentioned they were sympathetic to the personal circumstances of the Scott family, those circumstances and past land use decisions and transactions predate Parks Canada’s involvement in these lands by decades.

8 Item 7.1

Parks Canada indicated in their correspondence that if, as planned, the property becomes part of the country’s first ever national urban park, this land would assuredly be protected from development for generations to come as part of Rouge National Urban Park, and it would contribute to the critical goal of connecting park land from the Oak Ridges Moraine to Lake Ontario.

The property also has significant ecological features that Parks Canada would work to protect and enhance. For instance, a stretch of Petticoat Creek – near the headwaters – runs through the property and would benefit from Rouge National Urban Park’s aquatic habitat restoration program. In addition to the waterway, the property sits adjacent to one of the rare remnants of interior forest in Rouge National Urban Park.

Parks Canada also indicated that heritage properties of this kind also contribute to the story of the Rouge Valley – a story Parks Canada intends to bring to light through it interpretive programs and materials. The unprecedented opportunity to add these public lands to Rouge National Urban Park – a project long supported by all levels of government – would afford the property with its strongest ever natural and cultural protections and serve as a fitting homage to all prior stewards of these compelling lands.

Infrastructure Ontario and Ministry of Infrastructure Infrastructure Ontario in their comments indicated the subject property is part of PIN 06053-0394 (LT) which was expropriated by the Minister of Housing, Province of Ontario on February 4th, 1974. The compensation provided for the subject property at the time was in the amount of $365,610 (inclusive of the settlement price for the property, compensation for all inconvenience and entitlements and interest).

The property was later transferred to the Ontario Land Corporation and on March 31, 1987 was transferred to Her Majesty the Queen in Right of Ontario as represented by the Minister of Government Service. On May 26th, 2003, the Minister of Municipal Affairs and Housing, successor to the Minister of Housing, approved the sale and disposal of certain lands, including this property, situated within the Rouge Park Lands without giving the owner from whom the land was expropriated the first chance to repurchase the land. This is referred to as a Section 42 Waiver.

The lands were transferred to the TRCA for a nominal sum on March 31, 2004 for the purpose of the establishment of the Rouge Park. In the transfer to TRCA, the Province retained interests in the Lands being: a first right of refusal (right to repurchase) for the Province to reacquire the Lands if the TRCA moved to dispose of the Lands; and, a conservation easement in the Province’s favour.

The Minister of Infrastructure transferred Ontario’s interests in the Lands to Parks Canada for the Rouge National Urban Park effective October 21, 2017. It is understood that the TRCA has entered into agreements with the federal government to contribute the Lands to the federal government at nominal value to the Rouge National Urban Park. When the federal government receives the Lands from the TRCA, the interests that the Province has transferred to the federal government will merge with the ownership.

IO is not aware of any properties expropriated in the Rouge National Urban Park area that have been sold back to the original owners.

9 Item 7.1

City of Toronto Staff This property is designated as Natural Areas in the Official Plan and Open Space in the Zoning By-law.

The property is located within the area subject to the Toronto Official Plan Site and Area Specific Policy 141: Rouge Valley Area. Policy c) states:

To ensure the continued maintenance of the area by public agencies, the division of lands by consent and/or the sale or disposal of will be prohibited, unless; a. The land is being conveyed to TRCA or Parks Canada for parks or conservation purposes; or b. The land is being conveyed to the City, for infrastructure approved by Council, or to the owner of existing or approved infrastructure.

The property is partially located within the Official Plan natural heritage system. If consent is required, Policy 3.4.11 c) would apply: 11. Consents to sever land or approval of plans of subdivision will not be permitted for any parcel of land that is entirely within or part of the natural heritage system, unless: a. The land is being conveyed to the Toronto and Region Conservation Authority or other public agencies; b. The land is within an approved Special Policy Area; or c. The assessment of the impacts to the natural heritage system has been satisfactorily completed.

Section 4.3.8 of the Toronto Official Plan States, “The sale or disposal of publicly owned lands in Parks and Open Space Areas is discouraged and no City owned lands in Parks and Open Space Areas will be sold or disposed of.”

In addition, Rouge Park is designated as Open Space as well as Natural Areas. Section 4.3.3 of the OP states “the areas shown as Natural Areas on Maps 13-23 will be maintained primarily in a natural state, while allowing for:

a) Compatible recreational, cultural and education uses and facilities that minimize adverse impacts on natural feature and functions; and b) Conservation projects, public transit, public works and utilities for which no reasonable alternatives are available, and that are designed to have only minimal adverse impacts on natural features and functions.”

A 3.44m widening is required by the City along the frontage of this property to satisfy the requirement of a 27m wide right-of-way for this section of Pickering/Scarborough Townline.

City staff would strongly discourage the sale of this property as it is a part of Toronto’s Green Space System.

10 Item 7.1

TRCA staff The requested parcel for disposal encompasses a main tributary of the Petticoat Creek valleylands, including a floodplain and an erosion hazard associated with watercourse. The valleylands form part of the natural system and are contiguous with the Provincially Significant Townline Swamp Wetland Complex to the south. A portion of the requested parcel, located south of the existing dwelling and between the valleylands and the road are identified as a cultural meadow.

TRCA is responsible for providing comments of behalf of the Province of Ontario with respect to Natural Hazard and Natural Feature policies contained in the Provincial Policy Statement, 2014 (PPS, 2014). The property is located within an erosion hazard which is considered a natural hazard as defined in the PPS. The proposal seeks to sever the existing parcel in order to create a new lot, with the boundary extending across the Petticoat Creek valleylands. The PPS includes "the creation of a new lot" within its definition of “development.” Section 3.1.2(c) of the PPS provides that development shall not be permitted in lands subject to flooding or an erosion hazard.

The property is also partially within the Natural Heritage System as shown in Map 9 of the City of Toronto’s Official Plan (OP), 2002. Section 2.1.5 and 2.1.8 of the PPS provides that development shall not be permitted within or adjacent to a significant valleylands or significant woodlands unless it has been demonstrated that there will be no negative impacts on the natural features or their ecological function.

TRCA is the City of Toronto’s partner in managing the natural environment. Section 3.4 of the City’s OP provides policies for development within or near natural hazards and lands containing the natural heritage system. The west portion of the requested parcel contains a valley feature. Policy 8 of the City’s OP states that development will be set back at least 10 metres from the top of bank and other locations where slope instability, flooding or physical conditions are present.

The property is within the natural heritage system as shown in Map 9 the OP. The natural heritage system is made up of areas where protecting, restoring and enhancing the natural features and functions should have high priority in our city-building decisions. Policy 11 of the OP states that consents to sever land will not be permitted for any parcel of land that is within or part of the natural heritage system unless the lands are to be conveyed to public ownership and a study has been provided to assess a development’s impact on the system.

The Living City Policies for Planning and Development in the Watersheds of the Toronto and Region Conservation Authority (LCP) guides TRCA’s role as an approval authority under Ontario Regulation 166/06, as amended, and as an advisor to municipalities under the Planning Act with respect to natural heritage and natural hazards. For the latter role, TRCA has a provincially delegated responsibility to uphold the provincial interest in protecting life and property from natural hazards such as flooding and erosion. Because the subject property contains part of the Petticoat Creek valley corridor, the LCP applies to this application.

The LCP describes a “Natural System” as being made up of natural features and areas. Water resources, natural hazards, potential natural cover and/or buffers. The LCP recommends that development not be permitted within the Natural System and that it be conveyed into public ownership for its long term protection and enhancement.

11 Item 7.1

This request for disposal seeks to sever TRCA-owned lands that encompass a flooding hazard, erosion hazard and part of the natural heritage system. The creation of a new lot within the natural heritage system and where natural hazards are present is not permitted under the PPS, City of Toronto OP, or TRCA’s LCP. In addition, the various policy documents encourage the long-term protection and enhancement of the natural heritage system and protect hazard lands through public ownership.

TRCA Legal Counsel Section 42 of the Expropriations Act states: “Where lands that have been expropriated and are in the possession of the expropriating authority are found by the expropriating authority to be no longer required for its purposes, the expropriating authority shall not, without the approval of the approving authority, dispose of the lands without giving the owners from whom the land was taken the first chance to repurchase the lands on the terms of the best offer received by the expropriating authority.”

In the case of 14 Pickering/Scarborough Townline, the Minister of Housing for the Province of Ontario was the expropriating authority. The first few lines of section 42 provides for an obligation to convey if the original expropriated authority is still in possession of the lands subject to certain terms and conditions. Since TRCA was not the original expropriated authority, Section 42 giving the first right to repurchase to the owner from whom the land was first taken would not apply.

Moreover, when TRCA acquired the land in 2004 the expropriating authority had already obtained the waiver under Section 42 giving it the right to convey to TRCA. Accordingly, the provision allowing for conveyance to the former owner which is found in section 42 would also for this reason not be applicable.

For these reasons, TRCA would have no obligation to honour a request for a repurchase.

RATIONALE Staff has reviewed and considered all internal and external comments and is recommending that the land be retained until such time as they are conveyed to Parks Canada for the Rouge Urban National Park, for the following reasons:

 The property was transferred to TRCA by the Province of Ontario on March 31, 2004 for Rouge Park purposes;  The Province of Ontario retained an Option to Purchase/First Right of Refusal over all the lands transferred in 2004 including the subject property which option was transferred to Parks Canada on October 21, 2017 and TRCA must offer the property back to the holder of the Option to Purchase/First Right of Refusal if considering disposal;  The property is included in the Memorandum of Agreement Respecting the Assembly of Lands for the Proposed Rouge National Urban Park and will be transferred to Parks Canada;  The property requested for disposal encompasses a main tributary of the Petticoat Creek, including floodplain and erosion hazard associated with watercourse;  The valleylands form part of the natural system and are contiguous with the Provincially Significant Townline Swamp Wetland Complex to the south;  This property is designated as Natural Areas in the City’s Official Plan and Open Space in the City’s Zoning By-law;

12 Item 7.1

 The creation of a new lot within the natural heritage system and where natural hazards are present is not permitted under the PPS, City of Toronto OP, or TRCA’s LCP.

Report prepared by: Brandon Hester, extension 5767; Mike Fenning, extension 5223 Emails: [email protected], [email protected] For Information contact: Brandon Hester, extension 5767; Mike Fenning, extension 5223 Emails: [email protected], [email protected] Date: November 15, 2017 Attachments: 1

13 Attachment 1

Subject

Property #

TLINE PICKERING

BEARE RD Pe ek tt ico at Cre FINCH AVE

FINCH AVE E

Legend DURHAM SubProperty ject YORK Watercourses PEEL SITE !!!!!! Floodline ^ RegulationLimit F TORONTO TRCAProperty Lake Ontario Parcel AssessmentParcel 0 75 150 300 Meters 14 KeyMap © Queen’s Printer for Ontario and its licensors. [2017] May Not[2017] ©Queen’sbe Reproduced licensors. PrinterOntario forits andNOTwithout THIS ISPLANA Permission. OF SURVEY. Item 7.2

Section I – Items for Authority Action

TO: Chair and Members of the Executive Committee Meeting #10/17, Friday, December 15, 2017

FROM: Mike Fenning, Associate Director, Property and Risk Management

RE: REQUEST FOR DISPOSAL OF TORONTO AND REGION CONSERVATION AUTHORITY LAND 4156 Dundas Street West, Etobicoke, City of Toronto, Humber River Watershed CFN 45819

KEY ISSUE Recommendation that the subject Toronto and Region Conservation Authority-owned land located north of Dundas Street West and east of Prince Edward Drive, municipally known as 4156 Dundas Street West, Etobicoke, in the City of Toronto, Humber River watershed, be retained in TRCA ownership.

RECOMMENDATION

THE EXECUTIVE COMMITTEE RECOMMENDS THAT Toronto and Region Conservation Authority-owned (TRCA) land at 4156 Dundas Street West, Etobicoke, in the City of Toronto, be retained in TRCA ownership at this time;

THAT TRCA staff work with City of Toronto staff to assess the suitability of the subject TRCA land for use as parkland as part of the Dundas Street West Avenue Study and as part of any future redevelopment of surrounding area;

AND FURTHER THAT staff report back to a future Executive Committee meeting on the results of the discussions with City of Toronto staff.

BACKGROUND In November 2010 and March 2011, TRCA was approached by David Rembacz, on behalf of Maria Rembacz, expressing an interest in purchasing a parcel of TRCA land located north of Dundas Street West and east of Prince Edward Drive, municipally known as 4156 Dundas Street West, Etobicoke, in the City of Toronto (the Land). Maria Rembacz is the current owner of the adjoining property at 4158 Dundas Street West.

The Land was conveyed by the Municipality of to TRCA in April, 1967. It is a narrow rectangular parcel with an approximate 12m road frontage to Dundas Street West and is approximately 55m in length. The land is currently managed by the City of Toronto pursuant to the Management Agreement dated June 14, 1961.

The Land is currently used as a driveway and parking lot for the adjacent commercial business. A portion of the land has been developed as a “parkette” with benches and in-ground water features installed by the owner of the adjoining commercial business to the east “Water Arts”. TRCA staff is working with City of Toronto, as manager of the land to resolve the existing encroachments.

The land is burdened by an existing right of way benefiting the western adjoining landowner and an existing sanitary easement to the City of Toronto.

15 Item 7.2

At Executive Committee Meeting #5/11, held on June 10, 2011, Resolution #B96/11 was approved as follows:

THAT the request for disposal of a parcel of land located on the north side of Dundas Street West, east of Prince Edward Drive (vacant land between 4154 and 4158 Dundas Street West), City of Toronto (Etobicoke York Community Council Area) be referred to Toronto and Region Conservation Authority (TRCA) staff for review and discussion in accordance with established TRCA policies;

AND FURTHER THAT a report be brought to the Executive Committee at a future date recommending further action.

Attached is a sketch illustrating the location of the subject land.

This request was circulated to staff at the City of Toronto and TRCA staff for review and comment. In accordance with TRCA policy, the following comments have been received and action taken to date:

TRCA staff Planning and Development staff has confirmed that the land is partially located within TRCA’s Regulated Area of the Humber River watershed. The Humber valley slope in this location is extremely steep and affected by toe erosion and active slope failure in select areas. There is a significant hazard along this reach and a 10m buffer must be applied from the long term stable slope line to any new development along this reach, and the valley corridor including the 10 metre buffer should be retained in public ownership.

Staff indicated that there will likely be some developable area, but given the significant hazard, a complete development limits analysis should be done to determine the extent of the valley corridor and the extent of the land that could be sold. This would best take place through a comprehensive geotechnical slope stability study of the entire reach along Dundas Street. The City has completed an Avenue Study for the area; there is considerable development pressure and it is likely that the portion of the lands outside of the natural hazard can be incorporated into a development scheme at some point in the future.

Preliminary geotechnical investigations undertaken by internal TRCA staff estimate that the long term stable slope crest (LTSSC) would be 23m from the existing top of slope, with a further 10m buffer area.

Attached is a sketch illustrating the top of slope, LTSSC and buffer area.

City of Toronto staff The Land is designated Mixed Use Areas in the Official Plan. The land is also subject to Site and Area Specific Policy No. 277 (SASP 277) which was adopted in 2006 to implement the Dundas Street West Avenue Study. The Dundas Street West portion of the site is identified as an Avenue on Map 2 – Urban Structure of the Official Plan. Avenues are areas where growth and reurbanization are intended to occur.

16 Item 7.2

The land is subject to the former City of Etobicoke Zoning Code, as amended by By-law No. 717-2006 which is the implementing Zoning By-law for SASP 277. The land is zoned General Commercial – Avenues – Holding (CG-AV-H).

The CG-AV-H zone permits a limited range of residential uses, including apartment houses, dwelling units above business or retail uses and live-work units. Townhouses are not permitted on the north side of Dundas Street West and in the first 60 m of depth on the south side of Dundas Street West. Permitted uses include stores, banks, restaurants, hotels, business and professional offices, service stations and public garages, health centres and athletic clubs.

The CG-AV-H zone includes an "H" Holding Symbol that applies to the subject site. The “H” symbol may be removed by the City of Toronto subject to the satisfactory availability of any road, infrastructure, servicing and school capacity improvements necessary to accommodate the proposed development. Upon fulfillment of these criteria, the “H” symbol can be removed, in whole or in part.

In June 2011, City of Toronto was asked to provide any comments about the request to sell the land. The City undertook an internal circulation to ascertain whether there was any objection to the sale of the land. The only comment back by City Planning Staff was:

“We would not have any issues with the proposed sale of this property from a natural heritage point of view. As with any property of this type, any new development would need to be set back 10m from the stable top of bank. A geographical study would be required to establish stable top of bank; a natural impact study may be required.”

In March 2016, the City of Toronto was asked if they had any interest in the potential sale of the land or were interested in purchasing it. The City responded that they had no interest in purchasing the land.

Prior to engaging with the public, the City was again asked in July 2016 to confirm whether they have any interest in the land. The City confirmed that there was no interest in purchasing it.

Following the public consultation process, TRCA staff also spoke directly with the relevant Parks, Forestry and Recreation planner for the Etobicoke York district. The Parks planner indicated that the City’s priority for this area is to provide direct access to the Humber River. However, given the steep slope and existing erosion hazard, there is no interest in purchasing the land. TRCA and City staff will continue to work together to identify ongoing recreational opportunities and assessment of the land as a parkland as part of future redevelopment of the surrounding area.

Public Consultation  TRCA staff met on-site with the adjoining landowners on February 9, 2017 to discuss the disposal process, upcoming Public Information Session and existing encroachments on the property;  Notice of the Public Information Session was distributed during the week of January 30, 2017 to nearby residents via a Canada Post “letterdrop” service;  A dedicated webpage on the TRCA website and email address for comments and questions was created. The webpage provided general information about the property, process for disposal, relevant contact information and invited the public to attend the Public Information Session;

17 Item 7.2

 Notices of the Public Information Session were distributed to the City of Toronto Parks, Forestry and Recreation Department and Councillor Justin Di Ciano and Councillor John Campbell (as the property is located on the ward boundary);  Notices of the Public Information Session were placed in the Etobicoke Guardian and the Toronto Star on February 2, 2017;  A Public Information Session was held on February 16, 2017, at Lambton House, 4066 Old Dundas Street, from 6:00 p.m. to 7:00 p.m.;  An information package was distributed at the Public Information Session and the public was invited to ask questions and provide any comments to TRCA by March 2, 2017. Seven submissions were received by TRCA.

A summary of the submissions received by the public are attached.

RATIONALE Staff has reviewed and considered all public submissions and internal and external technical comments and is recommending that the land be retained at this time for the following reasons:  The land is impacted by geotechnical slope stability concerns with preliminary investigations indicating that over half the land would be in the slope hazard and 10m development buffer, with this portion to be retained in TRCA ownership under The Living City Policies;  At this point, continued ownership by TRCA of the land affected by the slope hazard will ensure the long term protection of the natural features in the area until the LTSSC can be determined; and  Retaining the land will facilitate TRCA staff continuing to work with City of Toronto planning and parks staff to:  identify opportunities for recreation and access to the Humber River;  assess the suitability of the land for use as a parkland as part of the Dundas Street West Avenue Study and as part of any future redevelopment of the surrounding area; and  Retention in the immediate short term as open space/parkette is consistent with the public’s view.

Report prepared by: Nadia Wells, extension 5859, George Leja, extension 5342; Emails: [email protected]; [email protected] For Information contact: Nadia Wells, extension 5859, George Leja, extension 5342; Emails: [email protected]; [email protected] Date: August 11, 2017 Attachments: 3

18 Attachment 1

H

u m b e Subject r R Property iv er

#

ROYAL YORK RD DUNDAS ST W

Legend

DURHAM SubProperty ject YORK Watercourses !!!!!! Floodline PEEL RegulationLimit F TORONTO TRCAProperty SITE ^ Lake Ontario Parcel AssessmentParcel 0 37.5 75 150 Meters 19 KeyMap © Queen’s Printer for Ontario and its licensors. [2017] May Not[2017] ©Queen’sbe Reproduced licensors. PrinterOntario forits andNOTwithout THIS ISPLANA Permission. OF SURVEY.

Attachment 2

20

Attachment 3 - Summary of Public comments

Summary

Does not support the sale of this property:

 There is no pressing reason to sell the land at this time.  There are alternate uses of the property as publicly owned land which should take precedence over sale to a private individual or developer. There is a need for new parkland and recreational land at street level on Dundas Street. The property is suitable for use as parkland.  The property is vacant, and is surrounded by heritage-protected properties. Development would create a barrier to the maintenance of these heritage properties as a unified whole. In addition, sale of this land opens the door to developers’ consolidating land packages in the area and then attempting to overturn the Heritage designations of these properties.  If the TRCA’s decision is to sell the property, a covenant should be attached as a condition of sale, specifying that the land must be used for purposes and in a built form which is in harmony with current heritage properties in the same block.

The property in question is close to a huge development on the RONA lands a little further up the street. This may be the only property that offers a "buffer" to put a check on similar developments. Notwithstanding our close access to the Humber River parklands, PLEASE consider retaining this property on the north side of Dundas Street West to allow for a public area that all of the existing and many future residents in the area can enjoy.

New development that is proceeding in the area, including a new condo development adjacent that will have impacts on natural light. This very small parcel of land is very close and gives access to the Humber River parklands, please consider retaining this property on the north side of Dundas Street West to allow for a public area that all of the existing and many future residents in the area can enjoy. This would a benefit to the existing community.

Any “green space” that can be held back from the inevitable intensive development along this stretch of Dundas St. W. will be a huge plus for city planners. This lot is positioned so that it can become a green break, once the inevitable large developments along this stretch of Dundas take place. As larger houses keep being built in this area (with the smaller ones being demolished), along with the office and condo developments, more and more land is being paved over. We need to preserve as much green space as possible: to soak up water run-off, to help the urban tree canopy (many of the trees in this area are coming to the end of their natural lives), and to provide more bird and wildlife protection. Bird life and wildlife in the area has been markedly diminishing over the past few years. It would be morally wrong for the TRCA to sell it now into private ownership instead of using it for the benefit of the municipality at large.

With a few benches and garden shades or gazebo structures, the empty piece of land is ideal for seniors, to go there and relax any time of the day. There are a couple of retirement homes between the Humber River and Royal York. Seniors, especially with limited mobility problems or in wheelchairs, can't walk long distance to the park beside the river. The City should take over the plot of land.

An owner of adjoining property stated they will be affected by what happens on the lot. Would appreciate being informed of what is going to happen with the property and with the opportunity to purchase it.

21

Does not object to the proposed disposition of the TRCA vacant land and may be interested in purchasing this land if it becomes surplus to the needs of TRCA. Has maintained portions of the property as a park since 1986 at his expense. This maintenance has included snow removal, grass cutting, setting out park benches, and providing additional horticultural vegetation. The neighbourhood considers 4156 Dundas as a local park. If he was to be the successful purchaser, the park like setting would be maintained for a certain period of time. The owners adjoining the 4156 Dundas Street West property should be given consideration during the TRCA process for the sale.

22 Item 7.3

Section I – Items for Authority Action

TO: Chair and Members of the Executive Committee Meeting #10/17, Friday, December 15, 2017

FROM: Mike Fenning, Associate Director, Property and Risk Management

RE: GREENLANDS ACQUISITION PROJECT FOR 2016-2020 Flood Plain and Conservation Component, Humber River Watershed Build Toronto Inc. CFN 55477 ______KEY ISSUE Acquisition of a conservation easement located east of Jane Street and north of St. Clair Avenue West – 200 Rockcliffe Court, in the City of Toronto, Etobicoke York Community Council Area, under the “Greenlands Acquisition Project for 2016-2020,” Flood Plain and Conservation Component, Humber River watershed.

RECOMMENDATION

THE EXECUTIVE COMMITTEE RECOMMENDS THAT a conservation easement for the protection of the 350 year storm flood plain, containing 0.41 hectares (1.01 acres), more or less, of vacant land, located east of Jane Street and north of St. Clair Avenue West – 200 Rockcliffe Court, said land being Part of Lot 37, Concession 3, FTB, designated as Part 28 on a draft Plan of Survey prepared by Rouse Surveyors Inc., under their Reference No. 17-767-02, dated November 14, 2017, in the City of Toronto, Etobicoke York Community Council Area, be purchased from Build Toronto Inc.;

THAT the purchase price be $2.00;

THAT Toronto and Region Conservation Authority (TRCA) acquire the conservation easement free from encumbrance, subject to existing service easements;

THAT the firm Gardiner Roberts LLP, be instructed to complete the transaction at the earliest possible date. All reasonable expenses incurred incidental to the closing for land transfer tax, legal costs, and disbursements are to be paid by TRCA;

AND FURTHER THAT authorized TRCA officials be directed to take the necessary action to finalize the transaction, including obtaining any necessary approvals and the signing and execution of documents.

BACKGROUND Resolution #A161/15 at Authority Meeting #8/15, held on September 25, 2015, approved the Greenlands Acquisition Project for 2016-2020.

Negotiations have been conducted with Mr. Michael Whelan, Vice President, Development, Build Toronto Inc.

Attached is a sketch illustrating the location of the subject lands.

23 Item 7.3

RATIONALE The subject lands fall within TRCA's approved master plan for acquisition for the Humber River watershed as outlined in the approved Greenlands Acquisition Project for 2016-2020. Through the review of Consent Application No. B0092/16EYK for commercial development, TRCA staff established the limits of the conservation easement lands (i.e. Part 1on draft Plan of Survey) which are comprised of the 350-year storm flood plain within the Rockcliffe Special Policy Area (SPA).

The northern portion of the site is located within the 350-year storm flood plain and is unsuitable for development as stipulated in the Rockcliffe SPA policies. The SPA recognizes the existing commercial and residential development within the Regulatory (i.e. Regional Storm) flood plain and allows new development/redevelopment in the area outside the 350 year storm flood plain, subject to new structures being adequately flood proofed to above the Regional Storm flood elevation.

Build Toronto Inc. has obtained consent to sever its land holdings at 200 Rockcliffe Court and is currently in the process of selling the severed lot to a commercial business. As described above, the northern portion of the severed lot is undevelopable and, due to its close proximity to the flood control channel, the area of the 350-year storm must be kept free and clear of obstructions. As part of the conditions of the consent application and prior to the sale of the subject lot, staff requires that Build Toronto Inc. register a conservation easement on title to the subject lands stipulating that:

 No development, parking or outside storage will be permitted within the 350-year storm flood plain;  The 350-year storm area will either be planted with native, low growing shrubs and grasses or seeded/sodded with grass and, in either case, will be maintained in perpetuity by the landowner and all future owners, successors, assigns, etc.;  The 350-year storm area will be kept clean of waste in perpetuity by the landowner and all future owners, successors, assigns, etc.; and  TRCA will have the ability to enter and use the 350-year storm area for inspection and flood control purposes, including any development or infrastructure required for flood control.

