Attachment 1 Summary of Procurements.Pdf

Total Page:16

File Type:pdf, Size:1020Kb

Attachment 1 Summary of Procurements.Pdf 1 Attachment 1 ‐ Summary of Procurements Highest Ranked Goods/Services Total Cost (Before Total TRCA Division Project Name Awarded Bidder Contract Cost Contingency Cost Responded Procured Revisions) Vendors (Responsible) Cost estimating services Shendale Drive Slope A.W. Hooker Restoration and for slope stabilization $24,930.00 $2,493.00 $27,423.00 6 2 Stabilization Associates Ltd. Infrastructure works. Core drilling services to drill and evaluate the New TRCA Administrative Aardvark Drilling viability of an $48,210.00 $4,821.00 $53,031.00 4 1 Corporate Services Building Inc. ATES/Open Loop geothermal system. Detailed management Natural Systems Climate recommendations, Change Adaptation in Peel Aecom Canada Ltd. $50,702.50 $5,070.25 $55,772.75 4 4 Policy and Planning policy framework, and Region case study illustrations. Professional services to Lotus Notes Support support the existing Appvision Inc. $45,500.00 $0.00 $45,500.00 3 3 Corporate Services Services Notes databases and applications. Rental of bypass Aqua‐Tech Restoration and Mud Creek‐ Reach 6 $24,780.00 $2,478.00 $27,258.00 9 4 pumping system. Dewatering Infrastructure Engineering services for detailed evaluation and Aquatic Design & Petticoat Creek Pools $53,500.00 $10,700.00 $64,200.00 17 1 Corporate Services review of the various Engineering aquatic elements. Supply and delivery of Bruce's Mill Conservation Armstrong bulk fuel and storage $29,322.00 $2,932.20 $32,254.20 3 3 Parks and Culture Park Petroleum tank rental. Fluvial geomorphic Rouge National Urban Park ‐engineering services for Beacon Restoration and $19,907.50 $1,990.75 $21,898.25 4 3 Whittamore Property assessment and project Environmental Infrastructure design. 2 Attachment 1 ‐ Summary of Procurements Highest Ranked Goods/Services Total Cost (Before Total TRCA Division Project Name Awarded Bidder Contract Cost Contingency Cost Responded Procured Revisions) Vendors (Responsible) Hydrogeological consulting services to evaluate installation of a New TRCA Administrative closed loop geo‐ Beatty Geothermal $37,000.00 $7,400.00 $44,400.00 6 1 Corporate Services Building exchange Consulting heating/cooling system vs. a aquifer thermal energy storage. Integrated Telecommunications and Telecommunications network connectivity Bell Canada $235,000.00 $23,500.00 $258,500.00 1 1 Corporate Services Infrastructure services Engineering services for Hadrian Drive and Summer Central Earth Restoration and slope stability and $47,295.00 $4,729.50 $52,024.50 8 8 Hill Gardens Engineering Inc. Infrastructure erosion risk assessment. Geotechnical investigation of the Central Earth Restoration and Home Smith Park Road $9,950.00 $1,492.50 $11,442.50 10 5 pavement strength for Engineering Inc. Infrastructure the use in design build. Consulting services for development of Delft‐ FEWS as the Decision Support System (DSS) for Flood Forecasting and Development and TRCA’s Flood Forecasting Deltares USA Inc $84,126.00 $12,618.90 $96,744.90 3 1 Warning Engineering Services and Warning program and a pilot SWMM hydrologic model for the Don River watershed. 3 Attachment 1 ‐ Summary of Procurements Highest Ranked Goods/Services Total Cost (Before Total TRCA Division Project Name Awarded Bidder Contract Cost Contingency Cost Responded Procured Revisions) Vendors (Responsible) Facilitation services to oversee two public Rockcliffe Flood information centres, and Dillon Consulting Development and Remediation $24,880.00 $4,976.00 $29,856.00 21 4 up to three community Limited Engineering Services Environmental Assessment liaison committee meetings. Modelling study of projected Electric Peel Region Electric Vehicle Education and Vehicle adoption by Dr. Hany Farag $25,000.00 $1,250.00 $26,250.00 6 2 Strategy Training residents and the impact on the electrical grid. Design/Build services for development of detailed Lower Humber Channel ‐ design of bank Dynex Construction Restoration and $522,095.00 $52,209.50 $574,304.50 3 1 Home Smith Park Weir stabilization and Inc. Infrastructure implementation of major maintenance works. Consulting services for analysis, geotechnical Ecosystem Restoration and Brandon Gate Park investigation and Recovery $50,905.00 $5,090.50 $55,995.50 6 3 Infrastructure detailed design for bank Incorporated stabilization. Stouffville Dam Concrete Engineering design Development and Fordes Engineering $34,973.00 $6,994.60 $41,967.60 33 3 and Emergency Spillway services for repairs. Engineering Services Engineering support to develop an engineered Hanlan's Point Boardwalk Restoration and stamped design package GHD Limited $69,424.91 $6,942.49 $76,367.40 8 2 Upgrade Infrastructure for a boardwalk replacement. 4 Attachment 1 ‐ Summary of Procurements Highest Ranked Goods/Services Total Cost (Before Total TRCA Division Project Name Awarded Bidder Contract Cost Contingency Cost Responded Procured Revisions) Vendors (Responsible) Coastal engineering services to develop Humber Bay Park West detailed designs for the Restoration and GHD Limited $123,419.00 $12,341.90 $135,760.90 21 5 Major Maintenance long‐term repair of Infrastructure failing erosion control structures. New TRCA Administrative Third party inspections Golder Associates $36,187.48 $13,000.00 $49,187.48 9 6 Corporate Services Building and testing services. Ltd. Assessment of the Humber River and Greck & Associates Restoration and Boyd Conservation Area engineered designs to $19,825.00 $1,982.50 $21,807.50 6 4 Ltd. Infrastructure address bank stabilization measures. Evaluation of alternative(s) and Locust Hill Drainage conceptual design Greck and Restoration and $15,980.00 $2,397.00 $18,377.00 14 14 Feasibility Study development for Associates Ltd. Infrastructure remedial drainage improvements. Engineering services to complete a fluvial Morningside Park Culvert Greck and Restoration and assessment, $37,065.00 $3,706.50 $40,771.50 4 2 Replacement Associates Ltd. Infrastructure geotechnical study, and design. Geotechnical engineering services to Toronto Island Park Flood conduct a sub‐surface Grounded Restoration and $98,686.23 $9,868.62 $108,554.85 5 2 Mitigation Project investigation and Engineering Inc. Infrastructure develop detailed designs. Integrated Goose Goose relocation Restoration and Canada Goose Relocation Management $19,000.00 $1,900.00 $20,900.00 3 1 services. Infrastructure Services 5 Attachment 1 ‐ Summary of Procurements Highest Ranked Goods/Services Total Cost (Before Total TRCA Division Project Name Awarded Bidder Contract Cost Contingency Cost Responded Procured Revisions) Vendors (Responsible) Research services, Peel Region Electric Vehicle Education and surveys of residents, by Ipsos $19,000.00 $950.00 $19,950.00 5 5 Strategy Training area municipality. Professional public relations and Meadoway kg&a $48,000.00 $19,200.00 $67,200.00 4 4 Corporate Services engagement services for a pop up event. Pre and post construction inspections Restoration and Bolton Berm KGS Group $49,987.00 $4,998.70 $54,985.70 8 2 and vibration Infrastructure monitoring. Fleet and staff parking New TRCA Administrative safetyd an security LEA Consulting Ltd. $11,800.00 $1,180.00 $12,980.00 3 1 Corporate Services Building review. Engineering consulting Scarborough Waterfront services for the detailed McIntosh Perry Project ‐ Brimley Road $238,474.00 $23,847.40 $262,321.40 