TAXES AND MAINTENANCE The lands subject to the conservation easement will be transferred into private ownership. As such, the new owner will be responsible for taxes and maintenance.

FINANCIAL DETAILS Funds for the costs related to this purchase are available in the TRCA land acquisition capital account.

Report prepared by: George Leja, extension 5342, Mike Fenning, extension 5223 Emails: [email protected], [email protected] For Information contact: George, extension 5342, Mike Fenning, extension 5223 Emails: [email protected], [email protected] Date: November 17, 2017 Attachments: 1

24 Attachment 1 ROCKCLIFFE BLVD

ALLIANCE AVE

Black Creek #

ROCKCLIFFE CT Subject Property

JANE ST

ST CLAIR AVE W

Legend

DURHAM SubjectProperty YORK Watercourses !!!!!! Floodline PEEL R egulation Limit Regulation F TORONTO TRCAProperty SITE ^ Lake Ontario Parcel AssParcel ess ment 0 50 100 200 Meters 25 KeyMap © Queen’s Printer for Ontario and its licensors. [2017] MayReproduc beNOT Not[2017] THISISPLANA licensors.Permiss without OFed its SURVEY.and ion. Ontario for ©Queen’s Printer Item 7.4

Section I – Items for Authority Action

TO: Chair and Members of the Executive Committee Meeting #10/17, Friday, December 15, 2017

FROM: Mike Fenning, Associate Director, Property and Risk Management

RE: GREENLANDS ACQUISITION PROJECT FOR 2016-2020 Flood Plain and Conservation Component, Humber River Watershed Pine Valley (FGH) Inc. CFN 58765 ______KEY ISSUE Acquisition of property located south of Regional Road 7 and west of Pine Valley Drive, municipally known as 4603 to 4611 Regional Road 7, in the City of Vaughan, Regional Municipality of York, under the “Greenlands Acquisition Project for 2016-2020,” Flood Plain and Conservation Component, Humber River watershed.

RECOMMENDATION

THE EXECUTIVE COMMITTEE RECOMMENDS THAT 0.7205 hectares (1.78 acres), more or less, of vacant land, located south of Regional Road 7 and west of Pine Valley Drive, said land being Part of Lot 29, Registrar’s Compiled Plan 9831 and Part of Lot 4, Registered Plan 4319, designated as the “Valleyland” block on the draft Plan A101, Site Plan and Statistics, prepared by Graziani Corazza Architects, dated January 19, 2017 municipally known as 4603 to 4611 Regional Road 7, in the City of Vaughan, Regional Municipality of York, be purchased from Pine Valley (FGH) Inc.;

THAT the purchase price be $2.00;

THAT Toronto and Region Conservation Authority (TRCA) receive conveyance of the land free from encumbrance, subject to existing service easements;

THAT the firm Gowling WLG, be instructed to complete the transaction at the earliest possible date. All reasonable expenses incurred incidental to the closing for land transfer tax, legal costs, and disbursements are to be paid by TRCA;

AND FURTHER THAT authorized TRCA officials be directed to take the necessary action to finalize the transaction, including obtaining any necessary approvals and the signing and execution of documents.

BACKGROUND Resolution #A161/15 at Authority Meeting #8/15, held on September 25, 2015, approved the Greenlands Acquisition Project for 2016-2020.

Negotiations have been conducted with Mark McConville, Senior Planner, acting as agent for the owners Pine Valley (FGH) Inc.

Access to the subject lands will be achieved through its frontage off Regional Road 7.

Attached is a sketch illustrating the location of the subject lands.

26 Item 7.4

RATIONALE The subject lands fall within TRCA's approved master plan for acquisition for the Humber River watershed as outlined in the approved Greenlands Acquisition Project for 2016-2020. Through the review of the Official Plan Amendment Application 12.004, Zoning By-law Amendment Application Z.12.010, and Site Plan Application 13.090 for a 14-storey apartment building (residential condominium) and a seven-storey rental apartment for seniors, TRCA staff established the limits of the open space land.

TAXES AND MAINTENANCE Taxes for 2018 have been estimated at $600. Based on TRCA's preliminary review of the environmental criteria for lands that are eligible to receive a property tax exemption under the provincial Conservation Land Tax Incentive Program, it would appear that the subject property will be eligible for a tax exemption. While it is expected that the subject parcel of land will not significantly impact TRCA’s maintenance costs at this location, an assessment of the aggregate acquisitions in the area will be undertaken and the results will be integrated into TRCA’s land management program and associated budgets.

FINANCIAL DETAILS Funds for the costs related to this purchase are available in the TRCA land acquisition capital account.

Report prepared by: Nadia Wells, extension 5859 Emails: [email protected] For Information contact: Nadia Wells, extension 5859, Mike Fenning, extension 5223 Emails: [email protected], [email protected] Date: November 9, 2017 Attachments: 1

27 Attachment 1

k e e r

C

y

e

s

r

e

J

PINE VALLEY DR

REGIONAL RD 7

#

Subject Property

Legend

DURHAM SubProperty ject YORK Watercourses !!!!!! Floodline PEEL SITE RegulationLimit ^ F TORONTO TRCAProperty Lake Ontario Parcel AssessmentParcel 0 37.5 75 150 Meters 28 KeyMap © Queen’s Printer for Ontario and its licensors. [2017] May Not[2017] ©Queen’sbe Reproduced licensors. PrinterOntario forits andNOTwithout THIS ISPLANA Permission. OF SURVEY. Item 7.5

Section I – Items for Authority Action

TO: Chair and Members of the Executive Committee Meeting #10/17, Friday, December 15, 2017

FROM: Mike Fenning, Associate Director, Property and Risk Management

RE: GREENLANDS ACQUISITION PROJECT FOR 2016-2020 Flood Plain and Conservation Component, Humber River Watershed 4208-4214 Dundas Street West (VI) Ltd. CFN 58842 ______KEY ISSUE Acquisition of property located north of Dundas Street West and east of , municipally known as 4208-4214 Dundas Street West, in the City of Toronto, under the “Greenlands Acquisition Project for 2016-2020,” Flood Plain and Conservation Component, Humber River watershed.

RECOMMENDATION

THE EXECUTIVE COMMITTEE RECOMMENDS THAT 0.3650 hectares (0.9109 acres), more or less, of vacant land, located north of Dundas Street West and east of Royal York Road, said land being Part of Lot 94, 95 and William Street, Registered Plan 234 and Part of Lot 10, Concession C, Fronting the Humber designated as Parts 7, 8, 9, 10 and 11 on draft Registered Plan, Drawing No. 10-313RP02 prepared by Krcmar dated August 2017, municipally known as 4208 to 4214 Dundas Street West, in the City of Toronto, be purchased from 4208-4214 Dundas Street West (VI) Ltd.;

THAT the purchase price be $2.00;

THAT Toronto and Region Conservation Authority (TRCA) receive conveyance of the land free from encumbrance, subject to existing service easements;

THAT the firm Gowling WLG, be instructed to complete the transaction at the earliest possible date. All reasonable expenses incurred incidental to the closing for land transfer tax, legal costs, and disbursements are to be paid by TRCA;

AND FURTHER THAT authorized TRCA officials be directed to take the necessary action to finalize the transaction, including obtaining any necessary approvals and the signing and execution of documents.

BACKGROUND Resolution #A161/15 at Authority Meeting #8/15, held on September 25, 2015, approved the Greenlands Acquisition Project for 2016-2020.

Negotiations have been conducted with Steven Barr, Development Manager, acting as agent for the owners 4208-4214 Dundas Street West (VI) Ltd.

Access to the subject lands will be achieved via an access easement through the development site.

29 Item 7.5

Attached is a sketch illustrating the location of the subject lands.

RATIONALE The subject lands fall within TRCA's approved master plan for acquisition for the Humber River watershed as outlined in the approved Greenlands Acquisition Project for 2016-2020. Through the review of the Official Plan Amendment Application and Zoning By-law Amendment Application Reference No. 14 183631 WET 04 OZ for an eight-storey mixed use building, three-storey stacked townhouses and 21-storey residential apartment building, TRCA staff established the limits of the open space land.

TAXES AND MAINTENANCE This parcel of land will be turned over to the City of Toronto under the terms of the existing management agreement.

FINANCIAL DETAILS Funds for the costs related to this purchase are available in the TRCA land acquisition capital account.

Report prepared by: Nadia Wells, extension 5859 Emails: [email protected] For Information contact: Nadia Wells, extension 5859, Mike Fenning, extension 5223 Emails: [email protected], [email protected] Date: November 9, 2017 Attachments: 1

30 Attachment 1

H

u m b e r R iv er

# Subject Property

ROYAL YORK RD

DUNDAS ST W

Legend

DURHAM SubProperty ject YORK Watercourses !!!!!! Floodline PEEL RegulationLimit F TORONTO TRCAProperty SITE ^ Lake Ontario Parcel AssessmentParcel 0 37.5 75 150 Meters 31 KeyMap © Queen’s Printer for Ontario and its licensors. [2017] May Not[2017] ©Queen’sbe Reproduced licensors. PrinterOntario forits andNOTwithout THIS ISPLANA Permission. OF SURVEY. Item 7.6

Section I – Items for Authority Action

TO: Chair and Members of the Executive Committee Meeting #10/17, Friday, December 15, 2017

FROM: Mike Fenning, Associate Director, Property and Risk Management

RE: ROOF AND EAVES TROUGH REPLACEMENTS FOR ROUGE PARK RESIDENTIAL RENTAL PORTFOLIO ______KEY ISSUE Award of Contract #10005456 for Roof and Eaves Trough Replacement for nine locations within TRCA’s Rouge Park residential portfolio located in the cities of Toronto and Markham.

RECOMMENDATION

THAT Contract #10005456 for Roof and Eaves Trough Replacement for nine locations within Toronto and Region Conservation Authority’s (TRCA’s) Rouge Park residential rental portfolio in the cities of Toronto and Markham be awarded to Tony K. Roofing Inc. for a total cost not to exceed $131,640, plus 20% contingency to be expended as authorized by TRCA staff, plus HST;

AND FURTHER THAT authorized staff be directed to take the necessary action to implement the contract including the signing and execution of documents.

BACKGROUND It is TRCA’s continuing objective to regularly assess the ongoing operational and capital investment requirements to maintain the dwellings within its residential portfolio as per the standards of the Residential Tenancy’s Act and applicable regulations.

Roof and/or eaves trough replacement is required at 13 locations within the Rouge Park residential rental portfolio, as the roofs and/or eaves trough, have deteriorated sufficiently and warrant their replacement in order to avoid additional interior and exterior structural damages. Seven of these 13 locations are historically designated.

It is to be noted that the locations included in RFT #10005456 are anticipated to be transferred to Parks Canada in 2018.

RATIONALE RFT #10005456 was publically advertised on Biddingo (www.biddingo.com) and bids were received from three contractors: Tony K. Roofing Inc., Eileen Roofing Inc. and AAA Roofmaster Ltd. The RFT documentation requested each of the locations to be priced separately. Bids received were opened by TRCA staff (Nick Tanczos, Lisa Moore, Judith Reda and Lori Colussi) on September 8, 2017 with the following results:

32 Item 7.6

Site (* represents Tony K. Roofing AAA Roofmaster Eileen Roofing Contract historically Inc. Ltd. Inc. Recommended for significant dwelling) (Plus HST) (Plus HST) (Plus HST) Award *19 Beare Road, Scarborough $50,000 $48,660 $52,850 Tony K. Roofing Inc. Cedar Shake Option 1 *19 Beare Road, Scarborough This option not being $28,900 $25,233 $26,970 Conventional Shingle awarded Material Option 2 *7551 Reesor Road, $10,500 $10,721 $11,200 Tony K. Roofing Inc. Markham 7607 Reesor Road, $6,580 $7,129 $6,800 Tony K. Roofing Inc. Markham 7659 Reesor Road, $6,460 $6,992 $7,560 Tony K. Roofing Inc. Markham 7733 14th Avenue, $20,980 $23,360 $21,830 Tony K. Roofing Inc. Markham *7914 14th Avenue, $3,640 $3,792 $4,220 Tony K. Roofing Inc. Markham *20 Beare Road, $5,100 $5,850 $5,350 Tony K. Roofing Inc. Scarborough 1201 Sewells Road, $14,400 $15,300 $13,780 Tony K. Roofing Inc. Scarborough 1203 Sewells Road, $13,980 $14,629 $15,250 Tony K. Roofing Inc. Scarborough 9183 Reesor Road, AAA Roofmaster $25,900 $23,475 $24,710 Markham Ltd. *7273 14th Avenue, AAA Roofmaster $17,580 $17,375 $16,150 Markham Ltd. *9035 Reesor Road, AAA Roofmaster $4,850 $4,650 $4,450 Markham Ltd. *9 Reesor Road, No bid $96,395 $96,750 Not being awarded Scarborough

TRCA staff is recommending that Eileen Roofing Inc. not be awarded work under RFT #10005456 as there are current ongoing performance and deficiency issues still being addressed for a previously awarded project for roof and eaves trough replacement under Contract #10002463. TRCA staff has yet to undertake final inspection and be satisfied with the work completed, and to determine whether any further action is necessary in order to appropriately resolve the project.

The residence at 19 Beare Road, Scarborough is an historically designated building, currently being rented by Parks Canada for their staff use. This location has a mix of both cedar shake shingles and conventional shingles. Contractors were asked to provide quotes on two options: i) conventional roofing material; ii) cedar shake roofing material. Given this location’s impending transfer to Parks Canada, Parks Canada has requested the roof replacement be completed using cedar shake roofing material and by a contractor experienced in using these materials.

33 Item 7.6

The Federal Heritage Building Review Office (FHBRO), a division of the federal government, is currently reviewing this building as they believe it may meet their heritage requirements, and therefore have requested the cedar shake option. As Tony K. Roofing Inc. has recently completed roof repair work at 19 Beare Road, Scarborough, to the satisfaction of both TRCA and Parks Canada, it is recommended that Tony K. Roofing Inc. be awarded the roof replacement work for 19 Beare Road, Scarborough. Tony K. Roofing has carried out numerous repairs for the TRCA. They have demonstrated excellent workmanship. Parks Canada has confirmed that Tony K. Roofing Inc.’s experience with cedar shake roofing, as well as the materials that will be used, meet their FHBRO requirements. Parks Canada will be reimbursing TRCA for the cost of this work as per the Interim Management Agreement (IMA), and are aware of Tony K. Roofing Inc.’s bid price.

Under RFT #10005456, it is being recommended for approval by the CEO that roof and eaves trough replacement for three locations within TRCA’s Rouge Park residential rental portfolio be awarded to AAA Roofmaster Ltd. for a total cost not to exceed $45,500, plus 20% contingency to be expended as authorized by TRCA staff, plus HST, as per the approval limits of TRCA’s Purchasing Policy, as AAA Roofmaster Ltd. is the lowest bidder for these locations. The three locations are 9183 Reesor Road, 7273 14th Avenue, and 9035 Reesor Road, in the City of Markham.

The slate roof replacement at 9 Reesor Road, Scarborough, will not be awarded at this time given the high bid results for this residence, and budgetary constraints.

Based on bids received, staff recommends that for nine of the locations referenced in Contract #1005456 for Roof and Eaves Trough Replacement, be awarded to Tony K. Roofing Inc.

FINANCIAL DETAILS Park’s Canada will reimburse TRCA for all expenses incurred for the roof replacement at 19 Beare Road, Scarborough, as per the IMA. Funding for the remaining Rouge Park Residential Portfolio is provided primarily through rental income.

Report prepared by: Lisa Valente, extension 5297 Emails: [email protected] For Information contact: Lori Colussi, extension 5303 Emails: [email protected] Date: November 17, 2017

34 Item 7.7

Section I – Items for Authority Action

TO: Chair and Members of the Executive Committee Meeting #10/17, Friday, December 15, 2017

FROM: Carolyn Woodland, Senior Director, Planning, Greenspace and Communications

RE: LAKE WILCOX SPECIAL POLICY AREA Comprehensive Policy and Boundary Update, Town of Richmond Hill ______KEY ISSUE The Town of Richmond Hill is updating the policies and boundary of the Lake Wilcox Special Policy Area based upon a comprehensive flood risk management and planning analysis in accordance with provincial guidelines. The Authority is requested to endorse the proposed Official Plan Amendment and Zoning By-law Amendment that will implement the updated Special Policy Area policies and boundary.

RECOMMENDATION

THE EXECUTIVE COMMITTEE RECOMMENDS THAT WHEREAS the Town of Richmond Hill, in collaboration with Toronto and Region Conservation Authority (TRCA), has undertaken a comprehensive review to update the policies and boundary of the Lake Wilcox Special Policy Area (SPA) in accordance with provincial guidelines for amending the policies and boundaries of existing SPAs;

AND WHEREAS the Town of Richmond Hill has proposed amendments to the policies and mapping in their Official Plan and Zoning By-law associated with the Lake Wilcox SPA, based upon this comprehensive review;

AND WHEREAS TRCA staff has reviewed the proposed amendments and support the updates as proposed;

THEREFORE LET IT BE RESOLVED THAT the Authority endorse the request of the Town of Richmond Hill to update the policies and boundary of the Lake Wilcox Special Policy Area through an Official Plan Amendment (OPA) and Zoning By-law Amendment for approval;

AND FURTHER THAT the Town of Richmond Hill, the Region of York, the Ministry of Municipal Affairs and the Ministry of Natural Resources and Forestry be so advised by the CEO’s Office.

BACKGROUND A “Special Policy Area” designation is a planning mechanism provided by the Province of Ontario to recognize the unique circumstances of historic communities that existed within flood vulnerable areas prior to the implementation of a provincial flood hazard planning policy and where it has been demonstrated that the application of other provincial flood hazard planning management approaches (One Zone or Two Zone) would not allow for the continued social and economic viability and revitalization of these areas. New SPAs and any amendments to the policies, land use designations or boundaries of existing SPAs must be approved by both the Minister of Municipal Affairs and the Minister of Natural Resources and Forestry because they allow for reductions to provincially prescribed floodproofing standards within these areas, where this is

35 Item 7.7 deemed appropriate. As stated in the Provincial Policy Statement (PPS), SPAs are not intended to allow for new or intensified development, if a community has feasible opportunities for development outside the flood plain.

The proposal for a new SPA or modifications to the boundaries or policies of an existing provincially approved SPA may only be initiated by lower-tier or single-tier municipalities as the proponent. Such proposals must be undertaken in accordance with the Ministry of Natural Resources and Forestry Technical Guide, Appendix 5 – River and Stream Systems: Flooding Hazard Limit, “Procedures for Approval of New Special Policy Areas (SPAs) and Modifications to Existing SPAs Under the Provincial Policy Statement, 2005 (PPS, 2005), Policy 3.1.3 – Natural Hazards – Special Policy Area, dated January 2009”. The policies and boundaries of an SPA are determined through a consultative process between the municipality, TRCA, Ministry of Municipal Affairs (MMA) and the Ministry of Natural Resources and Forestry (MNRF), to the SPA policies and mapping in a municipality’s Official Plan and Zoning By-law. These site specific SPA policies are used by TRCA staff to inform the standards applied within these areas through TRCA’s regulatory permitting responsibilities under Section 28(1) of the Conservation Authorities Act.

The existing Lake Wilcox SPA is located within the Humber River watershed on the north side of Lake Wilcox and west of , on the north and south sides of King Road (Attachment 1). The policies and boundary of the existing Lake Wilcox SPA were approved by an Order of the Ontario Municipal Board (OMB) respecting OPA 129 (the former North Urban Area Secondary) on July 10, 1995.

On July 12, 2010, the Town of Richmond Hill Council adopted a new Official Plan (OP). The OP included direction to undertake a review of the Lake Wilcox SPA in order to update the existing policies and mapping. The OP contains SPA policies (Section 3.2.2.4) which were largely carried forward from OPA 129, with minor modifications to be consistent with the PPS, 2005. The recommendations of this report are based on the outcome of the comprehensive SPA policy and boundary review process that has now been completed.

RATIONALE The proposed policy and boundary modifications to the Lake Wilcox SPA reflect a collaborative and consultative effort between staff from the Town of Richmond Hill, TRCA (policy, planning and engineering staff), MMA and MNRF. This process was undertaken to ensure consistency with the PPS, 2014 and informed by updated flood plain mapping for the area. The provincial approval procedures require an endorsement of the proposed updated SPA policies and boundary by Town Council as part of the Town’s final submission package to the Province of Ontario. A similar endorsement from the Authority is also required. On October 10, 2017, Town Council approved in principle the Draft Official Plan Amendment and Draft Zoning By-law Amendment as detailed in the staff report to the Committee of the Whole held on October 2, 2017 (Link to Staff Report).

Flood Risk within the Lake Wilcox SPA A fundamental element of the comprehensive SPA review was to update the boundary of the SPA based upon current flood plain mapping. Flood plain mapping for the East Humber River area was updated in 2014 in accordance with the methodology and specifications for regulatory mapping prescribed by the Ministry of Natural Resources and Forestry (Technical Guide-River and Stream Systems: Flooding Hazard Limit, 2002).

36 Item 7.7

TRCA prepared a series of maps to illustrate the current technical flood plain information to inform and assist the Town with the risk analysis, land use and emergency management components of the SPA review. This included maps illustrating flood depths and velocities for both the Regulatory (Regional/) Flood event and the 1:350 year storm. Modelling shows that flood depths during a Regulatory Flood will range from 0 to 3 metres, with the majority of the SPA experiencing1 to 2 metres depth of flooding near the shoreline of Lake Wilcox. Under the 1:350 year storm (more frequent), flood depths are for the most part within the 0 to 2 metre range, with depths up to 3 metres noted within the valley system upstream (east) of Yonge Street.

In addition, TRCA generated a Regional Risk analysis map (Attachment 2) in accordance with criteria set by MNRF to identify areas within the SPA where flood depths and velocities would be considered low risk (safe for vehicular and pedestrian access/egress); medium risk (safe for pedestrian access/egress only); and high risk (potentially unsafe for both). The risk assessment determined that the majority of the SPA is within the high risk area. As the velocities of flood waters in a Regional storm event in the SPA are generally low, the risk criterion is exceeded on the basis of depth of flooding.

Flood Mitigation Options As part of the SPA review, Burnside Consulting was retained by TRCA and the Town of Richmond Hill to investigate alternatives for reducing or eliminating the flood vulnerabilities in the SPA. The study looked at the mechanisms of flooding that govern the flood limits within the Lake Wilcox area. Where distinct causes were identified, potential opportunities to reduce the aggregate flood risk within the SPA were identified, and the benefits and costs of such alternatives assessed in a preliminary manner. The study concluded the primary influence on the flood levels within the SPA is a result of the relatively flat topographic profile of the area downstream of Lake Wilcox in combination with the culvert at Yonge Street into which the Lake Wilcox outlet channel discharges. During the Regulatory storm event, the culvert does not have sufficient capacity to convey the Regulatory flows downstream, resulting in floodwaters building up in the valley/flood plain behind Yonge Street. Flood depths on the upstream (east) side of Yonge Street eventually reach a level that allows water to flow over and across Yonge Street, and into the East Humber River on the downstream (west) side of Yonge Street.

A number of alternatives for remediation or elimination of flood risk within the SPA were identified, all centered on improvements to the capacity of the crossing at Yonge Street (e.g. box culverts, clear-span bridge). None of the alternatives investigated had the ability to remove all vulnerable structures from the flood plain, as the relatively flat topography within the overland areas in the SPA promotes a wide, shallow flood plain under expected flow conditions. It would require major engineering works, including regrading of the shoreline of the lake to eliminate the wide shallow flood plain that exists. Ultimately, the major engineering works required, and their associated costs, would not result in the removal of all vulnerable structures from the flood plain.

Emergency Management Emergency management and planning plays an important role in minimizing the risk to public health, safety and property damage within the Lake Wilcox SPA. The Town of Richmond Hill and TRCA work closely together to ensure that the most current flood risk information is shared to facilitate the coordination of flood forecasting and emergency planning. TRCA operates a Flood Forecasting and Warning System that monitors watershed and weather conditions daily in order to issue timely warning of anticipated or actual flood conditions. Conditions during a flood event are closely monitored by TRCA and communicated to the municipality. As with all emergencies, municipalities have the primary responsibility for the welfare of residents and incorporate flood emergency response into municipal emergency planning.

37 Item 7.7

In addressing the provincial SPA guidelines, the Town’s emergency management policies and procedures, as outlined in Richmond Hill’s Emergency Plan, were reviewed with the Town’s Fire and Emergency Management staff and included in the SPA Justification Report to demonstrate how the Fire and Emergency Services group would be deployed in an emergency situation, including a potential flood event.

Special Policy Area Planning Justification A comprehensive policy and land use planning analysis was undertaken in accordance with the requirements of the provincial SPA guidelines. The findings of the technical analysis (flood plain characterization, analysis of risk, flood plain remediation assessment and assessment of emergency management) and the land use planning analysis (policy context, assessment of existing conditions and land use vision established by the 2010 Official Plan) established the basis for the recommended boundary revisions and policy modifications for the Lake Wilcox SPA.

Planning principles were developed to guide the SPA boundary revisions. Generally speaking, principles for removing lands from the existing SPA included: the removal/or reduction in the flood plain area based on the updated mapping; lands designated as part of the Greenway System (as defined by the OP 2010); and potential for expansion of existing uses outside of the flood plain. Principles for adding lands to the SPA included: the expansion of the flood plain; the location of lands within various categories of risk as defined by the major storm event; and the impact to the viability/continuation of existing uses in light of the PPS, 2014 policies for natural hazard lands. The proposed SPA boundary resulting from this review process includes the existing residential development on the north side of Lake Wilcox as identified in the attachments to this report.

The Town has prepared a draft Official Plan Amendment (OPA) and draft Zoning By-law Amendment (ZBA) to be consistent with current provincial legislation and implement the outcome of the comprehensive SPA review. The following is a summary of changes:  the OP’s Natural Hazard (3.2.2.3) and Special Policy Area (Section 3.2.2.4) policies have been modified to reflect the policy language of the PPS, 2014;  clarification that modifications to SPA boundaries, land use designations and/or policies require the approval of the Ministers of MMA and MNRF;  clarification on the range of permitted and prohibited uses, technical/floodproofing standards and safe access/egress requirements;  residential use permissions for SPA lands within the “Neighbourhood” designation will be limited to single detached dwellings;  continuation of policy from OP 2010 that prohibits new lot creation within natural hazard lands, including the SPA;  amending the Zoning By-law with a “Special Policy Area” overlay to implement updated regulatory standards associated with the SPA; and  prohibiting secondary suites within the SPA as a measure to minimize the risk to life and property.

The comprehensive SPA review was subject to a public/landowner consultation process as per the requirements of the provincial SPA guidelines and as prescribed under the Planning Act. TRCA staff is satisfied that the Draft OPA and ZBA capture TRCA’s planning and regulatory interests, roles and responsibilities for development within the SPA. Staff recommends that draft amendments be supported.

38 Item 7.7

DETAILS OF WORK TO BE DONE The following is a summary of the concluding steps in the process to update the Lake Wilcox SPA boundary and policies, in accordance with the provincial guidelines:  Town Council approval in principle of the Draft Official Plan Amendment and Draft Zoning By-law Amendment (October 10, 2017);  TRCA resolution of endorsement of the Draft OPA and ZBA;  Region of York resolution of endorsement of the Draft OPA and ZBA;  Council, TRCA and York resolutions forwarded to MMA and MNRF;  Submission of final/formal documentation to the Province for approval;  Ministers of MMA and MNRF issue a decision;  Town Council adopts the OPA and enacts ZBA and, with respect to the OPA, approval by the Region of York.

FINANCIAL DETAILS Funding for the flood plain modelling was provided by the Region of York under account 127-90 and funding was provided by the Town of Richmond Hill for the flood plain mapping. Funding to support policy and planning input and GIS services for mapping products was provided by the Region of York under accounts 120-12 and 120-19.

CONCLUSION The Town of Richmond Hill, in collaboration with TRCA, has undertaken a comprehensive review of the Lake Wilcox Special Policy Area in accordance with provincial guidelines for amending the policies and boundaries of existing SPAs. The SPA Planning Justification is based upon a flood risk assessment using the most current flood plain management information for the East Humber River to inform land use and emergency planning. The development of the Town’s submission, including the SPA Justification Report, Draft OPA and ZBA, has been subject to extensive discussions with MMA and MNRF staff to ensure that their comments have been addressed. On this basis, TRCA staff recommends that the Authority support the proposed updates to the Lake Wilcox SPA boundary and policies as outlined in this report in order to advance to the next steps of the Provincial approval process.

Report prepared by: Laurie Nelson, extension 5281; Quentin Hanchard, extension 5324 Emails: [email protected], [email protected] For Information contact: Laurie Nelson, extension 5281; Quentin Hanchard, extension 5324 Emails: [email protected], [email protected] Date: November 23, 2017 Attachments: 2

39 Attachment 1

L

O

R

R D

I R REGATTA AVE CAPELLE D ALOE AVE

S G TARO ST

N E CRT

O ALYSSUM E

S V

O B T R

A A C YS D WATER CRT AVE M I D

R O

ELM GROVE AVE O D

W O

D O

B

L

I W FERGUS AVE CRES A

R Y W KAITLIN DR MORAY AVE D MARYLEBONE V

D I

E L G R W E E I E F N A ST H MEADOW CRES Y O R K V S E A

E

V

SUNDERLAND

MAPLE GROVE AVE A

N LAKE RD K

N

A

B

OLDE BAYVIEW AVE

W

O

L WENDY WAY WENDY

S L I C H W PENNY PL O M

PARKER AVE PARKER WESTLEA AVE B E LAKELAND CRES R AUBREY AVE G S

R E GEORGE ST D R

C

GATE GATE SYLVAN

PADDLE

LAUNCH

CANOE CRT

ST SHAVER KING RD B O S

T YONGE ST W IC K C R E S

B O S

T CRES W D I R

C HEADWATER K DOUGLAS RD K

C R

R A E VANE P S K BOND CRES

JACINTA LAKE AVE

DUNN DR DUNN CRT TIMBER VALLEY AVE

SUNSET BEACH RD E N

A L ESTATE GARDEN DR K

R

ANTIQUE DR A P

R

D CRES R I C H M O N D H I L L W CAROUSEL PARK CRES E SNOWY MEADOW AVE I

OAK O YV L ST D S A C H O E B S L N O I N R

Y L O

R C

R D G BAYVIEW AVE

U O N

T E H

N COLONIAL CRES R

A E

C V

N CRES L

I BEL

LACONA E

CRES S CANTO B ANDBANKS DR

Legend: Flood Line (2014) Flood Plain (2006) Toronto and Region Conservation Authority Flood Line (2006) Current SPA Boundary Special Policy Area - Lake Wilcox Flood Line (1977) Proposed SPA Boundary

Attachment 1 Regional Floodline with SPA Boundary 0 150 300 600 Metres February 2015 40 Attachment 2

LORRIDGE

D ST R REGATTA AVE CAPELLE S ALOE AVE N ST

O TARO E

O

ALYSSUM V

CRT C A BAYSW ATER AVE CRT D

O ELM GROVE AVE O R W

D

D

L

M I E

I

V

R W FERGUS AVE CRES R D KAITLIN DR A MORAYAVE

MARYLEBONE D D W

O

L E

O

E G I

I R V

F W E E Y Y O R K H N

ST S MEADOW CRES A

A B

E

V MAPLE GROVE AVE SUNDERLAND A

N LAKE RD K

N

A

B

OLDE BAYVIEW AVE

W

O

L WENDY WAY WENDY

S L I C H W PENNY PL O M

PARKER AVE PARKER WESTLEAAVE B E LAKELAND CRES R AUBREY AVE G S

R E GEORGE ST D R

C

GATE GATE SYLVAN

PADDLE

LAUNCH CANOE CRT

YONGE ST

ST SHAVER KING RD B O STW

IC K C R E S

B O S

T CRES W D

I R

C HEADWATER K DOUGLAS RD K

C R

R A E VAN P S EK BOND CRES

JACINTA LAKE AVE

DUNN DUNN DR CRT TIMBER VALLEY AVE

SUNSET BEACH RD E N

Product of Depth and Velocity > 0.37 m sq/s or Depth > 0.8m or VelocityA > 1.7 m/s High L

ESTATE GARDEN DR K

R

A ANTIQUE DR R P D High Area Inaccessible During Times of Flooding CAROUSELCRES K PARK CRES W A E I

S O SNOWY MEA VE T S DOW A V

E

S A

H Y

R N O A S L N

C RD I C H M O N D H I L L I Pedestrian Access/Egress ONLY Available (Product Depth and Velocity <0.37 m sq/s, C D B ModerateO O L L B O

O R O N G Depth < 0.8m and Velocity < 1.7 m/s) A Y T T BAYVIEW AVE U R N N N

D N H E S K A

A R

E S C

C COLONIAL CRES E R Low Vehicular and Pedestrian Access/Egress is Available (depth <0.3m) L V L D C

E E N R CRES SANDBANKS I B B LACONA DR

Toronto and Region Conservation Authority Legend Special Policy Area - Lake Wilcox Regional Flood Line (2014) Current SPA Boundary Proposed SPA Boundary

Regional Event - Low, Moderate and High Risk Conditions 0 150 300 600 Metres September 2016 41 Item 7.8

Section I – Items for Authority Action

TO: Chair and Members of the Executive Committee Meeting #10/17, Friday, December 15, 2017

FROM: Nick Saccone, Senior Director, Restoration and Infrastructure

RE: EAST DON TRAIL CONSTRUCTION PROJECT – PHASE 1 AND PHASE 2 Design-Build Request for Proposal #10005933 – Phase 1 and Design-Build Request for Proposal #10006438 – Phase 2 ______KEY ISSUE Award of Contract #10005933 and Contract #10006438 for engineering and construction services in support of Phase 1 and Phase 2 of the East Don Trail Project, in the City of Toronto.

RECOMMENDATION

THAT Contract #10005933 for engineering and construction services in support of Phase 1 of the East Don Trail Construction Project, in the City of Toronto, be awarded to Metric Contracting Services Corporation at a total cost not to exceed $9,949,934.01, plus HST, as they are the lowest bidder that best meets Toronto and Region Conservation Authority (TRCA) specifications;

THAT Contract #10006438 for the engineering and construction services in support of Phase 2 of the East Don Trail Construction Project, in the City of Toronto, be awarded to Metric Contracting Services Corporation at a total cost not to exceed $9,797,493.62, plus HST, as they are the lowest bidder that best meets TRCA specifications;

THAT TRCA staff be authorized to approve additional expenditures to a maximum of 15% of the contract cost for each contract as a contingency allowance if deemed necessary;

THAT should staff be unable to execute an acceptable contract with the awarded contractor, staff be authorized to enter into and conclude contract negotiations with the other contractors that submitted tenders, beginning with the next lowest bidder meeting TRCA specifications;

AND FURTHER THAT authorized TRCA officials be directed to take any action necessary to implement the contract including obtaining any required approvals and the signing and execution of documents.

BACKGROUND The East Don Trail Project is being completed by the City of Toronto in partnership with TRCA and in coordination with the City’s consultant, Aquafor Beech Ltd. The purpose of the East Don Trail Project is to create a key connection in the City of Toronto’s multi-use trail system while providing safe and equitable access to nature and recreational opportunities for the public, and to create a safe travel route. A significant gap in the multi-use trail network currently exists within the East Don Corridor between the existing East Don Trail (east of Wynford Heights Crescent), the future Meadoway trail (at approximately Bermondsey Road), and the Lower Don Trail System. The proposed East Don Trail will fill this gap, creating a continuous connected trail network. In addition, a section of the East Don Trail will realize one of the strategic connections of the Pan Am

42 Item 7.8

Path, a multi-use path connecting Toronto trails and creating an active-living legacy for the TORONTO 2015 Pan Am/Parapan Am Games.

The City of Toronto’s Bikeway Trails Implementation Plan identified the need for a trail connection in the East Don Corridor, while the East Don Trail Master Plan Update, completed in 2012, determined that the trail connection was feasible and recommended that further environmental studies were necessary.

The Bikeway Trails Implementation Plan was approved by City Council on June 6, 2012 with the following direction:  City Council authorize the Acting General Manager, Transportation Services, the General Manger, Parks, Forestry and Recreation and, where appropriate, TRCA, to undertake and manage any Environmental Assessment studies required for the new trail connections contained in the Bikeway Trails Implementation Plan and file the Environmental Study Report with the Ministry of the Environment and Climate Change as necessary; and  City Council authorized the Acting General Manger, Transportation Services, and General Manger Parks, Forestry and Recreation and, where appropriate, TRCA to undertake site assessments, design, public consultation, project management and construction of the new trail connections contained in the Bikeway Trails Implementation Plan.

At Authority Meeting #5/12, held on June 22, 2012, Resolution #A98/12 was approved for TRCA to undertake the Environmental Assessment (EA), as well as, the management of the design and construction of the East Don Trail. After consultation with the Ministry of the Environment and Climate Change (MOECC), the City of Toronto and TRCA initiated the East Don Trail Municipal Class Schedule C EA in 2013. Through extensive public consultation, the EA identified, evaluated and selected a preferred route for the East Don Trail. The Environmental Study Report for the EA was filed with MOECC for a 30-day public review period and was subsequently approved in November 2017.

The recommended solution (preferred trail route), as documented in the Environmental Study Report, is a 3.6 to 4 metre-wide by approximately 5 kilometres long, asphalt multi-use trail routed within the East Don Corridor (not including access routes). The route includes nine bridges over the East Don River, one over Taylor Massey Creek (constructed by City of Toronto) and two over drainage tributaries, as well as five crossings of the Metrolinx railway corridor.

The preferred trail route has been divided into three distinct phases for detailed design and construction, with Phases 1 and 2 being prioritized. Phase 1 spans from the Lower Don Trail to the future Meadoway at Bermondsey Road, while Phase 2 spans from the existing East Don Trail off Wynford Heights to . Phase 3 will span from approximately Eglinton Avenue to connect to Phase 1, and has been deferred to a later date.

Attachment 1 is a map illustrating the location of Phase 1, Phase 2 and Phase 3, respectively.

Phase 1 and 2 of the East Don Trail project has been identified as one of the initiatives that will be funded under the federal Public Transit Infrastructure Fund (PTIF), covering up to 50 per cent of the design and implementation. Announced in the 2016 Federal Budget, PTIF provides short-term funding to help accelerate municipal infrastructure investments over a 10 year period.

43 Item 7.8

Based on staff expertise, familiarity with the project, and responsibility for ownership of some of the lands located in the study area, TRCA has been requested to lead the implementation of the East Don Trail, in collaboration with the City of Toronto, Transportation Services and Parks, Forestry and Recreation staff.

The scope of work for Phase 1 and Phase 2 consists of the construction of approximately 5.4 kilometres of multiuse asphalt trail including:  Site preparation and removals;  Erosion and sediment control (ESC) and dewatering measures;  Installation of nine temporary bridge crossings;  Two at grade level crossings over the Metrolinx GO Line;  Design-Build of nine permanent corten steel pedestrian bridges;  Design-Build of three permanent corten steel boardwalks;  Asphalt trail construction including line painting;  Drainage control and channel works;  Bank stabilization works;  Signage;  Resting areas and entry nodes; and  Site restoration.

RATIONALE Request for Pre-Qualification (RFPQ) statements for general contractors to provide engineering and construction services for the East Don Trail Construction Project was publicly advertised on the electronic procurement website Biddingo (www.biddingo.com) on May 31, 2017. General contractors interested in pre-qualifying were advised that the criteria for evaluation would include the following in order to receive a tender package:  Completeness of submission;  Past experience with multi-use trail (asphalt) construction within Environmentally Sensitive Areas;  Design-Build of pedestrian bridges over river networks;  Installation of temporary at-grade crossings and use of flagmen for Metrolinx railway crossings,  Ability to meet construction schedule milestones;  Ability to coordinate work by others;  Experience dealing with and projects with construction budgets of $10,000,000.00; and  Experience working with, around Metrolinx/GO rail lines, Enbridge pipelines, and within hydro corridors.

On June 22, 2017, TRCA received pre-qualification submissions from the following 15 general contractors:  Brennan Paving & Construction Ltd.;  Bronte Construction Ltd.;  Cedar Springs Landscape Group;  Dagmar Construction Inc.;  Dynex Construction Inc.;  Esposito Bros Construction Ltd.;  Four Seasons Site Development Ltd.;  Gazzola Paving Ltd.;  Grascan Construction;

44 Item 7.8

 LocPave Construction;  McPherson-Andrews Contracting Ltd;  Metric Contracting Services Corp.;  Midome Construction Services Ltd.;  R&M Construction; and  Soncin Construction.

Following receipt of the submissions, pre-qualifying documents were reviewed by the selection committee made up of TRCA staff. Evaluations were based on the criteria defined above. Based on the evaluation process, Design-Build Tender documents for Phase 1 and Phase 2 were made available on October 27, 2017 to the following nine general contractors:  Brennan Paving & Construction Ltd.;  Dagmar Construction Inc.;  Dynex Construction Inc.;  Grascan Construction;  LocPave Construction;  McPherson-Andrews Contracting Ltd;  Metric Contracting Services Corp.;  R&M Construction; and  Soncin Construction.

A mandatory bidders meeting/site tour for Phase 1 was held on November 2, 2017 and for Phase 2 on November 3, 2017. Design-Build Request for Proposals closed on November 24, 2017. The Design-Build Request for Proposal (RFP) was scored using a two-envelope system. Envelope one contained the technical components of the RFP and envelope two contained the fee components of the RFP. Technical proposals were reviewed by the evaluation committee, separate from the fee proposals, based on the following criteria:

Criteria Weight 1. Conformance with terms of the RFP 5 2. Understanding of Project and Scope of Work 5 3. Approach and Methodology for the Services 10 4. Expertise and availability of Project Team and Schedule 5 5. Prequalification of General Contractors 10 6. Fee Proposal 65 Total Weighted Points 100

The results of the technical evaluation were then compiled using the weighted scoring system shown above including 10% of the value of the points the proponent earned during the Request for Prequalification stage of the project. The weighted scoring of the fee proposal (65%) was calculated using the following formula: Number of Points = Lowest Fee / Proponent Fee x 65 points.

The final results of the evaluation of the received proposals for Phase 1 and Phase 2 of the Project are as follows:

45 Item 7.8

Design-Build Request for Proposal #10005933 – Phase 1

TOTAL TENDER AMOUNT Overall PROPONENT (Plus HST) Ranking Metric Contracting Services $9,949,934.01 1 Corporation Grascan $11,067,000.00 2 Soncin Construction $10, 873,236.00 3 Dynex Construction Inc. $13,079,053.00 4

Design-Build Request for Proposal #10006438 – Phase 2

TOTAL TENDER AMOUNT Overall PROPONENT (Plus HST) Ranking Metric Contracting Services $9,797,493.62 1 Corporation Grascan $11,327,000.00 2 Soncin Construction $11,370,087.75 3 Dagmar Construction $14,682,198.55 4 Dynex Construction Inc. $13,803,605.00 5

Based on the results from the evaluation process it was determined that the technical and fee proposal submitted by Metric Contracting Services Corporation was the highest ranked proposal meeting the needs of TRCA’s project and offering the best value for services.

FINANCIAL DETAILS Funding for this project is coming from the City of Toronto Transportation, Cycling Infrastructure, and Parks Forestry and Recreation, Capital Projects. A portion of the funds will be provided through the federal Public Infrastructure Fund, and administered through the City of Toronto. Award of Contract #10005933 and Contract #10006438 will be subject to TRCA negotiating an agreement with the City of Toronto.

Report prepared by: Michelle Guy, extension 5905 Emails: [email protected] For Information contact: Mark Preston, extension 5848 Emails: [email protected] Date: November 17, 2017 Attachment: 1

46 Attachment 1 E DR Existing Don Trail MOR

WIG # Wigmore V

Park I C # T O

R

I A

P

SWIFT DR A DR PHASE 2 ORD R NF K WY TRAIL A E V E E AV ON N T LI # EG Gatineau CorridorTrail PHASE 3 #

TRAIL BERMONDSEY RD

E a VE s A ISE t UNR D S

o # n R i W DON MILLS RD v e DVP e st )" r PHASE 1 D TEWAY o GA B n L R V D TRAIL iv e r R D

R O N N O CURITY AVE 'C O

D E BLV VE LEA R A VER AI O C L ST

S RE LL C PARKVIEW HI

Lower Don Trail # ek Tay Cre l or-M ass ey

Legend

DURHAM FutureTrail YORK Ex isting Trail Existing ProposedTrail PEEL Railways TORONTO F SITE Watercourses ^ Lake Ontario TRCAProperty 0 250 500 Meters 47 KeyMap © Queen’s Printer for Ontario and its licensors. [2017] May Not[2017] NOTReproducedbeTHIS ISPLAN A without OFlicensors. SURVEY. Permission. its and Ontario for ©Queen’sPrinter Item 7.9

Section I – Items for Authority Action

TO: Chair and Members of the Executive Committee Meeting #10/17, Friday, December 15, 2017

FROM: Darryl Gray, Director, Education, Training and Outreach

RE: KORTRIGHT VISITOR’S CENTRE RENOVATION PROJECT Contracted Construction Services for Renovations to Washrooms and Classrooms ______KEY ISSUE Award of Contract #10006491 for contracted construction services to undertake renovations of the washrooms and classrooms at the Kortright Centre’s Visitor’s Centre.

RECOMMENDATION

THE EXECUTIVE COMMITTEE RECOMMENDS THAT Contract #10006491 for contracted construction services, including hazardous material abatement, to undertake renovations of the washrooms and classrooms at the Kortright Centre’s Visitor’s Centre be awarded to Anacond Contracting Inc. at a total cost not to exceed $373,563.05, plus HST, as they are the lowest bidder that best meets TRCA specifications;

THAT TRCA staff be authorized to approve additional expenditures to a maximum of 25% of the contract cost as a contingency allowance if deemed necessary;

THAT staff be authorized to direct Anacond Contracting Inc. to proceed immediately, upon approval by the Executive Committee, with the labour, material and equipment to perform asbestos and other hazardous material abatement prior to removals and renovations, during the holiday closure and into January, to mitigate health and safety concerns, as well as disruptions to organized events and to staff;

THAT should staff be unable to execute an acceptable contract with the awarded contractor, staff be authorized to enter into and conclude contract negotiations with the other contractors that submitted tenders, beginning with the next lowest bidder meeting TRCA specifications;

AND FURTHER THAT authorized TRCA officials be directed to take such action as is necessary to implement the contract, including obtaining any required approvals and the signing and execution of documents.

BACKGROUND The Visitor’s Centre at the Kortright Centre for Conservation is the hub of all the recreational programs and activities that are featured in the building and outdoors. The many thousands of visitors at Kortright are welcomed through environmental education programs, special events, green energy and sustainable technology workshops and cultural heritage community festivals. As such, the pressures placed on the late 1970’s built building has become evident in need of repair and improvements.

48 Item 7.9

Early in 2017, staff at Kortright submitted an application as part of the Canada 150 Community Infrastructure Program offered by the Federal Economic Development Agency for Southern Ontario. The goal of the program is to renovate, expand and improve existing community infrastructure assets. A non-repayable contribution of $200,000 was awarded to the Kortright Centre in support of the proposed renovations put forward in the application. The proposed works in the application included upgrades to the building fire alarm system, renovations to the washrooms and Accessibility for Ontarions with Disabilities Act (AODA) compliant upgrades to entrance doors, replacement of the service counter, addition of a building automation system, and renovations to the classrooms facilities.

With limited funding for these improvements, priority items were selected based on a combination of rectifying building deficiencies and removing accessibility barriers to meet the needs of its increasing user base. The scope of work for this design consists of upgrades to the aging men’s and women’s washroom facilities which includes new flooring, tiling, plumbing, inclusion of barrier free washrooms, accessible counter space, automatic fixtures and new LED lighting. A portion of the work will also include the remediation of asbestos containing material identified in the original drywall. The six classrooms located on the lower level will be retrofitted with new flooring, dry walling, LED lighting fixtures and new paint. The improvements within these two areas will greatly enhance the overall experience of users to the Kortright Centre Visitor’s Centre. In order to minimize disruption to events and school programs, renovation and construction activities at the Kortright Visitor’s Centre are limited to mid-December through mid-January for upgrades to the washroom facilities and classrooms.

RATIONALE Request for Tender (RFT) documents were publicly advertised on the electronic procurement website Biddingo (www.biddingo.com) on November 15, 2017. The tender provided drawings and specifications on labour, materials and equipment, including the hazardous material abatement requirements to undertake the proposed renovations. A mandatory site information meeting was held on November 17, 2017.

Request for Tender documents were received by 23 general contractors, six of which submitted a bid. The Procurement Opening Committee publicly opened the tenders on November 30, 2017. Members of the Selection Committee consisting of TRCA staff (Aaron D’Souza, Adrian O’Driscoll and Chris Ellis) reviewed the submissions and evaluated them based on cost, qualifications and the ability to complete the project within the specified construction window.

The results of the evaluation are as follows:

Bidder Bid Price Anacond Contracting Inc. $373,563.05 Norfield Construction Inc. $430,656.78 ICIR Construction Ltd. $441,700.00 R-Chad General Contracting Inc. $505,000.00 MIR Construction Inc. $531,000.00 Trustco Construction Ltd. $588,000.00

TRCA staff reviewed the bids against its own cost estimates and has determined that the bids are of reasonable value.

49 Item 7.9

Based on an evaluation of the bids received and a review of provided references, staff recommends that Contract #10006491 be awarded to Anacond Contracting Inc. for a total cost not to exceed $373,563.05, plus a 25% contingency, plus HST, as they are the lowest bidder that meets TRCA specifications. In addition, staff recommends that work to perform asbestos abatement and removals, as well as the renovations to the washrooms be initiated by December 26, 2017 prior to final approval at Authority Meeting #10/17, scheduled to be held on January 5, 2018.

FINANCIAL DETAILS Funds for this project are available through account 425-20, Kortright Visitor Centre Canada 150 Infrastructure Grant. This account is funded by the Federal Economic Development agency of Southern Ontario ($200,000) and with matching TRCA moneys ($203,000).

Report prepared by: Natalie Racette, extension 5603 Emails: [email protected] For Information contact: Aaron D’Souza, extension 5775; Adrian O’Driscoll, 905-832-2289 extension 240 Emails: [email protected] Date: December 4, 2017

50 Item 8.1

Section II – Items for Executive Action

TO: Chair and Members of the Executive Committee Meeting #10/17, Friday, December 15, 2017

FROM: Mike Fenning, Associate Director, Property and Risk Management

RE: SUSTAINABILITY CONSULTING SERVICES Preferred Source Contract #10006760 ______KEY ISSUE Award of Contract #10006760 for professional consulting services to develop the sustainability program and manage the sustainability certification process in support of Toronto and Region Conservation Authority’s new administrative office building located at 5 Shoreham Drive, Toronto.

RECOMMENDATION

THAT Contract #10006760 for professional sustainability consulting services to develop the sustainability program and manage the sustainability certification process in support of an Administrative Office Building for Toronto and Region Conservation Authority (TRCA) be awarded on a preferred source basis to Green Reason Inc., at a total cost not to exceed $87,500.00, plus 10% contingency, plus HST;

AND FURTHER THAT authorized officials be directed to take the necessary action to implement the contract including obtaining necessary approvals and the signing and execution of documents.

BACKGROUND At Authority Meeting #5/16, held on June 24, 2016, Resolution #A85/16 approved the construction of an administrative office building at 5 Shoreham Drive in the City of Toronto and directed staff to take the necessary action to complete the Project, including the submission of formal requests for approval to the participating municipalities and the Province of Ontario. Staff reported at Authority Meeting #1/17, held on February 24, 2017 that all six of TRCA’s participating municipalities, by way of their respective Councils, had approved the Project and the allocation of $60,000,000 in new and existing capital funding toward the Project.

In May 2017, TRCA retained Jones Lang LaSalle Canada (JLL) as its project managers for the Project. TRCA then retained the services of an integrated design team, led by ZAS Architects and Bucholz McEvoy Architects, to proceed with the development of the project design, approvals and construction documents. TRCA has also engaged Eastern Construction Ltd. to provide pre-construction services throughout the design and tendering stages, manage construction of the new facility, coordinate commissioning and operational start-up, and associated site works.

RATIONALE TRCA has targeted to achieve Leadership in Energy and Environmental Design (LEED) Platinum, WELL Building Silver certifications and at minimum Toronto Green Standard (TGS) Tier 2 for the new administrative office building at 5 Shoreham Drive. The project has also been approved by the Canada Green Building Council as a pilot study participant under their Zero Carbon Building Standard. To achieve these ambitious sustainability targets, TRCA staff requires the support of a sustainability consultant to develop a sustainability strategy and to coordinate and manage the certification process.

51 Item 8.1

Green Reason Inc. is currently providing sustainability consulting services as part of ZAS Architects and Bucholz McEvoy Architects integrated design team. As such, the consultant has detailed knowledge of the project design, cost and criteria that will support the development of a sustainability program that is based on an effective balance between the project’s current budget, schedule and sustainability goals.

Furthermore, Green Reason’s involvement as a member of the integrated design team during the design development, planning approvals and construction document stages will allow for a more cost effective and seamless transition into the contract administration, certification and commissioning phases of the project that will be required to achieve the project’s sustainability targets. Continuity between the design phase and the certification phases that will follow the construction and commissioning phases are also expected to be benefited by Green Reason’s involvement in this additional scope of work.