4 4 Corporate Services design of a separated Limited South multi‐use trail. Midome 30, 32, 36 Rose Park Design/Build for slope Restoration and Construction $1,100,000.00 $110,000.00 $1,210,000.00 7 5 Crescent stabilization works. Infrastructure Services Ltd, Engineering consulting Rockcliffe Flood services to undertake a Morrison Development and Remediation riverine flood protection $1,716,000.00 $257,400.00 $1,973,400.00 26 4 Hershfield Limited Engineering Services Environmental Assessment EA and develop a flood protection plan. Community and Corporate Portable toilet and hand Restoration and Natures Call $15,000.00 $2,250.00 $17,250.00 3 3 Restoration Events washing stations. Infrastructure 6 Attachment 1 ‐ Summary of Procurements Highest Ranked Goods/Services Total Cost (Before Total TRCA Division Project Name Awarded Bidder Contract Cost Contingency Cost Responded Procured Revisions) Vendors (Responsible) Supply and delivery of Neil Vanderkruk Restoration and TRCA Native Plant Nursery aquatic plants in plug $24,417.50 $4,883.50 $29,301.00 5 3 Holdings Inc. Infrastructure format. Conceptual designs and Palmer Class Environmental Environmental Restoration and E.T. Seton Park $58,900.00 $5,890.00 $64,790.00 6 2 Assessment support Consulting Group Infrastructure services. Inc. Supply and delivery of Restorationd an TRCA Native Plant Nursery supplementary bare root Pineneedle Farms $35,985.00 $5,397.75 $41,382.75 6 4 Infrastructure plants. Supply and delivery of Restoration and TRCA Native Plant Nursery supplementary bare root Pineneedle Farms $39,871.00 $7,974.20 $47,845.20 6 5 Infrastructure liner plant stock. Conceptual design Planmac Restoration and Don Mills Road Staircase $10,015.00 $1,001.50 $11,016.50 9 1 development. Engineering Inc. Infrastructure Detailed design and construction Moore ‐ Heath Switchback Planmac Restorationd an administration of a $89,649.54 $8,964.95 $98,614.49 8 3 Trail Connection Engineering Inc. Infrastructure vegetated mechanically stabilized earth wall. Engineer stamped design Restoration and Governor's Bridge Lookout package for lookout Plant Architect Inc. $105,173.50 $10,517.35 $115,690.85 7 1 Infrastructure redesign . Caledon Canada Day Pyrotechnics display. Pyroworld
Recommended publications
  • Escribe Agenda Package
    Board of Directors Meeting #7/19 was held at TRCA Head Office, on Friday, July 26, 2019. The Chair, Jennifer Innis, called the meeting to order at 9:33 a.m. PRESENT Jennifer Innis Chair Paul Ainslie Member Kevin Ashe Member Shelley Carroll Member Ronald Chopowick Member Joanne Dies Member Jennifer Drake Member Paula Fletcher Member Jack Heath Vice-Chair Gord Highet Member Linda Jackson Member Heidi Karst Member Maria Kelleher Member Cynthia Lai Member Mike Layton Member Basudeb Mukherjee Member Michael Palleschi Member Steve Pellegrini Member Anthony Perruzza Member Gino Rosati Member Connie Tang Member ABSENT David Barrow Member Dipika Damerla Member Chris Fonseca Member James Pasternak Member Jason Runtas Member Rowena Santos Member Estair Van Wagner Member The Chair recited the Acknowledgement of Indigenous Territory. RES.#A140/19 - MINUTES OF MEETING #6/19, HELD ON JUNE 21, 2019 Moved by: Michael Palleschi Seconded by: Paula Fletcher THAT the Board of Directors approves the Minutes of Meeting #7/19, held on Friday, June 21, 2019. CARRIED Section I – Items for Board of Directors Action RES.#A141/19 - REQUEST TO DELEGATE PERMIT APPROVAL AND CANCELLATION OF AUGUST 9, 2019 EXECUTIVE COMMITTEE MEETING The August 9, 2019 Executive Committee is proposed to be cancelled. Staff request the Board of Directors to delegate approval authority of all permits in the entire jurisdiction originally scheduled for the August 9, 2019 meeting to staff. Moved by: Linda Jackson Seconded by: Steve Pellegrini WHEREAS as a matter of new business at the July