Staff therefore recommends award of the contract on a preferred source basis as per Section 9.3.3 of TRCA’s Purchasing Policy as follows:

The required goods and services are to be supplied by a vendor or supplier having specialized knowledge, skills, expertise or experience that cannot be reasonably provided by any other supplier.

FINANCIAL DETAILS The final design and site plan approval process will be undertaken between October 2017 and into early 2019, followed by construction and commissioning phases that will conclude in 2021. Funds are available in the Capital Budget for the contract period of 2017 – 2021, in account 006-50.

Report prepared by: Jed Braithwaite, extension 5345 Emails: [email protected] For Information contact: Laura Stephenson, extension 5296 Emails: [email protected] Date: November 27, 2017

52 Item 8.2

Section II – Items for Executive Action

TO: Chair and Members of the Executive Committee Meeting #10/17, Friday, December 15, 2017

FROM: Chandra Sharma, Director, Watershed Strategies

RE: LAB SERVICES Contract #10006541 – Water Quality Samples for Tributary Monitoring Program ______KEY ISSUE Award of contract for analysis of water quality samples to monitor tributary water quality for the binational 2018 Cooperative Science and Monitoring Initiative.

RECOMMENDATION

THAT Contract #10006541 to analyze water quality samples for tributary water quality (from 2017 to 2020) be awarded on a preferred source basis to the York-Durham Regional Environmental Laboratory a total cost not to exceed $123,893.81, plus HST;

AND FURTHER THAT authorized Toronto and Region Conservation Authority (TRCA) officials be directed to take the necessary action to implement the contract including signing and execution of documents.

BACKGROUND It can be generally stated that the Canadian and Amercian shores of Lake Ontario have elevated nutrient concentrations in comparison to the oligotrophic offshore. Zebra and quagga mussels, and lakebed algae, are present to varying degrees within the nearshore while the nutrient-poor offshore is becoming less habitable for certain fish species and other biota. Significant resources are being spent on the abatement of point and non-point nutrient loading to Lake Ontario to mitigate nearshore eutrophication, however, it is difficult to assess whether abatement is effective from a lake perspective due to a poor understanding of overall nutrient loading and the associated loading impacts on the lake. It is impossible to predict how restoration or future development on land will affect the lake in absence of a better understanding of how nutrients are leaving the land. Understanding the delivery of nutrients, pollutants and other materials from watersheds to the Great Lakes is therefore fundamental to understand lake response, and to manage environmental quality, ecosystem health and lake health.

There is a broad need for tributary loading information associated with other program areas and initiatives. Most notably, it is expected that focus of the Nutrient Annex of the Great Lakes Water Quality Agreement and the task of setting nutrient loading and concentrations targets will shift to Lake Ontario in the coming year. Multiple domestic program areas also need or will benefit from the insights that an effective tributary monitoring program can deliver including source water protection, the Great Lakes Protection Act, and management of the recurrent issues associated with excessive algae and shoreline fouling. The primary driver of the timing of the proposed tributary monitoring is to support the binational 2018 Lake Ontario Cooperative Science and Monitoring Initiative (CSMI) and Canada-Ontario Agreement (COA), however, the motivator for the work is broader and should be considered a starting point for increased emphasis and possibly ongoing tributary nutrient and pollutant export monitoring across Lake Ontario.

53 Item 8.2

Tributary monitoring will be completed binationally in 2018 and 2019 to estimate nutrient loadings to Lake Ontario. In Canada, data will be generated from TRCA, and the provincial and federal governments. These data will need to be combined for future analysis of loading calculations, and hence will need to be directly comparable.

RATIONALE Since this effort is binational, it is crucial that the water quality data generated from the tributary monitoring can be compared with provincial and federal government data and ideally with our American counterparts. The York-Durham Regional Environmental Laboratory was historically an Ontario Ministry of the Environment lab and hence has lab methods that are comparable to the Province of Ontario. TRCA has conducted cross-lab comparisons between the York-Durham Regional Environmental Lab and the Ministry of the Environment and Climate Change (MOECC) for the Regional Watershed Monitoring Program and found the data to be comparable. In addition, lab quality assurance/quality control through cross-lab comparisons between the York-Durham Regional Environmental Lab and the federal government have shown in the past that this lab generates analytical results that are comparable to the federal government. There have also been extensive cross-lab comparisons between the provincial and federal governments and the federal and the American researchers.

The request for lab services on a preferred source basis is in compliance with TRCA’s purchasing policy under Section 9.3 (3) which states:

The required goods and services are to be supplied by a particular vendor or supplier having special knowledge, skills, expertise or experience that cannot be provided by any other supplier.

FINANCIAL DETAILS In the multi-year grant from the Ontario Ministry of the Environment and Climate Change (Account code 225-95), $140,000 has been allotted for laboratory services at the York-Durham Regional Environmental Lab.

DETAILS OF WORK TO BE DONE In 2018 and 2019, water quality samples will be collected during storm- and base- flow events and analyzed for Total, Dissolved, and Soluble Reactive Phosphorus, Nitrate plus Nitrite, Nitrite, Total Kjeldhal Nitrogen, Ammonia plus Ammonium, Chloride, Sulphate, Total Suspended Solids, and Conductivity.

Report prepared by: Krista Chomicki, extension 5857 Emails: [email protected] For Information contact: Gary Bowen, 416-271-8944 Emails: [email protected] Date: November 17, 2017

54 Section IV – Ontario Regulation 166/06, As Amended

TO: Chair and Members of the Executive Committee Meeting #10/17, December 15, 2017

FROM: Carolyn Woodland, Senior Director, Planning, Greenspace and Communications

RE: APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO REGULATION 166/06, AS AMENDED Development, Interference with Wetlands and Alterations to Shorelines and Watercourses ______KEY ISSUE Pursuant to Ontario Regulation 166/06, as amended, written permission from the Authority is required for: a) straightening, changing, diverting or interfering in any way with the existing channel of a river, creek, stream or watercourse, or for changing or interfering in any way with a wetland; b) development, if in the opinion of the authority, the control of flooding, erosion, dynamic beaches or pollution or the conservation of land may be affected by the development.

A permit may be refused through a Hearing Process, if in the opinion of the Authority, the control of flooding, erosion, dynamic beaches, pollution or the conservation of land is affected.

RECOMMENDATION

THAT permits be granted in accordance with Ontario Regulation 166/06, as amended, for the applications which are listed below:

PERMIT APPLICATIONS 10.1 - 10.5 ARE MAJOR APPLICATION - REGULAR

Applications that involved a more complex suite of technical studies to demonstrate consistency with policies; applications that cover a significant geographic area (e.g. subdivisions, stormwater management ponds), extensive modifications to the landscape, major infrastructure projects, emergency infrastructure works, resolution of violations/after the fact permits, trail construction.

55 CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA)

10.1 16 NORDALE CRESCENT To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 215, Plan A-01, (16 Nordale Crescent), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to construct a pool, pool decking and retaining wall to the rear of the existing single family dwelling at 16 Nordale Crescent in the City of Toronto (Etobicoke York Community Council Area). The proposal also includes minor landscaping. A portion of the works were constructed without TRCA or Municipal permits. As such, the applicant has paid double the application fee as required for a permit "after-the-fact" in association with the violation of Ontario Regulation 166/06.

The permit will be issued for the period of December 15, 2017 to December 14, 2019 in accordance with the following documents and plans which form part of this permit:

 Drawing No. A-01, Site Plan, prepared by Applicant, Revision No. 3 dated October 31, 2017, received on November 10, 2017, redlined revised by TRCA staff on November 13, 2017;  Drawing No. S-01, Landscape Retaining Wall, prepared by JCS Contracting and Marketing Ltd. signed and stamped by P. Eng. W.P Shamon, dated October 30, 2017, received on November 2, 2017.

RATIONALE The application was reviewed by staff on the basis of the following information:

56 Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Humber River watershed in order to facilitate the construction of a pool, pool decking and retaining wall to the rear of the existing single family dwelling at 16 Nordale Crescent. The proposal also includes minor landscaping. The subject site is located west of Black Creek Drive and south of West in the City of Toronto (Etobicoke York Community Council Area).

Permit After the Fact: As a portion of the works were completed prior to the issuance of a permit under Ontario Regulation 166/06, the permit is to be issued "after-the-fact". The applicant has paid double the application fee as required for a permit "after-the-fact" in association with the violation of Ontario Regulation 166/06.

Control of Flooding: The proposed works are not located within a Regulatory Flood Plain and the proposal will have no impact on the storage and/or conveyance of floodwaters.

Pollution: The proposed construction is well removed from the ravine. The proponent is required to abide by the municipal sewer use by-law so that sediment will not enter the storm sewer system.

Dynamic Beaches: Not applicable

Erosion: There are no slope stability/geotechnical concerns associated with this application.

Conservation of Land: There are no other significant natural features on, or adjacent to, the site that would be negatively impacted by the project.

Plantings Not applicable

Policy Guidelines: This proposal complies with Section 8.5 Valley and Stream Corridors of The Living City Policies for Planning and Development in the Watersheds of the Toronto and Region Conservation Authority.

CFN: 58649 - Application #: 1142/17/TOR Report Prepared by: Anna Lim 5284 [email protected] For information contact: Mark Rapus 5259 [email protected] Date: November 13, 2017

57 CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA)

10.2 TORONTO TRANSIT COMMISSION To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on, (225 and 230 Milliken Boulevard (formerly 2080 McNicoll Avenue)), in the City of Toronto (Scarborough Community Council Area), Highland Creek Watershed as located on the property owned by Toronto Transit Commission. The purpose is to develop a slab-on-grade single storey bus garage facility approximately 28,000m3 at 2080 McNicoll Avenue, Scarborough. No in-water works associated with this project.

The permit will be issued for the period of December 15, 2017 to December 14, 2019 in accordance with the following documents and plans which form part of this permit:

 Drawing No. MN1-1-G001; McNicoll Bus Garage, Drawing List 1 of 4; prepared by Eastern Construction on behalf of Toronto Transit Commission; dated October 27, 2017; received by TRCA on October 30, 2017;  Drawing No. MN1-1- G005; McNicoll Bus Garage, General Notes 1; prepared by Eastern Construction on behalf of Toronto Transit Commission; dated October 27, 2017; received by TRCA on October 30, 2017;  Drawing No. MN1-1- G006; McNicoll Bus Garage, General Notes 2; prepared by Eastern Construction on behalf of Toronto Transit Commission; dated October 27, 2017; received by TRCA on October 30, 2017;  Drawing No. MN1-1- C100; McNicoll Bus Garage, Site Location Plan; prepared by Eastern Construction on behalf of Toronto Transit Commission; dated October 27, 2017; received by TRCA on October 30, 2017;  Drawing No. MN1-1- C201; McNicoll Bus Garage, Topographic Survey; prepared by Eastern Construction on behalf of Toronto Transit Commission; dated October 27,2017; received by TRCA on October 30, 2017;  Drawing No. MN1-1- C202; McNicoll Bus Garage, Erosion and Sediment Control Plan 1, Building Area; prepared by Eastern Construction on behalf of Toronto Transit Commission; dated October 2017; received by TRCA on October 30, 2017;  Drawing No. MN1-1- C203; McNicoll Bus Garage, Erosion and Sediment Control Plan 2, Parking Area; prepared by Eastern Construction on behalf of Toronto Transit Commission; dated October 27, 2017; received by TRCA on October 30, 2017;

58  Drawing No. MN1-1- C301; McNicoll Bus Garage, Overall Site Servicing Plan; prepared by Eastern Construction on behalf of Toronto Transit Commission; dated October 27,2017; received by TRCA on October 30, 2017;  Drawing No. MN1-1- C302; McNicoll Bus Garage, Proposed Site Servicing Plan, Building Area; prepared by Eastern Construction on behalf of Toronto Transit Commission; dated October 27,2017; received by TRCA on October 30, 2017;  Drawing No. MN1-1- C303; McNicoll Bus Garage, Proposed Storm Drainage Plan, Building Area; prepared by Eastern Construction on behalf of Toronto Transit Commission; dated October 27,2017; received by TRCA on October 30, 2017;  Drawing No. MN1-1- C304; McNicoll Bus Garage, Proposed Storm Drainage Plan, Employee Parking Lot; prepared by Eastern Construction on behalf of Toronto Transit Commission; dated October 27,2017; received by TRCA on October 30, 2017;  Drawing No. MN1-1- C307; McNicoll Bus Garage, Miscellaneous Details 1; prepared by Eastern Construction on behalf of Toronto Transit Commission; dated October 27,2017; received by TRCA on October 30, 2017;  Drawing No. MN1-1- C308; McNicoll Bus Garage, Miscellaneous Details 2; prepared by Eastern Construction on behalf of Toronto Transit Commission; dated October 27,2017; received by TRCA on October 30, 2017;  Drawing No. MN1-1- C309; McNicoll Bus Garage, Miscellaneous Details 3; prepared by Eastern Construction on behalf of Toronto Transit Commission; dated October 27,2017; received by TRCA on October 30, 2017;  Drawing No. MN1-1- C312; McNicoll Bus Garage, Composite Landscape/ Utility Plan; prepared by Eastern Construction on behalf of Toronto Transit Commission; dated October 27,2017; received by TRCA on October 30, 2017;  Drawing No. MN1-1- C401; McNicoll Bus Garage, Proposed Grading Plan, Building Area; prepared by Eastern Construction on behalf of Toronto Transit Commission; dated October 27,2017; received by TRCA on October 30, 2017;  Drawing No. MN1-1- C402; McNicoll Bus Garage, Proposed Grading Plan, Employee Parking Lot; prepared by Eastern Construction on behalf of Toronto Transit Commission; dated October 27,2017; received by TRCA on October 30, 2017;  Drawing No. MN1-1- C404; McNicoll Bus Garage, Proposed 100 Year Surface Storage Plan, Employee Parking Lot; prepared by Eastern Construction on behalf of Toronto Transit Commission; dated October 27,2017; received by TRCA on October 30, 2017;  Drawing No. MN1-1-L100; McNicoll Bus Garage; Landscape Plan, Tree Protection Plan; prepared by Eastern Construction on behalf of Toronto Transit Commission; dated April 5, 2017; received by TRCA June 14, 2017;  Drawing No. MN1-1-L101; McNicoll Bus Garage; Landscape Plan, Tree Protection Plan; prepared by Eastern Construction on behalf of Toronto Transit Commission; dated April 5, 2017; received by TRCA June 14, 2017;  Drawing No. MN1-1-L200; McNicoll Bus Garage; Landscape Plan, Overall Context Plan; prepared by Eastern Construction on behalf of Toronto Transit Commission; dated April 18, 2017; received by TRCA June 14, 2017;  Drawing No. MN1-1-L201; McNicoll Bus Garage; Landscape Plan, North Portion of Site; prepared by Eastern Construction on behalf of Toronto Transit Commission; dated April 18, 2017; received by TRCA June 14, 2017;  Drawing No. MN1-1-L202; McNicoll Bus Garage; Landscape Plan, Centre Portion of Site; prepared by Eastern Construction on behalf of Toronto Transit Commission; dated April 18, 2017; received by TRCA June 14, 2017;

59  Drawing No. MN1-1-L203; McNicoll Bus Garage; Landscape Plan, South Portion of Site; prepared by Eastern Construction on behalf of Toronto Transit Commission; dated April 18, 2017; received by TRCA June 14, 2017;  Drawing No. MN1-1-L204; McNicoll Bus Garage; Landscape Plan, Employee Parking Lot; prepared by Eastern Construction on behalf of Toronto Transit Commission; dated April 18, 2017; received by TRCA June 14, 2017;  Drawing No. MN1-1-L205; McNicoll Bus Garage; Landscape Plan, Fencing Plan; prepared by Eastern Construction on behalf of Toronto Transit Commission; dated April 18, 2017; received by TRCA July 20, 2017;  Drawing No. MN1-1-L300; McNicoll Bus Garage; Landscape Plan, Planting Details; prepared by Eastern Construction on behalf of Toronto Transit Commission; dated April 5, 2017; received by TRCA June 14, 2017;  Drawing No. MN1-1-L301; McNicoll Bus Garage; Landscape Plan, Details; prepared by Eastern Construction on behalf of Toronto Transit Commission; dated April 5, 2017; received by TRCA June 14, 2017;  Drawing No. MN1-1-L400; McNicoll Bus Garage; Landscape Plan, Green Roof; prepared by Eastern Construction on behalf of Toronto Transit Commission; dated April 5, 2017; received by TRCA June 14, 2017;  Drawing No. MN1-1-L401; McNicoll Bus Garage; Landscape Plan, Green Roof Details; prepared by Eastern Construction on behalf of Toronto Transit Commission; dated April 5, 2017; received by TRCA June 14, 2017;  Drawing No. MN1-1- C500; McNicoll Bus Garage, Setback& Silt Fence; prepared by Eastern Construction on behalf of Toronto Transit Commission; dated October 27,2017; received by TRCA on October 30, 2017;  Drawing No. TRCA-001; McNicoll Bus Garage, Site Logistics Plan - Stage 1; prepared by Eastern Construction on behalf of Toronto Transit Commission; dated May 18, 2017; received by TRCA on June 14, 2017;  Drawing No. TRCA-002; McNicoll Bus Garage, Site Logistics Plan - Stage 2; prepared by Eastern Construction on behalf of Toronto Transit Commission; dated May 18, 2017; received by TRCA on June 14, 2017;  Drawing No. TRCA-003; McNicoll Bus Garage, Site Logistics Plan - Stage 3; prepared by Eastern Construction on behalf of Toronto Transit Commission; dated May 18, 2017; received by TRCA on June 14, 2017;  Drawing No. MN1-1-A230; McNicoll Bus Garage, Roof Plan - Overall Roof Plan; prepared by Eastern Construction on behalf of Toronto Transit Commission; dated April 3, 2017; received by TRCA on July 20, 2017;  Drawing No. MN1-1-A101; McNicoll Bus Garage, Site Plan - Overall Site Plan; prepared by Eastern Construction on behalf of Toronto Transit Commission; dated April 3, 2017; received by TRCA on July 20, 2017;  Drawing No. MN1-1-AR001; McNicoll Bus Garage, Rendings - 3D Exterior Perspectives; prepared by Eastern Construction on behalf of Toronto Transit Commission; dated April 3, 2017; received by TRCA on July 20, 2017;  Drawing No. MN1-1-A103; McNicoll Bus Garage, Site Plan - Parking Lot Plan; prepared by Eastern Construction on behalf of Toronto Transit Commission; dated April 3, 2017; received by TRCA on July 20, 2017.

RATIONALE The application was reviewed by staff on the basis of the following information:

60 Proposal: The proposal involves the development of a new TTC bus garage at 2080 McNicoll Avenue, Scarborough in Toronto. The proposed site is near the intersection of McNicoll Avenue and Kennedy Road. The new bus garage will consist of a slab-on-grade single storey facility approximately 28,000m3, surrounded by rigid concrete driveways and bus parking areas on a 5.53 hectare property. In addition, an adjacent 1.9 hectare property located along the newly construction Milliken Boulevard will be developed into an employee parking lot to serve approximately 352 vehicles. The main building will contain maintenance bays, a brake shop, a degrease shop, a body and paint shop, bus cleaning areas, maintenance and transportation offices, two service lines, fuel and repair bay. It will also include an indoor maintenance and storage facility to accommodate two hundred and twenty three (223) buses and storage for two hundred and fifty (250) conventional buses. The employee amenities will consist of a locker room and lunch room/cafeteria and material receiving storage and distribution area. The building design will incorporate recycling of waste, waste heat and water, including a bus wash waste water recycle system. Crippled bus parking will be located along the northern sections of the property and eighteen (18) crippled articulated bus bays and nine (9) crippled standard bus bays will be provided.

TTC is proposing an innovate stormwater management system which will include both low impact development (LID) measures, an oil grit separator and conventional underground storm water storage system. The employee parking lot will include enhanced filter strip system, bio swales, permeable pavers (0.52ha) and emergency spillways to improve surface drainage and promote infiltration and water balance on the site. The maintenance building will have a vegetated green roof which will be one of the largest in Canada to date, a reflective white roof, a transpired solar collector wall, workspaces illuminated by natural light and energy efficient fixtures. The green roof will cover approximately 54% (1.63ha) of the building area. Construction is proposed to commence in the Fall of 2017.

Control of Flooding: The proposed works are not anticipated to impact flooding, flood storage or conveyance of flood waters. As a precautionary measure and upon TRCA request, the TTC consultants will monitor to the weather to ensure works are completed during favorable weather conditions.

Pollution: Erosion and sediment control measures including, rock check dams, sedimentation traps (4) , sedimentation ditches, silt fences, catch basin protection will be installed prior to construction and maintained for the entire duration of construction. These measures will be implemented to prevent the release of construction generated sediments into the Highland Creek. Erosion and sediment control measures have been provided in accordance with the Greater Golden Horseshoe Area Conservation Authorities Erosion and Sediment Control Guidelines for Urban Construction (2006).

Dynamic Beaches: Not applicable

Erosion: Staff does not anticipate any impacts to slope stability or erosion as a result of these works.

Conservation of Land: There are no in-water works associated with this project.

61 Plantings The City of Toronto Tree Protection Policy and Specifications for Construction near trees will be adhered to during the construction period. Approximately 0.35 ha of marsh vegetation community will be impacted by construction. TTC will be providing natural heritage compensation funds ($33,000) to TRCA for compensation plantings else where within the watershed to ensure no ecological net loss from this project.

Policy Guidelines: This proposal complies with Section 7.4.4 Infrastructure and Section 8.9 Infrastructure Policies of The Living City Policies for Planning and Development in the Watersheds of the Toronto and Region Conservation Authority.

CFN: 58458 - Application #: 1155/17/TOR Report Prepared by: Renee Afoom-Boateng 5714 [email protected] For information contact: Renee Afoom-Boateng 5714 [email protected] Date: December 6, 2017

62 CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA)

10.3 TORONTO ZOO To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 1, 2, 3, 4, 5, 6, 7, 8, Plan 3, 4, (361A Old Finch Avenue), in the City of Toronto (Scarborough Community Council Area), Rouge River Watershed as located on the property owned by Toronto Zoo. The purpose is to construct a zipline, a treetop walk, a challenge course, and an ecological educational center at the Toronto Zoo.

The permit will be issued for the period of December 15, 2017 to December 14, 2019 in accordance with the following documents and plans which form part of this permit:

 Permit Request, prepared by Toronto Zoo, dated July 13, 2017;  Environmental Commitment Statement, prepared by Darryl Hore, P.Eng., Director of Engineering, Ecotrek Adventure Group, dated June 16, 2017.

RATIONALE The application was reviewed by staff on the basis of the following information:

Proposal: The Toronto Zoo has subcontracted with Ecotrek adventures to develop a zipline, a treetop walk, a challenge course, and an ecological educational center adjacent to the Indo Malay Centre on the south east side of the Zoo. The access platform for the zipline, treetop walk and challenge course will be located on the existing pedestrian bridge that crosses a valley draw feature that leads down to a multi-level access deck at the base of the valley. The subject lands are owned by TRCA and leased to the Zoo. The Zoo has responsibility for managing the lands and assuming all liability for the use of the lands. The Zoo is TRCA's partner in protecting and enhancing the natural heritage system. To that end, Ecotrek has committed to providing an attraction which exists in harmony with its ecosystem while providing an eco-educational experience for its patrons, staff, and industry colleagues. They have committed to providing a park that has a net beneficial environmental effect through-out all stages of the design, construction and operation of the facility.

63 Toronto Zoo staff has confirmed in correspondence dated November 29, 2017 that approvals from the Ministry of Natural Resources and Forestry as well as municipal building permits are not required. They have confirmed the need for approvals under the City of Toronto Ravine and Natural Feature Protection By-law. TRCA staff will coordinate with By-law staff to ensure that the final drawings approved as part of this permit are consistent with their requirements, including any tree protection and tree planting necessary to mitigate impacts and enable the ecological enhancement commitments in the letters from the Zoo and Ecotrek. Control of Flooding: The project is not located within the regional storm floodplain.

Pollution: The proponent has committed to ensuring the appropriate erosion and sediment controls are in place during construction. There will be very limited ground impact.

Dynamic Beaches: Not applicable.

Erosion: The proponent has committed to ensuring the appropriate erosion and sediment controls are in place during construction. There will be very limited ground impact.

Conservation of Land: The project will for the most part be elevated above the ground, and be accomplished utilizing low impact products, creating a course design that eliminates patron access to the forest floor, and using proven tree anchorages that are claimed by Ecotrek to not cause a negative impact on tree health. Throughout the process, the proponent will be relying heavily on input from qualified arboreal professionals and ecologists to ensure the process is environmentally sensitive and can serve to enhance the existing environment. This includes mitigating existing slope erosion, planting native tree species, installing bat boxes, and removing invasive species. Work within the trees will not be conducted during bird breeding season.

Plantings Plantings will be provided per the requirements of the Ravine and Natural Feature Protection By-law.

Policy Guidelines: This proposal is consistent with the intent of Section 8.9, Infrastructure Policies, of The Living City Policies for Planning and Development in the Watersheds of the Toronto and Region Conservation Authority.

CFN: 58309 - Application #: 0887/17/TOR Report Prepared by: Steve Heuchert 5311 [email protected] For information contact: Steve Heuchert 5311 [email protected] Date: December 4, 2017 Attachments: 1

64 Attachment 1

2017-07-13

Brian Denney Chief Executive Officer Toronto and Region Conservation Authority 5 Shoreham Drive Toronto, ON M3N 1S4

Dear Brian,

Re: Permit Request

Thank you for your positive and informative letter dated 2017-04-29 which highlighted actions required by the Toronto Zoo in order to facilitate the implementation of an Eco Tour being offered to Zoo guests. The Toronto Zoo is a leader in protecting and preserving the environment and as such we understand the requirements of this project and the sensitivities of the area in which it is to be erected.

The educational enhancement this tour shall provide will serve to promote the natural habitat and create a call to action for guests as they experience a conservation-related activity, minutes from the City. The net benefit to the natural environment will be the education afforded the Zoo guests as they are immersed in a learning experience in the forest.

Please find attached a letter from the proponent that clearly outlines the educational and conservation values which are the primary rationale for such an experience at the Zoo. The letter further discusses the proponent’s founding philosophy of environmental awareness, and the benefits such experiences provide.

The City of Toronto is aware of the project as the Board of Management of the Toronto Zoo is a City agency and more particularly through the City budget process. We will be happy to provide engineering plans as they become available. Please accept this letter as a formal request for a permit to begin work on this exciting new initiative at the Toronto Zoo that will benefit the Zoo, the TRCA and generations of visitors to come.

If you have any questions, please feel free to contact me at (416) 392-5913.

Yours truly,

Robin D. Hale Chief Operating Officer

Attch.

65 June 16th, 2017 Toronto and Region Conservation Authority (TRCA) 101 Exchange Ave, Concord, ON L4K 5R6

Re: Ecotrek Eco-Adventure Park - Environmental Commitment Statement

Dear TRCA,

This letter is intended to outline Ecotrek’s environmental commitment with respect to our proposed eco-adventure attraction within the Toronto Zoo. The proposed eco-adventure park, consists of four main attractions; a zipline, a treetop walk, a challenge course, and an ecological educational center. The ultimate goal of the park is to provide an attraction which exists in harmony with its ecosystem while providing an eco-educational experience for its patrons, staff, and industry colleagues. Ecotrek is committed to providing a park that has a net beneficial environmental effect through-out all stages of the design, construction and operation of the facility.

The park will be designed so as to provide the least environmentally intrusive end-product. This will be accomplished utilising low impact products, creating a course design that eliminates patron access to the forest floor, and using proven tree anchorages that do not cause a negative impact on tree health. Throughout the design process, we will be relying heavily on input from qualified arboreal professionals and ecologists to ensure our process is not only environmentally sensitive, but can serve to enhance the existing environment surrounding the park Examples of this would include eliminating erosion, planting native tree species, installing bat boxes, and removing invasive species.

The success of the Eco-Adventure Park is directly linked to the over-all health of the ecology in which the park is immersed. Thus, it is imperative that the park construction sequence results in an area that is a thriving example of a strong, healthy and vibrant eco-system. To achieve this end, construction methods must be low-impact and construction scheduling conducted to work with environmental requirements. All heavy equipment will be restricted to using existing, but improved, pathways and trails. Whenever feasible, manpower will be utilised in place of equipment to limit damage and forest floor compaction. Timing of major construction activities will be sequenced to minimise harmful effects. Work within the trees will not be conducted during bird breeding season, and civil works to improve erosion issues will be conducted in the autumn.

The operation of the Eco-adventure park will permit the greatest opportunity to achieve our net-benefit commitment. Our patrons will be immersed in an ecological learning environment with educational experiences embedded throughout the course. The Eco-Amphitheatre provides a venue to provide

Epic Adventures…naturally!

66 themed environmental awareness seminars, presentations, and study groups. Designed as the final feature before leaving the park, we will work with ecologists and area experts to communicate current environmental affairs to guests. Anticipated themes could include water quality, species at risk, invasive species, as well as seasonal hot topics such as ticks, zika, etc. A further area that we would explore is permitting various study and monitoring groups (such as Adopt-a-pond, Batcon, TRCA, etc) to utilise the Eco-Amphitheater for monitoring, studies, presentations, and fund-raising events.

EcoTrek is a company that is founded in the ideals and philosophy of healthy environmental awareness. As such, it is our goal to conduct all phases of our projects with the protection of nature held paramount, and to foster a healthy, enjoyable co-habitation with our eco-system. We strive to fulfil this policy via the use of low-impact construction practices and environmental remediation measures that serve to enhance the existing area. A key component of the EcoTrek experience is education, awareness, and enjoyment of the natural beauty of our surroundings. Our processes and operations are to be subjected to ongoing evaluations, with the ultimate goal of continuously improving our environmental performance within our surroundings. We will strive to deliver an ever-increasing knowledge base for those who enjoy it with us.

Best Regards, Ecotrek Adventure Group

Darryl Hore, P.Eng Director of Engineering

Epic Adventures…naturally!

67 CITY OF VAUGHAN

10.4 1352579 ONTARIO INC. To construct, reconstruct, erect or place a building or structure on West Half Lot 30, Concession 6, (4251 Kirby Road), in the City of Vaughan, Humber River Watershed as located on the property owned by 1352579 Ontario Inc. The purpose is to recognize the construction of a 177.5 sq. m. (1910.6 sq. ft.) ground floor and 290.2 sq. m. (3123.7 sq. ft.) second floor addition to an existing single family dwelling as well as a 55.2 sq. m. ( 594.2 sq. ft.) deck located at the side/rear of the dwelling. The described additions to the dwelling and replacement deck were constructed without TRCA or municipal permits. As such, the applicant has paid double the application fee as required for voluntary compliance related to resolution of a violation of Ontario Regulation 166/06.

The permit will be issued for the period of December 15, 2017 to June 14, 2018 in accordance with the following documents and plans which form part of this permit:

 Sheet No. 1, Site Plan, prepared by Trevor Gain & Associates, dated July 22, 2013, received by TRCA on November 14, 2017;  Sheet No. 2, Site Statistics, prepared by Trevor Gain & Associates, dated July 22, 2013, received by TRCA on November 14, 2017;  Sheet No. 1A, Ground Floor Plan, prepared by Trevor Gain & Associates, dated November 28, 2017, received by TRCA on November 28, 2017, redline revised by TRCA on December 4, 2017;  Sheet No. 2A, Second Floor Plan, prepared by Trevor Gain & Associates, dated July 22, 2013, received by TRCA on November 14, 2017, redline revised by TRCA on December 4, 2017;  Sheet No. 3A, Basement Plan, prepared by Trevor Gain & Associates, dated November 28, 2017, received by TRCA on November 28, 2017, redline revised by TRCA on December 4, 2017;  Sheet No. 4A, Elevations, prepared by Trevor Gain & Associates, dated July 22, 2013, received by TRCA on November 14, 2017;  Sheet No. 5A, Elevations, prepared by Trevor Gain & Associates, dated July 22, 2013, received by TRCA on November 14, 2017.

68 RATIONALE The application was reviewed by staff on the basis of the following information:

Proposal: The purpose of this permit is to recognize the construction of a 177.5 sq. m. (1910.6 sq. ft.) ground floor and 290.2 sq. m. (3123.7 sq. ft.) second floor addition to an existing single family dwelling as well as a 55.2 sq. m. (594.2 sq. ft.) deck located at the side/rear of the dwelling. The described additions to the dwelling and replacement deck were constructed without TRCA or municipal permits. As such, the applicant has paid double the application fee as required for voluntary compliance related to resolution of a violation of Ontario Regulation 166/06.

Over the past several years the owner of the subject property has been going through the process of obtaining approvals from the City of Vaughan Development Planning and Building Standards Departments for development on their property that was constructed without municipal approvals. As a part of that process, the owner was informed about TRCA's permitting requirements as a significant portion of the property is regulated by TRCA.

The reason why the subject property is regulated by TRCA is because the eastern and southern portions of the property are traversed by a valley corridor associated with a tributary of the East Humber River. The existing dwelling on the property is located in close proximity to the top of bank of the valley corridor. As a part of a concept development process (CFN: 55089.24) TRCA staff visited the site to assess the condition of the valley slope. Based on observations made on site, TRCA staff requested that a slope stability assessment be completed in order to determine the location of the Long Term Stable Top of Slope (LTSOTS). Based on the findings of the slope stability assessment, it was determined that the ground floor and second floor additions, located on the west side of the existing dwelling, are outside of the LTSTOS.

A portion of the deck structure is located within the LTSTOS as determined by the slope stability assessment. The applicant has submitted documentation to confirm that the portion of the replacement deck structure that is located within the LTSTOS is the same size and footprint as a previously existing deck located in the area. As such, it is the opinion of TRCA staff that the replacement deck does not exceed the erosion risk associated with the previously existing structure.

Furthermore, the location of the subject works is void of any significant vegetation and is outside of the Regional Storm Flood Plain on the property, which is contained within the valley corridor. As such, there are no geotechnical, ecological or flood related impacts anticipated with the subject works.

Fee and Permit Timing: As the works were completed prior to the issuance of a permit under Ontario Regulation 166/06, the permit is to be issued "after-the-fact". The applicant has paid double the application fee as required for a permit "after-the-fact" in association with the violation of Ontario Regulation 166/06. In addition, the time frame for this permit has been adjusted to reflect that the works have been completed (i.e. 6 months).

Control of Flooding: The subject works are not located within the Regional Storm Flood Plain. As such, impacts on the storage or conveyance of flood waters are not anticipated as a result of the subject works.

69 Pollution: Sediment and erosion control measures are not required as the works have already been completed.

Dynamic Beaches: Not applicable.

Erosion: There are no geotechnical and/or slope stability concerns with the project.

Conservation of Land: The location of the works is void of any significant vegetation.

Plantings Given that no significant vegetation was removed during construction of the works, no plantings are required.

Policy Guidelines: This proposal complies with Section 8.5.1.3 - Additions to Existing Buildings or Structures - and Section 8.5.1.4 - Replacement or Reconstruction of Existing Buildings or Structures - of The Living City Policies for Planning and Development in the Watersheds of the Toronto and Region Conservation Authority.

CFN: 58927 - Application #: 1357/17/VAUG Report Prepared by: Stephen Bohan 5743 [email protected] For information contact: Coreena Smith 5269 [email protected] Date: December 4, 2017

70 TOWN OF CALEDON

10.5 255 KING STREET EAST To construct, reconstruct, erect or place a building or structure on Part Lot 1, Plan 43R- 8908, 255 King Street East, in the Town of Caledon, Humber River Watershed. The purpose is to recognize the construction of a 5.5 m by 6.8 m (18 ft by 22.3 ft) wood deck located at the west side of an existing residential dwelling located within TRCA's Regulated Area of the Humber River Watershed. The described works were initiated without the issuance of a TRCA or municipal building permit. As such, an additional permit application fee of 100% was charged for this "after-the-fact" permit.

The permit will be issued for the period of December 15, 2017 to December 14, 2019 in accordance with the following documents and plans which form part of this permit:

 Drawing No. A-1, prepared by Momentus Engineering Management, Revision No. 3, revised on October 23, 2017, received by TRCA on October 25, 2017;  Drawing No. A-2, Floor Plans, prepared by Momentus Engineering Management, Revision No. 1, revised on September 29, 2017, received by TRCA on September 27, 2017;  Drawing No. A-3, Sections & Details, prepared by Momentus Engineering Management, Revision No. 1, revised on September 29, 2017, received by TRCA on September 27, 2017.

RATIONALE The application was reviewed by staff on the basis of the following information:

71 Proposal: The applicant initiated works in advance of obtaining a permit under Ontario Regulation 166/06, therefore the permit to be issued is "after the fact". The applicant has paid the application fee plus 100% as required for an "after the fact" permit in contravention of the Regulation. In addition, the time frame for this permit will be adjusted to reflect that the works have been completed.

Control of Flooding: The proposed works are located within the Regional Floodplain. TRCA Water Resource staff has reviewed the proposal and anticipate that the proposed works will not have any significant impacts to the storage and/or conveyance of flood waters.

Pollution: Erosion and sediment controls (i.e. silt fencing) will not be required as the proposed works have been completed.

Dynamic Beaches: Not applicable.

Erosion: There are no geotechnical and/or slope stability concerns anticipated with this project.

Conservation of Land: No significant vegetation was removed as a result of the works.

Plantings As no significant vegetation was removed, plantings are not required at this time.

Policy Guidelines: The proposal complies with Section 8.5.1.7 - Property Improvements and Non-habitable Accessory Structures - of the Living City Policies for Planning and Development in the watersheds of the Toronto and Region Conservation Authority.

CFN: 58660 - Application #: 1176/17/CAL Report Prepared by: Andrea Terella 5657 [email protected] For information contact: Andrea Terella 5657 [email protected] Date: December 6, 2017

72 10.6 STANDARD DELEGATED PERMITS

Standard Permits, including Emergency Infrastructure Works permissions, are implemented by Planning and Development Division staff and are received monthly by the Executive Committee. Standard Permits , including Emergency Infrastructure Works permissions, are subject to the authorization of designated staff appointed as Enforcement Officers, as per Authority Res.#A198/13, #A199/13 and #A103/15, respectively. All standard and emergency infrastructure works are non-complex permissions consistent with TRCA approved policies and procedures and issued for a time period of two years or less.

CITY OF BRAMPTON

1803070 ONTARIO CORP. - Humber River Watershed The purpose is to undertake works within TRCA's Regulated Area of the Humber River Watershed in order to facilitate the construction of a new 2,286 sq. m (24,610 sq. ft.) commercial plaza ranging from one storey to two storey and a retaining wall associated with a municipal site plan application (City File No. SP16-094.000), a municipal minor variance application (City File No. A17-164) and a municipal building permit. The subject property is located at 4781 Castlemore Road, in the City of Brampton.

CFN: 58623 - Application #: 1268/17/BRAM Report Prepared by: Anant Patel, extension 5618, email [email protected] For information contact: Anant Patel, extension 5618, email [email protected] Date: November 6, 2017

GREEN VALLEY DEVELOPMENTS LTD. / MICHAEL CECI / DORA CECI - Humber River Watershed The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate final grading operations and servicing within the Phase 2 subdivision lands associated with a municipal draft plan of subdivision application and zoning by-law amendment application to allow a residential development within the Vales of Humber Secondary Plan.

CFN: 58348 - Application #: 0923/17/BRAM Report Prepared by: Adam Miller, extension 5244, email [email protected] For information contact: Adam Miller, extension 5244, email [email protected] Date: November 16, 2017

58 DAWNRIDGE TRAIL - Etobicoke Creek Watershed The purpose is to undertake works within a TRCA Regulated Area of the Etobicoke Creek Watershed in order to facilitate the construction of 4.87 metre x 10.36 metre (15.9 feet x 33.9 feet) in-ground swimming pool and 3.05 metre x 3.05 metre (10 feet x 10 feet) pool shed at the rear of an existing residential dwelling associated with a municipal building permit.

CFN: 58703 - Application #: 1178/17/BRAM Report Prepared by: Andrea Terella, extension 5657, email [email protected] For information contact: Andrea Terella, extension 5657, email [email protected] Date: November 6, 2017

73 REGIONAL MUNICIPALITY OF PEEL - Mimico Creek Watershed The purpose is to undertake emergency work to temporarily cover and protect an exposed trunk sewer located within a tributary of the Mimico Creek, located east of Airport Road and north of Highway 407, in the City of Brampton. This permit was reviewed in accordance with the TRCA Permission for Emergency Infrastructure Works Review Protocol (Authority Res. #A105/15). Due to the emergency nature of the work, no construction timing window will apply to this project.

CFN: 58630 - Application #: 1281/17/BRAM Report Prepared by: Annette Lister, extension 5266, email [email protected] For information contact: Annette Lister, extension 5266, email [email protected] Date: November 13, 2017

7435 MAYFIELD ROAD - Humber River Watershed The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a 450.58 sq. m (4,850 sq. ft.) replacement single family dwelling and driveway associated with a municipal building permit application.

CFN: 58072 - Application #: 0703/17/BRAM Report Prepared by: Andrea Terella, extension 5657, email [email protected] For information contact: Andrea Terella, extension 5657, email [email protected] Date: November 10, 2017

490 MAIN STREET NORTH - Etobicoke Creek Watershed The purpose is to is to undertake works within TRCA's Regulated Area of the Etobicoke Creek Watershed in order to facilitate the construction of a replacement septic system at the rear of an existing residential dwelling associated with a municipal building permit.

CFN: 57710 - Application #: 0399/17/BRAM Report Prepared by: Anant Patel, extension 5618, email [email protected] For information contact: Anant Patel, extension 5618, email [email protected] Date: October 30, 2017

CITY OF MARKHAM

38 CACHET PARKWAY - Rouge River Watershed The purpose is to undertake works within TRCA's Regulated Area of the Rouge River Watershed in order to facilitate the construction of a 1,120 sq. m (12,056 sq. ft) replacement dwelling and detached garage associated with a municipal building permit.

CFN: 58073 - Application #: 0709/17/MARK Report Prepared by: Nicholas Cascone, extension 5927, email [email protected] For information contact: Nicholas Cascone, extension 5927, email [email protected] Date: November 2, 2017

74 30B ROUGE STREET - Rouge River Watershed The purpose is to undertake works within TRCA's Regulated Area of the Rouge River Watershed to facilitate the construction of a new two-storey single detached dwelling with a total GFA of 321.9 square metres with several ancillary structures (i.e. deck, pool and shed) on the subject property.

CFN: 58843 - Application #: 1314/17/MARK Report Prepared by: Aidan Pereira, extension 5723, email [email protected] For information contact: Doris Cheng, extension 5306, email [email protected] Date: November 13, 2017

8 CACHET PARKWAY - Rouge River Watershed The purpose is to undertake works within TRCA's Regulated Area of the Rouge River Watershed in order to facilitate the construction of a 566.10 sq.m (6,093.44 sq.ft) replacement dwelling, septic system and rear porch associated with a municipal building permit.

CFN: 55725 - Application #: 0347/16/MARK Report Prepared by: Nicholas Cascone, extension 5927, email [email protected] For information contact: Nicholas Cascone, extension 5927, email [email protected] Date: November 10, 2017

YMCA OF GREATER TORONTO - Rouge River Watershed The purpose is to undertake works within TRCA's Regulated Area of the Rouge River Watershed in order to facilitate the expansion of a parking lot on the subject property.

CFN: 58779 - Application #: 1311/17/MARK Report Prepared by: Aidan Pereira, extension 5723, email [email protected] For information contact: Doris Cheng, extension 5306, email [email protected] Date: November 13, 2017

YORK CONDOMINIUM CORPORATION 100 - Don River Watershed The purpose is to undertake works within TRCA's Regulated Area of the Don River Watershed to demolish/remove multiple structures (i.e. decks, patios, wooden retaining wall etc.) located at the rear of the condominium townhouse block in order to regrade the area to facilitate the construction of an emergency access walkway. In addition, the applicant is proposing to build five replacement wooden staircases/patios approximately 4 square metres in size at the rear entrances of the townhouses.

CFN: 58517 - Application #: 1078/17/MARK Report Prepared by: Aidan Pereira, extension 5723, email [email protected] For information contact: Doris Cheng, extension 5306, email [email protected] Date: November 24, 2017

75 YORK REGION DISTRICT SCHOOL BOARD - Rouge River Watershed The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed to facilitate site grading, landscaping, and the construction of a paved driveway, concrete walkways, asphalt parking and stormwater servicing (outfall, storm sewers, manhole and catch basins), associated with a proposed two-storey public school.

CFN: 56626 - Application #: 1142/16/MARK Report Prepared by: Jeffrey Thompson, extension 5386, email [email protected] For information contact: Doris Cheng, extension 5306, email [email protected] Date: October 30, 2017

CITY OF MISSISSAUGA

3525 BRANDON GATE DRIVE - Mimico Creek Watershed The purpose is to undertake works within TRCA's Regulated Area of the Mimico Creek Watershed in order to facilitate the reconstruction of fourteen (14) second storey wood decks located at the rear of existing condominium townhouse units associated with a municipal building permit.

CFN: 58587 - Application #: 1107/17/MISS Report Prepared by: Andrea Terella, extension 5657, email [email protected] For information contact: Andrea Terella, extension 5657, email [email protected] Date: November 8, 2017

REGIONAL MUNICIPALITY OF PEEL - Etobicoke Creek Watershed The purpose is to construct a new asphalt road, inbound and outbound truck weigh scales and a leaf and yard waste storage bunker at the existing Fewster Community Recycling Centre. No in- water works are proposed.

CFN: 58619 - Application #: 1257/17/MISS Report Prepared by: Sharon Lingertat, extension 5717, email [email protected] For information contact: Sharon Lingertat, extension 5717, email [email protected] Date: November 3, 2017

3181 MERRITT AVENUE - Mimico Creek Watershed The purpose is to undertake works within TRCA's Regulated Area of the Mimico Creek Watershed in order to facilitate a unit located in the basement of an existing residential dwelling. The subject property is located at 3181 Merritt Avenue, in the City of Mississauga.

CFN: 58874 - Application #: 1323/17/MISS Report Prepared by: Anant Patel, extension 5618, email [email protected] For information contact: Anant Patel, extension 5618, email [email protected] Date: November 17, 2017

76 CITY OF PICKERING

MARSHALL HOMES (COPPERFIELD) LTD. - Petticoat Creek Watershed The purpose is to construct a temporary sales trailer and grade a new gravel parking lot to the rear at 1893 Altona Road in the City of Pickering.

CFN: 58873 - Application #: 1318/17/PICK Report Prepared by: Vanessa Aubrey, extension 5662, email [email protected] For information contact: Steve Heuchert, extension 5311, email [email protected] Date: November 29, 2017

NORTH PICKERING COMMUNITY MANAGEMENT INC. - Duffins Creek Watershed The purpose is to allow for stockpiling of approximately 55,000 cubic metres of surplus excavated material from the adjacent subdivision lands for the future 3rd Concession Road extension and overpass, as part of the servicing for the new Seaton community in the City of Pickering. Stockpiling will occur from approximately the CP rail tracks, westerly for 0.42 km. A permanent 900 mm diameter culvert will also be installed to convey drainage through the site from an outfall at the adjacent subdivision. Work at this site is part of a multi-staged approach involving stockpiling within the future 3rd Concession Road right-of-way to facilitate the new road extension (CFN 56603), constructing a trunk sanitary sewer (previously approved, CFN 56655), and constructing the road extension (part of a separate future permit approval, CFN 54884). Works will take place within the City of Pickering, Duffins Creek Watershed, as located on lands owned by Infrastructure Ontario.

CFN: 56603 - Application #: 1226/16/PICK Report Prepared by: Sharon Lingertat, extension 5717, email [email protected] For information contact: Sharon Lingertat, extension 5717, email [email protected] Date: November 13, 2017

CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA)

4208-4214 DUNDAS STREET WEST (VI) INC. - Humber River Watershed The purpose is to construct a new 21 storey residential tower. The existing building and appurtenances will be removed from the buffer area and the buffer area will be re-graded.

CFN: 58730 - Application #: 1224/17/TOR Report Prepared by: Mark Rapus, extension 5259, email [email protected] For information contact: Mark Rapus, extension 5259, email [email protected] Date: November 10, 2017

59 BARTONVILLE AVENUE WEST - Humber River Watershed The purpose is to construct a one storey addition including basement to the rear of the existing two storey single family detached dwelling at 59 Bartonville Avenue West in the City of Toronto (Etobicoke York). The existing one storey rear addition is to be demolished.

77 CFN: 49015 - Application #: 0223/13/TOR Report Prepared by: Nicole Moxley, extension 5968, email [email protected] For information contact: Steve Heuchert, extension 5311, email [email protected] Date: November 29, 2017

23 KENNEDY PARK ROAD - Humber River Watershed The purpose is to construct a replacement retaining wall in the rear yard of the existing dwelling at 23 Kennedy Park Road in the City of Toronto (Etobicoke York). The existing retaining wall is in a state of disrepair.

CFN: 57212 - Application #: 0128/17/TOR Report Prepared by: Nicole Moxley, extension 5968, email [email protected] For information contact: Steve Heuchert, extension 5311, email [email protected] Date: November 16, 2017

22 BECKETT AVENUE - Humber River Watershed The purpose is to construct a replacement detached garage to the rear of the existing single family dwelling at 22 Beckett Avenue in the City of Toronto (Etobicoke York Community Council Area).

CFN: 58350 - Application #: 0931/17/TOR Report Prepared by: Anna Lim, extension 5284, email [email protected] For information contact: Mark Rapus, extension 5259, email [email protected] Date: November 10, 2017

32 GOLF VALLEY LANE - Etobicoke Creek Watershed The purpose is to reconstruct the existing second storey at the two storey single family dwelling at 32 Golf Valley Lane in the City of Toronto (Etobicoke York Community Council Area).

CFN: 58727 - Application #: 1223/17/TOR Report Prepared by: Anna Lim, extension 5284, email [email protected] For information contact: Mark Rapus, extension 5259, email [email protected] Date: November 8, 2017

22 SPEARS STREET - Humber River Watershed The purpose is to construct a second storey addition above the existing bungalow and cantilevered above a proposed rear patio at 22 Spears Street in the City of Toronto (Etobicoke York).

CFN: 58675 - Application #: 1179/17/TOR Report Prepared by: Nicole Moxley, extension 5968, email [email protected] For information contact: Steve Heuchert, extension 5311, email [email protected] Date: October 25, 2017

78 2567 WEST - Waterfront Watershed The purpose is to construct a replacement shoreline protection structure along the waterfront in the rear yard of the existing single family detached dwelling at 2597 Lake Shore Boulevard West in the City of Toronto (Etobicoke York). The existing shoreline protection structure is in a state of disrepair.

CFN: 58663 - Application #: 1167/17/TOR Report Prepared by: Nicole Moxley, extension 5968, email [email protected] For information contact: Steve Heuchert, extension 5311, email [email protected] Date: November 13, 2017

57 GREENBROOK DRIVE - Humber River Watershed The purpose is to construct a two storey single family dwelling with integral garage at 57 Greenbrook Drive in the City of Toronto (Etobicoke York Community Council Area).

CFN: 57431 - Application #: 0195/17/TOR Report Prepared by: Anna Lim, extension 5284, email [email protected] For information contact: Steve Heuchert, extension 5311, email [email protected] Date: October 27, 2017

CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA)

18 SHAMOKIN DRIVE - Don River Watershed The purpose is to construct a two storey replacement dwelling where an existing one storey single family detached dwelling is currently located at 18 Shamokin Drive in the City of Toronto (North York Community Council Area).

CFN: 58665 - Application #: 1174/17/TOR Report Prepared by: Stephanie Worron, extension 5907, email [email protected] For information contact: Mark Rapus, extension 5259, email [email protected] Date: November 14, 2017

12 WINTON ROAD - Don River Watershed The purpose is to construct a two storey single family dwelling with integral garage at 12 Winton Road in the City of Toronto (North York Community Council Area).

CFN: 58011 - Application #: 0662/17/TOR Report Prepared by: Anna Lim, extension 5284, email [email protected] For information contact: Mark Rapus, extension 5259, email [email protected] Date: November 9, 2017

26 RYKERT CRESCENT - Don River Watershed The purpose is to construct a new two-storey single family detached dwelling at 26 Rykert Crescent in the City of Toronto (North York Community Council Area).

79 CFN: 57497 - Application #: 0278/17/TOR Report Prepared by: Anna Lim, extension 5284, email [email protected] For information contact: Steve Heuchert, extension 5311, email [email protected] Date: November 3, 2017

25 YORK VALLEY CRESCENT - Don River Watershed The purpose is to construct a main floor and second floor addition to the existing dwelling located at 25 York Valley Crescent in Toronto (North York Community Council Area).

CFN: 57359 - Application #: 0144/17/TOR Report Prepared by: Jessica Bester, extension 5250, email [email protected] For information contact: Steve Heuchert, extension 5311, email [email protected] Date: November 3, 2017

120 GLENVIEW AVENUE - Don River Watershed The purpose is to underpin the existing basement of the existing two and a half storey single family detached dwelling located at 120 Glenview Avenue in the City of Toronto (North York Community Council Area).