    [Show full text]
  • Toronto Field Naturalists 20 College St., Unit 4 Toronto, Ont
    TORONTO FIELD NATURALIST Number 422 October 1991 ✓. · -...___~ ~-::;:~=---~~ ..;~-~~-----· .... ~~✓w,~- Inside Amphibians & reptiles 8 Plants 5,14,17,2J,24,25 Birds 1,6,7,9,24,26-27 Reading 9- 10 Coming events 29 TFN - meetings 2 Don watershed 18-22,24 newsletter submissions 15 Invertebrates 6,13,15,23,25 outings 2,3-5 Issues 6,11-15,16,17,26-27 Weather 28 TFN 422 - 2 TFN MEETINGS Monday, October 7 - THE GEOLOGY OF WASTE: THE GARBAGE CRISIS IN ONTAR I O a t 8 pm an illustrated lecture by Dr. Nick Eyles from Scarborough College of the University of Toronto 155 College St. Dr. Eyles has done extensive research on the Scarborough bluffs and the Don Valley Brick Yard. He is an expert on ground water 6th floor auditorium -- a topic which we should all know roore about. It is only by understanding roore about the irovernent of water underground that we can avoid polluting our drinking water supplies when we locate garbage dumps in unsuitable places. Come and bring your friends with you to this ~rtant meeting. - from 7 IXl1 to 8 IXl1 TFN holds a social hour just outside the lecture auditorium - memberships and publications are for sale - a display of the art of Jean McGill Next Meeting: Monday, November 4, 1991 FOR ENJO YMENT OF TFN OUTINGS, REMEMBER THE FOLLOWING: free camera TTC RIDE GUIDE thermos or flask Metro map notebook &pen snack - Bring your family ~ keys and/or friends NO pets money TTC fare TO HELP PR OTECT THE NATURAL ENVIRONMENT, CONTACT THE FOLL OWING: air or wa ter pollution complaints: 424-3000 debris in valleys: 661-6600 TFN 422 - 3 TFNOUTINGS October Wednesday BES'IVIEW - nature walk East Don, North York Oct.
    [Show full text]
  • Attachment 1 Summary of Procurements.Pdf
    1 Attachment 1 ‐ Summary of Procurements Highest Ranked Goods/Services Contingency Total Cost (Before Total TRCA Division Project Name Awarded Bidder Contract Cost Responded Procured Cost Revisions) Vendors (Responsible) Engineering services for slope stability, erosion Eldorado Court, risk assessment, and Grandravine Drive and AECOM CANADA Restoration and alternative conceptual $225,489.00 $22,548.90 $248,037.90 11 5 Ladyshot Crescent, in the LTD. Infrastructure design for forty‐five (45) City of Toronto properties in the City of Toronto. Fill Quality Control, Site Decommissioning and 2019 laboratory Restoration and ALS Canada Ltd $49,300.00 $4,930.00 $54,230.00 4 3 Environmental Monitoring analytical services. Infrastructure Programs Professional engineering services for preliminary AMTEC Engineering Wiley Bridge design, detailed design $36,325.00 $5,448.75 $41,773.75 17 3 Corporate Services Ltd. and contract administration services. Pre‐construction and Upper Highland Creek Pan post‐construction CCTV Restoration and Andrews Engineer $33,274.00 $12,000.00 $45,274.00 12 1 Am Path Connection inspection services of Infrastructure sanitary infrastructure. Newtonbrook Creek Engineering services for AQUAFOR BEECH Restoration and Bridge Replacement Slope detailed designs for $35,800.00 $3,580.00 $39,380.00 7 2 LIMITED Infrastructure Stabilization Project slope stabilization. 2 Attachment 1 ‐ Summary of Procurements Highest Ranked Goods/Services Contingency Total Cost (Before Total TRCA Division Project Name Awarded Bidder Contract Cost Responded Procured Cost Revisions) Vendors (Responsible) Engineering services for Grey Abbey Ravine Slope AQUAFOR BEECH Restoration and development of detailed $59,160.00 $5,916.00 $65,076.00 5 1 Stabilization Project LIMITED Infrastructure designs.