CFN: 58567 - Application #: 1117/17/TOR Report Prepared by: Stephanie Worron, extension 5907, email [email protected] For information contact: Mark Rapus, extension 5259, email [email protected] Date: November 8, 2017

52 FIFESHIRE ROAD - Don River Watershed The purpose is to construct a two-storey replacement dwelling, with rear terrace, in-ground pool and associated landscaping at 52 Fifeshire Road in the City of Toronto (North York Community Council Area).

CFN: 47697 - Application #: 0525/12/TOR Report Prepared by: Jessica Bester, extension 5250, email [email protected] For information contact: Steve Heuchert, extension 5311, email [email protected] Date: November 7, 2017

36 REVCOE DRIVE - Don River Watershed The purpose is to construct a two storey single family dwelling with integral garage at 36 Revcoe Drive in the City of Toronto (North York Community Council Area)..

CFN: 56564 - Application #: 1061/16/TOR Report Prepared by: Anna Lim, extension 5284, email [email protected] For information contact: Mark Rapus, extension 5259, email [email protected] Date: October 25, 2017

80 THE ONTARIO ASSOCIATION OF ARCHITECTS - Don River Watershed The purpose is to construct an underground geothermal system and HVAC piping at the Ontario Association of Architects located at 111 Moatfield Drive in the City of Toronto (North York Community Council Area).

CFN: 58604 - Application #: 1154/17/TOR Report Prepared by: Stephanie Worron, extension 5907, email [email protected] For information contact: Mark Rapus, extension 5259, email [email protected] Date: October 25, 2017

UJA FEDERATION OF GREATER TORONTO - REAL ESTATE GROUP - Don River Watershed The purpose is to construct an integrated private institutional complex that includes a community centre, theatre, chapel, offices, private school, day-care, art gallery, artist studio, museum, library, fitness centres, food services and swimming facilities, as well as significant landscaping and connections to the Don River valley.

CFN: 58589 - Application #: 1105/17/TOR Report Prepared by: Steve Heuchert, extension 5311, email [email protected] For information contact: Steve Heuchert, extension 5311, email [email protected] Date: September 18, 2017

15 YORK VALLEY CRESCENT - Don River Watershed The purpose is to construct a two storey replacement dwelling, basement walkout, and rear yard hardscaping at 15 York Valley Crescent in the City of Toronto (North York Community Council Area).

CFN: 58513 - Application #: 1081/17/TOR Report Prepared by: Stephanie Worron, extension 5907, email [email protected] For information contact: Mark Rapus, extension 5259, email [email protected] Date: December 1, 2017

CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA)

59 FALLINGROOK ROAD - Waterfront Watershed The purpose is to construct a two storey replacement dwelling and rear and front deck where an existing one storey single family detached dwelling is currently located at 59 Fallingbrook Road in the City of Toronto (Scarborough Community Council Area).

CFN: 58773 - Application #: 1274/17/TOR Report Prepared by: Stephanie Worron, extension 5907, email [email protected] For information contact: Mark Rapus, extension 5259, email [email protected] Date: November 14, 2017

81 281 WEST POINT AVENUE - Rouge River Watershed The purpose is to construct an attached garage to the front of an existing one and a half storey single family detached dwelling located at 281 West Point Avenue in the City of Toronto (Scarborough Community Council Area).

CFN: 58661 - Application #: 1184/17/TOR Report Prepared by: Stephanie Worron, extension 5907, email [email protected] For information contact: Mark Rapus, extension 5259, email [email protected] Date: November 9, 2017

1343 WARDEN AVENUE - Don River Watershed The purpose is to construct a second storey addition over the existing footprint and a two storey addition to the rear, converting the existing dwelling into a legal two family dwelling at 1343 Warden Avenue in the City of Toronto (Scarborough Community Council Area).

CFN: 57891 - Application #: 0583/17/TOR Report Prepared by: Stephanie Worron, extension 5907, email [email protected] For information contact: Mark Rapus, extension 5259, email [email protected] Date: November 24, 2017

CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA)

60 GLENWOOD CRESCENT - Don River Watershed The purpose is to construct a two-storey addition to the front and third storey above the existing two-storey single family detached dwelling at 60 Glenwood Crescent in the City of Toronto (Toronto & East York).

CFN: 57225 - Application #: 0110/17/TOR Report Prepared by: Vanessa Aubrey, extension 5662, email [email protected] For information contact: Mark Rapus, extension 5259, email [email protected] Date: November 9, 2017

101 GLEN DAVIS CRESCENT - Waterfront Watershed The purpose is to reconstruct the existing rear addition at the two storey single family dwelling at 101 Glen Davis Crescent in the City of Toronto (Toronto and East York Community Council Area).

CFN: 58121 - Application #: 0725/17/TOR Report Prepared by: Anna Lim, extension 5284, email [email protected] For information contact: Steve Heuchert, extension 5311, email [email protected] Date: November 8, 2017

82 CITY OF TORONTO - Waterfront Watershed The purpose is to install a standby gas generator and precast shed with associated electrical equipment at the City of Toronto's Fire Training Academy located at 895 , east of Leslie Street, in Toronto. No in-water work is within the scope of this project.

CFN: 57666 - Application #: 0570/17/TOR Report Prepared by: Heather Wright, extension 5766, email [email protected] For information contact: Heather Wright, extension 5766, email [email protected] Date: October 23, 2017

18 HEATHDALE ROAD - Don River Watershed The purpose is to construct a one storey rear addition to the existing two storey single family dwelling at 18 Heathdale Road in the City of Toronto (Toronto and East York Community Council Area).

CFN: 58601 - Application #: 1140/17/TOR Report Prepared by: Anna Lim, extension 5284, email [email protected] For information contact: Mark Rapus, extension 5259, email [email protected] Date: November 9, 2017

2 GLENSHAW CRESCENT - Don River Watershed The purpose is to construct a new attached garage below a second storey addition and a two- storey addition to the side and rear of the existing 1 1/2 storey single family detached dwelling at 2 Glenshaw Crescent in the City of Toronto (Toronto and East York).

CFN: 57194 - Application #: 0058/17/TOR Report Prepared by: Vanessa Aubrey, extension 5662, email [email protected] For information contact: Mark Rapus, extension 5259, email [email protected] Date: November 9, 2017

12 HEATHDALE ROAD - Don River Watershed The purpose is to construct a one storey and two storey rear addition to the existing three storey single family detached dwelling at 12 Heathdale Road in the City of Toronto (Toronto and East York Community Council Area).

CFN: 57700 - Application #: 0397/17/TOR Report Prepared by: Anna Lim, extension 5284, email [email protected] For information contact: Mark Rapus, extension 5259, email [email protected] Date: November 13, 2017

CITY OF VAUGHAN

BAY HOMES INC. - Humber River Watershed The purpose is to facilitate, within TRCA's Regulated Area of the Humber River Watershed, the development of two (221.2 sq. m. (2380.9 sq. ft.) and 219.9 sq. m. (2366.9 sq. ft.)) single detached dwellings on lands known municipally as 22 and 26 Francesca Court, in the City of Vaughan.

83 CFN: 58306 - Application #: 0893/17/VAUG Report Prepared by: Anthony Syhlonyk, extension 5272, email [email protected] For information contact: Coreena Smith, extension 5269, email [email protected] Date: November 21, 2017

BEST WAY STONE LIMITED - Humber River Watershed The purpose is to facilitate, within TRCA's Regulated Area of the Humber River Watershed, the development of a new septic system and the decommissioning of an existing septic system on lands known municipally as 8821 , in the City of Vaughan.

CFN: 58575 - Application #: 1113/17/VAUG Report Prepared by: Anthony Syhlonyk, extension 5272, email [email protected] For information contact: June Little, extension 5756, email [email protected] Date: November 23, 2017

BLOCK 11 DEVELOPERS GROUP - Don River Watershed The purpose is to facilitate, within TRCA's Regulated Area of the Don River watershed, the cleaning and restoration of the Block 11, Stormwater Pond 9 as part of the assumption process for the City of Vaughan.

CFN: 57922 - Application #: 0631/17/VAUG Report Prepared by: Anthony Syhlonyk, extension 5272, email [email protected] For information contact: Colleen Bonner, extension 5307, email [email protected] Date: October 24, 2017

140 COLDSPRING ROAD - Humber River Watershed The purpose is to undertake works in TRCA's Regulated Area of the Humber River Watershed in order to construct a 2-storey replacement dwelling with a basement, an in-ground pool and a cabana on the subject property, associated with a municipal building permit.

CFN: 57196 - Application #: 0061/17/VAUG Report Prepared by: Polina Bam, extension 5256, email [email protected] For information contact: June Little, extension 5756, email [email protected] Date: October 27, 2017

68 KIRKHILL PLACE - Humber River Watershed The purpose is to undertake works within TRCA's regulated area of the Humber River Watershed in order to facilitate the construction of an addition to the basement and first floor of the existing dwelling, associated with a municipal building permit. The subject property is municipally known as 68 Kirkhill Place in the City of Vaughan.

CFN: 58715 - Application #: 1201/17/VAUG Report Prepared by: Polina Bam, extension 5256, email [email protected] For information contact: Coreena Smith, extension 5269, email [email protected] Date: October 26, 2017

84 TOWN OF CALEDON

14189 CENTREVILLE CREEK ROAD - Humber River Watershed The purpose is to undertake works within TRCA's Regulated Area of the Humber River Watershed in order to implement a stream channel restoration project on the subject property. The works also include wetland restoration/plantings as well as the decommissioning of a gravel driveway. Furthermore, the works are to be completed by TRCA's Restoration Services Division.

CFN: 58777 - Application #: 1284/17/CAL Report Prepared by: Nicholas Cascone, extension 5927, email [email protected] For information contact: Nicholas Cascone, extension 5927, email [email protected] Date: November 2, 2017

CANCIAN CONSTRUCTION LTD. - Humber River Watershed The purpose is to construct a new three storey building within a TRCA Regulated Area within the Bolton Special Policy Are.

CFN: 57989 - Application #: 0681/17/CAL Report Prepared by: Quentin Hanchard, extension 5324, email [email protected] For information contact: Quentin Hanchard, extension 5324, email [email protected] Date: June 12, 2017

8242 MAYFIELD ROAD - Humber River Watershed The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order facilitate the construction of a 9 m x 6.1 m (29.5 ft. x 20 ft.) storage building associated with a municipal building permit application. The subject property is located at 8242 Mayfield Road, in the Town of Caledon.

CFN: 58761 - Application #: 1303/17/CAL Report Prepared by: Anant Patel, extension 5618, email [email protected] For information contact: Anant Patel, extension 5618, email [email protected] Date: November 24, 2017

DUNSIRE (MOUNT PLEASANT) INC. C/O DUNSIRE DEVELOPMENTS INC. - Humber River Watershed The purpose is to undertake works within TRCA's Regulated Area of the Humber River Watershed in order to facilitate the construction of a 495.3 sq. m (5,331 sq. ft.) residential dwelling and a septic system associated with a municipal building permit.

CFN: 57984 - Application #: 1185/17/CAL Report Prepared by: Anant Patel, extension 5618, email [email protected] For information contact: Anant Patel, extension 5618, email [email protected] Date: December 4, 2017

85 DUNSIRE (MOUNT PLEASANT) INC. C/O DUNSIRE DEVELOPMENTS INC. - Humber River Watershed The purpose is to undertake works within TRCA's Regulated Area of the Humber River Watershed in order to facilitate the construction of a 575.6 sq. m (6,196 sq. ft.) residential dwelling and a septic system associated with a municipal building permit.

CFN: 58650 - Application #: 1143/17/CAL Report Prepared by: Anant Patel, extension 5618, email [email protected] For information contact: Anant Patel, extension 5618, email [email protected] Date: October 24, 2017

DUNSIRE (MOUNT PLEASANT) INC. C/O DUNSIRE DEVELOPMENTS INC. - Humber River Watershed The purpose is to undertake works within TRCA's Regulated Area of the Humber River Watershed in order to facilitate the construction of a 507.8 sq. m (5,466 sq. ft.) residential dwelling and septic system associated with a municipal building permit.

CFN: 58655 - Application #: 1146/17/CAL Report Prepared by: Anant Patel, extension 5618, email [email protected] For information contact: Anant Patel, extension 5618, email [email protected] Date: October 24, 2017

DUNSIRE (MOUNT PLEASANT) INC. C/O DUNSIRE DEVELOPMENTS INC. - Humber River Watershed The purpose is to undertake works within TRCA's Regulated Area of the Humber River Watershed in order to facilitate the construction of a 578.40 sq. m (6,225.68 sq. ft.) residential dwelling and a septic system associated with a municipal building permit.

CFN: 58679 - Application #: 1195/17/CAL Report Prepared by: Anant Patel, extension 5618, email [email protected] For information contact: Anant Patel, extension 5618, email [email protected] Date: November 14, 2017

229 RIDGE ROAD - Humber River Watershed The purpose is to undertake works within TRCA's Regulated Area of the Humber River Watershed in order to facilitate the construction of a new 254.2 sq.m. (2639.31 sq. ft.) 1.5 storey dwelling with attached garage on a vacant lot of record associated with a Municipal Minor Variance application (Town File: A039-17) and Municipal building permit.

CFN: 58657 - Application #: 1161/17/CAL Report Prepared by: Andrea Terella, extension 5657, email [email protected] For information contact: Andrea Terella, extension 5657, email [email protected] Date: November 8, 2017

86 M.J.J.J. DEVELOPMENTS INCORPORATED - Humber River Watershed The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the enclosure of the existing storm drainage feature and the installation of the storm sewer pipe to divert the flows located 7 Loring Drive, in the Town of Caledon.

CFN: 57180 - Application #: 0039/17/CAL Report Prepared by: Anant Patel, extension 5618, email [email protected] For information contact: Anant Patel, extension 5618, email [email protected] Date: November 14, 2017

14586 MT. PLEASANT ROAD - Humber River Watershed The purpose is to undertake works within TRCA's Regulated Area of the Humber River Watershed in order to facilitate the construction of a 245.9 sq. m. (2647.06 sq. ft.) two storey replacement dwelling and install septic bed associated with municipal Site Plan Application (Town File: 17-0040) and building permit application.

CFN: 58506 - Application #: 1045/17/CAL Report Prepared by: Andrea Terella, extension 5657, email [email protected] For information contact: Andrea Terella, extension 5657, email [email protected] Date: November 8, 2017

TOWN OF CALEDON - Humber River Watershed The purpose is to reconstruct 250 m of Finnerty Sideroad from approximately 100 m west of The Gore Road, in the Town of Ajax. The cold water construction timing window will be applied to this project.

CFN: 56326 - Application #: 0780/16/CAL Report Prepared by: Caroline Mugo, extension 5689, email [email protected] For information contact: Caroline Mugo, extension 5689, email [email protected] Date: November 13, 2016

TOWN OF RICHMOND HILL

18 CASTLERIDGE DRIVE - Don River Watershed The purpose is to undertake works within TRCA's Regulated Area of the Don River Watershed in order to facilitate the construction of a 6.7 m. by 2.1 m. (22 ft. by 7 ft.) addition located at the rear of an existing dwelling associated with a municipal building permit.

CFN: 58600 - Application #: 1141/17/RH Report Prepared by: Nicholas Cascone, extension 5927, email [email protected] For information contact: Nicholas Cascone, extension 5927, email [email protected] Date: November 2, 2017

MATTAMY HOMES (ELGIN MILLS) LIMITED - Rouge River Watershed The purpose is to undertake internal servicing works in support of the approved draft plan of subdivision.

87 CFN: 58769 - Application #: 1269/17/RH Report Prepared by: Doris Cheng, extension 5306, email [email protected] For information contact: Quentin Hanchard, extension 5324, email [email protected] Date: October 26, 2017

REGIONAL MUNICIPALITY OF YORK - Rouge River Watershed The purpose is to undertake road reconstruction to eliminate an intersection jog at Leslie Street and 19th Avenue, and to widen Leslie Street and 19th Avenue to four lanes at the new intersection.

CFN: 57963 - Application #: 0737/17/RH Report Prepared by: Scott Smith, extension 5758, email [email protected] For information contact: Scott Smith, extension 5758, email [email protected] Date: November 9, 2017

TOWN OF RICHMOND HILL - Rouge River Watershed The purpose is to undertake the cleanout works of the stormwater management facility (19-1) located at Cassata Avenue, northwest of Major Mackenzie Drive East and Frank Endean Road. The warm water construction timing window will apply to this project.

CFN: 57957 - Application #: 0739/17/RH Report Prepared by: Manirul Islam, extension 5715, email [email protected] For information contact: Manirul Islam, extension 5715, email [email protected] Date: October 19, 2017

TOWN OF RICHMOND HILL - Rouge River Watershed The purpose is to undertake the cleanout works of the stormwater management facility (19-2) located on 1390 Major Mackenzie Drive East. The warm water construction timing window will apply to this project.

CFN: 57958 - Application #: 0738/17/RH Report Prepared by: Manirul Islam, extension 5715, email [email protected] For information contact: Manirul Islam, extension 5715, email [email protected] Date: October 19, 2017

TOWN OF RICHMOND HILL - Rouge River Watershed The purpose is to undertake the cleanout works of the stormwater management facility (19-5) located on 109-123 Toporowski Avenue. The warm water construction timing window will apply to this project..

CFN: 57967 - Application #: 0754/17/RH Report Prepared by: Manirul Islam, extension 5715, email [email protected] For information contact: Manirul Islam, extension 5715, email [email protected] Date: October 19, 2017

88 YORK REGION RAPID TRANSIT CORPORATION - Don River Watershed The purpose is to undertake widening of Yonge Street within the regulated area between Highway 7 and Garden Avenue. The works will include removal and reconstruction of the roadway, installation of a oil grit separator (OGS) unit that will discharge into the storm sewer and site grading. The works are required to accommodate VivaNext Bus Rapid Transit (BRT) project.

CFN: 57451 - Application #: 0288/17/RH Report Prepared by: Harsha Gammanpila, extension 5629, email [email protected] For information contact: Harsha Gammanpila, extension 5629, email [email protected] Date: November 21, 2017

TOWNSHIP OF KING

36 CHARLES STREET - Humber River Watershed The purpose is to facilitate, within TRCA's Regulated Area of the Humber River Watershed, the development of a 89 sq. m. (960 sq. ft.) garage and dwelling expansion on lands known municipally as 36 Charles Street, in the Township of King.

CFN: 58922 - Application #: 1350/17/KING Report Prepared by: Anthony Syhlonyk, extension 5272, email [email protected] For information contact: Jackie Burkart, extension 5304, email [email protected] Date: November 24, 2017

115 LYNWOOD CRESCENT - Humber River Watershed The purpose is to undertake works within TRCA's regulated area of the Humber River Watershed in order to facilitate the construction of a replacement two-storey dwelling with a basement on the subject property. The property is municipally known as 115 Lynwood Crescent in the Township of King.

CFN: 58333 - Application #: 0928/17/KING Report Prepared by: Polina Bam, extension 5256, email [email protected] For information contact: June Little, extension 5756, email [email protected] Date: October 25, 2017

2 BLUEBERRY LANE - Humber River Watershed The purpose is to facilitate, within TRCA's Regulated Area of the Humber River Watershed, the development of a 962 sq. m. (10,354 sq. ft.) replacement dwelling on lands known municipally as 2 Blueberry Lane, in the Township of King.

CFN: 58735 - Application #: 1232/17/KING Report Prepared by: Anthony Syhlonyk, extension 5272, email [email protected] For information contact: Colleen Bonner, extension 5307, email [email protected] Date: November 3, 2017

89 PERMISSION FOR ROUTINE INFRASTRUCTURE WORKS

Permission for Routine Infrastructure Works Letter of Approval including Emergency Infrastructure Works permissions are subject to authorization by staff designated as Enforcement Officers as per Auth. Res. #A198/13 and #A103/15, respectively. All routine and emergency infrastructure works are located within a Regulated Area, generally within or adjacent to the hazard or natural feature and in the opinion of staff do not affect the control of flooding, erosion, dynamic beaches, pollution or the conservation of land.

CITY OF BRAMPTON

ENBRIDGE GAS DISTRIBUTION INC. To undertake sewer, watermain or utility installation or maintenance within an existing roadway on West Drive and at 33 West Drive, located north of Orenda Road, in the City of Brampton, Etobicoke Creek Watershed as located on the property owned by a private landowner to whom Enbridge Gas Distribution Inc. is providing service, and on property owned by the City of Brampton under a franchise agreement with Enbridge Gas Distribution Inc. The purpose is to install a NPS 1 ST HP gas main in order to service a development that was previously approved under a separate application. No in-water work is associated with this project.

CFN: 58446 - Application #: 1118/17/BRAM Report Prepared by: Tony To, extension 5798, email [email protected] For information contact: Tony To, extension 5798, email [email protected] Date: October 26, 2017

ENBRIDGE GAS DISTRIBUTION INC. To undertake sewer, watermain or utility installation or maintenance within an existing road allowance on The Gore Road, south of Castlemore Road, and on property located at 9990 The Gore Road, in the City of Brampton, Humber River Watershed as located on property owned by a private landowner to whom Enbridge Gas Distribution Inc. is providing service, and on property owned by the Region of Peel under Franchise Agreement with Enbridge Gas Distribution Inc. The purpose is to install NPS 1 1/4 SC HP gas service in order to service a new commercial development, which was previously approved by TRCA under Permit No. C- 150782. No in-water work is associated with this project.

CFN: 58621 - Application #: 1309/17/BRAM Report Prepared by: Zack Carlan, extension 5310, email [email protected] For information contact: Zack Carlan, extension 5310, email [email protected] Date: November 27, 2017

ROGERS COMMUNICATIONS CANADA INC. To undertake sewer, watermain, utility installation or maintenance within an existing roadway on Kennedy Road North, south of Mayfield Road, in the City of Brampton, Etobicoke Creek Watershed as located on property owned by the City of Brampton. The purpose is to install a 100 mm diameter conduit for Rogers Communications Canada Inc. along Kennedy Road North, from Mayfield Road southwards for a length of 150 m, in the City of Brampton. No in-water works are associated with this project.

90 CFN: 58695 - Application #: 1169/17/BRAM Report Prepared by: Leila Sotoudeh, extension 5925, email [email protected] For information contact: Leila Sotoudeh, extension 5925, email [email protected] Date: November 27, 2017

CITY OF MARKHAM

ALECTRA UTILITIES CORPORATION To undertake utility pole installation on Warden Avenue from 16th Avenue to Major Mackenzie Drive, in the City of Markham, Rouge River Watershed as located on the property owned by Regional Municipality of York. The purpose is to undertake replacement of existing poles and guying on Warden Avenue from 16th Avenue to Major Mackenzie Drive. The pole line is being rebuilt to allow for the addition of two new circuits. The new poles will be installed using the Vac- System technique with backfill. The Ministry of Natural Resources and Forestry (MNRF) Redside Dace fisheries timing window will apply to this proposal unless otherwise specified in writing by MNRF.

CFN: 58451 - Application #: 1103/17/MARK Report Prepared by: Harsha Gammanpila, extension 5629, email [email protected] For information contact: Harsha Gammanpila, extension 5629, email [email protected] Date: November 3, 2017

CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA)

ENBRIDGE GAS DISTRIBUTION INC. To undertake sewer and watermain or utility installation or maintenance within an existing road allowance on Finch Avenue near Milvan Drive, in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed as located on the property owned by the City of Toronto under a franchise agreement with Enbridge Gas Distribution Inc. The purpose is to install a NPS 4 PE IP pipeline crossing above a watercourse. The warmwater construction timing window will apply to this project.

CFN: 57834 - Application #: 0576/17/TOR Report Prepared by: Tony To, extension 5798, email [email protected] For information contact: Tony To, extension 5798, email [email protected] Date: October 26, 2017

ROGERS COMMUNICATIONS CANADA INC To undertake sewer, watermain or utility installation or maintenance within an existing roadway on West and Indian Road, in the City of Toronto (Etobicoke York Community Council Area), Waterfront Watershed as located on the property owned by the City of Toronto. The purpose is to install conduit and grade level boxes. No in-water work is within the scope of this project.

91 CFN: 57295 - Application #: 1291/17/TOR Report Prepared by: Heather Wright, extension 5766, email [email protected] For information contact: Heather Wright, extension 5766, email [email protected] Date: December 5, 2017

TELUS COMMUNICATIONS INC. To undertake sewer, watermain or utility installation or maintenance within an existing roadway on Little Avenue, a portion of Lawrence Avenue West, near Black Creek Drive, and a portion of Weston Road, east of Cross Street, in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed as located on property owned by the City of Toronto. The purpose is to install conduit and handwells. The warm water construction timing window of July 1st to March 31st will be applied to this project.

CFN: 57683 - Application #: 1026/17/TOR Report Prepared by: Heather Wright, extension 5766, email [email protected] For information contact: Heather Wright, extension 5766, email [email protected] Date: November 29, 2017

CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA)

CITY OF TORONTO To undertake road/pathway resurfacing or reconstruction at 1132 Leslie Street, in the City of Toronto (North York Community Council Area), Don River Watershed as located on property owned by the City of Toronto. The purpose is to undertake re-paving of an existing access driveway and parking lot in Sunnybrook Park. The warm water construction window of July 1 to March 31 will apply to this project.

CFN: 57170 - Application #: 1104/17/TOR Report Prepared by: Heather Wright, extension 5766, email [email protected] For information contact: Heather Wright, extension 5766, email [email protected] Date: November 22, 2017

TELUS COMMUNICATIONS INC. To undertake sewer and watermain or utility installation or maintenance within an existing roadway on Wilmington Avenue and Finch Avenue West, in the City of Toronto (North York Community Council Area), Don River Watershed as located on property owned by the City of Toronto. The purpose is to install conduit and handwells. No in-water work is within the scope of this project.

CFN: 57282 - Application #: 1137/17/TOR Report Prepared by: Heather Wright, extension 5766, email [email protected] For information contact: Heather Wright, extension 5766, email [email protected] Date: December 5, 2017

92 CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA)

BELL CANADA To undertake sewer, watermain or utility installation or maintenance within an existing roadway at the intersection of Ellesmere Road and Birchmount Road, in the City of Toronto (Scarborough Community Council Area), Highland Creek Watershed as located on property owned by the City of Toronto. The purpose is to install conduit. No in-water work is within the scope of this project.

CFN: 57281 - Application #: 1138/17/TOR Report Prepared by: Heather Wright, extension 5766, email [email protected] For information contact: Heather Wright, extension 5766, email [email protected] Date: October 26, 2017

BELL CANADA To undertake sewer, watermain or utility installation or maintenance within an existing roadway on Morningview Trail, east of Morningside Avenue, in the City of Toronto (Scarborough Community Council Area), Rouge River Watershed as located on property owned by the City of Toronto. The purpose is to install conduit and grade level boxes. No in-water work is within the scope of the project.

CFN: 57283 - Application #: 1238/17/TOR Report Prepared by: Heather Wright, extension 5766, email [email protected] For information contact: Heather Wright, extension 5766, email [email protected] Date: November 22, 2017

BELL CANADA To undertake sewer and watermain or utility installation or maintenance within an existing roadway on , (side of 1 Skyridge Road an across Military Trail), in the City of Toronto (Scarborough Community Council Area), Highland Creek Watershed as located on the property owned by City of Toronto. The purpose is to install conduit and grade level boxes. No in-water work is within the scope of this project.

CFN: 57286 - Application #: 1241/17/TOR Report Prepared by: Heather Wright, extension 5766, email [email protected] For information contact: Heather Wright, extension 5766, email [email protected] Date: November 22, 2017

BELL CANADA To undertake sewer, watermain or utility installation or maintenance within an existing roadway on East Avenue, north of Maberley Court, in the City of Toronto (Scarborough Community Council Area), Waterfront Watershed as located on property owned by the City of Toronto. The purpose is to install conduit. No in-water work is within the scope of this project.

CFN: 57287 - Application #: 1244/17/TOR Report Prepared by: Heather Wright, extension 5766, email [email protected] For information contact: Heather Wright, extension 5766, email [email protected] Date: November 22, 2017

93 BELL CANADA To undertake sewer, watermain or utility installation or maintenance within an existing roadway on Rolark Drive, Ellesmere Road and Birchmount Road, in the City of Toronto (Scarborough Community Council Area), Highland Creek Watershed as located on property owned by the City of Toronto. The purpose is to install conduit and a grade level box. No in-water work is within the scope of this project.

CFN: 57345 - Application #: 0338/17/TOR Report Prepared by: Heather Wright, extension 5766, email [email protected] For information contact: Heather Wright, extension 5766, email [email protected] Date: October 26, 2017

ROGERS COMMUNICATIONS CANADA INC. To undertake sewer, watermain or utility installation or maintenance within an existing roadway on Pharmacy Avenue and Alrita Crescent, northeast of and Ellesmere Road, in the City of Toronto (Scarborough Community Council Area), Don River Watershed as located on property owned by the City of Toronto. The purpose is to install conduit and a vault. No in-water work is within the scope of this project.

CFN: 58253 - Application #: 0856/17/TOR Report Prepared by: Heather Wright, extension 5766, email [email protected] For information contact: Heather Wright, extension 5766, email [email protected] Date: November 10, 2017

CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA)

CITY OF TORONTO To undertake road/pathway resurfacing or reconstruction on Eastern Avenue from Marigold Avenue to Knox Avenue, near Leslie Street, in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed as located on property owned by the City of Toronto. The purpose is to undertake road resurfacing on Eastern Avenue from Knox Avenue to Marigold Avenue in Toronto. No in-water work is within the scope of this project.

CFN: 57292 - Application #: 1237/17/TOR Report Prepared by: Heather Wright, extension 5766, email [email protected] For information contact: Heather Wright, extension 5766, email [email protected] Date: November 22, 2017

94 CITY OF VAUGHAN

ALECTRA UTILITIES CORPORATION To undertake sewer, watermain or utility installation or maintenance within an existing roadway on 9570 Highway 27, between Major Mackenzie Drive and Rutherford Road, in the City of Vaughan, Humber River Watershed as located on the property owned by the Regional Municipality of York, with access granted through municipal consent. The purpose is to remove an existing utility pole at 9570 Highway 27, between Major Mackenzie Drive West and Rutherford Road in the City of Vaughan on property owned by the Regional Municipality of York. The Ministry of Natural Resources and Forestry (MNRF) Redside Dace timing window will apply to these works unless otherwise specified in writing by the MNRF..

CFN: 58163 - Application #: 0972/17/VAUG Report Prepared by: Christine Furtado, extension 5310, email [email protected] For information contact: Christine Furtado, extension 5310, email [email protected] Date: November 3, 2017

ENBRIDGE GAS DISTRIBUTION INC. To undertake sewer, watermain or utility installation or maintenance within an existing roadway on 7895 Jane Street, in the City of Vaughan, Humber River Watershed as located on the property owned by a private landowner to whom Enbridge Gas Distribution Inc. is providing service and on property owned by the City of Vaughan under a franchise agreement with Enbridge Gas Distribution Inc. The purpose is to install NPS 2 ST YJ HP gas service in order to service a new development. No in-water work is associated with this project.

CFN: 58609 - Application #: 1245/17/VAUG Report Prepared by: Tony To, extension 5798, email [email protected] For information contact: Tony To, extension 5798, email [email protected] Date: October 26, 2017

TOWN OF AJAX

ENBRIDGE GAS DISTRIBUTION INC. To undertake sewer, watermain or utility installation within an existing roadway along Rossland Road and a new street tentatively named "Street A", located near Bunting Court in the Town of Ajax, Duffins Creek Watershed as located on the property currently owned by the developer. The property will eventually be assumed by the Town of Ajax, and will be under Franchise Agreement with Enbridge Gas Distribution Inc. The purpose is to install a NPS 2 PE IP gas pipeline in order to service a new residential development, which was approved by TRCA under a separate permit (Permit No. C-160182). No in-water work is associated with the project.

CFN: 58614 - Application #: 1258/17/AJAX Report Prepared by: Zack Carlan, extension 5310, email [email protected] For information contact: Zack Carlan, extension 5310, email [email protected] Date: December 5, 2017

95 ENBRIDGE GAS DISTRIBUTION INC. To undertake sewer, watermain or utility installation or maintenance within an existing roadway along the north side of Rossland Road, and along Seagrave Lane located immediately north of Riverside Drive, in the Town of Ajax, Duffins Creek Watershed, as located on property owned by the Town of Ajax, under Franchise Agreement with Enbridge Gas Distribution Inc., and on property owned by a private landowner from whom Enbridge Gas Distribution Inc. is in the process of obtaining an easement. The purpose is to install a NPS 2 PE IP gas header service to service a future residential development, which was previously approved by TRCA under Permit No. C-170365. No in-water work is associated with this project.

CFN: 58622 - Application #: 1293/17/AJAX Report Prepared by: Zack Carlan, extension 5310, email [email protected] For information contact: Zack Carlan, extension 5310, email [email protected] Date: December 5, 2017

TOWN OF CALEDON

TOWN OF CALEDON To undertake structure maintenance at 15924 Innis Lake Road, in the Town of Caledon, Humber River Watershed as located on property owned by the Town of Caledon. The purpose is to construct a new illuminated sign, located at 15924 Innis Lake Road on the south corner of the Ontario Provincial Police (OPP) access road, in the Town of Caledon. No in-water works are associated with this project.

CFN: 58696 - Application #: 1262/17/CAL Report Prepared by: Leila Sotoudeh, extension 5925, email [email protected] For information contact: Leila Sotoudeh, extension 5925, email [email protected] Date: November 10, 2017

TOWN OF RICHMOND HILL

ENBRIDGE GAS DISTRIBUTION INC. To undertake sewer, watermain or utility watercourse crossing by trenchless technology on the east side of Yonge Street, from Industrial Road to Bernard Avenue, in the Town of Richmond Hill, Don River Watershed as located on the property owned by the Town of Richmond Hill under a franchise agreement with Enbridge Gas Distribution Inc. The purpose is to install a NPS 8 ST DFBE HP gas pipeline crossing a watercourse. No in-water work is associated with this project.

CFN: 58443 - Application #: 1077/17/RH Report Prepared by: Tony To, extension 5798, email [email protected] For information contact: Tony To, extension 5798, email [email protected] Date: October 26, 2017

96 ENBRIDGE GAS DISTRIBUTION INC. To undertake sewer, watermain or utility installation or maintenance within an existing roadway on Yonge Street, Elgin Mills Road, at 10737 Yonge Street, in the Town of Richmond Hill, Don River Watershed as located on the property owned by the Town of Richmond Hill under a franchise agreement with Enbridge Gas Distribution Inc. and on property owned by a private landowner to whom Enbridge Gas Distribution Inc. is providing service. The purpose is to install a NPS 1 1/4 PE IP gas header service. No in-water work is associated with this project.

CFN: 58612 - Application #: 1247/17/RH Report Prepared by: Tony To, extension 5798, email [email protected] For information contact: Tony To, extension 5798, email [email protected] Date: October 26, 2017

ENBRIDGE GAS DISTRIBUTION INC. To undertake sewer and watermain or utility installation or maintenance within an existing roadway on the east side of Yonge Street, between Levendale Road and north of Industrial Road, in the Town of Richmond Hill, Don River Watershed as located on the property owned by the Town of Richmond Hill under a franchise agreement with Enbridge Gas Distribution Inc. The purpose is to install NPS 12 ST DFBE IP gas mains. No in-water work is associated with this project.

CFN: 58613 - Application #: 1256/17/RH Report Prepared by: Tony To, extension 5798, email [email protected] For information contact: Tony To, extension 5798, email [email protected] Date: November 9, 2017

MINOR WORKS LETTER OF APPROVAL

Permission for Minor Works Letter of Approval are implemented by Planning and Development Division staff and are received monthly by the Executive Committee. The permission of minor works is subject to authorization by the Director, Planning and Development and signed by an appointed enforcement officer. All minor works are located within a Regulated Area, outside of the flood plain and in the opinion of staff do not affect the control of flooding, erosion, dynamic beaches, pollution or the conservation of land.

CITY OF BRAMPTON

38 MAVERICK CRESCENT To construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on , 38 Maverick Crescent, in the City of Brampton, Humber River Watershed.

CFN: 57982 - Application #: 1164/17/BRAM Report Prepared by: Andrea Terella, extension 5657, email [email protected] For information contact: Andrea Terella, extension 5657, email [email protected] Date: October 27, 2017

97 6 PORTLANE COURT To install a swimming pool on Lot 55, Plan 43M-1975, 6 Portlane Court, in the City of Brampton, Humber River Watershed.

CFN: 57979 - Application #: 1165/17/BRAM Report Prepared by: Andrea Terella, extension 5657, email [email protected] For information contact: Andrea Terella, extension 5657, email [email protected] Date: October 27, 2017

2 ROCKSTEP COURT To construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) and change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Lot 357, 358, 359, 360, 361, 362, 363, Plan 43M-1566, 2 Rockstep Court, in the City of Brampton, Humber River Watershed.

CFN: 58746 - Application #: 1219/17/BRAM Report Prepared by: Andrea Terella, extension 5657, email [email protected] For information contact: Andrea Terella, extension 5657, email [email protected] Date: October 27, 2017

CITY OF MARKHAM

43 CASTLEVIEW CRESCENT To construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 36, Plan 65M-3644, (43 Castleview Crescent), in the City of Markham, Rouge River Watershed.

CFN: 58935 - Application #: 1375/17/MARK Report Prepared by: Aidan Pereira, extension 5723, email [email protected] For information contact: Doris Cheng, extension 5306, email [email protected] Date: November 30, 2017

CITY OF PICKERING

1998 TREETOP WAY To construct a ground floor addition up to 50 sq. m (538 sq. ft) on Part 1 Lot 10, Plan 40M-1810, (1998 Treetop Way), in the City of Pickering, Petticoat Creek Watershed.

CFN: 58848 - Application #: 1316/17/PICK Report Prepared by: Stephanie Worron, extension 5907, email [email protected] For information contact: Steve Heuchert, extension 5311, email [email protected] Date: November 14, 2017

98 CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA)

44 NORDALE CRESCENT To construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft), construct a ground floor addition up to 50 sq. m (538 sq. ft), construct a ground floor addition or structure greater than 50 sq. m (538 sq. ft) but less than 150 sq. m (1614 sq. ft) and change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Lot 15, Plan 3704, (44 Nordale Crescent), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed.

CFN: 58933 - Application #: 1347/17/TOR Report Prepared by: Anna Lim, extension 5284, email [email protected] For information contact: Mark Rapus, extension 5259, email [email protected] Date: November 24, 2017

10 VISTA HUMBER RIVER To construct a ground floor addition up to 50 sq. m (538 sq. ft) on Lot 26, Plan M-1632, (10 Vista Humber Drive), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed.

CFN: 58846 - Application #: 1340/17/TOR Report Prepared by: Anna Lim, extension 5284, email [email protected] For information contact: Mark Rapus, extension 5259, email [email protected] Date: November 22, 2017

240 ST. MARKS ROAD To install a swimming pool, undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads), construct a ground floor addition up to 50 sq. m (538 sq. ft) and change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Lot 59, Plan 4655, (240 St. Marks Road), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed.

CFN: 58752 - Application #: 1253/17/TOR Report Prepared by: Anna Lim, extension 5284, email [email protected] For information contact: Mark Rapus, extension 5259, email [email protected] Date: November 13, 2017

76 WEST DEANE PARK DRIVE To construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) and change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Lot 138, Plan 5719, (76 West Deane Park Drive), in the City of Toronto (Etobicoke York Community Council Area), Mimico Creek Watershed.

CFN: 58860 - Application #: 1343/17/TOR Report Prepared by: Anna Lim, extension 5284, email [email protected] For information contact: Mark Rapus, extension 5259, email [email protected] Date: November 22, 2017

99 10 MEADOWCREST ROAD To change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on , (18 Meadowcrest Road), in the City of Toronto (Etobicoke York Community Council Area), Mimico Creek Watershed.

CFN: 58662 - Application #: 1182/17/TOR Report Prepared by: Nicole Moxley, extension 5968, email [email protected] For information contact: Steve Heuchert, extension 5311, email [email protected] Date: October 27, 2017

17 NORBERT CRESCENT To change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Lot 21, Plan 7736, (17 Norbert Crescent), in the City of Toronto (Etobicoke York Community Council Area), Etobicoke Creek Watershed.

CFN: 58744 - Application #: 1270/17/TOR Report Prepared by: Anna Lim, extension 5284, email [email protected] For information contact: Mark Rapus, extension 5259, email [email protected] Date: November 8, 2017

CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA)

61 YATESBURY ROAD To construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on , (61 Yatesbury Road), in the City of Toronto (North York Community Council Area), Don River Watershed.

CFN: 58742 - Application #: 1266/17/TOR Report Prepared by: Stephanie Worron, extension 5907, email [email protected] For information contact: Mark Rapus, extension 5259, email [email protected] Date: November 9, 2017

CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA)

185 BETHANY LEIGH DRIVE To change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Lot 25, Plan M2024, (185 Bethany Leigh Drive), in the City of Toronto (Scarborough Community Council Area), Highland Creek Watershed.

CFN: 57983 - Application #: 1187/17/TOR Report Prepared by: Stephanie Worron, extension 5907, email [email protected] For information contact: Mark Rapus, extension 5259, email [email protected] Date: October 24, 2017

100 CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA)

21 COPELAND AVENUE To construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft), construct a ground floor addition or structure greater than 50 sq. m (538 sq. ft) but less than 150 sq. m (1614 sq. ft) and change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Lot 120, Plan E - 461, (21 Copeland Avenue), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed.

CFN: 58932 - Application #: 1348/17/TOR Report Prepared by: Anna Lim, extension 5284, email [email protected] For information contact: Mark Rapus, extension 5259, email [email protected] Date: November 24, 2017

CITY OF VAUGHAN

1 HAVENBROOK COURT To construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on , (1 Havenbrook Court), in the City of Vaughan, Don River Watershed.

CFN: 58568 - Application #: 1109/17/VAUG Report Prepared by: Anthony Syhlonyk, extension 5272, email [email protected] For information contact: Colleen Bonner, extension 5307, email [email protected] Date: October 27, 2017

161 TWIN HILLS CRESCENT To install a swimming pool, undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) and construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 15, Plan 65M-4111, (161 Twin Hills Crescent), in the City of Vaughan, Humber River Watershed.

CFN: 58704 - Application #: 1192/17/VAUG Report Prepared by: Polina Bam, extension 5256, email [email protected] For information contact: Colleen Bonner, extension 5307, email [email protected] Date: November 10, 2017

TOWN OF AJAX

92 ROBERSON DRIVE To construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 188, Plan 40M-1793, (92 Roberson Drive), in the Town of Ajax, Duffins Creek Watershed.

CFN: 58734 - Application #: 1231/17/AJAX Report Prepared by: Stephanie Worron, extension 5907, email [email protected] For information contact: Steve Heuchert, extension 5311, email [email protected] Date: October 30, 2017

101 98 SHARPLIN DRIVE To construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 32, Plan 40M-2487, (98 Sharplin Drive), in the Town of Ajax, Carruthers Creek Watershed.

CFN: 58937 - Application #: 1376/17/AJAX Report Prepared by: Stephanie Worron, extension 5907, email [email protected] For information contact: Steve Heuchert, extension 5311, email [email protected] Date: December 5, 2017

TOWN OF CALEDON

91 SACKVILLE STREET To construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 32, 33, 34, Block 4, Plan BOL-7, Part 1 Plan 43R-9835, 91 Sackville Street, in the Town of Caledon, Humber River Watershed.

CFN: 58759 - Application #: 1283/17/CAL Report Prepared by: Andrea Terella, extension 5657, email [email protected] For information contact: Andrea Terella, extension 5657, email [email protected] Date: November 13, 2017

13905 KENNEDY ROAD To construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 3, Plan 43M- 1897, 13905 Kennedy Road, in the Town of Caledon, Humber River Watershed.

CFN: 58737 - Application #: 1235/17/CAL Report Prepared by: Andrea Terella, extension 5657, email [email protected] For information contact: Andrea Terella, extension 5657, email [email protected] Date: November 7, 2017

24 FILTON ROAD To install a swimming pool on Lot 12, Plan 43M-1481, 24 Filton Road, in the Town of Caledon, Humber River Watershed.

CFN: 58676 - Application #: 1177/17/CAL Report Prepared by: Andrea Terella, extension 5657, email [email protected] For information contact: Andrea Terella, extension 5657, email [email protected] Date: November 7, 2017

TOWN OF RICHMOND HILL

441 PARADELLE DRIVE To construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 82, Plan 65M-3727, (441 Paradelle Drive), in the Town of Richmond Hill, Humber River Watershed.

102 CFN: 58774 - Application #: 1275/17/RH Report Prepared by: Nicholas Cascone, extension 5927, email [email protected] For information contact: Nicholas Cascone, extension 5927, email [email protected] Date: November 15, 2017

TOWNSHIP OF KING

35 HOGAN COURT To install a swimming pool and undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on , (35 Hogan Court), in the Township of King, Humber River Watershed.

CFN: 58741 - Application #: 1248/17/KING Report Prepared by: Anthony Syhlonyk, extension 5272, email [email protected] For information contact: Colleen Bonner, extension 5307, email [email protected] Date: October 25, 2017

103 PERMIT APPLICATIONS 10.7 – 10.12 ARE MAJOR APPLICATION - REGULAR

Applications that involved a more complex suite of technical studies to demonstrate consistency with policies; applications that cover a significant geographic area (e.g. subdivisions, stormwater management ponds), extensive modifications to the landscape, major infrastructure projects, emergency infrastructure works, resolution of violations/after the fact permits, trail construction.

CITY OF MARKHAM

10.7 29 GLENBOURNE PARK DRIVE To construct, reconstruct, erect or place a building or structure on , (29 Glenbourne Park Drive), in the City of Markham, Rouge River Watershed. The purpose is to undertake works within the Rouge River Watershed to facilitate the restoration of an area disturbed by unauthorized site alteration and grading works within a TRCA Regulated Area. The proposed works will resolve the outstanding TRCA violation (No. V3044) on the subject property. In addition, the works also includes the construction of a deck (approximately 270 square feet in size) at the rear of the existing dwelling.

The permit will be issued for the period of December 15, 2017 to December 14, 2019 in accordance with the following documents and plans which form part of this permit:

 Site Plan and Restoration Planting Plan, prepared by Agent (Qining Ran), no date provided, received by TRCA on December 6, 2017;  Restoration Planting Plan Memo, prepared by Agent (Qining Ran), dated December 6, 2017, received by TRCA on December 6, 2017.

104 RATIONALE The application was reviewed by staff on the basis of the following information:

Proposal: The purpose of this application is to undertake works within the Rouge River Watershed to resolve an outstanding violation in respect to unauthorized site alteration and grading works within a TRCA Regulated Area. The rear of the subject property contains a portion of the Berczy Creek valley corridor associated with the Rouge River. TRCA Enforcement staff issued Violation No. V3044 on May 19, 2017 for the unauthorized site alteration and grading works adjacent to and within the vegetated area contiguous with the valley corridor. To restore and enhance the ecological condition of the disturbed area on the subject property, the applicant has submitted a restoration planting plan. The restoration planting plan consists of native, non-invasive species of trees and shrubs with deep root systems which will be planted along the edge of the dripline at the mid-point of the property. Furthermore, the existing grades prior to the disturbance will be reestablished as part of the proposed works. TRCA Ecology staff are satisfied that the restoration planting plan will remediate the disturbed area caused by the unauthorized site alteration adjacent/within the valley corridor and will provide a net ecological gain to the valley system. In addition to the proposed restoration works on the subject property, the applicant is proposing to construct a deck, approximately 270 square metres in size at the rear of the existing dwelling. The location of the proposed deck is appropriately setback from the valleyland feature and extends no further than the existing limit of development. As such, there are no flood or geotechnical related concerns anticipated as part of this application.

Additional Fee: The applicant initiated works in advance of a permit pursuant to Ontario Regulation 166/06 being issued. The applicant has paid the application fee plus 100%, as required in association with the violation of the regulation.

Control of Flooding: The proposed development is located outside of the Regional Storm Floodplain. As such, no impacts to the storage and/or conveyance of floodwaters are anticipated.

Pollution: Appropriate erosion and sediment controls (i.e. silt fencing) will be installed and maintained throughout the duration of the project.

Dynamic Beaches: Not applicable

Erosion: There are no anticipated geotechnical and/or slope stability concerns associated with this project.

Conservation of Land: TRCA staff required a restoration planting plan to aid in reestablishing and remediating the area disturbed by the unauthorized site alteration and grading. The restoration planting plan consists of native, non-invasive species of trees and shrubs with deep root systems and will enhance the overall ecological condition of the valley corridor.

105 Plantings

All plantings proposed are deep rooting, native, non-invasive species in accordance with TRCA's guidelines.

Policy Guidelines: This proposal complies with Section 8.4 - General Regulation Policies - of The Living City Policies for Planning and Development in the Watersheds of the Toronto and Region Conservation Authority.

CFN: 58664 - Application #: 1175/17/MARK Report Prepared by: Aidan Pereira 5723 [email protected] For information contact: Doris Cheng 5306 [email protected] Date: December 11, 2017

106 CITY OF VAUGHAN

10.8 75 VALLEY ROAD To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 2, Plan 3755, (75 Valley Road), in the City of Vaughan, Humber River Watershed. The purpose is to facilitate, within TRCA's Regulated Area of the Humber River Watershed, the continued development of a partially completed 541.86 sq. m. (5,832 sq. ft.) 2 storey dwelling and new septic system on lands known municipally as 75 Valley Road, in the City of Vaughan. The described works were started without TRCA or municipal permits. As such, the Owner has paid double the application fee as required for voluntary compliance related to resolution of a violation of Ontario Regulation 166/06.

The permit will be issued for the period of December 15, 2017 to December 14, 2019 in accordance with the following documents and plans which form part of this permit:

 Drawing A1.0, Site Plan, prepared by Fausto Cortese Architects, dated December 2016, received by TRCA September 29, 2017; redline revised by TRCA on December 6, 2017 for erosion and sediment control details;  Drawing A2.0, First Floor Plan, prepared by Fausto Cortese Architects, dated December 2016, received by TRCA September 29, 2017;  Drawing A2.1, Second Floor Plan, prepared by Fausto Cortese Architects, dated December 2016, received by TRCA September 29, 2017;  Drawing A2.2, Roof Plan, prepared by Fausto Cortese Architects, dated December 2016, received by TRCA September 29, 2017;  Drawing A3.0, Elevations, prepared by Fausto Cortese Architects, dated December 2016, received by TRCA September 29, 2017;  Drawing A3.1, Elevations, prepared by Fausto Cortese Architects, dated December 2016, received by TRCA September 29, 2017;  Release and Hold Harmless Agreement, prepared by TRCA, dated December 6, 2017, signed by the owner of 75 Valley Road, in the City of Vaughan, December 6, 2017.

107 RATIONALE The application was reviewed by staff on the basis of the following information:

Proposal: The purpose is to facilitate, within TRCA's Regulated Area of the Humber River Watershed, the continued development of a partially completed 541.86 sq. m. (5,832 sq. ft.) 2 storey dwelling and new septic system on lands known municipally as 75 Valley Road, in the City of Vaughan. The entire property is within the Humber River valley corridor, on the valley floor adjacent to the flood plain and river bank. The Humber River is just east of the single family dwelling. The property is flat and void of any significant vegetation. The proposed structure is outside of the meander belt to the Humber River and is adjacent to the stable top of slope of the river bank. The flood plain is contained within the banks of the Humber River in this location.

In 2016, works were undertaken by the applicant to remove a previously existing 1 storey dwelling on the property and replace it with a 2 storey dwelling on the existing foundation without building permits from the City of Vaughan or TRCA. A Stop Work Order was issued by the City of Vaughan requiring the applicant to obtain proper approvals in December of 2016. Since January 2017, TRCA staff have been working with the applicant to advance the permit. As the replacement dwelling is built on the foundation of the previous dwelling and was shown to not have increased the risk, it was agreed that the replacement dwelling could be permitted provided the owner enter into a "Release and Hold Harmless Agreement" which acknowledges the risk and releases TRCA from claims arising from any erosion or flooding impact from the location of the home on the property.

This permit will also facilitate the installation of a replacement septic system, which will be set back further from the erosion and flooding hazards on the property than the partially completed dwelling. The replacement septic system is located outside of all hazards and the existing system is to be abandoned in place.

Fee and Permit Timing: As the works were started prior to the issuance of a permit under Ontario Regulation 166/06, the permit is to be issued "after-the-fact". The applicant has paid double the application fee as required for a permit "after-the-fact" in association with the violation of Ontario Regulation 166/06. In this case, the time frame for this permit will not be shortened so that the applicant has a full 2 years to complete all works.

Control of Flooding: TRCA staff have confirmed that the proposed dwelling is outside of the Regional Storm Flood Plain of the adjacent Humber River. The flood plain is contained within the banks of the Humber River in this location. Per the signed agreement included with this permit, the risk of flooding on this property cannot be completely eliminated, and the owner agrees to the release and hold harmless agreement, releasing TRCA from any liability arising from flooding or erosion risks to the property.

Pollution: Construction of the dwelling was undertaken and largely completed prior to the issuance of any building permits. Erosion and sediment controls consisting of silt soxx have been proposed for the outstanding septic works and will be maintained through all phases of construction.

Dynamic Beaches: Not applicable.