    [Show full text]
  • Meeting #4/13
    Executive Committee Meeting #4/13 Chair: Gerri Lynn O'Connor Vice Chair: Maria Augimeri Members: Ben Cachola Ronald Chopowick Glenn De Baeremaeker Michael Di Biase Jack Heath Colleen Jordan Gloria Lindsay Luby Mike Mattos Jim Tovey Richard Whitehead June 7, 2013 11:00 A.M. FLAG ROOM, MIMICO CRUISING CLUB, 220 HUMBER BAY PARK RD. W., TORONTO, AGENDA EX1. MINUTES OF MEETING #3/13, HELD ON MAY 10, 2013 Minutes Summary Enclosed Herewith on PINK EX2. BUSINESS ARISING FROM THE MINUTES EX3. DISCLOSURE OF PECUNIARY INTEREST AND THE GENERAL NATURE THEREOF EX4. DELEGATIONS EX5. PRESENTATIONS EX6. CORRESPONDENCE 1 EX7. SECTION I - ITEMS FOR AUTHORITY ACTION EX7.1 GREENLANDS ACQUISITION PROJECT 2011-2015 Flood Plain and Conservation Component, Rouge River Watershed Geranium Homes (Ninth Line) Limited CFN 49273 28 EX7.2 GREENLANDS ACQUISITION PROJECT FOR 2011-2015 Flood Plain and Conservation Component, Humber River Watershed 3E Capital Inc. CFN 49284 31 EX7.3 REGIONAL MUNICIPALITY OF PEEL Conveyance of Land and a Permanent Easement for the Gore Road Widening , City of Brampton, Regional Municipality of Peel, Humber River Watershed CFN 49221 34 EX7.4 SWAN LAKE RESIDENCE RETROFIT AND RENOVATION PROJECT Tender PMO13-04 37 EX8. SECTION II - ITEMS FOR EXECUTIVE ACTION EX8.1 CANADA GREEN BUILDING COUNCIL GREATER TORONTO CHAPTER Continuation of Partnership Agreement 41 EX8.2 MUD CREEK REACH 5 PROJECT Contract RSD13-053 45 EX9. SECTION IV - ITEMS FOR THE INFORMATION OF THE BOARD EX10 ONTARIO REGULATION 166/06 PERMIT APPLICATIONS EX10.1 - EX10.6 ARE MAJOR APPLICATIONS Applications that involved a more complex suite of technical studies to demonstrate consistency with policies; applications that cover a significant geographic area (e.g.
    [Show full text]
  • The Toronto Ravines Study: 1977-2017 Long-Term Changes in the Biodiversity and Ecological Integrity of Toronto’S Ravines
    The Toronto Ravines Study: 1977-2017 Long-term Changes in the Biodiversity and Ecological Integrity of Toronto’s Ravines Eric Davies, Anqi Dong, Catherine Berka, Paul Scrivener, Dale Taylor, Sandy M Smith Faculty of Forestry, University of Toronto - July 2018 ACKNOWLEDGEMENTS This report would not have come into being without the work of the many individuals who dedicated endless volunteer hours to its realization. Our thanks to: The originators of the 1977 study, our co-authors Paul Scrivener and Dale Taylor, for sticking with the project over the past 40 years, and for getting it going again. Dale and Paul provided the team with a real-life example of ‘citizen science’ in action, and a generational timeline to the past. They made this project an adventure for all of us. Good stewardship of the land is a lifelong affair, and Dale and Paul have exemplified that commitment beyond all expectations. Esther McNeil for walking into the University of Toronto, Faculty of Forestry six years ago and asking: “How can I help save the Toronto ravines?” Esther inspired us to start working in the Toronto ravines, which ultimately led to this project, this report, and a renewed interest in ravine conservation. Catherine Berka for jumping with two feet into this project from day one, and for providing an endless source of positivity, leadership, humour, community outreach, and every day hard work. The project would simply not be what it is today without the heart and soul of our other co-author, Catherine. This project has benefited tremendously from the expertise, cooperation, and guidance of many people, especially in The City of Toronto, the Toronto and Region Conservation Authority, local nature groups, and countless citizens.