108 Erosion: The applicant has submitted fluvial geomorphological and slope stability assessments indicating that the erosion risk to the property has not been increased by the addition of a second storey to the footprint of the previous dwelling. Per the signed agreement included with this permit, the risk of erosion on this property cannot be completely eliminated, and the owner agrees to the release and hold harmless agreement, releasing TRCA from any liability arising from flooding or erosion risks to the property.

Conservation of Land: No significant vegetation has been removed as a part of this proposal. The replacement structure is located on the foundations of the previous dwelling and the proposed septic area consists of manicured lawn.

Plantings As no significant vegetation is to be removed, a compensation planting plan was not required.

Policy Guidelines: This proposal has met the general intent of Section 8.4 - General Regulation Policies, and Section 8.5.1 - Development within the Flood Hazard and Erosion Hazard of Valley and Stream Corridors, of The Living City Policies for Planning and Development in the Watersheds of the Toronto and Region Conservation Authority. The owner has worked with TRCA to demonstrate there will be no impacts to the control of flooding, erosion, dynamic beaches, pollution, or the conservation of land.

CFN: 58666 - Application #: 1173/17/VAUG Report Prepared by: Anthony Syhlonyk 5272 [email protected] For information contact: Coreena Smith 5269 [email protected] Date: December 8, 2017

109 CITY OF VAUGHAN

10.9 NASHVILLE (NORTH) DEVELOPMENTS INC. To site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Part Lot 24, Concession 9, (10533 Huntington Road), in the City of Vaughan, Humber River Watershed as located on the property owned by Nashville (North) Developments Inc. The purpose is to allow development and the alteration of a watercourse within a Regulated Area of the Humber River Watershed to facilitate topsoil stripping and the installation of sediment and erosion control measures in Phase 1 of a draft approved plan of subdivision (19T- 16V010) also known as the Mizuno lands within Block 61 West, northeast of Major Mackenzie Drive and Huntington Road, in the City of Vaughan.

The permit will be issued for the period of December 15, 2017 to December 14, 2019 in accordance with the following documents and plans which form part of this permit:

 Letter of Undertaking, prepared by Schaeffers Consulting Engineers, dated December 12, 2017, indicating the owner will undertake to work with TRCA to resolve any outstanding issues to the satisfaction of TRCA prior to the release of the permit, received by TRCA on December 12, 2017.

RATIONALE The application was reviewed by staff on the basis of the following information:

Proposal: The purpose is to allow development and the alteration of a watercourse within a Regulated Area of the Humber River Watershed to facilitate topsoil stripping and the installation of sediment and erosion control measures in Phase 1 of a draft approved plan of subdivision (19T- 16V010) also known as the Mizuno lands within Block 61 West, northeast of Major Mackenzie Drive and Huntington Road, in the City of Vaughan.

110 There are two watercourses on the Nashville Developments (North) Inc. property: one which traverses the central portion of the site (Tributary 'A') and a second in the eastern portion of the property (Tributary 'C'). There are small wetland pockets associated with each tributary and a woodland defining the Tributary 'C' corridor. Phase 1 of the draft approved plan of subdivision is west of Tributary 'A'.

This permit will facilitate topsoil stripping and the installation of various erosion and sediment control measures in Phase 1. The watercourse will be isolated from the topsoil stripping activities by a double row of siltation control fencing. Other sediment and erosion control measures will also be employed including, but not limited to, temporary swales, flow dispersion dams, sediment traps and erosion control blankets.

It should be noted that only a portion of the topsoil stripping activity is regulated by TRCA. The applicant also requires approval from the City of Vaughan.

Control of Flooding: There will be no impact on the storage or conveyance of floodwaters.

Pollution: Sediment and erosion control measures will be installed and maintained throughout construction to prevent sediment from entering the adjacent natural features.

Dynamic Beaches: Not applicable.

Erosion: There are no geotechnical/slope stability issues associated with the proposed development. In addition, the implementation of the aforementioned sediment and erosion control measures will minimize erosion on the site.

Conservation of Land: All natural features on the site will be protected during the topsoil stripping activities.

Plantings A planting plan has not been submitted with the current proposal, but the applicant is required to provide extensive plantings to satisfy TRCA's conditions of draft plan approval. These plantings will occur elsewhere on the site.

As part of the current proposal, seeding of the disturbed areas will be utilized as a means of erosion control.

Policy Guidelines: This proposal complies with Section 8.4 - General Regulation Policies - of The Living City Policies for Planning and Development in the Watersheds of the Toronto and Region Conservation Authority.

CFN: 58592 - Application #: 1124/17/VAUG Report Prepared by: Coreena Smith 5269 [email protected] For information contact: Coreena Smith 5269 [email protected] Date: December 12, 2017

111 TOWN OF CALEDON

10.10 CASTLES OF CALEDON CORPORATION To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 4, Concession 6, (89 Walker Road West), in the Town of Caledon, Humber River Watershed as located on the property owned by Castles of Caledon Corporation. The purpose is to grade, place fill and construct interim servicing within a Regulated Area of the Humber River watershed to facilitate the development of a new residential subdivision.

The permit will be issued for the period of December 15, 2017 to December 14, 2019 in accordance with the following documents and plans which form part of this permit:

 Letter of undertaking provided by John Spina, Castles of Caledon Corp., dated December 12, 2017, to address all outstanding TRCA requirements, prior to the issuance of the permit.

RATIONALE The application was reviewed by staff on the basis of the following information:

Proposal: This permit is the first of two associated with the Castles of Caledon Corp. development, located at the north-east corner of Walker Rd. and Mountainview Rd. in Caledon East, in the Town of Caledon. The Castles of Caledon Corp. development is a draft approved residential plan of subdivision, which was approved by the OMB in 2015. TRCA staff participated in the hearing to ensure that our interests with respect to the natural features on the site (i.e. the tributaries and Provincially Significant Wetlands (PSWs)), natural hazards and Stormwater Management (SWM) were adequately considered. The hearing resulted in a settlement being reached, in which TRCA’s interests were adequately addressed.

112 The subject lands are approximately 24.92 ha in size and are generally surrounded by residential, rural and agricultural land uses. The proposed development consists of a total of 200 single family homes; two SWM ponds; and two environmental protection blocks that total approximately 8.91 ha in size. Two tributaries of the West Humber River watershed traverse the subject lands. The headwater reach of Bracken Creek flows from north to south on the west side of the subject property. To the east, a portion of Walker Creek flows from north to south. Both tributaries continue to flow south and drain into the Caledon East Swamp, which is an Environmentally Sensitive Area (ESA). Two Provincially Significant Wetlands (PSW’s) on the subject property associated with the tributaries have been evaluated by the Ministry of Natural Resources. In addition, a portion of the Caledon Complex ESA occurs in the north-east corner of the property. The proposed development is adequately setback from the natural heritage features and natural hazards on the property.

TRCA regulates development adjacent to the wetlands and tributaries. The applicant is presently proposing to initiate earthworks and initial servicing on the site. TRCA staff have reviewed the proposed works, and are satisfied with the erosion and sediment control measures, and the earthworks proposed. A future permit application will be brought forward at a later date for the permanent development and servicing within the Regulated areas.

Control of Flooding: The proposed development is located outside of the Regulatory Floodplain. As such, no impacts on the storage or conveyance of floodwaters are anticipated.

Pollution: Sediment and erosion control measures will be installed and maintained throughout construction to prevent sediment from migrating from the portion of the site on which the development is being completed.

Dynamic Beaches: Not applicable.

Erosion: There are no existing geotechnical/slope stability issues associated with this site. In addition, the implementation of the aforementioned sediment and erosion control measures will minimize erosion on the site.

Conservation of Land: This development, and the works proposed under this permit application are located on lands that have been designated for development by the Town of Caledon. All significant natural systems and the associated buffers have been protected through the plan of subdivision.

Plantings A planting plan will form part of the second permit application for development on the subject property, which will be brought forward to the Executive Committee for consideration at a later date.

As part of the current proposal, seeding of the disturbed areas will be utilized as a means of erosion control.

113 Policy Guidelines: This proposal is consistent with Section 8.4 General Regulation Policies of The Living City Policies for Planning and Development in the Watersheds of the Toronto and Region Conservation Authority.

CFN: 55989 - Application #: 0571/16/CAL Report Prepared by: Leilani Lee-Yates 5370 [email protected] For information contact: Leilani Lee-Yates 5370 [email protected] Date: December 12, 2017

114 TOWN OF RICHMOND HILL

10.11 MATTAMY (ELGIN MILLS) LIMITED To site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and interfere with a wetland on Part Lot 27, 28, Concession 2, (Leslie Street and Elgin Mills Road East), in the Town of Richmond Hill, Rouge River Watershed as located on the property owned by Mattamy (Elgin Mills) Limited. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed to facilitate the grading and servicing of a municipally approved draft plan of subdivision. These works include the installation of revised sediment and erosion control measures, the construction of an outfall and permanent stormwater management pond (Pond D1) which outlets to a pocket wetland and infiltration swale, prior to discharging to the natural heritage system and Tributary 2-2 within the North Leslie Secondary Plan Area.

The permit will be issued for the period of December 15, 2017 to December 14, 2019 in accordance with the following documents and plans which form part of this permit:

 Drawing No. 45, Plan and Profile of SWM Pond D1 Inlet, prepared by DSEL, dated September 2016, revised September 29, 2017, stamped received by TRCA October 3, 2017;  Drawing No. 46, Plan and Profile of SWM Pond D1 Outfall, prepared by DSEL, dated September 2016, revised September 29, 2017, stamped received by TRCA October 3, 2017;  Drawing No. 49, SWM Pond D1, prepared by DSEL, revised September 29, 2017, stamped received by TRCA October 3, 2017;  Drawing No. 49A, SWM Pond D1 Subdrain, prepared by DSEL, dated September 2016, revised September 29, 2017, stamped received by TRCA October 3, 2017;  Drawing No. 50, SWM Pond D1 Sections, prepared by DSEL, dated September 2016, revised September 29, 2017, stamped received by TRCA October 3, 2017;  Drawing No. 51, SWM Pond D1 Details, prepared by DSEL, dated September 2016, revised September 29, 2017, stamped received by TRCA October 3, 2017;

115  Drawing No. SILT 1, Erosion & Sediment Control Plan Stage 1 - Phase 1, dated September 2016, revised December 8, 2017, received by TRCA December 11, 2017;  Drawing No. SILT-1B, Erosion & Sediment Control Plan Stage 1 Phase 2, dated September 2016, revised December 8, 2017, received by TRCA December 11, 2017;  Drawing No. SILT-2, Erosion and Sediment Control Plan Stage 2 - Phase 1, prepared by DSEL dated September 2016, revised December 8, 2017, received by TRCA December 11, 2017;  Drawing No. SILT-2A, Erosion and Sediment Control Plan Stage 2 - Phase 2, prepared by DSEL dated September 16, 2017, revised December 8, 2017, received by TRCA December 11, 2017;  Drawing No. SILT - 3, Erosion & Sediment Control Details, prepared by DSEL, dated September 2016, revised December 8, 2017, received by TRCA December 11, 2017;  Drawing No. SILT-4, Erosion and Sediment Control Details, prepared by DSEL dated September 16, 2016, revised May 4, 2017, received by TRCA December 11, 2017;  Drawing No. Geo-1, Pond D1 and D2 Outfall Plan, prepared by Geo Morphix, dated revised September 2017, stamped received by TRCA October 3, 2017;  Drawing No. Geo-3, Pond D1 Outfall and Bioswale Plan and Cross Sections, prepared by Geo Morphix, dated revised September 2017, stamped received by TRCA October 3, 2017;  Drawing No. Det-1, Pond D1 and D2 Outfall Details, prepared by Geo Morphix, dated revised September 2017, stamped received by TRCA October 3, 2017;  Sheet SWM1, Stormwater Management Pond D1 - Landscape Plan, prepared by NAK Design Strategies, dated December 2015, revised September 6, 2017, stamped received by TRCA October 3, 2017;  Sheet D1 - Planting Details, prepared by NAK Design Strategies, dated December 2016, revised September 29, 2017, stamped received by TRCA October 3, 2017;  Sheet D4 - Fence & Paving Details, prepared by NAK Design Strategies, dated December 2016, revised September 29, 2017, stamped received by TRCA October 3, 2017;

RATIONALE The application was reviewed by staff on the basis of the following information:

Proposal: The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the final construction of a permanent stormwater management pond (Pond D1) associated with the municipally approved draft plan of subdivision (19T(R)- 14006) and municipal permits. TRCA issued a permit for Phase 1 grading works which included (TRCA Permit C-170680) topsoil stripping and stockpiling, site alteration and grading, importing large volumes of fill, implementing temporary stormwater management facilities, and implementing sediment and erosion control measures. The subject property is located north of Elgin Mills Road East, west of Leslie Street, and south of 19th Avenue, in the Town of Richmond Hill. Located in the North Leslie Secondary Plan Area, the Master Environmental Servicing Plan (MESP) for North Leslie (west of Leslie Street) was reviewed and approved in principle by TRCA staff on October 9, 2015.

116 Works proposed under this permit application include establishing the final grades for stormwater management pond (Pond D1) to service a portion of the approved plan of subdivision to treat stormwater prior to discharging to the adjacent natural heritage features, as established through the approved Master Environmental Servicing Plan, the Environmental Impact Study (EIS), the Environmental Management Plan (EMP), and the Functional Servicing and Stormwater Management reports. Adjacent significant natural heritage features including the Rouge River Tributary 2-2, wetland and floodplain have been protected through the provincial and the OMB approved secondary plan policies for the area, which includes a 30 metre buffer from all features. However, through further detailed design, it was determined that minor grading encroachments would be required to facilitate a stable grade transition to the natural heritage system (NHS). As such, in collaboration with the Town of Richmond Hill and TRCA senior staff, encroachments into the 30 metre buffer (which will be conveyed to the Town of Richmond Hill) have been accommodated for the maintenance access road around the pond (to be constructed with permeable paving and also is to be integrated into the overall trail network within the North Leslie Secondary Plan area). Furthermore, the Town of Richmond Hill Engineering staff have provided TRCA staff with an email confirming that design of Pond D1 is satisfactory to them and a Town permit for its construction will be issued in the near future.

The final stormwater management pond design is consistent with the principles of the approved MESP, and a comprehensive monitoring plan and adaptive management plan has been completed to TRCA’s satisfaction. Staff reviewed the details associated with the outlet structure which includes the construction of a pocket wetland and infiltration swale to provide tertiary controls prior to discharge to the provincially significant wetland (PSW) and Tributary 2-2. This wetland and infiltration channel is consistent with the approved MESP and provides water quantity and quality requirements to meet the Feature Based Water Balance calculations for the PSW and flow to Tributary 2-2. Staff are satisfied with the design, level of sediment and erosion controls, and the dissipation of discharge to the natural features subject to the enhanced planting and restoration plan. TRCA staff note that the Ministry of Natural Resources and Forestry (MNRF) Redside Dace construction timing window may apply to this proposal unless otherwise specified in writing by MNRF.

Control of Flooding: The proposed stormwater management pond is located outside of the Regional Storm Floodplain, however a portion of the outfall is located within the floodplain. TRCA staff have determined the proposed works are minor and will not adversely impact the storage and/or conveyance of flood waters. As such, staff do not anticipate any impacts related to flood control or flood conveyance as a result of the works.

Pollution: Appropriate sediment and erosion control measures have been installed as part of the Phase 1 and Phase 2 site alteration and grading plans, and will be maintained during this phase of construction. In addition, the Environmental Management Plan has been approved with a comprehensive monitoring plan to monitor the proposed works and their impact to the adjacent natural heritage features.

Dynamic Beaches: Not applicable

117 Erosion: As a result of the dynamic hydrogeological conditions within North Leslie, the site was required to import large volumes of fill (TRCA Permit C-170680) to raise the overall elevation of the site to ensure that all underground structures would be located outside of the groundwater table. The elevated developable areas of the site will be transitioned to the Natural Heritage System lands through geotechnically stabilized slopes ranging from 3:1 to 2:1, at the approval of the Town of Richmond Hill. Furthermore, a series of retaining walls will also be constructed to limit encroachments into the natural heritage system. These walls were designed by a structural engineer, and have been accepted by the Town of Richmond Hill. As such, TRCA staff are satisfied that the geotechnical and/or slope stability concerns associated with this application have been addressed to the satisfaction of the Town and the TRCA.

Conservation of Land: All disturbed areas are to be isolated from the natural heritage system with an approved sediment and erosion control measure plan, designed to the satisfaction of TRCA staff. No significant vegetation is proposed to be removed, and staff note that a approvals are required from MOECC for the stormwater management pond. A further permit may be required from the Ministry of Natural Resources and Forestry (MNRF) with respect to the Redside Dace construction timing window of July 1 to September 15, unless otherwise specified in writing by MNRF.

Plantings The lands subject to this permit has been previously utilized as farm land. As such, no significant vegetation was removed. However, disturbed areas will be restored and stabilized in accordance with the approved comprehensive native, non-invasive enhancement planting plan submitted in support of this permit and draft plan. The planting plan includes all plantings to be implemented within the environmental buffer, all disturbed areas, and within the disturbed areas of the proposed outlet structure and pocket wetlands, consistent with TRCA planting guidelines and approved native seed mixes.

Policy Guidelines: This proposal is consistent with Section 8.4 - General Regulation Policies of the Living City Policies for Planning and Development in the Watersheds of the Toronto and Region Conservation Authority.

CFN: 56719 - Application #: 1027/16/RH Report Prepared by: Doris Cheng 5306 [email protected] For information contact: Doris Cheng 5306 [email protected] Date: December 12, 2017

118 TOWN OF RICHMOND HILL

10.12 MATTAMY (ELGIN MILLS) LIMITED To site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and interfere with a wetland on Part Lot 27, 28, Concession 2, (Leslie Street and Elgin Mills Road East), in the Town of Richmond Hill, Rouge River Watershed as located on the property owned by Mattamy (Elgin Mills) Limited. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed to facilitate the grading and servicing of a municipally approved draft plan of subdivision. These works include the installation of revised sediment and erosion control measures, the construction of an outfall and permanent stormwater management pond (Pond D2) which outlets to a pocket wetland and infiltration swale, prior to discharging to the natural heritage system and Tributary 2-1 within the North Leslie Secondary Plan Area.

The permit will be issued for the period of December 15, 2017 to December 14, 2019 in accordance with the following documents and plans which form part of this permit:

 Drawing No. 47, Plan and Profile of SWM Pond D2 Inlet, prepared by DSEL, dated September 2016, revised October 31, 2017, stamped received by TRCA November 28, 2017;  Drawing No. 48, Plan and Profile of SWM Pond D2 Outfall, prepared by DSEL, dated September 2016, revised October 31, 2017, stamped received by TRCA November 28, 2017;  Drawing No. 52, SWM Pond D2, prepared by DSEL, dated September 2016, revised October 31, 2017, stamped received by TRCA November 28, 2017;  Drawing No. 52A, SWM Pond D2 Subdrain, prepared by DSEL, dated September 2016, revised October 31, 2017, stamped received by TRCA November 28, 2017;  Drawing No. 53, SWM Pond D2 Sections, prepared by DSEL, dated September 2016, revised October 31, 2017, stamped received by TRCA November 28, 2017;  Drawing No. 54, SWM Pond D2 Details, prepared by DSEL, dated September 2016, revised October 31, 2017, stamped received by TRCA November 28, 2017;

119  Drawing No. SILT 1, Erosion & Sediment Control Plan Stage 1 - Phase 1, dated September 2016, revised December 8, 2017, received by TRCA December 11, 2017;  Drawing No. SILT-1B, Erosion & Sediment Control Plan Stage 1 Phase 2, dated September 2016, revised December 8, 2017, received by TRCA December 11, 2017;  Drawing No. SILT-2, Erosion and Sediment Control Plan Stage 2 - Phase 1, prepared by DSEL dated September 2016, revised December 8, 2017, received by TRCA December 11, 2017;  Drawing No. SILT-2A, Erosion and Sediment Control Plan Stage 2 - Phase 2, prepared by DSEL dated September 16, 2017, revised December 8, 2017, received by TRCA December 11, 2017;  Drawing No. SILT - 3, Erosion & Sediment Control Details, prepared by DSEL, dated September 2016, revised December 8, 2017, received by TRCA December 11, 2017;  Drawing No. SILT-4, Erosion and Sediment Control Details, prepared by DSEL dated September 16, 2016, revised May 4, 2017, received by TRCA December 11, 2017;  Sheet SWM2, Stormwater Management Pond D2 Landscape Plan, prepared by NAK Design Strategies, dated December 2015, revised September 6, 2017, received by TRCA October 3, 2017;  Sheet D1, Planting Details, prepared by NAK Design Strategies, dated December 2016, revised September 29, 2017, received by TRCA October 3, 2017;  Sheet D2, Fencing & Paving Details, prepared by NAK Design Strategies, dated December 2016, revised September 29, 2017, received by TRCA October 3, 2017;  Sheet D4, Fencing & Paving Details, prepared by NAK Design Strategies, dated December 2016, revised September 29, 2017, received by TRCA October 3, 2017;  Drawing GEO-1, Pond D1 and D2 Outfall Plan, prepared by GEO Morphix Ltd., dated September 2017, received by TRCA October 3, 2017;  Drawing GEO-2, Pond D2 Outfall Plan and Cross Sections, prepared by GEO Morphix Ltd., dated September 2017, received by TRCA October 3, 2017;  Drawing DET-1 Pond D1 and D2 Outfall Details, prepared by GEO Morphix Ltd., dated September 2017, received by TRCA October 3, 2017;

RATIONALE The application was reviewed by staff on the basis of the following information:

Proposal: The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the final construction of a permanent stormwater management pond (Pond D2) associated with the municipally approved draft plan of subdivision (19T(R)- 14006) and municipal permits. TRCA issued a permit for Phase 1 grading works which included (TRCA Permit C-170680) topsoil stripping and stockpiling, site alteration and grading, importing large volumes of fill, implementing temporary stormwater management facilities, and implementing sediment and erosion control measures. The subject property is located north of Elgin Mills Road East, west of Leslie Street, and south of 19th Avenue, in the Town of Richmond Hill. Located in the North Leslie Secondary Plan Area, the Master Environmental Servicing Plan (MESP) for North Leslie (west of Leslie Street) was reviewed and approved in principle by TRCA staff on October 9, 2015.

120 Works proposed under the permit application include establishing the final grades for stormwater management pond (Pond D2) to service a portion of the approved plan of subdivision to treat stormwater prior to discharging to the adjacent natural heritage features, as established through the approved Master Environmental Servicing Plan, the Environmental Impact Study (EIS), the Environmental Management Plan (EMP), and the Functional Servicing and Stormwater Management reports. Adjacent significant natural features including Rouge River Tributary 2-1, wetland and floodplain have been protected through the provincial and the OMB approved secondary plan policies for the area, which includes a 30 metre buffer from all features. However, through further detailed design, it was determined that minor grading encroachments would be required to facilitate a stable grade transition to the natural heritage system (NHS). As such, in collaboration with the Town of Richmond Hill and TRCA senior staff, encroachments into the 30 metre buffer (which will be conveyed to the Town of Richmond Hill) have been accommodated for the maintenance access road around the pond (to be constructed with permeable paving and also is to be integrated into the overall trail network within the North Leslie Secondary Plan area). Furthermore, the Town of Richmond Hill Engineering staff have provided TRCA staff with an email confirming that design of Pond D2 is satisfactory to them, and a Town permit for its construction will be issued in the near future.

The final stormwater management pond design is consistent with the principles of the approved MESP, and a comprehensive monitoring plan and adaptive management plan has been completed to TRCA’s satisfaction. Staff reviewed the details associated with the outlet structure which includes the construction of a pocket wetland and infiltration swale to provide tertiary controls prior to discharge to the provincially significant wetland ( PSW) and Tributary 2-1. This wetland and infiltration channel is consistent with the approved MESP and provides water quantity and quality requirements to meet the Feature Based Water Balance calculations for the PSW and flow to Tributary 2-1. Staff are satisfied with the design, level of sediment and erosion controls, and the dissipation of discharge to the natural features subject to the enhanced planting and restoration plan. TRCA staff note that the Ministry of Natural Resources and Forestry (MNRF) Redside Dace construction timing window may apply to this proposal unless otherwise specified in writing by MNRF.

Control of Flooding: The proposed stormwater management pond is located outside of the Regional Storm Floodplain, however a portion of the outfall is located within the floodplain. TRCA staff have determined the proposed works are minor and will not adversely impact the storage and/or conveyance of flood waters. As such, staff do not anticipate any impacts related to flood control or flood conveyance as a result of the works.

Pollution: Appropriate sediment and erosion control measures have been installed as part of the Phase 1 and Phase 2 site alteration and grading plans, and will be maintained during this phase of construction. In addition, the Environmental Management Plan has been approved with a comprehensive monitoring plan to monitor the proposed works and their impact to the adjacent natural heritage features.

Dynamic Beaches: Not applicable

121 Erosion: As a result of the dynamic hydrogeological conditions within North Leslie, the site was required to import large volumes of fill (TRCA Permit C-170680) to raise the overall elevation of the site to ensure that all underground structures would be located outside of the groundwater table. The elevated developable areas of the site will be transitioned to the Natural Heritage System lands through geotechnically stabilized slopes ranging from 3:1 to 2:1, at the approval of the Town of Richmond Hill. Furthermore, a series of retaining walls will also be constructed to limit encroachments into the natural heritage system. These walls were designed by a structural engineer, and have been accepted by the Town of Richmond Hill. As such, TRCA staff are satisfied that the geotechnical and/or slope stability concerns associated with this application have been addressed to the satisfaction of the Town and the TRCA.

Conservation of Land: All disturbed areas are to be isolated from the natural heritage system with an approved sediment and erosion control plan, designed to the satisfaction of TRCA staff. No significant vegetation is proposed to be removed, and staff note that a permit is required from MOECC for the stormwater management pond. A further permit may be required from the Ministry of Natural Resources and Forestry (MNRF) with respect to the Redside Dace construction timing window of July 1 to September 15, unless otherwise specified in writing by MNRF.

Plantings The lands subject to this permit has been previously utilized as farm land. As such, no significant vegetation was removed. However, disturbed areas will be restored and stabilized in accordance with the approved comprehensive native, non-invasive enhancement planting plan submitted in support of this permit and draft plan. The planting plan includes all plantings to be implemented within the environmental buffer, all disturbed areas, and within the disturbed areas of the proposed outlet structure and pocket wetlands, consistent with TRCA planting guidelines and approved native seed mixes.

Policy Guidelines: This proposal is consistent with Section 8.4 - General Regulation Policies of the Living City Policies for Planning and Development in the Watersheds of the Toronto and Region Conservation Authority.

CFN: 56720 - Application #: 1028/16/RH Report Prepared by: Doris Cheng 5306 [email protected] For information contact: Quentin Hanchard 5324 [email protected] Date: December 12, 2017

122