    [Show full text]
  • 2020 Erosion Risk Management Program Update Toronto And
    June 2, 2020 Sent via email SEE DISTRIBUTION LIST RE: 2020 Erosion Risk Management Program Update Toronto and Region Conservation Authority (TRCA) Board of Directors, at its meeting #3/20, held on April 24, 2020, adopted Resolution #A41/20 as follows: WHEREAS TRCA staff were requested by the Executive Committee at meeting #3/19 to provide more information regarding the positive impact that the Federal Disaster Mitigation & Adaptation Fund will have on TRCA’s plans for erosion mitigation work; IT IS RECOMMENDED THAT this staff report on TRCA’s Erosion Risk Management Program and the positive impacts of Federal Disaster Mitigation & Adaptation Fund and partner contributions be received; AND FURTHER THAT this report be circulated to TRCA’s municipal partners. The report and referenced resolution are attached to this letter and can also be accessed at the TRCA Board of Directors webpage. If you have any questions or require additional information, please contact Matthew Johnston at 416-661-6600 ext. 5525, [email protected]. Sincerely, Alisa Mahrova Clerk and Manager, Policy c: John MacKenzie, Chief Executive Officer, TRCA Moranne McDonnel, Director, Restoration and Infrastructure, TRCA Matthew Johnston, Senior Manager, Erosion Risk Management, TRCA Ashour Rehana, Manager, Capital and Special Projects, TRCA DISTRIBUTION LIST Alexander Harras, Manager, Legislative and Information Services /Deputy Clerk, Town of Ajax Amanda Fusco, Acting Town Clerk, Town of Caledon Christopher Raynor, Regional Clerk, Regional Municipality of York Debbie
    [Show full text]
  • Erosion Risk Management Program
    Item 8.6 Section III – Items for the Information of the Board TO: Chair and Members of the Board of Directors Meeting #3/20, Friday, April 24, 2020 FROM: Moranne McDonnell, Director, Restoration and Infrastructure RE: 2020 EROSION RISK MANAGEMENT PROGRAM UPDATE ____________________________________________________________________________ KEY ISSUE An information report regarding the Erosion Risk Management Program and related services and strategic updates from the Engineering Projects business unit of Restoration & Infrastructure. RECOMMENDATION WHEREAS TRCA staff were requested by the Executive Committee at meeting #3/19 to provide more information regarding the positive impact that the Federal Disaster Mitigation & Adaptation Fund will have on TRCA’s plans for erosion mitigation work; IT IS RECOMMENDED THAT this staff report on TRCA’s Erosion Risk Management Program and the positive impacts of Federal Disaster Mitigation & Adaptation Fund and partner contributions be received; AND FURTHER THAT this report be circulated to TRCA’s municipal partners. BACKGROUND Managing the risk associated with the natural hazards of flooding and erosion is one of the primary roles of conservation authorities under the Conservation Authorities Act. Toronto and Region Conservation Authority (TRCA) fulfills this role through the delivery of multiple natural resource management programs and services, including the Erosion Risk Management Program (ERMP). The ERMP focuses on the identification and remediation of shoreline and valley land erosion hazards throughout TRCA’s jurisdiction and encourages proactive prevention, protection, and management of erosion issues on private and public property. While many business units in TRCA work to prevent and address erosion impacts, the main business unit that manages erosion hazards is Engineering Projects (EP) which is organized under the Restoration and Infrastructure Division (R&I).
    [Show full text]
  • Capital Variance Report for the Twelve Months Ended December
    BU19.6 APPENDIX 5 Capital Dashboard by Program/Agency For the Period ended December 31, 2019 Table of Content Program/Agency Page # Community and Social Summary 2 Children's Services 3 Court Services 6 Economic Development & Culture 8 Seniors Services & Long­Term Care 11 Parks, Forestry & Recreation 13 Shelter, Support & Housing Administration 17 Toronto Employment & Social Services 20 Toronto Paramedic Services 22 Infrastructure and Development Summary 24 City Planning 25 Fire Services 27 Transportation Services 30 Waterfront Revitalization Initiative 35 Corporate Services Summary 38 311 Toronto 39 Facilities & Real Estate 41 Fleet Services 45 Technology Services 48 Finance and Treasury Summary 53 Financial Services 54 Other City Programs 57 Office of the Lobbyist Registrar 58 City Clerk's Office 60 Agencies Summary 63 Exhibition Place 64 TO Live 66 Toronto & Region Conservation Authority 68 Toronto Police Service 71 Toronto Public Health 76 Toronto Public Library 78 Toronto Zoo 81 Toronto Transit Commission 83 Yonge Dundas Square 87 Rate Supported Programs Summary 89 Solid Waste Management 90 Toronto Parking Authority 94 Toronto Water 97 2019 Capital Spending by Program Community and Social Services 2019 Expenditure Alert (Benchmark 2019 Approved YTD Year­End Trending 70% spending Cash Flow % at Year End Program Spending Projection rate) 4M 26.77 1.04 14.48 54.1% ⓎⓎⓎ Q2 22.28 1.64 14.48 65.0% ⓎⓎⓎ Children's Services Q3 22.33 3.05 8.12 36.4% ⓇⓇⓇ Q4 22.33 5.04 5.04 22.6% ⓇⓇⓇ 4M 0.06 0.00 0.06 100.0% ⒼⒼⒼ Q2 0.06 0.01 0.06 100.0% ⒼⒼⒼ
    [Show full text]
  • A History of 28 the Wa by Kim Tai T Have Shapedit Through Toront Surround and Run ROM Magazine Spring2011 and Mary Burridge Terways 2 O S S Pas Tha O O T T
    a History Of TO s H 2 O By Kim TaiT and mary Burridge The waTerways ThaT surround and run Through ToronTo have shaped iTs pasT Photos: TK Photos: 28 ROM Magazine Spring 2011 The name Toronto likely derives from the mohawk word Tkaronto, meaning “where there are trees standing in the water.” Fish-Market, Toronto, circa 1838. Modern reproduction of a hand-coloured engraving by W. H. Bartlett Photos: TK Photos: (1809–1854). ROM Magazine Spring 2011 29 or more Than Two cenTuries, an abundant supply of fresh water has fuelled Toronto’s growth and prosperity. The city’s many waterways have offered pleasurable places for recreation and abundant sources of fresh food, but they’ve also been the source of outbreaks of cholera and typhoid fever. In many ways, Toronto’s water has shaped the city we know today. Toronto’s six waterways—the Etobicoke, charge of guarding against future infectious diseases. But the city’s Mimico, Humber, and Don rivers, Highland numerous waterways made it particularly vulnerable to epidemics Creek, and the Rouge River—drain into Lake of water-borne illnesses and the board was not able to prevent Ontario along 157 kilometres of constantly outbreaks of typhoid fever in 1845 and 1847 and of cholera in 1849, changing shoreline. The first settlements in the 1854, and 1866. Toronto region, established by the Petun and In the early 1860s, before unsanitary water was discovered to be Neutrals, were strategically located near the the cause of the cholera outbreaks, Taddle Creek was dammed to mouths of the Humber and the Rouge.
    [Show full text]
  • Appendix A-4 Forks of the Thames EIS DRAFT
    Appendix A-4 Forks of the Thames EIS DRAFT ONE RIVER MASTER PLAN FORKS OF THE THAMES ENVIRONMENTAL IMPACT STUDY CITY OF LONDON THAMES RIVER Report Prepared for: JACOBS AND THE CITY OF LONDON Prepared by: MATRIX SOLUTIONS INC. Version 0.3 March 2019 Guelph, Ontario 7B- 650 Woodlawn Road West Guelph, Ontario N1K 1B8 T 519.772.3777 F 519.648.3168 www.matrix-solutions.com DRAFT ONE RIVER MASTER PLAN FORKS OF THE THAMES ENVIRONMENTAL IMPACT STUDY Report prepared for Jacobs and The City of London, March 2019 reviewed by Karen Reis, B.E.S. (Hons) Arnie Fausto, M.Sc. Ecologist Senior Ecologist contributor Martine Esraelian, B.Sc. Terrestrial Ecologist DISCLAIMER Information collected in the EIS may be used by the City of London to contribute to its programs as well as those of the Conservation Authorities, other member municipalities and the province. Matrix Solutions Inc. certifies that this report is accurate and complete and accords with the information available during the project. Information obtained during the project or provided by third parties is believed to be accurate but is not guaranteed. Matrix Solutions Inc. has exercised reasonable skill, care, and diligence in assessing the information obtained during the preparation of this report. This report was prepared for Jacobs and The City of London. The report may not be relied upon by any other person or entity without the written consent of Matrix Solutions Inc. and of Jacobs and The City of London. Any uses of this report by a third party, or any reliance on decisions made based on it, are the responsibility of that party.
    [Show full text]
  • Toronto's Natural Environment Trail Strategy
    Natural Environment Trail Strategy June 2013 City of Toronto Prepared by LEES+AssociatesLandscape Architects and Planners with ACKNOWLEDGMENTS The City of Toronto’s Natural Environment Trail Strategy is a product of over fifteen years of cumulative trail management experiences, outreach, stewardship and efforts by many groups and individuals. We would like to thank the following people who helped create, shape and inform the strategy in 2012: Natural Environment Trails Program Working Group Garth Armour Jennifer Kowalski Rob Mungham Michael Bender Scott Laver Brittany Reid Edward Fearon Roger Macklin Alex Shevchuk Norman DeFraeye Beth Mcewen Karen Sun Ruthanne Henry Brian Mercer Ed Waltos Natural Environment Trails Program Advisory Team Lorene Bodiam Jennifer Hyland Jane Scarffe Christina Bouchard Dennis Kovacsi William Snodgrass Susanne Burkhardt Sibel Sarper Jane Weninger Susan Hughes City of Toronto Teresa Bosco Jennifer Gibb Wendy Strickland Jack Brown Jim Hart Richard Ubbens Chris Clarke Janette Harvey Mike Voelker Chris Coltas Amy Lang Soraya Walker Jason Doyle Nancy Lowes Cara Webster Carlos Duran Cheryl Post Sean Wheldrake Jason Foss Kim Statham Alice Wong Councillor Mary Fragedakis Christine Speelman Toronto and Region Conservation Authority Adele Freeman Alexis Wood Adam Szaflarski Amy Thurston Keri McMahon Vince D’Elia Arlen Leeming Steven Joudrey Susan Robertson Natural Environment Trail Strategy Project Team Lees+Associates Azimuth Decarto Sustainable Trails The Planning Environmental Consulting, Ltd. Ltd. Partnership consulting,
    [Show full text]
  • MUD CREEK LOST RIVERS LOOP (Moore Ave., Milkmans Walane, Mount Pleasant, St
    MUD CREEK LOST RIVERS LOOP (Moore Ave., Milkmans WaLane, Mount Pleasant, St. l Clair k loop) Experience a walk along routes of three buried waterways, all hidden from public view decades ago in the interest of progress. Enjoy the natural serenity of living ponds on the former site of Toronto’s largest brick works, right in the heart of the city. Public Transit: Getting there; Saturday only 28A TTC Bus from Davisville Subway station. Free daily Evergreen shuttle bus from Broadview Subway For over 100 years, this the metal plate are some of the Lost station. 1 unique property was home to Rivers of the Don Watershed; The Getting home; Take the 28A TTC Bus back to Davisville Subway Station or return to the Don Valley Brick Works. The site large Exploring the Lower Don map Broadview Subway station via the Evergreen shuttle bus. was perfect for brick making, with a shows where you are in relation to the *Public transit routes and schedules are subject to change. Please check with provider. TTC Information: www.ttc.ca or 416-393-4636. Visit www.ebw.evergreen.ca for their shuttle bus schedule. quarry of clay and shale, access to lake. water from Mud Creek, and nearby Walk through the open- Parking: Paid parking available at Evergreen Brick Works. railroads for transportation. In 1989, 2 when brick production ended, the city, air building on your left, called The Pavilions, and out to the Terrace. Food and Washrooms: Available at Evergreen Brick Works. province, conservation authority and private donors purchased the property Until the early-1980s, this large area was an active quarry with a 40 meter Level of Difficulty/Accessibility: The trail varies from gravel, dirt to hard- to protect and restore the lands.
    [Show full text]